FIFTEENTH REPORT
OF THE
STATE HIGHWAY BOARD OF GEORGIA
TO THE
GOVERNOR AND GENERAL ASSEMBLY
OF 'fHE
STATE OF GEORGIA
FOR THE
FISCAL YEARS ENDING JUNE 30, 1933 AND JUNE 30, 1934
CONTENTS
PART ONE- INTRODUCTORY, COMMENTS AND GENERAL INFORMATION.
PART TWO- FISCAL YEAR ENDING JUNE 30th, 1933
PART THREE- FISCAL YEAR ENDING JUNE 30th, 1934
PART ONE
INTRODUCTORY, COMMENTS AND GENERAL INFORMATION
To His ExcELLENCY, HoNORABLE EuGENE TALMADGE, GovERNOR oF GEORGIA, ATLANTA, GEORGIA. DEAR SIR:
In compliance with the law applying to the duties of the State Highway Board of Georgia, we are submitting to your Excellency for consideration, a report of the activities of the Board for the fiscal years ending June 30, 1933 and June 30, 1934.
The tables in this report give a comprehensive review of the activities of the State Highway Board for the two years covered in the report.
We wish to thank your Excellency for the splendid cooperation given us during our tenure of office.
Respectfully submitted, STATE HIGHWAY BOARD OF GEORGIA
ByW. E. WILBURN, Chairman, MAx L. MvRAE, Member, JoHN A. HEcK, Member,
7
STATE HIGHWAY BOARD OF GEORGIA
HISTORY OF STATE HIGHWAY BOARD MEMBERSHIP 1916 THROUGH JUNE 30, 1934
The State Highway Department of Georgia was created by Act of Legislature, August 16, 1916, and a Highway Commission was appointed composed of the three members of the Prison Commission, together with the State Geologist, the Dean of the College of Civil Engineering of the State University, and the Professor of Highway Engineering at the Georgia School of Technology.
The original Highway Commission consisted of the following members:
T. E. PATTERSON, Chairman, Member of Prison Commission.
E. L. RAINEY, Member of Prison Commission.
J. E. DAVIDSON, Member of Prison Commission.
S. W. McCALLIE, State Geologist. C. M. STRAHAN, Professor of Civil Engineering, State University. R. D. KNEALE, Professor of Civil Engineering, Georgia School of Technology.
The above Commission served until the reorganization of the Highway Department, by Act of Legislature approved August 18, 1919.
This Legislature of 1919 provided that the State Highway Department of Georgia reorganized and reconstructed should be managed and controlled by the State Highway Board, which should consist of three members appointed by the Governor, one from each of three divisions of the State and the boundaries of each division were named. The term of office of initial appointees to be two, four and six years, after which each new member to serve six years.
The Appointments to the newly reorganized State Highway Board and their successors with term of office follows:
8
Name of Member
Title
Appointed By I Term Began Term Ended I
Remarks
i~itial t~= ----- --------
C. M. Strahan __ _
Chairman___ Governor Dorsey ___ Sept. 1, 1919_ ,Dec. 31, 1921 I Expiration of
two year
Stanley S. Bennet_
Member _____ Governor Dorsey ___ Sept. 1, 1919_ Dec. 31, 1923_ Expiration of initial four year term.
R. C. Neely_
Member_ ____ Governor Dorsey ___ :Sept. 1, 1919_ Oct. 27, 1923_ Died in office.
John N. Holder
Chairman ___ Governor Hardwick'Jan. 1, 1922 __ June 2, 1929. Succeeded C. M. Strahan
W. T. Anderson
Member_ ____ Governor Walker_ __ Nov. 1, 1923 __ July, 1925_ __ Succeeded R. C. Neely.
Stanley S. Bennet
Member_ ____ Governor Walker_ __ Jan. 1, 1924 __ Dec. 31, 1929_ Reappointed.
John R. Phillips_
Member _____ Governor Walker ___ Aug. 1925 ____ Dec. 31, 1933_ Succeeded W. T. Anderson
Sam Tate __
Chairman ___ Governor Hardman June 4, 1929_ April 1, 1930_ Succeeded John N. Holder.
W. C. Vereen _
Member ____ Governor Hardman Jan. 1, 1930__ June19, 1933 Succeeded Stanley S. Bennet.
J. W. Barnett __ _
Chairman_ _ Governor Hardman April 1, 1930_ June 19, 1933_ Succeeded Sam Tate.
J. P. Wilhoit_
Member ____ !Governor RusselL_ Jan. 1, 1932 __ June 19, 1933_ Succeeded John R. Phillips.
