Fifteenth report of the State Highway Board of Georgia to the Governor and General Assembly of the State of Georgia for the fiscal years ending June 30, 1933 and June 30, 1934 [June 30, 1934]

FIFTEENTH REPORT
OF THE
STATE HIGHWAY BOARD OF GEORGIA
TO THE
GOVERNOR AND GENERAL ASSEMBLY
OF 'fHE
STATE OF GEORGIA
FOR THE
FISCAL YEARS ENDING JUNE 30, 1933 AND JUNE 30, 1934

CONTENTS
PART ONE- INTRODUCTORY, COMMENTS AND GENERAL INFORMATION.
PART TWO- FISCAL YEAR ENDING JUNE 30th, 1933
PART THREE- FISCAL YEAR ENDING JUNE 30th, 1934

PART ONE
INTRODUCTORY, COMMENTS AND GENERAL INFORMATION

To His ExcELLENCY, HoNORABLE EuGENE TALMADGE, GovERNOR oF GEORGIA, ATLANTA, GEORGIA. DEAR SIR:
In compliance with the law applying to the duties of the State Highway Board of Georgia, we are submitting to your Excellency for consideration, a report of the activities of the Board for the fiscal years ending June 30, 1933 and June 30, 1934.
The tables in this report give a comprehensive review of the activities of the State Highway Board for the two years covered in the report.
We wish to thank your Excellency for the splendid cooperation given us during our tenure of office.
Respectfully submitted, STATE HIGHWAY BOARD OF GEORGIA
ByW. E. WILBURN, Chairman, MAx L. MvRAE, Member, JoHN A. HEcK, Member,
7

STATE HIGHWAY BOARD OF GEORGIA
HISTORY OF STATE HIGHWAY BOARD MEMBERSHIP 1916 THROUGH JUNE 30, 1934
The State Highway Department of Georgia was created by Act of Legislature, August 16, 1916, and a Highway Commission was appointed composed of the three members of the Prison Commission, together with the State Geologist, the Dean of the College of Civil Engineering of the State University, and the Professor of Highway Engineering at the Georgia School of Technology.
The original Highway Commission consisted of the following members:
T. E. PATTERSON, Chairman, Member of Prison Commission.
E. L. RAINEY, Member of Prison Commission.
J. E. DAVIDSON, Member of Prison Commission.
S. W. McCALLIE, State Geologist. C. M. STRAHAN, Professor of Civil Engineering, State University. R. D. KNEALE, Professor of Civil Engineering, Georgia School of Technology.
The above Commission served until the reorganization of the Highway Department, by Act of Legislature approved August 18, 1919.
This Legislature of 1919 provided that the State Highway Department of Georgia reorganized and reconstructed should be managed and controlled by the State Highway Board, which should consist of three members appointed by the Governor, one from each of three divisions of the State and the boundaries of each division were named. The term of office of initial appointees to be two, four and six years, after which each new member to serve six years.
The Appointments to the newly reorganized State Highway Board and their successors with term of office follows:
8

Name of Member

Title

Appointed By I Term Began Term Ended I

Remarks

i~itial t~= ----- --------

C. M. Strahan __ _

Chairman___ Governor Dorsey ___ Sept. 1, 1919_ ,Dec. 31, 1921 I Expiration of

two year

Stanley S. Bennet_

Member _____ Governor Dorsey ___ Sept. 1, 1919_ Dec. 31, 1923_ Expiration of initial four year term.

R. C. Neely_

Member_ ____ Governor Dorsey ___ :Sept. 1, 1919_ Oct. 27, 1923_ Died in office.

John N. Holder

Chairman ___ Governor Hardwick'Jan. 1, 1922 __ June 2, 1929. Succeeded C. M. Strahan

W. T. Anderson

Member_ ____ Governor Walker_ __ Nov. 1, 1923 __ July, 1925_ __ Succeeded R. C. Neely.

Stanley S. Bennet

Member_ ____ Governor Walker_ __ Jan. 1, 1924 __ Dec. 31, 1929_ Reappointed.

John R. Phillips_

Member _____ Governor Walker ___ Aug. 1925 ____ Dec. 31, 1933_ Succeeded W. T. Anderson

Sam Tate __

Chairman ___ Governor Hardman June 4, 1929_ April 1, 1930_ Succeeded John N. Holder.

W. C. Vereen _

Member ____ Governor Hardman Jan. 1, 1930__ June19, 1933 Succeeded Stanley S. Bennet.

J. W. Barnett __ _

Chairman_ _ Governor Hardman April 1, 1930_ June 19, 1933_ Succeeded Sam Tate.

J. P. Wilhoit_

Member ____ !Governor RusselL_ Jan. 1, 1932 __ June 19, 1933_ Succeeded John R. Phillips.

J.P. Wilhoit __

Officer in

<0

Charge ____ Governor Talmadge June 19, 1933_ July 20, 1933. Appointed officer in charge.

J. J. Mangham_

Chairman ___ Governor Talmadge July 20, 1933_ Nov. 21, 1933_ Succeeded J. W. Barnett.

W. E. Wilburn_

Member_ ____ Governor Talmadge July 20, 1933_ Nov. 21, 1933_ Succeeded J.P. Wilhoit.

Max L. McRae

Member_ ____ Governor Talmadge July 20, 1933_ Still in office_ Succeeded W. C. Vereen.

W. E. Wilburn_

Chairman___ Governor Talmadge Nov. 21, 1933_ Still in office_ Appointed Chairman.

John A. Heck_

Member_ ____ Governor Talmadge Nov. 21, 1933_ Dec. 31, 1933_ Succeeded J. J. Mangham.

John A. Heck

Member____ Governor Talmadge Jan. 1, 1934 __ Still in office_ Reappointed to full term.

OFFICIALS AND PERSONNEL OF THE STATE HIGHWAY DEPARTMENT CORRECTED PRIOR TO PUBLICATION
- - - - - - - --~-~--

Name

,

Title

I Location

W. E. Wilburn __ Max L. McRae John A. Heck __ F. P. Vanstory.

Ichairman, State Highway Board . _!Atlanta
Member, State Highway Board .. __ -/McRae
!Member, State Highway Board_. __ 1Marietta
1
lse~~~~Ka~Zr~asurer, s~ate High- A1 tlanta

B.S. Miller.... _

Assistant Attorney-General

Atlanta

H. E. Newton __ ___ State Highway Engineer. __ ____ Atlanta

E. N. Seymour__

Office Engineer __ ..

__Atlanta

C. N. Crocker.____ !Bridge Engineer. __

_Atlanta

Geo. C. Blount____ __,Maintenance Engineer_

___ Atlanta

W. J. Clarke __________ Locating Engineer _______ _ ____ Atlanta

J. E. Boyd____________ Testing and Research Engineer. __ Atlanta

H. G. Smith ___________ First Division Engineer. ___ ____ Fitzgerald

E. Jack Smith ______ Second Division Engineer _______ Macon

L. J. Bahin_ _____ __Third Division Engineer

__ East Point

S.D. Grant_ ________ Purchasing Agent_______________ Atlanta

10

STATE

HIGHWAY BOARD OF
ORGANIZATION CHART
APRIL 7 I~

GEORGIA

CH.M'1'3 $. (All A!I!IT.S

ACCOUNTING
The section of this Annual Report devoted to statements from the Treasurer reflects the financial condition and activities of the State Highway Board for the fiscal years July 1, 1932 to June 30, 1933 and July 1, 1933 to June 30, 1934. The fiscal year ended June 30, 1933, is included in Part Two, and the fiscal year ended June 30, 1934, is included in Part Three. Each section is composed of separate Exhibits and Schedules for the year.
The financial condition of the State Highway Board, at the close of the fiscal year, is reflected in Exhibit "A," Statement of Assets and Liabilities. A Reconciliation of the Fund Surplus, reflecting Fund Revenues, Appropriations, and Allotments is given in Exhibit "B." Exhibit "C" reflects Revenue Receipts and Expense Disbursements. Exhibit "D" in Part No. 3 is a Comparative Statement of Revenue Receipts and Expense Disbursements for fiscal years ended June 30, 1931, 1932, 1933, 1934. These Exhibits are supported by various Schedules, which analyze the financial results for the fiscal years.

EXHIBIT "A" STATEMENT OF ASSETS AND LIABILITIES-
FUND BALANCES CURRENT ACCOUNT POSITION
A comparative summary of the current financial condition at June 30, 1934, as compared with June 30, 1933 and June 30, 1932, is presented as follows:

Description

June 30,
I 1932

June 30,
I 1933

June 30, 1934

ASSETS

DCeufrerrernetdAAsssseettss-_-_-_-_-_-_-

$1,576,425.25 261,357.05

$1,398,188.54 179,837.64

$5,441,282.67 197,422.80

I
TOTAL ___________ $1,8~,782.30 ~,.!>~~26.1~1~~~fi;~=

LIABILITIES &
RESERVES Current Liabilities ___ $ 106,604.86 $ 103,499.09 Fund Balances _______ 6,002,407.98 3,867,400.50 Reserves______________ 1 899,442.67 568,680.04

TOTAL _______ ---1$7,008,455.51 $4,539,579.63

I FUND SURPLUS (OR)

DEFICIT Current Deficit

___ -~5,170,673.21

2,961,553.45

Current Surplus __

$ 750,600.00 3,555,701.97
379,042.60 $4,685,344.57
953,360.90

TOTAL

----1$1,_37,782.30 1$1,578,026.18 I $5,63~'7'()~47_

- - - - - - - - - - - - =-===t=====~----

12

Particular attention is directed to the current surplus of $953,360.90 on June 30, 1934, as compared with a current deficit of $2,961,553.45 on June 30, 1933, and a current deficit of $5,170,673.21 onJune30, 1932.
The surplus or deficit balance at the close of the fiscal year constitutes State funds and is exclusive of the available balance of unallotted Federal funds. The available Federal funds (representing funds against which contracts had not been let) on June 30, 1934, amounted to $3,540,810.36 as compared with $250,885.34 on June 30, 1933, and $1,985,086.36 on June 30, 1932.
In arriving at the current surplus or deficit at the close of a fiscal year provision is made not only for all actual liabilities; but also, for contractual obligations not yet matured, including outstanding purchase orders, balances of specific allotments for State force work, and sundry reserves. Consideration is given to amounts due from participating agencies only when corresponding contract is let and liability accrued. A surplus acts as an enhancement to the revenue for the succeeding year; whereas, a deficit is forwarded to the succeeding year as an incumbrance.

CAPITAL ACCOUNT POSITION

Capital assets, liabilities and surplus are shown in a separate section of Exhibit "A" and are not considered in the current financial position. The capital account items as of June 30, 1934, are summarized as follows:

Description

June 30, 1934.

CAPITAL ASSETS Land, Buildings and Equipment _____________ $ 1,556,925.25 Roads and Bridges Construction cost to date__________________ 132,374,638.70
Total Assets ______________________________ $~3, 931 ,563.~

CAPITAL LIABILITIES Highway Refunding Certificates ______________ $ 26,637,282.87
CAPITAL SURPLUS Surplus Invested in Plant and Equipment_ __ $ 1,556,925.25 Surplus Invested in Highways_______________ 105,737,355.83 Total Surplus ___________________________ $107,294,281.08
Total Liabilities & Surplus _______ _

13

Fixed Assets, representing land, buildings, and equipment, are appraised at the close of each fiscal year and their values adjusted through Surplus Invested in Plant and Equipment. Additions and replacements during the year are charged as an expense disbursement but capitalized at the close of the fiscal year and credited to Surplus Invested in Plant and Equipment.
Roads and Bridges, construction cost to date, represents total expenditures since the beginning of the State Highway Board of Georgia. During the fiscal years ended June 30, 1933 and June 30, 1934, construction cost to date was increased in the amount of $20,242,953.96 as follows:

Roads & Bridges, construction

Cost to June 30, 1932__

________________ $112,131,684.74

Construction Expenditures

Fisca1year ended June 30, 1933 _____________ $ 11,369,631.60

Fiscal year ended June 30, 1934___

8,873,322.36

$ 20,242,953.96

Roads & Bridges, construction cost to June 30, 1934 ____ _

State of Georgia, Highway Department Refunding Certificates have been issued in accordance with the provisions of an Act of the General Assembly of Georgia, approved March 1, 1933, and as amended by another Act approved March 22, 1933. These certificates are for the purpose of refunding to the several counties of this State and the Coastal Highway District, funds advanced for construction of roads on the State Highway System, under the supervision of the State Highway Department prior to September 1, 1931. Ten per cent of the amount owing is due and payable on March 25, 1936, and each year thereafter for ten years. The certificates are transferable but non-interest bearing.
The original issue of certificates amounted to $26,516,763.29. Supplementary certificates in the amount of $120,519.58 were issued to Richmond County in accordance with an order from the Judge of the Clarke Superior Court on December 14, 1933. The total outstanding certificates on June 30, 1934, amounted to $26,637,282.87 as shown in Schedule No.5.
Capital surplus which is a contra to accounts with property has been split into two amounts; namely, Surplus Invested in Plant and Equipment, $1,556,925.25, and Surplus Invested in Highways, $105,737,355.83. Capital Surplus represents the amount from revenues invested in property and should not be confused with the current surplus, which is essentially a surplus of money, having to do with cash or with resources expected to become cash, such as accounts receivable and similar items.

14

EXHIBIT "B"
RECONCILIATION OF FUND SURPLUS (OR) DEFICIT
This exhibit reconciles the Fund Surplus or Deficit at the beginning of the year with the Fund Surplus or Deficit at the close of the year, and thereby reflects the Fund Revenue as accrued, Appropriations, Allotments, and Reserves.

EXHIBIT "C" STATEMENT OF REVENUE RECEIPTS AND EXPENSE
DISBURSEMENTS REVENUE RECEIPTS
A comparative summary with relative percentages as taken from Exhibit "C," of the Revenue Receipts for fiscal years ended June 30, 1933 and June 30, 1934, is presented as follows:

Do"rtptlon

Year Ended

Year Ended

1 1

June 30, 1933

June 30, 1934

.I roe~;~ :1-~~~unt -~\ ro~~r~_i - ~moun~~

REVENUE

I

'

RECEIPTS State Treasurer

-II

I 1

I

62.38% !'$ 8,906,992.771

'I
70.94% $10,012,623.15

Counties, Cities I

&Railroads ______ 02.02 . 289,103.33 00.29 , 40,465.04

Federa1Government 35.47 I 5,065,020.341 28.68 : 4,048,503.74

Miscellaneous Income .. _ TOTAL...

[

I

i

i

1 00.13

18,852.02 00.09 'I

12,244.63

.l100_.()llf'~I~!..~!!;9_E>S~!!l _1()().Q_%_1!1!'c~E~_E3_3~~

STATE FUNDS

Revenue Receipts from State funds are entered on the records

when credit is passed to the State Highway Board of Georgia by the State Auditor and not when the funds arc remitted on executive warrant. This revenue therefore represents the State Highway Board's pro-rata share of collections as made by the State Treasurer and includes at all times the unremitted balance of State funds due to the State Highway Board of Georgia.
An analysis of State funds is as follows:

Description

Year Ended June 30, 1933

Year Ended June 30, 1934

Motor Vehicle Fees___ ____ $1,120,670.19

Gasoline Taxes_________

7, 786,322.58

$ 1,233,125.52 8,779,497.63

TOTAL

__ $_13_,_(J(l~, ()!")~~'7'_7

:Bl~1;~~:3_.~

15

Motor Vehicle Fees represent collections from motor vehicle license tags and common carrier mileage and license fees; as credited to the State Highway Board of Georgia. 'fhese credits reflect an increase for the year ended in 1934 as compared with the year ended in 1933 of $112,455.33.
Gasoline 'faxes represent the State Highway Board's pro-rata share of collections under the Fuel Oil Tax Law. These credits reflect an increase for the year ended in 1934 as compared with the year ended in 1933 of $993,175.OS.

COUNTIES, CITIES AND RAILROADS

Revenue receipts from this source are analyzed as follows:

Description

Year Ended June 30, 1933

Year Ended June 30, 1934

Counties ___ _ Cities ________ _
Railroads ___ _

$276,143.27 4,733.08 8,226.98

$24,935.82 320.00
15,209.22

TOTAL_____ _

$289' 103.33

$40,465.04
- - - - - - -- -- -- - - - - - - -

Revenue receipts from counties represent contract credits and adjustments to county cash participation, on construction contracts executed prior to September 1, 1931. Reimbursement certificates covering these credits and adjustments were issued prior to March 1, 1933, and therefore included under the amount set up in the Act of the General Assembly of Georgia, approved March 1, 1933.
Revenue receipts from cities represent contributions in connection with construction work; whereas, receipts from railroads reflect their participation in the elimination of grade crossings.

FEDERAL GOVERNMENT

Revenue receipts from the Federal Government are analyzed

as follows:

Description

Year Ended June 30, 1933

Year Ended June 30, 1934

Federal Aid Vouchers________ $5,065,020.34 National Recovery Vouchers __

$1,139,345.52 2' 909' 158.22

TOTAL___________________ ~_,_()65,0~~!_-

$4,04~_._1i~24

Federal funds allotted to the State Highway Board of Georgia are considered under revenue receipts only as expenditures on Federal projects are made and the corresponding reimbursement vouchers are forwarded for collection to the Bureau of Public Roads.

16

Appropriations of Federal funds are recorded on the records as Estimated ReYenue when notice of apportionme:1t is received from the Bureau of Public Roads. During the fiscal year 1933 there was an emergency apportionment by the Federal Government in the amount of $3,123,298.00 and during the fiscal year 1934 a ~ational Recovery apportionment of $10:091,185.00.
A reconciliation of unallotted balances, Federal funds, is as follows:

Description

Year Ended June 30, 1933

Year Ended June 30, 1934

Unallotted Balance beginning of year _

-- $1,985,086.36

$ 250,885.34

Federal Apportionments Federal Emergency Funds National Recovery Funds
TOTAL_ _ Allotted to Projects_

3,123,298.00
-- $5,108,384.36 4,857,499.02

10,091,185.00
$10,342,070.34 6,801,259.98

Unallotted Balance end of year __ _

$ 250,885.34

The unallotted balance is dropped at the close of the fiscal vear with the elimination of estimated reYenues which haye not been realized; however, it is included and recorded in the succeeding year as part of the estimated revenue for that year.

As contracts are let the Federal funds specifically allotted to the projects are recorded as Construction Estimated Participation. Reimbursement vouchers are credited and the balances adjusted to actual participation upon completion of the projects.

A reconciliation of the estimated participation accounts, Federal funds, is as follows:

Description

Year Ended June 30, 1933

Year Ended June 30, 1934

Estimated Participation beginning of year ____ _
Allotted to Projects _
TOTAL ______ _ Reimbursement vouchers __ _

- $1,310,482.87 4,857,499.02
$6' 167' 981.89 5,065,020.34

$1 '102' 961.55 6,801,259.98
$7,904,221.53 4,048,503.74

Estimated Participation end of year __ _

$1 '102' 961.55

--

-

$3,855,717.79

17

The estimated participation balances on June 30th are shown in Exhibit "A" as a deduction from contractual obligations on Federal projects. This reduces the contractual obligations to a net State liability.
Federal funds apportioned to the State Highway Board of Georgia since the beginning of the Department are as follows:

Regular_____ National Recovery_ ____ Emergency Advance___ Emergency ______ Flood Relief National Forestry _

____ $33,759,273.80
10,091, 185.00
2,077,996.00 3,123,298.00
505 , 167 . 50
7l ,031.84

TOTAL_

The second National Recovery apportionment in the amount of $5,113,491.00 for fiscal year 1935 has not been included in the foregoing figures.

MISCELLANEOUS INCOME
Represents revenue receipts from sundry and miscellaneous sources in the amount of $18,852.02 for fiscal year 1933 and $12,244.63 for fiscal year 1934.

EXPENSE DISBURSEMENTS
A comparative summary with relative percentages as taken from Exhibit "C", of the Expense Disbursements for fiscal years ended June 30, 1933 and June 30, 1934, are as follows:

Description

Year Ended June 30, 1933

Percent to Total

Amount

Year Ended June 30, 1934

Percent to Total

Amount

EXPENSE DIS-

1

BURSEMENTS

Administration __

C o n s t r u c t i o n __

Maintenance_

Land,Bldgs.& Equipt

Legislative Transfers

03.21% 79.09 09.62 00.45 07.63

$ 466,957.07 ll,496,948.04 1,399,327.47 64,477.08 1,108,909.15

02.79% $ 298,666.02

84.26 9,016,229.07

11.19 1' 197,088.11

01.25

133,906.93*

00.51

54,368.05

TOTAL ____ _1~~_y"=ri!l.'!-.~6. 618.81 100.00% $10,700,258.18

*Includes equipment overhauls in the amount of $37,064.64.

Comments upon the various expense classifications are next in order as they appear in the foregoing summary; followed by a summary of disbursements classified as to administrative and supervisory charges, direct charges and transfers.

18

ADMINISTRATION
Administration is the function of management or direction and consists of the general planning, the establishing of policies, the issuance of orders and instructions, and the control of the forces and work which they are doing, both in the general office and the division offices.

Administration disbursements are analyzed as follows:

Description

Year Ended June 30, 1933

Year Ended June 30, 1934

General Administration General Offiice
Division Offices_
Warehouse __ _

- $294,317.75 66,853.16 18,298.48

TOTAL _______ _

-- $379,469.39

Research __

--- --- - 7,103.81

Collection of Revenue

79,507.38

Quarry_

876.49

TOTAL

$466,957.07

$200,819.7 4 39,104.74 13,509.19
$253,433.67 2,480.03
41,812.11 940.21
$298,666.02

'l'hese figures reflect a decrease or savings in Administration cost for fiscal year 1934 as compared with 1933 of $168,291.05.
The Administration cost for fiscal year 1933 as expressed in percentage to total disbursements is 03.21%; whereas, for 1934 the percentage is 02.79% or a decrease in percentage to total disbursements of 00.42%.
The percentage comparison does not reflect as great a decrease as in actual dollars, because of a decrease in total disbursements for 1934; however, it does reveal a cut in Administration cost in a greater proportion than the decrease in total disbursements. An examination of past years shows that a decrease in total disbursements has caused an increase in Administration percentage to total disbursements, rather than a decrease as reflected for fiscal year 1934.
A detail analysis of Administration disbursements may be found in Schedules No. 8-A and No. 10-A,

19

CONSTRUCTION

Construction disbursements arc analyzed as follows:

Description

Year Ended June 30, 1933

Year Ended June 30, 1934

Surveys Actual Surveys Plans _____ _

- $ 63,894.45 63,421.99

$ 71,670.68 71,236.03

TOTALS

_$ 127,316.44

$ 142,906.71

Construction Supervision Direct .. _

_$ 672,861.64 10,696,769.96

$ 392 ,117. 74 8,481,204.62

TOTALS __ _

$11,369,631.60

$8,873,322.36

TOTALS _

$11,496,948.04

=$9=.0=16=.2=29=.0=7

Survey disbursements represent a preliminary construction cost. 'fhese charges are presented so as to show the cost of actual surveys conducted in the field separate from the cost of plans prepared in the General Office.

The ratio of cost of plans to actual surveys is practically the same for the two years.

A detail analysis of Survey disbursements may be found in Schedules No. 8-B and No. 10-C.
Actual Construction disbursements are separated into two classes; namely, supervision charges and direct charges.
Supervision is the function of engineering and inspection and consists of furnishing inspection while the work is in progress, testing materials, preparing monthly statements and reports, and such other operations of a strictly engineering nature.
Direct is the function of actual building costs for roads and bridges and consists of contractual payments, and in the case of work done by State forces, the furnishing of labor, materials, supplies, etc., used in the work.
An examination of the foregoing summary reveals a decrease or savings in Construction supervision cost for fiscal ye'lr 1934 as compared with 1933 of $280,743.90.
Supervision cost for fiscal year 1933 as expressed in percentage to Construction direct disbursements is 06.29%; whereas, for 1934 the percentage is 04.62% or a decrease in percentage to total direct disbursements of 01.67%.
A statement of Construction allotments (representing estimated cost of work let to contract or begun by State Forces) rather than Construction disbursements more clearly presents the construction activities in the fiscal year 1934, as the work placed under construction greatly exceeds the disbursements for same. The

20

unexpended balance of course being represented by contractual obligations on June 30, 1934, as shown in Exhibit "A."
The Construction allotments for the fiscal year 1933 were $7,848,586.03 as compared with Construction disbursements of $11,369,631.60. The Construction allotments for the fiscal year 1934 were $11,312,809.36 as compared with Construction disbursements of $8,873,322.36.
A summary of Construction balances, allotments and disbursements are as follows:

Description

Year Ended June 30, 1933

Year Ended June 30, 1934

Unexpended Balances, beginning of year __

$ 8,146,338.87

$ 4,720,037.39

Construction Allotments.

7,848,586.03

ll ,312, 809.36

TOTAL ____ _

. __ $15,994,924.90

$16,032,846.75

Construction Disbursements ____$11, 369,631.60

$ 8, 873,322.36

Unliquidated Encumbrances__

94,744.09 Or.

7,179.50

TOTAL_ ______ _

$11,274,887.51

$ 8,880,501.86

Unexpended Balances end of Year. _________ _

__ $ 4,720,037.39

$ 7,152,344.89
=----=====

A detail analysis of Construction disbursements may be found in Schedules No. 8-B, No. 10-B and No. 12.

MAINTENANCE

Maintenance disbursements are analyzed as follows:

Description

Year Ended June 30, 1933

Year Ended June 30, 1934

General
Supervision Direct__

$ 82,674.30 1, 306,631.06

$ 79,507.15 1, 051,282.24

TOTALS __

- $1,389,305.36

$1,130,789.39

Reconstruction Supervision __ Direct _______ _
TOTALS
TOTALS_

-- $ 10,022 .ll $ 10,022.11

$

143.39

66,155.33

$ 66,298.72

21

1\faintenance disbursements are divided into two sub-activities; namely, General Maintenance and Reconstruction.
General Maintenance represents the ordinary or routine maintenance work; whereas, Reconstruction represents extraordinary maintenance of a reconstruction nature, which can be properly allocated and charg-ed to a particular project. There is very little distinction between these two sub-activities as both reflect disbursements necessary in keeping each type of roadway, structures and facilities in a usable condition.
Maintenance disbursements are also separated as to supervision charges and direct charges. These two functions are the same as commented upon under Construction disbursements.
An examination of the foregoing summary reveals a decrease or savings in Maintenance supervision for fiscal year 1934 as compared with 1933 of $3,023.76.
Total Maintenance disbursements for fiscal year 1934 of $1,197,088.11 compared with total disbursement for 1933 of $1,399,327.47 reflect a reduction of $202,239.36; and when compared with fiscal year 1932 in the amount of $2,130,327.77 a reduction of $933,239.66.
A detail analysis of Maintenance disbursements may be found in Schedules No. 8-C, No. 10-D and No. 10-E.

LAND, BUILDINGS AND EQUIPMENT

Land, Buildings and Equipment disbursements are as follows:

Description

Year Ended June 30, 1933

Year Ended June 30, 1934

Land, Buildings & Equipment NewEquipment__ __________
Major Overhauls, Charged as Equipment-1934

$64,477.08

$96,842.29 37,064.64

TOTALS _

$64,477.08
=====-------=

~~3.f!~~=

Disbursements represent the purchase of necessary equipment replacements and also, for the fiscal year 1934, the cost of rebuilding by the Central Shop certain major equipment in use by the State Force outfits. This work put under way in 1933.
A detail analysis of Land, Buildings and Equipment disbursements, classified as to detail object of expenditure and function to which assigned, may be found in Schedule No. 8-D.

22

LEGISLATIVE TRANSFERS

Legislative Transfers are analyzed as follows:

Description

Year Ended June 30, 1933

Year Ended June 30, 1934

W. & A. Rental Warrants Prison Farm Purchase~~~~ Motor Vehicle License Tags~~

$1,080,000.00 5,118.76
23,790.39

$ 2,719.85 51,648.20

TOTAL

~ !1~~. 9Qfl,2~

$ 54,368.05
~------

Disbursements classified as W. & A. Rental Warrants, in the

amount of $1 ,080,000.00, represent Western and Atlantic Rail-

road Rental Assignment Warrants purchased at face value by

the State Highway Board of Georgia; in accordance with the

provisions of an Act of the General Assembly of Georgia in 1931.

Similar disbursement in the amount of $540,000.00 was made

during the fiscal year 1932.

W. & A. Rental Warrants purchased by the State Highway

Board of Georgia total $1,620,000.00 and are due monthly from

January 1, 1941 to December 1, 1943, inclusive, in the amount

of $45,000.00.

The Act provides that the Governor and the State Highway

Board are authorized to sell the warrants to match regular Federal

Aid or any emergency fund which might be offered the State High-

way Board by the Federal Government.

The warrants have not been discounted by the State Highway

Board of Georgia.

Disbursements classified as Prison Farm Purchase represent

payments made in accordance with the provisions of an Act of

the General Assembly in 1931. This Act made available the

amount of $200,000.00, from any funds allocated to the State

Highway Board of Georgia, for the purpose of buying lands and

equipping a prison farm. The fund to be expended when the

same might be necessary in the judgment of the Prison Commis-

sion of Georgia and concurred in by the Governor.

When requested by the Prison Commission, transfers of funds

are made to them from this allocation of $200,000.00. Disburse-

ments to June 30, 1934, are as follows:

Description

Amount

Allocation of funds, in accordance with Act

$200,000.00

Transfers of funds to Prison Commission For Fiscal Year 1931 ___ .
For Fiscal Year 1932_ For Fiscal Year 1933_ __ ~ For Fiscal Year 1934 ~ ~ ~ ___ ~ __

$ 2,109.80 124,186.93 5,118.76 2,719.85

TOTAL.-----------~ __ ~--~-----

~~-- $134,135.34

Unexpended balance, June 30, 1934___________ ~ ____~~5, ~~~~

23

The unexpended balance is carried in Exhibit "A" as a Fund balance.
Disbursements classified as Motor Vehicle License Tags represent transfers of funds to the Prison Commission and Revenue Commission to cover the cost of tags, and is in accordance with the provisions of an Act of the General Assembly. The payments amounted to $23,790.39 for fiscal year 1933 and $51,648.20 for fiscal year 1934.

EXPENSE DISBURSEMENTS CLASSIFIED AS TO ADMINISTRATIVE-SUPERVISORY CHARGES, DIRECT CHARGES, AND TRANSFERS

The total disbursements have been divided into the five general

lines of actiYity as shown in the foregoing comments and stated

as follows:

(I) Administration

(2) Construction

(3) Maintenance

(4) Land, Buildings and Equipment

(5) Legislative Transfers

The first three of these general lines of activity include both

direct, and administrative-supervisory charges. The latter is

composed of Administration, Construction Supervision and Main-

tenance Supervision.

A summary of disbursements, classified as to administrative-

supervisory charges, direct charges, and transfers is given as

follows:

Year Ended

Year Ended

June 30, 1933

June 30, 1934

Description

Amount

Amount

ADMINISTRATIVE- -SUPERVISORY CHARGES
Administration __
Construction Supervision Maintenance Supervision

$ 466,957.07 672,861.64 82,674.30

$ 298,666.02 392,117.74 79,650.54

TOTAL

- $ 1,222,493.01

$ 770,434.30

DIRECT CHARGES Surveys __ Construction __ Maintenance_ Land, Bldgs., & Equipt.

$ 127,316.44 10,696,769.96 1,316,653.17
64,477.08

$ 142,906.71 8,481,204.62 1,117,437.57 133,906.93*

TOTAL _

$12,205,216.65

$ 9,875,455.83

LEGISLATIVE TRANSFERS

Legislative Transfers_

$ 1,108,909.15

$ 54,368.05

Total Disbursements

$14,536,618.81

$10' 700' 258.18

*Includes equipment overhauls in the amount of $37,064.64.

24

These figures reflect administrative-supervisory charges for fiscal year 1933 of $1,222,493.01 as compared with corresponding charges for fiscal year 1934 of $770,434.30. This difference represents a savings in administrative-supervisory cost of $452,058.71 or as expressed in percentage a decrease of 36.98%.
The total direct charges, exclusive of l.egislative 'fransfers, for the fiscal year 1933 amounted to $12,205,216.65 as compared with $9,875,455.83 for fiscal year 1934. This difference represents a decrease in direct charges of $2,329,760.82 or as expressed in percentage a decrease of 19.09%.
The savings in administratin-supervisory cost is partially accounted for by the decrease in total direct charges, but the percentage reduction of 36.98% in the former as compared with 19.09% in the latter shows a decided savings in administrativesupervisory cost per dollar disbursed for direct charges.
GENERAL
A modern budgetary control system was installed in 1930 when all accounting was centralized in the General Office.
Under this Budget System, the accounts in the Treasurer's Office are not limited to the actual assets and liabilities, but include resources in the form of unearned estimated revenue for the fiscal year; likewise, other obligations in the form of appropriations of these revenues, specific allotments of the appropriations and encumbrances of the allotments.
The accounts representing unrealized fund resources and the commitments of these resources are known as "Fund" accounts. These fund or budget accounts are necessary as the activities of the State Highway Board are carried on in accordance with limitations and estimates set up in the Budget.
A Balance Sheet and correlative statements arc prepared monthly from the accounts. These financial statements are of great value as they reflect the exact financial condition on their respective dates; also, the budget position for the balance of the fiscal year.
All transactions affecting allotments, accounts payable, and disbursements, are recorded. By the use of collating forms several records are prepared in one operation and at the same time all account balances are automatically computed and all columns automatically totaled. Notwithstanding the fact that the volume of detail handled is very large, accurate statements are rendered promptly.
Additional analyses of all expenditures are obtained through the use of an electric tabulating machine in the Statistical Department. 'fhc detail expenditures and accumulated construction costs are analyzed so as to furnish information regarding source
25

of funds, cost, location, type and mileage of projects; also, object of expenditure, unit and activity classifications.
At various times the Accounting Department is called upon for numerous financial and statistical reports which are compiled promptly and accurately without delay or confusion; however, the preparation of same would be very difficult without the present system and tabulating equipment.
An audit has been made of this Department by the State Auditor for the period ended December 31, 1933, and the records were found in order, all funds being properly disbursed. The fullest cooperation has been received from the State Auditor's office, and, as stated in the last report, many beneficial suggestions were made by the examiners.
26

ENGINEERING
ROADS
Some of the secondary roads are now being improved with available local material such as sand clay, clay gravel, pebble soil and chert as a base with a course of asphalt as a wearing surface. Such pavements have been built and are now being built at costs of from four to eight thousand dollars per mile.
It is fully forseen that such low cost roads will have to be retopped and otherwise reconstructed periodically, but the cost of such work will be far less than a reasonable interest on the additional money that would have been required for high cost pavements. Such low cost roads will be adequate on many of our rural highways where traffic is and will be moderate for a long time to come.
The use of this type of construction renders better traffic service to the public since it enables the Board to surface many more miles of road than would otherwise be possible.
Survey parties are now operating under the direction of the division engineers with general supervision of the Locating Engineer from the General Office. These parties send their field note books to the General Office where all plans are prepared. The plans are made to conform with certain standards in order to secure uniformity. All plans are printed with our blue print machine and special prints are made with our photostat machine which save both time and money.
BRIDGES
Bridge construction has kept pace with road construction during this two year period. Roadway widths for bridges of 22 :feet and 24 feet have become standard, instead of the old 16 feet and 18 feet widths. The greater widths are necessary for safety with the increased volume and speed of traffic. The following materials, either alone or in combination, have been used to most economically meet the drainage requirements: Cypress timber, treated pine, structural steel and reinforced concrete. A tabulation of these are shown elsewhere in this report.
There were designed in the Bridge Department, during this period, bridges having a total length of 53,613 lineal feet or 10.154 miles.
The two bridge paint crews worked a part of this period painting 5, 763 lineal feet of bridges with lead and oil and aluminum paint.
27

MAINTENANCE
All State highways have been maintained by an efficient maintenance organization headed by the State 1\faintenance Engineer. Excellent results have been accomplished with the funds available for maintenance.
The Maintenance Department has three major divisions which are as follows: Office, Field and Equipment. The Office division consists of the administrative and supervisory direction of all maintenance operations. The Field division consists of patrol sections with an experienced road man in charge of each. The length of each section is approximately fifty miles. The Equipment division consists of a superintendent of equipment at the head of a corps of mechanics who actually repair and rebuild all State owned equipment. The heavy work is done at the general shop at East Point which is a thoroughiy modern garage.
Reports of all known accidents are sent to the General Office to be tabulated and filed. Tables of these accidents are given elsewhere in this report.
The latest road information is kept by this department and road maps, based on this information, are published monthly for free distribution to the public.
STATE FORCES
The Board has two groups of forces doing work directly with hired help and with convicts. The first group is known as the Asphalt Department, and the second as the Convict Department. These outfits were operated under a supervisor for State Asphalt outfits and a Supervisor of Convict forces. These positions have been abolished and the administration of these outfits is now handled by the Division offices.
The three units in the Asphalt Department are equipped for laying local bases and for placing asphalt tops. These outfits have been continuously in operation on various new construction and repair projects.
The Convict Department is made up of ten main prison camps, consisting of a personnel of approximately 700 convicts. These forces work mainly on grading and top soiling roads and in building local timber bridges.
28

LABORATORY
'l'he Laboratory operated in connection with the General Office in Atlanta has continued its very efficient service in controlling the quality of all materials entering into road and bridge construction. It has further extended its activities into research and investigation of new materials and new combinations of old materials for advancement of highway construction.
GENERAL
The State, for administration purposes, was divided into six highway divisions at the beginning of the period covered by this report. This set-up was changed on October 1, 1933, to reduce this to three highway divisions with offices at Fitzgerald, ),lacon and East Point, for the Southern, Central and Northern territories, respectively.
The State System contained 8196.816 miles on July 1, 1932, and 8876.218 miles on June 30, 1934, which is an increase of 679.402 miles for the two year period. The total length of pavement, based on completed projects, was 3422.090 miles on June 30, 1934.
29

PURCHASING
All purchases are made under the direct superv1s1on of the Purchasing Agent and on approval of the Chairman of the Board.
During the fiscal year ending June 30, 1933, the Purchasing Department issued a total of 15,752 orders and during the fiscal year ending June 30, 1934, issued a total of 16,469. These orders are divided into four groups as follows:
1. Orders issued for the purchase of road building material, supplies for the General Office and Division Offices, and groceries, clothing, stock feed and general supplies for the various Convict Camps, located at eleven different points in Georgia.
2. Orders issued for the purpose of Truck and machine parts, and other items used exclusively by the East Point Shop for repairs on equipment. This group also includes stock placed in the Warehouse at East Point and later drawn out as needed and also stock for the Stationery and Supply Department.
3. Orders issued to the Warehouse for shipment of items carried in stock.
4. Orders issued to cover the cost of work performed by the East Point Shop in repairing and rebuilding Equipment.
Competitive bids are obtained on all commodities, and purchase awards made to the lowest bidder meeting specifications. Such items as nails, grader blades, shovels, lubricating oil and grease, center line paint, etc., are purchased under yearly contract. The purpose of this method of buying is to reduce the cost.
Legal notices advertising for bids are published in the official organ of the County where material is to be used. Invitations covering specifications and quantities of various items are mailed out to all known manufacturers and dealers.
All commodities purchased are strictly required to meet specifications of the State Highway Board, and it is the duty of the Purchasing Department to see that the grade and price are in accordance with the Purchase Order issued, and if there is a discrepancy reported in grade or price, the Purchasing Agent adjusts any discrepancies before clearing the purchase for payment.
The Purchasing Agent, in addition to other duties, has jurisdiction over the Stationery and Supply Department. He also has the responsibility of checking freight rates, and has a man who is an expert in checking freight rates among the personnel of the Purchasing Department.
Under the present Administration, the Purchasing Department is handling the largest volume of work, with less overhead, smaller personnel, and in a more efficient manner, than at any time since the creation of the Highway Department.
30

ALPHABETICAL LIST OF COUNTIES SHOWING COM'RS. DIST., CONG. DIST'S., ENG. DIV'S., AREA, POPULATION, STATE MILEAGE AND PERCENTAGES.

Eng. Eng.

County

Com. Cong. Div. Div.

Dist. Dist. (1933) (1934)

- - --

Appling ________ l

11

6

l

Atkinson _______ l

11

6

l

Bacon ____ -----

l

11

6

l

Baker_ __________ l

2

5

l

Baldwin ________ 2 10

4

2

Banks _____

3

9

2

3

Barrow _________ 3

9

2

3

Bartow _________ 3

7

l

3

Ben HilL ------ l

3

5

l

Berrien_________ l

11

5

l

Bibb ___________ 2

6

3

2

Bleckley ________ 2 12

4

2

Brantley________ l

11

6

l

Brooks __________ l

11

5

l

Bryan __________ l

l

6

l

Bulloch_________ 2

l

4

2

Burke __________ 2

1

4

2

Butts___________ 2

6

3

2

Calhoun________ l

2

5

l

Camden ________ l

11

6

l

Candler ________ 2

l

4

2

CarrolL _________ 3

4

l

3

Catoosa_________ 3

7

l

3

Charlton _______ l

11

6

l

Chatham _______ l

l

6

l

Chattahoochee 2

4

3

2

Chattooga ______ 3

7

l

3

Area Sq. Miles
454 330 271 357 307 222 168 471 256 455 277 205 434 514 431 668 956 203 284 711 228 492 169 792 370 218 328

Pop. 1930 Census
13,314 6,894 7,055 7,818
22,878 9,703 12,401
25,364 13,047 14,646 77,042
9,133 6,895 21,330 5,952 26,509 29,224 9,345 10,576 6,338 8,991 34,272 9,421 4,381 105,431 8,894 15,407

Pop. Per. I

1

Sq1.9M30ile I Mileage I Mileage Mileage
Census . 7-1-32 6-30-33 6-30-34

29

62.715 62.505 62.805

21

49.343 49.343 49.343

26

32.940 32.940 46.426

22

42.670 42.670 42.670

75

44.893 45.261 45.261

44

36.650 36.650 36.650

74

33.339 40.269 40.269

54

66.954 76.254 76.254

51

19.201 37.851 37.851

32

56.160 56.160 56.160

278

49.165 49.165 49.165

45

32.425 32.425 32.425

16

48.548 48.548 53.884

42

75.785 75.785 76.385

14

62.056 62.056 62.056

40

72.211 81.228 88.128

31

93.092 93.092 93.092

46

31.058 31.058 51.249

37

53.950 53.950 53.950

9

57.103 72.903 72.903

39

27.050 27.050 27.050

70

74.310 74.548 74.548

56

15.853 15.853 15.853

6

43.838 43.838 43.950

285

58.316 58.316 61.393

41

43.032 42.482 42.482

47

33.130 46.380 46.380

Percentages 7-1-32
.7651 .6020 .4019 .5206 .5477 .4471 .4067 .8168 .2343 .6852 .5998 .3956 .5923 .9246 .7571 .8810 1.1357 .3789 .6582 .6967 .3300 .9066 .1934 .5348 .7115 .5250 .4042

Per-
I " cent- cent-
ages ages 6-30-33 6-30-34

.7355 .5807 .3876 .5021 .5326 .4312 .4739 .8972 .4454 .6609 .5785 .3816 .5712 .8918 .7302 .9558 1.0954 .3655 .6348 .8579 .3183 .8772 .1865 .5159 .6862 .4999 .5457

.7076 .5559 .5230 .4808 .5099 .4129 .4536 .8591 .4265 .6327 .5539 .3653 .6070 .8606 .6991 .9929 1.0487 .5774 .6078 .8213 .3048 .8398 .1786 .4952 .6916 .4787 .5225

ALPHABETICAL LIST OF COUNTIES SHOWING COM'RS. DIST., CONG. DIST'S., ENG. DIV'S.,

AREA, POPULATION, STATE MILEAGE AND PERCENTAGES.

--

------------ ---

-----

- - - ~-------

---

--- - --- - -

--

County

I

I

I Eng. I Eng. I Area

Com.ICong.l Div. Div. Sq.

Pop. 1930

----- - - --- -- - - - - - - - - - -

1Pop. Per. ,

!

,

Per- Per-

1 1

S

q. Mile 1930

1
I Mileage

1

I cent-

Mileage i Mileage ages

I

centages

i I

Percentages

1 - - 1Dist. ~~ist. (1933) (1934;1 Miles I Census --~--- 1 ------

I Census
--------

7-1-32 6-30-33 , 6-30-34 I 7-1-32 I 6-30-33

---1 -- ---1-

- - - - ----

I 6-30-34
-----

Cherokee ______ 3 9 I 1

3

429 20,003

47

Clarke _________ 3 ' 8 2

3

114 25,613

225

I 56.579 I 56.579 56.579 I .6903 I 35.886 3E.886 35.886 .4378

.6658 .4223

.6374 .4043

1

Clay_ _ __ _____ 1 i 3 I 5

1

203

6,943

34

37.411

I

37.411

I I

37.411

.4564

.4402

.4215

Clayton_________ 1 3 . 6 1 1

3

142 10,260

72

38 .772 I 38.772 38.772 .4730 .4562 .4368

Clinch __________ j 1 11

6

1

747

7,015

9

69.311 69.311 69.311 .8456 .8156 .7808

Cobb_ --------1 3

7

1

3

353 35,408

100

Coffee __ - -----I 1

11

6

1

632 19,739

31

Colquitt -------1 1

2

5

1

529 30,622

58

Columbia ______ -~ 2 10

4

2

350

8,793

25

Cook ________ 1 11

5

1

241 11,311

47

49.782 58.380 77.880 52.513 44.470

49.782 59.830 77.880 52.513 44.470

60.992 .6073 60.195 .7122 78.858 .9501
52.513 1 .6407
44.470 ' .5425

.5858 .7040 .9164 .6180 .5233

.6872 .6781 .8884 .5917 .5010

1(5 Coweta _________ , 2

4

3

2

443 25,127

57

78.155 78.155 78.155 .9535 .9196 .8805

Crawford _______ ! 2

6

3

2

319

7,020

22

51.720 62.820 62.820. .6310 .7392 .7077

-I Crisp

1

Dade __________ 3

3 7

5 1

1 3

277 17,343

186

4,146

63 22

41.651 24.100

41.651 41.651 24.100 24.100

.5081 .2940

.4901 .2836

.4692 .2715

Dawson _________ I 3

9

2

3

216

3,502

16

44.104 44.104 44.104 .5381 .5190 .4969

Decatur_ ---- i 1

2

5! 1

583 23,622

41

DeKalb_ -------: 3

5

2

3

272 70,278

258

Dodge ______ Dooly __

---I

2 2

12 3

4 3

2 2

431 21,599 397 18,025

50 45

70.600 41.384 49.827 67.615 1

70.600 42.218 49.827 67.615

70.600 42.218 79.677 67.615

.8613 .5049 .6079 .8249

.8307 .4968 .5863 .7957

.7954 .4756 .8977 .7617

Dougherty Douglas_

~I

1 3

2 5

5 1

1 3

342 22,306

208

9,461

65 46

5o .433 1 50.433 51.262 .6153
22.975 ' 22.975 34.925 .2803

.5934 .2704

.5776 .3934

Early ____

1

2

5

1

524 18,273

35

67.440 1 69.440 69.440 .8472 .8171 .7823

Echols ______ --I 1 11

6

1

362

2,744

Effingham __ I 2

1

4

2

448 10,164

Elbert Emanuel

~~~~::I

3 2

8 12

2 4

3 2

361 18,485 764 24,101

8

55.500 i 55.500 62.900 .6771 .6530 .7087

23

34.454 I 34.454 44.254 .4203 .4055 .4985

E1

74.952 74.952 74.952 .9144 .8819 .8445

32 i 118.757 I 116.232 116.232 1.4488 1.3677 1.3094

Evans --- - ---I 1

1

6

1

287

7,102

25

20 .578 . 20 .E78 20.578 .2511 .2422 .2319

ALPHABETICAL LIST OF COUNTIES SHOWING COM'RS. DIST., CONG. DIST'S., ENG. DIV'S., AREA, POPULATION, STATE MILEAGE AND PERCENTAGES.

County

Eng. I Eng. Com. Cong. Div. Div. Dist. Dist. (1933) (1934)

~- ~-

Fannin_________ 3

9

1

3

Fayette_________ 2

6

3

2

Floyd ___________ 3

7

1

3

Forsyth_________ 3

9

2

3

Franklin _______ 3

8

2

3

Fulton _________ 3

5

1

3

Gilmer_ _____ ---- 3

9

1

3

Glascock _______ 2 10

4

2

Glynn __________ 1 11

6

1

Gordon_________ 3

7

1

3

Grady __________ 1

2

5

1

Greene _________ 3

8

2

3

Gwinnett _______ 3

9

2

3

Habersham_____ 3

9

2

3

HalL ___________ 3

9

2

3

Hancock ________ 2 10

4

2

Haralson _______ 3

7

1

3

Harris __________ 2

4

3

2

Hart ____________ 3

8

2

3

Heard __________ 2

4

3

2

Henry __________ 2

6

3

3

Houston ________ 2 12

3

2

Irwin___________ 1 11

5

1

Jackson ________ 3

9

2

3

Jasper_ _________ 2

6

3

2

Jeff Davis ______ 1 11

6

1

Jefferson _______ 2 10

4

2

Area Sq. Miles
401 234 502 247 279 541 440 170 439 375 444 416 440 290 437 530 284 501 261 285 324 443 378 355 321 300 646

Pop.
1930 Census

Pop. Per.
Sq. Mile 1930 Mileage Mileage Mileage
Census 7-1-32 6-30-33 6-30-34

Percentages
7-1-32

Percentages
6-30-33

12,969 8,665
48,667 10,624 15,902 335,220
7,344 4,388 19,400 16,846 19,200 12,616 27,853 12,748 30,313 13,070 13,263 11,140 15,174 9,102 15,924 11,280 12,199 21,609 8,594 8,118 20,727

32

45.008 45.008 45.008 .5491 .5296

37

23.610 23.610 23.610 .2880 .2778

97

88.367 88.367 88.367 1.0781 1.0398

43

37.390 37.390 37.390 .4562 .4400

57

60.840 60.840 60.840 .7422 .7159

620

78.582 78.582 90.572 .9587 .9247

17

51.759 58.409 58.409 .6315 .6873

26 44

I

25.975 53.792

25.975 53.792

30.875 53.792

.3169 .6563

.3056 .6330

45

56.245 56.245 56.245 .6862 .6618

43

56.020 73.527 ' 73.527 .6834 .8652

30

60.300 ' 60.300 I 60.300 .7357 .7096

63

94.020 94.020 94.020 1.1470 1.1063

44

53.870 53.870 59.570 .6572 .6339

69

75.887 75.970 75.970 .9258 .8940

25

62.800 62.800 62.800 .7662 .7389

47

36.065 36.065 36.065 .4400 .4244

22

43.560 43.560 67 .060 .5314 .5126

58

57.940 57.940 57.940 .7069 .6818

32

45.570 45.570 45.570 .5560 .5362

49

44.950 44.950 61.890 .5484 .5289

26

63.850 63.850 63.850 .7790 .7514

32

46.230 56.330 56.330 .5640 .6628

61

72.003 72.003 72.003 .8784 .8473

27

60.250 59.151 59.151 .7350 .6960

27

24.806 22.560 22.560 .3026 .2655

32

101.400 101.400 101.400 1.2371 1.1931

Percentages 6-30-34
.5070 .2660 .9956 .4212 .6854 1.0204 .6581 .3478 .6060 .6337 .8283 .6794 1.0592 .6711 .8559 .7075 .4063 .7555 .6528 .5134 .6972 .7194 .6346 .8112 .6664 .2541 1.1424

ALPHABETICAL LIST OF COUNTIES SHOWING COM'RS. DIST., CONG. DIST'S., ENG. DIV'S., AREA, POPULATION, STATE MILEAGE AND PERCENTAGES.

i

Eng. Eng. Area

County

Com.lcong. Div. Div. Sq.

Dist.j Dist. _(19_ 33) (1934) Miles

--

I Jenkins ______ _
Johnson ______ _ 22 121

4 4

2 2

342 292

Jones_ ____ __ Lamar _________ _ JanieL _______ _

2I 6
2I 6
1 11

3 3 6

2 2 1

377
184 191

I Laurens _______ _
Lee __________ _

2 1

123

4 5

2 1

806 326

I Liberty _______ _
Lincoln _______ _ 31 110

6 2

1 3

543 291

Long

1

1

6

1

393

;;: Lowndes __

1 11

5

1

483

Lumpkin _____ _ 3

9

2

3

280

Macon _________ _ 2

3

3I 2

332

Madison ____ _

3

8

2

3

284

Marion ________ _ 2

4

3

2

360

McDuffie ___ _

2 10

4

2

287

Mcintosh __

1

1

6

1

470

Meriwether __ _

2

4

3

2

496

Miller__ ____ ___ _ 1

2

5

1

253

Mitchell _____ _

1

2

5

1

548

Monroe __ _

2

6

3

2

470

Montgomery ___ _ 1 12

6

1

190

Morgan ________ _ 3

8

2

3

390

Murray_

3

7

1

3

342

Muscogee _____ _ 2 Newton _______ _ 3

4 8

I 3

2

2

3

235 262

Oconee _____ _ 3

8

2

3

172

-' - - - - -

I

I

Pop. 1930 Census

12,908

12,681

8,992

9,745

5,190

32,693

I

8,328 8,153

7,847

4,180

29,994

4,927

16,643

14,921

6,968

9,014

5,763

22,437

9,076

23,620

11,606

10,020

12,488

9,215

57,558

17,290

8,082

Pop. Per. Sq. Mile
1930 Census
38 43 24 53 27 41 26 15 27 11 62 18 50 53 19 31 I 12 45 36 43 25 53 32 27 245 66 47

Mileage 7-1-32
56.095 58.736 63.809 34.271 40.820 92.627 28.017 34.734 39.400 45.263 74.690 58.349 54.957 76.750 34.550 40.629 33.006 56.702 46.380 74.146 56.923 47.395 51.392 51.616 64.214 40.429 37.260

Percent-

Percent-

I ,

Percent-

Mileage Mileage ages ages I ages

6-30-33 6-30-34 7-1-32 6-30-33 16-30-34
---- -------

56.4121-".412- .6844 .6638 .6356

58.736 58.575 63.809 63.809
34.271 I 48.071
40.820 40.820 92 .627 113 .369

.7166 .7785 .4181 .4980 1.1300

.6912 .7508 .4033 .4803 1.0900

I .6599 .7188
I .5416 .4599 1.2772

28.017 33.117 .3418 .3297 i .3731

34.734 35.830 .4238 .4087 .4037

39.400 48.300 .4807 .4636 .5441

45.197 43.947 .5522 .5318 .4951

74.690 58.349

84.090 58.349

.9112 .7119

I

.8789 .6866

.9474 .6574

69.757 69.757 .6705 .8209 .7858

76.750 76.750 .9363 .9031 .8647

34.550 34.550 .4215 .4065 .3893

40.629 48.479 .4957 .4781 .5461

33.006 33.006 .4027 .3884 .3719

66.116 66.116 .6918 .7780 .7448

46.380 46.380 .5658 .5457 .5226

86.046 85.292 .9046 1.0125 .9609

71.623 71.623 .6945 .8428 .8069

47.395 46.802 .5782 .5577 .5272

65.292 65.292 .6270 .7683 .7356

51.616 51.616 .6297 .6074 .5815

64.792 64.792 .7834 .7624 .7300

47.832 67.782 .4932 .5629 .7636

50.760 50.760 .4546 .5973 .1>719

--- - - - - - - - - -

I
-----~----~-

ALPHABETICAL LIST OF COUNTIES SHOWING COM'RS. DIST., CONG. DIST'S., ENG. DIV'S.,

AREA, POPULATION, STATE MILEAGE AND PERCENTAGES.

County

Oglethorpe ___ _Paulding ___ _Peach ________ _

Pickens ________ _-

Pierce ______ _ -

Pike_

-

Polk_

PulaskL ____ _ -

Putnam _____ _

Quitman ___ _ ~Rabun _______ _-
Randolph ____ _Richmond Rockdale ___ _

Schley ___ _

Screven __ Seminole ____ _

Spalding ____ _Stephens _____ _

Stewart __ .

Sumter

Talbot __

Taliaferro __

Tattnall _

Taylor_

Telfair

TerrelL_

Com. Dist.
~~
3 3 2 3 1 2 3 2 2 1 3 1 2 3 2 2 1 2 3 1 1 2 3 1 2 1 1

Cong. Dist.
~~
8 7 12 9 11 6 7 12 8 3 9 3 10 5 3 1 2 6 9 3 3 4 10 1 3 12 3

Eng. Eng.

Div. Div.

(1933) (1934)

- - ~~
2I 3

1

3

3

2

1

3

6 3

I

1 2

1

3

3

2

4

2

5

1

2

3

5

1

4

2

2

3

3

2

4

2

5

1

3

2

2

3

5

1

5

1

3

2

2

3

6

1

3

2

6

1

5

1

Area Sq. Miles
---
504 324 179 231 345 237 317 258 361 144 377 412 319 119 154 794 240 209 166 411 456 312 212 466 340 373 322

Pop. 1930 Census
--~-
12,927 12,327 10,268 9,687 12,522 10,853 25,141
9,005 8,367 3,820 6,331 17,174 72,990 7,247 5,347 20,503 7,389 23,495 11,740 11,114 26,800 8,458 6,172 15,411 10,617 14,997 18,290

Pop. Per. Sq. Mile
1930 Census
--~
26 38 57 42 36 46 79 35 23 27 17 42 229 61 35 26 31 112 71 27 59 27 29 33 31 40 52

Mileage Mileage 7-1-32 6-30-33
------
58.500 58.500 54.377 54.377 30.090 30.090 42.080 55.080 21.896 22.698 38.942 38.942 49.972 58.146 55.236 55.236 58.790 58.790 36.660 36.660 58.559 58.559 40.174 40.174 68.835 68.835 19.235 19.235 28.760 28.760 60.900 74.803 25.500 25.500 39.262 40.382 25.659 25.548 67.300 67.300 75.718 75.718
56.546 56.546 24.986 ' 24.986 68.860 68.860 62.560 68.710
55.882 55.882 42.168 42.168

====P e~ r - ==P e~ r - ~~P~ e r cent- cent- cent-
Mileage ages ages ages 6-30-34 7-1-32 6-30-33 6-30-34
- - - - - - - - --~ -~-
58.500 .7137 .6883 .6590 54.377 .6634 .6399 .6127 30.090 .3671 .3541 .3390 55.080 .5134 .6481 .6205 42 .ll1 .2671 .2671 .4744 38.942 .4751 .4582 .4387 57.496 .6097 .6842 .6478 55.236 .6739 .6500 .6223 58.790 .7172 .6918 .6624 36.660 .4473 .4313 .4130 58.559 .7144 .6891 .6598 40.174 .4901 .4727 .4526 68.1'35 .8398 .8100 .7755 26.385 .2347 .2264 .2972 28.803 .3509 .3384 .3245 74.803 .7430 .8802 .8427 25.500 .3111 .3001 .2873 40.382 .4790 .4751 .4550 32.548 .3130 .3007 .3667 67.300 .8211 .7919 .7582 75.718 .9238 .8910 .8530 67.446 .6899 .6653 .7599 24.986 .3048 .2941 .2814 68.860 .8401 .8102 .7758 67.760 .7632 .8085 .7634 70.632 .6818 .6576 .7958 54.068 .5144 .4962 .6091

- - - - - - - - - - - - - - - - -~ -

-~-- - - - - - - - - - - - - - - - - - - - -

---- --

ALPHABETICAL LIST OF COUNTIES SHOWING COM'RS. DIST., CONG. DIST'S., ENG. DIV'S.,

County

AREA, POPULATION, STATE MILEAGE AND PERCENTAGES.

- - - - -- - - ------- -- - - - - -

-----

' I

I

I I Eng. I Eng. Area

'Pop. Per. I Pop. I Sq. Mile

I

' Percent-

a)l g~;4) Com. Cong1 Div
I Dist. Dist. (193

Sq.

1930 I 1930 Mileage Mileage Mileage ages

Miles Census I Census 7-1-32 6-30-33 6-30-34 7-1-32

-
Per- I Percent- centages ages 6-30-33 6-30-34

---------

---

Thomas

1

Tift_ Toombs_

1 1

Towns __ _ Treutlen.

~

Troup __ _

2

Turner ____ _

1

Twiggs _______ _ 2

Union

3

g; Upson__ __

2

Walker__

3

Walton _____ _

3

Ware ___ _

1

Warren_

2

Washington ___ _ 2

Wayne __

1

Webster_

1

Wheeler _____ _

1

White ________ _ 3

Whitfield ____ _ 3

Wilcox______ __ 1

Wilkes_

__ 3

Wilkinson _____ _ 2 Worth _________ _ 1

TOTALS ______ _

21 5

1

530 32,612

122 I 56

1 1

243 16,068 393 17,165

1~ I ~

3 2

181 262

4,346 7,488

4

3

2

435 36,752

3

5

1

231 11,196

12

4

2

314

8,372

9

2

3

324

6,340

6

3

2

317 19,509

7

1

3

432 26,206

8

2

3

331 21,118

11

6

1

771 26,558

10

4

2

440 11,181

10

4

2

669 25,030

11

6

1

615 12,647

3

5

1

302

5,032

12

6

1

264

9,149

9

2

3

245

6,056

7

1

3

283 20,808

12

5

1

403 13,439

8

2

3

458 15,944

10

4

2

472 10,844

2

5

1

651 21,094

---

58,725 2,908,506

62 66

II 73.046 48.040

73.046 56.690

90.826 56.690

.8912 .5861

.8595 1.0232 .6671 .6387

44

60.470 60.470 60.141 .7377 .7116 .6776

24

38.330 38.330 38.330 .4676 .4510 .4318

29

27.900 27.900 27.900 .3404 .3283 .3143

85

60.060 69.900 77.900 .7327 .8225 .8776

49

26.218 34.218 34.218 .3199 .4027 .3855

27

51.398 51.398 51.398 .6271 .6048 .5791

20

44.160 44.160 44.160 .5387 .5196 .4975

62

61.830 62.984 63.100 .7543 .7411 .7109

61

48.983 48.983 56.563 .5976 .5764 .6372

64

52.066 72.916 72.916 .6352 .8580 .8215

34

78.716 79.242 81.254 .9603 .9325 .9154

28

42.910 42.910 46.510 .5235 .5049 .5240

37

92.030 92.030 91.996 1.1228 1.0829 1.0364

21

75.438 75.271 75.459 .9203 .8857 .8502

17

24.110 24.110 24.110 .2941 .2838 .2716

35

46.339 46.339 46.339 .5653 .5452 .5220

25

44.900 44.900 44.900 .5478 .5284 .5059

74

47.109 47.109 47.109 .5747 .5543 .5307

33

44.290 44.290 44.290 .5403 .5212 .4990

35

59.347 59.347 59.347 .7240 .6983 .6686

23 32

I 59.044 59.044 58.999
I 55.370 63.870 63.870

.7203 .6755

.6948 .7515

.6647 .7196

49.5 8,196.816 ,8.498.300 8,876.218 100.0000100.0000 100.0000

DISTRIBUTION OF ONE CENT GASOLINE TAX TO COUNTIES FISCAL YEARS ENDING JUNE 30, 1932, JUNE 30, 1933, AND JUNE 30, 1934.

Total~Year

Total-Year

Total- Year

County -I-E_n_d_in_g_6_-_3o_-_32_ _E_n_d_in_g_6_-3_o_-3_3_ Ending 6-30-34

1
Appling _______ $ 17,384.76 $ 14,757.90

$ 15,763.75

Atkinson_____

13,678.01

11,630.39

12,429.33

Bacon__________

9,131.05

7,764.13

9,954.99

Baker______

10,950.53

10,057.53

10,748.42

Baldwin________

12,405.30

10,601.73

11,401.09

Banks_____ ____

9,556.26

8,638.59

9,232.01

Barrow _________ ,

9,386.17

8,401.76

10,143.60

Bartow_____

17,934.15

16,355.50

19,208.11

Ben HilL

4,039.63 '

7,773.53

9,534.53

Berrien___

15,567.69

13,237.20

14,146.50

Bibb_______

13,628.66

11,588.44

12,384.48

Bleckley________

8,988.29

7,642.74

8,167.75

Brantley_______

10,120.29

11,443.01

12,884.17

Brooks____ ___

21,400.05

17,862.91

18,263.55

Bryan______

17,198.16

14,626.91

15,631.70

Bulloch_____

20,017.06

19,163.28

21,749.42

Burke____ _

24,848.79

21,942.26

23,449.54

Butts____

8, 609.36

7,320.53

10,248.46

Calhoun______

13,802.75

12,716.29

13,589.81

Camden______

14,597.73

14,434.84

18,364.01

Candler__ _

7,498.33

6,375.82

6,813.80

CarrolL________

20,598.90

17,556.69

18,778.37

Catoosa____ __

4,437.01

3,736.63

3,993.31

Charlton...

8,844.85

10,332.84

11,049.69

Chatham___ __

16,165.34

13,745.38

14,884.12

Chattahoochee

11,151.77

10,013.23

10,701.05

Chattooga______

9,043.02

8,626.87

11,652.97

Cherokee________

14,454.14

13,335.96

14,252.05

Clarke___________

9,138.07

8,458.52

9,039.56

Clay__________

10,370.42

8,817.96

9,423.69

Clayton_______ Clinch__________

9,14l.E6 19,088 .38 1

9,138.75 16,336 .96

9,766.53 17,459 .19

Cobb____ ___ _

14,441.85

11,733.88

14,633.06

Coffee___________

14,084.44

14,033.34

15,094.04

Colquitt______

21,588.53

18,356.71

19,679.51

Columbia_______

10,492.62

12,377.58

13,227.84

Cook____

12,327.19

10,4Rl.81

11,201.83

Coweta_________

21,146.06

18,421.53

19,686.96

Crawford__

13,804.44

14,806.99

15,824.13

Crisp__________

11,545.76

9,817.36

10,491.74

Dade_____

6,680.59

5,680.48

6,070.70

Dawson__

10,406.49

10,395.55

11,109.64

Decatur________

18,274.08

16,640.78

17,783.89

Dekalb_ ___

11,086.51

9,899.66

10,634.55

Dodge __________

13,604.63

11,744.49

17,530.47

Dooly_

16,904.33

15,937.21

17,031.97

Dougherty__ ___

11,849.74

11,887 .32

12,756 .30

Douglas________

6,083.90

5,415.33

8,018.67

Early______ _

17,147.20

16,367.36

17,491.68

Echols__ _____

12,996.91

13,081.63

15,844.28

Effingham___

9,669.45

8,120.98

10,508.72

Elbert_______

20,754.05

17,666.57

18,880.13

EmanueL______

30,419.10

27,417.03

29,278.43

Evans__________

5, 704.28

4,850.34

5,183.53

Fannin______

12,476.33

10,608.62

11,337.35

Fayette_________

6,544.75

5,565.00

5,947.27

F_l_o..::y_d_______________-________23_,,'-0_41_._0_9___,_c--_ _20-','-8_28_.5_6_:____~_?_2,_2_59_.~-

37

DISTRIBUTION OF ONE CENT GASOLINE TAX TO COUNTIES FISCAL YEARS ENDING JUNE 30, 1932, JUNE 30, 1933, AND JUNE 30, 1934.

County

Forsyth_ Franklin

______-_-_

Fulton_ Gilmer ______

Glascock ____

Glynn ___ ---- --

Gordon ___ ----Grady ___
----

Greene

----

Gwinnett

Habersham ___

HalL

----

Hancock_ ----

Haralson_ ---

Harris ____ Hart ____

- ---
-----

Heard ___ Henry ____

-- ---

- -----

Houston __ Irwin ______

--------

Jackson ____

Jasper_ ________

Jeff Davis ___ Jefferson ____

--
--

Jenkins --- --

LLJJLooaaanhmnueniraesesrrn_o___s_n________________-_----_----_---_---

Lee _____________

L i b e r t y _________

Lincoln _________

Long __ Lownde

s-_-_-_-_-_-_-_-

Lumpkin _______ Macon __________

Madison ________

Marion _________

McDuffie _______

Mcintosh ___ ---Meriwether _____ Miller_ _____ ---MMiotncrhoeelL_________-_-_-_-

Montgomery_ Morgan ________ . Murray _________

Muscogee ______

Newton_ Oconee_

-

---

Oglethorpe ___

Paulding __ .. -Peach_ --- -PPiiecrkceen_s______-_-_-_-_--

Total-Year Ending 6-30-32
$ 9,608.30 14,842.75 19,992.71 11,804.04 4,677.95 14,913.88 15,591.25 15,528.88 16,715.32 24,269.62 13,743.15 21,159.36 17,408.31 9,702.89 12,074.94 15,291.52 11,638.69 12,460.25 17,699.38 11,999.65 17,838.57 16,701.45 6,878.78 27,159.85 13,966.04 10,207.51 15,561.43 9,206.48 11,315.41 24,561.56 7,593.00 9,628.34 10,921.77 12,547.01 20,704.25 14,303.00 15,073.25 17,404.74 9,577.35 11,310.46 9,149.33 15,492.55 12,856.66 18,956.02 13,744.93 9,288.61 14,254.98 14,308.08 15,667.80 11,168.37 10,328.56 16,216.34 12,271.95 8,407.63 12,260.70 6,069.62

Total-Year Ending 6-30-33
$ 8,813.03 14,340.30 18,522.18 12,610.37 6,122.44 12,679.04 13,257.24 14,193.56 14,213.02 22,160.99 12,697.43 17,896.57 14,802.28 8,500.60 10,267.31 13,656.76 10,741.08 10,594.95 15,049.77 13,277.27 16,971.48 14,009.85 5,586.52 23,900.50 13,277.08 13,844.38 15,040.11 8,077.84 9,621.48 21,832.65 6,603.75 8,186.98 9,286.79 10,661.08 17,604.91 13,753.16 13,867.29 18,090.36 8,143.62 9,576.47 7,779.69 13,946.10 10,932.01 18,211.19 16,881.91 11,171.26 12,971.44 12,166.16 15,271.81 10,387.59 9,615.75 13,788.75 12,816.94 7,092.37 10,720.99 5,523.98
38

Total-Year Ending 6-30-34

$ 9,418.39

15,325.39

22,033.32

14,713.01

6,852.79

13,550.01

14,167.91

18,521.18

15,189.35

23,683.30

15,005.46

19,136.57

15,819.10

9,084.64

15,095.29

14,594.88

11,478.91

13,980.09

16,083.58

14,189.34

18,137.30

14,899.92

I

5,682.78

25,542.29

14,209.98

14,785.20

16,073.25

11,209.52

10,282.41

I

28,644.68 8,009.68

8,818.65

11,016.07

11,305.92

21,181.97

14,697.91

17,571.54

19,333.04

8,703.02

11,196.91

8,314.09

16,654.38

11,682.96

21,627.01

18,041.59

11,901.13

16,446.82

13,001.88

16,320.86

13,511.94

12,786.25

14,735.93

13,697.37

i

7,579.58 13,874.46

I

8,145.33

DISTRIBUTION OF ONE CENT GASOLINE TAX TO COUNTIES FISCAL YEARS ENDING JUNE 30, 1932, JUNE 30, 1933,
AND JUNE 30, 1934.

County

Total-Year

Total-Year

Total-Year

Ending 6-30-32 Ending 6-30-33 Ending 6-30-34

Pike

$

Polk_

Pulaski_ __

Putnam __ _

Quitman ____ _

Rabun __

Randolph

Richmond

Rockdale ..

Schley_

Screven __

Seminole Spalding Stephens__ __

Stewart_ Sumter_ __ . Talbot ________ _

Taliaferro _____ TattnalL ______ _

Taylor_ __

Telfair ________ TerrelL ________ _

Thomas .. ____ . __ _

Tift. ___ ___ __I

Toombs _______ , Towns __________
Treutlen _____ --11

-I Troup___ ------1
Turner. _ ___ - Twiggs ______ 1

Union ___ - ---~ Upson ________ -

Walker_ __ ---Walton ... ------~1 Ware. __ -------

Warren_

1

Washington._--~
Wayne _____ -----

Webster - -----i Wheeler_ ___ - - - [

-I White ____ ------
Whitfield. _____

-I Wilcox_______ . --
Wilkes ______ - - -

Wilkinson_. __ _

Worth ________

1
1

10,793.88 12,411.88 15,265.71 16,298.29 10,162.24 12,309.71 11,023.05 19,907.50
3,736.73 7,977.34 16,881.62 5,578.51 10,841.37 7,112.73 18,797.07 21,123.02 14,784.46 5,928.95 19,088.16 14,945.64 13,836.04 10,771.57 20,256.92 13,316.80
14' 151.49 9,111.72 6,727.23 16,089.97 7,267.69
14,247.65 12,241.26 17,139.42 13,165.62 13,361.77 21,820.27 11,890.02 20,109.09 17,915.76
6,683.34 12,831.98
9,942.44 12,970.55 12,277.30 15,798.26 13,013.66 15,348.70

$

9,178.83

$

9,809.36

12,290.52

14,567.05

13,019.42

13,913.75

13,857.10

14,808.98

8,6405)6

9,234.53

13,802.66

14,750.81

9,469.22

10,119.67

16,224.76

17,339.29

4,533.79

5,722.00

6,778.88

7,247.26

17,750.86

18,842.61

6,010.48

6,423.35

9,449.29

10,172.09

6,035.09

8,198.72

15,862.95

16,952.64

17,847.12

19,073.09

13,328.19

16,989.40

5,889.33

6,293.88

16,230.65

17,345.59

15,125.37

17,247.74

13,171.68

15,885.18

9,939.21

12,843.97

17,217.32

20,580.28

13,362.13

14,280.01

14,253.08

15,211.36

9,034.57

9,655.18

6,576.18

7,027.91

14,763.89

18,588.56

6,673.57

8,619.39

12,114.77

12,946.97

10,408.74

11,123.74

14,774.61

15,872.78

11,545.55

12,817.86

14,101.37

18,367.28

18,614.75

20,087.97

10,114.11

11,036.47

21,691.94

23,173.47

17 '761.76

18,972.37

5,682.85

6,073.22

10,922.35

11,672.62

10,583.16

11,310.15

1

11,103.83 :

11,866.58

[

10,439.38 I

11,156.49

11---13_,1_938,_981_6..39_89_[~ _ _ _1144_,,_89740_9._1.32_0_

13,575.70

16,088.62

TOTALS ___ I$ 2,145,630.40 1$ 1,965,568.96 I$ 2,201,221.35

I

I

Mileag-e~0-n-S~tate System increased 301.484 miles for fiscal year 1933

over 1932. Gasoline Tax disbursements decreased $180,061.44 for fiscal

year 1933 under 1932.

Mileage on State System increased 377.918 miles for fiscal year 1934

over 1933. Gasoline Tax disbursements increased $235,652.39 for fiscal

year 1934 over 1933.

Disbursements are made to the Counties every three months.

39

STATE HIGHWAY BOARD OF GEORGIA

TABLE OF COMPLETED MILEAGE WITH FEDERAL AID, TEN SOUTHEASTERN STATES,

AT JUNE 30, 1932, 1933 AND 1934

State Co~~~~ted co!~~~e: coi~~ed I;n~~~:se--In~i~:sel;;~~a~:ll.~~~f=~;Jii~:~-;:fe~n

to June
30, 1932

Alabama________________ _ 2,393.9

Florida __________________ _

638.0

to June
30, 1933
2,344.31 661.1]

to June j.
30, 1934 2,585.6I 787.7 1

I
-49.6!I 23.1

I Mile
1933

241.3 126.6

I
1

3 10

I

Miles
1934

I

3

10

Miles

.---1 I 1933

I I

9 6

Miles
1934
5 9

GEORGIA--------------- 3,038.4 3.238.8 3,518.21 170.4 279.4 1

1. 1I 3

Kentucky ________________ _ 1,911.0 Louisiana.. ___________ .. __ _ 1,566.8

1,933.6 1
1,619.61'

2,190.9 1 1,673.3[

22.6 1 52.81.

257.3 53.7

6 9

6. 7

9

4

4 10

MississippL _ ________ __ 1,809.01 ~ North Carolina __________ 2,226.4

21,,385683..88 1

2,095.11 2,940.7

54.8 132.41

231.3 581.91

7 2

7 2

3 2

6 1

South Carolina ________ .. __ 2,013.6

1,962.5

2,258.41 -51.1

295.9

5

4

10

2

Tennessee _______________ _ 1,682.4

1,723.5

1,925.1

41.1 201.61 8

8

5

8

Virginia_________________ 1 1,992.9

1,994.3

2,223.7

1.4

229.41

4

5

8

7

TOTALS ___________ 1 19,302.41

19,700.3 ~198.7]--3-97.9 . 2,49~--4----------------------

1

Note: Information obtained from Magazine of Bureau of Public Roads, July 1932 and 1933 Issues, and Report of the Chief of the Bureau of Public Roads, 1934.

PART TWO
FISCAL YEAR ENDING JUNE 30, 1933

STATE HIGHWAY BOARD OF GEORGIA

Exhibit 11A"

STATEMENT OF ASSETS AND LIABILITIES-FUND BALANCES JUNE 30,1933.

ASSETS

Current Assets

Cash

In Banks

__ $

State Treasurer Account.

State Treasurer __ U. S. Government Vouchers in
Transit. .. _______ _
Accounts Receivable Advances. ___________ _

]03.063.73 48,880.30 $ 151.944.03
771, 148.65
376,874.97 51,338.01 46.882.88 $ 1,398,188.54

Deferred Assets

Inventory of Materials and Supplies

Shop Jobs in Process

_________ _

Undistributed Charges ____________ _

Undistributed Payrolls _.... __ __

Total Proprietary Assets .. _____ __ _

$ 105,269.79 16,797.69 19,488.55 38, 281.61

179,837.64

--------------------- $ 1,578,026.18

Capital Assets

Land. Buildings and Equipment (Schedule No. 4)

Land .. _____________________________ $ 176,445.25

Buildings ------------- ____________

315.229.00

Trucks .. ___ ------------------------Tractors______________________ ______

402,320.00 207.909.00

Other Road Equipment ______ _ __.

361, 169.00

Engineering Equipment... OfficeEquipment _________________

44,146.00 42,383.00

Shop Equipment

57,456.00

Laboratory Equipment_

17,053.00

Quarry Equipment

65,153.00$ 1,689,263.25

Roads and Bridges Construction Cost to Date: On Closed Projects............... $113,533,337.81 On Opened Projects.............. 9,967,978.53

123,501,316.34

Total Capital Assets ________ .. __ _

.. $125, 190,579.59

TotaL

..... $126.768,605.77
42

Exhibit "A"
STATE HIGHWAY BOARD OF GEORGIA
STATEMENT OF ASSETS AND LIABILITIES-FUND BALANCES JUNE 30, 1933.
LIABILITIES, FUND BALANCES AND SURPLUS

Current Liabilities
Accounts Payable__ ------------Due to Counties. Surveys and Plans

* none 103.499.09

Total Proprietary Liabilities_
Fund Balances (Schedule No.6) Construction Contracts and Allotments Unencumbered Balances_. Less: Contract Participation_

$ 103.499.09
$ 4. 720.037.39 26,454.89

Net Cash Liability_ Less: Cash Participation
Federal Aid . -----County Cash. Excess Participa-
tion _________________ _

OtherCash.

-----------

$ 4.693,582.50
l.I02. 961.55
l3,563.92CR 28,367.80 l.ll7,765.43

Net Cash State Liability ______ . Other Unencumbered Allotments
Survey Projects __________________ _
Reconstruction Projects _______ .... _-
Maintenance GeneraL------------Convict Farm ______________________ _

3,575,817.07

2.445.13 ll,335.83 55,507.92 68,584.51

137' 873,39

Maintenance Appropriation. ___ . __ .Unliquidated Purchase Orders. etc.

34,672.72 ll9, 037.32

Total Fund Balances _______ ------------------------------------- $

Capital Liabilities and Surplus

Capital Liabilities

Refunding Certificates-Due to

Counties-1936 thru 1945 (Schedule No. 5) ________________________ _

26,516,763.29

Surplus Invested in Plant and Equipment_ ________________________ _

1. 689,263.25

Surplus Invested in Highways_------

96,984,553.05

3,867,400.~0

Total Capital Liabilities and Surplus_--------------------------- $125,190,579.59

Current Fund Deficit Deficit State Funds, Encull\brance against 1933-34 Income-Exhibit "B" _ Less: Unrecorded Reserves: For Construction Detail Estimates, Counties-Execution of Contract not Complete_______________ $
For Revolving Fund to cover Inventories, Advances. etc.----------

$ 2, 961. 553.45

368,680.04 200.000.00

568.680.04

Deficit as per books. ___ ----------------------- _________ _ Total ____________________________________________ _

___ $2,392,873.41Dr. --- $126.768.605.77

43

Exhibit "B" STATE HIGHWAY BOARD OF GEORGIA RECONCILIATION OF FUND DEFICIT, REFLECTING FUND REVENUE, APPROPRIATIONS AND ALLOTMENTS
JULY 1, 1932 TO JUNE 30, 1933.

FUND DEFICIT, JULY 1, 1932___
Revenue Received (Schedule No. 7) Motor Vehicle_ Gasoline Taxes_ Miscellaneous Income__

FUND REVENUE

_____ $ Ll20,670.19 7, 786,322.58 18. 852.02

$ 8, 925,844.79

4,970,673.21

Estimate.d Participation Jl.ccru.-.ls
Federal Aid Allotments County Cash_ County Contract_ Other Cash Other Contract_

_____ $ 4,857,499.02 10,335. 26Dr. 337.585.93Dr 27,132.65 1.390.00 $4,538,100.48

Total Fund Revenue

13,463,945.27

Available for Allotments_____

___________________ $

APPROPRIATIONS AND ALLOTMENTS

Continuing Ailotrnent' (Schedule No. 6)

Construction Projects Regular Funds ________________ $ G,887,200.13

Convict Outfit Appropriation__ 551,185.15

Asphalt Dept. ApproPriation____ 332,170.41

Maintenance Appropriation_____ 78,030.34 $ 7,848,586.03

Survey Projects____________________ _

6,547 .86Cr.

Reconstruction Projects_

30,965.59

Maintenance General------------

l, 349,605.04

8, 493,272.06

Total Continuing Allotments____________________ $ 9, 222,608.80

Non-Continuing Allotments (Schedule No. 6)

Administration, General Administration Appropriation_

352,198.99

Maintenance Appropriation ________::_26:c'_:c8c:_50:.:._:c8cc4~ 379,049.83

Research and Analysis ____________ _ Collection of Revenue ____________ _
Quarry __ ---------------------------Equipment
Equipment Appropriation_______

38,113.83

7,096.29 79, 432.07
874.99

Maintenance Appropriation _______c2:..:0.:..,5:..:9:..:2.:...l:..:O:_____ Shop ________________________________ _
Legislative Transfers W. & A. Rentals __________________ $ 1,080,000.00

58,705.93 85.55Cr.

Motor Vehicle License Tags

23,790.39

l, 103,790.39

Total Non-Continuing Allotments ______________$ 1,628,863.95

Total Allotments __ ------------------------------- 10,851,472.75 Continuing Appropriation (Schedule No. 6)

Maintenance Appropriation______ .$ 1, 540, 631.08 Allotments__________________________ l, 505,958.36

Balance Forwarded to 1933-34 __ _

34,672.72

Total Allotments and Appropriations_---------------------------$

10,886,145.47

Fund Deficit as per records ________________________________________ - _________ $

Less: Unrecorded Reserves
Construction Detail Estimates Revolving Fund- ______________ _

$ 368,680.04 200,000.00

Fund Deficit June 30, 1933-Exhibit "A"

______ $

44

2. 392,873.41
568,680.04 2. 961,553.45

THE HIGHWAY DOLLAR
Gasoline ?.i>x 54.5 "k
INCOME
EXPENDITURES JULY 1,1932 -JUNE 30. 1933.
45

Exhibit "C" Page 1

STATE HIGHWAY BOARD OF GEORGIA

STATEMENT OF REVENUE RECEIPTS AND EXPENSE DISBURSEMENTS

JULY 1, 1932 TO JUNE 30, 1933.

REVENUE RECEIPTS

State Treasurer
Motor Vehicle License Tax Fuel Oil Tax_ --------------

1,120, 670.19 7, 786,322.58$

8,906,992.77

Counties Cash for Construction ___ . ________ _
Construction Contract Credits ____ _

3,228.66 272,914.61

276,143.27

Railroads, Cities, etc.
Cash for Construction Construction Contract Credits ____ _

$

9,241.74

3, 718.32

12,960.06

U. S. Government
Federal Aid Vouchers for Construction _______________________ _
Miscellaneous Income. ____________ _
Total Revenue Receipts _________ _

5,065,020.34 18,852.02
------------- .....$ 14,279,968.46

EXPENSE DISBURSEMENTS

Administration (Schedule No. 8-A1
General Administration General Office... ___________________ $
Division Offices __ Warehouse.

294,317.75 66,853.16 18,298.48$

Research ____________ _ Collection of Revenue_ Quarry_--------------------

379,469.39
7,103.81 79,507.38
876.49$

Construction (Schedule No. 8-B)
Surveys Actual Surveys_ _________________ $
Plans ____ _

63.894.45 63,421.99$

127,316.44

Construction

Supervision_

__________ $

672,861.64

Actual Construction _

10,696,769.96

ll, 369,631.60

Maintenance (Schedule No. 8-C)
General Supervision.------------- --------- $ Actual Maintenance ______________ _

82,674.30 1,306,631.06$ 1,389,305.36

Reconstruction Supervision. _______________ . _______ . Actual Reconstruction ____________ $

10 '022 .ll

10,022.ll

466,957.07 U,496,948.04 1,399' 327 .47

46

STATE HIGHWAY BOARD OF GEORGIA

Exhibit "C" Page 2

STATEMENT OF REVENUE RECEIPTS AND EXPENSE DISBURSEMENTS

JULY 1, 1932 TO JUNE 30, 1933.

Land, Buildings and Equipment (Schedule No. 8-D)

Administration Land and Buildings_

_______ . $

Euuipment _____ _

720.99 6,605.64 $

7,328.83

Construction Equipment. _____ _
Maintenance Land and Buildings_ Euuipment_ _________ _

-$

6, 523.88

14.284.80

36,341.97 20,808.48 $

84,477.08

Legislative Transfers (Schedule No. 8-El Prison Farm Purchase W. & A. Rental Discount. ________ _ Motor Vehicle License Tags_
Total Expense Disbursements_ Excess Disbursements over Receipts
DEDUCT Excess Proprietary Assets over Liabilities. July l. 1932 ____ _
Excess Proprietary Assets over Liabilities, June 30, 1933-Exhibit "A" ___ __

$

5,118.76

1,080,000.00

23,790.39

l, 108, 909 .15

14,536.618.81

$

256.650.35

l, 731,177.44 $ 1,474,527.09

RECONCILIATION

Excess Proprietary Assets over Liabilities (as above). Available for Liquidation of Fund Balances and Unrecorded Reserves ___________ _
Fund Balances (Contracts, Allotments.PurchaseOrders.etc.) _____ $

3,867,400.50

Unrecorded Reserves (Detail Estimates. Revolving Fund) __

568,680.04

1.474,527.09 4,438,080.54

Fund Deficit-Exhibit "A"

$ 2, 961,553.45

47

l p..

STATE mGHWAY BOARD OF GEORGIA LAND, BUILDINGS AND EQUIPMENT
June 30, 1933.

Schedule No. 4..

Description

Appraisal Value
July 1, 1932

Additions for Fiscal Year
1932-33

Total June 30, 1933

Depreciation for Fiscal Yr.
1932-33

Appraised Value
June 30, 1933

Land___

___ _ _ _____ $

Buildings_____ ___ __ __ __ ___

Automobiles ___________ . _. __

Trucks ____ __ _______ ____ ___

Tractors_

____ ______ __ __ __

~Other Road Equipt._ ____ __ ___

Engineering Equipt._____

OfficeEquipL ________________ ,

Shop Equipt. __ ___ ______ I

LaboratoryEquipt. ______ _____

Quarry Equipt.__ ___ ______

176,335.25 308,411.95 113,028.00 466,544.00
260,336.00
423,487.00 48,818.00 51,848.50 62,325.00 17,543.00 72,737.00

$

110.00

7,134.67

15,030.90

3,070.03

5,211.50

26,356.44

972.11

4,265.66

1,857.33

468.44

$ 176,445.25 315,546.62
128,058.90 469,614.03
265,547.50
I 449,843.44
49,790.11 56,114.16 64,182.33
18,011.44 72,737.00

$ 317.62
128,058.90 67,294.03
57,638.50
88,674.44 5,644.11 13,731.16 6,726.33
958.44 7,584.00

$ 176,445.25 315,229.00
402,320.00 207,909.00 361,169.00 44,146.00 42,383.00 57,456.00 17,053.00 65,153.00

_

_

_

T_o_ta_l

_-E_x_hi_bi_t

_"A_"________________:_=_2=_,0=_0=1_=,4_=1'_---'3_"'-'_.7=0_=--=_

__:1_______~~__,4__'7"_7'.__Q_8________

=2~,Oc-c6=5=,8=9=0=.7=8=-= lc=~3~76~,~62~7~-~53::..C*=
_ _ _ _ _ _ _ ___:____ _ _ _ _ _ _ __

_

I

_

,

~-9_,2_6_3~.2_5_

__

_

*Depreciation includes value of automobiles disposed of by the State Supervisor of Purchases on April1, 1933.

Schedule No. 6 Page 1
STATE HIGHWAY BOARD OF GEORGIA STATEMENT OF REFUNDING CERTIFICATES
JUNE 30, 1933

.County

1----A_m_o_u_n_t________c_o_u_n_t_Y_____ ____A_m__o_u_n_t___

Applmg___________ !$

1
243,720.14 Elbert_____________ $

166,551.32

Atkinson__________ Bacon_____________

12,314.60 EmanueL_________ 26,272.90 Evans_____________

493,986.86 72,135.44

Baker_____________

24,969.42 Fannin ________ __

187,014.95

Baldwin___________

99,927.56 Fayette ___ ________

46,859.63

Banks_____________

75,191.59 Floyd_____________

430,838.77

Barrow____________

71,720.80 Forsyth________

65,191.97

Bartow____________

124,299.84 Franklin__________

108,765.48

Ben HilL_________ Bibb______________

61,400.58 Fulton____________ 898,356.10 Gilmer____________

113,926.08 56,130.62

Bleckley___ ___ __ ___

26,606.23 Glynn_____________

420,745.28

Brantley__________ Brooks____________

36,034.961 Gordon___________ 359,320.51 Grady_____________

91,044.59 111,967.53

Bryan_____________

30,623.58 Greene____________

61,662.97

Bulloch___________

123,758.98 Gwinnett_ _____ ___

206,029.29

Burke_____________ Butts_____________

243,630.66 Habersham________ 82,818.10 HalL_____________

341,736.71 400,391.36

Calhoun__________

9,977. 75 Hancock__________

75,923.85

Camden___________

13,152.00 Haralson__________

149,659.86

CampbelL________

205,893.32 Harris_ ___________

106,678.62

Candler___________

30,835.42 Hart______________

125,506.39

CarrolL___________

523,814.89 Heard_____________

19,131.75

Catoosa___________

23,142.85 Henry_____________

219,591.56

Charlton__________

81,348.22 Houston__________

291,391.43

Chatham__________ 1,310,079.46 Irwin______________

56,545.31

Chattahoochee____ Chattooga___ ___ ___

17,875.97 Jackson___________ 124, 788.ll Jasper_______

127,589.35 91,658.61

Cherokee__________ Clarke____________ Clay_______________

199,509.72 Jeff Davis_ 372,977.13 Jefferson_________ 47,141.09 Jenkins __ _____ ___

33,398.63 350,905.53 85,086.68

Clayton___________

49,202.42 Johnson__________

35,649.49

Clinch_ ___________

62, 153. 55 Jones_ ____________

42, 877 .44

Cobb______________

278,612.80 Lamar____________

19,499.10

Coffee__ ____ ______

75,961.09 Laurens___________

284,243.00

Colquitt__________

150,890.06 Lee________________

81,509.77

Columbia_________

61,865.28 Liberty __ ___ ______

31,332.06

Cook______________

209,732.93 Lincoln_ _________

32,830.45

Coweta____________

487,277.97 Long______________

38,174.64

Crawford Crisp______________

31,709.18 Lowndes__________ 91,539.61 Lumpkin__________

547,277.10 84,092.05

Dade______________

74,869.42 Macon_____________

193,593.06

Dawson___________

25,713.39 Madison___________

20,359.40

Decatur___________

371,629.87 Marion____________

22,817.86

DeKalb___________ Dodge_____________ Dooly______ ______ _

259,849.79 McDuffie__ 64,102.49 . Mcintosh_________ 192,022.91 Meriwether________

53,649.81 15,277.50 405,913.92

Dougherty________

493,915.221 Miller_____________

35,395.83

Douglas___________

44,494.34 Milton____________

20,713.10

Early______________ Effingham________

77,836.12 MitchelL_________ 57,391.06j1 Monroe____________

417,193.11 119,384.92

50

Schedule No. II Page 2
STATE HIGHWAY BOARD OF GEORGIA
STATEMENT OF REFUNDING CERTIFICATES
JUNE 30, 1933.

County

Montgomery _______ $ Morgan __________ _

Murray____ _

Muscogee Newton _________ _

Oconee _________ _

Oglethorpe ______ _ Paulding ________ _ Peach ____________ _

Pickens _________ _

Pierce ____________ _ Pike______________ _

Polk _____________ _

PulaskL _________ _ Putnam __________ _

Rabun ___________ _

Randolph________ _

Richmond Rockdale _________ _ Schley __________ _

Screven _________ _

Seminole ________ _

S p a l d i n g __

Stephens Stewart_

_ ~

~

~

-

:

:

::

I

Sumter __________ _

Talbot ___________ _

Taliaferro ________ _

TattnalL ________ _

Taylor ___________ _

Amount 11

County

Amount

124,580.70 Telfair.

__ _1$

74,387.83

259,212.39 TerrelL ___________ I

271,526.03

89,811.16 Thomas __________ _

391,611.67

827,817.07 Tift ______________ _

177,857.97

95,468.70 Toombs ______ _

205,582.07

26,106.42 Towns ______ _

45,084.25

39,279.24 Treutlen ______ _

2,000.00

19,157.24 Troup _______ _

631,255.57

8,194.69 Turner_ __________ _

24,384.28

120,956.51 Twiggs _________ _

22,555.36

169,875.66 Union ____________ _

50,680.00

12,808.02 Upson ___ _

121,586.46

183,409.70 VValker ___________ ,

187,076.07

242,410.52 VValton_ ___ -----

161,859.52

103,271.71 VVare ____ _

634,572.73

318,631.00 VVarren_ _ ___ _

22,603.85

82,788.81 VVashington _ ____ _

106,474.51

1,019,304.41 1VVayne

272,659.54

2,091.95 VVebster __________ _

13,740.18

55,521. 49! VVheeler __ _

133,062.67

40,751.20 VVhite ___ _

35,472.82

25,742.03 VVhitfield_

265,529.38

377,686.16 VVilcox___________ _

10,093.64

133,031.70 VVilkes ________ _

268,753.94

47,475.00 VVilkinson __ _

36,060.67

365,369.72 VVorth __ _

245,023.78

74,343.95 Coastal Highway _

882,898.87

15,691.86

1~-----

43,422.071 26,056.54

TotaL _______ $ 26,516,763.29

51

Schedule No. 6

STATE HIGHWAY BOARD OF GEORGIA

SUMMARY OF ALLOTMENTS, APPROPRIATIONS, AND FUND BALANCES; ALSO

REFLECTING RECONCILIATION WITH EXPENSE DISBURSEMENTS

- -~-----=------------~-=---~--=---=--=-=---

JULY 1, 1932 TO JUNE 30, 1933.
===~

I Not

Estimated

I

Net

/

I Fund Balances Participation FundBalances Allotments

Encum- Expenditures

Total

I I Estimated

Net

Fund Balances Participation Fund Balances

_

July 1, 1932. July 1,1932. July 1,1932.

[ brances

Charges Juno 30,1933. June 30, 1933./June 30, 1933

A~~~~~~::~~:~:ents -----------------------~------~-----~----- ---- . - - - -

1
. --

-~ - -

--------1 (Schedule N o.6-A) 1$5, 486,652.69 $2,659,686.18 $8,146,338.87 $ 7, 848,586.031$ 94.744.09 $11,369,631.60 $11, 274, 887.51 $ 4, 720,037.39 $1,144,220.32 $3,575,817.07

Surveys __ ----------- 136,041.86 ______ _ 136,041.86 CR6,547.86

267.57 127,316.44 127,048.871

2,445.131 _

2,445.13

~~~~~:~~;~!on.

_____________ ______ _____ _____ ____

30,965.59 DR9,607.65

10,022.11

19,629.76

11.335.83/ ____ __ j 11,335.83

(Schedule No.6-B)

67,112.55[------------

67,112.55[ 1,349,605.04 28,095.69 1,389,305.36 1,361.209.67

55,507.92[-------------~ 55,507.92

Convict Farm_

73,703.27._____________

73,703.27 1 ______________ ____________

5,118.76

5,118.76 1

68,584.51~------------

68,584.51

T~~~~t~~~~~uing

~~63,5:~~~~;~:.686~~:~~~=~:/,;::::8~~ 1

~~=~=~~~~2.

90~:~:

;2,

78~:~:~ 1 ~857,

:~;~~~:~:~:

~~=~90~:

Non-Continuing Allotments

I

Administration

.



I

(Schedule No.6-C)

$ 379,049.83$

419.56$ 379,469.39 $ 379,049.83

_____ __

Research (Schedule No. 6-C)___________

1

I

__ !

7.096.29,

7.52

7,103.81 1

7.096.29 __

:C?o~ulo~l~e:~c~~t~i~o~~n:hheedodufulleeRNevo-.1::~-~:::.::.