J.P. Wilhoit __
Officer in
<0
Charge ____ Governor Talmadge June 19, 1933_ July 20, 1933. Appointed officer in charge.
J. J. Mangham_
Chairman ___ Governor Talmadge July 20, 1933_ Nov. 21, 1933_ Succeeded J. W. Barnett.
W. E. Wilburn_
Member_ ____ Governor Talmadge July 20, 1933_ Nov. 21, 1933_ Succeeded J.P. Wilhoit.
Max L. McRae
Member_ ____ Governor Talmadge July 20, 1933_ Still in office_ Succeeded W. C. Vereen.
W. E. Wilburn_
Chairman___ Governor Talmadge Nov. 21, 1933_ Still in office_ Appointed Chairman.
John A. Heck_
Member_ ____ Governor Talmadge Nov. 21, 1933_ Dec. 31, 1933_ Succeeded J. J. Mangham.
John A. Heck
Member____ Governor Talmadge Jan. 1, 1934 __ Still in office_ Reappointed to full term.
OFFICIALS AND PERSONNEL OF THE STATE HIGHWAY DEPARTMENT CORRECTED PRIOR TO PUBLICATION
- - - - - - - --~-~--
Name
,
Title
I Location
W. E. Wilburn __ Max L. McRae John A. Heck __ F. P. Vanstory.
Ichairman, State Highway Board . _!Atlanta
Member, State Highway Board .. __ -/McRae
!Member, State Highway Board_. __ 1Marietta
1
lse~~~~Ka~Zr~asurer, s~ate High- A1 tlanta
B.S. Miller.... _
Assistant Attorney-General
Atlanta
H. E. Newton __ ___ State Highway Engineer. __ ____ Atlanta
E. N. Seymour__
Office Engineer __ ..
__Atlanta
C. N. Crocker.____ !Bridge Engineer. __
_Atlanta
Geo. C. Blount____ __,Maintenance Engineer_
___ Atlanta
W. J. Clarke __________ Locating Engineer _______ _ ____ Atlanta
J. E. Boyd____________ Testing and Research Engineer. __ Atlanta
H. G. Smith ___________ First Division Engineer. ___ ____ Fitzgerald
E. Jack Smith ______ Second Division Engineer _______ Macon
L. J. Bahin_ _____ __Third Division Engineer
__ East Point
S.D. Grant_ ________ Purchasing Agent_______________ Atlanta
10
STATE
HIGHWAY BOARD OF
ORGANIZATION CHART
APRIL 7 I~
GEORGIA
CH.M'1'3 $. (All A!I!IT.S
ACCOUNTING
The section of this Annual Report devoted to statements from the Treasurer reflects the financial condition and activities of the State Highway Board for the fiscal years July 1, 1932 to June 30, 1933 and July 1, 1933 to June 30, 1934. The fiscal year ended June 30, 1933, is included in Part Two, and the fiscal year ended June 30, 1934, is included in Part Three. Each section is composed of separate Exhibits and Schedules for the year.
The financial condition of the State Highway Board, at the close of the fiscal year, is reflected in Exhibit "A," Statement of Assets and Liabilities. A Reconciliation of the Fund Surplus, reflecting Fund Revenues, Appropriations, and Allotments is given in Exhibit "B." Exhibit "C" reflects Revenue Receipts and Expense Disbursements. Exhibit "D" in Part No. 3 is a Comparative Statement of Revenue Receipts and Expense Disbursements for fiscal years ended June 30, 1931, 1932, 1933, 1934. These Exhibits are supported by various Schedules, which analyze the financial results for the fiscal years.
EXHIBIT "A" STATEMENT OF ASSETS AND LIABILITIES-
FUND BALANCES CURRENT ACCOUNT POSITION
A comparative summary of the current financial condition at June 30, 1934, as compared with June 30, 1933 and June 30, 1932, is presented as follows:
Description
June 30,
I 1932
June 30,
I 1933
June 30, 1934
ASSETS
DCeufrerrernetdAAsssseettss-_-_-_-_-_-_-
$1,576,425.25 261,357.05
$1,398,188.54 179,837.64
$5,441,282.67 197,422.80
I
TOTAL ___________ $1,8~,782.30 ~,.!>~~26.1~1~~~fi;~=
LIABILITIES &
RESERVES Current Liabilities ___ $ 106,604.86 $ 103,499.09 Fund Balances _______ 6,002,407.98 3,867,400.50 Reserves______________ 1 899,442.67 568,680.04
TOTAL _______ ---1$7,008,455.51 $4,539,579.63
I FUND SURPLUS (OR)
DEFICIT Current Deficit
___ -~5,170,673.21
2,961,553.45
Current Surplus __
$ 750,600.00 3,555,701.97
379,042.60 $4,685,344.57
953,360.90
TOTAL
----1$1,_37,782.30 1$1,578,026.18 I $5,63~'7'()~47_
- - - - - - - - - - - - =-===t=====~----
12
Particular attention is directed to the current surplus of $953,360.90 on June 30, 1934, as compared with a current deficit of $2,961,553.45 on June 30, 1933, and a current deficit of $5,170,673.21 onJune30, 1932.