--~-----::::: 58,~~:~: 5,77~:~~- 64.:~~:~;~ 58,~~:~:1 -----1

I 79,432.07

75.31

79,507.38

79.432.oL ___________ , --------- --- -----------

j

::::::::::::1::::.:::::: :::::::::::::

~~~~=~ .~.;~. .,j~~=~:.::1: ,;::,;:;;~;:::~;:~.~:;. "'"'~~=;~.. ~::~r~e~~~~:~-----~::::__
u=~ '"'" --

-

1
-I

. I____ 1 1.0~~~~:~~ ______ ~ -5 55 i:iisa:iiiiii:iiii 1.0~~~:~~1::::_:::::::: :::::__ ,,oo.~ . --- ~. oo.w "~.~] - ...... - - ...

-
-.. -

Schedule No. 6

STATE HIGHWAY BOARD OF GEORGIA

SUMMARY OF ALLOTMENTS, APPROPRIATIONS, AND FUND BALANCES; ALSO

REFLECTING RECONCILIATION WITH EXPENSE DISBURSEMENTS

JULY 1. 1932 TO JUNE 30, 1933.

I I -========---====-~=-=-=======~====-=~-=--==-=-=-=-=--=====~===

Net

Estimated

Net

'

I I Estimated

Net

Fund Balances Participation Fund Balances 1\llotments

Encum- Expenditures

Total

Fund Balances Participation Fund Balances

July 1, 1932. July 1, 1932. July 1, 1932.

brances

Charges June 30,1933. June 30, 1003.1June 30, 1933.

-----r------- APPROPRIATI~-=----- ------ -------

----- ------~-- ------

----- -------- - - - ---

;;;:;~~ance 1 I Appro-

I

/

I 1

priation (Schedule (No. 6-F)....

_ __________ ____________ $ 1,540,631.08 Appropdat ion

I . ... . ... ---- .. -1-- ---- ... I --- --- ...

1 ~---- - - - - - - - ___ ____

1,505,958.36 ~~-Allot~= rlt_s____ !,_:_:_~~~~~!___3_4~672. '/:~'~~~~~- _ -~~'/::2: I

T~J~!~~~r-~~~~~--- ,__ ___

$ 34,672.72 ____

I

$ 34.672.72 .....

$ 34.672.72

1 N~~l~~~~93~a~~-~~~~:l$5,763,510.37

--~~

Estimated Participation. July I.

1932----------------- __

$2.659,686.18

Fund Balances. July I. 1932

$8,423,196.55

I
I I
I

[

~~ ~-~~~,

]

I

I

Allotments for Year-Exhibit "B".

$10,886,145.47

[

I

Encumbrancesforyear-NetLiuuidation.

--:$ ---

!!9,860.291

I

1,

Expenditures for Year-Exhibit "C" ____ Total Charges for Year.. .... ____

.

..-- $l4,5o0 6,6l8.Sl

I

-------- -~- ------1$14,416,758.52

FundBal2nces. June 30. 1933. _____________ Estimated Participation, June 30. 1933.

_____ .. --- $4,892,583.50

[

1

.

.

. _____________ $1.157,784.24

Net Fund Balances. June 30.1933.

______ $3,748,363.18

ADD Unliquidated Purchase Orders etc.

l!U, 037.32

Total Fund Balances. Net. June30. 1933-Exhi..cb_i_t_".::A=-'-'_-.::..c--'.-'_.:__.:__ _ _..c

$3,867,400.50 --------------

Schedule No. 6-A

STATE HIGHWAY BOARD OF GEORGIA

DETAIL OF CONSTRUCTION UNENCUMBERED ALLOTMENTS, BY CLASS OF PROJECT

JUNE 30, 1933

Unencumbered Allotments

Contracts Regular Contracts _____________________ $ 2,632, 735.67 Emergency Federal Aid Contracts _______ 1,617,779.33

Total Con tracts _____________________ _

$4,250,515.00

State Force Allotments
Division Forces ___________________________ $ 13,255.05 AsphaltForces_____________ _____________ 456,267.34

Total 8 tate Forces_ _____________________

469, 522.39

Total Unencumbered Allotments ______ _

$4,720,037.39

Less: County Contract Participation___ _

26,454.89

Net Cash Liability_____________________ _

$4,693,582.50

Less: Estimated Participation Federal Aid ______________________________ $ 1,102,961.55

County, Cash, Excess Participation______ Other Cash______________ ______ ___ __

13 ,563.92Cr 28,367.80 1,117, 765.43

Net St~te ~~ab~~ity, June 30, 1933Exhibit A. _______________________ - _

$3,575,817.07
=====

'-

Schedule No. 6-B.

STATE HIGHWAY BOARD OF GEORGIA

DETAIL OF MAINTENANCE UNENCUMBERED ALLOTMENTS, BY UNITS AND CONGRESSIONAL DISTRICTS

Unencumbered Allotments July 1, 1932

Allotments

JUNE 30, 1933
-

Net

Expenditures

Encumberances

DIVISION NO. 1.

T otal Charges
--

Unencumbered
Allotments June 30, 1933

1-4_____________ $ 1-5 _____________ 1-6____ --------1-7_____________ 1 - 9 ____________
Totals ______ $
-

438.75 704.52 1,236.93 6,593.20 983.64
9,957.04

2-5 _____________ $ 2 - 8 _____________ 22--190--_-_-_-_-_-_-_-__-_-_-_-
Totals ______ $

1,157.44 4,842.12 4,123.76
850.94
10,974.26

$ ll,024.12 13,001.85 5,7ll.97 106,650.17 36,442.47
$ 172,830.58

' $

7, 760.16

109,223.81

125,866.65

8,322.78

$ 251,173.40

$

377.52 $ ll ,291. 65

58.73

13,135.94

22.72

6,888.28

1,989.03

111,700.33

1,047.41

37,213.07

$ 3,495.41 $ 180,229.27

DIVISION NO. 2.

$

109.24 $ 8,801.64

2,908.24

110,361.31

2,262.96

126,745.63

222.53

9,292.17

$ 5,502.97 $ 255,200.75

$ 10,914.13 13,077.21 6,865.56 109,711.30 36,165.66
$ 176,733.86
$ 8,692.40 107,453.07 124,482.67 9,069.64
$ 249,697.78

$

548.74

629.16

83.34

3,532.07

1,260.45

1$

6,053.76

$

225.20

6,612.86

5,507.74

104.08

$ 12,449.88

------

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 6-B-Cont'd.

DETAIL OF MAINTENANCE UNENCUMBERED ALLOTMENTS, BY UNITS AND CONGRESSIONAL DISTRICTS

JUNE 30, 1933
c---=---=-----=-=-----=-===-=-====-=---==--- - - - - - - - - - - - - - = - - -_ - - __-_--_---==------'----=----=c..-=--=--~-~~--=--

Unencumbered I Allotments , Allotments July 1, 1932 1.

Net

Expenditures

Encumbrances

Unencumbered Total Charges Allotments
June 30, 1933

----------- -------'----------- ------------------- -----

DIVISION NO. 3.

01 0>

3-3_

3-4____ - -

1$

1,834.14 4,831.17

1$ I

32,398.10 81,455.21

1$ I

776.33

1$

33,644.06

I
$

32,867.73

I
$

998.50

84,605.51

83,607.01

1,364.51 2,679.37

3-6 --- -3-12 ___

6,194.50 I 104,194.41 I

-

1
-

,034.79
---

- I

22,830.90
----

-

I

1,783.93 1,032.90

I

108,584.49 22,563.29

106,800.56 21,530.39

3,588.35 2,335.30

--1----------------

Totals __ - $ 13,894.60

------- ----- -

-

I$ 240,878.62 [$

4,591.66 1$

I - - - - - - - -I- - - - - - - - - - - - -

__2_4_9,397. 35 -~---~4~~-05_._69--

_1$_ _9_._967. 53-

-

DIVISION NO. 4.

-- - --------------- ----------------;---- ---------------------

4-L __
4-8 -4-10 --4-12

$ 3,153.69
628.88

1$
I

53,639.71 8,882.24

I
1$

5,678.68 808.85 I

I 90,015.95
69,649.52

Totals

I

I

-!$ 10,270.10 ',$ 222,187.42 1$

- - - - - - - - - - - - - - -I- - - - - -

I

747.78 $ 54,515.01 II$ 53,767.23 $1 3,026.17

238.61

9,732.69

9,494.08

17.04

269.07

93,254.38

92,985.31

2,709.32

1,742.63

67,537.94 I 65,795.31

4,663.06

--;-------------1------

2,998.09 1$ 225,040.02 1$ 222,041.93 1$ 10,415.59

--------------'---

Schedule No. 6-B-Cont'd. STATE HIGHWAY BOARD OF GEORGIA DETAIL OF MAINTENANCE UNENCUMBERED ALLOTMENTS, BY UNITS AND CONGRESSIONAL DISTRICTS
JUNE 30, 1933
"___---_ = "---=------""~-=- '---===='--===='------'==:==
IU1R~f.:f.~:d I Allotm Enow_!_b_e~_a_n_c_e_s"___.__E_x_p_e_ndltn<~ I Total ChM_:_~:1~ri~~d

-------

5-2 -"

---'$

"'__,

5-3"---5-11 ---

5-12 -

DIVISION NO. 5.

--~ 39~ .54~ 0~ r ~ $ ~~ 11~ 7,7~ 46~ .2~ 1 -~ $-~~ 2,3" 9- 3.1- 9 --$~~ 1~ 15~ ,12~ 8.= 18

866.62 2,057.80

73,0!'.50 46,699.72 1

688.74 610.50

73,407.63 47,710.58

100.17

7,163.05

I-~ 23- 5.28 1-7- ,370.86

Totals

- $ 2,985.05

-----"" ------

i$ 244,691.48 l$ ----

3,927 0 71

$ 243,617.25

"------~-----"

112,734.99 $ 4, 971.68

1$ 72,718.89

1,230.23

47,100.08

1,657.44

I

7,135.58

127.64
---------

1$ 239,689.54 $ 7,986.99

"- _______" ____"_

6-L __

$ 4,946.52 ]$

6-1L_

--

9,736.14 :

6-12_

I 1

4,348.84 1

Totals

$19,"031:"5cl-i$

63,813.87 126,483.23 32,717.20
223,014.30

DIVISION NO. 6.

-------

-

-

1$
I
I

1,539.32 ]$
I 1,468.30 ! 598.53Dr

68,538.49 132,080.30 35,201.93

I!$ 66,999.17 130,612.00 35,800.46

$
I

1,761.22 5,607.37 1,265.58

1

$--2,409-:G9-$~~--i$-233,4il.63-l$--8,634.17 - -

~;i~ges~a~~t--,__-_--

.$

Crews__

1

I

_ - -_ _ _ _

-1

2,45l.36Cr $--~i.il-6--1----=-~" _ " _ I$ *2,45l.36Cr , _ _ ~ " _

J--*:_.719.~0~-~-_:___:_ 2,719.40Cr [__2,719.40_ 1_"-_____ _:_

___:_____ _:___:_:

_T_ot_a_ls-= _____-'-:$__67, 112.55 _/_$_1_,3_49_,605. 04_----'-i$_ ~, 095. 6~__$1 1,389, 3~. 36__ I 1, 361, :?(J9. 6'7'__ $ ~507. 92 __

*-Expenditures for Signs and Bridge Paint Crews are pro-rated to the Divisions.

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 6-B-Cont'd.

DETAIL OF MAINTENANCE UNENCUMBERED ALLOTMENTS, BY UNITS AND CONGRESSIONAL DISTRICTS

JUNE 30, 1933

Unencumbered Allotments July 1, 1932

Allotments

Net Encumbrances

Expenditures

Total Charges

Unencumbered Allotments June 30, 1933

Div. No.1_ _____ $

2____ --

01 00

3___ --4 ______

5 ______

6 ______

Totals ______ $

9,957.04 10,974.26 13,894.60 10,270.10 2,985.05 19,031.50
67,112.55

SUMMARIZED BY DIVISION UNITS

I
$ 172,830.58 '$ 251,173.40 240,878.62 222,187.42
244,691.48 223,014.30

3,495.41 5,502.97 4,591.66 2,998.09 3,927.71 2,409.09

180,229.27 1$ 255,200.75
249,397.35 I 225,040.02
243,617.25 235,820.72

$ 1,354,775.80 $ 22,924.93 $ 1,389,305.36

$ 176,733.86 249,697.78 244,805.69 222,041.93 239,689.54 233,411.63
$ 1,366,380.43

$ 6,053.76 12,449.88 9,967.53 10,415.59 7,986.99 8,634.17
$ 55,507.92

UNDISTRIBUTED BY DIVISION UNITS

G. 0. Signs _____________________ $ Bridge Paint
Crews _________________ _

2,451.36Cr $ 2,719.40Cr

2,451.36 2,719.40

j___________ _________

___ 1$

2,451.36Cr 2,719.40Cr

Totals______ ___ __ _____ ___ $

5 ,170. 76Cr -$~~5_,_17_0_._76~-i~~~~~~-i~~-5_,_17_0_.7_6_C_r_'~--- _ _ __

Totals ______ $ 67,112.55

$ 1,349,605.04
1
1

$ 28,095.69

$ 1,389,305.36 [$ 1,361,209.67

j$ 55,507.92

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 6-B-Cont'd.

DETAIL OF MAINTENANCE UNENCUMBERED ALLOTMENTS, BY UNITS AND CONGRESSIONAL DISTRICTS

JUNE 30, 1933

~- Unencumbered

\

Unencumbered

Allotments

Allotments

Net

[' Expenditures Total Charges

Allotments

I___J_u_l~y_1~,_1_93_2________________~E_n_c_u_m_b_r_a_n~ce~s________________________________ June30,1933

SUMMARIZED BY CONGRESSIONAL DISTRICTS

Dist. No. L ____ $ 8,100.21 $ 117,453.58 $ 2,287.10 $ 123,053.50 $ 120,766.40 $ 4,787.39

23_._-_-_-__-

39.540r 2,700.76

117,746.21 105,480.60

2,393.19 1,465.07

115,128.18 107,051.69

112,734.99 105,586.62

4,971.68 2,594.74

4.. - -

5,269.92

92,479.33

1,376.02

95,897.16

94,521.14

3,228.11

5.. - -6 _____

1,861.96 7,431.43

20,762.01 109,906.38

167.97 1,806.65

21,937.58 115,472.77

21,769.61 113,666.12

854.36 3,671.69

7 _____

6,593.20

106,650.17

1,989.03

111 '700.33

109,711.30

3,532.07

8 - --

5,471.00

118,106.05

3,146.85

120,094.00

116,947.15

6,629.90

109__-_-__

5,107.40 6,529.62

162,309.12 98,338.73

3,310.37 491.60

163,958.70 102,546.55

160,648.33 102,054.95

6,768.19 2,813.40

1L ___ 11,793.94

173,182.95

2,078.80

179,790.88

177,712.08

7,264.81

12.. ---

6,292.65

132,360.67

2,412.28

132,674.02

130,261.74

8,391.58

Totals ______ $ 67,112.55 $ 1,354,775.80 $ 22,924.93 $ 1,389,3C5.36 $ 1, 366' 380.43

UNDISTRIBUTED BY CONGRESSIONAL DISTRICTS

------ $ G. 0. Signs _____ - ~---- -

2,451.360r $

-- ~-~.451.36

----

Bridge Paint

-~ i$

Crews. ________ ---------- ----- -

2, 719.400r

2,719.40

- -- ---- ---

2,451.360 r 2,719.400 r

---- $ Totals ______ -- --- -----

5,170. 760r $

Totals ______ $ 67,112.55 [$ 1,349,605.04 i$

5,170.76 28.095.69

$ ----- --

---r$

5,170.760 r

$ 1,389,305.36

1,361,209.67

$ 55,507.92
---
1----------
55,507.92

STATE HIGHWAY BOARD OF GEORGIA DETAIL OF ADMINISTRATION UNENCUMBERED ALLOTMENTS, BY UNITS
JUNE 30, 1933

Schedule No. 6-C.

Unencumbered Allotments July 1, 1932

Allotments

Net Encumbrances

Expenditures

Total Charges

Unencumbered Allotments June 30, 1933

G. o. _______ _
G. o. Mtnc.
Mtnc. Claims ~ __ Magazine

----- .. --- - - $

----------~~~-- ---~--~~---
GENERAL ADMINISTRATION ALLOTMENTS

261,878.05 16,524.58
10,326.26 5,166.37

GENERAL OFFICE

315.05

-----

- - ~~~--

-~--~

$ 262,193.10 $ 261,878.05

-- -

1$

107.44

16,632.02

16,524.58

10,326.26 5,166.37

10,326.26 5,166.37

I- -

Totals __ _
-I Warehouse___

$ 293,895.26 -I$ 18,280.94

No. L_ ------- - --- ---

2 ___ 3___ -

---

-- --

-----

4___ ---

---

5 ___ ~

6___ --

1$ - - - -
----

Totals ___ - - ---- -----I$

Totals __ ~ - - ---

---

-$

9,629.08 10,604.66 10,362.35 12,608.98 11,232.10 12,436.46
66,873.63
379,049.83

1$

422.49 $ 294,317.75 $

------

WAREHOUSE

293,895.26 I - - - ----~

----~

I

1$ I

17.54 I$ 18,298.48 1$ 18,280.94 1- ---

DIVISIONS

j$

4.72 $ 9,633.80 j$ 9,629.08

15 .34Dr

10,589.32 I 10,604.66

72.G6Dr

10,289.69

10,362.35

95.82

12,704.80

12,608.98

18.08

11,250.18

11,232.10

51.09Dr

12,385.37

12.436.46

-

---. --

--
-- --

- -- ------

--

__ _ ____ _ __

$

20.47Dr ,$ 66,853.16 ~~66,873.63 -- ~--_-_.:_

1

j$

419.56 1$ 379,469.39 ,$ 379,049.133 I_

____ -----

----~

STATE IDGHWAY BOARD OF GEORGIA

Schedule No. 6-C-Cont'd.

DETAIL OF ADMINISTRATION UNENCUMBERED ALLOTMENTS, BY UNITS

JUNE 30, 1933
-----

Unencumbered
Allotments July 1, 1932

Allotments

Net Encumbrances

Expenditures

Total Charges

Unencumbered
Allotments June 30, 1933

OTHER ADMINISTRATION ALLOTMENTS RESEARCH AND ANALYSIS

"' Analysis_ ,_. Research_
Totals_ ___ _

$

9.81 i'$

7,086.48 I

-$

7,096.29

I
1$

I

1$ 9.81Dr

I
I

17.33

$

9.81

7,103.81

7,086.48

1--7.52 1$ 7,103.81

$

7,096.29 1- -

I

Totals_

COLLECTION OF REVENUE

_1$ 79,432.07 1$

i

I

--------~-~---~-----~-~--~----
75.31 1$ 79,507.38 1$ 79,432.07
I,

----------

Totals ____ -I

--- $

874.99 1$

$ 1$ Totals__

--~--------I--87-,4-0

~~-
3.35

QUARRY

1.50 1$

876.49

84.33 ,$ 87,487.68

--~---------

1$

874.99

I

1$ 87,403.35 I

STATE HIGHWAY BOARD OF GEORGIA

MAINTENANCE APPROPRIATION JUNE 30, 1933.
APPropriation. fiscal year,

1932-33- - ---------DEDUCT: Allotments for year
Maintenance General Division No. L .. Division No. 2... Division No.3.. .. Division No.4 Division No.5.... Division No. 6 ___________ _
Bridge Paint Crews. -----~ Less: Prorated to Divisions......

7, 758.53 10,477.93

$172,830.58 251,173.40 240,878.62 222.187.42 244,691.48 223,014.30
2, 719.40Cr.

Schedule No. 6-E $1,540,631.08

G. 0. Signs ______________ $ 4,535.72

Less: Prorated to Divi-

sions............

6, 987.08

2,451.36Cr. $1.349.605.04

Maintenance Administration General Office.. _________ _
Claims........ ___ ... __ .....

$ 16,524.58 10,326.26

26,850.84

Maintenance EQuipment. .. Reconstruction. ___________ _
Shop ___ --------------Less: Shop Billings_

$ 172,861.97 172,947.52

20,592.10 30,965.59
85.55Cr.

Total Allotments .

Construction Project Allotmer.ts

from Maintenance Appro.

Route 9-53Construction

23 Forsyth.. ______ $ 11,634.45 109 Dawson ________ _ 7,613.68

268 Dawson.. .

3, 864.79

283 Forsyth........ . 2, 922.61

317-BC Lumpkin. ____ _ 6,194. 76

321 Forsyth ________ _ 8,026.74

$1,427,928.02 $ 40,257.03

New Construction Projects 141 Richmond __ ....$ 370 Richmond ...... . 279 Cook __________ __
357 Lowndes _______ _ 451-A EmanueL ______ _

5, 914.56 8, 536.03 12,807.29 23,273.13 8, 053.27

$ 58,584.28

Revision l93l-32Projects

61 Wilkes.. .........$ 4, 941. 76Cr.

282 Lowndes ______ __ 14,927.49Cr.

387 Burke ......... ..

941. 72Cr.

20,810.97

Total Construction Projects .......... _________ 78,030.34

TotaL.__________________________________________________________ 1, 505,958.36

Appropriation Balance, June 30, 1933-Exhibit "A"--------------------------- ~2__!~

62

Schedule No. 6-F

STATE HIGHWAY BOARD OF GEORGIA

ADMINISTRATION APPROPRIATION

JUNE 30, 1933.

Appropriation
Appropriation for year 1932-33___ _ DEDUCT: Underrun closed into
Surplus, June 30, 1933 _________ _

497,523.51 57,921.17

Net Available _________ _
DEDUCT: Allotments tor year
General Administration Division No. L__ __________ _ Division No.2 Division No. a___ Division No. L __ Division No.5 __ _ Division No.6 _________________ _ General Office __________________ $ Less: Blue Print Billings____ __

------------------------------------- 43g, 602.34

$
325,520.04 63,641.99

9,629.08 10,604.66 10,362.35 12,608.98 ll,232.10 12,436.46
261,878.05

Magazine ______________________ _ Warehouse ____________________ _

5,166.37 18,280.94 $ 352,198.99

Other Administration Allotments Research and Analysis __ Less: Test Billings __________ _

$ 36,683.02 29,586.73

7,096.29

Collection of Revenue __ Quarry _______________ _

79,432.07 874.99

Total Allotments _____ _

439,602.34

Appropriation Balance, June 30. 1933 __ _

------------- ===0=.0=0

63

Schedule No. 6-G STATE HIGHWAY BOARD OF GEORGIA

SURVEY APPROPRIATION

JUNE 30, 1933

Appropriation

Appropriationforyear1932-33 _______ $ 300,000.00

Less: Write off of Survey Project ____ _

Balances in October 1932

306,547.86

Net Available

___ _

Deduct: Allotments for year

$ 6,547.86Dr 6,547.860r

Appropriation Balance, June 30, 1933 __

0.00

64

Schedule No. 7 STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ESTIMATED PARTICIPATION, ALSO REFLECTING RECONCILIATION
WITH REVENUE RECEIPTS
JULY 1, 1932 TO JUNE 30, 1933

Description

Estimated Participation July 1, 1932

Fund Revenue Revenue Receipts Accrued

Estimated
Participation June 30, 1933

State Treasurer Motor Vehicle_____________ _ Gas Tax __________________ _

Counties

Cash for Construction______ ___ _________ $ 699,442.67

Contract for Construction__ __________ _

636,784.78

a;, Railroads, Cities, etc.

01 Cash for Construction___ _

10,476.89

Contract for Construction____ _

2,498.97

Federal Aid

Cash for Construction_________________ _

1,310,482.87

Miscellaneous Income_______________________ ____ _____ _

$ 1,120,670.19 $ 1,120,670.19

7,786,322.58

7,786,322.58

709, 777. 93Dr 337, 585. 93Dr

3,228.66 272,914.61

27,132.65 1,390.00

9,241.74 3,718.32

4,857,499.02 18,852.02

5,065,020.34 18,852.02

------- ---- ---. ------ ------
$ 13,563.92Cr 26,284.24
28,367.80 170.65
1,102,961.55
-------------------

Estimated Participation, 7-1-32 ___________ ~ 2,~~~~~=~

Fund Revenue Accrued ______________ _ ADD : Reduction in Reserve for Doubtful
County Cash Due___________________________ _
Fund Revenue-Exhibit "B" _________ _ Revenue Receipts-Exhibit "C" ___________ _
Estimated Participation, 6-30-33-Exhibit "A" _

$ 12,764,502.60
699,442.67
----~--
I
!~=2~~~~~~== ~2~~~~~~==-
___ ----- ---------- ----1~=1!!~~~~==

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF EXPENSE DISBURSEMENTS, BY OBJECT OF EXPENDITURE

Schedule No.8

JULY 1. 1932 TO JUNE 30, 1933

I =====

(Analysos)

(Analysis) I (Analysis)

(Analysis)

(Analysis)

(Sche~ule

I (Schedule

(Schedule

(Schedule

(Schedule

No. 8-E)

, Total I Ntt E>pense I ---

-~-- -- -- -- - - - - -- - -
MEMORANDUM
'I

OBJECT OF EXPENDITUFiE

No. 8-A) 1 No. 8-B)

No. 8-C)

No. 8-DJ

Legoslative Disbursements Net Expense Inter-Depart-~ Gross Expense

Administration; Construction Maintenance Equipment

Transfers

Disbursements m.ental Billings, Disbursements

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ---~-~----- - - - - - - - - - - - - - - - : - - - - -

Personal Services_________________ $ 323,434.36$ 846,328.01!$ 722,889.88 ______________ ,~ 1,354_21,$ 1,894,006.46$ 1,894,006.46$ 141,673.821$ 2,035,680.28

Equipment Expense______________

16,563.46 197,396.041 478,240.901:------------j

1 ~~~::~c~~~~c~:~~~~~~::::::::: -----i7:o94:8o ----- 4:189:95 ------6:397:84 '~ . :~ 1 64 477 8

Heat. Light. Power and Water___

4,837.84

1,813.46

1,263.01 .. -----------~-

Rents-----------------------------

5,515.40

5,146.56

8,892.54~-- _________

7.221
2:33]
____ ___________

692,207.62
~~::~~:~:
7,914.31 19,554.50

692,207.621'
~i::~~:~: --
7,914.311
19,554.50

5,457,381
56a:99l
3,404.30' 51.001

697,665.00
~:::~~:~
11.318.61 19,605.50

Traveling Expenses_______________
"'Supplies and Materials___________ "'Insurance_________________________

46,872.57
6,603.65 6,063.47

76,000.48]
643.228.85' 3,546.67

25,091.78- _________
135,891.14 --------------~---
16,885.26~------- ______ __

362.53
1

148,327.36
785,723.64 26,495.40

148,327.36
785,723.64 26,495.40

2,527.57
111,889.221' 511.49

15C,854.93
897,612.86 27,006.89

Printing,Binding,Publicity, etc. Claims_____________________________

9,846.36

74.62

8.23----- ________ --------------

18,714.52 ______________ . __________ -~----- ___ __ __ _ __________ .. __

9,929.21 18,714.52

9,929.21 ______________ 18,714.52 __________ . ___

9,929.21 18,714.52

Payments to Contractors________ ______________ 9, 620,182.36

SpecialandMisc.Expenses ______ . ___1~4lO.~j

99,04l.04i

1

T~;~~.~~~:~~-t_r_~:~~~-~~~~~~~:..1$ 466,957.071

II

2,249.84 ______________ :____________ __
1 1,517.05 ::.::==::_:_J ~182.861

9,622,432.20 9,622,432.20 --------------~' 9,622,432.20
1,219,151.~ _l,219,15l.59 ___~o.47 ___:.~!),~~~
$14,536,618.81$ 266,176.24$14,802,795.05

Total Co~struction-Exhib.it.'.'c.': ------------- $11,496,948_04

1
Total Mamtenance-Exh1b1t C ---------------------------- $ 1.399, 327.471

I

Total Equipment-Exhibit "C"---------------------------------------------- $ 64,477.08

I

Total Legislative Transfers-Exhibit "0"------------------------------------------------- $ 1,108,909.15

Total Expense Disbursements-Exhibit 'C" -------- _________________ .. __ .. __ . ___________________________ !$14, 536,618.81

NOTE: For Summary by Congressional Districts. see Schedule No. 9. For Summary by Division Units, see Schedule No. 10.

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF ADMINISTRATION EXPENSE DISBURSEMENTS, BY OBJECT OF EXPENDITURE
JULY 1, 1932 TO JUNE 30,1933

Schedule No. 8-A

GENERAL ADMINISTRATION

--II RESEARI CH AND ANA LYSis_ _

i

OBJECT OF EXPEI\I>ITURE

'

I

Inter-Depart-

General

mental

Net General

Administration Billings Administration

1

1
Inter-Depart- 1
1
Research and I mental 1
Analysis j Billings ,

Net Research

Collection
1 of Revenue
I

Quarry

i Total
I NGt Expense
1, Disbursements

-P-ers_o_n_a_lS_e_r_VI_.c_e_s_-_-__-_-__-_-__-_-__-__-_-_ $
00
-'l Equipment Expenses______________ Communication Services_________ ~
RTHr=a~v~e~!Lm.-~g~~E-~x,_p~e-0n-~s-e~s~--~~--~---~---__a_t__~_~- - - -~
S u p p ! i e s a n d M a t e r i a l s ___________ Insurance_________________________ Printing,Binding,Publicity ,etc.
1 ~~~c~:i~d:M:i~~::E~~~;;s-~;_:::::: _ TOTALS .. ------------------$

329,205.66$ 55,621.24$ 273,584.42$ 23,444.97 $ 23,439.971$

5.00$ 49,121.04$

723.90$ 323,434.36

9,488.20--------------

9,488.20

1,390.67

914.16

476.51

6,589.68

9.07 16,563.46

16,662.23 ______________
;: ~~; :~~~1~~~ ~~ ~~~~~~~ ~~~

16,662.23'

20.40

20.40 -------------

432.57--------------

::~~~ :!~~------~:~~~~~ --- ---~:~~~:4 -~~:::::::::: i:::::::::::::: ::::::::::::::

17,094.80
i: ~~~ :!~

23,892.23 -- -----.

23,892.23

1,746.171

1,746.17 ------. ---

22,980.341______________

46,872.57

14,142.46,

8,020.751

6,121.711

2,428.841

1,962.52

466.32

12.73,

2.89

6,603.65

5,711.84 ----------9,836.66 ------

5,711.84
9,836 .66~

118.15

118.15 -----

7.78 -------'

7.78

211.00 1

140.63

1.92~'--------------

6,063.47 9,846.36

1~:~~!:~! -:::::::::::::I__J:~~~~~=6:i45-.32:_______cli2:8SI-----;;:;48:2ol=----;;ii:iol::::::::::::::l--~~_:_~~-~-:~_!

443,111.38$ 63,641.99_-$___ 379,469.39$ 36,690.541$ 29-,586.73$ 7,103.81

79,507.38$

876.49$ 466,957.07

Total Administration Expense Disbursements-Exhibit "0"----- __ _ ..-------------------.------------- - ------- ------ ----.--- -------1$ 466,957.07

Schedule No. 8-B STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF CONSTRUCTION EXPENSE DISBURSEMENTS, BY OBJECT OF EXPENDITURE
JULY 1, 1932 TO JUNE 30, 1933

Object of Expenditure

Actual

Surveys Plans I Total

Construction Supervision Direct I
I I

Total

Total _ Expense Dis-
bursements

Personal Services ___________ -- $ 44,629.51 -- -------- $ 44,6?9.51 $541,342.25$ 260,356.25$ 801,698.50$ 846,328.01

Equipment Expenses ______ ---

2,251.09 --

---

2,251.09 24,056.38 171,088.57 195,144.95 197,396.04

0> 00

Communication Services_ ----Heat, Light, Power and Water__

Rents ____________________

----

50.52- - -------9.44 ------- . - -25.28 --- ----- --

50.52 9.44 25.28

1,254 .4.0 26.50 919.68

2,885.03
1,777.52 4,201.60

4,139.43
1,804.02 5,121.28

4,189.95 1,813.46 5,146.56

Traveling Expenses ___________

15,256.73 -------

15,256.73 57,668.87

3,074.88

60,743.75

76,000.48

Supplies and Materials ________

1,658.18-- ----------

1,658.18 12,992.02 628,578.65 641,570.67 643,228.85

Insurance ___________________ ---

---

----

68.43

3,478.24

3,546.67

3,546.67

Printing, Binding, Publicity,

etc. __________________________

12.10 --- -- --

12.10

62.52 --------------

62.52

74.62

Payments to Contractors ____ -- ----- ---- . -----

- --------- 3,817.56 9,616,364.80 9,620,182.36 9,620,182.36

Special and Miscellaneous Ex-

penses ____________________ --

1.60 63,421.99 63,423.59 30,653.03

4, 964.42

35,617.45

99,041.04

TOTALS __________________ $ 63,894.45$ 63,421.99 $ 127,316.44 $ 672,861.64$10,696,769.96 $11,369,631.60$11,496,948.04

Total Construction Expense Disbursements-Exhibit "C" _________________ _

-----1$11,496,948.04

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF MAINTENANCE EXPENSE DISBURSEMENTS, BY OBJECT OF EXPENDITURE
JULY 1, 1932 TO JUNE 30, 1933

Schedule No. 8-C

OBJECT OF EXPENDITURE

GENERAL MAINTENANCE

Supervision

Direct

Total

RECONSTRUCTION

Supervision Direct

Total

Shop

SHOP
Inter-Departmental
Billings

Net Shop

Total Net Expense Disbursements

Personal Services__________________ $ 51,859.71$ 667,280.11 $
85 Eo.uipmentExpenses______________ 3,900.30 473,437.30

Communication Services_________ 5,622.51

775.33

Heat. Light, Power and Water...

161.25

1,101.76

Rents------------------------------ 2,273.00

6,619.54

Traveling Expenses_______________ 15,893.58

9,015.86

Supplies and Materials___________ 2,177.22 128,527.51

Insurance_________________________

778.50 16,106.76

Printing,Binding,Publicity,etc.

8.23--------------

Payments to Contractors________ ------------

2,249.84

Special and Misc. Expenses______ ____________

1,517.05

719,139.82------------$ 3,750.06$ 3,750.06$ 62,612.61 $ 62,612.61 ------------$

477,337.60 ____________

903.30

903.30 4,543.22 4.543.22------------

6,397.84------------ ---------- -----------

540.59

540.59------------

1,263.01 ____________ ------------ ____________ 2,016.06 2,016.06------------

8,892.54 ____________ ____________ ____________

51.00,

51.00------------

24,909.44 -----------

182.34

182.34

781.40

781.40------------

130,704.73 ------------ 5,186.41 5,186.41 101,905.95 101,905.95 __ ----------

16,885.26------------ ------------ ------------

393.34

393.34------------

8.23 ____________ ------------ ------------ ----------- ------------ ------------

2,249.84 ____________ ------------ ____________ ------------ ----------- -----------

1.517.05 ------------ ____________ ____________

103.35

103.35 ------------

722,889.88 478,240.90
6,397.84 1,263.01 8,892.54
25,091.78 135,891.14 16,885.26
8.23 2,249.84 1,517.05

TOTALS-----------------------;---;;,;~;;$ 1.306,631.06$ 1,389,305.36 ------------ $ 10,022.11$ 10,022.11 $ 172,947.52,$ 172,947.52 __________ __\$ 1,399,327.47

-------+ Total Maintenance Expense Disbursements-Exhibit "C"________________ --------------------------------------------- __________________ ....

1, 399,327.47

Schedule No. 8-D

STATE HIGHWAY BOARD OF GEORGIA

ANALYSIS OF EQUIPMENT EXPENSE DISBURSEMENTS BY OBJECT OF EXPENDITURE

JULY 1, 1932 TO JUNE 30, 1933

. - - - - - - - - - - - - - - - - - - - - - - - - - --- - - - - - - - - - - -

- - - - - - -------~
~-~

-~-

- - -------~-

~-,--

1

1

[

I 1
Object to Expenditure i, Admmis- Construe-

I Total Mainte- 'I DEixspbuenrssee-

! tration 'i tion

tenance ments

------1

I

I

Land & Buildings _____ j$ 720.99$ __________ $6,523.68 \$ 7,244.67

Automobiles __________ , 1,831.18, 9,586.89 3,612.83

15,030.90

I Trucks _______________ ' _ _______ 1,016.07 2,053.96 1 3,070.03
Tractors_________________ _____ ___ 5,319.00 107,50Cr 5,211.50

Road Machinery Misc.__ ______ __ __ 19,488.26 6,868.18

26,356.44

~~;~e~~~f~~~J)~ent 4 ' 2~g:~~ -----93i~75 ~~~~~~~~~~~:\

4,265.66 972.11

Shop EqUipment_______ ,___________ ___ ____ ____ 1,857.33

1,857.33

r - - - Laboratory Equipment_ I 468.44 _______ -- __ ,--- __ -- __ - _ 1

468.44

Totals _______ _____ I$ 7,326.63 $ 36 ,341.97[$20,808.48 I,$ 64,477.08

:~==--=~=~=~~~'-=!~~==~

Total Eq~:pn;,ent Expense Disbursements-

1

Exhibit 0 _________________________________________ -~~-~~()il

70

Schedule No. 8-E STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF LEGISLATIVE TRANSFER EXPENSE DISBURSEMENTS, BY OBJECT OF EXPENDITURE
JULY 1, 1932 TO JUNE 30, 1933

I E;;:~e I Motor

W. & A.

Object of Expenditure Vehicle Convict Rental I

License Farm Discount Disburse-

Tags

I ments - - -

--~~----

Personal Services.. ____ -1$- ____ [$1.354.21 $

1,354.21

Equipment Expenses ___ __ . _______ ,

7.22

7.22

Communication Ser-

HW!~:t~~h-t~-:p()~~~-&1_1 ____

1
__II__ _2.331. -

2.33
i

Rents_____ ___ Traveling Expenses_____ __
Supplies and Materials_ -
~~~;;~~~~el3in<iing:P-ul:>-\ -licity, etc. _____ _

_. ___ -I _
_ 362.53 __

-!

-1--

l1

1

1'1

.

_

,

362.53
--

Special & Misc., Ex-

1 1

1

penses Transfer of

Funds___ __ ___ 123,790.39,1 3,392.47/1,080,000.00[1,107,182.86

Totals ___

__ ~~, 790.~(jlI$

~--~~ 5,118. 76I$!Jl~().OOO.__()() :g_,l08,!)09-_!~

T~~~i~~fi~~.~ive -~~a~sfer Ex:_e_~se-~isb-~~~~~~~~_-l~-1~~0()~~

71

Schedule No. 9.

STATE HIGHWAY BOARD OF GEORGIA

SUMMARY OF EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS

JULY 1, 1932 TO JUNE 30, 1933
==~================

Districts

(Analysis) I (Analysis) fl (Analysis) !(Analysis) (Schedule (Schedule (Schedule (Schedule No. 10-B) No. 10-C) \ No. 10-D) No. 10-E) Construction I Surveys Maintenance Recon-
struction

Total

N~- $1,325,877.241$10,145.511$ 123,053.50$. _____ -1$1,459,076.25

----------I 2 1' 124,550.51. 13 '705.36 $ 115,128.181 412.64 1,253 '796.69

3

900,953.66 9,866.07 107,051.69

1,017,871.42

4

531,288.331 10,531.07 95,897.161 2,269.02 639,986.25

5 6

------1 237,911.70 4,299.78 21,937.58 137.721
648,152.23 11,848.13 115,472.771-

264,286.11 775,473.13

7

834,863.40 17,475.18 111,700.331-- -------

964,038.91

8 1,387,118.20 11,196.62 120,094.00-------- - 1,518,408.82

9

885,590.85 8,961.23 163,958. 70] 573.261 1,059,084.04

10

834,595.84 3,585.42[ 102,546.551 189.40

940,917.21

11 1,379,102.67 13,940.521 179' 790.881 6,440.071 1,579,274.14

12 ~9,626.~ 11,761.551~674.02!~~1 1,424,062.54

Totals $11,369,631.601$127,316 .44!$1 ,389,305 .36~$10,022.111

Total Expense Disbursements Distributed_J:>y Districts_c__J $1_:? ,8962.275.51

Undistributed by :Cistricts Administration General Office_ Warehouse _________ _
Division Offices _____ _ Research_ __________ __
Collection of Revenue Quarry_____________ _

_$ 294,317.75 18,298.48 66,853.16 7,103.81 79,507.38 876.49

TotalAdministration _______ _____ $ 466,957.07

Land, Buildings and Equipment_

64,477.08

Legislative Transfers

Convict Farm Purchase _____ $ 5,118. 76

W. & A. Rental Discount ___ 1,080,000.00

Motor Vehicle License Tags_ 23,790.39 1,108,909.15

Total Expense Disbursements Undistributed by Districts$ 1,640,343.30

Total Expense Disbursements-Exhibit "C" _

72

Divisions
No.L 2 3 L 5 __ 6__ _

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 10

. . SUMMARY OF EXPENSE DISBURSEMENTS, BY DIVISION UNITS JULY 1 1932 TO JUNE 30 1933. --

(Analysis)
I (Sch<3dule No. 10-B)
[. Construction 1 '703,196 .09$

(Analysis) (Schedule No. 10-C)
Surveys

I
I

(Analysis) (Schedule

No. 10-D)

Maintenance

I (Analysis) I (Analysis) I

(Schedule No. 10-E)

I

(Schedule No. 10-A)

R"construction Administratior

- ------- -

I
I

26,666.36$

180,229.27 $

783.87 $

9,633.80 1$

Total 1,920.E09.39

1,846,798.56

18,712.24

255,200.75

573.26

10,589.32

2,131,874.13

1,559,547.55

26,542.59

249,397.35

1,812.27

10,289.69

1,847,589.45

I

2,324,999.83

I

2,013,367.58 1,921,721.99

15,311.091 23,369.03 16,715.131

225,040.02 243,617.25 235,820.72

- 594.341 6,258.37[

12,704.80 11,250.18 12,385.37

2,578,055.74 2,292,198.38 2,192,901.58

Totals __ _ 1$ 11,369,631.60$

127.316 .441$ 1,389,305.36$

10,022 .ul$

66,853.16l

-

_, Total Expense Disbursements D1stnbuted by DivisiOns

- - - - - - - - - ------- - - - - -- ]$

"' Undistributed by Divisions

Administration

General Office __ ___ _____

_________ __ $

294,317.75

Warehouse__

_________ _

Research___ _______ ___________ _________________________________ _

18,298.48 7,103.81

Collection of Revenue______________________

_______ _

79,507.38

QuarrY. __

- - - - - - - - - -- -- - - -- -

876.49 $

400,103.91

12,963,128.67

Total Administration ___ _
Land Building and EqUipment Legislative Transfers
Convict Farm Purchases ______________________________________ _ $ Motor Vehicle License Tags _____________________________________ _ W. & A. Rental Discount_________________________________________ _

64,477.08

5 ,118. 76 23,790.39 1,080,000.00$

1,108,909.15

Total Expense Disbursements Undistributed by Divisions _______________________________________________ $ 1,573,490.14

Total Expense Disbursements-Exhibit "C" ______________________________________ _

-------------- $ 14,536,618.81

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF ADMINISTRATION EXPENSE DISBURSEMENTS, BY UNITS
JULY 1,1932 TO JUNE 30,1933.

Schedule No. 10-A

I Personal
I Services

I Furnishing!

1 Heat,

I Equipment Communi- 1 Light,

Expenses cation

Power

Rents

1

-

I

I Traveling Supplies
Expenses and !Insurance

Printing, Binding, Publicity,

-
Claims

Special
and Miscellaneous

Total

Services and Water

Materials

Etc.

Expenses

1~~-----------------1------------- ~-

GEN~~~~?s:~~~~rs ----------~----------1--------- ~------ -~-~'>~-

-1$ .............
Genera1Engineering_______
---1 P1ansforRoadways________
Plans forBridges........

31,449.71$1.127.36

$ 3,836.00----------1- - ..... ----

21,286.60 73,291.03

514774..2051-------------------+!--------------------,-------------------~

1,855.30 __________ 330.23 ----------'

I
------- $

_1_:8_-4_-o_-~col-

16,863.88 290.29 ----------!---------- ---------- 1,322.16---------- _

- --------$
I
- :: ____ --_:_:_-_-_-_-_:_,

36,413.07 23,689.15
75,635.27 18,476.33

Construction________________ ! 11,510.56 1,449.41 ----------~---------- ----------1 3,817.85--------
Accounts____________________ 59,752.45 412.46---------- ---------- __________ 2,097.54---------

16,777.82
--------1 62,262.45

Statistics___________________ 5,545.19 .......... ----------!---------- $3,177.00 53.00,$ 435.02

i _____ __________ 9,210.21

Purchasing__________________ 16,750.80

97.87 .......... ;.......... __________

152.71 1. . . . . . ____ _________

17,001.38

Maintenance............... 12,566.37 1,119.13 ---------~---------- __________ 2,835.75----------$ 164.52

_ $10,272.51,-

26,958.28

Publica.tion_________________ 2,277.00 __________ $ 459.321---------- 175.00----------

18.00

30.00 2,202.05 __________ ,$ 5.00 5,166.37

Undistributed ............... __16.148.47 1,442.14 10,409.97$4,623.87 ~-1,670.26 10,278.97 3,109.29 _ _5,767.01 8,041.991 4,723.44 66,369.41

TOTALS.---~-----:~------$ ==.:._:_ ==:.:..:: .:..:.== .:.:.==j .:.:.==j Less: Blue Pnnt Billmgs..

1

267,442.06$ 6,659.92$10,869.29$ 4,623.87$ 3,506.00$17,970.801$10,731.99$ 3,303.81 $ 9,809.06$18,314.50$ 4,728.441$ 357,959.74

55,621.24 ..........

8, 020.75 ---------- ------------ __________

63,641.99

':_~623 -~ 711.~~$ 1
TOTALS. _........... ____ . 1$ 211,820.82 $ 6, 659.92 $10,869.29

$ 3,506.00 $17,970 .80 $ 2,

3,303.81 $ 9, 809 .06l $18,314.50 $ 4, 728.44!'$ 294,317.75

WAREHOUSE..................... 1$ 16,271.05 $ 618.39 $ 120.20 $ 46.001$

i

1

9.00$ 184.67$ 489.941$ 147 .15! .... ________ ,$ 40.001$ 372.08$ 18,298.48

1

!

!

I

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF ADMINISTRATION EXPENSE DISBURSEMENTS, BY UNITS
JULY 1,1932 TO JUNE 30, 1933.

Schedule No. 10-A-Cont'd.

I Furnishing I
1 Heat,

j
Printing,

Special and

Personal Equipment Communi- light,

Traveling Supplies II

Binding,

Miscel-

Services Expenses cation Power

Rents Expenses and Insurance Publicity, Claims laneous

Total

Services and Water

Materials

Etc.

Expenses

---------------1----- --------------------- ---1----1---- -------
DIVI~~~N~ne. _ ----------------- $ 7,044.85 $ 265.28 $ 461.02 $ 36.09 $ 310.00 $ 850.37 $ 308.601$ 357 .591 ____________ ---------- ---------- $ 9,633.80

No. Two_____________________
~~: ~:~e::::::::::::::::::: No. Five.. -------------------1
No. Six______________________

7,760.35
~:~!~:;~
7,591.10 7,921.40

202.60 605.44
!~::~ ~:~:;:~~
264.68 1.064.88 522.54 1,446.00

27.00 365.40 881.34 348.22 397.97[------------ $ 1.00 __________ 10,589.32
!~:i: ;~~:~~ 1.~i:~; ::::;:1 ;~~:~~~:::::::::::: ----i97~co :::::::::: ~~:;~::~~

16.11 490.00 899.77 370.44 409.12$ 9.00 345.00 1,194.03 554.20 343.84[

13.06 131.02---------- 11,250.18

14.54 31.00

3.82 12,385.37

= - = = =r=r= = -----------~-------~~-----

TOTALS_______ --------_--_ $ 45,492.55 $ 2,209.89 $ 5, 672.74 $ 167.97 $ 2, 000.40 $ 5, 736.76 $ 2, 920.53 $ 2, 260.88 $

27.60 $ 360.02 $ 3.82 $ 66,853.16

-'1 TOTAL GENERAL

,

CJ1 Administration _________________ $ 273,584.42$9,488.20$16,662.23$4,837.84$5,515.40$23.892.23$6,121.71,$5,711.841$ 9,836.661$18,714.52$5,104.34$379,469.39

RESEARCH AND ANALYSIS

=

=

=

----

Division of Tests. ___________ $ 23,439.97$ 914.16$ 20.40.$ 1,388.24----------$1,746.17$ 1,962.5~ $ 118.15~------------ __________ CR2.88 $ 29,586.73

DiVision of Research.______

5.CO 476.51 __________ ---------- ---------- ---------- 466.32 __________

7.78---------- 6,148.20 7,103.81

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ---~~ - - - - - - - -

TOTALS-------------------$ 23,444.97$ 1,390.67$ 20.4C $ 1,388.24----------$ 1,746.17$2,428.84$ 118.15.$

7.78----------$6,145.32$ 36,690.54

Less: Test Billings_________ 23,439.97 914.16

20.40 1,388.24---------- 1,746.17 1,962.52 118.151____________ ~---------- CR2.88 29,586.73

TOTALS-------------------_$_ 5.00$ 476.51 ::_:==-:_:: ==-:_:::_: ::_:_::_:::_:::_:::_: ::_:_::_:::_:::_:::_: ~466 -~ ==-:_:::_:_1$_ _7.78,::..:.=::_:::_: $ 6,148.20$ 7,103.81

COLLECTION OF REVENUE

Enforcement ofM. V. Law. $ 83,595.56$ 4,153.54$ 388.83---------- ---------- $13,411.10$ 10.03$ 116.00$

1.92 _________ _.$ 158.10$ 51,834.58

Enforcement of Gas. Tax

Law________________________ 15,525.48 2,436.14

44.24 ---------- ---------- 9,569.24

2. 70 95.00---------------------- --------- 27,672.80

------------------------------1----l----------

TOTALS-------------------$ 49,121.04$ 6,589.68$ 432.57---------- ----------$22,980.34$ 12.73$ 211.00$

1.92----------$ 158.10$ 79,507.38

1----1-------------------------------------

QUARRY. ---------------------- $ 723.90 $ 9.07 ---------- ---------- ---------- ---------- $ 2.89$ 140.63------------ ---------- ---------- $ 876.49 ------------------ ------- ----1----1-----------

TOTAL ADMINISTRATION _________ $ 323,434.36 $16,563.46 $17,094.80 $ 4,837.841$ 5,515.40 $46,872.57 $ 6,603.65 $ 6,063.47 $ 9,846.36$18.714.52 $11,410.64 $ 466,957.07

Schedule No. lo-B

STATE HIGHWAY BOARD OF GEORGIA

ANALYSIS OF ACTUAL CONSTRUCTION EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS

JULY 1,1932 TO JUNE 30,1933

Personal Services

I

I

Furnishing I

I Communi- Heat, Light,'

Equipment cation Power and

Expenses Services Water

kents

I

Supplie Traveling and Expenses Materials

lnsur-
a nee

Printing, Binding, Payments to Publicity, Contractors
Etc.
I

CONSTRUCTION SUPERVISION BY CONGRESSIONAL DISTRICTS

Special and Miscellaneous Expenses
----

Total

~ ;::+ DistrictNo.

53,199.94 $ 2,667.521$ 343.42------------ ----------$6,218.60$ 1,490.56$

8.97$

11.93 -------------- $ 2,171.85 $ 66,112.79

52,365.88 1,830.99

L-1 37,160.77 1,560.091

4___ ,
~:::11

27' 147.45 14,546.62 33,126 '70

1,451.051 489.73
1,275.35

87.56 ------------

70.13 $

1.50

165.50 85.00

14.00 ------------ 14.03 ____________ ,

20.00 15.00

19.63------------1----------

5,329.44 4, 400.06
2,983.99 986.29
3,526.25

1,259.54

7.30

.42--------------

974.07 ---------- ------------ --------------

572.57 ---------- ------------ --------------

338.98---------- ------------ --------------

494.29 ---------- ------------ --------------

3,645.24 1, 944.29 1,247.36 1, 774.40 1, 791.74

64,691.87 46,195.91 33,436.42 18,165.05 40,233.96

7. . . 8__ _ 9__ _
10. . . 11.._

60,618.91
77' 831.43! 46,899.371 36,288.21 50,335,15

2, 920.07j 2, 710.01' 2,314.26 2,027.60 2,365.17

90.28 ------------1 340.50 142.17 ------------~----------

53.75------------

66.50

105.26------------

4C.OO

165.93

25.00

26.00

5,861.86
5,998.18 5,119.04 4,856.61 6,339.63

1,295.13

32.54------------ --------------

1,2SC.45 ----------

.79$ 3,817 .56i

~:~~~:~~ ~ :~~ :::::::::::: ::::::::::::::1

1,778.79

5.01

38.51 --------------

2,710.87 4,206.69 2, 320.94 2,356.99 2,183.95

73,870.16 95,997.28
57' 861.22 46,858.62 63,263.14

12. . .

51,821.82 2,444.54 148.24 ------------ 161.18 6,048.92 1.240.94

10.87-------------- 4,298.71

66,175.22

---- ---- ---- -------------- ---- --- -------- ---------

TOTALS....... $ 541,342.25$ 24,056.38$ 1,254.40$

26.50 $ 919 .68 $57' 668.87 $ 12,992.021$ 68.43 $

62.52 $ 3,817.56$ 30,653.031$ 672,861.64

Schedule No. lo-B-Cont'd.

STATE HIGHWAY BOARD OF GEORGIA

ANALYSIS OF ACTUAL CONSTRUCTION EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS

JULY 1, 1932 TO JUNE 30,1933

-

--

-

Furnishing Communi- Heat, Light,

Supplies I

I Printing,

Special and

Personal Equipment cation Power and Rents Traveling

and

lnsur-

Binding,

Payment~ to

Miscel-

Total

Services

Expenses Services Water

Expenses Materials

anee Publicity,
I Etc. I

Contractors

laneous Expenses

CONSTRUCTION DIRECT BY CONGRESSIONAL DISTRICTS
..,
~ Di"re' No L' ~:~:~1'};~ ~:~ } ~~ ~~~ :::1:::::..~~~ i milE...~~:: EE!~

5___

1,265.571

48.11 ----------!

3.26

5.oo'__________ 27,630.47 _________ _! ___________ 190,794.24 ____________ 219,746.65

6___

612.24------------ ----------'------------- ------- ---------- 22,138.31 __________ ............ 585,167.72 ............ 607,918.27

7... 60,138.59 38,843.54 924.15:

529.85 306.00 526.02 52,814.90 1,238.03 ............ 603,886.07 1,686.091 760,993.24

8...

5,519.35 3,273.66 26.51

11.5311,035.861 ....... --- 7,184.88 ...................... 1,274,06g_93 ............ 1,21,120.92

9... 68,301.98 50,522.75 776.73

372.77 1,662.60 502.13 68,036.08 477.50 ............ 634,552.59 2,524.EO 827,729.63

10... 15,162.95 11,372.92 145.23

125.451 57.00 84.80 33,427 _g6 280.87 ............ 726,917.53

162.61 7g7,737 .22

1L. 49,991.94 43,115.18 472.78

464.21 662.79 729.90 76,900.07 696.18------------ 1,142,449.05

357.43 1,315,839.53

~~:::$ TOTALS.. 2~:::::::!$ 171.:::::: ~ 2,88:::::~~::::1$ 4,2:::~ ~-~:~;~:~~ $ 6:~::::~~~-~:~~~:~: ::::::::::. $ ::~~::::::~---::~:~:~$1:::::::::.;

----------------------~----~~----~----------------- .

.

I

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 1Q-B-Cont'd.

ANALYSIS OF ACTUAL CONSTRUCTION EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS

JULY 1,1932 TO JUNE 30,1933

Personal Services

Equipment Expenses

Furnishing Communi- Heat, Light,
cation Power and Services Water

Rents

I
Traveling Expenses

Supplies and
Materials

lnsurance

CONSTRUCTION SUPERVISION BY DIVISION UNITS

I

Printing,

Special and

Binding, Payments to Miscel-

Publicity, Contractors

laneous

Etc.

Expenses

I

I

Total

$ ]$ Division No. L. $ 110,217.24$ 5,178.69$ 136.55------------ 442.001$10,081.36$ 2,559.93

38.161-----------J ------------- $ 5, 938.31 $ 134,592.24

2___ 100,357.94 3,803.00 186.53 ------------ __________ 8,727.65 I, 739.63

1.68$

. 791$ 3,817.56 5,586.29 124,221.07

cz

!::: :_:_:_:_:_:_:_: ::!!~:::

!:!;~:~~

2~i:~~ ~-------~~:~

2~~:~~ ~~:!~~:~~

~:::~:~~

-----16:28--------4:92:

-------------
-------------

3,838.36 5, 784.88

85,916.70 114,264.77

5___

95,728.45 3,627.74 173.43 ----------- 243.00 10,604.05 2,313.2811 12.31

.42,_ ------------- 5,707.73 118,410.41

2~~ --=~~~ 6... ___7_5,_9_7o_._oo_ _ _ 3_,7_2_5._9_9 ____4_7_4._89 _ _ _ _ _ I.Oo 8,888.87

-~-56.39-1--:--_-_--~--~--~- --3,-797~.46 ~-9-5,4-56-.45

1

1

TOTALS...... -$ 541,342.25$ 24,056.38$1,254.40.$

26.50$ 919.68$57,668.87$ 12,992.021$ 68.43$

I

,

62.521$ 3,817.56$ 30,653.03$ 672,861.64

Division No. L .. $
2.,_
3___ 4.,_
5.. . 6.. .
..!$ T O T A L S . . . . .

CONSTRUCTION DIRECT BY DIVISION UNITS

I

I

1

85,250.45$ 63,259.97$1,201.62$ 892.14$ 358.001$ 597.76$!27,630.58$1,544.78 ____________ !$!,284,134.11 3,734.44$1,568,603.85

5l,!i~:~~ ---~~:~~~:~ ____:~~~:: -------~:~~: --~:~~~~~~ ----4~~~~~ :~:~~~:~~ ----~70~:l:1::::::::::ll i::~~::::~ ------~:~~~~ i:~;;:~~:~

35,710.56 64,089.73 23,565.97

18,137.68 44,671.70 12,932.501

400.43 697.03 60.18

180.80 661.31 18.00

127.00 376.64

345.99 249,613.93 688.50 100,624.04

697875.C.6714-----------------------~-'

1,905,370.421 1,681,724.22

688.50:-~012.241 70,098.90~==~.: 1,717,744.96

162.61 2,210,735.06 446.93 1,894,957.17 144.29 1,826,265.54

260,356.25$171,088.571$ 2,885.0+ 1,777.521 4,201.601$3,074.881$628,578.651$ 3,478.241------------1* 9,616,364.8(11$ 4,964.42$10,696,769.96

---

Schedule No. 10-C

STATE HIGHWAY BOARD OF GEORGIA

ANALYSIS OF SURVEY EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS

JULY 1,1932 TO JUNE 30,1933

Personal Services

Equipment Expenses

Furnishing

Communi.. Heat, Light,

cation Power and

Services
I
I

Water

I
i

Rents

I

I

Traveling Expenses

Supplies

and Materials

I

lnsur .. arce

I

Printing, Binding, Publicity,
Etc.

Payments to Contractors

Special and Miscellaneous Expenses

Total

SURVEY ACTUAL BY CONGRESSIONAL DISTRICTS

L.l$ ------------!---)$ ~ ../$ ~ -----------------------~--------,---------------------~-----------------------~------~-------------------------

<0 District No.

1,773.91$ 273.69$

.75

833.54$

33.241----------1$

3.70.............. ...........

2,918.83

:2:.:.:.

5,007.75 !:~~:~~

L ;:mE

272.54 115.68
;~~

----r-------- .60 ............
5.18.. ....

25.28 2,123.67 928.75

i~~ :~r : ;m~

207.72, .......... ------------]---------- ............

107.59, _________________________________ $

1.25

~~~ 1 : ~M

7,637.56
,t*~1 :::i:: ~

10... 1L.
TOTAL' ": 0

590.42 5,216.74
.::: :: $

34.31..........

.20,.......... 456.69

16.31 ..................... '.............. ............

= ~ j;CC~ ~~ <Th.: : .--;: l 608.99 13.50 ............!.......... 2,056.35

' :, 0

::;:

*

289.71 .......... 0:

"'"~ ool; 8.40 .............. ............

$

;

1,097.93
8,193.69
~ :: ~

Schedule No. 10-C-Cont'd.

STATE HIGHWAY BOARD OF GEORGIA

ANALYSIS OF SURVEY EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS

JULY 1, 1932 TO JUNE 30, 1933
~

Personal Services

Equipment Expenses

Furnishing

Communi Heat, Light,

cation Power and

Services

Water

Rents

Supplies Traveling and Expenses Materials

lnsurance

Printing, Binding, Publicity,
Etc.

Payments to Contractors

Special and Miscellaneous Expenses

Total

- - --------~---~~---

--

SURVEY PLANS BY CONGRESSIONAL DISTRICTS

DistrictNo. L.- -------- ---------- I--------- I___ _

-------c--~-----------------------

:

I

I

I

7,226.681$ 7,226.68

6. 067.80

6,067.80

5. 521.501 4, 054.61

5,521.50 4,054.61

2,402.06

2, 402.06

7 567 39

7,567.39

4,342.23

5, 760.44

4,429.96

I

'

'

'

--

'

I

---~

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 10-C-Cont'd.

ANALYSIS OF SURVEY EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS

JULY 1,1932 TO JUNE 30,1933

Personal Services

Equipment Expenses

Furnishing Communi.. Heat, Light,
cation Power and Services Water

Rents

Traveling Expenses

I

I

I

'

Supplies and
Materials

ln~ur .. a nee

Printing, Binding, Publicity,
I Etc.
I

Payments to Contractors

Special and Miscellaneous Expenses
I

rota I

SURVEY ACTUAL BY DIVISION UNITS

Ll$ ~.24 474.69~----------1------ -----1-------------- ........... Division No. 2..1

11,922.82$ 7,395.5C

403.651,$ 252.271

----------- .......... $ 4,009.93$

2.00

6.01 .......... 1 2,060.21

$ 16,819.33

187.58'.................................... ------------

9,903.57

00

3..

9,807.001

345.401 22.13

3.43- -------- 3,006.36

396.86----------,------------ --------------

1.60 13,582.78

......

4..

1
1,950.001

5~.84 -------:[--------- -~-- ....... 982.421

71.35 ----------~------------ -------------- ------------

3,060.61

5..

8,424.16

46o.06

7.90 __________ $ 25.28 3.451.19

330.87 ________________________________________________

12.704.51

1,658.18~----------1$ 6..1-~0 -03/---=~r~l =--=-:..:.:..:.::..= =--=-:..:.:..:. __:746 -~~

[$ T O T A L S . . . . . . .

44,829.51 $ 2,251.09l$ 50.52!$

9.441$ 25.28 $15,256.73$

~~ .6~ 1
196.83[::.:.:.::.:..:::..=::.:.

=::.:.=::..=::.:. =::.:.=::.:.1.---7.823

12.10 1$ . . . . . . . . . . . . . .

1.601$ 63,894.4o

1

1

1

SURVEY PLANS BY DIVISION UNITS

9,847.03 $ 8,808.67 12,959.81 12,250.48

9,847.03 8,808.67 12,959.81 12,250.48

TOTALS.......

Schedule No. 1o-D STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF GENEflAL MAINTENANCE EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1, 1932 TO JUNE 30, 1933

Personal Services

Equipment Expenses

Furnishing Communi- Heat, Light,
cation Power and Services Water

Rents

Traveling Expenses

Supplieo and
Materials

lnsu ranc

Printing, Binding, Publicity,
Etc.

Payments to Contractors

Special and Miscellaneous Expenses

Total

---

MAINTENANCE SUPERVISION BY CONGRESSIONAL DISTRICTS

~District * 62.88]------------~~----- -------~----~------~-----.------~------~-----------.------.----

1
No. L.l$ 3,956.49$ 334.88 $ 550.321$

10.34 195.38$1,300.78$ 214.64$

____________________ $

6,625.71

2...

4,000.15

435.021 440.541____________ 233.57 1,447.52

155.80 76.69------------ -----

.. ............

6,789.29

3...

3,837.65

367.701 415.85:

9.19 137.2C 1,400.51

168.17 65.72 ____________ .....

.. ............

6,401.99

!::: ~:~~::::! 2:~:~~1 4!~:~~1 2::~~ :;:~~ 1,:~~:~~ ~~::;~ 5~8:7~1 ~ .. :::..._______ ________ :__.:__--_-_--_-j:_:___:_ :::::::: ~:~~!:~i

6...

4,266.13

320.74 457.93;

26.75

17.08 1,459.001

238.02

6,844.36

7...

5,773.42

215.36 449.321

28.01 274.29 1,001.621

148.77 75.55$

7.13

------ ....

7,973.47

8...

4,186.5S

282.57 353.58

6.27 260.91 1,286.651

124.41 54.59 ............ .............. ............

6,555.57

9...

5,995.77

345.26 490.98

14.65 355.95 1,575.87

207.43 79.18

1.10--------------------------

9,066.19

10... IL.

3,303.361 6,615.21

264.66 602.85

383.13 1

17.02

970.28 ............

170.82 1,378.41 344.10 1.774.87

202.19 262.12

51.64 ............ .............. ............ 110.(3 . . . . . . . . . _ -------------- . . . . . . . . . . . .

5,771.23 10,679.46

12... _ _4,738.51 __ 384.80 _605.13 --18.45 ~~~~3.711--~~~~::i1 -------- =~====---7,935.35

TOTALS....... $ 51,859.71$ 3,900.3C $ 5,622.51'$

161.25$ 2,273.00!1$15,893.58 $ 2.177.22$ 778.50 $

1

1

8.23 .............. ............ $
1

82,674.30

-"-
------

Schedule No.1 D-D-Cont'd.

STATE HIGHWAY BOARD OF GEORGIA

ANALYSIS OF GENERAL MAINTENANCE EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS

JULY 1,1932 TO JUNE 30, 1933

---

--

Personal Services

I Equipment
i Expenses

Furnishing Communi- Heat, Light,
cation Power and Services Water

Rents

Traveling Expenses

Supplies and
Materials

I

I

lnsura nee

Printing, Binding, Publicity,
Etc.

Payments to Contractorf1

Special and MiscelJaneous Expenses

Total

MAINTENANCE DIRECT BY CONGRESSIONAL DISTRICTS

DistrictNo. L $ 62,103.81 $ 42,836.48$ 100.201$

L-

55,511.93 44,656.82

32.16

69.63 $ 293.50 $ 608.19 $ 8,230.12 $ 1,430.15 ------------ $

655.12 $

67.04 332.94 885.23 5,150.60 1,557.35 ---------- ---------------

100.591$ 116,427.79 144.82 108,338.89

L-

52,298.89 41 '368 "05

18.88

71.74 270.63 713.99 4,423.11 1,369.42 ------------ --------------

114.99 100,649.70

4._-

48,894.92 29,267.83

8.29!

87.71 226.63 555.67 9, 315.32 1,101.95 -------- ---------------

107.07

89,565.3 9

L-

9, 977.741 6,619. 721 17.67

6 ___

57' 470.89 41,624.97

4.30

28.33 94.43

104.48 223.15

206.12 576.38

2,985.86 272.06 ------------ --------------
7,264.87 1,228.04 ------------ --------------

25.69 141.38

20,237.6 108,628.41

L-

51,655.89 33,563.02

74.78

g___

54,515.22 43,156.85

89.58

121.78 417.67 127.96 1, 072.45

953.02 15,623.26 1,193.65 ------------ --------------

859.33 12,309.52 1' 160.51 ------------

94.14

123.79 152.87

103,726.86 113,538.43

L-

71,276.12 48,738.33 113.50

168.45 2,274.88 1,145.82 29,499.25 1,518.03 ------------ --------------

158.13 154,892.51

10---

50,143.55 35,907.90

67.13

77.60 662.50 714.90 6, 940.02 1,274.53 ------------

872.97

114.22 96,775. 32

lL_

88,197.26 58,340.32 165.00

94.44 344.60 881.27 18,570.47 2,308.65 ------------ --------------

209.41 169,111.42

- - - - - - lL-

65,233.89 47,357.01

---------

83.84

92.65

----

396.11

-

915.94
---

-

8,215.11 --

1, 692.42
---

----------------

-

-

627.61
--

-

124.09
---

-

124,738.6
---

TOTALS _______ $ 667' 280.11 $ 473,437.30 $ 775.33 $ 1,101.76 $ 6,619.54 $ 9, 015.86 $ 128,527.51 $16,106.76 ------------ $ 2,249.84 $ 1,517.05 $ 1' 306,631. 06

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 1Q-D-Cont'd.

ANALYSIS OF GENERAL MAINTENANCE EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS

JULY 1, 1932 TO JUNE 30, 1933

""

========~======----

I

I

Ij .,.....;-

"'"Furnishing u .

I

Supplies

I Printi ng,

Special and

Personal Services

I

Equipment Expenses

cation Services

Power and Water

Rents Traveling

and

Expenses Materials

lnsurance

Bindi ng, Payments to Publicity, Contractors

Miscellaneous

Total

------

I

- ----- -----

'

Etc.

Expenses

I

---------------------

MAINTENANCE SUPERVISION BY DIVISION UNITS

L:]I* Division No.

1 9,517 .3o $

363.90 $_7_4_5_.4_21_*_" 48.741$ 455.ool* 1,663.381$

257 .o91* 125.o7l'*

1.131-------------- -------------~~~3

2- "

8,720.391

591.71 723.21

10.581 558.001 2,613.80

283.09 113.35

1.10 -------------- ------------

13,615.23

oo

L.

9,761.05

751.60 1,051.86

61.33---------- 3,509.34

~

L-

7.238.46!

580.93 863.00

40.60 360.00 3.127"05 '

5___

8,209.24:

877.451 904.791 ------------1 480.001 2,976.67

2,273.00~~~;3.581 $ 6__.

8,413.271

734.7111,334.23]------------,

TOTALS_______ ;--- 51,859.;: ;---;:900.30;5,622.51 $

- - - - - - - ' - - - - - - ' - -1'- - - - '

. 1

161.25 ; 1'

420.001 2,003.34,1 '

------------r-------------- ____________ 552.73
452.66

134.24~"------------~-------------- -----------115.68

302.431 157.34------------ -------------- ------------

;--;8.501;---~;;1:-:=:-:=:-: 329.221
2,177 ,;;

132.82, ____________ -------------- -----------==:-:r$

'

I

I

15,822.15 12.778.38 13,907.92 13,367.59
82,674.30

MAINTENANCE DIRECT BY DIVISION UNITS

:i-vi-sl-.o-n_N_o___1___-_']$--8-1-.7-72-.-19-,-l$_5_4-.2-24-.-42c-,$--12-0-.2-9-~$- 201.74$ 726.331$1,585.501$ 26,241.741$1,978.091----- __ __j ______________ l$ 195.94~$ 167,046.24

2..

113.712.08] 83.213.45 192.65

268.86 3.221.21 1.729.84 1 36.597.71 2.362.62 ____________ ______________

287.101 241.585.52

a__ _I 126,314.011 84,287.512----------

215.06 495.2511.292.14 17,838.44 1 2,835.85, ______ ---- --------- -

296.931 233,575.20

4 _ 109,682.45, 81,444.14 145.60 5___ 116.656.22 94.211.22 66.00

162.59 1.235.25 1,664.06 137.51 682.50 1,749.93

12,674.731 12.703.07

2,882.711. ___ -- _ 3.226.41 ____________

1$_______2_,1_4_6__.1_C_

224.01 276.47

212,261.64 229.709.33

;---;;;;~:~437 ;---;~~~;-~~;;;~~~~~~ ~;,~ ~~;;;J=:-::-::-:1~~~ ;-~;;;~;~;;~~z~ 6..-
T O T A L S . . _____

119,143.16 1 76,056.55 .30

1
250.791

116.001 259.001 994.39 22,471.8212,821.08------------ 1

103.74

236.60 222,453.13

District No.

Schedule No. 10-E

STATE HIGHWAY BOARD OF GEORGIA

ANALYSIS OF RECONSTRUCTION EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS

Personal Services

JULY 1, 1932 TO JUNE 30, 1932

I I I
Equipn\i.nt Expenses

Furnishing CommJni- Heat, Light,
cation Power and Services Water

Rents

Traveling Expenses

Supplies and
Materials

i

lnsur-
a nee

Printing,
II Binding,
I PuJiicity,

Payments to Contractors

I I Etc.
I

Special and Miscellaneous Expenses

Total

RECONSTRUCTION SUPERVISION BY CONGRESSIONAL DISTRICTS

.

I

.

i

Schedule No. 1D-E-Cont'd. STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF RECONSTRUCTION EXi'ENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1, 1932TO JUNE 30,1933

Personal Services

Equipment Expenses

Furnishing

Communi- Heat, Light,

cation Power and

Services

Water

Rents

Traveling Expenses

Supplies and
Materials

lnsura nee

Printing 1
Binding, Publicity,
Etc.

Payments to Contractors

Special and Miscellaneous Expenses
I

Total

P.ECONSTF.UCTION DIF.ECT BY CONGRESSIONAL DISTRICTS

+ ~ No.;l, Dlli<tld

"i

~I

i

1 1 : : : ... : : 1~: -: ~7~ ~6~: : : : : 1 : : : : : : 1: : : : : : : ::::::::::::~:::::::~~~~~~

4___

1,650.841

363.481 --- --- - - --- --~---------- ----------1

249.701 _____ ------------------------ ---- ------------

2,269.02

.,J. .~: i ~ ~ J.:;:;;,;;.:j..!... . i.. I

!

.~ ~ ""~1 -~.~~-... =;";;; ~ k ...t =r .;~;.; -:;.!. TOTALS , ;:::

;.i. ;.; ....-.:. 1--

. :; ;

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 10-E-Cont'd.

ANALYSIS OF RECONSTRUCTION EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS

JULY 1,1932 TO JUNE 30,1933 --

Persoral Services

Equipment Expenses

Furnishing Communi- Heat, Light,
cation Power and Services Water

Rerts

Traveling Expenses

Supplies and
Materials

lnsur .. anee

Printing, Binding, Publicity,
Etc.

Payments to Contractors

Special and Miscellaneous Expenses

Total

L: : : oo Dlrl= No.

I :

RECONSTRUCTION SUPERVISION BY DIVIS~IO~N_U~N_IT~S--,-_ _ __

: . ~ J .

.....::::: -

-..":1

4___ --------------' ------------ ----------

----------!-------

--- ---------- ------------ ------------ - ---------- - --------------

~~ -1-~~~-~~~~~~~~~~~~~C ~ ~.:
TOTALS :

~~ =-== ~~ =~-=~

I

i

I

I

I

RECONSTRUCTION D IR EC~T_BY~D_IV~I~S_IO~N_.::.U~N~IT~S----------~-

L '~:~... ,::: : : : : 1464 90 ~:~ 615.95~~ i;o:.~~ _-_-_----------~---- Division No. L __ $

1
37.20 __ -------- ---- --- ---- ----------j---- ___ __J$

-I$ - -_-_-__- __ :_:::::- :: 1- :: _::::

783.87

3705~0.5_0961 :~~ ~~~ ~~ :__182.~ ~~~_:_ ----=1~--~1:_$-~~~~ 6__ __13

___

I

%UO .

..

... I

I

-----

_::l!J2.68 _:_ ____

TOTALS.. _____ $

903.30---------- ______

----------$ 182.34 5,186.41 ______ --- -------- --
1

10,022.11

OBJECT 0 F EXPENDITURE
PERSONAL SERVICES G. 0. Administration
00 00
Field Office Administration

Schedule No. 11.

STATE HIGHWAY BOARD OF GEORGIA

ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATION

ADMINISTRATION

JULY 1,1932 TO JUNE 30, 1933
I CONSTRUCTION

MAINTENANCE

====-:.:="-~--

I General Research Collection

Administra and

of

Quarry Construction

Maintenance I'

I Bu~::;'i~~s

Surveys I and Recon-

Strop

and

Leg isla live

Total

tion

Analysis Revenue

struction 1

I Equipment Transfers

71,109.60 211,128.51
21' 157.55 24,335.00

Supervifion

: : _: : : : : : : : : : : : : : : : : : : _ : : : : : : Direct Supervision_______ ------------ ___________ ---------------------$ 531,230.14-----------$ 35,697 .64~------------- -------- -----------

Dir::~~~:~~~~~~~~~~~~~~~- ~~~:::~:~:::

-----~~:~~~~~~ ~-:~:~:~:~~ ----~~:~~~~~~

~--::::::~;

MaintenancePatrolmen ------------ ----------- ----------- ---------- --------------,----------- 193,480 .10[ __________ _1 ___________ -----------

566,927.78 26,274.18
45,983.72 193,480.10

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATION
JULY 1, 1932 TO JUNE 30, 1933

Schedule No. 11-Cont'd.

ADMINISTRATION

CONSTRUCTION

MAINTENANCE

Land,

OBJECT OF EXPENDITURE

General Research Collection

Maintenance

Buildings Legisla-

Administra- and

of

Quarry Construction Surveys and Recon- Shop

and

tive

Total

lion

Analysis Revenue

~truction

Equipment Transfers

------------------------------------------------------------- ------

Direct Costs-Cont'd.

Constr.and Reconstr.

Foreman ________________ ------------ __________ ----------- __________
Equipment Operators____ -------------------------------------------Shop Employee's Field.-------------,--------------------------------

~i:m:~~::::::::::: ::::_:::::I::::::::: 1 73,249.33 ___________
60,623.15 ----------11,916.33-----------

74,628.82 177,995.82 41' 724.53

Sign Employees______________________ ----------- ----------- __________ -------------- -----------

Other Skilled Labor .. ________ .... ___ .......... __ .. ____ .. __ ........ __

50, 1!9 .84 .......... -

Common Labor______________________ -----------_____________________ 64,447.60-----------

17,707.09'----------- ---------------------16,413.84 ----------- ----------- ----------294,868.78----------- ----------- -----------

17' 707.09 66,533.68 359,316.38

~;a~~;~.:::-.:<O.:~ ~~::,~~ :~:~ Quarry

::::::: "

::::::::::: ::::::: ::::::::::1::::: :: : ..... E

1 TOTALS.................... ;-;~;;;;;-;~~;;~;-.;;~~;;;;;-~;~ ;-;;,;;:; ;~~~== ;---.:~ $ 2,035,680.28

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATION
JULY 1, 1932 TO JUNE 30, 1933

Schedule No. 11-Cont'd.

ADMINISTRATION

CONSTRUCTION

MAINTENANCE

Land,

OBJECT OF EXPENDITURE

General Research Collection

Maintenance

Buildings Leg isla-

Administra- and

of

Quarry Construction Survey!-! and Recon

Shop

and

tive

Total

tion

Analysis Revenue

struction

Equipment Transfers

- - - - - - - - - 1 - - - - - --------------~- -~-~

~---- ---~

---~~- --~--- ~--- ------1~------

EQUIPMENT EXPENSES

Automobile Maintenance Tires and Tubes__________ $ Accessories, Parts and Repairs________________ _
Greasing, Washing, Storage, etc. ___________ _
Road Equipment Expense Gas and OiL ___________ _ Tires and Tubes ________ _ Accessories, Parts and Repairs ________________ _
Miscellaneous Charges__ _

1,39l.C1 $
5,099.03
1,056.65
269.83 25.13
136.87 1.18

54.38$ 1,522.29 ----------
219.39 3,734.17 ----------
13.651 1,326.78----------
265.8C' ----------- $ 9.07 28.36 -- -------- ----------
615.18----------- ---------3.44 ----------- ----------

i$ 4, 259.37 $ 414.83 $ 1,936.13$ 68.87 ----------- -----------

9,646.88

15,474.25 1,434.62 2,880.50 211.71 -----------

5.47

29,059.14

3,886.88 336.65

391.46

1.00 -----------

1.75

7, 014.82

88,043.44 ----------- 223,810.88 8,755.19 ----------- 13,316.88

44.05 ----------- ----------24.00 ----------- -----------

312,443.07 22,149.56

68,382.24 ----------- 232,868.75

887.29-----------

1,382.43

192.01 ----------- ----------44.17----------- -----------

302,195.05 2,318.51

Rei> airs to Office Euuipt _. Repairs to Engineering
Euuipt. __________________ _

521.26

13.00 ----------- ----------

107.95--------------------------------

83.84 -----------

443.67

64.99

122.15 ----------- ----------- ----------1.53 ----------- -----------~-----------

740.25 618.14

Rei>airs to Machinery

Euuipt____________________ ----- ______ _ 177.47

6.44---------- ---------------

Rei>alrs and UI>kee];), Land

and Buildings ____________ /

879.29 ______________________________________________ -----------

10.85 740.33

2,398.80 ----------- ----------376.38 ___________ ___________

2, 593.56 1,996.00

Transportation ofEuuii>t. ____________ ___________ ___________ __________

4,928.78 ___________

779.C1 1,182.23 ___________ -----------

6,890.02

- - - - - - - - - - - - - .---------=~---------

~---

TOTALS__________________ [$ 9,488.20$ 1,390.6 $ 6,589.68$ 9.C7$ 195,144.95$ 2,251.09$ 478,240.901$ 4,543.22,

$

7.22 ,$ 697,665.00

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATION
JULY 1, 1932 TO JUNE 30, 1933

Schedule No. 11-Cont'd.

ADMINISTRATION

CONSTRUCTION

MAINTENANCE

Land,

OBJECT 0 F EXPENDITURE

General Research Collection

Maintenance

Buildings Legisla-

Adm inistra- and

of

Quarry Construclion Surveys and Recon- Shop

and

live

lion

Analysis Revenue

struction

Equipment Translers

Total

EQUIPMENT PURCHASES

Automobiles.. _____________________________________ -----------1---------- -------------- ----------- ------------- ___________ $ 15,030.90 ___________

!5,030.90

~~f;~:~c~~~....... . ~~~.,~~

Laboratory EQuipment .. __ ------------ ___________ ' ______________________________________________ -------------___________

468.44 ___________

468.44

Buildings.. _________________ ----------------------- _____________________ ------------------------- _____________ ----------- 7,134.67 ___________

7,134.67

L~od~~~~-:::::::::::::::: ~::::::::~1;;::.~~~::~~::::1::-. ~~~~==;~;~,;;~~::::: ;;~:::: .~~~:::::,_-~-~~ ~=~~~~;

COMMUNICATION SERVICES Telephone and Telegraph_ $ 9,503.21 $ 20.40$ Postage____________________ _ 7,159.02-----------
TOTALS.. ________________ $ 16,662.23$ 20.40 -~

294.05-------- . $ 138.52 ----------
432.57 ---------- $

2,799.77$ 1,339.66
4,139.43 $

20.20 $ 4. 267.27 $ 495.84 ------ -- $

30.32 2,130.57

44.75-----------

50.52$ 6,397.84$ 540.59----------

1.33 $ 17,402.07

1.00

10,843.84

2.33 $ 28,245.91

STATE HIGHWAY BOARD OF GEORGIA ANALVSI S OF EXPENSE Dl SBURSEM ENT S BY DETAIL OBJECT 0 F EXPENDITURE CLA SSI FICATI ON
JULY 1, 1932 TO JUNE 30,1933

Schedule No. 11-Cont'd.

ADMIN! STRATI ON

CONSTRUCTION

MAINTENANCE

Land,

OBJECT 0 F EXPENDITURE General Research Collection

Maintenance

Buildings Legisla-

Administra- and

of

Quarry Construction Surveys and Recon- Shop

and

live

Total

tion

Analysis Revenue

struction

Equipment Transfers

------------------------------1---------------------------------- ------

HEAT, LIGHTS, POWER

WATER, AND CLEANING-

SERVICES Furnishing of Heat ________ $

664.96$

31.20 ___________ ---------- -------------- ----------- $

12.41 $ 90.051 ___________ ----------- $

798.62

Furnishing of Lights...... 1,405.25 1,349.04 ___________ ..........

1,558.95 .......... .

745.05 348.03 ----------- -----------

5,406.32

Furnishing of Power..................................................

57.73 .......... .

32.96 1,354.84----------- ----------

1,445.53

Furnishing of Cleaning___ 1,960.60 ...................... __________ -------------- -----------

.51----------- ----------- -----------

1,961.11

Furnishing of Water...... -

807.03

8.00........... ..........

187.34$ 9.44

472.08 223.14 ----------- -----------

1, 707.03

------------- -----1----- ----------------------- ----

TOTALS.................. $ 4,837.84$ 1,388.24 ---------- .......... $ 1,804.02 $ 9.44$ 1,263.01$ 2,016.06 ---------- ---------- $ 11,318.61
---------------------- ------------------- ------

RENTS

Rents, Road Machinery ___ ----------------------- _____________________ $ 3,G77.96 ___________ $ 2. 560 ..83 ...... .. ._ .. ._._-_-_-_-_-__- _--_: ::::_-__--__-:: $ 5,638.79

Rents,B1dgs.andGrounds 2,175.40 ______________________ ----------

2,007.32

25.28 6 328 21

51 00 1

10,587.21

~:~~~: ~~f!~!C:~i~;;;~: ----~:~~~~~ ::::::::::: ::::::::::: :::::::::: :::::::::::::: ::::::::::: ::::::::::::: :::::::::::!::::::::::: ::::::::::: ------~:~:~~~~

Rents, Miscellaneous......

37.00----------- ___________ ----------

36.00-----------

3.50 -----------~----------- -----------

76.50

TOTALS... ---------------$ 5,515.40 -----------~----------'j"-- ....... $

1

1

5,121.28 $ 1

25.281$ 8,892.54 $

51.00~----------- ----------- $ 19,605.50

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS 0 F EXPENSE DISBURSEMENTS BY DETAIL OBJECT 0 F EXPENDITURE CLA SSI FICATI ON
JULY 1,1932 TO JUNE 30,1933

Schedule No. 11-Cont'd.

ADMIN I STRATI ON

CONSTRUCTION

MAINTENANCE

OBJECT OF EXPENDITURE

General Research Collection

Maintenance

Administra- and

of

Quarry Construction Surveys and Recon- Shop

lion

Analysis Revenue

~truction

Land, Buildings
and Equipment

Legislative
Transfers

Total

TRAVELING EXPENSES Subsistence_________________ $ Transportation Gas and OiL-----------Mileage Allowance______ _
Other Transportation.. -

8,326.35$
9,957.17 3, 283.74 2,324.97

535.35$ 12,989.69---------- $

616.72 137.55 456.55

9,507.10 ---------222.13 ---------261.42----------

5,089.61 $ 11,287.30$ 11,108.68$

40' 472.62 3, 916 .33

13,7 47.24

53.10

1,434.28 -----------

10,469.25 3,293.85 220.00

246.95 ----------- $ 296.25 $

283.09-----------

66.28

77.50 ----------- -----------

73.86 ----------- -----------

49,88C .18
75,288.56 20,915.11 4, 771.08

TOTALS----------------$ 23,892.23$ 1,746.17$ 22,980.34---------- $ 60,743.75$ 15,256.73$ 25,091.78$ 781.40----------- $ 362.53 $ 150,854.93

SUPPLIES AND MATERIALS

Office Supplies-------------$ 9,200.41$ 347.81$ 12.73----------$ 1,367.27$ 75.15$ 1,773.65$ 155.16---------------------- $

Drafting and Engineering

Supplies__________________ 3,405.10---------------------- ---------- 12,580.28 1,562.32

204.16---------------------- -----------

PhotographicSupplies____

254.73----------- _____________________ ------------------------- ------------- ----------- ___________ -----------

Cleaning and Toilet Sup-

plies______________________

993.33

5.00----------- __________

1,489.75-----------

25.5C

21.22 ___________ -----------

Laboratory Supplies and

Materials _________________ ------------ 2,076.03----------- __________ -------------- ___________ ------------- ___________ ----------- -----------

Forage and Supplies for

: : : : : : : : : : : : : : :.: : ::::_:::::: ::::::::::: ::::::::::: Animals__________________ -------------------------------------------
~~~J;Ji!~t~:~_:_::::t~~::~~;~~~

13,822.85----------- ------------- ----------- ---------- -----------
~u;u~ ::::::~~:~r:::::::::::

6,058.78 -----------~

381.05 ----------- ----------- -----------

12,932.18
17,751.85 254.73
2,534.80
2,C76.03
13,822.85 35,224.28 12,841.95 1,394.90 6,439.83

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATION
JULY 1,1932 TO JUNE 30,1933

Schedule No. 11-Cont'd.

j ______A_D_M_IN_I_S_T_R_AT_I_O_N_--:----

CONSTRUCTION

1- MAINTENANCE

Land,

OBJECT OF EXPENDITURE

General Research Collection

I Administra- and

of

Quarry

~--t-io_n ~alysis -~ RevenIue---------~------~"---~---- ~~ipm~t- __,.~~~~- SUPPLIES AND MATERIALS

__

'

Maintenance

Construction I Surveys and Recon1

ShOp

Buildings and

Legislative

Total

------

:: : _ : : : : : : ;~;::~~~~~~~~:::::::::::J:::_:zz~~~f:: ::::::1:. _:::::: -- -- ---- H!tE::___ _ 4-i~U~I ~-~~~:~t

UiU[

B~~~:fa~uv_~~i_e_~~-~~-- -----1---- ______ ... __

...! _ 6,86!.31 ______ ---[------ ...

I__

_ __ . . . .

___

__

6,86!.31

1 ~:~~~ s__::R~~tis -~n"d____ ---

-~----------- ----- -- --

358.03/ ______ 19,893.75 ____ --r---- ____ ,------ __ 1

20,25!.78

Bndges_:----------- __ _ ____________ ____ ______ ___

_ ______ 531.94!.35 ______

/ 105,440.981 _ _ ____ ___

637.382.33

1 1 ~~5~:_::_::_:_.:_.:_1 2~~ __:(}:_2~f-_:_-_:_:_:_:__ :_::_:_:~_ --~~:_a ~:!~:1:1~u~:~~s-...:R~;;d~-- ------------~- ---- --- ----------

---------------- __ _

1
and Bridges _______________ 38.06 :_:_:_::-.:_:__:_:_:_ _:_:_:__:_:_:_ _$__2.89

____ _____ __

1 99.977.57 __
1
__

99.977.57

INS~:A:::s- -------------- ~~~ 14,142.~~~_::.=28-~ ~--~~~~~~~ ~-641.~~~~~_1~~~~ ~ 135,89~~~~~1~~~~~~:_:_.:___:_:::__ :_:_:_:_:_:_:_:_ ~--~~~~

Fire Ins. B1dgs. and Fix-

I

Li~~~~t;:Fi;~:~1:~-.:-i;;~iv.[$

2.!~~:~: -----io3.i5 ::_:-:: __ $

140

63 .

$----;:i77:"7r

_ __

15,;~~:~~ $----336:34 ::.::::: :::::::::

21,;~::!~

~:~~,.i,:;";:!~~~;i;;; : ':~'"j. " oc, _"'oo .:..:::. _ uo oo

u~ ool m oo _:_::.:::. ::::.::.: '""

B:::~::~~~~~~~~--::::-1;-~;~r~-~~ ;.:..-~~ ~:.:~~ ~:.:~~; _::.::~~~=--~~;~ ~~~~~~~~~~~~~ 1;--~~~~

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATION
JULY 1, 1932 TO JUNE 30, 1933

Schedule No. 11-Cont'd.

OBJECT OF EXPENDITURE PRINTING, BINDING, PUB-

ADMINISTRATION

CONSTRUCTION

MAINTENANCE

Land,

General Research Collection

Maintenance

Buildings Leg isla-

Administra- and

of

Quaory Construction Surveys and Recon- Shop

and

tive

tion

Analysis Revenue

struction

Equipment Transfers

- - - - - - - - - - - - - - - - -------------~------

Total

LICITY, ETC.

Printing.Annua!Report.. Printing Maps............. .

3,133.09 .............................. 1.... . I, 186 .49 ..................... _ ...... .

$ 3,133.09 1,186.49

Publication-Georgia

Highways............... - 2,202.05 ........... ----------- ---------- ........................................ ..

2,202.05

Stenography, Typewriting

and Multigraphing, Job
Work -------------------Photo Printing and De-l

469.75 ---------- ---------- ----------

....... 1$ 12.10 --

481.85

veloping Job Work ......

71.61,$

7. 78 $

1.92 ......... $

62.521 .......... $

8.23 ----

152.06

Publication of Notices and

Advertising_____________ .

2,773.67 ............... ..

2, 773.67

1----1--------------------------------------- -----

TOTALS................. $ 9,836.66$

7. 78 $

!.92 ---------- $

62.52 $ l2.IC $

8.23 ........... ----------- -----------

9, 929.21

-------------- -----------1------------------------ -----

INDEMNITIES

Compensation-Medical

Service Claims and Costs$ 13,814.29 ...................... _.................................. ------------ ----------- ................... __ $ 13,814.29

Damage to Private Property______________________ _ 4,067.23 ........... ----------- .......... ------------------------- ............. ---------------------- ---------

4,067.23

Damage for Personal in-

juries_--------------------

833.CO ...................................................................... ___________ ----------- .......... .

833.00

-------------------------- ----------1-----

TOTALS................ --$ 18,714.52 .............................................. ----------- ........................ ---------------------- $ 18,714.52

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATION
JULY 1,1932 TO JUNE 30, 1933

Schedult No. 11-Cont'll.

ADMIN I STRATI ON

CONSTRUCTION

MAINTENANCE

OBJECT OF EXPENDITURE

General Research

Administra and

lion

Analysis

Collection of
Revenue

Quarry

Construction

Surveys

Mai ntonance and Reconstruction

Land,

Buildings Legiela-

Shop

and

live

Equipment Transfers

Total

PAYMENTS TO CONTRACTORS

Payments to Contractors.. ---------------------------------- __________ $ 9,610,964.03 ----------- $ 2,249.84 ___________ ---------- ------------ $ 9,613,213.87

Bonus_______________________ ------------ ___________ ---------------------

9,218.33 _____________________________________________ ------------

9,218.33

------------------------------------------ 1-----

<:0 0>

TOTALS.-------------------------------------------------------------$ 9,620,182.36----------- $ 2,249.84----------- ---------- ------------ $ 9,622,432.20
----1---- ----------------------------------- ------

SPECIAL AND MISC. EXPENSES

Misc. Camv Exvenses ______ ------------ ----------- ------------ ---------- $ 2.479.87 ----------- ------------- ----------- ---------- ------------ $

BluePrints-----------------$ 12.57----------- ----------- ----------

3.06$ 63,421.99------------- ----------- ---------- ------------

Tests------------------------------------$ 28.20----------- ---------- 30,646.47----------- $ 1,512.G2 $ 101.35---------- ------------

Traffic Counts _____________ ------------ 6,120.00----------- ---------- -------------- ----------- ------------- ----------- ---------- ------------

Subscriptions and Dues.. Incidentals........... ______

4,001.52[

5.00----------- ---------- -------------- ----------- ------------- ----------- ---------- ------------

516.85 CR7 .88 $ 37.15 ----- ____ .

147.80

1.60

5.03

2.00 ---------- ___________ .

2,479.87 63,437.62 32,288.04 6,120.00 4,006.52
702.55

Interest_____________________ ------------------------------------------------------------------------------------------------------------------- -------------Transfers ___________________ ----------------------- _____________________ -------------- ----------- ------------- ___________ ---------- $1,107,182.86 1,107,182.86

Burial Expenses____________ ----------------------- _____________________ ------------------------- _____________ --------------------------------- --------------

Rewards____________________ -----------------------_____________________

2,340.25----------- ------------- ----------- ---------- __________ __

2,340.25

Court Costs... _____________

573.40----------- 120.95 __________ -------------- ----------- ------------- ----------- ---------- ------------

694.35

1----1---------------------------------------- ------

TOTALS------------------$ 5,104.34,$ 6.145.321$ 158.10---------- $ 35,617.45$63,423.59$ 1,517.05$ 103.35~---------- $1,107,182.86 $1,219,252.05
TOTALS__________________ $ 443,11! .38~~~ ;-~;;~~l$11,369,631.60 $127,316 .44.~;;-::;. ~.;; ;;~ ;~~~ $14,802,795.05

Schedule No. 11-Cont'd.

STATE HIGHWAY BOARD OF GEORGIA

ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATION

JU LV 1, 1932 TO JUNE 30, 1933

ADMINISTRATION

I CONSTRUCTION

MAINTENANCE

Land,

OBJECT OF EXPENDITURE

I I General Research Collection

Administra- and

of

Quarry I Construction

Maintenance Surveys and Recon-

Shop

Buildings Logisla

and

live

Total

tion

Analysis Revenue

struction

Equipment Transfers

---------------------------------------------------------

-----

LESS: INTER-DEPARTMENTAL

BILLINGS

Blue Prints G. 0. Salaries____________ $ 55,621.24----------- ----------- ---------- -------------- ----------- ------------- ___________ ----------- ----------- $ 55,621.24

G. 0. Supplies and Materials____________ -- ___ -_

8,G20.75 ___________ - - - - - - - - - - - __________ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

Shop

1

Re~~a;:~ ~~~:~~~ents ____ ,. ___________ ----------- ----------- __________ -------------- __________ _____________ 172,947.52 ----------- -----------

8, 020.75 172,947.52

1

=::=== Total Test Disbursements___________________ ------------

29,586.73 ==::_::~=::=:: __________ -------------- ___________ I

==~= ~=:: .:..:.:.=:==:: __2_9,_586_.7_3

1

TOTALS------------------$ 63,641.99$ 29,586.73----------- ---------- -------------- ___________ !_____________ $172,947.52----------- ----------- $ 266,176.24

----1----- - - - ---1-----1---- ---- -.---------- 1-----

NET EXPENSE DIS-

$

BURSEMENTS _________ $ 379,469.39$ 7,103.81 $ 79,507.38$ 876.49 $ll,369,631.6C $127,316.44$1,399,327.47----------- $ 64,477.031.108,909.15 $14,536,618.81

Schedule No. 12. STATE HIGHWAY BOARD OF GEORGIA

CONSTRUCTION ALLOTMENTS & DISBURSEMENTS BY TYPES

JULY 1, 1932 TO JUNE 30, 1933 --------=-=====,======

Description

July 1, 1932 j' Jan. 1, 1933\

To

To I Total

Dec. 31, 1932 June 30,_1-'-93_3_l__F_o_r_Y_e_a_r_

ALLOTMENTS

SoiL ______________________ !$1,400,281.52 1$742,573.00 1$2,142,854.52

GraveL _____________ . _____ , 15 ,236.87Cr, 58,448.79
Macadam __________________ 188,762.62 i 89,577.35

43,211.92 278,339.97

Surface Treatment___

2,239,388.52 1 30,461,61Cr 2,208,926.91

Bituminous Mixtures_ ___ 480,863.27 ! 16,650.60

497,513.87

Bituminous Concrete ______ i 42,583.70Crl 7,175.13Cr 49,758.83Cr Cement Concrete __________ i 2,588,833.85 11,534.85 2,600,368.70

~~;~~tlires~ ~~ ~: :::::::::-- --- 47~82o~iiii 1 1~.5~t95i.~~r 1~~.B.fis.~~cr

____ Totals_________

: _ ~~f3_,_~88,13Q_:~I$

960,455.83

I
$7,848,586.03

--~----=----=--==--'-

1
_cl_ _ _ _ __

EXPENDITURES

SoiL ______________________ !$1,870,065.22 i$1, 749,470.86 '1$3 ,619,536.08

GraveL ___________________ ! 130,866.431 125,831.90 256,698.33

Macadam__________________

80,229.56

95,589.61 175,819.17

Surface Treatment.______ 1,376,372.86 1,325,075.64 2, 701,448.50

B~tuminous Mixture _______ 122,609.59 342,610.69 465,220.28

B1tununous Concrete _____ ,1 157,402.59 i1 60,633.65 218,036.24

Cement Concrete __________ 1 2,009,653.79 ' 1,662,520.73 3,672,174.52

Brick____________ __

19,998.17

41,637.80

61,635.97

Structures .. _______________

71,136.23 127,926.28 199,062.51

Totals ___ _

$5,838,334.44 .$5,531,297.16 $11,369,631.60
~c - _ __:-~__:__ i___ - - - - - - - .. ---------

OR

Schedule No. 13.

STATE HIGHWAY BOARD OF GEORGIA

SUMMARY OF ACTUAL CONSTRUCTION ALLOTMENTS, BY CONGRESSIONAL DISTRICTS

(ALSO, A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)

JUNE 30, 1933.

-

-

I Distr. of Total

I ot Allotments

1 on Mileage

' Basis

Funds Actually Allotted

Excess Allot. Allot. Under

Over Mil- Mileage

eage Basis Basis Dis-

Distr.

tribution

CONSTRUCTION Beginning of Department to June SO, 1933.

------

DistrictNo. 1 10,871,306.71 1$ 10,635,439.24$ __

$ 235,867.47

2 10,742,890.831 11,146,744.96 403,854.13

3 11,046,651.48'1 7,935,376.54-

3,111,274.94

4' 9,309,850.36 9,964,556.45: 654,706.09-

5 I 2. 334,163. 3s 2. 544. oo8. 54: 2o9. 845.16

6 I 9,998,505.621 8,786,047.161

1,212,458.46

7 ' 10,153,010.8611 11,403,607.38 1 1,250,596.52

8 ' 11,358,051.59 9,000,583.50

. 2,357,4e8.09

9 13,510,537.71 17,887,880.50 4,377,342.79

10 9.824.491.57 8,626,887. 71

_ _

1,197.603.86

11 16,454,516.59; 19,182,284.44 2,727,767.85-

12 1~692,631.4~1_11,183,191.~---- - - - - 1,50~,439.72

1
Totals _ -,$128,296,608.17 $128,296,608.171

I

CONSTRUCTION January 1, 1930 to June 30, 1933.

District No.1 3,824,019.53$ 4,533,273.82$ 709,254.29$

2 4,017,352.75 4,084,805.65 67,452.90

3 3,601,926.30 2,824,100.261----- -- - 777,826.04

4 3,153,543.44 2,358,453 .001_---

- - 795,090.44

5

692,539.61 1,105,216.93 412,677.32

6 3,394,722.901 2,296,189.39 7 3,411,148.94 3,384,535.461

__I 1,098,533.51

-

i 26,613.48

8 I 4,063,542.40 4,200,716.431 137,174.031
9 i 4,776,812.19 4,909,516.19! 132,704.001

10 ' 3,422,201.43, 3,659,992.05 237,990.621

11 5,830,418.64 6,227,366.381 396,947.74

12 i 4,405,605.551 5,009,668.12 604,062.57 1------------ -,- ---------- --- ------ -

Totals .1$44,593,833.68$44,593,833.68.

i

I

:

SUMMARY OF ALLOTMENTS
January 1, 1930 to June 30, 1930 July 1, 1930 to June 30, 1931 July 1, 1931 to June 30, 1932 July 1, 1932 to June 30, 1933

- $ 7,514,305.57 ---- 16,551,385.83
12,679,556.25 7,848,586.03

Total __ _

$44,593,833.68

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 14.

SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL DISTRICTS rALSO, A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS!

JULY 1. 1932 TO JUNE 30, 1933

District

Distribution of Total of Allotments on Mileage Basis

Junet~~. July 1, 1932 to Dec. 31, 1932

I
Jan 1 19331 1933

Total for Year

Funds As Actually Allotted

i

I

I

~~. June~~. [ July 1, 1932 1 Jan. 1, 1933 1 Total

for Year

I Dec. 1932j

19331

-------------------~----------~---------

Excess Allotment
over Mileage Basis Distribution

Allotment under Mileage
Basis Dis-
tribution

,_.

CONSTRUCTION

0 0

July 1, 1932 to June 30, 1933

--------------------~------------------ ------------~---------- ---~~

--

1-

.. ------1~--~

No. L __ .. ___ $
2 ._ _____ _ 3___ -----4 ________ _ 5 ________ _
6.. _-----7________ _
89______-_-__-_-_--_
11n20._.._.._-. _-- _--_--_--_---_-

568,625.60$ 625,947.65 545,959.11 465,797.64 127,324.78 509,059.38 520,884.34 606,145.65 771,966.38 548,379.47 900,200.49 697,839.71

80,081.84$ 648,707.44$ 87,091.25 713,038.901
77,800.77 623,759.88 64,561.84 530,359.48 17,736.73 145,061.51 72,047.631 581,107.01 72,164.81 593,049.15 83,977.45 690,123.10 107,070.66 879,037.04 75,929.80 624,309.27
125,468.19 1,025,668.68 96,524.86 794,364.57

771,464.11$ 56,298.77 $ 722,407.51 129,154.54 I
493,854.39 62,133.08
563,470.79 115,059.81 91,767.32 66,435.60
519,864.96 164,814.63
608,813.87 130,261.03 903,440.84 44,319.31 567,485.79 10,190.33CR 146,397.26 78,164.62
640,939.92 3,738.81CR 858,223.44 127,743.58

827,762.881$ 179,055.44-----------851 ,562.05 138,523.15 _____ .. ____ _
555,987.47------------$ 67,772.41
678,530.60 148,171.12------- ---158,202.92 13,141.41 _____ ------
684,679.59 103,572.58----- ------
739,074.90 146,025.75 -----------947,760.15 257,637.05 -----------557,295.46 ____________ 321,741.58 224,561.88 __________ ._ 399,747.39
637,201.11 ------------ 388,467.57 985,967.02 191,602.45 ____ ._ _____ _

Totals ____ $ 6,888,130.20$ 960,455.83$ 7,848,586.03$ 6,888,130.20$ 960,455.83 $ 7,848,586.03 _______________________ _

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 14---Cont'd.

SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL DISTRICTS (ALSO, A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)

JULY 1, 1932 TO JUNE 30, 1933

Distribution of Total of Allotments on

Funds As Actually Allotted

I

I

______M_i_le_aco:g_e_B_a_s_is_ _ _ _ _ _ - - - - - - - - , - - - - - - - - - - - ! Excess Allotment

District

July 1, 1932 Jan. 1, 1933

to

to

Total

~ July 1, 19321! Jan. 1, 1933 I

Total

for Year

to

to

: for Year

All~!~rent ~ft~e 'I Mileage Basis Dis-

Dec. 31, 1932 June 30, 1933

i Dec. 31, 1932 June 30, 1933 !

Basis Dis- tribution

_ _ _ .---------~--- _____

------~__ tribution 1

......

MAINTENANCE

.0.....

July 1, 1932 to June 30, 1933

- - - - - - - - - - -

--

No. L _______ j$
2___ -. ---3___ -----4___ -----5___ --6___ -----7 _________
8___ -----g___ -----10___ -----1L _______
12___ -----

70,607.00 $ 78,748.08j
69,114.561 58,964 .47! 16 ,118.08' 62,975.54 65,939.57 76,733.86 97,725.13 69,421.04 113,383.93 88,465.83

40,570.451$ 44,121.50 39,414.82 32,707 .82i
8,985.651
36,500.221 36,559.58 42 ,544.00! 54,243.301
38,466.971 63,563.72 48,900.68

111 ,177.45 $ 122,869.58: 108 ,529. 38:
91,672.29 25,103.73 99,475.76 102,499.15 119,277.86 151 ,968.43 107,888.01 176,947.65 137,366.51

78,186.28
77,912.631 68,675.84 56,904.84 15,493.00 67,059.29 66,770.02 72,995.04 101,916.21 63,402.87 113,348.93 85,532.14

39,267 .30;$ 39,833.58 36,804.76 35,574.49
5,269.011 42,847.09 39,880.15 45,111.011 60,392.911 34 ,935.86, 59 ,834.02', 46,828.53

117,453.58$

6 ,276.13I 1 ___________ _

117 ,746.21j ____________ !$ 5,123.37

105,480.60 ------------ 3,048.78

92,479.33

807.04 ------------

20,762.01 ------------ 4,341.72

109,906.38 10,430.62 ------------

106,650.17 4,151.02 --- --------

118,106.05 ------------ 1,171.81

162,309.12 10,340.69 ------------

98,338.73

I
------------1

9,549.28

173,182.95 ------------ 3,764.70

132,360.67 ------------ 5,005.84

Totals ____ $

868,197.091$

I

I

486,578.711$ 1,354,775.801$

868,197.09 $

486,578. 7l $ 1,354,775.80 ------------ ------------

I

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 14-Cont'd.

SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL DISTRICT (ALSO, A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS'

JULY 1, 1932 TO JUNE 30, 1933

District

Distribution of Total of Allotments on Mileage Basis

July 1, 1932 Jan. 1, 1933

1

to

I

to

I Dec. 31, 1932 : June 30, 1933

Total for Year

Funds As Actually Allotted

July 1, 1932 I Jan. 1, 1933 I

to

,

to

1

Dec. 31, 1932 I June 30, 1933

i

Total for Year

Excess Allotment
over Mileage
Basis Distribution

Allotment under
Mileage Basis Distribution

....
0
""

No.1 _
2 3 4 5 __
6
7 8 9 10 __ 1L_ 12 ___

3,300 .OlCr $ 3,680.51Cr! 3 ,230.26Cr! 2 ,755.87Cr\
753.32Cr 1
2 ,943.34Cr 3 ,08l.87Cr 3 ,586.37Cr 4,567 .46Cr
3 ,244. 59Crj 5 ,299.32Cr
4 ,134.73Crl

Totals ___ $ 40 ,577. 65Crl $
I
------ --------

SURVEYS July 1, 1932 to June 30, 1933

2,837.37$

3,085.72

2 ,756.55,

2,287.48

628.43

2 ,552. 7l

2,556.86

2

,975.40

1
1

3,793.60

2,690.26

4,445.45

3,419.961

34,029.791$

462.64Cr$ 594.79Cri 473.7l0fl 468.39Cr 124.89Crl 390.63Cr; 525.01Cr' 6l0.97Cr 773.86Cr 554.33Crl 853.870rl 7l4.77Cr 1
6,547.86Cr;I$ I

I

I

1 ,666.41Cr $ ll ,646.82Cr 2 ,800. 78Cr

2 ,335.46!$ 669.05 $ 3,399.381 8,247 .44Cr
4,250.14, 1,449.36 1

1 ,131.69; -- - f$ 7,652.65
1 ,923.07,_-

2,265.28

1,540.84: 3,806.12

4,274.511

204.80

1 ,2o2 .c6: 1,406.86

1 ,531. 75

415.15Cr'

5,610.92 5,195.77

5,586.40-

1 ,821. 21

2,124.29 3,945.50

4,470.51 -

3 ,665.07Cr

3,279.52

385.55Cr

225.42

2,837.84Cr

3,554.931

717.09 !1 1,490.951

3,ll6.76Crl 20,624 .68Cr'

1,254.45: 1 ,862.31Cr!------------ 1,307.98 2,500.02 18,124.66Crl _________ 1 17,270.79

1 ,904. 57 1----~-_!)'77. 781 4,882.35 ' 5,597.121

40,577.65CrI 1
I

34,029.791I$ 6,547.86Cr I______

I

I

-----------~----------

- - - - - -

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 14-Cont'd.

SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL DISTRICTS (ALSO, A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS'

JULY 1, 1932 TO JUNE 30, 1933

-

1-D~istri~b~u~t~io-~~~~~l;~a_oi_!l_Bo_:s_!ll.otm~nts-on_ j '

Funds As Actually Allot:_e~------! Excess

I

j

; Allotment

District

! July 1, 1932

Jan. 1, 1933

1
1'

Total

July 1, 1932 1 Jan. 1, 1933

Total I over

to

to

for Year

to

to

for Year I Mileage

------~-----1~::~~1, 193~-~une 30, 1933! ------------~-61: 31, ~~~ Jun~~~3~11-

~r~~~t~~~
1

Allotment;
under Mileage
Basis Distribution

RECONSTRUCTION July 1, 1932 to June 30, 1933

2,581.88$ 2,807.871
2,508.341 2,081.51
571.84
2,322.851 2,326.63 2,707.48 3,452.011 2 ,448.02i
43,,101425..011511

.

,

I

2,581.881 ---- --- - i$ 2,807.87! ---- _______ _I

991.08$ 2,808.50

991.08: 2,808.50,$

- -:$ 1,590.80

.631' --

--

2,508.34[---------- ---1

341.11!

341.11, ----------- 2,167.23

2,081.511-------------1

4,600.001

4,600.00: 2,518.49

571.841--------------

400.001

400.001------------

171.84

~:~~~:!~,_ ~~~~~~~~~~-I=== :~~6~661 :~~6:66!~-~~~~~ ~ ~~ ~ :!~~:~~ 1 = =

===i

== === =i

== 1

1 := 3 ,452, 01 ______________ ,
~ :6!~:~; = =: =: == == == =[

1 ,000, 00
---is ~826~46

1 ,000. 00
----- is~s26~4o

__ _-------.
---14 ~ 775~25

I
!

_

_

_

_

2 ,452 01
2~~4~: 0~

1 1 3,112.01 --------------

754.50

754.50 ------------ 2' ,357.51

30,965.591--------------1$

30,965.591$ 30,965.591--------

~ i ----------

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 14--Cont'd

SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL DISTRICTS (ALSO, A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)

JULY 1, 1932 TO JUNE 30, 1933

District
....
0 tl>o

Distribution of Total of Allotments on Mileage Basis

July 1, 1932 Jan. 1, 1933

to

to

Dec. 31, 1932 June 30, 1933

Total for Year

Funds As Actually Allotted

July 1, 1932 Jan. 1, 1933

to

to

Dec. 31, 1932 June 30, 1933

Total for Year

TOTAL ALLOTMENTS July 1, 1932 to June 30, 1933

Excess I Allotment

Allotment under

over

Mileage

Mileage Basis Dis-

Basis Dis- tribution

tribution

No. L _______ $ 635,932.59$

23______-_-_-_-__-_4 _________ 5 _________

701,015.22
611,843.41 522,006.24
142,689.54

67___-_-_-_-_-_-_-_-

569,091.58 583,742.04

8___ -----9 _________ 10 _________

679,293.14
865,124.05 614,555.92

1l2l ______-_-_-_-__-_-

1,008,285.10 782,170.81

126 ,071. 54$ 762,004.13$ 137,106.34 838,121.56
122,480.48 734,323.89 101,638.65 623,644.89 27,922.65 170,612.19 113,423.41 682,514.99 113,607.88 697,349.92 132,204.33 811,497.47 168,559.57 1,033,683.62 l19,535.05 734,090.97
197,522.51 1,205,807.61 151,957.51 934,128.32

847,983.98$
788,673.32 559,729.45
622,640.91 107,465.12
956,509.10
677,405.10 972,770.81
666,564.16 206,683.37 733,664.17
945,660.15

98,892.61$ 175,196.00
103,529.09

946,876.59 963,869.32 663,258.54

$ 184 ,872.46 125,747.76
------------

--------------7--1-,0-6--5-.3-5-

156,775.14 779,416.05 155,771.16 ------------

73,306.67 213,272.64

180,771.79 799,781.74

10,159.60 117,266.75

-----------------------

172,265.47 849,670.57 152,320.65 ------------

93,959.84 1,066,730.65 255,233.18 ------------

54,757.51 721,321.67 ------------ 312,361.95

114,354.93 77,415.63

321,038.30 811,079.80

------------
------------

413,052.67 394,727.81

178,304.39 1,123,964.54 189,836.22 ------------

Totals ____ $ 7,715,749.64 $ 1,512,029.92 $ 9,227,779.56 $7,715,749.64 $ 1,512,029.92 $ 9,227,779.56 ------------ ------------

Schedule No. 14--Cont'd

STATE HIGHWAY BOARD OF GEORGIA

SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL DISTRICTS (ALSO, A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)

JULY 1, 1932 TO JUNE 30, 1933

Other Allotments Undistributed

Undistributed Maintenance___________________________________________________ ---_$ 5 ,170. 76Cr Administration _______________________________________________________________ ---- 379,049.83

Research and Analysis _____________________________ ----- _____ -- __ ----------------Collection of Revenue _________________________________________________ --- __ -------

7,096.29 79,432.07

E~uqaurirpYm--e--n-t-_-_-_-_-_-_-_-_-__-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_ Shop ____________________________________________________________________________ _

874.99 58,705.93
85.55Cr

MW.o&torAV. eRheicnltealLDiciesncsoeuTnat_g_s-_-_-_-_-_-_-_-_-_-_-_-_-_-_-__-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_----_-_-_-_-_-__-_-_-_--_

1,080,000.00 23,790.39

Total Allotments-Exhibit "B" ____________________________________________________ .$10,851 ,472. 75

STATE HIGHWAY BOARD OF GEORGIA ENGINEERING
STATE MILEAGE BY ENGINEERING DIVISIONS
AT JUNE 30, 1933.
--------~-----

. Div. No. / - No. of

Area Population II Mileage at Mileage at

Counties Sq. Miles 1930 Census July 1, 1932 June 30,

I
------~--

----,

1933
!----

1.

21

7' 113 694,705 . 1,032.618 . 1,083.230

2 3

30 28

I 8,811 i 457,327 1' 507.887 1,571.276
8.860 478.411 1.401.247 1.468.454

4.

24

11,025 431,648 1,425.291 1,446.371

5

30

11,342 484,282 ! 1,523.728 1,607.035

6

26

_1_1~,5~7~4~'--36_2_,1_3_3_i 1 '306. 045 1~-3_21~.9~34~-

Totals __ 159

58,725 12,908,506 18,1~6.81B 8,498.300

1
------~~-
1933 over 1932=301.484 miles.
--------------

STATE MILEAGE BY CONGRESSIONAL DISTRICTS

AT JUNE 30, 1933

---------

------------
~---------

Cong. Dist.

No. of

Area Population Mileage At Mileage At

Counties Sq. Miles 1930 Census July 1, 1932 June 30,

1933

L _______

13

t~~~~:~~\
5 ________ 6 ________
7 ________ 8 ________

13 15 10
4
13 13 13

9 ________ . 18

10 _______

12

lL

20

12 _______

15

6,396 5,528
4,563 3,777 1,140
3,614 4,366
4,193 5,449 4,657
9,465 5,557

260,291 242,276 189,719
220,708 422,206
221,050 262,219
198,927 218,496 212,934
248,290
211,390

666.615 743.475 652.520
556.699 162.176
594.562 622.553
724.452 912.646
655.415 1,070.481
835.222

689.786 790.032 700.120 576.219
163.010
621.537 653.277 780.105
939.198 655.783 1,096.536
832.697

Totals __ 159

58,725 2,908,506 8,196.816 18,498.300

---------
1933 over 1932=301.484 miles.

STATE MILEAGE BY COMMISSIONERS DIVISIONS AT JUNE 30, 1933

Comm. I No. of I Area Population Mileage at Div. Counties Sq. Miles 1930 Census July 1, 1932

----- 1',----!-----1----

L _______ 2 ________

56 52

22,916 19,885

846,415 2,829.773 910,059 2,826.538

3 ________

51

15,924 1,152,032 2,540.505

Mileage at June30, 1933
2,928.969 2,914.825 2,654.506

Totals __ 159

58,725 2,908,506 8,196.816 8,498.300

106

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ROADWAY MILEAGE PLACED UNDER CONSTRUCTION
DURING THE FISCAL YEAR ENDING JUNE 30, 1933

Surface

Graded, Top Gravel,

Treatment Surface

Proj.

County

ComJ Cong. Eng. Soil, and Chert, and Macadam Re-Surface on Miscel Treatment Bituminous Bituminous Cement

Brick

Sand Olay Selected

_:__ - - - - - Dist.l Dist. Div.

Material

laneous Bases

on

Mixtures

Lime Rock

Concrete

Concrete

- - - - - 1 - - - - 1 - - - - - - - - - - -------~-----~---- - - - - - - - - - - . - - -

22 Fulton .....- 3 I 23 , Forsyth_ ----i 3 24 ' Cherokee____ _

----------- ------------ ------------ ------------ ------------ ------------' 9.956 ------------ ------------

2 1

:::::::::::: ::::::::::::I:::::::::::: :::::::::::: ____:::~:~__ ::::::::::::i::::::::::::i::::::::::::

----8: i43--

25-B Candler..... .

29-D Johnson_

12

30-B Cobb-------- 3

34 Haralson ____ _ 3

52 64

Evans ________
i Glynn _______ _

l 1

11

76

1 Wheeler _____ _ 1

1

12

85 Haralson. ___ _ 3 7

86 Haralson____ _ 3 7

87 Haralson ____ _ 3 7

93 Taylor ______ _ 2 3

109 Dawson _____ _ 3

4 ------------ ------------ ------------ ------------

4.450 ------------ ----- ______ ! ____________ ------------

4

7.063.. ------------ ------------ ------------ ------------ ------------ ------------ ------------ ------------

1

0.872 ------------ ----------- ------------ ------------ ----------- ------------ ------------ ------------

1

5.650

------------1------------ ------------ ------------ ------------1 8.852 ------------ ------------ ------------

6

7.742 '------------ ------------ ------------ ------------'------------ ------------'------------ ------------

6 ------------ ------------ ------------ ------------ ------------ ------------ ------------! ------------ 9.123

1 ----------- ------------------------------------------------------------ ------------~' ------------ 5.194

l ------------ ------------ ------------ ----------- ------------ ------------ ------------ -----------

4.466

1 3 2

:::::~:~~~:: :::::::::::: :::::::::::: :::::::::::: :::::7:;~~:: :::::::::::: :::::::::::: -::::::::::: :::::~:~~;::1 ::::::::::

115-B Chattooga __ _ 3 118 Fannin _____ __ 3

7 9

1 ------------

4.762 ------------ ------------ ------------ ------------ ------------ ------------ ------------

1 ------------ ------------ ----------- ------------;

0.492

120 CarrolL ..... 3 135 Elbert...... 3

4 8

1 2

:::::::::::: :::::::::::: :::::::::::: ::::::::::::I:::::::::::: ::::::::::::!::::::::::::I::::::::::::

8.320 1.298

141 Richmond .. _ 2 10
144-A Peach._----- 2 12 144-C Peach....... . 2 12 153-A Newton_----- 3 8

::1: ~:.1 : ::: : : :: I :::,~;:: 4

2.500 ------------ ------------1------------ ------------ -----------

3

3 2

:::::::: :: :::: ::::::: :: :::::: I ::

:: I :

::

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ROADWAY MILEAGE PLACED UNDER CONSTRUCTION
DURING THE FISCAL YEAR ENDING JUNE 30 1933

Surface

Graded, Top Gravel,

Treatment Surface

Proj.

County Comm Cong. Eng. Soil, and Chert, and Macadam Re-Surface on Miscel- Treatment Bituminous Bituminous Cement

Brick

No.

Dis!. Dis!. Div. Sand Clay Selected

laneous

on

Mixtures Concrete Concrete

Material

Bases Lime Rock

- - - - - - - --~--

---l----1----l----l-----l----~--~----l-----l-----1

153-C Newton ______

8 2

!.833

159-B Miller_---- ___ 171-B Clay__________ 179-B Greene _______ 3

182 Jenkins_----- 2

..... 205 Effingham ___ 2

0 00

215 226-A

Banks ________ Liberty _______

3 1

226-B Liberty_______ l

2 3 8 l I 9 1 1

5

6.896 ------------ ------------ ------------ ------------ ------------ ------------ ------------ ------------

5

12.480 ------------ ------------------------ ------------ ------------ ------------ ------------ ------------

2 4 4 2

:

:~:~

:~:~:

:~:

:

:



;:~.:r:

~:~:

;:

:

l

:,:.~

l

;:

:;~:;.

::,.

:::::::;

~:

::

:~

:.

----------

241-A Hancock _____ 2 10 4

241-B Baldwin______ 2 10

244-A Colquitt. ____ 1 2

244-B Colquitt_____ 1 2

256-A AI>I>ling ______ 1 11

264 Early_________ 1

2

4 ------------ ------------ ------------ ------------

6.362 ------------ ------------ ------------ ------------

5

7.931 ------------ ------------ ------------ ------------

7.931 ------------ ------------ ------------

5

6.381

6

5

266 Dawson______ 3 9 2

267-A Stewart ______ I

3

5

268 UI>son. _______ 2 6 3 273-A Talbot _______ 2 4 3

273-B Talbot _______ 2 4 3

279 Cook_-------- 1 11 5

283 Forsyth.. ____ 3 9 2

284 Union. _______ 3

9

2

3.692

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ROADWAY MILEAGE PLACED UNDER CONSTRUCTION
DURING THE FISCAL YEAR ENDING JUNE 30, 1933

Surface

Graded, Top Gravel,

Treatment Surface

Proj.

County Comm Cong, Eng, Soil, and Chert, and Macadam Re-Surface on Miscel- Treatment Bituminous Bituminous Cement

No.

Dis!. Dist. Div. Sand Clay Selected

laneous

on

Mixtures Concrete Concrete

Material

Bases Lime Rock

285 Lumpkin ... 3 9 296-A McDuffie_____ 2 10

296-B McDuffie.. 2 10 310 Union ________ 3 9

312 Lumpkin---- 3 9

..... 315 Wilkes________ 3 8

0 <D

317-B

Lumpkin ..

3

9

321 Forsyth.. 3 9

347-C Stewart.. 1 3

351 Franklin.... 3 8 357 Lowndes _____ 1 11

369-B Toombs... 1 12

370 Richmond ... 2 lO

372-A Elbert .. 3 8

379-B Colquitt. ____ 1 2 386 Talbot _______ 2 4

390-A Crawford ____ 2 6

390-D Crawford.... 2 6 393-D Taylor________ 2 3 393-E Taylor________ 2 3

402-B Madison. -- 3 8 402-D Madison ______ 3 8 402-E Madison______ 3 8

2

6.830

4

7.700

4

4.495

2

3.415

2

3.020

2

10.569

2

5.851

2

7.578

7.578

5 ------------ ------------ --------- ------------ ------------

5.614 ----------- ------------ ------------

2

3.320 ------------ ------------ ------------ ------------ ------------ 5.038 ------------ -----------

5

11.400

6

3.200

4

5.000

2

3.674

5

11.669

3

0.253

3

4.931

3

2.430

3

10.510

3

3.278

2

5.179

2

3.207

2

1.050

Brick

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ROADWAY MILEAGE PLACED UNDER CONSTRUCTION
DURING THE FISCAL YEAR ENDING JUNE 30, 1933

Surface

II

Graded, Top Gravel,

Treatment Surfaeo

Pro].

County

Com. Cong. Eng, Soil, and Chert, and Macadam Re-Surface on Miscel- Treatment Bituminou Bituminou Cement

Brick

No,

Dist. Dist. Div. Sand Clay Selected

_ _ _ _ _ _ _ _ _ Material

----1---- laneous
Bases

on

Mixtures

Lime Rock

Concrete

Concreto I

408-A Stewart ______

408-B Stewart_----

409-A Putnam......

4W-D Putnam......

409-F Jones.........

..........
0

410-D 41G-E

Atkinson ..... Atkinson _____

41G-G Atkinson _____

41()-H Ware_________

H2-A Telfair________

412-B Telfair. ___ ...

418-0 Lamar........

m-D Wilcox........

424-S Polk..........

428-A Bryan .... ___ -

428-B Bryan........ 444-A Oconee_______ 444-B Morgan ______ 445-F Taylor________ 44g-c DeKalb ______

44Y-G Gwinnett. ... 465-B Johnson _____
468-B Oglethorpe___

1

1

1 3

2 8

2

8

4

2 6 3

1 11

6

1 11 6

1 11 6

1 11 6

1 12 6

1 12 6

2 6 3

1 12 5

3 7 1

1 1 6

1

8

3 8

: 2 3
3 5

3 2

1.,

r,

''" I
:1

+r::~~ --I~- --1 J 1 - :(:~-n:-I-: -

1

:

1

---------'-----'---- - - - - ---------

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ROADWAY Ml LEAGE PLACED UII'DER CONSTRUCTION
DURING THE FISCAL YEAR ENDING JUNE 30, 1933

Surface

Graded, Top Gravel,

Treatment Surface

Proj.

County

Com. Cong. Eng. Soil, and Chert, and Macadam Re-Surface on Miscel- Treatment Bituminous Bituminous

No.

Dist. Dist. Div. Sand Clay Selected

laneous

on

Mixtures Concrete

Material

Bases Lime Rock

- - 470-C Twiggs_______

471-B 478-A

W a r r e n _______ Long _________

~~
1

-- ~~~:~~~~~ :~:::~~:~~~~:::::::::: ::::::::::::~::::::::::~ :::::::::::: ::::::::::::1::::::::::::

.

I

478-B Liberty_______

1 6

479-A Heard-------- 2

3

...............

483-A 483-B 483-C

Madison ______ M a d i s o n ______ Madison ______

3 3 3

2

483-E Madison _____ 3 8

483-F Clarke________ 3 8

487-D Thomas______ 1 2

489-A Lanier_ _______ 1 11

490 Fulton _______ 3 5

577 Ghattah o o c h e e ____

.

I

I

580-A 580-B

Butts _________ B u t t s _________

679-B Jasper________

681 Jackson ______

9

2

725 Colquitt._._.

2 5

738-B CarrolL ______

1

805-A Chattooga ___ 3

1

805-D Chattooga ___ 3

1

- - - - - ' - - - - - - - - ' - - - ' - - - - - - - - - - - - - - -I . -- - - - -I - - - - - - I-

I

I

Cement Concrete

Brick

;::~~ I----

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ROADWAY MILEAGE PLACED UNDER CONSTRUCTION
DURING THE FISCAL YEAR ENDING JUNE 30, 1933

Surface

Proj.

County

I Graded, Top Gravel,

Treatment Surface

Comm Co11J1. Eng. Soil, and Chert, and Macadam Re-Surface on Miscel- Treatment Bituminous Bituminous Cement

Brick

No.

Dist. Dis! Div. Sand Clay Selected

laneous

on

Mixtures Concrete Concrete

Material

Bases Lime Rock

-----------------l-----l-------------1----r------------ ----

805-E Chsttooga.... 3 7

806-C Whitfield...... 3 7

817-B Meriwether... 2 4

823 Emanuel..... 2 12

828-A Wheeler ....... 1 12

..........

833-A 833-B

Effingham.. _ Effingham ....

2 2

1 1

~ 845-A TattnalL.... 1

1

853-A Coweta.... 2 4

857-E DeKalb ...... 3 5

862-A TattnalL.... 1 1

905-D Clinch-------- 1 11

907-C Wayne........ 1 11

1 ------------ ------------ ------------ ------------ ------------ ------------ 4.675 ------------ ------------

1 ------------ ------------ ------------ ------------

5.178 ------------ ------------ ------------ ------------

3

3.222 ------------~------------ ------------ ------------ ------------ ------------ ------------ ------------

j~ ~:: ~::r:~ 4

1.754 ------------ ------------ ------------

6

4

4

6

3
2 1::1

:! .,t

5.025 ------------ ------------ ------------ ------------
rl

,-----~:~~~-- :::::::::::: ::::::::::::I:::::::::::: 6

4.242 .............. ------------------------- ------------ ------------ ------- ----~------------ ------------

6 6

-----5:875-- ::::::::::::1 :::::::::::: :::::::::::: ::::::::::::

910-

A&B Decatur. 1 2

------------ 18.959 ------------ ------------ ------------ ------------ ------------ ------------ ------------

919-B Chatham_____ 1 928 Screven....... 2

1 1

6 4

-----;:;;8-- ~::::::::::: :::::::::::: ::::::::::::~:::::::::::: :::::::::::: -----~::::.. :::::::::::: ::::::::::::

932-D Wilcox......... 1 12 5 939-C Wilkinson.... 2 10 4 942-C Laurens....... 2 12 4 942-D Johnson ..... 2 12 4 944-B BleckleY------ 2 12 4 95o-D Macon ........ 2 3 3

4.139 ------------ ------------- ---------- ----------- ------------ ------------ ------------ ------------
3.257 ------------ ------------ ------------ ------------ ------------ ------------ ------------ ------------
3.888 ------------ ------------ ----------- ------------ ------------ ------------ ------------ ------------
0~:.9~2~3! :::::::::::: :::::::::::: :::::::::::: :::::::::::: :::::::::::: :::::::::::: :::::::::::r::::::::::

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ROADWAY MILEAGE PLACED UNDER CONSTRUCTION
DURING THE FISCAL YEAR ENDING JUNE 30, 1933

!
1

I j

Graded, Top Gravel,

Surface

I

Treatment Surface

Proj. No.

County

~e~:::~~ l~:::~s Lim;~ock Commi Cong Eng. Soil, and Chert. and Macadam Re-Surface on Miscel- Treatment Bituminous Bituminous Cement

Brick

DiEt. I Dist. l Div. Sand Clay

I

Mixtures I Concrete Concrete I

F~m ......

3

<;;

~.~,~_i=0~
1016=A

~g~!~~~~~~:~:~:~:::_:::::I

: ~

1016-C ColQuitt ___

1017-A Cook_________

1017-B Bernen _ ____

1
1021-A

Marion_______ 1

1022-A Jenkins ______ ! 2

1025-A Pulaski... ___ I 2

1025-B Houston_____ 2

1025-C Houston_____ 2

1032-A Tift.__________ I

1032-BI Berrien ______ 1

I1:~~

I

'
~

:::::7~.6:6~9ii~:r_:_:_:__~_:_~_;_;_:__:[I-:-:-:-:-:-':-:~--:"-:-l-:r:-:-:-:--:-:-:-:-:-:-:-1I:-:-:::-:--:-:--:~-:-~:-:-11---:-:--:--:--:-:--:---:--:-:--:-1:-:-:-~:-:--:-:--:---:--:-:--:-1:-:-::_-_:_:-_:-_:_:1_:-_:-:.:-.~-.---_--_-_--_-~_:_-~_-~_~-_-_--_'1,:--:--:--:---:---:--:--:--:--:

2 5

11 5

11 5

4 3

1 4

12 3

12 3

12 3

2

4.673

11

4.082

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ROADWAY Ml LEf..GE PLACED UNDER CONSTRUCTION
DUiil NG THE Fl SCAL YEAR ENDING JUNE 30, 1933

I

I

I

j

I

I

'I Graded, Top Gravel,

surface I

: I

I

Treatment Surface

Proj.