The surplus or deficit balance at the close of the fiscal year constitutes State funds and is exclusive of the available balance of unallotted Federal funds. The available Federal funds (representing funds against which contracts had not been let) on June 30, 1934, amounted to $3,540,810.36 as compared with $250,885.34 on June 30, 1933, and $1,985,086.36 on June 30, 1932.
In arriving at the current surplus or deficit at the close of a fiscal year provision is made not only for all actual liabilities; but also, for contractual obligations not yet matured, including outstanding purchase orders, balances of specific allotments for State force work, and sundry reserves. Consideration is given to amounts due from participating agencies only when corresponding contract is let and liability accrued. A surplus acts as an enhancement to the revenue for the succeeding year; whereas, a deficit is forwarded to the succeeding year as an incumbrance.
CAPITAL ACCOUNT POSITION
Capital assets, liabilities and surplus are shown in a separate section of Exhibit "A" and are not considered in the current financial position. The capital account items as of June 30, 1934, are summarized as follows:
Description
June 30, 1934.
CAPITAL ASSETS Land, Buildings and Equipment _____________ $ 1,556,925.25 Roads and Bridges Construction cost to date__________________ 132,374,638.70
Total Assets ______________________________ $~3, 931 ,563.~
CAPITAL LIABILITIES Highway Refunding Certificates ______________ $ 26,637,282.87
CAPITAL SURPLUS Surplus Invested in Plant and Equipment_ __ $ 1,556,925.25 Surplus Invested in Highways_______________ 105,737,355.83 Total Surplus ___________________________ $107,294,281.08
Total Liabilities & Surplus _______ _
13
Fixed Assets, representing land, buildings, and equipment, are appraised at the close of each fiscal year and their values adjusted through Surplus Invested in Plant and Equipment. Additions and replacements during the year are charged as an expense disbursement but capitalized at the close of the fiscal year and credited to Surplus Invested in Plant and Equipment.
Roads and Bridges, construction cost to date, represents total expenditures since the beginning of the State Highway Board of Georgia. During the fiscal years ended June 30, 1933 and June 30, 1934, construction cost to date was increased in the amount of $20,242,953.96 as follows:
Roads & Bridges, construction
Cost to June 30, 1932__
________________ $112,131,684.74
Construction Expenditures
Fisca1year ended June 30, 1933 _____________ $ 11,369,631.60
Fiscal year ended June 30, 1934___
8,873,322.36
$ 20,242,953.96
Roads & Bridges, construction cost to June 30, 1934 ____ _
State of Georgia, Highway Department Refunding Certificates have been issued in accordance with the provisions of an Act of the General Assembly of Georgia, approved March 1, 1933, and as amended by another Act approved March 22, 1933. These certificates are for the purpose of refunding to the several counties of this State and the Coastal Highway District, funds advanced for construction of roads on the State Highway System, under the supervision of the State Highway Department prior to September 1, 1931. Ten per cent of the amount owing is due and payable on March 25, 1936, and each year thereafter for ten years. The certificates are transferable but non-interest bearing.
The original issue of certificates amounted to $26,516,763.29. Supplementary certificates in the amount of $120,519.58 were issued to Richmond County in accordance with an order from the Judge of the Clarke Superior Court on December 14, 1933. The total outstanding certificates on June 30, 1934, amounted to $26,637,282.87 as shown in Schedule No.5.
Capital surplus which is a contra to accounts with property has been split into two amounts; namely, Surplus Invested in Plant and Equipment, $1,556,925.25, and Surplus Invested in Highways, $105,737,355.83. Capital Surplus represents the amount from revenues invested in property and should not be confused with the current surplus, which is essentially a surplus of money, having to do with cash or with resources expected to become cash, such as accounts receivable and similar items.
14
EXHIBIT "B"
RECONCILIATION OF FUND SURPLUS (OR) DEFICIT
This exhibit reconciles the Fund Surplus or Deficit at the beginning of the year with the Fund Surplus or Deficit at the close of the year, and thereby reflects the Fund Revenue as accrued, Appropriations, Allotments, and Reserves.