County IComm Cong. Eng. Soil, and Chert, and Macadam Re-Surface en Miscel- Treatment Bituminous Bituminous Cement

Brick

-- -1---- No. I

~--~--~--~- Dist. Dis!. I Div

~~

~--- Sand Clay

-~Se~le~ctied~-~-----

-----~-B_"slean_eso_usJ~_I'_"'on"_~~~-

Mixtures
- - ---

-~~

-~--' Concrete '

-C-o-n-cr-ete-~

1034-Aj Sumter _____
~~:;=! ~:~~~ord-. ~-,

2.472 1



.

..

1~!.:0~~3~ : ------ .:: :::__:::..~~~-:::::::::!::::::: __

, ________ _

1057-AI' Thomas _____

-----------

1063 Berrien ... ____ 1

11

~ 1065 , Schle, ------

3

12.302 1-----
2.595

.. ...

--I

1
----------- --------

---1

___________ _

-----------1---- ------------

~~~~~:: i;~~~~m~---1
1098 . Tift

11

~:~~~ ,-

---o:,,;sIr::::::..:::::-:

:I:::::::.::

1::::::::::::1
:1

:_:_--

__

.......

1.211 !

:1_: _- :_ :_ __ l.G52 ---------_--__ -__ -_-_:_-_:_:__-_:_:_:1_-_:_:_:_ _:__::_-_:_::_-:_- __

~~i~ I~:~"-~~_:::_
~~~! ~~i~~~-i~t_::::l 1
1506 Spalding_____
~;!~-AI :~~~=~~~~~::

~~

.~:::::::::::: 3.970 l.5GO
-----~::::~-

1

_:_ :::::.:-1 - .i.ooo 1.:::.:.:::: ~-::_

__

___

.....

:

1 ':

_

i-

------::::1:

::::::::: 1

::::::

---

:::::::1:::_::::_::_::: ::::_::::::_:1:::_::_::::1_ ---~:~~0 .1:::::::::::, ::::-:::::: ::::::::::1 :::::::

...... -
~-:_:::_ -~~--

--o:4~_1r::::~:-1::..~.~.~.~.~.~.~.~.!.~.-.-.:..:._:-~.~.~.~..~.~..~.:.~..Jo-~~-~:~J1

~:~~

.. ........ .
:::~) :~::~~-:

i TOTALS..

I 405.724

44.269 I 32.055 I 25.900 I 147.704 I 99.275 I 54.560 I o.coc I 122.896 : 0.000

------------------~
A TOTAL OF 187 PRO.TECTS COVERING 933.383 MILES OF ROADWAY WAS PUT UNDER CONSTRUCTION DURING THIS PERIOD.

STATE HIGHWAY BOARD OF GEORGIA

ROADWAY MILEAGE PLACED UNDER CONSTRUCTION BY ENGINEERING DIVISIONS

~--------

DURING FISCAL YEAR ENDING JUNE 30, 1933

---------------

- --------------------------- - - - - - - - - - - ~

Number of

, 1

Projects'

----

Type of Road
~-~ - - - - - - - - - - - - -

I Division : Division I

i

One (Miles',

1

Two (Miles'

- - , - - 1
----- -----

Division
Three rMiles:

Division Four (Miles'

Division Five "Miles

-----

---------- --

I

Division

Six rMiles;

i i '

Total (Miles;

- - -------

I

89 I Graded Earth, Top Soil and Sandi

;may

___

-~ 8.984

60.880

7 ;Gravel, Chert and Selected Ma-

teriaL_ 9 Macadam __

7.028 ! 10.338 1.088 30.967

4 Resurface

0.000

0.000

............ 22
Ol

Surface Treatment on Misc'Li

Bases

5.670

57.106

21 Surface Treatment on Lime Rock

Bases 12 Bituminous Mixtures __

0.000 ! 0.000 20.087 22.026

0 Bituminous Concrete_

0.000

0.000

23 Cement Concrete~ 0 Brick__

I 35.635 0.000

26.193 0.000

92.687
0.000 0.000 0.000
0.000
31.359 4.283 0.000 16.064 0.000

60.212
0.000 0.000 7.500
36.110
6.059 5.790 0.000 21.651 0.000

114.138
26.903 0.000 18.400
36.670
20.505 0.382 0.000 14.230 0.000

69.823
0.000 0.000 0.000
12.148
41.352 1.992 0.000 9.123 0.000

406.724
44.269 32.055 25.900
147.704
99.275 54.560
0.000 122.8!16
0.000

------ --------------- ---

---- ------------

------------

187

TOTALS

78.492 207.510

144.393 137.322

231.228 ' 134.438

!133.383

---------

-----

-- -----------

STATE HIGHWAY BOARD OF GEORGIA

ROADWAY MILEAGE PLACED UNDER CONSTRUCTION BY CONGRESSIONAL DISTRICTS DURING FISCAL YEAR ENDING JUNE 30, 1933

~;'Cl~~ [ 1

Type of Road

~-~~~~~~~~~~!~'i~~~~~'~i~l[~~&..~'i~l~~~~'~i~~~~'~i~~~'~i-!l~~z~'~i ~~G~)~'i~l~~~-~'~~il~~~'~il~j~~~~i~'il~-i~

Z P..

.o

o

o jo ,o ,o o o1

o ,o . o o

1

1

89 faraded Earth, Top Soil and' i

I

!

I

I ----~-~- - 1 -- -~- - ~~---~- -,---

1 Sand Clay_______________ I40.156J, 57.54236.796]30.427 o.ooo,42.208 5.872 49.723116.95m5.452 57.91353.6781406.724

7 .Gravel, Chert and Selected

1

:

j

I

'

I

I

I

i MateriaL _______ ..... ___ 0.000 26.903 0.000 0.000 0.000 0.000[ 7.028 0.000 10.3381 0.0001 0.000 0.000 44.269

9 jMacadam_____ ___

'0.000 0.0001 0.0001 0.000 7.598 0.000 0.000: 0.000124.457 0.000 0.000[ O.OOOj 32.055

4 !Resurface -- - ------ - I o.oool 0.000 0.000 0.0001 o.ooo, 0.000 0.000. 0.000 0.000 7.5oo, 18.400 0.000 25.900

22 Surface Treatment on

'

'1

I

I

I

'

! Misc'l. Bases __________ ,18.393 12.8831 o.oool o.ooo o.ooo, o.ooo_. 5.178 18.787 38.81118.965[. 18.008]16.6791147.704

21 Surface Treatment on Lime[

1

1



,

,

,

12

: RockBases _____________ 33.650114.89119.402 7.988 0.000 4.931 0.000 jBituminousMixtures_______ 7.782 0.3821 o.ooo o.ooo 9.37714.28313.887

0.000 8.893l1

09..09 05 06 11

0.000 0.000;

13.761 o.ooo

4.652[99.275 o.ooo! 54.560

0

Bituminous Concrete ____

I 0.0001

0.0001 0.000 0.000 0.000 0.000 0.000 1

0.000

o.oool 0.000

0.000. 0.000

0.000

23 [Cement Concrete__ _ _ __ 0.000 11.180 3.050 8.320 0.00016.06419.172 26.193 8.143] 5.9811 0.000 24.793.122.896

0 Brick____________ __ _ _ _ 0.000 0.000 0.00011 0.000 0.000 0.000 0.000 0.000 0.000! 0.000 0.000 0.0001 0.000

---
187

TOTALS____

---

---
99.981

---
123.781

1 -
59

--
.248

-
46.

1 ---- _
735116.975]67

_ .4_ 86~, _ 51_ .13_ 711_ 10_ 3.5-96-11-08-.-6612

--
47 .

--
898

-------
108.082[199.

--
802

i


9

----
33.383

1

I

1

--'

- - - - - I -

- - - -' -

'

1'

Proj. 470-C. Twiggs County- Concrete Pavement

Proj. 1094. Dougherty County- Brick Pavement

Proj. 393. Taylor County- Surface Treatment on Limerock Base

Proj. 468. Oglethorpe County- Concrete Pavement

Proj. 241. Baldwin County- Surface 'treatment on Gravel Base

Proj. 226-A. Liberty County- Surface Treated Road

------ ------------ -
Proj. 85. Haralllon County- Concrete Pavement

Proj. 22. Fulton County- Bituminousl'dacadam on Stone Base

Proj. 24. Cherokee County- Concrete Pavement.

Proj . 483-F. Clarke County- Cold Mix Asphalt Surfacing on Stabilized Top SoU Base

Proj. 402. Madison County- Concrete Pavement

Proj. 311. Elbert County- Concrete Pavement

STATE HIGHWAY BOARD OF GEORGIA

SUMMARY OF BRIDGES COMPLETED DURING THE FISCAL YEAR ENDING JUNE 30. 1933

I
Project No.I

County

I Comm.l Cong.l Eng.

No. Gf

1

1

I Timber, 1-Beams 1

CoPcrete

Concrete

a,1d Concrete

T1mbcr

~ Concrete BridgP i

Totals

- -;;;--! CarrolL

z:l

1 Forsyth

I Dis!. I Di't. [llv. Bridges

I I

--1- ---I:---

--- ....... .. _i 3 1 4

1

................ .! 3

9

(Lin. Ft.) >nd I-Se1ms1

Flocrs

1 (Lin. Ft.) 1 Culverts ' (Lin. Ft.J

I-~"'__Ft.).___(L~.-~t~- -1------~~- _(.=_tn._Ft~}-1------

.. .. ..

...

.

160.0 I

32.0
.........

32.0 160.0

24

Cherokee

855.0

24

, Cherokee.

96.0

24

Cherokee

32.0

2.)-A Candler .......

32.0

2.)-A Candler. .. ..

>-'

...... 1

<"=">

30-C Cobb ............... . ---------1

77

Charlton

I

ll

129.0 2!10.0 418.0

80

Glynn ...

!

ll

80.0

86

I Haralson

56.0

88

Brooks

ll

26.0

ll2 169

~~l~~~s ..1 :::::::::::::........

12 ll

783.0
::::_1.

783.0 424.0

173

Schley ...................... -;

--------

20.0

179-C 244-A

I gfr~~r~~:--::::::::::::::::::::::1

128.0 I 623.0

24-l-B 1

195.0

128.0 623.0 195.0

. ::-::_ ~f~l~~~~--::::::: 244-B
252-A 256-A

268

I

_::1

ll 6

310

Union............................ !

9

86.0 :
I
. ~~~:0.. 1

109.0

86.0

39.0

39.0

268.0

192.0

322-A Wayne............................ I

ll

I - - - - - - ~------------

32.0

32.0

1

i

STATE HIGHWAY BOARD OF GEORGIA

SUMMARY OF BRIDGES COMPLETED DURING THE FISCAL YEAR ENDING JUNE 30, 1933

I

'

:

I

i

j Timber, 1-Bea" I

Project No,

County

I

Comm. Dist.

Cong. Dist.

I 1

Eng. Div.

No. of

I
'

Concrete

I

Concrete

1

and Concrete

Timber / Concrete Bridge

Bridges (Lin. Ft.) I and 1-Beamsl

Floors

I (Lin. Ft.) I Culverts

Totals (Lin. Ft.)

::b 'iit;f E ffij ------1---------------------- ------- ---- (Lin. Ft.), ~-~~-~----]--(~~- --

379-B

I H

I

i

I

i

!

241.0 408.0 306.0 180.0

......
"0 "

~::::r 390-A
390-D 393-0 393-0

....

393-D Taylor_____________ ______________

21.0

3

I!- "__"__"___ ____________

< l

:::

32.0 226.0 47.0

223.0 ___________ 1 ---------------

223.0

393-E 393-E

~:~i~~:-_- :::::_____::::::::::::'

~~~:~--

::::::::~

-32:()-

1

::::::::::::. _____

___________

-------

120.0 32.0

:------- !:~:~~;_-_::::::: 402-B
408-0 410-G

Madison and Franklin._________

ll

~

1:::: :::::::,::::::::::::1 --- ~~:~-- ---481:()--1 - 208.0

------------~ --------------

1 -----------~

- -------1

:::::::::::::::,

208.0 108.0 481.0

410-I 410-I

Ware________________ Ware________________

ll

6~

ll

.

--------~-----------:

282.0

21.0

21.0

282.0

445-F Taylor____________

3

1

29.0

445-F Taylor--------------- ____________

3

449-0 471-B

~:r~~~~:~~~~~a~~::_::::::::

i~

473-A

1

1 1

306.0

t:-:::::::;_:

___

:--

340

0 .

21.0 Underpass
310.0 306.0

::-- 473-A
478-A

f~~=~~;:t:~~::-:::::::-:::

~~

478-A

_ :::::'::::: - 1: 100.0

32.0 100.0 47.0

STATE HIGHWAY BOARD OF GEORGIA

SUMMARY OF BRIDGES COMPLETED DURING THE FISCAL YEAR ENDING JUNE 30, 1933
~~-===-~=~=-~~=-=~========~========--==-~~-~-_-_~-~~--_-_-

Projct No.I

County

, Comm.

I

Dist.

----1

478-B 1 Liberty ___ -----------------479-A , Heard ___________________ _

483-0 Madison _________________________ _

483-F Clarke__________ _ 487-0 , Thomas _ _ _____ ___ ______ _ 578-0 Jenkins ________ _ ___ _____ 2

>-'

589-A 1 B1bb

-- -

--- -- -- i

<:;:> >-'

594

597

Burke_ Meriwether.

_________ _
__ j

615

Troup and Harris _______ _

785-A Whitfield. ______________ --------1,

785-B 788

Whitfield-----------------Heard ________ _

820-B Johnson

820-B Johnson

839-0 857-E 861-A

Bartow ..

I DeKalb. _

__________ _

Jeffer3on ____________ _

883

Effmgham __ _ _ -------------

905-D I Olmch _______ -----------907-F Wayne ___________ _

928

Screven_

932-0 Wilcox __ _
I 932-D Wilcox._

Timber,I-Beams

Cong. Eng. No. of Concrete Concrete and Concrete Timber Concrete Bridge

-;-1 ; 1-; : _: : -- l-- -,-- Dist. 1 Div. 1

Bridges

(Lin. Ft.)
~

I and 1-Beams
(Lin. Ft ),
1

Floors (Lin. Ft.)
::.~

(Lin. Ft.)

Culverts (Lin. Ft.)
26.0-

~:[1/: ~ - 1

I : :I ,ro "i--

: ' II I

I ]

';~:{l 1

------------

32.0

12 12

~ ;ooo

(4) 125.0

23.0

-

29.0

-----+'------- ------1'

124.0 45.0

10 11

' :

:

- -- -___ :

::o:~--

I

16ii0.0

46.0

11

1 U ,nderpas' I,___________ _

50.0

1

2

12

4

56.0

-----.-----~ -. -- -------1-

131.0

12

------------

86.0

Totals (Lin. Ft.)
26.0 229.0 220.0 29.0 96.0 240.0 21.0 126.0 53.0 29.0 235.0 278.0 23.0 29.0 580.0 124.0 45.0 340.0 46.0 1650.0 50.0 56.0 131.0 86.0

~~~~~-

STATE HIGHWAY BOARD OF GEORGIA

SUMMARY OF BRIDGES COMPLETED DURING THE FISCAL YEAR

ENDING JUNE 30, 1933

- - - - - - - - -~~-~----c

Project No.

County

I Comm.

Dist.

-----~-- - - - - - - - - - - - -

----1-- -

944-B I BJec1,ley____ _

I

950-D Macon __

980

Elbert _____ _

981

Dawson______

-------

1006-B I Rg_ndolph _________ --------- ---11

......
r"o '

1015-B 1017-A 1017-A

1 Thomas __________ _ 1 Cook __________________ _
Cook_

1018-A Lanier ____ _

1023-B ! Fannin ___ _

1034-A I Sumter._

Cong. Dist.
12 3
ll ll ll 9

TOTALS ____ _

Eng. I No. of Div. Bridges

Concrete (Lin. Ft.)

1

I Timber,I-Beams

Concrete I and Concrete I

and I-Beams

Floors

(Lin. Ft.)

1
!

(Lin. Ft.)

1-------- --------

Timber Concrete Bridge I

(Lin. Ft.)

Culverts

(Lin. Ft.)

----

'

3011.0

----1

150

2913.11

836.o 1

645o.o

3.Z24 .0

19:i3 .0

Totals (Lin. Ft.)
27.0 239.0 495.0 .211.0 64.0 96.0 180.0 tiO.O 27.0 300.0 79.0
l:i. 406 0

BRIDGE MILEAGE COMPLETED BY ENGINEERING DIVISIONS DURING FISCAL YEAR ENDING JUNE 30, 1933
-~=~~~=--~---~=~-~-~--=--~--------~

Number of
Bridges

Type of Structures

j Division I One
Miles

Division 1 Division !

Two

Three I

Miles ! Miles

- - - -----,~----------------

- - - - - - -- -~------- - - - - - - - -

24

Concrete_____________ __ __ 0.016

0.064

0.116

4

1 Concrete & !-beams__

0.117

0.042

0.000

41

!Timber,I-beam,concretefloor 0.248

0.184

0.131

15

ITimber______ ____ __

___ 0.000

0.094

0.000

--~6__J~oncrete bri~ge _c:_~verts~--~ _ 0~65 ___~4 __ 0.062

Division Four Miles
0.206 0.000 0.284 0.024 0.067

Division Five Miles
0.155 0.000 0.141 0.020 0.126

150

I Total Constructed____

0.446

0.398

0.309

0.581

0 .442

..... - - - - - - -
<: <:

BRIDGE MILEAGE COMPLETED BY CONGRESSIONAL DISTRICTS DURING FISCAL YEAR ENDING JUNE 30, 1933

I Division I Total

! Six

Miles

Miles I

0.000

0.557

0.000

0.159

0.234

1.222

0.472

0.610

0.036 i 0.370
-+----

o. 742 1 2.918

I
Number of
Bridges

Type of Structures

1---~

---- - Congressional Districts

~-~~~~

Miles

- --~

I
! Total

' One

I Two

T

h

r

e

e

1 1

Four

Five II

Six

SeveniEight Nine I Ten iElevenl Twelve'

Miles

24 Concrete______ ________ o:ooo~ 0.155 0.066 0.000 0.000 0.050 0.0001' 0.064 Q.Oi6!.0.0581--o.ooo!-0~48~~ 0.557

1

4 41

Concrete Timber,

&!-b!-ebaemams,s_Concrete~.

0.000

0.000 0.0001
I

0.000

0.000

o.ooo:

0.060 0.042
1

0.057 0.0001

!

'

0.0001

0.000

0.159

Floor_ _________________ 0.064 0.107 0.0881 0.043 0.000 0.000 0.067 0.077 0.287!0.130! 0.249 0.110 1.222

15 Timber______ _ __ ____ 0.024 0.000 0.020 0.000 0.000 0.000 0.000 1 0.094 0.000 0.000 0.472,1 0.000 0.610

66 Concrete Bridge Culverts _I 0.063 0.042 0.055 0.026 0.009 0.014 0.053 0.005 0.00610.006; 0.0391 0.052, 0.370

~;;-1

0~ 0~ -o~:o.282i 1

-_-!O.W Total Constructed___

0.304-0.229-0.069

1
2-:918 o.-36610.194I0-:76ol--o-.3l(y

A Typical Concrete Box Bridge Culvert

Proj. 906. Clinch County- Cypress Timber Bridge over Suwanee River

Proj. 24. Cherokee County- Bridge over L. & N. Railroad near Toonigh
Proj. 578. Jenkins County- Bridge over Central of Georgia Railroad near Millen

Proj . 24. Cherokee County- Combination Concrete Bridge with Creosoted Piling Approach Spans over Etowah River

Proj . 179. Greene County-Combinatio~, Concrete Bridge with Creosoted Piling Approach Spans over Apalachee River

Proj. 30-C. Cobb County- Concrete Bridge over Sweetwater Creek near Austell

STATE HIGHWAY BOARD OF GEORGIA

SUMMARY OF MAINTENANCE PERSONNEL BY DIVISIONS

I
Foremen ofl Special Outfits .
1

Patrol Sections

AS OF JUNE 30, 1933

-

-

-

~

I

I

: Patrolmen '

1. 1

,

1

;

I

Miles Paved

!

I

.'I Miles

Unpaved .

, 1

1,

Total Mileage

DIVISION NO. !--CARTERSVILLE
---

3

22

22

440.617 I 642.613

1,083.230

DIVISION NO. 2-GAINESVILLE

3

29

29

492.008 ' 1,079.268 : 1 ,571. 276

DIVISION NO. 3 THOMASTON

4

21

21

I, 547.3101 921.144 1,468.454

I

DIVISION NO. 4-LOUISVILLE

2

25

25

_ _ _._ - - - - - - - -

1~ 1 377.799 1,068.572

DIVISION NO. 5 -MOULTRIE

1,446.371

2

28

28

I 605.77411,001.261 I 1,607.035

4 Total :18

DIVISION NO. 6-WAYCROSS

-

- - -- ----

-

----- -

'

I

I

24

24

I 561.928 , 76o. oo6 ' 1, 321.934

149

149

!3,025.436 I 5,472.864 I 8,498.300

140

STATE HIGHWAY BOARD OF GEORGIA
ACCIDENTS REPORTED FOR FISCAL YEAR ENDING JUNE 30, 1933
--------------

Col. With

i

Col. With

I
1

Col.

With .

Drove

' Drove _I

At

. Ran .I Ran

Cause of Accident

Mtr. Veh. 1 Other : Parked I Off I off 1 R. R. I into into Total

in Motion ' Vehicle ' Vehicle , Roadway I or !nto Crossing Animal: Pe~es-

~t:~~~~ ~~ ~~~~t lights____

in Motion

1 Bndge '

, 1

tnan

- ------ --- -----1-

------

2

I

1

3 _--I-__---- 3 I 18

6" -j

__ __ 1

6

39

Deficient brakes_ _ Deficient lights___

3

,

6

1 2

9

9 4

1 5

5 1

1 :_

20

1 __- _ ~- 1

27

Deficient steering gear____

_ 1

2

4

4

10

Deficient tires_ _____ _______ _ __

1

________ ____

6

7

,_. Driver asleep___

1

1

3

2

3

10

:::; Driver intoxicated__

12

1

4

26

6

2

51

Failure to observe signs____

I

8

Pass car without right-of-way__

4

_________ . 1

3

3

8

14

l

14

Reckless, careless driving_______ _

52

18

3

28

9

13

4

17

144

~~~~~i~t-~~~ --------

--1 1~ 1-- 1

i

4~

1~

4

8 86

Wrong side of road__ ________ _

_ ___3 _ _ :___4___ '___2 ___ ___13

3 _ __

26

Totals___ ______ __

108

J __ ~- l __2i)___ 1 171

58

27

456

Accidents on curves__________

96

'I

14

~--1-6-~-- 89 ---27-,--8--

ll

262

AccidentsonStraightRoad ___ ~~~~~!

12

18

1

9

1

82

31 ! 19 1

15 i 194

Totals _______ _

1 l - - 1 - 0 8_ _ _

32

Persons killed_____________ Persons injured____________________

39~

8 53

25 - 171___ 58_j-271- -9- -26-!45-6-

- - I T 1 ~ - f~

~43

--=--:-= ---~~-~~~~~ -

1

Property damage only__ _

14

2

3

27 ____

2

5

______ 53

-~----=--------------~----------~----

Route 96. Taylor County- Machining Graded Earth Road

Richmond County- Local Stone Ditch Checka and Retaining Wall Placed by Maintenance Forces to Prevent Erosion

Route 3. Patching Old Bituminous Pavement Spraying Hot Asphalt to Seal Cracks in Old Asphalt Pavement

Route 9. Lumpkin County- Hightower River Bridge Being Constructed by Maintenance Forces

Steel and Wood Ferry Constructed at East Point Shops for Use on the Ocmulgee River on Route 31 at the TelfairCoffee County Line

Division Maintenance Sh~ps at Cartersville

STATE ffiGHWAY BOARD OF GEORGIA ASPHALT DEPARTMENT
The following projects, approximating 55 miles, wer_e_completed. d.uring_!_h_El_fiscal year ending June 30, 1933._____

Project No.
-~-----------

County
------------

Type

A14L _______ _

A205 ______ _

A370

A451

A1080 __

A725 __

A1501

A375 A&B _

:;;: A61 _____ _

oo A805 ODE __ _

A805 A99l

oA________

_Richmond Effingham Richmond Emanuel Bulloch
_I,Oolqmtt ,Colquitt IMitchell ____ iWilkes _Ohattooga _Ohattooga
.. iOhattooga_

_Double surface treatment

6" lime rock base with surface treatment

'Double surface treatment. __

i Surface treatment

__________ _

_ Prepanng base and surface treatment __

Oold mix surfacing

- _ _ _

_____ _

_ Lime rock base with surface treatment _

_ IPebble sml base with surface treatment ____ _

--12" _ 1}" mixed in place asphalt cold mix asphalt ___ _ _ 1~" cold mix asphalt ____ _

_ 2" cold mix asphalt __ _

- - - - - - - - - - - - - 1,

CONVICT DEPARTMENT

Thefoll<>wing projects were completed during the fiscal year ending June 30, 1933.

Miles
2.500 3.817 5.000 8.500 3.067 0.382 0.581 12.407 4.000 4.675 4.426 4.786

Pro.iect

1

County

No.

1
------- ------------- ---1-----------

0839 0 -

IBartow __

Type 1 Grading and drainage __

Miles 13.250

Proj . 1041-A. Baker County- Clearing and Grubbing Right of Way by State Convict Forces
Proj . 1041-A. Baker County- Grading by State Convict Forces

Berrien County- Road Graded by State Convict Forces

Proj. 1063. Berrien County- Drainage Structures Built and Road Gra(Jed by State Convict Forces
Proj. 376. Mitchell County- Surface Treatment on Pebble Soil Base Constructed by State Asphalt Forces

Proj . 806. Whitfield County- Road Surface Treated by State Asphalt Forces

STATE HIGHWAY BOARD OF GEORGIA LABORATORY
MATERIALS TESTED OR INSPECTED July 1st, 1932 to June 30th, 1933

Kind of Material

I
----

Item

Cement __ S a n d __ Water_ __
Coarse Aggregate Top SoiL Tar__
Limerock_ Fertilizer_ Grease __ _ Paint__ _
Asphalt Asphalt Filler_ Expansion Joint_ Sign MetaL __
Asphalt Sand_ Center Strip _ OiL _____ _
Guard RaiL __ Pine Tar_ ______ _
Creosote OiL __ _ Copper Flashing __
Concrete Cylinders_ Concrete Beams _ Concrete Cores _ Corrugated Metal Pipe_ Concrete Pipe
Reinforcing SteeL Timber__ Concrete Sign Post_

Samples_ ___ Samples__
-~Samples_
__ Samples _ ___1. SSaammpplleess__ _
Samples __ !S a m p l e s _ ____ ~Samples __ Samples_ __ Samples_ _Samples_ Samples ___ Samples_ S a m p l e s __ __ Samples Samples __ ___ Samples_ ___ Samples ______ Samples__ ___ Samples_
____ Shipments .Shipments ___ _
_-~Shipments Shipments_
__ Shipments

Total Samples and ShipmentsI__ _

Number
3572 446 135
810
1850 336 596
3 7 60 690 13 23 5 35 12 33 9 1 2 2 2659 349 987 552 140 256 50 18
13651

153

PART THREE
FISCAL YEAR ENDING JUNE 30, 193+

STATE HIGHWAY BOARD OF GEORGIA

STATEMENT OF ASSETS AND LIABILITIES-FUND BALANCES JUNE 30,1934.

Current Assets

ASSETS

Cash in Banks State Funds __
National Recovery Trust Fund Trust Funds, Miscellaneous

862,652.51
* 864,340.58 600.00 1,727,593.09

Exhibit "A"

State Treasurer, Highway Funds

U.S. Government, Vouchers in Transit

Federal Aid

-~

National Recovery

3, 539.652.63

7,836.54 111.688.94

122.525.48

Accounts Receivable_ Advances __________ _

49.546.47 l,\165.00 ~ 5.441.282.67

Deferred Assets Inventory of Supplies and Materials Shop .robs in Process Undistributed Payrolls_ Undistributed Charges _
Total Proprietary Assets __

105.408.47 20. 203.13 46,366.35 25,414.85

197.-122.80

-- ~ 5,638.705.47

Capital Assets

Land, Buildings and Equipment \Schedule No. 4)

Land______________

_____ $ 178,145.25

Buildings_ ____________

315,229.00

Trucks __ ------ ________

327.640.00

Tractors __

163,775.00

Other Road Equipment _

364,432.00

Engineering Equipment

38,153.00

Office Equipment_

41,575.00

Shop Equipment

53,183.00

Laboratory Equipment Quarry Equipment __

* 16,500 .OG
58.293.00 1,556,925.25

Roads and Bridges Construction Cost to Date On Closed Projects. ___ __ On Open Projects ____ _

- *125,419,506.80 6,955,131.90 l32,3H,638.70

Total Capital Assets _

133,931.563.95

TotaL ______________________ _
156

_____ $ 139,570,269.42

STATE HIGHWAY BOARD OF GEORGIA

STATEMENT 0 F ASSETS AND LIABILITIES--FUND BALANCES JUNE 30,1934.

LIABILITIES, FUND BALANCES AND SURPLUS

Current Liabilities

Accounts Payable ________ ------------

none

Trust Funds, Miscellaneous_--------

$

600.00

U.S. Government. Advance National

Recovery Fund__ -----------------

750,000.00

Exhibit "A"

Total Proprietar:; Liabilities __ Fund Balances (Schedule No. 6)
Construction Contract Balances Contracts __ -----------------Contracts. National Reco\'ery _

-------------------------- $ 750,600.00
$ 2,344,958.08 4,240,106.75

Totals --------------- ----

------------------- $ 6,585,064.83

Less: Contract ParticipatiOn. __

342,77

Net Cash Liability __ --------Less: Casl1 Participation
Federal Participation --------National Recovery ____ --------Other Cash __ --------------County Cash Refund_-_--------

------- $ 6,584,722.06

33,898.80 3,821,818.99
11,530.13 12, 215.50Cr.

3, 885,032.42

Net Cash State Liability ____ _

Other Unencumbered Allotments

Con ~truction. State Forces

.",'

Survey Projects_____________ _

Reconstruction Projects __________ _

Maintenance, General Convict Farm ________________ _

567,280.06 38,727.61 f',86:J.27 18.311.68 65,864.66

$ 2,699,689.64 697,047.28

Unliquidated Purchase Orders_

158,965.05

Total Fund Balanceo;. Capital Liabilities and SL"plus
Capital Liabilities Refunding Certificates- -Due to Counties~1936 thru 1945 (Schedule No.5) _________________________ _
Surplus Invested in Plant and Equipment_ ________________________ _
Surplus Invested in Highways. _____ _

3, 555,701.97
26,637,282.87 l, 556,925.25 105, 737. 355 '83

Total Capital Liabilities and Surplus
Current Fund Surplus (Exhibit "8") Surplus. State Funds _______________ _

Less: Unrecorded Reserves For County Construction Contracts. Detail Estimates Incomplete_______________________________ s
For Revolving Fund to cover Inventories. Advances. etc __________ _

88,578.20 290,464.40

133,931' 563.95 953,360.90
379,042.60

SurplUli as per books_ --------------------------------------------- 1,332,403.50

TotaL ------------------------- _______ -------------------------- $139,570.269.42
NOTE: Current Surplus, as above, does not include Unallotted Federal Funds amounting to $3,50.810.36.
157

Exhibit "B" STATE HIGHWAY BOARD OF GEORGIA RECONCILIATION OF FUND SURPLUS REFLECTING FUND REVENUE,

APPROPRIATIONS AND ALLOTMENTS

JULY 1, 1933 TO JUNE 30, 1934.

Fund Deficit, Juy 1, 1933

FUND REVENUE

Revenue Received (Schedule No.7) Motor Vehicle _____________ , _________$

1,233,125.52

Gasoline Taxes- ___ --------------Miscellaneous Income_____________ _

8. 779,497.63 12.244.63 $10,024,867.78

$ 2. 392.873.41

Estimated Participation Accruals (Schedule No.7) Federal Aid Allotments ____________ $ National Recovery Allotments__ Other Participation, Railroads. Cities. etc. ___ ---------------------

70,282.77 6, 730,977.21
28,863.67

$6,830.123.65

Total Fund Revenue.------------- _____________ -------------------- 16,854,991.43

Available for Allotments ________________ --------------- ______ _

$ 14.462,ll8.02

APPROPRIATIONS AND ALLOTMENTS

Continuing Allotments (Schedule No. 6)

Construction Projects

Contractors ___ ._----------- ____ .. _$ 1. 738,118.53

Contractors. National Recovery

7,072,055.38

Counties as Contractors ________ _ 1,440,053.13

State Forces and Materials-_

1.062,582.32 $11,312,809.36

Survey Projects ____________________ _

179,247.61

Reconstruction Projects ______ . ___ _ Maintenance. GeneraL ___________ _

52,218.51 1.133,177.47

~~--~-
Total Continuing Allotments __ ------------------- $12.677,452.95

Non-Continuing Allotments (Schedule No.6) Administration General Administration Appropriation_ Maintenance Avvrovriation ____ _ Research.---- _____________________ Collection of Revenue _____________ _ Quarry _____________________________ _

247,595.82 5,627.85 $

Equipment

Equipment Appropriation _______ $

ll6, 051.72

Maintenance Appropriation ________2_0_.9_3_5_.0_4

253,223.67 2,385.17 41. 812.ll 940.21
136.986.76

ShOD.----------------------------Motor Vehicle License Tags _______ _

61.83Cr. 51,648.20

Total Non-Continuing Allotments_______________ _ $ 486,934.29

Total Allotments_______________ Continuing Appropriation (Schedule No. 6)
Maintenance Aovrooriation _______ $
Less: Allotments __ ----------------

----------- $13' 164. 387 .24
1.125,005.81 1.159,678.53

Excess Allotments over Appro-
priation absorbed in Appropriation Balance 7-1-33________ _

34.672.72Cr

Total Allotments and Appropriation

13,129,714.52

Fund Surplus as per records _______________ _
Less: Unrecorded Reserves Construction Detail Estimates __ Revolving Fund ___ -------------
Fund Surplus, June 30. 1934-Exhihit "A"_

$ 1,332.403.50

88.578.20 290,464.40
-------------------- $

379.042.60 953,360.90

158

THE HIGHWAY DOLLAR

Covnh'e-5
ffoi/road.s
ere. 00." Yo

6o.so//ne Tax 62.2 7--

INCOME
Le9/.s/o//i.-e 7/-"on.srer.s oo.s~
-4o'/n71;,;~/ro//on 0.?. 8% LeN?cT 8vilehn .s B-?vi,<'l77en/0/.2;6

EXPENDITURES JULY I 1933 T 0 JUNE 30 1934

Exhibt "C"

STATE HIGHWAY BOARD OF GEORGIA

STATEMENT OF REVENUE RECEIPTS AND EXPENSE DISBURSEMENTS

JULY 1, 1933 TO JUNE 30, 1934.

REVENUE RECEIPTS

State Treasurer
Motor Vehicle License Tax ______ _ Fuel Oil TaX--------------------

*1,233,125.52
8, 779,497.63

* 10,012,623.15

Counties Cash for Construction, Refund __ Construction Contract Credits ___ _

.0, l, 3-18.42Cr.
26,284.24

Railroads, Cities, etc.
Cash for Construction ___________ _
Construction Contract Credits_

12.326.24 3.202.98

15, 529.22

U. S. Government
Federal Aid Vouchers for Construction. _________ ._._.
National Recovery Vouchers for Construction _____________ _

*l,l39, 345.52
2, 909,158.22

4,048,503.74

Miscellaneous Income_

12,244.63

Total Revenue Receipts....

~ 14,113,836.56

EXPENSE DISBURSEMENTS

Administration (Schedule No. 8-A)
General Administration General Office_ .. Division Offices _______ _
Warehouse._------------

200,819.7-1 39,104.74 13,509.19$ 253,433.67

Research. ____ ----------Collection of Revenue .. Quarry_---------------- __________ __

2. 480.03 41.812 .ll
940.21

Construction (Schedule No. 8-B)
Surveys Actual Surveys Plans _________ ----------------

71,670.68 71,236.03$ 142,906.71

Construction Supervision Actual Construction_

-------* 392,!!7.74 8, 481, 201.62 8, 873,322.35

Maintenance (Schedule No. 8-C)
----* General Supervision.---------- _______ Actual Maintenance__

79,507.15 1,051,282.24$1,130,789.39

Reconstruction
Supervision.-------------------Actual Reconstruction. _____ _

143.39 66,155,33

66,298.72

298,666.02 9,016,229.07 1,197,088.11

160

Exhibit "C" Cont'd.

STATE HIGHWAY BOARD OF GEORGIA

STATEMENT OF REVENUE RECEIPTS AND EXPENSE DISBURSEMENTS

JULY 1, 1933 TO JUNE 30, 1934.

Land, Buildings and Equipment (Schedule No. 8-D) Administration Equipment ____ .. ___ .. _. __________ _
Construction Equipment.... ____ .. ____ ._ ... _... _
Maintenance Land and Buildings_ .. _________ .. $ Equipment._._ ..... _... __ ..... ___ _

3, 231.33

110,340.56

1. 700.00 18, 635.04

20,335.04 $

133,906.il3

Legislative Transfers (Schedule No. 8-E)
Prison Farm Purchase_ Motor Vehicle License Tags ______ .

2,719.85 51.648.20

54,368.05

Total Expense Disbursements.______ __

__ ____________ $ 10J:Q0.2_~8~

Excess Receipts over Disbursements___
ADD Excess Proprietary Assets over Liabilities July 1. 1933_ -------------

$ 3, 413, 578.38 1, 474,527.09

Excess Proprietary Assets over Liabilities, June 30, 1934-Exhibit
"A"-- ----------------------------

RECONCILIATION

Excess Proprietary Assets over Liabilities (as above) Available for liquidation of Fund Balances and Unrecorded Reserves. _______ _
Fund Balances (Contracts-Allotments-Purchase Orders-etc.)._ ..$
Unrecorded Reserves (Detail Estimates-RevolvingFund) _________ _

$4,888,105.47 3, 555,701.97
379,042.60 3,934,744.57

FundSurvlus-Exh!blt "A" _______ _

953,360.90

161

STATE HIGHWAY BOARD OF GEORGIA COMPARATIVE STATEMENT OF REVENUE RECEIPTS AND EXPENSE DISBURSEMENTS
FOR FISCAL YEARS ENDED JUNE 30, 1931, 1932, 1933, 1934

Exhibit "D"

Motor Vehicle License Fees____________ _ Gasoline Taxes ____ ----- ___________ -----Counties________________________ _
Railroads, Cities, etc._ U.S. Government ____ _ Miscellaneous Income

FISCAL YEAR

FISCAL YEAR

FISCAL YEAR

FISCAL YEAR

ENDED JUNE 30, 1931

ENDED JUNE 30, 1932

ENDED JUNE 30, 1933

END ED JUNE 30, 1934

Detail

Amount

Detail

Amount

Detail

Amount

Detail

-------------------------------------------

REVENUE RECEIPTS

Amount

$ 4, 156,038.81

$ 3, 778,430.05

$ 1,120,670.19

$ 1,233,125.52

8,885,000.00

8,701,965.17

7' 786,322.58

8, 779,497.63

1,044,774.93

800,012.43

276,143.27

24,935.82

66,868.50

22,829.47

12,960.06

15,529.22

5,512,958.62

5,275,811.64

5, 065,020.34

4,048,503.74

47,422.47

24,406.85

18,852.02

12,244.63

Total Revenue Receipts._

$19,713,063.33

$18,603,455.61

$14,279,968.46

$14, !13, 836 .56

,..._.Administration
R5 General Administration
General Office ____________________ $
Division Offices____________ _ Warehouse__________________ _

326,327.02 81,377.35 19,458.25 $

EXPENSE DISBURSEMENTS

$ 353, 02!.11

$

81,650.93

427,162.62

20,509.14 $ 455,181.18

294,317.75 66,853.16 18,298.48 $

$ 379,469.39

200,819.74 39,104.74 13,509.19 $

253,433.67

Research_ Collection of Revenue _____________ _
Quarry____ ----------------------------

2,380.87 24,267.28 4,788.85

7,376.72 40,537.54 1,647.14

7,103.81 79,507 .38
876.49

2, 480.03 41,812.!1
940.21

Total Administration _____ _

$ 458,599.62

504,742.58

466,957 .07

$ 298,666.02

Construction Surveys _______________________ _
Construction Supervision__________________________ $ 551,916.54
Actual Construction ________________ 13,447,180.45

$ 199,766.43 13,999,096.99

$ 769. 599 .22 15,910,059.96

$ 255' 416 .53 16,679,659.18

$ 672,861.64 10,696,769.96

$ 127' 316.44 !!,369,631.60

$ 392,!!7.74 8,481,204.62

$ !42, 906.71 8,873,322.36

Total Construction ______________ _

$14,198,863.42

$16,935,075.71

$11,496,948.04

$ 9,016,229.07

STATE HIGHWAY BOARD OF GEORGIA COMPARATIVE STATEMENT OF REVENUE RECEIPTS AND EXPENSE DISBURSEMENTS
FOR FISCAL YEARS ENDED JUNE 30. 1931. 1932, 1933, 1934

Exhibit "D"-Cont"d.

FISCAL YEAR

ENDED JUNE 30, 1931

Detail

Amount

FISCAL YEAR

ENDED JUNE 30, 1932

Detail

Amount

FISCAL YEAR

ENDED JUNE 30, 1933

Data il

Amount

FISCAL YEAR

ENDED JUNE 30, 1934

Detail

Amount

Maintenance
Reconstruction __ --------------------General Maintenance
Supervision ____ ------------------- __ $ 97,502.71 Actual Maintenance________________ 2,026,622.98

$ 69,671.06 2,124,125.69

EXPENSES DISBURSEMENTS $ 12,662.55

$ 94,680.92

$ 82,674.30

2.022,984.30 2,117,665.22 1,306,631.06

$ 10,022.11 1,389,305.36

$ 79,507.15 1,051,282.24

$ 66,298.72 1,130,789.39

Total Maintenance--------------
Land, Buildings and Equipment__ ___________ _ ,_. Legislative Transfers _______________________ _
a;, 0-l
Total Expense Disbursements... _

$2,193,796.75
*. 614,771 .83 2,109.80
---~---
$17' 468,141.42

$ 2, 130.327.77
$ 521,950.31 664.186.93
-----
$20,756.283 .30

$ 1,399,327.47
$ 64,477.08 1,108,909.15
$14.536,618.81

$ 1,197,088.11
$ 133,906.93 54,368.05
$10,700,258.18

Excess Disbursements over Receipts.. _ Excess Receipts over Disbursements... ADD
Cash, Inventories, etc., beginning of Period. __ -------------------- _______ _
BALANCE Cash. Inventories. etc., end of Period
DEDUCT Fund Balances. Contracts, Allotments. Reserves, Purchase Orders. etc .. end of Period________________ __

$ 2, 244,921.91
1,639,083.22
-----
$ 3,884,005.13
8,249,819.32

$ 2, 152.827.69 3,884,005.13
$ 1,731,177.44 6, 901.850.65

$ 256,650.35 1, 731,177.44
$ 1,474,527.09 4, 436,080.54

$ 3,413,578.38 1,474,527.09
$ 4, 888,105.47
3,934,744.57

Fund Deficit. June 30, 1931. 1932. 1933 _ Fund Survlus. June 30, 1934 ----------

$ 4,365,814.19

$ 5,170,673.21

$ 2,961,553.45

* 953,360.90

STATE HIGHWAY BOARD OF GEORGIA LAND, BUILDINGS AND EQUIPMENT JUNE 30, 1934

Schedule No. 4

Description

Appraised

Additions for

Total

Depreciation I Appraised

Value July 1, 1933

Fiscal Year 1933-34

June 30, 1934

for Fiscal Year I

Value

1933-34

June 30, 1934

---------------------l-----------l------------l----------------------~-----------

Land ____________ _ Buildings _______ _

$

176,445.25$

315,229.00, --

178,145.25 --------- ----- - $ 315, 229. 00 - - - -- -- - - - - - - - - - '

178,145.25 315,229.00

Automobile ___ _ ,_. Trucks ________ .. __

--
402,320.00

42,763.96

445,083.96$

117,443.96

327,640.00

~ Tractors _____________ _

207,909.00

20,700.64

228,609.64

64,834.64

163,775.00

Other Road Equipment __

361,169.00

64,810.49

425,979.49

61,547.49

364,432.00

Engineering Equipment_ __

44,146.00-

__________ I

44,146.00

5,993.00

38,153.00

Office Equipment ___ _

42,383.00

3,326.691

45,709.69

4,134.69

41,575.00

Shop Equipment _________ _

57,456.00

512.771

57,968.77

4,785.77

53,183.00

Laboratory Equipment __ _

17,053.00

92.38

17,145.38

645.38

16,500.00

Quarry Equipment __ _

65,153.00 --

_________ 1_ _ _ _6_5_1, _5_3_.o_o _ _ _ _ 6_,8_6_o_.o_o _ _ _ _5_8_,2_9_3_o. _o

Totals ____________________ =$===1~~~_6!__._~ _$_--==~-!__,_~-~-~1$--=--~-~-2~_,!__7~~-:1B____==~~~~~~ 1

Total Appraised Value, June 30, 1934-Exhibit "A"- __

------

1
- 1$

_1_,556,92~

----------------- -------------. --------

Schedule No. 5.

STATE HIGHWAY BOARD OF GEORGIA

STATEMENT OF REFUNDING CERTIFICATES

JUNE 30, 1934.

Appl::u~-t~--- _l-$-:-:-3-.~-:-ot-.1-4-1 Elber~-~u~t~-----~~$--:-:-6-~-:5-~-t.-3-2-

Atkinson______ __

Bacon__________

Baker_

Baldwin_______ __

Banks_ ___ _____ _

Barrow __ .____

Bartow___________

Ben HilL___ ___ _

Bibb______

_

Bleckley ____ ___

Brantley_____ _

Brooks_________

Bryan-__________

Bulloch_

_ ~-

Burke ___ ~:::~:_:_

Butts____________

Calhoun______

Camden

__

CampbelL____ __

Candler______

CarrolL ___ ---

Catoosa__________

Charlton________

Chatham________

Chattahoochee

Chattooga__ ______

Cherokee ______ .

Clarke__ _________

Clay______ ______

Clayton __ . ___

Clinch__________

Cobb_____ ____

Coffee_________

Colquitt_ ____ __

Columbia______ __

Cook____________

Coweta_______ ___

Crawford______

Crisp______

Dade____________

Dawson__________

Decatur__________

DeKalb___________

Dodge____________

Dooly_____________

Dougherty________

Douglas__________

Early_____________

Effingham_______

12,314.60 26,272.90 24,969.42 99,927.56 75,191.59 71,720.80 124,299.84 61,400.58 898,356.10 26,606.23 36,034.96 359,320.51 30,623.58
123,758.98 243,630.66
82,818.10 9,977. 75 13,152.00
205,893.32 30,835.42
523,814.89 23,142.85
81,348.22 1,310,079.46
17,875.97 124,788.11 199,509.72 372,977.13
47,141.09 49,202.42 62,153.55 278,612.80 75,961.09 150,890.06 61,865.28 209,732.93 487,277.97 31,709.18 91,539.61 74,869.42 25,713.39 371,629.87 259,849.79 64,102.49 192,022.91 493,915.22 44,494.34 77,836.12 57,391.06

EmanueL________ Evans___________ Fannin ___________ , Fayette___________ Floyd_____________ Forsyth__________ Franklin _____ -___ Fulton_____ ___ _ Gilmer___________ Glynn___________ Gordon___________ Grady____________ Greene.__________
GwinnetL_______ Habersham.______ HalL____________ Hancock_________ Haralson_________ Harris______ _____ Hart_ ___ __ ____ __ _ Heard___________ Henry_ __________
Houston_________ Irwin_____________
Jackson__________ Jasper__________ Jeff Davis________ Jefferson________ Jenkins ________ Johnson___ ___ __ Jones____________ Lamar__ ___ .______ Laurens__________ Lee_______________ Liberty___________ Lincoln_________ Long_____________ Lowndes ________ Lumpkin__ _____ Macon____________ Madison__________ Marion___________ McDuffie________ Mcintosh_________ Meriwether_______ Miller_____________ Milton____________ MitchelL________ Monroe _____ __ ___

493,986.86 72,135.44
187,014.95 46,859.63 430,838.77 65,191.97 108,765.48 113,926.08 56,130.62 420,745.28 91,044.59 111,967.53 61,662.97
206,029.29 341,736.71 400,391.36
75,923.85 149,659.86 106,678.62 125,506.39
19,131.75 219,591.56
291,391.43 56,545.31
127,589.35 91,658.61 33,398.63
350,905.53 85,086.68 35,649.49 42,877.44 19,499.10 284,243.00 81,509.77 31,332.06 32,830.45 38,174.64 547,277.10 84,092.05 193,593.06 20,359.40 22,817.86 53,649.81 15,277.50 405,913.92 35,395.83 20,713.10 417,193.11 119,384.92

166

Schedule No. 5-Cont'd.

STATEMENT OF REFUNDING CERTIFICATES JUNE 30, 1934.

County

Amount

County

Amount

Montgomery _____ $ Morgan__________ _

Murray_______ _

Muscogee _________ _

Newton _____ _

Oconee

Oglethorpe __

Paulding ______ _ Peach ___________ _

Pickens _________ _

Pierce ________ _

Pike _ Polk_

Pulaski __

Putnam

__ _

Rabun __________ _

Randolph_______ _ Richmond ______ _

Rockdale________ _ Schley___________ _

Screven _________ _

Seminole ________ _

Spalding________ _

Stephens_ Stewart _________ _

Sumter_ _________ _

Talbot___________ _

Taliaferro ___ ___ TattnalL _______ _ Taylor_ __________ _

124,580.70 : Telfair___ ___ _____ $

74,387.83

259,212.39 TerrelL__ ____ -:

271,526.03

89,811.16 827,817.07
95,468.70 26,106.42 39,279.24 19,157.24
8,194.69 120,956.51 169,875.66

jThomas__

__

l~~dri;bs---- _ ~=-

Towns

___ _

'iTreutlen __ _ , Troup ______ _

Turner _____ _ Twiggs ______ _

IUnion ____ _

391,611.67 177,857.97 205,582.07 45,084.25
2,000.00 631,255.57
24,384.28 22,555.36 50,680.00

12,808.02 Upson __ _

121,586.46

183,409.70 242,410.52

[W Waallktoenr_

187,076.07 161,859.52

103,271.71 318,631.00
82,788.81 1,139,823.99
2,091.95 55,521.49 40,751.20 25,742.03 377,686.16 133,031.70 47,475.00 365,369.72 74,343.95

Ware ____ _ Warren__________ _
Washington ______ _ Wayne________ _ Webster_ ________ _
IWheeler ______ _
White __________ _
Whitfield_ Wilcox ___ _ Wilkes ___ _ Wilkinson _______ _ Worth ___________ _
Coastal Highway_

634,572.73 22,603.85 106,474.51 272,659.54 13,740.18 133,062.67 35,472.82 265,529.38 10,093.64 268,753.94 36,060.67 245,023.78 882,898.87

15,691.86 43,422.07 26,056.54

TotaL ______ $ 26,637,282.87
--=---=--==::=-___::-=-:==-=-:

167

STATE HIGHWAY BOARD OF GEORGIA

Schedule No.6

SUMMARY OF AlLOTMENTS, APPROPRIATIONS AND FUND BALANCES; ALSO,

REFlECTING RECONCILIATION WITH EXPENSE DISBURSEMENTS

JULY 1, 1933 TO JUNE 30, 1934
-"===========-='-===-============='-'==-----

Net

Estimated I

Net

Estimated

Net

DESCRIPTION

!Fund Balances Participation. Fund Balances Allotments

Encum- Expenditures

Total

Fund Balances Participation Fund Balances

1 -~---~--- ~~~~3- _}_"'~~=:3__i__J_u_ly_1_.__19_3__3_ __~---l--b,_ra_n_c_es__ --~-- --~:_ge_s_ ~u_n_e~~~3~ _J_u_n_3_o_,1-9~ ~"_"~!J._~34

1

ALLOTMENTS

,

Continuing Allotments
Construction Contracts__

1

I

I

$3,106,294 .681' $l,l44, 220.32 $ 4, 25C ,515 .CO $ 3, 178,171.66 $ CR745 .25 $ 5, 084,473.83 $ 5, 083,728,58 $ 2, 344,958.08 $ 63,556.20 $2,281, 4GL88

Contracts, Nat'!

Recovery

____ ---[-- _ _

___ 7,on,o55.3s 7,344.59 2,824,604.04 2,831,948.63 4,240,106.75 3,821,818.99 418,287.76

State Forces and 1

Matenals

-_

..

4_:::2.391_~
__

_

_:____:_:__1 __469,:2.39 _L~=--582.32 _ _~0.16 ___!)():244.~ __ :{):824.65 -~~~0.06 -:..==~ -~67,280.0~

1

Total Construe- I

i

I

I

I

tion .. __ -. _-

1$3,575,817.071$1.144,220 .32l $ 4, 720,037 .39 $11,312,809.36 $ 7,179.50 $ 8, 873,322.36 $ 8,880,501.86 $ 7, 152,344 .89[$3, 885,375.19 $3,266,969.70

Surveys _____ :_______

2,44~.13[ _ _ _ 1

2,44~.13[1 179,217.61

58.4~ 142,906.71 142,965.13

38,727.61 ____

, 38,727.61

~~~~:!r:~~on _____ 11,33c.8~l

_ _ [ 11,33o.83

52,218.51 CR9,607.65

66,298.72

:6,691.07

6,863.271___ _

6,863.27

1

C

<Schectu1eNo onvict Farm

._6-A--l11

-

55,5C7.92~-- ______

55,507.92

68,584.51
----

-__ -___-_ --~1 --68-,5- 84.-51

1,133,177.47 ______ _____ _
1 ----

39,584.32 1,130,789.39

___________

2,719.85

-------

1,1,0,373.71

18,311.681.

2,719.85

65,864.66

1 .

--~r---- 1

.I 18,311.68 65,864.66

E[$ 1 I _

T _

oAtlall ~Ctomnetni~n_u-i n_g-

I1 $!,

713,690.~~[~l,l44,22C

4.