EXHIBIT "C" STATEMENT OF REVENUE RECEIPTS AND EXPENSE
DISBURSEMENTS REVENUE RECEIPTS
A comparative summary with relative percentages as taken from Exhibit "C," of the Revenue Receipts for fiscal years ended June 30, 1933 and June 30, 1934, is presented as follows:
Do"rtptlon
Year Ended
Year Ended
1 1
June 30, 1933
June 30, 1934
.I roe~;~ :1-~~~unt -~\ ro~~r~_i - ~moun~~
REVENUE
I
'
RECEIPTS State Treasurer
-II
I 1
I
62.38% !'$ 8,906,992.771
'I
70.94% $10,012,623.15
Counties, Cities I
&Railroads ______ 02.02 . 289,103.33 00.29 , 40,465.04
Federa1Government 35.47 I 5,065,020.341 28.68 : 4,048,503.74
Miscellaneous Income .. _ TOTAL...
[
I
i
i
1 00.13
18,852.02 00.09 'I
12,244.63
.l100_.()llf'~I~!..~!!;9_E>S~!!l _1()().Q_%_1!1!'c~E~_E3_3~~
STATE FUNDS
Revenue Receipts from State funds are entered on the records
when credit is passed to the State Highway Board of Georgia by the State Auditor and not when the funds arc remitted on executive warrant. This revenue therefore represents the State Highway Board's pro-rata share of collections as made by the State Treasurer and includes at all times the unremitted balance of State funds due to the State Highway Board of Georgia.
An analysis of State funds is as follows:
Description
Year Ended June 30, 1933
Year Ended June 30, 1934
Motor Vehicle Fees___ ____ $1,120,670.19
Gasoline Taxes_________
7, 786,322.58
$ 1,233,125.52 8,779,497.63
TOTAL
__ $_13_,_(J(l~, ()!")~~'7'_7
:Bl~1;~~:3_.~
15
Motor Vehicle Fees represent collections from motor vehicle license tags and common carrier mileage and license fees; as credited to the State Highway Board of Georgia. 'fhese credits reflect an increase for the year ended in 1934 as compared with the year ended in 1933 of $112,455.33.
Gasoline 'faxes represent the State Highway Board's pro-rata share of collections under the Fuel Oil Tax Law. These credits reflect an increase for the year ended in 1934 as compared with the year ended in 1933 of $993,175.OS.
COUNTIES, CITIES AND RAILROADS
Revenue receipts from this source are analyzed as follows:
Description
Year Ended June 30, 1933
Year Ended June 30, 1934
Counties ___ _ Cities ________ _
Railroads ___ _
$276,143.27 4,733.08 8,226.98
$24,935.82 320.00
15,209.22
TOTAL_____ _
$289' 103.33
$40,465.04
- - - - - - -- -- -- - - - - - - -
Revenue receipts from counties represent contract credits and adjustments to county cash participation, on construction contracts executed prior to September 1, 1931. Reimbursement certificates covering these credits and adjustments were issued prior to March 1, 1933, and therefore included under the amount set up in the Act of the General Assembly of Georgia, approved March 1, 1933.
Revenue receipts from cities represent contributions in connection with construction work; whereas, receipts from railroads reflect their participation in the elimination of grade crossings.
FEDERAL GOVERNMENT
Revenue receipts from the Federal Government are analyzed
as follows:
Description
Year Ended June 30, 1933
Year Ended June 30, 1934
Federal Aid Vouchers________ $5,065,020.34 National Recovery Vouchers __
$1,139,345.52 2' 909' 158.22
TOTAL___________________ ~_,_()65,0~~!_-
$4,04~_._1i~24
Federal funds allotted to the State Highway Board of Georgia are considered under revenue receipts only as expenditures on Federal projects are made and the corresponding reimbursement vouchers are forwarded for collection to the Bureau of Public Roads.
16
Appropriations of Federal funds are recorded on the records as Estimated ReYenue when notice of apportionme:1t is received from the Bureau of Public Roads. During the fiscal year 1933 there was an emergency apportionment by the Federal Government in the amount of $3,123,298.00 and during the fiscal year 1934 a ~ational Recovery apportionment of $10:091,185.00.