857,91C.78 [$!2,677,4_52.9~

!___

~~~~ll:!'7_.ll3

$10,253,251.62$

I
7 ,282)12.11!$3,885,375

.19$3,396,736.92

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ALLO rMENTS, APPROPRIATIONS AND FUND BALANCES; ALSO,
REFLECTING RECONCILIATION WITH EXPENSE DISBURSEMENTS JULY 1, 1933 TO JUNE 30. 1934

Schedule No. 6-Cont'd.

DESCRIPTION

I Net

Estimated

I Fund Balances Participation Fun-d Balances

July 1,1933 July 1,1933 July 1, 1933

Allotm-ents

Net
Encumbrances

Expendit-ures

---;;~~:~~~-~:~~::ents -~--~~--~-~ - - - - - - - - - - - - - - --~--- - - - - - - - -

Total Charges

E~timated

Net

Fund Balances Participation Fund Balances

June 30, 1934 June 30, 1934 June 30, 1934

(ScheduleNo.B-B)__

'

253,223.67$ CR210.00 $ 253,433.67$ 253,223.67

Research(Schedule

No.6-B)_ Collection of Rev-
enue(Schedule No. 6-B). __________ ------------- ___
::J:~~~~he-~~;::: :: ::::

__ 1

2,385.17 CR94.86

2,480.03

2,385.17~--

I

____________ 41,812.!1_____________ 41,812.11 41,812.11

I

---- ----- 136,;::;! -----3:079:83 133,;~~:;; 136,;~~:;!/:::::::::: ::I::- j

~~1~i~~:~i~:---- ~~~~~~-==~~~-~~=~ --~~::::::~---~~6~::3=~;~~~:::1__ 5:::~~[: - - - - - ---~--- ______

Total Non-Con-

I

I
tinuingAllotments___________ ___ _ ___ _ __ _______ __

I
__ ___ $ 486,934.29$ 2,713.141$ 484,221.15$ 486,934.29

I
_____ J--

- - _-- __

Total Allotments ~;;~~~~~.;,;;;.; ;-z~~~ ~~~;;;;-:;; ;----;;;;~ $10,700,258.18!$10,740, 185.91 .;-7,28;,~~~;;~;;,37~~~;;~9~~;;

DESCRIPTION

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 6-Cont'd.

SUMMARY OF ALLOTMENTS, APPROPRIATIONS AND FUND BALANCES; ALSO,

REFLECTING RECONCILIATION WITH EXPENSE DISBUF>SEMENTS

JULY 1, 1933 TO JUNE 30. 1934

Fund:a~~nces IP:~:~%~:n I I I En~:~. Fund Balances Allotments I July 1, 1933 July 1, 1933 July 1, 1933

brances

I Expenditures

Total Charges

I Estimated

Net

FundBalances Participation FundBalances

I I June 30, 1934 June 30, 1934 June 30 1934

APPROPRIATION-

Continuing

Maintenance Ap-

propriation

(ScheduleNo.6-D). $ 34,672.72 ............. $ 34,672.72$ 1,125,005.81 Appropriation

'1- ------------,-- -------------------------------------

1,159,678.53 OR A!lotme nts

-~--- - - - - - ----~--1-~~~-1---~~- - - - - - - - - - - - - - - - - ---~~- -~~--

Total Appropria-

tion ------------ $ 34,672.72 _____________ $~-,;;34;:;,;;67;:;2c;,.7;;:2}$-~3;;4;;:;6;;7,;:;2;:;:,;:.72 CR. ______ _

- - - - - - - - - - --------------~;:;-;;:;-~-~--~-~--~;:;--~--~-;;:;-;;:;-;;:;-;;;:;

Net Fund Balances. July 1. 1933 ________ $3,748,363.18

Estimated Participation. July 1. 1933........... ------------------- $1,144,220.32

FundBalances.Ju1yl.l933. _-------------------- $ 4, 892,563.50

Allotments for Year-Exhibit' 'B" --------------------------- $13,129.714.52

Encumbrances for Year-Net l!.ncumbrances ----------------------------- $ 39,927.73

Expenditures for Y~~ar-Exhibit "0" --------------------------.----------- .............. $10,700, 258.18

Total Charges for Y~~ar --------- ___ ..... ------------ ___________________ ....... ____ ....................... $10,740,185.91
~:!!~a;~~;c~:~:~. ~:~-3~~-~~~~::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::.~-~:~~~:~~~~~~~$3,885,375.19

Net Fund Balances, June 30. 1934------------------------------------------------------------------------------------------------------------------ $3,396,736.92 ADD
Unliquidated Purcnase Orders, etc.. ----------------- ................ ----- .... _.............................................. ___ ................ 158,965.05

Total Fund Balances. Net, June 30. 1934-Exhibit "A"_----------------------------------------------------------------------------------------- $3,555,701.97

STATE HIGHWAY BOARD OF GEORGIA
DETAIL OF MAINTENANCE UNENCUMBERED ALLOTMENTS, BY UNITS AND CONGRESSIONAL DISTRICTS
JUNE 30, 1934

Schedule No. 6-A.

Districts

Unencumbered Allotments July 1, 1933

Allotments

Net Encumbrances

Expenditures

Total Charges

Unencumbered
Allotments June 30, 1934

SUMMARIZED BY DIVISION UNITS JULY THRU SEPTEMBER-DIVISION NOS. 5 AND 6
OCTOBER THRU JUNE-DIVISION NO. 1

1-L ____________ $ 1-2_____________ 1-3 _____________

1, 761.22 4,971.68
1,230.23

$

47,874.30 96,982.74
56,681.68

$

1-ll ____________

7,264.81

133,616.58

1-12 ____________

1,393.22

37,337.03

-

Totals ______ $ 16,621.16 $ 372,492.33 $

1,474.58 $ 46,303.19 $ 47,777.77 $

1,161.47

97,316.31

98,477.78

920.21

58,012.42

58,932.63

45.13

139,124.99

139,170.12

629.37Cr

39,802.52

39,173.15

2,972.02 $ 380,559.43 $ 383,531.45 $

1,857.75 3,476.64 1,020.720r 1, 711.27
442.900r
5,582.04

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 6-A-Cont'd.

DETAIL OF MAINTENANCE UNENCUMBERED ALLOTMENTS, BY UNITS AND CONGRESSIONAL DISTRICTS

JUNE 30, 1934

--~-_---~-----==========~~~=====-========-~=-~-=-===~========~~=-~====~~==

Districts

Unencumbered

I'

Allotments

Allotments

Net

I

Encumbrances Expenditures

Unencumbered

Total Charges

Allotments

July 1, 1933 I

June 30, 1934

--------

1
----
JULY THRU SEPTEMBER-DIVISIONS NOS. 3 AND 4

OCTOBER THRU JUNE-DIVISION NO. 2

------ --------

2-l. ___ ---- -----I$
2-3 -----------2-4_____________ 1
2-6_____________ 2-8 ____ ------ --2-10 ____________
2-12____________ 1

3,026.17 1,364.51 2,679.37
3,588.35 17.04
2. 709.32
6,998.36

Totals ____ --1$20,383.12

$ 1$ 1

1

59,479.95

30,921.15

I

64,098.64 I

I'

73,484.09

6,866.18

83,031.44 I

I'

87.903.98

$--405,785."43-- $

612.34 1$
738.70 I
188.820r I 720.81 185.990r 2,275.94 18,044.60 1
22,017.58 1$

58,968.82 29,509.13 66,118.90 75,165.42
6,826.11 86,073.95 74,379.38
397,041. 7l

1

----

59,581.16 30,247.83 65,930.08 75,886.23
6,640.12 88,349.89 92,423.98
419,059.29

2,924.96 2,037.83
847.93 1,186.21
243.10 2,609 .130r 2,478.36
7,109.26

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 6-A~Cont'd.

DETAIL OF MAINTENANCE UNENCUMBERED ALLOTMENTS, BY UNITS AND CONGRESSIONAL DISTRICTS

JUNE 30, 1934

Districts

I Unencumbered

Allotments

Allotments

July 1, 1933 ,

-- Net-

I

Encumbrances I Expenditures

Totai Charges

Unencumbered Allotments June 30, 1934

--~-----~----------
JULY THRU SEPTEMBER~DIVISIONS NO. 1 AND 2

---- - - - - - - - - -

--------~-

::;; ~- - - - - - - - - - - -

OCTOBER THRU JUNE~DIVISION NO. 3

-------~------------ - - - - - -

I

C 3-4 __________ __]$

548.74 1$ 10,094.07

91.86 $ 10,087.04 '$ 10,178.90

463.91

~=L:::::::::::I 8~~:~~ , i~:~~i:~~

~~~:~~

1~:~~~:~~

2g:~g~:~~

i:~~~:~~

3-7____________ i

3,532.07

89,220.64

5,113.22

3-8__ ----------! 6,612.86

88,252.95

1,059.87

~=~a:::::::::

~j:

-

-

-6-,

-i3-t-6-~-

-

-

12~ :~~~:~~
---~--------

-

-

-

7 ,3~6:
---

~~
-

-

-

88,258.82
91,098.35
12~;g;~: ~i

93,372.04
92,158.22
13i:~~~:~~

619.330r
2,707.59
~~~:~~or

Totals _____ _ll$ 18,503.64

$---3-5-4,-8-99-.-71---~1$,~$-1-4,-5-94-.-72----$---3I53~,-18-8-.2-5----$I--36-7-,7-8-2-.9-7----i$-~~$5-,6-2-0-.3-8

Totals. _____ 1,$ 55,507.92 $ 1,133,177.47

39,584.32 $ 1,130,789.39 $ 1,170,373.71

18,311.68

- - - - - - - - - - - - - - ' -!- - - - - - - - - - - - ' - - - - - - - - - - - - - - - - ~---~-~------ - - - - - - - - - -

STATE WGHWAY BOARD 01' GEORGIA.

Schedule No. 6-A-Cont'd.

DETAIL 01' MAINTENANCE UNENCUMBERED ALLOTMENTS, BY UNITS AND CONGRESSIONAL DISTRICTS

JUNE 30, 1934

Districts

Unencumbered Allotments July 1, 1933

Allotments

Net Encumbrances

Expenditures

Total Charges

Unencumbered Allotments June 30, 1934

SUMMARIZED BY CONGRESSIONAL DISTRICTS

No. 2L_-_-__-_-_-_-_-_-__- $

4,787.39 4,971.68

$ 107,354.25 96,982.74

$

2,086.92 $ 105,272.01 $ 107,358.93 $

1' 161.47

97,316.31

98,477.78

34 _-_-_-_-_-_-_-_-_-_-_-

2,594.74 3,228.11

87,602.83 74,192.71

1,658.91 96.96Cr

87,521.55 76,205.94

89,180.46 76,108.98

56______-_-_-_-__-_-_-_-

854.36 3,671.69

20,721.51 84,691.68

720.34 957.77

19,535.04 84,751.84

20,255.38 85,709.61

87_-_-_-_-_-_-_-_-_-_-_-
9 ___________ 10 ___________ 1L.- ________

3,532.07 6,629.90
6, 768.19 2,813.40 7,264.81

89,220.64 95,119.13
127,789.37 90,645.02 133,616.58

5,113.22 873.88
7,311.70 2,336.71
45.13

88,258.82
97,924.46 127,570.77
93,125.76 139,124.99

93,372.04 98,798.34 134,882.47
95,462.47 139,170.12

12___ -- ------

8,391.58

125,241.01

17,415.23

114,181.90

131,597.13

4,782.71
3,476.64 1,017.11
1,311.84 1,320.49 2,653.76
619.330r 2,950.69
324.9l0r 2,004.050r 1, 711.27 2,035.46

Totals ______ $ 55,507.92 1$ 1,133,177.47 $ 39,584.32 $ 1,130,789.39 $ 1,170,373.71 $ 18,311.68

STATE HIGHWAY BOARD OF GEORGIA DETAIL OF ADMINISTRATION UNENCUMBERED ALLOTMENTS, BY UNITS
JUNE 30, 1934

Schedule No. 6-B

I Unencumbered I Allotments
July 1, 1933

Allotments

Net Encumbrances

Expenditures I Total Charges

GENERAL ADMINISTRATION ALLOTMENTS GENERAL OFFICE

Unencumbered Allotments June 30, 1934

G. 0. __________ -----------------$

Mtnc. Claims __ -----------------

......
-'1

Oonst. Claims __ ----------------Other Claims ___ -----------------

C1

Totals ______ -----------------$

192,779.67 5,627.85 1,527.97 792.00
200,727.49

$

92.25Cr $

-----------------------------------
---------------

$

92.25Cr $

192,871.92 5,627.85 1,527.97 792.00
200,819.74

$ 192,779.67 5,627.85 1,527.97 792.00
$ 200,727.49

------------------------------------- - ------
---- -- --------
------------------

Warehouse_____ I_________________ j$ 13,560.94

No.!__ _________ 2 ___________ 3 ___________

-----------------$
---------------------------------

Totals ______ ----------------- $

Totals ______ -----------------$

12,616.07 12,660.05 13,659.12
38,935.24
253,223.67

WAREHOUSE

1$

51.75 1$

DIVISIONS

13,509.19

$

44.960r $ 12,661.03

130.38Cr

12,790.43

5.84

13,653.28

$

169.500r $ 39,104.74

$

210.000r $ 253,433.67

1$ 13,560.94
$ 12,616.07 12,660.05 13,659.12
$ 38,935.24 $ 253,223.67

1------------------
--------------------------------------------------------------------------------------

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 6-B-Cont'd.

DETAIL OF ADMINISTRATION UNENCUMBERED ALLOTMENTS, BY UNITS

JUNE 30, 1934

I Unencumbered 1 Allotments 1

Net

I Expenditures I Total Charges Unencumbered

~~----~____-!_uIll'A__lllo:t.m_

ents 1933

Encumbrances _1 _ _ _ _ _ _ _1 _ _ _ _ _ -----~~---~

~- ___ - -

Allotments Jun~e~3~0' ~~4 _

OTHER ADMINISTRATION ALLOTMENTS

RESEARCH AND ANALYSIS

------~------

1-' Analysis __

~ Research_

-!'

Totals -----1

if 1~$-~2~,4-~~:~~Or -~~$---~6~:-~_~g-~_ ---2,480.63

[$ 2,385.17

94.86Cr j$

2,480.03

------ - - - -------'
84.61Cr 2,469.78
2,385.17

-~--------~--------'-- --------~--~--~---------~- - - - - - - - - - - - - - - .
COLLECTION OF REVENUE

J ,
Totals _____

_____________

I
:$

940.21

-----

--

-~---

-~ Totals Admins. 1_::_ _

cJL 298,361.:lfl_ 1$

QUARRY

940.21

304.86Cr 1$ 298,666.02

--- --

- - .-~

---

I
940.21 I.--
'
298,361.16 I ------------

Schedule No. 6-D

STATE HIGHWAY BOARD OF GEORGIA MAINTENANCE APPROPRIATION

JUNE 30, 1934.
APPROPRIATION For Fiscal Year 1933-34, Based upon $10.00 per mile______________________ _
SI>ecial A.PI>roi>riation. Bridge ReI>airs. etc. ------------------------
Unallotted Balance. Fiscal Year 1932-33. ------------ ____ _,---- .. ------

$ 1,037,114.94 86,157.83 34,672.72

TotaL---- ___________ ---------- ____________________ ... ____ $1,157,945,49

ADD Funds provided for overrun in AI>AI>ropriation-To be deducted from 1934-35 API>ropriation .. ------------

1, 733.04

Total Available.-------- ____________ ------

-------------- _________$ 1.159, 678.53

DEDUCT: Allotments for Year

Maintenance General

July thru September Division No.!. ____________________$ 34,606.90

2__ -- -----------------
3.. -------------------
4.--------------------
5.-------------------6________ ------------

46,032.95 39,870.24 49,236.31 53,217.08 39,888.18$ 262,851.66

OctoberthruJune Division No. L_ ___________________$ 279,387.07

2.-------------------- 316,678.88

3______________

274,259.86$ 870.325.81 $1,133,177.47

Maintenance Administration Compensation Claims_______ _
Maintenance Equipment ___________ __
Shoi>. __ - __________ ------------------ __ Less: Shoi> Billings _______________ _

$ 200,519.64 200.581.47

$ 5,627.85 20,935.04
61.83Cr

Total Allotments ... _____ ------------ ___________________________ . ________$ 1,159, 678.53

Appropriation Balance. June 30, 1934. ______________ _

0.00

177

Schedule No. 6-E

STATE HIGHWAY BOARD OF GEORGIA

ADMINISTRATION APPROPRIATION

JUNE 30, 1934.

APPROPRIATION For Fiscal Year, 1933-34

$ 400,000.00

DEQUCT Underrun closed into Surplus. June 30,1934----------------------

107,266.69

Net Available _______________ _

$ 292,733.31

DEDUCT: Allotments for Year General Administration July thru September Division No. L ___________________ $
32__-___-_--__-_~_-_--__-_-_--_------
4____________________ _ 5 __________ _ 6___________ _

3, 004.00 2, 959.00 2,939.00 4,020.00 2,814.00 2,854.00 $ 18,590.00

October thru June Division No.!. ____________________ $ 2___________________ --
a____________________ _

6, 948.07 5, 701.05 7,696.12

20,345.24

Total Divisions.----------

____________ $ 38,935.24

General Office___________ _

----* 264,507.94

Less: Blue Print Billings ___ _

71,728.27 192,779.67

Compensation Claims_______ _ Warehouse ____________ _______ _

2,319.97 13,560.94 $ 247,595.82

Other Administration Allotments Research:and Analysis. ___________ _
Less: Test Billings ______________ ..

* 27,035.64 24,650.47

2,385.17

Collection of Revenue ___________ _ Quarry ___________ _

41,812.11 940.21

Total Allotments

292,733.31

Appropriation Balance. June 30. 1934

0.00

178

Schedule No. 8-1' STATE mGHWAY BOARD OF GEORGIA
SURVEY APPROPRIATION JUNE 30, 1934
Appropriation For Fiscal Year 1933-34 ___________________ $ 100,000.00 Additional Appropriation__ _____________ 99,998.00

~otal ___________________________________ $ 199,998.00

Deduct Underrun closed into Surplus, June 30, 1934________________________________

20,750.39

Net available _____________________ _

$

Deduct Allotments for Year _________________________________ $

179,247.61 179,247.61

Appropriation Balance June 30, 1934_ _____ ___ _ ______

o.oo

179

Description

STATE HIGHWAY BOARD OF GEORGIA

SUMMARY OF ESTIMATED PARTICIPATION, ALSO

REFLECTING RECONCILIATION WITH REVENUE RECEIPTS

JULY 1, 1933 TO JUNE 30, 1934

Estimated Participation July 1, 1933

Fund Revenue Accrued

Revenue Receipts

Schedule No. 7
Estimated Participation June 30, 1934

State Treasurer Motor Vehicle~---------------------------~ ____________________ $ Gas Tax ___________________________________ ~-- _____________ ~ _~

Counties

,g...;.

Cash for Construction~-------------------$ Contract for Construction_______________ _

13,563.92Cr 26,284.24

Railroads, Cities, etc.

Cash for Construction~- _________________ _

28,367.80

Contract for Construction_______________ ~

170.65

Federal Aid Federal Aid______________________________ ~

1 ,102, 961. 55

National Recovery _________________________________________ _

Miscellaneous Income___ ____________________ ___________________ _

Estimated Participation, 7-1-33 ______________ $ 1,144,220.32

1,233,125.52 8,779,497.63
25,488.57 3,375.10 70,282.77 6,730,977.21 12,244.63

$ 1,233,125.52 8, 779,497.63

---------------------------------------

1,348.42Dr

12,215.50Cr

26,284.24 --------------------

12,326.24 3,202.98

41,530.13 342.77

1 '139 ,345.52 2,909,158.22
12,244.63

33,898.80 3,821,818.99
--------------------

Fund Revenue Accrued_~----- __________________________________ ==1=6"'',8=54~,9=9=1=.4=3=,= Revenue Receipts~~- ____________________________________________________________ _

14,113,836.56

Estimated Participation, June 30, 1934Exhibit "A" _____________________________ ~ ___________________________________________________________ ~ !__~~--

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF EXPENSE DISBURSEMENTS, BY OBJECT OF EXPENDITURE

Schedule No. 8

(Analysis) (Analysis)

OBJECT OF EXPENDITURE

I (Schedule
No. 8-A)

(Schedule No. 8-B)

- - - - - - - - - - - - - - I Administration'! Construction

JULY 1,1933 TO JUNE 30, 1934

(Analysis)

(Analysis)

I (Analysis)

(Schedule

Total

~J. -----M-:-E_M_O_R_A_N_D_U_M-;------

(Schedule No. 8-C)
Maintenance

(Schedule

No. 8-E) Net Expens

I I No. 8-D)

Legislative I Disbursements Net Expense Inter-Depart- Gross Expense

Equipment 1 Transfers

Disbursements mental Billings Disbursements

Personal Services_________________ $ 186,884.54$ 556,783.31$ 608,654.38-------------- --------------$ 1,352,322.23$ 1,352,322.231$ 136,044.71$ 1,488,366.94

Equii>mentExi>enses_____________

3,617.ll 179,462.6cl 403,623.01 ______________ -------------- 586,702.72 586,702.72

8,419.21 595,121.93

EqUii>ment Purchases.. -------- -------------- --------------'-------------- $ 133,9C6.93 _____________ _!

Communication Services_________ Heat. Light. Power and Water___

I8,ll2.13 3,494.33

3,205.28 2,496.51

--------------1 6,440.51 ______________ ,______________ 1
1,046.34 --------------

Rents _____________ ----------------_

5, 790.70

4,443.01

4,844 .C5 ____________________ --------

--------1 Traveling Expenses_______________
,_. SUPI>lies and Materials..
g: Ininpsurance ________________ :________

44,536.15
8,862.72 3,590.46[

84,169.79
496,959.44 6,493.061'

33,744.67-------------- --------------/
123,025.10-------------- --------------1
15,396.42----------------------------

l33,906.93j 27,757.92
7,C37 .18 1 15,077. 76i
162,450.611
628,847.26' 25,479.94/1

133,906.93 ______________ 1

27,757.92.

71C.65

7, 037.181 15,077. 76!
162,450.61
628,847.261 25,479.94

2. 730.96 50.00
3,613.1211
144,450.751
447.26

133,906.93 28,468.57
9, 768.14 15,127.76
166,063.73
773,298.01 25,927.20

rinting,Binding, Publicity, etc.

6, 724.18

30.79

7.00 -------------- --------------

6, 761.97

6, 761.97

40.18

6,802.15

demnities_______________________

10,744.96-------------- -------------- -------------- --------------

l0,744.96j 10,744.96--------------

10,744.96

ayments to Contractors_________ -------------- 7,559,828.89 -------------- ______________ .______________ 7,559,828.89' 7,559,828.89 -------------- 7,559,828.89

Special and Misc. EXPenses._____

6,308.74 122,356.39

306.63 --------------~~363.01; _ 183,339.~

183,339.81

453.37 183,793.18

1

Total Administration-Exhibit

1$10,700,258.18$ 296,960.21$10,997,218.39

"C"------------------------------ $ 298,666.02
Total Construction-Exhibit "C" -------------,* 9,016,229.07

Total Maintenance-Exhibit "C" ----------------------------1* 1,197,088.11

Total Equi:Dment-Exhibit "C" ---------------------------------------------- $ 133,906.93

Total Legislative Transfers-Exhibit "C" ------------------------------------------------- $ 54,368.05
Total Exvense Disbursements-Exhibit 'c '-------- ______________ ------- _________ ------ _________ ----- ___ ;$10, 700,258.18

NOTE: For Summary by Congressional Districts. see Schedule No. 9. For Summary by Division Units, see Schedule No. 10.

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF ADMINISTRATION EXPENSE DISBURSEMENTS, BY OBJECT OF EXPENDITURE
JULY 1, 1933 TO JUNE 30, 1934

Schedule No. 8-A

GENERAL ADMINISTRATION

RESEARCH AND ANALYSIS

OBJECT 0 F EXPENDITURE

Collection

Total

Intsr-D epart-

Inter-Depart-

of

Quarry

Nat Expense

Gsneral

mental

Net General ResEarch and

mental

Net

Revenue

Disburssments

Administration Billings Administration Analysis

Billings

Research

~Personal ~-:.342.19 ~~= ~4.229.: 18,580.:1~:--:580.:[~-~--~==J~-~~962.03 ~--~3.5C Services.-----------------
N Euuii>mentExoenses______________ Commu~ication Services_________

2,439.35 ----------- 17,927.80--------------

$-

2,439.35

1,563.46

17,927.8C

6.47

393.75.$ 1,169.711 6.47~--------------

$ 8.05 -----------184.33'~-------------

186,884.54 3,617.11 18,112.13

Heat. Light. Power and Water___

3,494.33--------------

3,494.33

1,032.98

1,032.98 _ ------ _____ ______________ ______________

3,494.33

~~~;=~~~-E"~~~~~~~:::~~~~~~~~~~~: 2~:1::~~ :::::::::::::: 2~:1~~:~~ ------2:3ii:ii ------2:237:76'[_________73-_35]- ---i9:6i:o:7al:::::::::::::: 4~:;~~:~~

Suovlies and Materials___________ 18,437.05

9,615.09

8,821.96

1,960.3611

1,919.60

40.76 ______________ --------------

8,862.72

Insurance_________________________

3,289.64--------------

3,289.64

96.37

96.37 ________ -----~

57.00,

243.82

3,590.46

Printing,Binding,Publicity,etc..

6,587.71--------------

6,587.71

176.65

40.181

136.47 --------------~--- __________

6,724.18

~~~~~!~~\ii~~:E~~-~~~~-s-_-::::: _l~~:i~ ::::~:::::::: _ 1~:;!!:i~~~~~4o2:~[=--34~~~~~i:oii9:~j::::::::~::::l~~~~~--2:~-- 1~:~~::~

TOTALS------------------------$ -2-25-,16-1.9-41-$ - -71,-72-8.2-71- $ -253,433.67i$ 27,130.501$ 24,650.47,$ 2,480.03$ 41,812.11,$

940.2d--------------

--1* Total Administration Exvense Disbursements-Exhibit' 'C" _______ ------- _____________________ ------- ___________ . _____ ------------ _------------

298,666.02

Schedule No. 8-B

STATE HIGHWAY BOARD OF GEORGIA

ANALYSIS OF CONSTRUCTION EXPENSE DISBURSEMENTS, BY OBJECT OF EXPENDITURE

JULY 1, 1933 TO JUNE 30,1934
~-=-=-=======c=========='j==---=-=-=------------=------~---=---=---=---=----

Object of Expenditure

Surveys

Construction

Total

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Expense Dis-

Actu~ Plans

1

1

Total 'Supervision! Direct ; Total

bursements

Personal Services ______________ $ 42,527.95 ____________ $ 42,527.951$ 278,008.14,$

Equipment Expenses__________

655. 75] ___ __ _______

655.75 3,157 .88!

Communication Services ______ -1

67.831 ___ ____ __ ___

67.83 1

,_. Heat, Light, Power and Water__~------------~------------____________

915.49' 8.25!

gJ Rents__________________________

82.50 ------------~

82.50

294.83:

Traveling Expenses____________ 6,497.66 ____________ 6,497.66 67,589.701

Supplies and Materials________ 2,027.17 ____________ 2,027.17 11,396.14

~~r~f:n~~e-:BiiiCii!li,--i>U.tii~ity~ ------------ ------------ ____________

14.631

236,247 .22J$ 175,648.97
2,221.96! 2,488.261 4,065.68 10,082.43 483,536.13
6,478.43

514,255.36 $ 178,806.85]
3,137.45 2,496.51 4,360.51 77,672.131 494,932.27 1
6,493.06

556,783.31 179,462.60
3,205.28 2,496.51 4,443.01 84,169.79 496,959.44
6,493.06

etc.__________________________

18.00 ____________

18.00

12.79'______________

12.79

30.79

Payments to Contractors_______ __ _________ _ _____ _______ ____________ 4,800.16 7,555 ,028. 73 7, 559,828.89 7, 559,828.89

Special and Misc. Expenses____ 19,793.82 71,236.03 91,029.85 25,919.73

5,406.81

31,326.54 122,356.39

Totals ____________________ $ 71,670.68 $ 71,236.03 $ 142,906.71 $ 39g_,ll7. 74 ~~481,~!_-!3~ !__tl,il'73 ,322 ~]-- ___________ _

T~f~bu~~~~!~~~=jf~hib~~~~g,~~ -I- _________ _- __________________________________________________________

-I$ 9,016,229.07

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF MAINTENANCE EXPENSE DISBURSEMENTS, BY OBJECT OF EXPENDITURE
JULY 1, 1933 TO JUNE 30, 1934

Schedule No. 8-C

GENERAL MAINTENANCE

RECONSTRUCTION

SHOP

-------------------------[------ ____ --------1----I OBJECT OF EXPENDITURE

Supervision

Direct

Total

Supervision

II1

Direct

Total

Shop

Inter-Departmental
Billings

Net Shop

Total Net Expense Disbursements

-----------1* Personal Services_________________ $ 46,820.94 $ 542,147.46$ 588,968.40

19,685.981$ 19.685.98$ 55,351.05 $ 55,351.05 ------------ $ 608,654.38

~ EQuiDmentExDenses............

252.33

1
397,507.041 397,759.37------------, 5,863.641 5,863.64 8,025.46 8,025.46------------

403,623.01

.,_Communication EXDenses______ _ 4,638.561

1,795.55

6,434.ll ------------

6.40

6.40

704.18

704.18 -----------

6,440.51

Heat, Light, Power and Water__ Rents____________________________ _

156.901 429.801

889.44 4,406.251

1,046.34------------ ____________ [______

4,836.05------------

8.coi

8.oo

1,697.98 5o.oo

1,697.98-----------50.oo -----------

1.046.34 4,844.05

Traveling EXDenses. _----------- _ 24,694.161

8,684.II 33,378.27------------

366.401

366.40 1,375.361 1,375.36 ----------

33,744.67

SuDDiies and Materials......... . 1,872.721 80,927.47 82,800.19------------ 40,224.91 40.224.911 132,916.06 1 132,916.06 ------------ 123,025.10

Insurance. __ ---------------------

484.40

Printing, Binding, Publicity,

I

s;~~i~i-;;~d'M'~~-.-:E~~;;_~-~~~~~~ ------157~34

14,912.021
!:~~~1

15,396.42 ------------ ------------1------

350.89

350.89------------

r~:~~ ;-----i43~3f.~~~:~~~~~~~~I------i43~39 ------iio~49 ------iio~49 :~~:~~:~~~~~

15,396.42
a~:~~

TOTALS---------------------- $ 79,507.15 $ 1,051,282.24,$ 1,130, 789.39 $

/~88 143.39,$ 66,155.331$ 66,298_.72 $ 200,581.471$ 200,581.47, ____________

.II

----/*I

Total Maintenance EXI>ense Disbursements-Exhibit' 'C"----------------------------------------------------- --------------------------------

I, 197,088 .II

Schedule No. 8-D

STATE HIGHWAY BOARD OF GEORGIA

ANALYSIS OF EQUIPMENT EXPENSE DISBURSEMENTS, BY OBJECT OF EXPENDITURE

JULY 1, 1933 TO JUNE 30, 1934

--

--.---

Object of Expenditure

Adm~nis-

1

I

! Con.struc-1

Mainte-

Total Expense

' trat10n ,

I

i

.

.

-------~~-~----~-~--~----;

t10n

. nance Disburse-

I ments

1.

j----

Land.~

~~~~$~~~

;$ ~~~-~~~-!$ 1,700.001$ 1,700.00

Trucks~~--~ ~~~~~~~ ~ ~

_ 33,633.34. 9,130.621 42,763.96

Tractors_~~~

i

~' 17,431.081 3,269.561 20,700.64

Road Machinery, Misc. i

~~I 59,262.871

Office Equipment_ ~~~ : 3,138.951

13.27

5,547.621 64,810.49 174.47j 3,326.69

Shop Equipment -~~ ~,~ ~ _ ~ ~ ~~~~~~ ~~~

512.771

512.77

-------:----1 (----- Laboratory Equipment 1

92.381~~-- ~~-~-1 -~~-~~ ~~--

!$___ :3,231. ~3:$1}_(),:3_40.561$ __2()_,~!)_.04,

92.38

; ~~- ~--. -~ i ~--- -~-----1

Total Equipment Expense Disbursements-Exhibit I

.. 0"- -- - - ~ - . - ~ . - - - - . - - - ~ - ~ - - ~ - -- - - ~ ~ - ~ - ~ ~ ~ ~ ~ - ~ -/~~~~~

185

Schedule No. 8-E STATE HIGHWAY BOARD OF GEORGIA
ANALYSIS OF LEGISLATIVE TRANSFER EXPENSE DISBURSEMENTS, BY OBJECT OF EXPENDITURE
JULY 1, 1933 TO JUNE 30, 1934

Object of Expenditure

Motor

Vehicle ' Convict

License

Farm

Tags

Total Expense Disburse-
ments

Special & Misc., Expense Trans-',

',

I

ferofFunds ~.

~ ~ ~_1i~~8.20j~-~~9.85~~-M,368.~

Totals~~ .

. 51,648.20$ 2,719.85 .,$

--

- ~-~~,.-

--

1 ..

Total Legislative Transfer Expense Disbursements-- 1.

Exhibit "0"~

-~-~ $

54,368.05

186

Schedule No. 9

STATE HIGHWAY BOARD OF GEORGIA

SUMMARY OF EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS

JULY 1, 1933 TO JUNE 30, 1934

~. 1

(Analysis)
1

(Analysis) 1 rAnalysis)

(Schedule I (Schedule (Schedule

1
Dis- 1

No. 10-B) ' No. 10-CJ i No. 10-D)

tricts I1 Construction . Surveys 1 Mainte-

nance

1

(Analysis) I (Schedule No.lO-E) I
i Reco!l- I' I structwn

Total

No. 1 1$ 861,583.8oll$ 3,926.99$ 105,272.03!$ 7,989.811_$_9_7-8,-7-72-.63

2

750,654.15 5,595.10I 97,316.311 2,134.94, 855,700.50

3

595,446.95i 28,065.43 87,521.531 340.661 711,374.57

4

629,296.66j 13,539.24 76,205.94, 4,567.31

723,609.15

5

103,812.47 5,401.691 19,535.04! 196.181 128,945.38

6 1,179,206.63 9,185.59 84,751.84 --------- 1,273,144.06

7

889,478.80 10,567 .26!, 88,258. 82'1 5' 859.52

989941.,116146 . 4304

8

779,798.99 7 ,099.97! 97 ,924.46[ 6,292. 92

9

635,249.08, 14,917.66, 127,570.771 7,526.301 785,263.81

10

588,271.311 10,695.221' 93,125.76 973.64

693,065.93

11

728,645.51 11,694.58 139,124.99 17,163.97

896,629.05

12 ~1,878.01\ 22,217.98 ~4,181.9~11 13,253.471_1_,2_8_1_,5_3_1_.3_6

, - - - Totals ~8, 87~~2. ~6,!42, 906.7!~~1_._!30,_78_!l_l~'$66,2~8. 721

----~---------

- - - -~-- - - -

Total Expense Disbursements Distributed by Districts ___ $10,213,317.18

Undistributed by Districts

Administration General Office ________________ $ 200,819.74

Warehouse___________________ 13,509.19

Divisions_____________________ 39,104.74 Research_ ____________________ 2, 480. 03

Collection of Revenue________ 41, 812.11

~uarry_______________________

940.21 $298,666.02

Land, Building & Equipment___

133,906.93

Legislative Transfers __________ _

Prison Farm Purchase ________ $ 2,719.85

Motor Vehicle License Tags___ 51,648.20 54,368.05

Tottraicl tEs _x_p_e_n_s_e__D__i_s_b_u__rs_e__m__e_n_t_s__U__n_d_i_s_t_r_i_b_u_t_e_d__b__y__D_i_s_-__ $

486,941.0~

Total Expense Disbursements-Exhibit "0" ____________ 1Q_.'7'()~8._~~

187

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 10

SUMMARY OF EXPENSE DISBURSEMENTS, BY DIVISION UNITS

JULY 1, 1933 TO JUNE 30, 1934

- --~~~alysi~;-- ~(~nalysis) ---ll An~;;:is~-

(Analysis) I 'Analysis!

Divisions

(Schedule

No. 10-B)

Construction
New~~~~$ 1,975,803.lll$

OldNo.5 __ ---1

417,842.221

OldNo.6 ____ 1

300,762.21!

(Schedule No. 10-C) Surveys

I (Schedule

(Schedule 1 (Schedule

No. 10-D) , No. 10-E'

No. 10-A~,

jl

Maintenance i Reconstruction I Administration

Total

48,414.08!$

292,659.21,_$_____ g,-7l6.6o!$-- 7,794.57 1$ 2,334,387.57

1,986.511

45,297.98

1,890.77! __ 42,602.24:-

2,387.78i

2,390.091

469,904.58

17,690.391------~76.371 ___ 365,4_::.:_~~

'"""" Total No. L.i$

&5

I

2,694,407.54: $ 1

NewNo.2______ ,$ 2,781,944.071$

OldNo.3 ____ OldNo.4_
Total No.2

-11~$--3,5543925,425,,798806.238..8922311$

52,291.36;,$
'
40,368.151$
33,,644189..6230~,
47 ,435.98~$

380,559.43, $
1

29,794.77 $ 1

12,661.03$ 3,169,714.13

309,987.89$ 41,562.21

I
124,,178537..1208'1$

.
7,587.281$ 2,318.90,

3,154,644.67 474,496.23

45,491.611 ________ ----1

2,89l.75i

404,665.92

397 ,041.71]$

16 ,940.38~-$--12,797 .9S~-$--4-,0-3-3-,8-0-6-.8-2

NewNo.3__ ---1$

Old No. L

I

Old No.2 ____ I

2,022960,,455674..3798,:1$ 302,301.831

',

I

Total No. 3___ r$ 2,619,324 001$

Totals___ !$_ -~~fl'i'3 ,322_:~!$

38,307.38'$

273,685.25:$

15,922.73'1$

8,059.141$ 2,362,431.89

4,071.83: 800.16[

31,240.62; 48,262.381

2,966.741 674.101

2,958.411 2,628.23

331,802.38 354,666.70

i

I

I

7 43,179.371$

353,188.25,$

~J!2_:9~6.7!;t~1 ,130_:?89.3~:!-~~-

169~,c5'623.9587.1$~1t=-=

13,645.781$ 3,048,900.97
39 ,1~:!_-'i"!l=~--- ------- =

Total Expense Disbursements Distributed by Divisions___

_____ . _____ _____ . _ __ _____

______ .$ 10 ,252 ,421. 92 I

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF EXPENSE DISBURSEMENTS, BY DIVISION UNITS
JULY 1, 1933, TO JUNE 30, 1934

Schedule No. 10-Cont'd

Undistributed by Divisions Administration General Office ___________________________ _ Warehouse________________________ __ __ ________ _ Research__________ .. _________________ _________ . Collection of Revenue_____________ _
...., Quarry ______________________________ ______________ _ gs
Land, Buildings and Equipment___ ___ Legislative Transfers
Prison Farm Purchase ____ .. _______ .. ______ _ Motor Vehicle License Tags_ -----
Total Expense Disbursements Undistributed by Divisions. _
Total Expense Disbursements-Exhibit "C" ___ _
Note. Division Units have been consolidated in accordance with present set-up of three Divisions.

200,819.74 13,509.19 2,480.03 41,812.11 940.21
2,719.85 51,648.20

$ 259,561.28 $ 133,906.93
54,368.05

447,836.26

STATE HIGHWAY BOARD OF GEORGIA

Schedule No.1 D-A-Cont'd.

ANALYSIS OF ADMINISTRATION EXPENSE DISBURSEMENTS, BY UNITS

JULY 1,1933 TO JUNE 30, 1934

Personal Services

1 Furnishing!

1

1

, Heat,

1 Equipment! Communi-1!1 Light,

1
1 Expenses , cation

Power

I

1
! Services ' and

I Water

Rents

1

I

1

Traveling Supplies

Expense< and Insurance
Materials I

I l I - - - -- -~-=-=-=-;-c-=~~~I Special

I I Printing, i lndemni and

Binding, I ties

Mlscel-

Total

Publicity, Etc. '

, laneous
I Expenses [

DIV~~0~~:~~===-~~-5,99~:~~-~3.34 $~,78~~31~~=~~=~0~:$-~780.:1$ 466.:i$ 397.35:---5.33:~~=~:---::~~2,661:

No. TWO---------------------: 6,147.12: 162.22 l,99l.36i 98.21, 374.40: 2,270.951 1,109.82: 639.30; ____________ ;__________

4.55~ 12,797.93

- - - - - - - -- ----- ____,___ ------1- - -- ---- No. Three__________________

7,543.52 1

14.50 1,657.96'
-~--

100.80 1,149.13: 1,946.05!

748.221

485.60'------------

--+'--------------; --1-3,6-45-.7-8

TOTALS .. ________________ .$ 19,685.96$ 220.C6R 6,134.15 1,

1
222.41 $

2,6o8.53!$

5,997.21

~

1 2,324.59$1,522.25 $

5.33'---------- $ 34.25,1$ 39,104.74

* ]()I" :* __ 1 t0 TOTAL GENERAL
,_. Administration ______ __ _____ __ RESEARCH AND ANALYSIS

I

I

I

I
164,229.01,'

2, 439~35,,~17, 927.Y.O

~

3~ 494

.33~.~

5,_'790

.70

'
1

$

24,

8

6

2

.

I

8~821. 96 II~

3,

I
289.64

I

'

'

,

1

1

1

6, 587.71 $10,_~44c96;1 ~-":_246.11 $ 253.433.67

Division of Test~-----------* 18,580.18!R 393.75$ 6.47$ 1,G32.98j---------- $ 2.2;7.7~!* 1,919.60$ 96.37*

40.1~ __________ $ 3;2-~8,$ 24,650.47

- --- -- -;--- - - -------!---- - ________ _:____ Dlnswn of Research. . ____________ , 1,169.71 ____________________ ,__________ ~- -~--1----

i3.3n

40.76----------

136.1' __________ ,1 1,0u9.141 2,480.03

!--~ -----~ ~--t---~----~-

TOTALS___________________ $ 18,580.48:$1,563.46$

6.4.7 8 1,(32.98 __________ $2,311.11 1$ 1,960.3e,$ 96.37$

176.65 __________ $ 1,402.62,$ 27,130.50

Less:

Test Billings ________ -~580.4(_393 ~~ --~7_4 _1.C32.98:.:.:.== _=-.2~7~'7fj~

1:91~~(j[Ji_~

_ _ _40~

1
-=:.:_:_:_:::_

342.88)~~

COLL:C:~O:L:-F-~~:~~~~-------:=~=i$1,169:~:~-==~.:.:.==~1===-- *--~~3~$ -~o~g=.:.:.~~:*-~~,.:.:.:.:.=.-__1*_1,059.74[~__:480.03

Enforcement of RevenueLaws .. $ 21,962.03,

----------'~ ----------!-- ________ 8.05l$ 184.33

:$19,600.70 _________ ,$ 57 .00! ____________ 1__________

41,812.11

QUARRY_....------ _______________ ~~-- 693.50 ~- ___ ---~~-- _~=-:_:-- .~~_...-- ~~---- ----i------ -~~~ -~:~_::- ---~~ ;-~3 .St.:.:.------~:.:.:..:.:..:.:.----.$ -~~~>8 -9~~~~

TOTAL ADMINISTRATION ------1~_!.86,884.54.~1_7.2J:$_1~~.l.ak_3,494.-a.s.!_[i~'l(J,$44,~~._1~$-_fl,862.72$ 3,590.46$ 6,724.18 j$10,744.96 $6,308.74.$ 298~_&'6.02
NOTE: Division Units have been consolidated in Accordance with present set-up of three divisions.

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 1D-B

ANALYSIS OF ACTUAL CONSTRUCTION EXPENSE DISBURSEMENTS, BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS

JULY 1, 1933 TO JUNE 30, 1934

Personal Services

Equipment Expenses

Furnishing Communi Heat, Light,
cation Power and Services Water

Rents

Traveling Expenses

Supplies

and
II Materials

lnsurance

Printing, Binding, Publicity,
Etc.

Payments to Contractors

Special and Miscellaneous Expenses

CONSTRUCTION SUPERVISION BY CONGRESSIONAL DISfRICTS

Total -----

~ DIStrict No.

1---$ 2...

{<)

3___

L-
~::: L-j

8.. 9... 1 10---.'1

24,336.701$ 28,354.981 20.120.01
14,425.22
2!: :;; :~~
29,512.38
29,684.451 29,107.231
17,535.821

59.181$ 110.67 , 216.59
1~3~1~2.:2:3~ 11
320.89 674.8ZI 463.801
128.25!

135.071-------- ---~~----------1$ 7,254.881$

94.16 -----------$ 66.8C 6,527.53

61.02 1 $

1.50. 30.00, 5.598.66

4. 8.261'------ -----~~---------- 1
2~ :~:- -------4~00 ::::-:_:::1

3,6~9~;9.:8~~0~11

64.971------------1 85.oo e,297.85
106.891 CRI0.80 ----- ----~ 5,781.75

48.311

1o.8o1 5.0t 5,477 .06.1

89.63, ... --------1 12.381 5,198.391'

1,116.23! __ -------1~

1$ 1.651 ______________

823.20j _________ ------------1--------------

--------------! 999.011______ 1-----------r--------------

51:.96!$ 2.93j

3.57

1. ~~~:~i~--- -- 2:9ai:::::: ::::::[$- ----1:ii8ii~ool

993.a8

5.86

3.56 ______________

1,622.011 ------- I

.551 3,720.16

818.811 _ ____ ----- ______ /___ __________

5~8.;9:----------j-- ________ !__ --- -----11

2,329.601$ 2,441.69]
1.620.501 1,519.391
2.!~~ :~~~1
2,o21.24
2,786.46 1 1,873.791
2,2:9.29

35,233.31 38,419.03 28.647.29
20,489.36
a:::;~:~;
39,305.13
44,366.29 37,804.80
25,752.25

1L-1 12 _

23,384.78 33.339.69

97.391 283.53:

158.33'------------

123.62,

2.75

1--

-----95.651

6,869.56 9.455.611

1,2o8.99 __ ----

3.46-------------

1.430.46

2.91 ____________________

2,2,0.271 3.784.241

34,C42.78 48.518.46

T~~~~~-~~~8,008.14_$_3-,1-57-.-sf-~15.49~---~-2+~ 294.831$67,589.~~~~~396 ..~41-I~~--$--~~~;-~00.16j;-;9119.7~~$--;2,117.~

1

1

1

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 1OB-Cont'd.

ANALYSIS OF ACTUAL CONSTRUCTION EXPENSE DISBURSEMENTS, BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS

Personal Services

---
Equipment Expenses

JULY 1, 1933 TO JUNE 30, 1934

Furnishing Communi- Heat, Light,
cation Power and Services Wat<r

Rents

Supplies

Traveling

and

Expenses Materials

lnsurance

-

CONSTRUCTION DIRECT BY CONGRESSIONAL DISTRICTS

Printing, Binding, Publicity,
Etc.

Payments to Contractors

Special and Miscellaneous Expenses

Total

District No. L .. $ 2___ 3... 4___

31,851.23 $ 19,894.21$

16,046.63 14,095.51

5,903.17

110.44

19,606.09 21,424.49

239.29$

I
97.02$ 660.25$ 2,240.10$ 58,658.00$ 442.56 ------------ $

191.28

314.23 318.67 588.26 25,407.85 503.55------------

2.49------------ 1,372.62 110.66 3,031.40 56.67------------

73.15

97.10 70.86 527.80 23,665.05 1,126.07------------

711,801.02$ 653,995.17 556,105.68 541,961.29

1
466.81 $ 773.97
106.53 255.4C

826,350.49 712,235.12 566,799.66 608,807.30

5___ -------------- ------------ ---------- ------------ ---------- ----------

6. -

3,651.07 1,792.94----------

14.68 24.00 124.70

7...

40,358.98 25,550.50 472.68

646.64 904.09 1,678.60

8...

l2,09l.9C 8,299.44

6.50------------ 118.30 73.70

9___

28,637.79 25,311.95 292.66

260.71 43.50 1,513.41

10.. -

8,546.77 9,516.18 109.90

118.46 85.50 501.33

lL.. 41,296.65 30,236.63 469.99

485.54 420.39 1,325.46

12..

28,256.94 ~6.68 ~~ --~3.88 _ _47 .5o 1,398.41

2.00 ---------- ------------

98,947.51 ------------

98,949.51

13.406.69---------- ------------ 1,125,516.47------------1 1.144,530.55

67,529.92 811.15[----------- 711,281.37

939.74 850,173.67

5,741.28

2.00 _____ ____

709,099.58------------ 735,432.70

63,061.76 769.201__________

476,979.41

573.69 597,444.28

15,497.92---------- ------------ 527,977.39

165.61 562,519.06

106,903.32 980.25------------ 512,126.12

358.38 694,602.73

1 100,630.74 1. 786.!!f![--~~~- -~9_2_9._2__37_.7_2_ _~1_,7_66_._68_: __1._08_3_,3_5_9._55

TOTALS. ______ $ 236,247.22$ 175,648.97$ 2,221.96$ 2,488.26$ 4,065.68$10,082.43$ 483,536.13$ 6,478.43 _ ---------- $ 7,555,028.73 $ 5,406.811$ 8,48l,2C4.62

I

--'-'~----'-----~~~~~---''--~~~-'--~~~1 ~~~~~ ~~~~-

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 1D-B-Cont'd.

ANALYSIS OF ACTUAL CONSTRUCTION EXPENSE DISBURSEMENTS, BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS

JULY 1, 1933 TO JUNE 30, 1934

Personal Services

Equipment Expenses

Furnishing Communi Heat, Light,
cation Power and Services Water
I

Rents

Traveling Expenses

Supplies and
Materials

lnsura nee

Printing, Binding, Publicity,
Etc.

Payments to Contractors

Special and Miscellaneous Expenses

Total

CONSTRUCTION SUPERVISION BY DIVISION UNITS

D ivision No. L . $
2___
L-
TOTALS_______ $

91,374.23 $ 87,846.88 98,787.03
278,008.14 $

374.11 $ 487.131~

I 2.751$ 123.80 $23,532.18'$ 3, 731.10 ----------$

5.11 -------------- $

973.09 198.62

5.50

81.03 24,737.01 3, 773.45 $ 8.77 ------------ $ 1,080.00

1,810.68 229.74 ____________

90.00 19.320.51 3.891.59

5.86

7.68

3,720.16

-------------------

3,157.88 $ 915.491$

8.25'$ 294.831$67,589.70$ 11,396.14$ 14.63 $
1

12.791$ 4,800.16 $

8,616.83 $ 9,525.18 7' 777.72
25,919.73$

128,247.24 128,229.53 135,640.97
392,117.74

CONSTRUCTION DIRECT BY DIVISION UNITS

Division No. L- $ 2 __ _
3.__

89,910.311$ 58,874.01 $ 743. 90! $ 842.27 $ 2,659.68 $ 3, 787.48 $ 177' 576.49 $ 1,950 .361_ ----------- $ 2, 228,534.27 $ 1'281.53 $ 2,566,160.30

65,159.66 57,613.07 706.22

738.64 340.11 2,762.44 168,552.17 2,945.72------------ 3,129,931.41 2,611.85 3,431,361.29

81,177 .251~161.89 ~~-- 907.35 1,065.89 3,532.51 ~407 .47 1,582.35 ------------ 2,196,563.05 _ _1,513.43 __:483,683.03

TOTALS...... $ 236,247.221$ 175,648.97$ 2,221.96$ 2,488.26$4,065.68$10,082.43$483,536.13$6,478.43 ------------1* 7,555,028.73$ 5,406.81$8,481,204.6

Note: Division Units have been consolidated in accordance with present set-uv of three Divisions.

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF SURVEY EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1, 1933 TO JUNE 30, 1934

Schedule No. 10-C

Personal Services

Equipment Expenses

Communication Services

I Furnishing Heat, Light, Power and
Water
I

Rents

Traveling Expenses

Supplies and
Materials

lnsur .. a nee

Printing, Binding, Publicity,
Etc.

Special and
Miscellaneous Expenses

Total

SURVEY ACTUAL BY CONGRESSIONAL DISTRICTS

L-1$ ~ DistrictNo.

01

2---

3__ _

4__ _

5__ _

6 __ _

L8__ _ 9__ _ 10__ _ 1L __

12-..

TOTALS-------I$

d~!:H1 ,::EI'

5,208.24

51.381

::_: lEl - ;: .!ll~1 ~:~i I. ::: ;;:~ E~w. ~:!~~

.811------~------- 75.00

593.16

151.52---------- --------------

310.57

6,390.68

1,123.75,

11.78,

.75'-------------- ----------

125.09

27.11 __________ --------------

1,600.00

2,888.48

2,703.88

3.351

.32-------------- ----------

303.001

123.2'7 ---------- --------------

120.50

3,254.32

3,371.581

61.99

4.62 -------------- ----------

300.31

153.01 ---------- --------------

741.25

4,632.76

544.40,

25.31 -------------- -------------- ----------

138.60

38.55---------- --------------

230.00

976.86

6,114.661

41.91

9.00-------------- ----------

812.61

361.04---------- --------------

1,257.93

8,597.15

~:~ :1- ,.:: ;,-~..:;: ;.~-$--1-:-:-:-:8-~: -$-:-:-:-:-:-~: 3,233.00

91.90--------------------------------------

: -$---6:-:-:.:-:r. ;

524.75

241.00'---------- --------------

-$- 2-:-::-:-::1- r

81.40

4,172.05
8

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 10-C-Cont'd.

ANALYSIS OF SURVEY EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS

JULY 1, 1933 TO JUNE 30, 1934

Personal Services

Equipment Expenses

Communication Services

Furnishing Heat, Light,
Power and Water

Rents

Traveling Expenses

Supplies and
Materials

lnsura nee

Printing, Binding, Publicity,
Etc.

Special and Miscellaneous Expenses

Total

SURVEY PLANS BY CONGRESSIONAL DISTRICTS

~District No. i:J:::::::::::::I:::::::::::::: ::::::::::::::1::::::::::::::1:::::::::: :::::::::::: :::::::::::: :::::::::: :::::::::::::: $

4 - -------------- -------------- -------------- ______________ !__________ ------------ ------------ ---------- --------------

5___ -------------- -------------- -------------- -------------- ---------- ------------ ------------ ---------- --------------

6... --- ---------- --------------' -------------- -------------- ---------- ------------ ------------ ---------- --------------

7___ -------------- -------------- -------------- -------------- ---------- ------------ ------------ ---------- --------------

8.. -------------- --------------'-------------- -------------- ---------- ------------ ------------ ---------- --------------

9___ -------------- --------------'--------------:-------------- ---------- ------------ ------------ ---------- --------------

~~::: ::::::::::::::~:::::::::::::: :::::::::::::: :::::::::::::: :::::::::: :::::::::::: :::::::::::: :::::::::: ::::::::::::::

T

~:::: OTALS..

I
:::::::::::::r::::::::::::

::::::::::::::

;
:::::::::::::r::::::::

::::::::::::

:::::::::::r::::::::

::::::::::::::

$

3,231.80 $ 3,685.71 7,827.50 7,148.56 2, 513.21 5,931.27 5,934.50 6,123.11 6, 320.51 6,523.17 4, 986.51 11,010.18
71,236.03

3,231.80 3,685.71 7,827.50 7,148.56 2, 513.21 5,931.27 5,934.50 6,123.11 6,320.51 6, 523.17 4, 986 .51 11,010.18
71,236.03

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 10-C-Cont"d

ANALYSIS 01' SURVEY EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS

Personal Services

JULY 1, 1933 TO JUNE 30 1934

Equipment Expenses

Communication Services

Furnishing Heat, Light,
Power and Water

Rents

Traveling Expenses

Supplies and
Materials

lnsura nee

Printing, Binding, Publicity,
Etc.

Special and
Miscellaneous Expenses

-
Total

SURVEY ACTUAL BY DIVISON UNITS

~Division No. L. $ 16,904.601$

333.33$

787.7~~--------- 48.7?. --------------$ 7.501$ 3,142.10!$

$

18.00$ 11.660.06 $ 32, 9G2 .02

--<

2.-- 11,871.01

134.01

4.20--------- ----

75.00 1,701.741

613.111---------- --- ----------

4,288.08

18,692.26

3___

13.752.34

188.41

14.. 88 ________________________ 1 1.653.82

621.27 __________ ______________

3.845.68

20,076.40

1

TOTALS------. -$--42-.-527-.-95~1-$---6-55-.7-5 -$~---;;7 .83 --------------~-=~;--8-2.;1-$-6-,4-97-.; -$~2,-02-7.-1r------------ ~-$~--1-8.-00 ;--1-9-7,-93-.8-2 -$--71-.6-70-.6-8

1

1

1

SURVEY PLANS BY DIVISION UNITS

"'""'=No.L:::: : : :::: : : ::: : 1.: : :: :.:. : :t: ..:::' .: ::/' !!:~~ ' ~m;;

----------====r------------1---------- -------------- TOTALs_______ -------------- -----------------------------------------

'----:---- - - - - - ;-~~~ ;-~;,-:;

NOTE: Division Units have been consolidated in accordance with present set-up of three Divisions.

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF GENERAL MAINTENANCE EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1,1933 TO JUNE 30,1934

Schedule No. 1OD

Personal Services

Equipment Expenses

Communi cation Services

Furnishing Heat, Light,
Power and Water

Rents

Traveling Expenses

I
I Supplies and
Materials

lnsurance

Printing, Binding, Publicity,
Etc.

Special a"d Miscellaneous Expenses

Total

,_.
co

DistrictNo.

00

L.$ 2 ___

3 ___

4 ___

5 ___

6 ___

7 ___
8 ___ 9 ___

10 ___

1L. 12.._

I
3, 985 .54'$ 4,063.60 3, 785.18 3,427.11
829.87 3, 731.75 3, 533.85 3,857.59 4, 852.61 3, 696.37 6,173.57 4,883.90

TOTALS------- $ 46,820.941$

MAINTENANCE SUPERVISION BY CONGRESSIONAL DISTRICTS

19.81 $ 24.68 20.48 15.72 4.C4 16.97 17.18 20.57 38.76 17.93 32.64 23.55
252.33,$
I

387 .08 $ 417.31 380.32 328.94 77.60 344.21 331.28 417.37 498.87 386.11 584.31 485.16
4, 638.56 $

I

I

16 .87'$ 49.90 $ 1,997.611$ 142.80 $

2.45 11.35

103.39 50.60

2,184.691 2,036.93

191.15 119.27

22.21

10.49 1,839.83 133.90

1.12 ----------

447.27

22.72

23.31

11.24 2,012.01 161.62

4.85 ---------- 1' 890.06 105.77

7.79

1.23 2,120.62 145.82

7.07 ----------

25.39

12 .~7

2,653.74 223.17 1,856.79' 165.89

3.41 145.17 3,161.68 145.31

31.08 45.41 2,492.93 315.30
- - - ---- ---

156.901$ 429.80 $ 24,694.16 $ 1,872.72$

42.82 -------------- $
34.90 -------------36.69 --------------
39 .36~-------------8.781 ______ -------41.66 -------------42.82 -------------36.681-------------47.47 -------------43.97, ______________
55.96)-------------53 .291 ______________
484 .401 ______________ 1$

I 1.321 $ 10.74 6.40 10.94 1.93 13.25 7.23 57.89 11.89 .70 4.49 30.56

6,643.7 7,032.9 6,447.2 5,828.5 1 '393 .33 6, 356. 02 5,933. 04 6, 665.56 8,333.5 8 6, 205.52 10,306.5 4 8, 361.1

157.34 $ 79,507.1

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 1D-D-Cont'd.

ANALYSIS OF GENERAL MAINTENANCE EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS

JULY 1,1933 TO JUNE 30,1934

Personal Services

Equipment Expenses

Communi .. cation Services

Furnishing I Heat, Light, I
Power and Water

Rents

Traveling Expenses

Supplies and
Materials

lnsuranee

Printing, Binding, Publicity,
Etc.

Special and Miscel laneous Expenses

Total

MAINTENANCE DIRECT BY CONGRESSIONAL DISTRICTS

----------------------------~--------------------------------~----~------~-------------------------

1

1

DistrictNo. L __ $ 49,361.10$ 38,187.681$

109.061 $

26.21$ 243.56 $ 714.02$8,751.68$ 1,234.07--------------$

.90 $ 98,628.28

2,__

46,523.09

32,414.04

98.70

72.77 322.72

807.39 8,656.41 1,388.28-------------- --------------

90,283.40

3,__

42,532.52

33,746.27

104.96

60.56 305.54

641.52 2,444.82 1,238.12 -------------- --------------

81,074.31

4,__

41,223.48

25,751.51

99.58

38.51 130.65

486.53 1,581.84 1,065.34----------------------------

70,377.44

5,__

9,662.16

5,990.93

6__ _ 42,805.04. 29,580.94

50.95 105.69

24.67 72.39

187.43 155.37

177.87 1,794.43

253.27----------------------------

545.88 4,023.74 1,105.77--------------1--------------

18,141.71 78,395.82

7,__

40,946.87

32,628.96

220.13

104.14 649.63

782.58 5,896.93 1,096.54 ______________ ]______________

82,325.78

8__ _

44,391.79

34,219.47

g___

62,020.75

44,678.15

252.531 318.29 1

98.42 130.C7

558.94 787.491

778.18 9,678.32 999.59 8,733.17

1,276.25--------------

5.00

1,569.68----------------------------

91,258.90 119,237.19

10.. - 42.980.48 33.009.96

131.77

65.46 473.83

676.05 8.402.341 1.173.35$

7.00 ______________

86.920.24

l!___ 12...