A reconciliation of unallotted balances, Federal funds, is as follows:
Description
Year Ended June 30, 1933
Year Ended June 30, 1934
Unallotted Balance beginning of year _
-- $1,985,086.36
$ 250,885.34
Federal Apportionments Federal Emergency Funds National Recovery Funds
TOTAL_ _ Allotted to Projects_
3,123,298.00
-- $5,108,384.36 4,857,499.02
10,091,185.00
$10,342,070.34 6,801,259.98
Unallotted Balance end of year __ _
$ 250,885.34
The unallotted balance is dropped at the close of the fiscal vear with the elimination of estimated reYenues which haye not been realized; however, it is included and recorded in the succeeding year as part of the estimated revenue for that year.
As contracts are let the Federal funds specifically allotted to the projects are recorded as Construction Estimated Participation. Reimbursement vouchers are credited and the balances adjusted to actual participation upon completion of the projects.
A reconciliation of the estimated participation accounts, Federal funds, is as follows:
Description
Year Ended June 30, 1933
Year Ended June 30, 1934
Estimated Participation beginning of year ____ _
Allotted to Projects _
TOTAL ______ _ Reimbursement vouchers __ _
- $1,310,482.87 4,857,499.02
$6' 167' 981.89 5,065,020.34
$1 '102' 961.55 6,801,259.98
$7,904,221.53 4,048,503.74
Estimated Participation end of year __ _
$1 '102' 961.55
--
-
$3,855,717.79
17
The estimated participation balances on June 30th are shown in Exhibit "A" as a deduction from contractual obligations on Federal projects. This reduces the contractual obligations to a net State liability.
Federal funds apportioned to the State Highway Board of Georgia since the beginning of the Department are as follows:
Regular_____ National Recovery_ ____ Emergency Advance___ Emergency ______ Flood Relief National Forestry _
____ $33,759,273.80
10,091, 185.00
2,077,996.00 3,123,298.00
505 , 167 . 50
7l ,031.84
TOTAL_
The second National Recovery apportionment in the amount of $5,113,491.00 for fiscal year 1935 has not been included in the foregoing figures.
MISCELLANEOUS INCOME
Represents revenue receipts from sundry and miscellaneous sources in the amount of $18,852.02 for fiscal year 1933 and $12,244.63 for fiscal year 1934.
EXPENSE DISBURSEMENTS
A comparative summary with relative percentages as taken from Exhibit "C", of the Expense Disbursements for fiscal years ended June 30, 1933 and June 30, 1934, are as follows:
Description
Year Ended June 30, 1933
Percent to Total
Amount
Year Ended June 30, 1934
Percent to Total
Amount
EXPENSE DIS-
1
BURSEMENTS
Administration __
C o n s t r u c t i o n __
Maintenance_
Land,Bldgs.& Equipt
Legislative Transfers
03.21% 79.09 09.62 00.45 07.63
$ 466,957.07 ll,496,948.04 1,399,327.47 64,477.08 1,108,909.15
02.79% $ 298,666.02
84.26 9,016,229.07
11.19 1' 197,088.11
01.25
133,906.93*
00.51
54,368.05
TOTAL ____ _1~~_y"=ri!l.'!-.~6. 618.81 100.00% $10,700,258.18
*Includes equipment overhauls in the amount of $37,064.64.
Comments upon the various expense classifications are next in order as they appear in the foregoing summary; followed by a summary of disbursements classified as to administrative and supervisory charges, direct charges and transfers.
18
ADMINISTRATION
Administration is the function of management or direction and consists of the general planning, the establishing of policies, the issuance of orders and instructions, and the control of the forces and work which they are doing, both in the general office and the division offices.
Administration disbursements are analyzed as follows:
Description
Year Ended June 30, 1933
Year Ended June 30, 1934
General Administration General Offiice
Division Offices_
Warehouse __ _
- $294,317.75 66,853.16 18,298.48
TOTAL _______ _
-- $379,469.39
Research __
--- --- - 7,103.81
Collection of Revenue
79,507.38
Quarry_
876.49
TOTAL
$466,957.07
$200,819.7 4 39,104.74 13,509.19
$253,433.67 2,480.03
41,812.11 940.21
$298,666.02
'l'hese figures reflect a decrease or savings in Administration cost for fiscal year 1934 as compared with 1933 of $168,291.05.
The Administration cost for fiscal year 1933 as expressed in percentage to total disbursements is 03.21%; whereas, for 1934 the percentage is 02.79% or a decrease in percentage to total disbursements of 00.42%.
The percentage comparison does not reflect as great a decrease as in actual dollars, because of a decrease in total disbursements for 1934; however, it does reveal a cut in Administration cost in a greater proportion than the decrease in total disbursements. An examination of past years shows that a decrease in total disbursements has caused an increase in Administration percentage to total disbursements, rather than a decrease as reflected for fiscal year 1934.
A detail analysis of Administration disbursements may be found in Schedules No. 8-A and No. 10-A,
19
CONSTRUCTION
Construction disbursements arc analyzed as follows:
Description
Year Ended June 30, 1933
Year Ended June 30, 1934
Surveys Actual Surveys Plans _____ _
- $ 63,894.45 63,421.99
$ 71,670.68 71,236.03
TOTALS
_$ 127,316.44
$ 142,906.71
Construction Supervision Direct .. _
_$ 672,861.64 10,696,769.96
$ 392 ,117. 74 8,481,204.62
TOTALS __ _
$11,369,631.60
$8,873,322.36
TOTALS _
$11,496,948.04
=$9=.0=16=.2=29=.0=7
Survey disbursements represent a preliminary construction cost. 'fhese charges are presented so as to show the cost of actual surveys conducted in the field separate from the cost of plans prepared in the General Office.
The ratio of cost of plans to actual surveys is practically the same for the two years.
A detail analysis of Survey disbursements may be found in Schedules No. 8-B and No. 10-C.
Actual Construction disbursements are separated into two classes; namely, supervision charges and direct charges.
Supervision is the function of engineering and inspection and consists of furnishing inspection while the work is in progress, testing materials, preparing monthly statements and reports, and such other operations of a strictly engineering nature.
Direct is the function of actual building costs for roads and bridges and consists of contractual payments, and in the case of work done by State forces, the furnishing of labor, materials, supplies, etc., used in the work.
An examination of the foregoing summary reveals a decrease or savings in Construction supervision cost for fiscal ye'lr 1934 as compared with 1933 of $280,743.90.
Supervision cost for fiscal year 1933 as expressed in percentage to Construction direct disbursements is 06.29%; whereas, for 1934 the percentage is 04.62% or a decrease in percentage to total direct disbursements of 01.67%.
A statement of Construction allotments (representing estimated cost of work let to contract or begun by State Forces) rather than Construction disbursements more clearly presents the construction activities in the fiscal year 1934, as the work placed under construction greatly exceeds the disbursements for same. The
20
unexpended balance of course being represented by contractual obligations on June 30, 1934, as shown in Exhibit "A."
The Construction allotments for the fiscal year 1933 were $7,848,586.03 as compared with Construction disbursements of $11,369,631.60. The Construction allotments for the fiscal year 1934 were $11,312,809.36 as compared with Construction disbursements of $8,873,322.36.
A summary of Construction balances, allotments and disbursements are as follows:
Description
Year Ended June 30, 1933
Year Ended June 30, 1934
Unexpended Balances, beginning of year __
$ 8,146,338.87
$ 4,720,037.39
Construction Allotments.
7,848,586.03
ll ,312, 809.36
TOTAL ____ _
. __ $15,994,924.90
$16,032,846.75
Construction Disbursements ____$11, 369,631.60
$ 8, 873,322.36
Unliquidated Encumbrances__
94,744.09 Or.
7,179.50
TOTAL_ ______ _
$11,274,887.51
$ 8,880,501.86
Unexpended Balances end of Year. _________ _
__ $ 4,720,037.39
$ 7,152,344.89
=----=====
A detail analysis of Construction disbursements may be found in Schedules No. 8-B, No. 10-B and No. 12.
MAINTENANCE
Maintenance disbursements are analyzed as follows:
Description
Year Ended June 30, 1933
Year Ended June 30, 1934
General
Supervision Direct__
$ 82,674.30 1, 306,631.06
$ 79,507.15 1, 051,282.24
TOTALS __
- $1,389,305.36
$1,130,789.39
Reconstruction Supervision __ Direct _______ _
TOTALS
TOTALS_
-- $ 10,022 .ll $ 10,022.11
$
143.39
66,155.33
$ 66,298.72
21
1\faintenance disbursements are divided into two sub-activities; namely, General Maintenance and Reconstruction.
General Maintenance represents the ordinary or routine maintenance work; whereas, Reconstruction represents extraordinary maintenance of a reconstruction nature, which can be properly allocated and charg-ed to a particular project. There is very little distinction between these two sub-activities as both reflect disbursements necessary in keeping each type of roadway, structures and facilities in a usable condition.
Maintenance disbursements are also separated as to supervision charges and direct charges. These two functions are the same as commented upon under Construction disbursements.
An examination of the foregoing summary reveals a decrease or savings in Maintenance supervision for fiscal year 1934 as compared with 1933 of $3,023.76.