66,994.37 49,453.76

153.20

68.44 243.70 1,130.50 8,813.60'1 1,960.88-------------- -------------- 128,818.45

1
52,705.811---37,845.37 _ _ _150.69 _ _

127.80 -~7 .391 ___944.00 12,150.19 --~549.471=~='~=== ~:820.72

1

TOTALS-------$ 542,147.461$ 397,507.04 $ 1,795.5+

889.44 $4,406.251$ 8,684.11$80,927.471$ 14,912.C2$

7.C+

5.901$1,051,282.24

1

1

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 1().D-Cont'd.

ANALYSIS OF GENERAL MAINTENANCE EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS

JULY 1, 1933 TO JUNE 30, 1934

Personal Services
I

I Equipment Expen~es
I

I

Furnishing

I Communi- Heat, Light,

cation

Power and

Services

Water

-I

Rents

Traveling
Expense~

I
I I
Supplies and
Materials

MAINTENANCE SUPEii\ ISION BY DIVISION UNITS

lnsura nee

-
Printing, Binding, Publicity,
Etc.

Special and Miscellaneous Expenses

Total

~-~~--- -~-------~---------

r:g Division No. L. $ 15,977.24

88.781$ 1,549.84 1$

I 14.18$ 369.80$ 8,332.901I$ 554.39$

142.00~I --------------

I
$

24.50 $ 27,053.63

0

2___ 17.015.60

78.75

1,683.96 1

122.72 60.00 8.813.18 787 .JJ

200.40 ______________

51.38

28.813.10

;-~~ ~~~;-~ ;-~~~;~-~~~===r;-~ 3... 13,828.10

84.80

1 TOTALS.._____ -$--46-,8-2-0-.9-4;'-$_ _ _25-2-.3-3

1,40L761

20.00---------- 7,548.08 531.22

142.00 .. -----------
1

81.46

23,640.42

-$-7-9-,5-07-.1-5

1

MAINTENANCE DI.,ECT BY DIVISON UNITS

Division No. L .. $ 184,157 .24$ 2... 192,747.28 3... 165,242.94
TOTALS.______ ~2,147 .46 ;-
1

132,733.02 $ 139,424.17

388.01 $ 506.37

I
235.01 $ 973.761$ 268.16 1,163.70

125,349.85

901.17 ____386_.27_ 2,268.79

397,507 .~ -$-1. 79;-:~~$

889.441$ 4. 406 .251;-

3,120.64$26,717.13$ 2,643.53 26,192.55
2,919.94 28,017.79

I

1

5,180.09--------------1$

.90 $ 353,505.80

5,275.85$

7.00-------------- 368,228.61

4,456.08--------------.1---5.00 _329,547 .83

8,684.11 $80,927 .47];---;912.02 $

7 .OOi$

5.90 $ 1,051,282.24

NOTE: Di Viliion Units have been consolidated in accordance with :t>resent set-U:t> of three Divisions.

-
N
.0..... District No.

Schedule No. 1D-E

STATE HIGHWAY BOARD OF GEORGIA

ANALYSIS OF RECONSTRUCTION EXP'ENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS

Personal Services

j
Equipment Expenses

-

JULY 1, 1933 TO JUNE 30, 1934

---

-

I

Communi . . cation Services

Furnishing
Heat, Light, I
Power and
Water
I

Rents

Traveling Expenses

'
Supplies Insurance and
Materials
I

Printing, Binding, Publicity,
Etc.

Special nd Miscellaneous Expenses

Total

' -----

RECONSTRUCTION SUPERVISION BY CONGRESSIONAL DISTRICTS

I
--------~-- ----------- ~-- --- -------1--------------

--- ----------------

143.39.

143 .3Q

Schedule No. 10-E-Cont'd.

STATE HIGHWAY BOARD OF GEORGIA

ANALYSIS OF RECONSTRUCTION EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS

JULY 1, 1933 TO JUNE 30, 1934

Personal Serwices

Equipment Expenses

Communication Services

I

I Furnishing Heat, Light,

Power and

I Water

I

I

Rents

I

I Traveling Supplies

I Expenses

and

Materials

I
Insurance

Printing, Binding, Publicity,
Etc.

Special nd Miscel-

I I

laneous I

Expenses I

I

Total
--~-

RECONSTRUCTION DIRECT BY CONGRESSIONAL DISTRICTS

~
District No. L- $

3,535.64'$

1,677.02 --------------1--------------1----------1* llOAOj$ 2,666.75~------------[--------------~------------ --1 $

7,989.81

;:~~1:--~~llii)l))::i ;~~))1)):)1:: ---:~~ t_)-..... 8...

1. 356.91

1~::: 4,;{~:;;

1

1

J_____________ 1 245.07 ____________

~ ----l----------1 ______________ ______

I_-- 4. 641.90 __________________________

:~~:~~ :::::::::::::':::::::::::::: :::::::::: :::::::::-1 2,77~:~~ :::::::::::1::::::::::::::1:::::~::::::::

6. 243.88
7,~~~::~

~~::: i: :~:~:r 1.~~~:~;~~---------~:~~ ::::::_:::::::~~-----~:~~ 2i~:~~~ ~~: ~~~:~~~1:::::::::::: ::::::::::::::r:::::::::::::_ g:!!:::;

TOTALS....... 19,685.98 $ 5,863.6?

6.40 ------- -----~~ ~ ;---;~~==~~===r--------------1 66.155.33

1

1

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 10-E-Cont'd.

ANALYSIS OF RECONSTRUCTION EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS

JULY 1, 1933 TO JUNE 30, 1934

Personal Services

I
I
Equipment I
Expenses I
I

Communi~
cation Services

I

Furnishing
I Heat, Light, I Power and

Water I

I

i

Rents

I

I

Traveling Supplies Insurance

Expenses

and

Mlterials I

I

I

Printing, Binding, Publicity,
Etc.

I
Special nd I Miscel laneous Expenses

Total

RECONSTRUCTION SUPERVISION BY DIVISION UNITS

50.00 93.39
143.3~

RECONSTRUCTION DIRECT BY DIVISION UNITS

Division No. L .. $ 2.. L.

8. 601.06 $ 4, 051.03 7,033.89

TOTALS... $ 19,685.98$
I

11 3,988.401I~

6.4011 I$

407 .2sj ..........

8.00I$

I 339.05I$ 16, 801.86. - .......
27.35 12,454.72 .......................

::::: :::~~-------- :::r::::.::::::.j~--- ~:0~1: ~:::+ 10,968.33 -- --

40,224.91:-11 $

NOTE: Division Units have been consolidated in accordance with present set-up of three Divisions.

29,744.77 16,940.38 19,470.18
66,155.33

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATIONS
JULY 1, 1933 TO JUNE 30, 1934

Schedule No. 11

ADMINISTRATION

CONSTRUCTION

MAINTENANCE

OBJECT OF EXPENDITURE

General Research

Administra- and

tion

Analy>is

Gollection of
Revenue

Quarry

Construction

Surveys

Maintenance and Recon-
struction

Shop

Land, Buildings
and Equipment

Legislative
Transfers

Total

PERSONAL SERVICES

G. 0. Administration

Administrative..... $ 37,652.85 ----------- ----------- ---------- -------------- ----------- ------------- ----------- ----------- -----------$
Others_____________________ 163,922.67 ---------- ---------- ---------- -------------- ________________________ ----------- ----------- -----------
Field Office Administration

Administrative____________ 13,445.991 ___________ ---------- _ ---------- -------------- ----------- ------------- ----------- ----------- -----------

Others.. ------------------

6, 239.97 1 ----------- ----------- _____________ ----------- ___________ ------------- ----------- ----------- __________ _

R~=~~~~~~~~~~:::::::::: :::::::::::: $ 1;::~~:~~~::::::::::. :::::::::: ::::::::::::::1::::::::::: ::::::::::::: ::::::::::: ::::::::::: :::::::::::

37,652.85 163,922.67
13,445.99 6, 239.97
2, 971.00 15,609.48

2,481.00 7,116.29 45, 753.76

286,385.71 38,443.37

42,527.95 161.164.09

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATIONS
JULY 1, 1933 TO JUNE 30, 1934

Schedule No. 11-Cont'd.

ADMINISTRATION

CONSTRUCTIOIII

MAINTENANCE

OBJECT OF EXPENDITURE

General Administra-
tion

Research and
Analysis

Collection of
Revenue

Quarry

Construction

Surveys

Maintenance and Recon-
struction

Shop

Land, Buildings
and Equipment

Legislative
Transfers

Total

Direct Costs-Cont'd.

Constr. and Reconstr.

Foremen_________________ -----------------------,---------------------$ 63,741.14-----------$ 4,013.60 ----------- ----------- ----------- $

i~:::~t%:~~~~~~~~~:: :::::::::::: ::::::1::::::::::: :::::::::: -----~~:~~;:~~ :::::::::: 1 ::::

83,992.12----------- ----------- ----------24,359.79----------- ----------- ----------6,939.66----------- ----------- -----------

:::::::::::: :::::::::::[:::::::::: :::::::::: ::::::::::: g~~~~:~:~!~~~~::::::

~~:~;~:~~

13,187.89 ----------- ----------- ----------265,176.29 ----------- ----------- .......... .

67,754.74 126,604.95 34,917.85
6, 939.66 71,463.71 326,235.66

Qua~ry

1

Drrect Quarry .. ___________ ----------------------------------$ 693.50-------------- ----------- ------------- ----------- ----------- -----------

693.50

:::::nruFoo; u: : :: ' ;; : ~; :I; :;,;;: ~ ;-: ,;;;, ::: : : :: ' L~ : : Collection of Revenue____ -----------------------~$ 21,962.03 ---------- -------------- ----------- ------------- ----------- ----------- -----------

$

=I ,; ;: ;;' :; --;;::;,; ;;;,; ;;,

21,962.03

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATIONS
JULY 1, 1933 TO JUNE 30, 1934

Schedule No. 11-Cont"d.

OBJECT OF EXPENDITURE

ADMINISTRATION

CONSTRUCTION

MAINTENANCE

Construction

Surveys

Maintenance and Recon-
struction

Shop

Land, Buildings
and Equipment

Leg islative
Transfers

Total

1,579.83
1, 931.03
323.82
300,101.90 27,045.61
242,038.86 1,847.49 978.14
673.79
3, 876.07

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATIONS
JULY 1,1933 TO JUNE 30,1934

Schedule No. 11-Cont'd.

AD MINI STRATI ON

CONSTRUCTION

MAINTENANCE

Land,

OBJECT OF EXPENDITURE

General Research Collection

Maintenance

Buildings Legisla-

Administra- and

of

Quarry Construction Surveys and Recon-

Shop

and

tive

tion

Analysis Revenue

struction

Equipment Transfers

roE~:~:~;~~:~:~~:~~~~~:~:::::-'::::::::::::::::::::::_:~~::::::::::::::::::: ::::::::::::_:1::-:_::::::11::::::::::::: -:-:::::::-$ :~:;~~::~ ::::::::::-$
~ Road Machinery. Misc. ____ ------------~----------- -----------~---------- --------------~---------- ____________ ___________ 64,810.49 ___________ Office Equipment___________ ---------------------- ----------- ----------~-------------- -----------, ----------- ___________ : 3,326.69 -----------
~~~~r~~~~~~~~~~~~t-:: ::::::::::::,::::::::::_':::::::::_,:::::::::: :::::::::::::: ::::::::::_ :::::::::::::::::::::: I 5~~:~~ :::::::::::

Total
:~:;~;;
64,810.49 3,326.69
5~~:~~

Telephone and TelegraPh--'~$ 10,436.03 $

6.47$ 30.51 __________ $

1 Postage______________________ ~1.77~=~1 ::..:=1- 153.~ ~== TOTALS-------------------~e 17,927.801$ 6.47~$ 184.33----------1$

!,688.36.$ 1,449.091
3,137.45'$

22.62$ 4,296.07$ 45.21 _ _2._144.44
67.831$ 6,440.511$

-----------1 659.68[-----------~'-----------'$
44.5l_::..:::..:_:_:
704.18~-----------:----------~$

17,139.74 1!,328.83
28,468.57

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATIONS
JULY 1, 1933 TO JUNE 30, 1934

Schedule No. 11 -Cont'd.

ADMI;>,il STRATI ON

I

CONSTRUCTION

MAINTENANCE

OBJECT OF EXPENDITURE

AdGmienniesrtarla-~I

Research and

I
I Collection I I of

-
Quarry

~----

I - - ~-----;---

I I j

Maintenance

I Construction Surveys and Recon-

Shop

Bu~~;i~gs Legisla-

and

tive

Total

HEAT,

1 LIGHTS,-----;;;-;,;,

-~o_".__

-~naly~~~--~\'(l~lJI)-,I-~--~~-- ---~-----~~~~ ------=quipmen~~ansfe~_______

1

r,:, WATER, AND CLEANING

5 SERVICES

i~~~E~~l[~~L-::_1$ l,::u~~.~."~ .''~ ~~ ~, ,E ~:i~ :!~ FurnishingofWater. ______
1 ''""I= I TOTAL'............

1

::;1

M'

'



658.89 --------- . . -

.. ....

754.51 ---------

493.66

150.54 ---------~-----------

2,C57.60

~'", ,""~[ ---:-1~ ~_];1 -_ ,

1;- ~;;,,.['-""":"' c=:::_cc:::

~~1 9,768.14

R~e~ts. -------~~$ --------~-- 1 Road Machinery____!______ _ [___

.. $ 2,845.21 ...

81.77'

--- ---1-----------$ 2,926.98

Rents,Bldgs.andGrounds.$ 2,645.13____

. :

1,488.75$

5.00

4,760.04$ 50.00.----------,-- ______ 1 8,948.92

RReennttss,.EngmeenngEqmpt_,1 ____________ Offi~eEuuipmenL.

3,120.57 ____
1 ___________ ----------

,------

---~-------------- ______________________________________________ ' __

-------[

_____

__

.80

77.50 ___________ , ___________________ -----------

3,120.57 78.30

5,790.70~---------- l.---------1~ Rents. Miscellaneous.. TOTALS .. _________________ $

25.00~:1.:.:.:.:_:_:_:~ :_::_::_:_:__:_:_ ~ ~~ ...:_:::.:.:..:.::.:__1

224.. :_:::.._::~:_::_:f_..:....:.=.:.:..:..:_:_: :_:_:__:_:...:.:::_:1___5~==

4,360.51$ 82.50$ 4,844.05$ 50.0l---------,----------- $ 15,127.76

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATIONS
JULY 1, 1933 ro JUNE 30, 1934
I - - - - -AD-MI-NIS-TR-AT-IO-N - - - - -C-ON-STR-UC-TI-ON- - ! -MA-ll\-TEN-AN-CE- - Land,

Schedule No. 11-Cont'd.

OBJECT OF EXPENDITURE

General Research Collection

Maictenance

Buildings Leg isla-

Administra- and

of

Quarry Construction Surveys and Recon-

Shop

and

live

Total

-----~----- -=~~:e~ _T~_ns_fe~- -----------l--t-io_n__ _A_n_a_ly_s_is_ _R_ev_e_nu_e_

_ _ _ _ _ _s_tr_uc_ti_on______

------

1

1

TRAVELING EXPENSES

I

Subsistence.................. $ 6,090.62. $ 491.85$ 5,455.22 .......... $ 2,708.67;$ 125.50$ 7,347.60 8 202.35....................... $ 22,421.81

ll:> 0
"'

O:h;::::~~~~~~-t~~-~::.- ;---;~~~~~~~~~~;-;~~~~~~=~ : : : : : ~~~ Transportation Gas and OiL ............. $ 52.95 Mileage Allowance........ 18,193.7311
1

167.45 1,564.94

12.56 .......... 14,065.48 ..........

$ 24.:::::: $ 2.3:::::$ 19,6::::: ::::::::::

I
4,302.22 1,433.41 69,954.29, 4,827.80;1

4,578.11

14.45: .......... ...........

21,772.50I 1,157.51 ..................... i

10,561.15 131,536.25

gi~~:ie:~~~~~~~~~~~~~~1$ ~::::::::c. ~::: SUPPLIES AND MATERIALS Photographic Supplies.....

I 23
::::::::: 205.57 .......... ..........

1:::~::::1* 2.027:::,$ z.o::::: :....~:~:~~ :::::::.::: :::::::::_ 10.24 ............................................ ,........... ,

Cleaning and Toilet Sup-
_ _ _ _ _ _ plies....................... 2,359.39
:E:r;l~r:~~:-:~~~-~:~---

4.411.--- . . . . . . J.........

i
2,392.87 ...........

72.98 ................................ .

1.692.52 __________

~----------

________________________________________________________ ' _________ _

15,413.60
19,703.37 215.81
4, 829.65
1,692.52

F~o~~~~~~i~;:::::::::::::::1:::::::::::::::::::::::1:1:::::::::: ::::::::::,

wearing AppareL ... --------~---- _______ -1--- ________ ..... _______ ... _______ .

Medwa1Supplles............

18.41~-----------~----------- ----------,1

~::~~~:!~1~::::::

: ::::::::::::: :::::::--:: ::::::::::: :::: ::::::

23,482.92 ... --------,

15.45: _______________ .... ______________ i

2,209.01 ---------~------ ---- ~-----------~-----------~- ---------~

~---------

52,598.15 66,413.53 23,498.37 2, 227.42

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATIONS
JULY 1, 1933 TO JUNE 30, 1934

Schedule No. 11-Cont'd.

OBJECT OF EXPENDITURE

ADMINISTRATION

General Research

Administra- and

lion

Analysis

Collection of
Revenue

Quarry

CONSTRUCTION Construction Surveys

MAINTENANCE

Maintenance and Recon-
struction

Shop

Land, Buildings
and Equipment

Leg islative
Transfers

Total

---~

SUPPLIES AND MATERIALS-

Con!' d.

Camp Supplies, Misc........ ___________ ---------- ----------- ----------

Tools________________________

.25

.20 ---------- ----------

11,823.401---- .. ---- -~------- ------

7,114.08 -----------

4. 084.72

-------1--.4--81--------.-.-----------~----------------------

11,823.40 11,200.73

Fuel Supplies_______________

188.99 ___________ ----------- ----------

Explosives ___________________ ------------ _______________________________ _

{...\..j.
0

Building Supplies and Materials.................. ---------------------------------.. ----------
Signs________________________________________________ ----------- ----------

4,821.031-----------
2:::::::t~~-~~~~--
3.60 -----------

1,252.64 1,248.89 ----------- -----------
39:::: ~~~~~~~~~~~ -~::~~-~~~- ~~~~~~~:~:~
4,825.59 ----------- ----------- -----------

7,511.55 9, 826.88
24,239.94 4,829.19

Materials-Roads and

-i Bridges. __ ----------------- ___________ _ _____ __ ____ ___________ ________ ____ 2_6__1_9_8__1_1_2_ -_-_: ::__-_-_-_-____ 1_o_8_:o_3__3_.5_5_ - ... . . .._- . _-_-_ :_-_-__ -_-_-_: _-_:_-_-_:: -_-_-_

376,015.27

G=~~~~~::Sli~~~~~~~~--- ............ __________ ---------- ---------- 7,602.37~- ---.1..-....-..... ---------- Materials-Shop............. ------------ ----------- ----------- ---------

31 479 671

131,479.67

--

-----------

-~---~-

.

2.176.59 ..........

9, 778.96

1----1-:~--f--~--

TOTALS ................... $ 18,437.05 $ 1, 960.36 ----------- -------- .. I$ 494,932.27 $ 2. 027.17 $ 123,025.10 $132,916.061- ____ ...... ______ ----- $ 773,298.01

INSURANCE

----~-----r

Fire Insurance-Buildings

and Fixtures .............. $ 296.50 ----------- -----------$ 221.25$ 2,500.00 ----------- $

441.48 ...................... ----------- $ 3,459.23

Liability, Fire, etc.. Equipt.

446.43 $ 72.37 ----------- ----------

2, 882.71 ----------- 13,937.94 $ 243.89 ......................

17,583.3~

Bond Premiums............. Casualty Insurance. Boiler

----2-,-5-4-6-.-7-1-1~~-----2-4-.0-0:1$----5-7.-00------------~--~-

550.35 _ _ _560.00

=--~----.-:-_--:-~-

1,017.00
=:=-:.:_:..:_

9.00 ---------- ----------98.00----------- ...........

4,204.06 680.57

TOTALS................... $ 3, 289.64 $ 96.31 $ 57 .oof$ 243.82 $ 6, 493.061........... $ 15,396.42 $ 350.8J __________ ----------- $ 25,927.20

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATIONS
JULY 1, 1933 TO JUNE 30, 1934

Schedule No. 11-Cont'd.

ADM INl STRA TION

CONSTRUCTION

MAINTENANCE

Land,

OBJECT OF EXPENDITURE General Research Collection

Maintenance

Buildings Leg isla-

Administra and

of

Quarry Construction Surveys and Recon- Shop

and

live

Total

tion

Analysis Revenue

struction

Equipment Transfers

-----------1----1---~ - - - - - - - - - ' - - - - - - - - - - - - - - - - - - - - - - - 1 - - - - 1 - - - - -

PRINTING, BINDING, PUB-

LICITY, ETC.

Printing Maps ______________ $ 888.40- .... ------- ----------- ---------- -------------- ----------- ----

------ ----------- ........... $

888.40

r......o......

Stenography, Typewriting and Multigraphing, Job

Work . . . . . . . . . . . . . . . . . . . . . . .

Photo Printing and Developing Job Work _______ _

__::::::::: 1::::: ~----:~:::r::::::::

~--------:~:~: 6.00 -------------!----------- ----------- -----------

$ 12.00 $

7.00 ---------- -------- .......... -

25.98 345.11

Publication of Notices and

Advertising.............. .. 5,542.661 ___________ ----------- --------

5,542.66

1----1----------------------1----- -------1----1-----

TOTALS................... $ 6,587.71$ 176.65 ---------- ----------$

12.79$ 18.00 1$

7.00 ___________ ----------- ---------- $ 6,802.15

1----1-----1----1---- ----1----1----- ------- -----1-----

INDEMNITIES

Compensation-Medical

Service, Claims and Costs_ $ 7,947.82----------- ----------- ------------------------- ----------- ------------- ................................. $
Damage to Private Property 2,624.69----------- ----------- ---------- -------------- ----------- ------------ ----------- ----------- ----------Damage for Personal Inju-

7, 947.82
2,624.6~

ries................ -------

172.45 -------- ----------- ---------- -------------- ----------- ----------- ...................... -----------

172.45

1----11-------------1------ ----1------1----1---1----[-----

TOTALS............ -------$ 10,744.96---------------------- .......... -------------- ......................................................... $ 10,744.96

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATIONS
JULY 1, 1933 TO JUNE 30, 1934

Schedule No. 11-Cont'd.

ADMIN I STRATI ON

CONSTRUCTION

MAINTENANCE

Land,

OBJECT OF EXPENDITURE General Research Collection

Maintenance

Buildings Legisla-

Administra- and

of

Quarry Construction Surveys and Recon- Shop

and

tive

tion

Analysis Revenue

struction

Equipment Transfers

Total

PAYMEN rs TO CONTRACTORS

PaY!llents to Contractors..................................... __________ $ 7,559,828.89 ......................................................... $ 7,559,828.89

!.-...:.>.

----1----1----1--~ - - - - - - 1 - - - - 1 - - - - - 1 - - - - - - - - - - -~-- ~---

!-.:> SPECIAL AND MISC. EXPENSES

Miscellaneous Camps Exp............... ----------- ----------- .......... $ 2, 667.97 ----------- ....................... _ ........... ----------- $

Blue Prints......................................... ----------- ..........

3.40 $ 71,236.03 ............. ---------- _ .................... ..

Tests......................... $

4.55$ 1.383.12 ........... ..........

25,917.82 1,071.72$

270.73$ 110.49 .................... ..

Subscriptions and Dues.... 4,182.20

19.50 .......................................................................................... ..

Incidentals..................

164.60 ...................... $ 2.89

100.30

52.63

35.90 .................................

Interest.................................. ----------- ........... ..........

465.52 ....................................................... ..

Transfers................................................................ -------------- ................................... -----------$ 54,368.05

2, 667.97 71,239.43 28, 758.43 4, 201.70
356.32 465.52 54,368.05

Burial Expenses ............ ............ ........... ........... ..........

100.03 .........................................................

100.03

Rewards............................................ ........... ..........

2,071.50 ----------- ........................ --------- ......... ..

Court Costs.................

894.76 ........... ........... .......... .............. 876.66 ............................................. .

2, 071.50 1, 771.42

Right of WaY-Purchases.......................... ----------- ........ -- .............. 17,792.81 ............................................ .. 17,792.81

TOTALS.................. $ 5,246.11$ 1.402.62 ........... $ 2.89$ 31.326.54$ 91,029.85$

306.63 $ 110.49 ----------- $ 54,368.05 $ 183,793.18

- - - - 1 - - - - - - - - - - - - --~- - - - - 1 - - - - - 1 - - - - ~-- - - - - - - - 1 - - - - -

TOTALS ................... $ 325,161.94 $ 27, 130.50 $ 41,812.11 $ 940.21 $ 8, 873, 322.36 $142,906.71 $l,l97, 088.11 $200,581.47 $133,906.93 $ 54,368.05 $10,997,218.39

STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATIONS
JULY 1, 1933 TO JUNE 30, 1934

Schedule No. 11-Cont'd,

ADMINISTRATION

CONSTRUCTION

MAINTENANCE

Land,

OBJECT OF EXPENDITURE

General Research Collection

Maintenance

Buildings Legisla-

Administra- and

of

Quarry Construction Surveys and Recon-

Shop

and

tive

tion

Analysis Revenue

structiOn

Equipment fransfers

-----------l----l---l----l---------------1-----!-----

LESS: INTER-DEPARTMENTAL

BILLINGS

Blue Prints

G. 0. Salaries_____________ $ 62,113.18 ----------- ----------- ---------- -------------- ----------- ------------- ----------- ----------- ----------- $

G. o. Supplies____________
Shop

9, 615.09 ----------- ----------- ---------- -------------- ----------- -------------.----------- ----------- -----------~

Total Disbursements..... --------------------------------------------------------------------- -------------.$200,581.47 ----------- -----------

Research and Analysis

1

T;;~::.~-~-~~::_e-~~~~~~~ ~--~::~:~::7;;;~~ ~ :::::::::::::: ::::::::::: ::::::_ ~:0~::~::~7~=~~~ :::::::::::$

Total
62,113.18 9,615.09 200,581.47
2:::::::::

NET EXPENSE DISBURSEMENTS------------ $ 253,433.67 $ 2, 480.03 $ 41,812.11 $
1

I
940.21 $ 8, 873,322.36 $142,906.71 $1, 197,088.11 _____ ------ $133,906.93 $ 54,368.05 $10,700,258.18

1

1

1

Schedule No. 12 STATE HIGHWAY BOARD OF GEORGIA CONSTRUCTION ALLOTMENTS & DISBURSEMENTS, BY TYPES
JULY 1, 1933 TO JUNE 30, 1934

Description

I July 1, 1933 Jan. 1, 1934

To

To

Dec.~31, 1933 June 30, 1934

I

ALLOTMENT s

Total For Year

Graded Earth and Soil ___ $ GraveL _____________ .. Macadam ______________ _

I

998,860.04$ 1,054,137.15 $ 2,052,997.19

299,791.84 1,013,372.10 1,313,163.94

106,490.68

61,447.36 167,938.04

Surface Treatment __

722,855.62 2,453,128.30 3,175,983.92

Bituminous Mixtures

185,007.13 303,486.56

Cement Concrete _____ _

1,152,099.5411,521,913.24

Brick_______________________ ____________ _.

25,114.82

Structures ________________ _ 597,921.26 817,183.72

488,493.69
2,674,012. 78 25,114.82
1,415,104.98

Totals _______________ --~~3 ,026.111$ 7,249,783.251$11,312,80~36

EXPENSE DISBURSEMENTS

Graded

Earth

and

SoiL ___ _

$

1,881,166.44$

I
1,303,875.47'$

3,185,041.91

GraveL ____________________ _ 189,255.83 490,414.50 679,670.33

Macadam __________________ _ 212,717.03

66,760.46 279,477.49

Surface Treatment ________ _ 985,513.38 1,354,492.67 2,340,006.05

Bituminous Mixtures ______ _ 210,556.1 4

77,803.89 288,360.03

Cement Concrete __________ _ Brick______________________ _

538,900.39 1,286,649.61 1,825,550.00

21,091.90

5,877.55

26,969.45

Structures ________________ _

56,671.52 191,575.58 248,247.10

Totals __________________ $ 4,095,872.63$ 4,777,449.73 $ 8,873,322.36
===

214

STATE HIGHWAY BOARD OF GEORGIA CONSTRUCTION ALLOTMENTS AND DISBURSEMENTS, BY CLASS OF PROJECT
JULY 1,1933 TO JUNE 30,1934

:Ochodule No. 13

Personal Services

Equipment Expenses

Furnishing Communi- Heat,
cation Lights, Services Power and
Water

Rents

Traveling Expenses

Supplies and
Materials

I nsurance

Printing, Binding, Publicity,
Etc.

Payments to Contractors

Special and
Miscel laneous Expenses

Total

EXPENSE Dl SBURSEMENTS

~SUPERVISION CONTRACTS StateAid.............. $100,717.82$ Federal Aid............ 55,944.45 National Recovery____ 86,412.77
TOTALS............. $ 243,075.04$

621.97$ 569.08 1,814.89
3.005.94$

I

I

1

301.961$ 2.75'!$

175.201

5.50

376.59 ----------~'

8~3.75 $ 8.25$

I

I

I

141.52$27,492.62,$ 3,460.131.......... $ 3.19$ 4.800.16$9,086.81$

59.76 11,341.33 28.55 18,516.76

1,696.60 __________ 9.60--------------

1 5,237.72 ~ ==~ ~==~~

1

1

4,942.49 9,225.21

229.83'$57,350.71 $ 10,394.45 .......... $ 12.79$ 4,800.16$23,254.51 $

146,628.9 74,744.0 121,612.4
342,985.4

sr;;!v~c~~:r~es........ -27,814.14~-~:---= ~=~ -~ 8,209.52 874.147~-= =~~~== -=~:- 38,271.08

Asphalt Forces........ 6,644.68

.25 18.43 ---------- 10.00 1,855.60

107.11

5.8t--------- -------------- 1,531.04 10,172.97

D::::~=~.~~~:~~::::~~~.:::::1:.:~~~~~~:.~.:::~~:~~~~.,~~;=,='":::::1: ~:.:::

STATE HIGHWAY BOARD OF GEORGIA CONSTRUCTION ALLOTMENTS AND DISBURSEMENTS, BY CLASS OF PROJECT
JULY 1,1933 TO JUNE 30,1934

Schedule No. 13-Cont'd.

Personal ServicE's

Equipment Expenses

I 1 Furnishing!
Communi- Heat,

1

cation

Lights,

Services I Power and 1 [ Water j

Rents

. I Supplies
rravel mg : and Expenses I Materials

I

i

Insurance

Prirting,
Bin~ing,
Publicity,
I Etc.
I

Payrrents to Contractors

I Special I and
i Mi~cel-

laneous

Expenses I

l
I

I

Total

EXPENSE DISBURSEMENTS

--------

~~;:[;L :-.: :, ~; ".: 1 Dl:t~~TA~dONTRACTS

:~

.

".:

I
::.J

:

I
[.

~

.~d.I

,~.

I
-i

;,;,-j

I
-;0,;1

:

:

I
:

:

!l

il

~

I
.

:

~

.:l~

ill

!1

1 TOTALS---------$ 5,903.17$ 110.44~~ 2.49:~~---------- $ 1,372.621$--110.661$ 3~03=.:~1$ 5~~~~~~~~ ;-~555,028.73.$ 476.26$7,566,092.44

STATE FORCES Convict Forces_

1
$ 122.930.27 $ 113,338.82 $ 1, 745.98!$ 2. 270.03 $ 688.63 $ 7, 288.06 $ 292, 53C. 7011$ 5,948.16:-------- - --------------:$ 4, 857.35 $ 551,598.00

Asphalt Forces________ 70,229.24 34,495.42 Division Forces_______ 37,184.54 27,704.29

454.54 18.951

216.23 535.09 1,989.56 163,932.83 473.60 __________ --------------~ 73.20 272,399.71

==---: 2.00 l, 469.34 694.15 24,041.20 ------::..:..:..:_

~= ::_::::_:~~ ~ 91,114.47

--------------18 ~~;-;,-488.26 ;-2, TOTALS_____________ $ 230,344.05 $ 175,538.53

693.061$

9, 971.77,1$

480,504.731$

1 6, 421.76 ----------

4, 930.551$ 915,112.18

2,221.96~~2,488.261 4,065.~~~~o82.43j$ 48~36.1r 6,47;~1=~=1$ Total Direct _____________ ;-236,247.22 $175,648.971$

$

7,555,o28.73[;-5,4o6.81$ 8,481,204.62

932.27,~~;-~1~828.8~1$31, ~;~~~~;;;2.36 d$ Total Disbursements. __ $ 514,255.36 $ 178,806 .85($ 3,137.45 $ 2, 496 .51[$ 4, 360 .51($77, 672. 494,

Schedule No. 13-Cont'd. STATE HIGHWAY BOARD OF GEORGIA CONSTRUCTION ALLOTMENTS AND DISBURSEMENTS, BY CLASS OF PROJECT
JULY 1, 1933 TO JUNE 30, 1934
ALLOTMENTS

New Contracts Revisions

Total

CONTRACTS

State Aid

Contractors-----------------------[$ l, 536,955.74 $

531.58

Counties __ ------- .. ---------------1 !,354, 268.!!

85,785.02

$ 1,537,487.32 1,440,053.13

Federal Aid. ________ ------------------ 520,471.74 National Recovery ____ , ______________ ,,_ 6,973,625.86

319,840 .53Cr. 200, 63!.21

98,429.52

7' 072,055.38

----------------

TOTALS ___ _ ______ .. _ .. _______ $10,385,321.45$ 135,094.4!Cr. $10,250,227.04

STATE FORCES

Convict Forces ______ , ... _______________ , __ $ 615.422.13$ 99,264.76 $ 7!4, 686.89

Asvhalt Forces ______________ ...... _. _______ _ 363,342.38 155,630.96Cr. 207' 7!!.42

Division Forces and Materials____________ _ !!8,180.81 22,003.20

140,184.01

----- -------1---

TOTALS .................................. $ 1.096,945.32$ 34,363.00Cr. $ 1.062,582.32

Total Allotments ........................... $!!,482,266.77 $ 169,457.4!Cr.l$!!,312,809.36

217

Schedule No. a
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ACTUAL CON STRUCTION ALLOTMENTS
BY COMMISSIONERS DISTRICTS JUNE 30, 1934

Distric~
No. 1, 2, 3,
1, 2, 3,
1, 2, 3,
i,
!,
3,

I Amount

CONSTRU CTION Beginning of Department to June
30, 1933

Southern CentraL __
Northern_

------ --- ----- - $ 45,099,763.46 - --------- ------- 39,788,179.25 ----------- --- ---- 43 '408 '665 .46

TotaL __ -----------

---

---r$

128,296,608.17
=====

CONSTRU CTION Beginning of Department to June
30, 1934

Southern ___ _-------------------$ 48,067,239.25 CentraL ___ _----------- ------- 44,459,537.09 Northern___ _-------------- ---- 47,082,641.19

TotaL __ ----------------

--$ 139,609,417.53
=====

CONSTRU CTION July 1, 1933 to J une 30, 1934
CONSTRUCTION REGULAR

S o u t h e r n __ CentraL ___

__--

---

---

---------- ----------------

$

Northern___ _-------------------

TotaL __ -------------------$
I

CONSTRUCTION NATIONAL RECOV ERY
CSoenuttrhaelr_n________-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_--_ $ Northern______________________ _

TotaL _____________________ $

680,909.05 2,298,128.67 1,261 '716.26 4,240,753.98
2,286,566.74 2,373,229.17 2,412,259.47 7,072,055.38

CONSTRUCTION TOTAL

1,
2,

--------------------------------------$

2,967,475.79 4,671,357.84

3,

3,673,975.73

TotaL _____________________ $ 11,312,809.36

218

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 16

SUMMARY OF ACTUAL CONSTRUCTION ALLOTMENTS, BY CONGRESSIONAL DISTRICTS (ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)

JUNE 30, 1934

District

Distr. of Total of
Allotments on Mileage Basis

Funds as Actually Allotted

Excess Allotment Over Mileage
Basis Distr.

Allotment Under Mileage Basis Distribution

CONSTRUCTION Beginning of Department to June 30, 1933

~!1:>No.~~~~~~~~~~~~~~~~~===$ ig;~1~;~~g:~~

i~;~~~;~ft~~

$

20,731.85 403,854.13

$-----------------------

3___________________

11,046,651.48

7 ,935,37'6.54

3,111,274.94

4___________________

9,309,850.36

9,964,556.45

654,706.09

5___________________

2,334,163.38

2,544,008.54

209,845.16

6___________________

9,998,505.62

8,786,047.16

1 ,212,458.46

7___________________

10,153,010.86

$

11,403,607.38

1,250,596.52

8___________________

11,358,051.59

9,000,583.50

2,357,468.09

9___________________

13,510,537.71

17,887,880.50

4,377,342.79

10___________________

9,824,491.57

8,626,887.71

1,197,603.86

11___________________

16,454,516.59

18,925,685.12

2,471,168.53

------------------------

12___________________

12.692,631.47

11,183,191.75

------------------------

1,509,439.72

Totals ____________ ~-$-==-,1-=-2=-8~-,-2=-9=-6-~,-6~-0-=8-=.-1=-7-==1= 1~-$=-=-1=-2=-8~-,2-=9-=6-~,-6=-0=-8=-.,-1-~-7-=-=-1=-==============!~======;,;~===~'~

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 16-Cont'd.

SUMMARY OF ACTUAL CONSTRUCTION ALLOTMENTS, BY CONGRESSIONAL DISTRICTS (ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)

JUNE 30, 1934:

District

Distr. of Total of Allotments on Mileage Basis

Funds as Actually Allotted

B:s:cess Allotment Over Mileage Basis Distr.

Allotment Under Mileage Basis Distribution

CONSTRUCTION Beginning of Department to June 30, 1934:

ii ~No. 1:1:) ~~===::::::::::::::= $

;+~~ ;~~:g~

$ ii ;~~g ;~g;:g~

$

100,850.66 12,962.28

$ ______________________ _

3___________________

11,977,130.31

8,623,585.93

3,353,544.38

4___________________

10,090,792.62

10,751,992.01

661,199.39

5___________________

2,554,413.40

2,792,006.35

237,592.95

6___________________

10,838,782.55

10,397,825.05

440,957.50

7___________________

11,017,342.87

12,469,670.20

1,452,327.33

8___________________

12,379,010.38

10,436,946.88

1,942,063.50

9___________________

14,769,407.99

18,692,612.17

3,923,204.18

10___________________

10,682,697.28

9,355,611.44

1,327,085.84

11___________________

17,911,578.98

19,828,231.34

1,916,652.36

12___________________

13,823,426.83

12,582,288.90

1,241,137.93

I-------------------I------------------I-----------------I-----------------

Totals____________ F$~~~1;;3:,;9~,6;;0:,;9~,4;;1~7;;.5;;3==+$~=::;;13;;9~,6::;;0;;9~,4;;1~7~.5;;3===I=--~-=--~-~-=--~-=--~-~-=--~-=--~-~-=--~-,I~-~-=--~-=--~-~-=--;;-;:,-=--~-=--;;-;:,--=-~--

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 16.

SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL DISTRICTS (ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)

JUNE 30, 1934

District

Distr. of Total of Allotments on Mileage Basis

Funds as Actually Allotted

Excess Allotment Over Mileage Basis Distr.

Allotment Under Mileage Basis Distribution

CONSTRUCTION-REGULAR

JULY 1, 1933 TO JUNE 30, 1934

.~....------------------------------------------------------------------------~-----------------

No. !_ __________________ $ 2 __________________ _ 3 __________________ _ 4 __________________ _
5 __________________ _ 6 __________________ _ 7 __________________ _ 8 __________________ _
9 __________________ _ 10 __________________ _
11 __________________ _ 12 __________________ _

343,541.62

$

387,685.78

348,706.84

292,821.28

82,324.88

314,720.51

323,967.31

382,817.60

472,024.54

321,791.96

546,338.51

424,013.15

241,977.81 105,128.82
135,091.16 295,090.74
14,738.83 910,836.75
539,049.57 534,671.69
313,417.93
156,559.45 219,856.50 774,334.73

$ _______________________ $
2,269.46 596,116.24 215,082.26 151,854.09
350,321.58

101,563.81 282,556.96 213,615.68
67,586.05
158,606.61 165,232.51 326,482.01

Totals __________ --,~$===4"=,2~4~0"=,7~5~3~9=8==,/~$~=~4~,2~4~0~,7~5~3=.9=8== ------------------------ ------------------------

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 16--Cont'd.

SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL DISTRICTS (ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)

JUNE 30, 1934
..

District

Distribution of Total of Allotments on Mileage Basis

Funds as Actually Allotted

Excess Allotment over Mileage Basis
Distribution

Allotment under Mileage Basis
Distribution

CONSTRUCTION-NATIONAL RECOVERY

JULY 1, 1933 TO JUNE 30, 1934

~----------------~-------------------------------------~----------------------------------

{1;)
No.!_ __________________ $

573,153.02

$

754,835.64

$

181,682.62

$______________________ _

2___________________

646,256.36

537,921.47

108,334.89

3___________________

581,771.99

553,118.23

28,653.76

4___________________

488,120.98

492,344.82

4,223.84

5___________________

137,925.14

233,258.98

95,333.84

6___________________

525,556.42

700,941.14

175,384.72

7___________________ 8___________________

540,364.70 638,141.19

527,013.25 901,691.69

263,550.50

13,351.45

9___________________

786,845.74

491,313.74

295,532.00

10___________________

536,413.75

572,164.28

35,750.53

11___________________

910,723.88

682,689.72

228,034.16

12___________________

706,782.21

624,762.42

82,019.79

1-------------------1-------------------

1 1 Totals ____________ ;$==~7~,0~7~2~,0~5~5;;3 ~8==, ~$~==7~,0=7=2~,0=5~5=.3=8== ------------------------ ------------------------

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 16-Cont'd.

SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL DISTRICTS (ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)

JUNE 30, 1934

District

Distribution of Total of Allotments on Mileage Basis

Funds as Actually Allotted

Excess Allotment
over Mileage Basis Distribution

Allotment under Mileage Basis
Distribution

CONSTRUCTION-TOTAL

JULY 1, 1933 TO JUNE 30, 1934

""~-------------------------------------------------------------------------------------------

No. L __________________ $

916,694.64

$

996,813.45

$

80,118.81

$ ______________________ _

2___________________

1,033,942.14

643,050.29

390,891.85

3___________________

930,478.83

688,209.39

242,269.44

4___________________

780,942.26

787,435.56

6,493.30

5__ ----------------6___________________

220,250.02 840,276.93

247,997.81 1,611,777.89

27,747.79 771,500.96

7___________________

864,332.01

1,066,062.82

201,730.81

8___________________

1,020,958.79

1,436,363.38

415,404.59

9___________________

1,258,870.28

804,731.67

454,138.61

10___________________

858,205.71

728,723.73

129,481.98

11___________________

1,457,062.39

902,546.22

554,516.17

12___________________

1,130,795.36

1,399,097.15

268,301.79

------------------------

1-------------------J------------------J-----------------

1 Totals ____________ ~$===1=1='3=1=2='8=09==3=6==,i=$===1=1=,3=1=2=,80=9=3. =6==oi,-=-=-=-=-=--=-=-=--=-=--=-=-=--=-=-=-=-I=-=-=--=-=--=-=-=-=-=--==-=-==-==-=--=-~--

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 16-Cont'd.

SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL DISTRICTS (ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)

JUNE 30, 1934

District

Distribution of Total of Allotments on Mileage Basis

Funds as Actually Allotted

Excess Allotment
over Mileage Basis Distribution

Allotment under Mileage Basis
Distribution

MAINTENANCE

JULY 1, 1933 TO JUNE 30, 1934

!\:) ~------------------------~-----------------

No. !_ __________________ $
2___________________ 3___________________ 4___________________ 5___________________ 6___________________ 7___________________ 8___________________

90,676.86

$

103,682.34

92,041.20

79,399.48

23,629.02

84,913.52

85,203.61

100,561.57

107,354.25

$

96,982.74

87,602.83

74,192.71

20,721.51

84,691.68

89,220.64

95,119.13

16,677.39 4,017.03

$______________________ _
6,699.60 4,438.37 5,206.77 2,907.51
221.84
5,442.44

9___________________ 10___________________

123,459.69 86,314.12

127,789.37 90,645.02

4,329.68 4,330.90

-----------------------,------------------------

1121______________________________________

111457,,390932..0988

112353,,264116..0518

------------------------1

9,937.93

-------

14,376.40

-

-

1 Totals____________ $----~~-1~-=1-3=-3~-=1~7-7=-=4~7~~~~-!l-$------1-,1-3_3_,1_7_7_.4_7__-=_-=_-=: 1~~~~~~~~~1==~~ ~ ~ ~ ~ ~ ~ ~ ~ ~- ~ ~-

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 16-Cont'd.

SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL DISTRICTS (ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)

JUNE 30, 1934

Distribution of Total

District

of Allotments on

Mileage Basis

_ _ _ _ _ _ _ __ -~~ -~-

..._

Funds as Actually Allotted

Excess Allotment over Mileage Basis
Distribution

RECONSTRUCTION

JULY 1, 1933 TO JUNE 30, 1934

Allotment under Mileage Basis Distribution

No. L __________________ ]$
2 __________________ , 3_ ___ _____________ __

4,178.52

1,$

4,777.84

4,241.39

6,167.77

1$

1,989.25

------------------------

260.92Cr .45Cr

!!-______________________________________________

5,038.76 4,241.84

4 __ ---------------5 __________________ , 6 ___________________ :

3,658.85 1,088.86 3,912.94

i

2,236.33

1------------------------

I

66.10Cr I__________________ ____

'r- __ __ ___ ____________ ______________________ __

1,422.52 1,154.96 3,912.94

g-___ __ 7-------------------~
~== -------~=-=-= --1

3,926.31

1

4,634.03

!

\!: : : _ :::1-----~-:~~r~_:!_! --- - -----------

5,689.21

'

__l

6,259.52 8 ,095 . 83
;::~~ ~ 6 1483 14 .......

2,333.21 3,461.80
t:7~9_3r.:9~3

1------------------------
I ______________________ __
~~~~~--~~-- '--~,_-=- ------------------------

Totals _____________ 1$ ==5=2~,218.51

j$ -=~~~~18.51==[--,-

~

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 16---Cont'd.

SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL DISTRICTS (ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)

JUNE 30, 1934

District

Distribution of Total of Allotments on Mileage Basis

Funds as Actually Allotted

Excess Allotment over Mileage Basis
Distribution

Allotment under Mileage Basis Distribution

SURVEY July 1, 1933 to June 30, 1934

No. L __________ $
2___________ 3___________

14,343.39

$

16,400.62

14,559.21

5,413.95
16,713.04 29,377.61

$-------------------- -- $ 312.42
14,818.40

4___________ 5___________
6___________

12,559.52 3,737.67
13,431.74

13,892.19 7,480.93
11,347.80

1,332.67 3,743.26

7___________

13,477.63

14,272.48

794.85

8___________

15,906.97

8,913.12

9___________

19,529.02

16,025.96

10___________

13,653.29

13,025.49

11___________

23,409.74

18,710.74

12___________

18,238.81

24,074.30

5,835.49

1-------------------1

Totals __________ 1 ;$====1~7~9~,2~4~7.:,::6~1==,l=$~===1:;:7~9~,2:,::4""7~.6;;1=========='=~===

8,929.44
2,083.94 6,993.85 3,503.06
627.80 4,699.00
---------

STATE HIGHWAY BOARD OF GEORGIA

Schedule No. 16-Cont'd.

SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL DISTRICTS (ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)

JUNE 30, 1934
-

District

Distribution of Total of Allotments on Mileage Basis

Funds as Actually Allotted

Excess Allotment
over Mileage Basis Distribution

Allotment under
Mileage Basis Distribution

--
TOTAL ALLOTMENTS

July 1, 1933 to June 30, 1934

_,{';)
{';)

No. L __ ------- $

2 ___

I

3 ___ 4 _______

-

~I

1 ,025 ,893.41 1,158,802.94 1,041,320.63
876,560.11

:$

~I 5--- ---
6_-----

248,705.57 942,535.13

87_-_-_-_--- ~~~I

966,939.56 1 ,142,061.36

9 ___

---

1,407,548.20

-I 10___
1L ______ ---

962,150.60 1,635,284.85

12 ___ -- -I

1,269,650.59

1,115,749.42 756,485.15 805,189.38 877,756.79 276,134.15
1,707,817.37 1,175,815.46 1 ,548 ,491.46
955,030.14 832,394.24 1,063,176.93 1 ,563 ,412.46

89,856.01

1$

--------------------

----------------
1,196.68
27,428.58 756,282.24
208,875.90 406,430.10

---------- -----

293,761.87

i-

---------------402,317.79 236,131.25
---------
----------------
----------
452,518.06 129,756.36 572,107.92

Totals_ ---- __ ,I$
I

12,677,452.95_~1!- - 12,677,452.95

I
--1

_I
,--

Schedule No. 16-Cont'd.

SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL DISTRICTS, (ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)

JUNE 30, 1934

Other Allotments Undistributed

Administration_________________

____________ _____________________________________ $

253,223.67

Research_ _____________ _ ______

_____________ _____ ____________________________________

2 ,385 .17

Collection of Revenue_ _______ __________

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

41 ,812.11

Quarry_________________ ___________ _________________________ ____________________ ____________

940.21

Shop________________________________________________

_________ ______ ______________________

61.83Cr

Equipment______________________________________

_________ ______________________ ____

136,986.76

Motor Vehicle License Tags______________________ _________ __________ ______________ __ _________

51 ,648.20

------------------

Total Allotments-Exhibit "B" _____________ __________ ___ _______ __ __ __ ______ __ _ _ _. ____ $===13='=1=64='=3=87==2=4===

STATE HIGHWAY BOARD OF GEORGIA

ENGINEERING

STATE MILEAGE BY ENGEERING DIVISIONS AT JUNE 30, 1934

(Divisions reduced from 6 to 3 on October 1, 1933)

--

--

---------

Div.

No. of

Area Population Mileage at ] Mileage at

No. Count1es Sq. Miles 1930 Census July 1, 19331 June 30,

1934

- - - - - - --~---

1

56 I 22,916

846,415 2,928.969 I 3,040.165

2

51

19,561

894,135 2,869.8751 3,028.877

3

52

16,2481 1,167,956 2,699.4561 _:,807~76

Totals_ 159

58,7251

-
1934 over 1933=377.918 miles

2,908,506 8,498.300 I 8,876.218
-----

STATE MILEAGE BY CONGRESSIONAL DISTRICTS AT JUNE 30, 1934
--

Cong. No. of Dist. Counties

1

13

2

13

3

15

4

10

5

4

6

13

7

13

8

13

9

18

10

12

11

20

12

15

Totals_ 159

Area Population Mileage at Mileage at

Sq. Miles 1930 Census July 1, 1933 June 30,

1934

----

6396

260,291

689.786

709.409

5528

242,276 790.032

808.86 5

4563

189,719 700.120

716.21 3

3777

220,708

576.219 I 618.619

1140

422,206

163.010

194.100

3614

221,050 621.537

672.58 4

4366

262,219

653.277

671.41 7

4193

198,927: 780.105

800.05 5

5449

218,4961 939.198

951.89 8

4657

212,934 655.783

680.95 4

9465

248,290, 1,096.536 1,155.148

5557

211,3901 832.697

896.95 6

58,725

--~
2,908,5061 8,498.300 8,876.218

-----
1934 over 1933=377.918 miles

-------- -

---

STATE MILEAGE BY COMMISSIONERS DIVISIONS AT JUNE 30, 1934
---

Comm. No. of

Area Population Mileage at Mileage at

Div. Counties Sq. Miles 1930 Census July 1,1933 June 30,

1934

1

56

22,916

2

52

19,885

3

51

15,924

Totals_! 159

58,725 I

1004 over 1933=377.918 miles

894160,,4015591 1,152,032
2,908,5061

2,928.969
2,914.825 2,654.506

3,040 .165 3,090 .767 2,745 .286

~--
8,498.300 8,876 .218

229

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ROADWAY MILEAGE PLACED UNDER CONSTRUCTION
DURING THE Fl SCAL YEAR ENDING JUNE 30, 1934 NOTE: The Engineering Divisions were reducej from six to three and made to correspond with the Co.nmissioner's Districts on October 1. 1933.

Graded,Top

ProJ.

County

Com. Gong. Eng. Soil and

No.

Dist. Dist. Div. Sand Clay

----

1-AF Spalding. __ _ 2 6 1-AF Spalding ___ _ 2 6

4 Oconee_____ _ 3 8

"" 4 Walton.. _

8 3

1::3 15 Columbia ... 2 10 2

17 Wilkes___ _

3 8 3

20 CarrolL ____ _ 3 4 3

20 CarrolL ..... 3

3

21 Heard ______ _ 2

2

23 Forsyth_. ___ 3

3

23 Forsyth ____ _

3

28-AB Paulding__ __

3

28-AB Paulding___ _

3

28-AB Paulding__ __

7 3

29-A EmanueL .. .

12 2

29-E EmanueL .. . 2 12 2

29-E EmanueL.- 2 i 12 2 3D-A Cobb _______ _ 3

30-A Fulton ______ 3

30-B Cobb ....... - 3

1

Gravel, Chert and Selected Material

Macadam

Re-Surface

Surface
Treatment
on Miscellaneous Bases

Surface Treatment
on Lime Rock

Bituminous Mixtures

Bituminous Concrete

Cement Concrete

Brick

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ROADWAY MILEAGE PLACED UNDER CONSTRUCTION

DURING THE FISCAL YEAR ENDING JUNE 30, 1934

Surface

I

Graded, Top Gravel

Treatment Surface

Proj.

County

Com. Gong. Eng. Soil and

Chert and Macadam Re-Surface on Miscel- Treatment Bituminous Bituminous Cement

Brick

No.

Dist. Dis!. Div. Sand Clay Selected

laneous

on

Mixtures Concrete Concrete

Material

Bases Lirre Rock

------ -----1-----i---- -----!----:-----1-----1------1-----1----

52 Evans_______ l

l

l

52 BrYan_______ l

l

l

0.073 2.399

56 Gwinnett_ __ 3 9 3

11.626

61-C Wilkes_______ 3

8

3

0.702

64

tv
c....:.>..

64 68

80

84

84

Glynn _______ 1 ll

Glynn _______

ll

W a l t o n ______

8

Glynn _______

ll

W a l t o n ______

8

Walton ______ 3 8

l l

-----~:~~~-- :::::::::::: :::::::::: :::::::::::::: ::::::::::::1

i:~:~ :::::::::::: :::::::::::: :::::::::::: ::::::::::

3 ------------ ------------ ---------- -------------- ------------ ------------ ------------ ------------

0.864

l 3 3

:::::::::::: :::::::::::: :::::::::: ::::::::::::::

-----n~~-"1:::::~:~~~:: :::::::::::: :::::::::::: :::::::::::: ::::::::::

88-A Brooks ______ l ll

l

1 ------------ ------------ ---------- -------------- ____________ _____ ------- ------------ ------------

1.701

-~ ~ ~- 88-A Brooks______ l ll

l

93 UI>Son _______ 96-B Floyd________ 102 Cobb ________

2 3 3

6

2 3 3

:::::::::j ::::::::::::

::::::::::

::::::::::::::

::::::::::}:::::::::::

::::::::::::' ::::::::::::

-

-

0.289

115-A Chattooga __ 3

7

3 ------------ ------------ ---------- --------------

0.284 ------------ ------------ ------------ ------------ ----------

115-B Chattooga __ 3

7

3 ------------ ------------ ---------- --------------

4.726 ------------ ------------ ------------ ------------ ----------

129 129 134

Clarke_______ C l a r k e _______ C o w e t a ______

3 3 2

8 8 4

3 3

:::::::::::: :::::;:~~~:: :::::::::: :::::::::::::: :::::::::::: ::::::::::::1:::::::::::: :::::::::::: -----~:;~;__ ::::::::::

STATE HIGHWAY BOARD OF GEORGIA

SUMMARY OF ROADWAY MILEAGE PLACED UNDER CONSTRUCTION

DURING THE FISCAL YEAR ENDING JUNE 30, 1934

Proj. No.

County

1

I

,

'IGraded,Top I Gravel, I

I ,

I ; Surface 1
I Treatment 1 Surface

Com. 1Cong.IEng. 1 Soil and

I Chert and Macadam Re-Surface on Miscel- I Treatment Bituminous Bituminous

'"' I ""I "' i ""' '"' ! :;;;:,~

' 1

I . ;:::; u.:~""l "' ! '""""'

= Cement

Brick

'"~""'

-----~----

l4Q-B !Hancock____

154-A IWayne ... ____

154-A Wayn8------ _

158 !Twiggs ______
159-B Miller_- __ . ___

""w 164-A 164-B

Macon Macon _______

"" 164-B Macon __

165

!Polk. __ ~---

171-B :Olay ________

171-B Clay__

171-D Calhoun ____

171-D Oslhoun ____ 179-A Greene _______ ,

179-B Greene ______ l 179-B ,Greene ______

179-B !Morgan_~---:

186-A !Johnson ____

186-A !Johnson ____ i

192-B IBibb. -----

12 2 3 2 I 2 I 3
2 I 8
3 3 2 12
12

6.896

------------

1.961--I---- _:1-::::::_:::I_- ~:~~~ !-- ::::::I::_::::::::: :::::::::::!:::::::::::::!::::::::::

2.013 'I____

'

2.978

0.965

1 ________________________ ' ____________ -------

--

0.888 :--_::::-:::r:::::::::-1 i:~~i :::::::::::r::::::::: ::_::::::::: :::::::::::: ::::::::::

1_-_-_::o:c9i- :()95--I::::::::::::I:::::::::::: ::::::::::::!:::::::::: --- __

1
1 : _ : _ : _ - _ -_ - _ - - _ _ - : : : : _ . _ : : : _ - :__ -__ : _ : _ : _ - _ -

0.164

---.- ()

_

1.508

______

_ _____________________________ _

-------- 1----------- 1--

0.089 1----------

1

1

1

1

Proj.