Total Maintenance disbursements for fiscal year 1934 of $1,197,088.11 compared with total disbursement for 1933 of $1,399,327.47 reflect a reduction of $202,239.36; and when compared with fiscal year 1932 in the amount of $2,130,327.77 a reduction of $933,239.66.
A detail analysis of Maintenance disbursements may be found in Schedules No. 8-C, No. 10-D and No. 10-E.
LAND, BUILDINGS AND EQUIPMENT
Land, Buildings and Equipment disbursements are as follows:
Description
Year Ended June 30, 1933
Year Ended June 30, 1934
Land, Buildings & Equipment NewEquipment__ __________
Major Overhauls, Charged as Equipment-1934
$64,477.08
$96,842.29 37,064.64
TOTALS _
$64,477.08
=====-------=
~~3.f!~~=
Disbursements represent the purchase of necessary equipment replacements and also, for the fiscal year 1934, the cost of rebuilding by the Central Shop certain major equipment in use by the State Force outfits. This work put under way in 1933.
A detail analysis of Land, Buildings and Equipment disbursements, classified as to detail object of expenditure and function to which assigned, may be found in Schedule No. 8-D.
22
LEGISLATIVE TRANSFERS
Legislative Transfers are analyzed as follows:
Description
Year Ended June 30, 1933
Year Ended June 30, 1934
W. & A. Rental Warrants Prison Farm Purchase~~~~ Motor Vehicle License Tags~~
$1,080,000.00 5,118.76
23,790.39
$ 2,719.85 51,648.20
TOTAL
~ !1~~. 9Qfl,2~
$ 54,368.05
~------
Disbursements classified as W. & A. Rental Warrants, in the
amount of $1 ,080,000.00, represent Western and Atlantic Rail-
road Rental Assignment Warrants purchased at face value by
the State Highway Board of Georgia; in accordance with the
provisions of an Act of the General Assembly of Georgia in 1931.
Similar disbursement in the amount of $540,000.00 was made
during the fiscal year 1932.
W. & A. Rental Warrants purchased by the State Highway
Board of Georgia total $1,620,000.00 and are due monthly from
January 1, 1941 to December 1, 1943, inclusive, in the amount
of $45,000.00.
The Act provides that the Governor and the State Highway
Board are authorized to sell the warrants to match regular Federal
Aid or any emergency fund which might be offered the State High-
way Board by the Federal Government.
The warrants have not been discounted by the State Highway
Board of Georgia.
Disbursements classified as Prison Farm Purchase represent
payments made in accordance with the provisions of an Act of
the General Assembly in 1931. This Act made available the
amount of $200,000.00, from any funds allocated to the State
Highway Board of Georgia, for the purpose of buying lands and
equipping a prison farm. The fund to be expended when the
same might be necessary in the judgment of the Prison Commis-
sion of Georgia and concurred in by the Governor.
When requested by the Prison Commission, transfers of funds
are made to them from this allocation of $200,000.00. Disburse-
ments to June 30, 1934, are as follows:
Description
Amount
Allocation of funds, in accordance with Act
$200,000.00
Transfers of funds to Prison Commission For Fiscal Year 1931 ___ .
For Fiscal Year 1932_ For Fiscal Year 1933_ __ ~ For Fiscal Year 1934 ~ ~ ~ ___ ~ __
$ 2,109.80 124,186.93 5,118.76 2,719.85
TOTAL.-----------~ __ ~--~-----
~~-- $134,135.34
Unexpended balance, June 30, 1934___________ ~ ____~~5, ~~~~
23
The unexpended balance is carried in Exhibit "A" as a Fund balance.
Disbursements classified as Motor Vehicle License Tags represent transfers of funds to the Prison Commission and Revenue Commission to cover the cost of tags, and is in accordance with the provisions of an Act of the General Assembly. The payments amounted to $23,790.39 for fiscal year 1933 and $51,648.20 for fiscal year 1934.
EXPENSE DISBURSEMENTS CLASSIFIED AS TO ADMINISTRATIVE-SUPERVISORY CHARGES, DIRECT CHARGES, AND TRANSFERS
The total disbursements have been divided into the five general
lines of actiYity as shown in the foregoing comments and stated
as follows:
(I) Administration
(2) Construction
(3) Maintenance
(4) Land, Buildings and Equipment
(5) Legislative Transfers
The first three of these general lines of activity include both
direct, and administrative-supervisory charges. The latter is
composed of Administration, Construction Supervision and Main-
tenance Supervision.