County

~-1----

194-A 'Fayette._. __ ,

194-A :Fayette.. ____ I

194-B jFayette .. _..

207-C !Chatham __ _
IHal ________ _ ~ 218 IPolk. _______ _
CJJ 220-D

221 :Houston __ ._

12

226-B ;Liberty_ ---236 Jenkins ____ _

241-A jHancock ___ _

10

241-C Hancock ....

lO

243 'I Houston. ___ '

12

2~6-AB Appling ____ _

ll

2o6-AB Applmg ____ _

ll

256-B :Appling____ _

ll

258-A Clayton ____ _

6

258-C 'Fulton ________ 258-C DeKalb ..... 264 [EarlY-------

1

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ROADWAY Ml LEAGE PLACED UNDER CONSTRUCTION
DURING THE FISCAL YEAR ENDING JUNE 30, 1934

3.005 0.216 1.268
0.092 3.308 4.931

6.487

0.815 ~---------0.500 ----------

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ROADWAY MILEAGE PLACED UNDER CONSTRUCTION
DURING THE FISCAL YEAR ENDING JUNE 30, 1934

I

Graded,Top Gravel,

Surface Treatment

Surface

Proj.

County

No. I

Com. 11 Cong. Eng. Soil and Chert and Macadam Re-Surface I on Miscel- rreatment Bituminous Bituminous Cement

Dis!. Dis!..I Div. Sand Clay Select~d

llaneous

on

Mixtures Concrete Concrete

Brick

~--,~1~-;;-~=!---;,-'-~--2-1~~~-~~-M~a-ter~ia~l i

-------- ~-----

Ba~es

Lime Rock

13.527

'+---- - 279-A Cook........ , l ll

l

--~

23 . 000000

II

-

Cook........

ll

Chatham....

:.: ...... .

295 'Wilkes......

1

~ 296-A McDuffie... .

2

"'" 296-A IMcDuffie... .

2

296-B McDuffie ____ ,

2

296-B McDuffie... .

296-C IMcDuffie... .

lO

296-C Wilkes ...... . 1

8

297 Clay. _______ _

3

299 [Pulaski.. ... .

12

. ...

0.347 .

304 ;Haralson....

309-A !Wayne .....

ll

311-A Elbert. ______ ,

316 Early_ .. ___ ._

317-BC /Lumpkin ....

1
1

318 [Chatham.... I

0.808

324-B ]Troup_______ ]

4

l

--------------

STATE HIGHWAY BOARD OF GEORGIA

SUMMAhY OF ROADWAY MILEAGE PLACED UNDER CONSTRUCTION

DURING THE FISCAL YEAR ENDING JUNE 30, 1934

I Graded ,Top I Gravel,

I

) 1
1

T~:::~~ent

[

Surface I

I

Proj.

County

No.

~~~~[Troup

I Carr.. Cong. Eng. I So1l and 1 Chert and
Dit. Dis!. Div. 1 Sand Clay Selected

Macadam Re-Surface on Miscel- ! Treatment [ Bituminous , Bituminous 1 llaneous 1 on 1 Mixtures Concrete

-_-_- -:=:-_- Material

Bases I Lime Rock I

1---.;- ~2

--2~1 ===--r---_- --r'--_- -___-~-___--__-__-_-__--_ -___-__- __-_

r

341-A B2ldwin ___ _ 341-A Baldwin____ _ 343-AB Randolph __ _ 343-AB Randolph__ _ 347-B Webster. __ _ 3-17-B Webster ____ _ 351 ,Franklin____ 1

li10

2 I : : :::::::]

I ::::7_4;;::r

- - _---1_--__:___ ::------_-_,1:_: __ -_-_-_- __-_ I

4.038

3

i:aaa 1:::__ _

~:~~~
r-:J

357 :Lowndes ___ _

u

I ll.5oo

36Q-D r'Warren _____ _

10

360-D Warren _____ _

10

369-A !Toombs ____ _

12

369-A [Toombs _____ !

12

::::::::::::]

1.::: 0.895
1.430

369-B Toombs ____ _

12

0.532 i ----------- --

36~-B !Toombs ____ _ 369-B. Toombs __ ... 371-AB Cobb _______ _
386 Talbot. ____ _ 386 Talbot. ____ _ 387-A Burke. _____ _

12 12
4 4 1

1 , ~ :~.1 ::0.460 _--_-_-_-_-_-__-_--_:-_1---_-_-_

-:'-----------------------['------------

-1
--

-------------~----------~-----

Cement Concrete

Brick

1---
1

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ROADWAY Ml LEAGE PLACED UNDER CONSTRUCTION
DURING THE FISCAL YEAR ENDING JUNE 30, 1934

Surface

Proj.

County

Graded,Top Gravel,
I Com. Cong. Eng. Soil and Chert and I Macadam

Treatment Surface
Re-Surface I on Miscel- Treatment Bituminous Bituminous

Cement

Brick

No.

Dist. Dist. Div. Sand Clay Selected

laneous

on

Mixtures Concrete Concrete

Material

Bases Lime Rock

- - - - - - - - ~-- - - - - - - - - - - - - - - - - - ) - - - - 1 - - - - - - - - - - - - - - - . - - - - - - - - - - - - - -

387-E Burke _______ 2

2

387-E Burke_ .. ____ 2

2

389-B Fulton ______ 3 5 3

396-D [Crawford.... 2 6 2

390-D Crawford.... 2 6 2

~ 401-B Houston_____ 2 12

2

a> 401-C Houston .. __ 2 12 2

403-A Tift__ ________ l

2 1

403-B Berrien.. -- __ l ll 403-B Berrien______ 1 ll 406-C Coweta______ 2 4 2

406-C Coweta .. ____ 2 408-D Stewart. ____ 1

4 2
3' 1

408-D Stewart _____ 1 3 1 409-A Putnam_____ 2 8 2

409-B Jones-------- 2 6 2

409-C Putnam _____ 2 8

409-D Putnam _____

2.259

409-D Jones ________

1
409-F !Jones--------

------------1------------

10.200
1.920 ------------ -----------, ----------- ---------3.593 ------------ ------------~------------ ----------
~:~~: 1::::::::::::1::::::::::::::::::::::::: ::::::::::

STATE HIGHWAY BOARD OF GEORGIA

SUMMARY Of ROADWAY MILEAGE PLACED UNDER CONSTRUCTION

DURING THE FISCAL YEAR ENDING JUNE 30, 1934

Surface

Graded,Top Gravel,

Treatment Surface

Proj,

County

Com. Cong. Eng. Soil and

Chert and Macadam Re-Surface on Miscel- Treatment Bituminous Bituminous Cement

Brick

No.

Dis!. Dist. Div. Sand Clay Selected

laneous

on

Mixtures Concrete Concrete

--------

Material

Bases

Lime Rock

41Q-A Atkinson____

4lo-D Berrien ______

Tl H-1-T:::::::::::: ::::::::::~:::::::::::: :::::::::::: :::::~:~~~:: -----~:~~-- :::::::::::::::::::::::: :::::::::::: :::::::::: 41Q-G Atkinson.___
410-I Ware _________

l

ll I ------------ ------------ ------------ ------------ ------------

4.499 ------------ ------------ ------------ ----------

412-B Telfair
i w1\:) 412-B Telfair ______

~

i;

1-----~:~~~-- :::::::::::: :::::::::::: :::::::::::: :::::::::::: ~:~!~ :::::::::::: :::::::::::: :::::;:~;~:: ::::::::::

: : : : : -'1 418-0 418-D 424-B 428-0

Lamar _______
Lamar...... P o l k _________ Bryan _______

~

6

~ [:-~:~~~:: :::~:~~~::~~ :~~~~~:~~~~~ ~~:~~~~~~~~: :~~~~~:~;~~~ :::::~~~i~::l:~~~~~~~~~~~ :~~~~~~~~~~~ -----~:~~~--

433-A Haralson __ -- 3

3 ----------- ------------ ------------ ----------- ------------ ------------ ------------ ------------ 0.381

433-A Haralson... 3

3 ------------ ------------ ------------ ------------ ____________ ,____________ ------------ ------------ 0.619

433-B 433-B 439-B 443-A 443-A 443-B 446-A 446-A

H a r a l s o n ____ H a r a l s o n ____ Baldwin _____
Jasper------ Jasper..... J a s p e r. . . . . . . Wilkinson ... Wilkinson ___

!3 7
~ i~j

: :- _: : :: :_ : .: : :-: -' :il : ;;"-: - -I _: _-_ :-.: ~': .:::::: 3 ------------ ----------- ------------ ------------ ------------'------------ ------------ ------------

2.999 ----------

i ::: _

::::::::::::11::: ::::: : :::: : : : : :: iill t : ll:::::::::j:::::::::::: ::::::::::

I

I

I

-I

.

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ROADWAY MILEAGE PLACED UNDER CONSTRUCTION
DURING THE Fl SCAL YEAR ENDING JUNE 30, 1934

I I

I

I

I f

I 1Graded,Top , Gravel, I

I

I ITreSautmrfaecnet

Surface

I

Proj. I' County

Com. Gong. Eng. Soil and

I Chert and Macadam Re-Surface 1 on Miscel- Treatment Bituminous Bituminous Cement

Brick

No.

Dist. Dist. Div. Sand Clay Selected

I

laneous

on

Mixtures Concrete Concrete

~~;~;-I-~;~~_n_________ ,

__ Materi_~_l _1'--'=im_"~o~l--- __

_ _ _ _ _ _ __

_ _ _ _ _ _ _ _ _ _ _ Base_s

_ _ _ _ 1 - - - - - [ _-_ -_______ _

11 11

o 490

I

/ .: J__ - - - !~E~ ~=:-:::: ~ 1

:-r --1- 1.079 I -- : . - [: ---J-:::~-~~!-f ~-::-:::: __:_:---

~ m~i ~im~~~~::l + . I ~ ~,,1 3

-:1 : i

. :: i :

47D-A Laurens_____

12

470-A Laurens _____

12

I ___

47D-0 Wilkinson ___

10

470-0 Wilkinson_

10

471-B Warren ______ I

10

:I

477-B rPutnam _____

477-C !Morgan _____

I

477-C Morgan _____ 3

I

479-A Heard _______ 2

483-A 483-A

1MMaaddiissoonn

_____ _____

l

3 3

483-B !Madison _____ ; 3

I

I

I

I

.. I

iffi I ...... ....... ... ....

!

l:lj 1"_:_",_. 1_.-_-._:_-:_~: 1

I .,,

1 . 1 . . . ' ' "

!

)

1 1 I t~r: ! ~~

STATE HIGHWAY BOARD OF GEORGIA

SUMMARY OF ROADWAY MILEAGE PLACED UNDER CONSTRUCTION

DURING THE FISCAL YEAR ENDING JUNE 30, 1934

=======-"=====~=---~

I I I

iEng.l Proj.

County

Com. ICong.

Graded,Top Gravel, Soil and Chert and [Macadam

No.

Dist. Dis!. I1 Div. Sand Clay Selected I

Re-Surface

Surface Treatment on Miscel-
laneous

---- ------------------
I
J
Surface

I[Treatment [Bituminous Bituminous Cement

on

Mixtures Concrete Concrete

Brick

1 1

Material

Bases Lime Rock I

--~--~~- - - ; - -~- ~3-~~~~-~-~--~~--~---~~~--~- -~~- ~---- -~--- ~~~ ~~-- ~~483-D lEibert_ ______ 483-D Madison _____

486-A ITattnaJL ___

]

492 DooJy _______ 2

492 DooJy _______ 2

"""" 493-A iHenry _______
"' 493-A Henry_______

3 3

,;

1/

494-A Irwin ________ l

1... .8.112 :~: 1

494-A Irwin ________ 1 u
495-A Quitman ____ 496-A IGwinnett ___ 496-B GwinnetL .. 3 9 496-0 IGwinnett ___ 3 9

i 1
1

j::::::::::_:~------;;:~~2

-~1

: - ~---- -I -- o--.-375--

r:::::;:~~~::l ____;:~5~--~ : - --1 -----::1:--- 1.

: :: 1

--~- _:::::::r_::::_-::1 :::::::::

196-D 497 499-B 500 501-B 502 502

Gwinnett- .. Newton _____ Pulaski _____
Worth----FloYd.------Long ________
TattnaJ]__ ___

3 3

9
12 2 7 1 l

~;: ;~;!~ "~ 11~ ; 11: i...i

. !-:

I

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ROADWAY Ml LEAGE PLACED UNDER CONSTRUCTION
DURING THE FISCAL YEAR ENDING JUNE 30, 1934

Brick

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ROADWAY Ml LEAGE PLACED UNDER CONSTRUCTION
DURING THE FISCAL YEAR ENDING JUNE 30, 1934

Graded, Top Gravel,

Proj.

County

Com. Cong. Eng. Soil and Chert and

No.

Dis!. Dis!. Div. Sand Clay Selected

1 -;9-A .Emanuel= ~-2-~-;- ~-2-

579-B Treutlen~ ~-- 2 12

2 I

4.114 11.195

Material

592

1 Sumter~-----

1
1 3

1 I

593cA ]Burke_______ 2 1

593-B Burke. _____ _

s:e 616 TrOUP----~--

4

,_. 617 ITrouP------~

696-A Gilmer_ ____ _

696-B ,Murray_____ _

I
~~~~~~:83~~~1 3.417
4.439 1 0.196
12.981 1 11.765

706-A 706-B
755-A 786 788
793 796

!EmanueL __ _ Trelltlen __ _
Banks~-----~ Bryan_--~
Heard ______ _
Screven __ _ !Burke ______ _

12 12

n~~

1
I~~~~~~""~.1~

....

6~~~/I

1.315

I~:::::~:::::1-- -------1

800~B Morgan __ ~ _~

I

____

1.263

804 Peach ___ --~-

12

817-B Meriwether__

1:::::::: 13.772
2.007

820-A Johnson

12

0.594 1---

Macadam

Surface

Treatment Surface

Re-Surface on Miscel- Treatment Bituminous Bituminous Cement

Brick

laneous

on

Mixtures Concrete Concrete

Bases LimeRock
-------1----1----1------------

I

~~~~~~~~~~~~~~~---------------~-

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ROADWAY Ml LEAGE PLACED UNDER CONSTRUCTION
DURING THE FISCAL YEAR ENDING JUNE 30, 1934

Graded, Top Gravel,

'

Surface Treatment

I 1
Surface

' 1

-- ----- 'I -------- Proj.

County

Com. Cong. Eng. Soil and Chert and I Macadam Re-Surface on Miscel- Treatment Bituminous 1 Bituminous Cement

Brick

No.

Dis!. Dis! Div. Sand Clay Selected I

laneous

on

Mixtures Concrete Concrete

~---r-~~~~~ -~,~-- ~~~~ -~ ~~M-aterial -~~~~-

-~ Base- s -Li-me~Roc-k -~~~~- 1 -~-~-r---~~-l~~~-~

88~243 o

Emanuel -!Dodge___

2 12 2 12

2 2

r_-_____-_____-T:_

2.010 _I__-__-_ -----1 -

-

- - __- --------.. --

- I- -
1.412

--1' --- ---- ------

---

--[

-- -- ----

828-A Wheel~~::
832-A /Jeff Da lS

1 12 ll

1 j ------3-.-8-0-3--1 --

-~---- -----1 --

-[-- ----- --- 1 - ------1- --'

3.000 1-----

-- 1-

____ ,__ __

1\:l 835 Heard _____ I

4

,.. 836 Banks

I

9

"" 839-A ,Gordon .

8~3~9;--Bo !~B~~a~rt\o~wso~__--_~

1~7

~;~=~ lg~~:~~ - ~

I

4.194

___

-1

I

,

-----~

I - ---~ z.oc6

I

I 1.380 I 1.607
4.874

j

__ _

.. -.--

!

1

-+1

I

I

--

--1-

I -------1

I

: 1----

-1:: :r::

J
1-- :::::1:::
--1-- ---

861 ,Jefferson
~~~=~ ~~~~~;u-

2 10 1

I I I

7.417 1-

I

-~-

_ _ __

_

__

1

------- ,__ __

901 Jones

6

_ 8.600

1 .

----------1

90j-E Echols.

ll

905-F Clinch.

ll

-- --- -

1

1

j

932-D ,Wilcox_______

12

939-0 !IWilkinson.__

1G

._

4. 779 ,

1-

1

-- i I - - - - - - - - - - - -

i-

1

1

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ROADWAY Ml LEAGE PLACED UNDER CONSTRUCTION
DURING THE FISCAL YEAR ENDING JUNE 30, 1934

Surface

Proj.

County

Graded, Top Gravel, Com. Cong. Eng. Soil and Chert and

Treatment Surface
I Macadam Re-Surface on Miscel- Treatment Bituminous Bituminous

Cement

Brick

No.

Dist. Dist. Div. Sand Clay Selected

laneous

on

Mixtures Concrete Concrete

-~2-1--;-- --~- -------
942-D Johnson.

--;-/

5.081

Material

- ~--~~~~-~ -L-i~~-~~~~ I~~~~~~~~~=~:~=~~----~

944-B Bleckley_

2 12

944-C Dodge_______ 2 12

9H-D Twiggs __ - - -- 2 1~

2

1.152

---- ------------ ------------ ------------1

I 2

0.876 ------------

- ------------ ------------ ------------ -------- ---

2

5.568 ___

_ __________________________________________________________ _

------------

970-A Monroe... __ -

5.326

....1\:) 970-B !Monroe______
C;j 974-B Btltts________

2

981 Dawson _____ 3

991-C Chattooga __ 3

998-C Fannin ______ 3

1002-A Worth _______

!~ I1::::::":_'_"_

,2i I I. I

I ' '"" I

4.998 ------- . -

----- ::::: _____ '

3.181 3.283

1003-B Candler_____ 2 1 2

4.049 ! ____________ -

1013 Effingham .. 2 1 1016-B Cook ________ 1 11
102l"B Schley_- .. __ - 2 3 1022 Jenkins. ____ 2 1

2

3.844 ------------ ------------ ------------

1 ------------

7.676

1025-A Pulaski.. .... 2 12

1025-C Houston .... 2 12 1032-A Tift _______ --- 1 2

1032-B Berrien.. __ -- 1 11

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ROADWAY MILEAGE PLACED UNDER CONSTRUCTION
DURING THE FISCAL YEAR ENDING JUNE 30, 1934

Proj, No.

County

Com. Cong Dist. Dist.

Graded, Top Eng. Soil and Div. San~ Clay

Gravel, Chert and Selected Material

Macadarr

Re-Surface

Surface Treatment on Miscel-
laneous Bases

Surface Treatment
on Lime Rock

Bituminous Bituminous Mixtures Concrete

Cement Concrete

Brick

ro33-A ;herokee______3___9_-;---~.607-1===

_____________________________________________ ~=======

i~!:=! ~~~:~;;:::: I 3 i ;:~~~ ~- -- ----- _::::::::::: ::::::::::: ::::::::::: -_:::::::::: _::::::_:::: ::::::::::: ::::::::::: ::::::::::

1044 Lincoln

10 3

3.405 ___________ _! ____________ ------------ ------------ ------------ ------------ ------------ ------------ ----------

1045-A Crawford____ ~ 1053-A Lanier.______

6 2 11 l

1.898

__ ------------ ------------ ------------ ____________ ------------ ------------ ------------ ________ __ 1.780 ------------ ------------ ------------ ------------ _----------- ------------ ------------ ----------

""' 1057-B Thomas_____

2

I ____________

3.314 ------------ ------------ ------------ ------------ ------------ ------------ ------------ ________ __

1065-B Macon_______

3 2

8.979 ------------ ------------ ------------ ------------ _________ _,_ ------------ ------------ ------------ ----------

1069-B Brantley____ I II

I ------------

3.735 ------------ ------------ ------------ ------------ ------------------------------------ ----------

mh H : : : : : : g~~Et::::: ~

2 ~:~~~_t:::::::::: ::::::::::::~_::::::::::: -----~:~:~--

:::::::::~ 1
:::::::::::: :::::::::::: ::::::::::::

1086 Clayton_____ 3 6

1096 CarrolL____ 3 4

z 1097-A Taylor___ __

3

1~m ~!~:~~~::: ~ :~
~;~~-A ~~:~~~~:::: : ~

0.843 [____________ ------------ ------------ ------------ ----------- ____________ ------------ ------------ ----------

:::::::::::r:::::::::: :::::::::: 1.157 ------------

1.1.57 ------------

1.157 ------------ ---------- ------------ ____________ ----------

1 5.694 ------------ ------------ ------------ ----------- ----------- ::::::::::::

2

~:~~; :::::~:~~~:: 1_____

__

:::::::::::: :::::::::::: -::::::::::: ::::::::::::,:::::::::::: :::::::::::: :::::::::::: ::::::::::

: ----i:i:i6--r-----~:~~:- ::::::::::::[:::::::::::: :::::::::::: :::::::::::r::::::::::l:::::::::::: :::::::::::r::::::::

1

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ROADWAY MILEAGE PLACED UNDER CONSTRUCTION
DURING THE FISCAL YEAR ENDING JUNE 30, 1934

Surface 1

Graded, Top Gravel,

Treatment Surface

Proj.

County

Com. Cong. Eng. Soil and Chert and Macadam Re-Surface on Miscel.. Treatment Bituminous Bituminous Cement

Brick

No.

Dis!. Dist. Div. Sand Clay Selected

laneous

on

Mixtures Concrete Concrete

Material

Bases Lime Rock

---1---- ------1----1----1------1-----1----

I508-B Cherokee....

9 3

I5IO-A Montgomery 1514 Tift__________ l5I6-A Upson _______

IZ 1 2 1 6 2

I521-A Ben HilL ___ ~ I524-A Turner ______ 01 1528 Dougherty __

3 I 3 I 2 1

I530-A TerrelL.....

3

1533-A Laurens_____ 2 12

I546-A Newton _____ 3

3

1550 Habersham. 3 9 3

:.:.: _ _:_:_:_:_:_:_: 1.400
1.649 -----------~~~ ~__:___=

==-~ ~::____:~~::__1' -~~-

TOTALS ..

260.638 165.762

26.373

47.333 224.065

74.521

30.795

15.653 I26.926 0.209

A TOTAL OF 334 PROJECTS COVERING 972.355 MILES OF ROADWAY WAS PUT UNDER CONSTRUCTION DURING THIS PERIOD.

STATE HIGHWAY BOARD OF GEORGIA
ROADWAY MILEAGE PLACED UNDER CONSTRUCTION BY ENGINEERING DIVISIONS AND COMMISSIONERS DISTRICTS
DURING FISCAL YEAR ENDING JUNE 30, 1934.
Note: The Engineering Divisions were reduced from Six to Three and made to correspond with the Commissioners Districts on October 1, 1933.

Number of
Projects

Type of Road

-----

I

...1\:)

85

IGraded Earth, Top Soil and Sand Clay_

0>

49

~ravel, Chert and Selected MateriaL __

ll

:r.~acadam_ _______________ _____________

9

'Resurface_ - -- --

----------

66

'Surface Treatment on Misc'l. Bases____

44

Surface Treatment on Lime Rock Bases

10

Bituminous Mixtures ___

3

Bituminous Concrete_______

56

Cement Concrete__

___1_ _1Brick_____

-------

334

TOTALS ____

I

---- I

Division and District One (Miles)

Division and District
Two (Miles)

Division and District
Three (Miles)

Total (Miles)
--------

56.283 87.630 0.000 16.500 78.916 30.920 0.000 0.000 3.291 0.000
273.540

133.922

70.433

52.670

25.462

11.019

15.354

16.423

14.410

73.569

71.580

43.601

0.000

14.459

16.336

4.896

10.757

68.165

55.470

_ _ _ _ _0_.00_0_ _ _ , _ _ _ _0_.28_9 _ _ _ ,

418.724

280.091

260.638 165.762 26.373 47.333 224.065
74.521 30.795 15.653 126.926
0.289
972.355

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ____.

STATE HIGHWAY BOARD OF GEORGIA ROADWAY MILEAGE PLACED UNDER CONSTRUCTION BY CONGRESSIONAL DISTRICTS
DURING FISCAL YEAR ENDING JUNE 30, 1934

Num bor of Pro jocts

TYPE OF ROAD

Cong. Dist.

Con g. Dist.

Con g. Dis!.

Cong. Cong

I Cong. Cong. Cong. Cong. Cong. Cong.

Dist. Dist. Dist. Dis!. Dist. Dist. Dist. Dist.

Con g. Dist.

Tot I

One Two Three Four Five

Six Seven Eight Nine Ten Eleven Twelve (Miles)

(Miles) (Miles) (Miles) (Miles) (Miles) (Miles) (Miles) (Miles) (Miles) (Miles) (Miles) (Miles)

- - - - - - - - - - - - - ~~-.---

~~----

~~-

~~-

~~-

~~-

85 Graded Earth. Top Soil and Sand Clay_ 18.524 14.911 34.650 30.655 3.400 9.446 22.258 17.194 24.435 8.632 11.846 64.687 260.638

49 Gravel. Chert and Selected MateriaL .. __ 21.866 19.764 25.980 11.150 0.000 0.000 4.301 7.550 13.611 16.204 23.804 21.532 165.762

11 Macadam---------------------------------- 0.000 0.000 0.000 12.176 2.815 0.000 7.353 1.000 3.029 0.000 0.000 0.000 26.373

1 9
66

~~~~~a~~~;t~~;;t-~~--Mi~~-~ ~~-~~~-~~-----

0.000 I 0.000

0.000

0.000

0.000

0.000

2.784

0.000 11.626 I

0.000 16.500 16.423 47.333

Bases.------------------------------------125.916! 38.630 12.093 15.412 0.000 28.733 10.035 40.580 12.426 18.060 11.259 i 10.921 224.065
44 Surface Treatment on Lime Rock Bases I 4.350 8.455 9.516 0.000 0.000 13.460 0.000 9.044 0.000 3.630 17.987 8.079 74.521

10 Bituminous Mixtures ___ --------

-- 10.218 0.000 0.000 4.241 0.000 0.000 4.786 0.702 10.848 0.000 0.000 0.000 30.795

3 Bituminous Concrete.. _ -- ------- -----

o .ooo o .ooo 1 0.000 0.000 0.000 0.000 I 0.000 I 15.653 0.000 o.oco 0.000 o.coo 15.653

56 Cement Concrete____ ---------------

_ o.845 o.ooo 1 0.000 4.217 3.860 49.402 23.322]18.831 I 2.715 7.036 2.446 14.252 126.926

1 Brick............. ---- - --------
---

I 0.000 I 0.000 I 0.000 0.000 0.000 0.000 0.289 0.000 0.000 0.000 0.000 0.000 0.289

-------~~-

- - --~- ' --~-

-~ ---~---

334

TOTALS __________________________ --- - 81.719 81.760 82.239 77.851 10.075 1101.041 175.1281110.554 78.690 53.562 83.842 1135.8941972.355

Proj. 470-A. Laurens County- Concrete Pavement

Proj. 506. Bleckley County- Surface Treatment on Limerock Base

Proj. 403-A. Tift County- Surface Treatment on Pebble Soil Base

Proj . 424-B. Polk County- Concrete Pavement

Proj. 264. Early County- Surface Treatment on Limerock Base

Proj. 424-B. Polk County- Concrete Pavement

Proj. 369. Toombs County- Surface Treatment on Pebble Soil Base

Proj. 409-F. Jones County- Concrete Pavement

Proj. 409. Putnam County- Surface Treatment on Limerock Base

Proj. 612-B. Schley County- Surface Treatment on Limerock Base Proj. 296-B. McDuffie County- Surface Treatment on Gravel Base
with Concrete Pavement in Background

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF BRIDGES COMPLETED DURING THE FISCAL YEAR
ENDING JUNE 30, 1934 NOTE: The Engineering Divisions were reduced from Six to Three and made to correspond with the Commissioners Districts on October l. 1933.

Project No.

County

4 15 17 29-A 29-D 64 87 115-A 179-C 226-B 211-A 241-A 264 273-A 296-A 386 389-B 390-A 409-G 410-G 412-C 424-B 421-S

Walton._ Columbia Wilkes .. Emanuel Emanuel Glynn __
Haralson. Chattooga Greene ancl Morg "n Liberty_ Hancock Hancock_ Early ________ _
Talbot __
McDuffie Talbot Fulton_ Crawford __ Jones._ Atkinson ___ _
Telfair and Wheeler Polk __ I Polk __

Comm. Cong. Eng. No. of Concrete

!
I Timber,I-Beams
CiJncrete 1 and Concrete

I

I

Timber ! Concrete Bridge '

Totals

Dist. Dist. Div.

(Lin. Ft.) and 1-Beams!

Floors

I Lin. Ft.)

Culverts 1 (Lin. Ft.)

llin. Ft.)

(Lin. Ft.J

(Lin. Ft.) I

!-

46 .u

46.0

10

212.0

212.0

200.0

200.0

1.8

(3) 7-10.0

1832.0

12

22.0

22.0

ll

120.0

120.0

127.0

427.0

82.0

82.0

1595.0

1595.0

48.0

48.0

10

23.0

23.0

10

100.0

100.0

136.0

lO

360.0

90.0

72.0

22.0

256.0

11

24.0

12

958.0

174.0

174.0

!

30.0

30.0

Project No.

County

STATE HIGHWAY BOARD OF GEORGIA
SUMMARY OF BRIDGES COMPLETED DURING THE FISCAL YEAR ENDING JUNE 30, 1934.

853-A

859-B

862

""c:;n
00

942-D 944-B

988-0

1018-B

1022-A

1028-A

1044

1098

1504-A

1508-B

Totals (Lin. Ft.)
120.0 35.0 107.0 160.0 32.0 100.0 360.0 32.0 160.0 193.0 22.0 470.0 250.0 749.0 160.0 130.0
1C.C09.0

STATE HIGHWAY BOARD OF GEORGIA

BRIDGE MILEAGE COMPLETED BY ENGINEERING DIVISIONS AND COMMISSIONERS DISTRICTS DURING FISCAL YEAR ENDING JUNE 30, 1934.
======. ----

Number

Division I Division ! Division

of

Typo of Stmotmo

I

Ono

I

Two

I

Tlu"

Total

__Bri:g~-~ Concrete ____ -- ---------------------- -----:~0::-- -~1 ---- -:~~~-----j----~~~--~---~-~~-:-:---

3

Concrete and !-beams ________________ :

0.000

0.139

I

0.025

j

0.164

2~ i~~~:~:~bea-~~,con~r~t~f-1~~r~~~~~~~~~ 1

g:i!~ I

I g:6~~

g:86~

1

6:~~i

16

Concrete bridge culverts _____ --------1

0.046

1

0.023

1

0.027

I

0.096

"' ___5_5___

Total Constructed _________ ------~

0.507

I

0.776

~- -- 0.612

1.895

g ------------ ---------

----'-

BRIDGE MILEAGE COMPLETED BY CONGRESSIONAL DISTRICTS

DURING FISCAL YEAR ENDING JUNE 30, 1934

. - - - - - - ~-====---

Congressional Districts

Number of Bndges

T pe of Structure Y

~-~:-~-Two

I Three

-F-=~T::"

----:;~

Miles 1 :even

~-:in-er-;c~-~ Eight

Total
Eleven i Twelve Miles

----7--: Concrete ------------------------~~000 ~ o.ooo -0.01; ~~~~--o.ooo 0.048 -c.ooo ~~~~ooo I o.ooo ~~~-0.133

3 1 Concrete and !-beams................ 0.000 0.000 '1 0.000 0.000 0.000 1 0.000 0.000 0.000 I 0.025 1 0.000' 0.000 0.139 1 0.164

27

] Timber. !-beams. Concrete Floor.... 0.042 1 0.049 0.000 1 0.056 0.0141 0.048 C.lll 0.340 1 0.000 ~ 0.1751 0.053 0.383 1 1.271

16

I Tunber................................. 0.000 0.071 1 0.000 0.000 0.000 0.089 0.000 0.000 1 0.000' 0.000 0.071 0.000 I 0.231
1 Concrete Bridge Culverts............ 0.013 0.000 1 O.OQO 0.000, 0.000 0.004 0.018 0.009 I 0.000 0.004 0.011 1 0.037 0.096

55 : ~:~1-c_o:~~:c~~d---~-~~----- --~- _ o.o~~--~~1z~l o.ooo___o~o7~~--~~~r1o.l41 1~~ o.34;-f_o_-~25 _ o.l7~l o.1~J~~~7I 1.s95

Proj. 1504.-A. Miller County- Concrete Deck Bridge with Steel I-beams on Creosoted Piling

Proj. 606-A. Blackley County- Bridge over Southern Railroad in Cochran

Proj . 412-C. Telfair and Wheeler Counties- Old Bridge over Gum Creek (Above) Replaced by New
Concrete Deck, Steel 1-Beams and Creosoted Piling Bridge (Below)

Proj. 696 . Murray County- Concrete Bridge Built on a Curve over Mountain Town Creek

Proj . 696. Murray County- Concrete Bridge Built on a Curve over Mountain Town Creek

MAINTENANCE ORGANIZATION CHART

STATE

HIGHWAY BOARD ----I

STATE HIGHWAY ENGINEER

t.wNTENAJE ENGINEER

SUPT EQUIPMENT

OFFICE
I
ROAD INfORMATION

ASSISTANT
I
OFFICE

SIG,J DEP.T.

M A INT. SUPERVISOR

SUPT. SHOPS
T
MECHf.NICS
WAREHOUSE

ASST. MAINT. SUPERVISOR

I
~TROLMAN
T
LABORERS T.&T. DRIVERS

DIV. MECH. DIV. SHOPS

STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF MAINTENANCE PERSONNEL BY DIVISIONS AS
OF JUNE 30, 1934

Foremen of
Special Outfits

Patrol Sections

Patrolmen Miles

I Miles

Total

Paved i Unpaved Mileage

DIVISION NO. 1-FITZGERALD

5

50

50

1 ' 303 .928 1 '736 .237 3,040.165

DIVISION NO. 2- MACON

5

51

51

1,046.53211,982.3451 3,028.877

DIVISION NO. 3 -EAST POINT

6
Total: 16

52

!

52

1,071.63011,735.546 2,807.176

153

--153- I 3,422.oool5,454.12sf --s,876~218-

PERSONNEL COMPRISING A TYPICAL PATROL SECTION:
1 Patrolman 1 Tractor Operator 1 Truck Driver 2 Machine Operators 2 Laborers
EQUIPMENT COMPRISING A TYPICAL PATROL SECTION:
1 5-ton tractor 2 n-ton dump trucks 1 1-man patrol or 3-ton truck 1 tar or asphalt heater Miscellaneous small tools

266

Cause of Accident
Blinded by bright lights Blinded by dust Deficient brakes Deficient lights Deficient steering gear Deficient tires .. "' Driver intoxicated_
3l Driver asleep
Failure to observe signs Pass car without right-of-way Reckless, careless driving Skidding_ Speeding_ Wrong side of road
Totals_
Accidents on curves Accidents on straight road
Totals_
Persons killed Persons injured Property damage only_

STATE HIGHWAY BOARD OF GEORGIA ACCIDENTS REPORTED
FISCAL YEAR ENDING JUNE 30, 1934.

'

I

At

Col. with I Col. with 1 Col. with Drove Drove I RailMtr. Veh. Other Veh. Parked I Off ~ Off or 1 road

Ran . Ran Into 1 Into 1

in Motion 'I in Motion Vehicle Roadway into ' Cross- I Animal Pedes- '

Bridge, ing

1 trian

1
4 --~-- 2

1

16

7

2

9

1

1

1

2

1

2

1

3

2

8

9

3

2

6

5

2

3

8

14

2

9

4

3

4

5

6

3

2

4

8

3

5

2

46

18

23

2

19

2

3

1

2

18

4

39

16

6

1

6

2

Total
41 2 10 24 13
ll 33
18
6
18 108
8 83
9

1C5

5

38

8

7

40

384

84 21

5

5
-----
1

4

-- -------~~----

9

3

29

5

28

8

23

1

18

12

3

3

8

214

4

i:2

170

_____ , ___ --

7

40 ' 384

28

145

ll

196

4

64

STATE HIGHWAY BOARD OF GEORGIA
SUMMARY OF TRUCKS, TRACTORS, GRADERS AND OTHER HEAVY ROAD EQUIPMENT FOR MAINTENANCE AND CONSTRUCTION AS OF JUNE 30, 1934

MAINTENANCE

I CONSTRUCTION

DESCRIPTION

Division Division Division

Total Asphalt & Grand

No.1

No.2

No.3

Shop Laboratory Maint. Convicts

Total

- - - - - - ~-------------- -------+-----1~----- ----~- ----~

--~----1-----

Trucks_ __________________ 192

183

153

7

2

537

116

653

Tractors_ _________ _____

67

66

62 ____ _

195

26

221

Graders__________ _______ 112

151

146 I

409

20

429

~ o~~~~::~tH-~~d _____ _ 53

36 1

35

_-__-_-_-_-_-_-_-_-____ -_-_-_-1 _--_-_-_--_-__

124 1 400

524

00

Totals

_ --:t24- --436_1_-----a96__

7

1

2

~--1265-1 --5;--1~27-

Note: The above totals represent heavy road working equipment and animals in use, but does not include light road equipment, Shop, Garage, Warehouse, Quarry, Engineering, Office and Convict Camp equipment, nor Real Estate and Build-
ings.

Ditch Being Cleaned by Maintenance Forces One-man Auto Patrol with Light Road Grader in Tow

Surface Maintenance on Sand Clay Road

Roadside Grass Being Mowed by Maintenance Forces

Proj. 694. Burke County- Maintenance Forces Placing Local Material Base
Proj. 694. Burke County- Maintenance Forces Sahping Local Material Base

Maintenance Forces Operating Portable Rock Crusher 853-A. Coweta County- Broken Stone Base Being
Constructed by Maintenance Forces

This SO-Foot Steel Span (Left), Being Placed by Maintenance Forces over the Pataula Creek on Route 39 in Clay County , Was Salvaged from an Abandon.ed Bridge in Another County. The Old Bridge (Right) Will Be Replaced by This Salvaged Span. This Is a Graphic Dlustration of Economy as Practiced by the Present State ~hway Board

3! Ton Liberty Truck Before and After It Was Rebuilt in East Point Shops

STATE HIGHWAY BOARD OF GEORGIA ASPHALT DEPARTMENT
The following projects, approximating llO miles, were completed during the fiscal year ending June 30th, 1934.

Project No.

County

A-785-A&B.

Whitfield.

A-806-A&B

Whitfield

A-998-C __

Fannin __

A-ll8-A __

Fannin

A-56

_ Gwinnett _

""A-1082-A._ _

Coffee __

~ A-1546____

Newton_

A-1514 ____ .

Tift_

A-226-B ____ .

Liberty

A-1017-B_____

Berrien.

A-1017-A__

Cook_

221-243-401-ABC _____ ;Houston_ _ _ _.

A-279-A-357_____

_!Lowndes and Cook __

A-409__ ____ ____

iJones_

A-471-B _________ ___ 1Warren.

A-582___

_________ McDuffie__

A-833-A&B___ _ ____ Effingham_

A-90L__

Jones

A-1002___

_______ Worth_

Type

Miles

i

________ !_______ --- ----

i
' Shaping base and crushing stone

_I

Cold mixture surface treatment

Surface treatment

Surface treatment_.

Seal coat

Pebble soil base with surface treatment

Chert base with surface treatment ___ _

_ Pebble soil base with surface treatment __

Pebble soil base with surface treatment_

Pebble soil base with surface treatment_

__ Pebble soil base with surface treatment__

Resurfacing_ ..

Seal coat ... __

__ Surface treatment_

Surface treatment _

, Surface treatment

-----------------

Lime rock base with surface treatment_ _______________ _

Surface treatment_

______________ _

Surface treatment.

8.000 5.188 1.088 0.500 10.200 1.813 1.400 2.000 6.104 4.974 7.159 16.423 11.500 10.200 1.080 0.427 8.850 8.600 4.998

STATE HIGHWAY BOARD OF GEORGIA CONVICT DEPARTMENT
The following projects, approximating 80 mile8, were completed during the fiscal year ending June 30th, 1934.

Project

I

County

/

Type

Miles

No.
1-~~------

I C-285_________________ Lumpkin__________
C-785-A&B ___________ -~Whitfield_____

_Widening road__ ________ _Grading and drainage____

_ _____________ _ _______________________ _

6.830 14.500

C-1023 _________________ Fannm___ ____
C-1018________________ i Berrien_______

_____ Grading and drainage__

_____________ _

Grading, drainage and bridges _______________________ _

9.880 11.650

C-1063________________ :Berrien_______ ________________ Grading and drainage________________________________ _ 12.302

"" C-1072 _________________ 1 Berrien ________________________ ,Grading and drainage______ ________ ______ ____

__, 2.255

~ C-241-A_______________ Hancock ______________________ IGradmg and dramage _____________________________ _ C-1053________________ Lanier.___________ ________ __ Gradmg and dramage___ __ ______ ____ ______________ _

7.300 1.780

C-788________________ !Heard______________ _________ IClay bound macadam_ _____ ___________________ _

2.161

C-28-A&B _____________ Paulding_____ ___ ______ __ Gradmg, dramage and bndges ____________________ _

C-1082-B_ _____________ Coffee_______

__________ Bndge____________

_______ _

8.873 0.151

C-177_________________ Bryan-Liberty-Mcintosh______ 115 bridges________

____ _____ _____ _ . __________ _

C-310_________________ Union__________________________ Widening road____

_____________

I 3.415

1

STATE HIGHWAY BOARD OF GEORGIA

ASPHALT DEPARTMENT

The following projects, approximating 55 miles, are now under construction.
--- --~----=c---=-=-=======

Project No.

County

Type

Miles

----------~----~--:-~~--~------ ------------ -! --- ----~~------~-- --- ----~--------- ---------~------ ----

A-785-A&B__________ !Whitfield________________ _

A-241-A_______________ 1Hancock

___________ _

A-283 & 32L __________ :Forsyth

A-236 & 452_________ 'Jenkins_

A-436 & 436- S _________ iPulaskL __ _

~ A-1096_______________ _1CarrolL _____ _

~ A-1025 ___ __________ iPulaskL ______ . _________ ---

A-309 _________________ Wayne________ _

A-832-A_ __

IJeff Davis ____ _

Chert surfacing and surface treatment

Clay gravel base, Class A, double surface treatment_

Bituminous road mixture with surface on base __

Sand clay base double surface treatment_

' Resurfacing___ _

, Surface treatment_____________ _

1 Gravel base double surface treatment __ ._

Grading__

_

__

Pebble soil base with surface treatment_

14.360
6.487 10.105 2.104 6.936
1.157 7.555 3.734
3.000

STATE HIGHWAY BOARD OF GEORGIA CONVICT DEPARTMENT
The following projects, approximating 107 miles, are now under construction.

Project

i

County

No.

I

:

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -------~-~~--

,

-----~----

Type

C-1041-A_ ______ -----!'Baker _________ _ C-1087 _______________ Lamer_ _______ _ C-944-D _____________ -!Twiggs ____ .. ____ _ C-804 _______ .- _________ IPeach _________________ _
C-579-A&B ___________ ITreutlen __ . N C-706-A&R_. ____ --- _,Treutlen __ _ ;2 C-579-A_____________ :EmanueL_
C-479-A__ _____ __ :Heard____ _
g=~k-------- .~ ~ ~ ~ ~- ~~~~~~~==~ ~: ~::-:
C-30-R__ ______ __-!Cobb __ C-1043-B_ ____________ White __ C-1069-R _____________ Brantley____ _ C-1550____________ . ___ Habersham___________ _ C-696-A&R_______ . ___ Gilmer-Murray________ _

Grading, drainage and bridges_ __

:Clearing, grubbing and bridge __ _

Grading, drainage and bridges_

Grading, drainage and bridges __ _

Grading, drainage and bridges __ ..

Grading, drainage and bridges ___ _

Grading and drainage____ _

Macadam base 6" compacted_.

Grading, drainage and bridge __ _

Grading and drainage ____ _

Grading and drainage___

_

Grading, drainage and bridge_ __ _. _ 2 bridges________ _______________ _

4" loose rock___ __ __ _____________ _

Grading and drainage____ __ ____ _

Miles
--1---------
12.407 7.371 11.757 13.772 10.600 1.205 4.114 8.858 3.655 4.194 3.561 10.945 0.019 1.649 12.981

Proj. 696. Murray County- Graded Road Completed by State Convict Forces

Proj. 696. Murray County- Graded Mountain-top Road Completed by State Convict Forces

Route 9. Surface Treated Road Constructed by State Asphalt Forces

Proj . 1082-A. Coffee County- New Satilla River Bridge Constructed by State Convict Forces to Replace Old Dilapidated Bridge

Proj . 696. Gilmer County- A Relocation, Completed by State Convict Forces, That Eliminated Old Road and Covered Bridge (Right)

STATE ffiGHWAY BOARD OF GEORGIA LABORATORY
MATERIALS TESTED OR INSPECTED July 1st, 1933 to June 30th, 1934

j___ _-----~ind of ~ate_r_ia_I__

I_t_e_ m __

Number

Cement___

I Samples_

1574

Sand__

_ _ _

Samples __

433

Coarse Aggregate___

ISamples_______ _

978

Water_____

__

-~Samples ______ _

187

Clay, Gravel, Chert, Top Soil _ Samples______ _

3725

Asphalt __ _

_ Samples_____ _

451

Asphalt Mixtures_

.Samples___ _

88

Asphalt Sand___

___ :Samples__

35

Asphalt Cores_

Samples_

4

Tar____

__ Samples__

315

Limerock

__ Samples__

233

Grease___ OiL__

__ Samples ___ _

-

66

____ .Samples__ _

133

Paint____ Fertilizer_ ___

ISamples_ _ Samples_

-I

66 11

Guard RaiL

_ Samples

32

Brass___

Samples__ _

2

Expansion Joint__

-~Samples ___ _

29

Copper Flashing___

Samples__ _

1

Wood Preservative__

Samples __

1

Center Strip__

I Samples_

8

Filler_

Samples

10

Sign MetaL ___

Samples

5

Concrete Cylinders

I _ _ _-

1300

Concrete Cores_

564

Concrete Beams_

206

Concrete Pipe___

___ Ishipments __

70

Corrugated Metal Pipe__

_ 'I Shipments_

Reinforcing SteeL_ Timber__

_ Shipments_ __ Shipments_

---1

410
2~~

R/W Markers__ Concrete Posts_ ____

- ::1 __ Shipments_
___ :Shipments_

~

I

j-----

Total Samples or Shipments I_
------

11265

285

STATE HIGHWAY BOARD OF GEORGIA

INDEX

Page

A

No.

Accidents Reported )933'__

141

Accidents Reported i1934)___

267

Accounting- -Alphabetical Index as Follows:

Administration Appropriation rl933;

__ Schedule 6-F 63

Administration Appropriation 11934)

Schedule 6-E 178

Administration Expense Disbursements by Object of Ex-

penditure, Analysis of (1933:r_____

Schedule 8-A 67

Administration Expense Disbursements by Object of Ex-

penditure, Analysis of (1934)_ _________

Schedule 8-A 182

Administration Expense Disbursements by Units, Analysis

of (1933) ___

Schedule 10-A 74

Administration Expense Disbursements by Units, Analysis of

(1934)

_ Schedule 10-A 190

Administration Unencumbered Allotments by Units, Detail of

i1933)

_Schedule 6-C 60

Administration Unencumbered Allotments by Units. Detail of

(1934;

Schedule 6-B 175

Allotments Appropriations and Fund Balances Reflecting Re-

conciliation ',l,ith Expense Disbursements, Summary of

(1933)

Schedule 6 52

Allotments, Appropriations and Fund Balances, Reflecting Re-

conciliation with Expense Disbursements, Summary of

(1934)_

Schedule 6 168

Allotments by Congressional Districts, Summary of

(1933L____

____ S..:hedule 14 100

Allotments by Congressional Bistricts, Surrmary of

(1934)

______ ___

_________ Schedule 16 221

Assets and_ Liabilities, Statement of (1933) _

__Exhibit A

42

Assets and Liabilities, Statement of (1934}_-

__ Exhibit A 156

Chart of Revenue and Expenditure Percentages (1933)

45

Chart of Revenue and Expenditure Percentages (1934)

159

Collection of Revenue Expense Disbursements by Object of Ex-

penditure, Analysis of (19331__

Schedule 8-A 67

Collection of Revenue Expense Disbursements by Object of Ex-

penditure, Analysis of (1934) _

Schedule 8-A 182

Comments

12

Construction Allotments by Commissioners Districts since be-

ginning of Department, Summary of (1934)___

Schedule 14 218

Construction Allotments by Congressional Districts since begin-

ning of Department, Summary of 11933)_

____ Schedule 13 99

Construction Allotments by Congressional Districts since begin-

ning of Department, Summary of 1)934)

_Schedule 15 219

Construction Allotments and Disbursements by Types, Analysis

of (1933)

_ Schedule 12 98

286

INDEX-Continued

Construction Allotments and Disbursements by Types, Analysis

of (1934) __

_ . Schedule 12 214

Construction Allotments and Disbursements by Class of Project,

Analysis of Cl934)_

_Schedule 13 215

Construction Expense Disbursements by Ob.i ect of Expenditure,

Analysis of (19331

Schedule 8-B 68

Construction Expense Disbursements by Ob.i ect of Expenditure,

Analysis of (1934).

Schedule 8-B 183

Construction Expense Disbursements by Congressional Districts

and Division Units, Analysis of r1933)

_Schedule 10-B 76

Construction Expense Disbursements by Congressional Districts

and Division Units, Analysis ot (1934)

___ Schedule 10-B 192

Construction Unencumbered Allotments by Class of Project,

Detail of (1933)_

_Schedule 6-A 54

Disbursements, Statement of (1933;

. Exhibit C

46

Disbursements, Statement of (19341

.Exhibit C 160

Equipment Expense Disbursements by Object of Expenditure,

Analysis of '1933) _

___ Schedule 8-D 70

Equipment Expense Disbursements by Object or Expenditure,

Analysis of (1934)_

.Schedule 8-D 185

Estimated Participation, Reflecting ReconcJliation with Revenue

Receipts, Summary of (1933)_ _

Schedule 7 65

Estimated Participation, Reflecting Reconciliation with Revenue

Receipts, Summary of (19341

____ Schedule 7 180

Expense Disbursements by Object of Expenditure, Summary of

(1933).

_Schedule 8 66

Expense Disbursements by Object of Expenditure, Summary of

(1934) _

.Schedule 8 181

Expense Disbursements by Congressional Districts, Summary of

(19331

___ Schedule 9 72

Expense Disbursements by Congressional Districts, Summary of

(1934)

Schedule 9 187

Expense Disbursements by Division Units, Summary of

(1933)

. Schedule 10 73

Expense Disbursements by Division Units, Summary of

(1934)

_Schedule 10 188

Expense r:: isbursements by r: etail Object of Expenditure Classifi-

cation, Analysis of (1933)

Schedule 11 88

Expense Disbursements by Detail Object of Expenditure Classifi-

cation, Analysis of (1934}

_ Schedule 11 204

Financial Condition, Statement of ~)933)

Exhibit A 42

Financial Condition, Statement of (1934)

Exhibit A 156

Fund Deficit, Reflecting Fund Revenue, Appropriations and

Allotments, Reconciliation of (1933)__

___ Exhibit B 44

Fund Surplus, Reflecting Fund Revenue, Appropriations and

Allotments, Reconciliation of (1934)

.Exhibit B 158

Land, Buildings and Equipment 1933)

Schedule 4 49

287

INDEX-Continued

Land, Buildings and Equipment (1934) ____________ Schedule4 165

LegislativeTransferExpenseDisbursements by Object of Expenditure, Analysis of (1933) _________________________ Schedule 8-E 71

Legislative Transfer Expense Disbursements by Object of Expenditure, Analysis of (1934) _____________________ Schedule 8-E 186

Maintenance Appwpriation (1933) ___________________ Schedule 6-E 62

Maintenance Appropriation (1934) __________________ Schedule 6-D 177

Maintenance Expense Disbursements by Object of Expenditure, Analysis of (1933) _________________________________ Schedule 8-C 69

Maintenance Expense Disbursements by Object of Expenditure,

Analysis of (1934)

_____ _ _ _ ___ Schedule 8-C 184

Maintenance Expense Disbursements by Congressional Districts and Division Units, Analysis of (1933) __________ Schedule 10-D 82

Maintenance Expense Disbursements by Congressional Districts

and Division Units, Analysis of C1934)_ ___

__Schedule 10-D 198

Maintenance Unencumbered Allotments by CongressionalDistricts

and Division Units, Detail of (1933)

Schedule 6-B 55

Maintenance Unencumbered Allotments byCongressionalDistlicts

and Division Units, Detail of (1934)----

__ Schedule 6-A 171

Quarry Expense Disbursements by Object of Expenditure, Analy-

sis of (1933)-. _

____ Schedule 8-A 67

Quarry Expense Disbursements by Object of Expenditure, Analy-

sis of (1934)__________ _________

_____ Schedule 8-A 182

Receipts, Statement of (1933)___ _________

______ Exhibit C

46

Re0eipts, Statement of (1934).__

__Exhibit C 160

Reconstruction Expense Disbursements by Object of Expenditure,

Analysis of (1933). _

__Schedule 8-C 69

Reconstruction Expense Disbursements by Object of Expenditure,

Analysis of (1934)_________

_____________ Schedule 8-C 184

Reconstruction Expense Disbursements by CongressionalDistricts and Division Units, Analysis of (1933) ______________ Schedule 10-E 85

ReconstructionExpenseDisbursements by Congressional Districts and Division Units, Analysis of (1934) ___________ Schedule10-E201

Refunding Certificates, Statement of (1933)_ _ _____ Schedule 5 50 Refunding Certificates, Statement of (1934) _________ Schedule 5 166

Research and Analysis Expense Disbursements by Object of Ex-

penditure, Analysis of (1933). _

__ Schedule 8-A 67

Research and Analysis Expense Disbursements by Object of Ex-

penditure, Analysis ot (1934) __________ . _________ Schedule 8-A 182

Revenue Receipts and Expense Disbursements, Statement of (1933) _ . ________________ . ___ . _______________________ Exhibit C 46

Revenue Receipts and Expense Disbursements, Statement of (1934) __ -------- ___________________________________ Exhibit C 160

Revenue Receipts and Expense Disbursements for 1931, 1932, 1933, and 1934, Comparative Statement oL ____ _____ ___ Exhibit D 162

Shop Expense Disbursements by Object of Expenditure, Analysis

of (1933)___ ___

_____ ___

Schedule 8-C 69

288

INDEX-Continued

Shop Expense Disbursements by ObJect of Expenditure, Analysis

of (1934)_

Schedule 8-C 184

Survey Appropriation (1933:_ ___

Schedule 6-G 64

Survey Appropriation (1934;

Schedule 6-F 179

Survey Expense Disbursements by ObJect of Expenditure, Analy-

sis of (19331

Schedule 8-B 68

Survey Expense Disbursements by ObJect of Expenditure, Analy-

sis of (1934~,

Schedule 8-B 183

Survey Expense Disbursements by Congressional Districts and

Division Units, Analysis of (1933'

Schedule 10-C 79

Survey Expense Disbursements by Congressional Districts and

D-,ivision Units, Analysis of r1934j

__ Schedule 10-C 195

Asphalt Department-Completed ProJects (1933j

148

Asphalt Department-Completed ProJects (1934::

276

Asphalt Department -Projects under Construction (1934:,

278

B

Bridge Mileage Completed by Congressional Districts :1933)

133

Bridge Mileage Completed by Congressional Districts r1934) _

259

Bridge Mileage Completed by Engineering Divisions (1933> _

133

Bridge Mileage Completed by Engineering Divisions (1934) _

259

Bridges Completed (1933) _

129

Bridges Completed r1934]

257

c

Comments-Engineering

27

Bridges

27

General

29

Laboratory

29

Maintenance

28

Roads

27

State Forces_

28

Convict Department-Completed Projects (1933)

148

Convict Department-Completed Projects (1934)

277

Con viet Department- Projects under Construction (1934)

279

F

Federal Aid -Completed Mileage in Ten Southeastern States

40

G Gasoline Tax, Distribution of, to Counties __

--- 37

H

History of State Highway Board Membership__

8

289

INDEX - -Continued

L

Laboratory -Materials Tested '1933)_

153

Laboratory- Materials Tested ~1934~

285

Letter of Transmittal

7

M

Maintenance Organization Chart

265

Maintenance Personnel by Engineering Divisions r1933',

140

Maintenance Personnel by Engineering Vi visions 1934,_

266

Maintenance- Typical Personnel and Equipment in Patrol __

266

Mileage by CommissiOners Divisions (1933)

106

Mileage by Commissioners Divisions r1934)_

229

Mileage by Congressional Districts )933: _

106

Mileage by Congressional Districts 1934',

229

Mileage by Counties -Showing Commissioners Districts, Congres-

sional Districts, Engineering Divisions, Area, Population and

Percentages__

31

Mileage by Engineering Divisions 11933',

106

Mileage by Engineering Divisions )934'

229

0

Officials and Personnel of the State Highway Department

10

Organization Chart

ll

p

Purchasing

30

R

Roadway Mileage Placed under Construction r1933)

107

Roadway Mileage Placed under Construction r1934)

__ 230

Roadway Mileage Placed under Construction by Congressional Dis-

tricts (1933)

__ 116

Roadway Mileage Placed under Construction by Congressional Dis-

W~)~~

W

Roadway Mileage Placed under Construction by Engineering Divi-

sions (1933)

115

Roadway Mileage Placed under Construction by Engineering Divi-

sions '1934_'

246

T Trucks, Tractors, Graders, etc., Inventory of

-- 268

290