A summary of disbursements, classified as to administrative-
supervisory charges, direct charges, and transfers is given as
follows:
Year Ended
Year Ended
June 30, 1933
June 30, 1934
Description
Amount
Amount
ADMINISTRATIVE- -SUPERVISORY CHARGES
Administration __
Construction Supervision Maintenance Supervision
$ 466,957.07 672,861.64 82,674.30
$ 298,666.02 392,117.74 79,650.54
TOTAL
- $ 1,222,493.01
$ 770,434.30
DIRECT CHARGES Surveys __ Construction __ Maintenance_ Land, Bldgs., & Equipt.
$ 127,316.44 10,696,769.96 1,316,653.17
64,477.08
$ 142,906.71 8,481,204.62 1,117,437.57 133,906.93*
TOTAL _
$12,205,216.65
$ 9,875,455.83
LEGISLATIVE TRANSFERS
Legislative Transfers_
$ 1,108,909.15
$ 54,368.05
Total Disbursements
$14,536,618.81
$10' 700' 258.18
*Includes equipment overhauls in the amount of $37,064.64.
24
These figures reflect administrative-supervisory charges for fiscal year 1933 of $1,222,493.01 as compared with corresponding charges for fiscal year 1934 of $770,434.30. This difference represents a savings in administrative-supervisory cost of $452,058.71 or as expressed in percentage a decrease of 36.98%.
The total direct charges, exclusive of l.egislative 'fransfers, for the fiscal year 1933 amounted to $12,205,216.65 as compared with $9,875,455.83 for fiscal year 1934. This difference represents a decrease in direct charges of $2,329,760.82 or as expressed in percentage a decrease of 19.09%.
The savings in administratin-supervisory cost is partially accounted for by the decrease in total direct charges, but the percentage reduction of 36.98% in the former as compared with 19.09% in the latter shows a decided savings in administrativesupervisory cost per dollar disbursed for direct charges.
GENERAL
A modern budgetary control system was installed in 1930 when all accounting was centralized in the General Office.
Under this Budget System, the accounts in the Treasurer's Office are not limited to the actual assets and liabilities, but include resources in the form of unearned estimated revenue for the fiscal year; likewise, other obligations in the form of appropriations of these revenues, specific allotments of the appropriations and encumbrances of the allotments.
The accounts representing unrealized fund resources and the commitments of these resources are known as "Fund" accounts. These fund or budget accounts are necessary as the activities of the State Highway Board are carried on in accordance with limitations and estimates set up in the Budget.
A Balance Sheet and correlative statements arc prepared monthly from the accounts. These financial statements are of great value as they reflect the exact financial condition on their respective dates; also, the budget position for the balance of the fiscal year.
All transactions affecting allotments, accounts payable, and disbursements, are recorded. By the use of collating forms several records are prepared in one operation and at the same time all account balances are automatically computed and all columns automatically totaled. Notwithstanding the fact that the volume of detail handled is very large, accurate statements are rendered promptly.
Additional analyses of all expenditures are obtained through the use of an electric tabulating machine in the Statistical Department. 'fhc detail expenditures and accumulated construction costs are analyzed so as to furnish information regarding source
25
of funds, cost, location, type and mileage of projects; also, object of expenditure, unit and activity classifications.
At various times the Accounting Department is called upon for numerous financial and statistical reports which are compiled promptly and accurately without delay or confusion; however, the preparation of same would be very difficult without the present system and tabulating equipment.
An audit has been made of this Department by the State Auditor for the period ended December 31, 1933, and the records were found in order, all funds being properly disbursed. The fullest cooperation has been received from the State Auditor's office, and, as stated in the last report, many beneficial suggestions were made by the examiners.
26
ENGINEERING
ROADS
Some of the secondary roads are now being improved with available local material such as sand clay, clay gravel, pebble soil and chert as a base with a course of asphalt as a wearing surface. Such pavements have been built and are now being built at costs of from four to eight thousand dollars per mile.
It is fully forseen that such low cost roads will have to be retopped and otherwise reconstructed periodically, but the cost of such work will be far less than a reasonable interest on the additional money that would have been required for high cost pavements. Such low cost roads will be adequate on many of our rural highways where traffic is and will be moderate for a long time to come.
The use of this type of construction renders better traffic service to the public since it enables the Board to surface many more miles of road than would otherwise be possible.
Survey parties are now operating under the direction of the division engineers with general supervision of the Locating Engineer from the General Office. These parties send their field note books to the General Office where all plans are prepared. The plans are made to conform with certain standards in order to secure uniformity. All plans are printed with our blue print machine and special prints are made with our photostat machine which save both time and money.
BRIDGES
Bridge construction has kept pace with road construction during this two year period. Roadway widths for bridges of 22 :feet and 24 feet have become standard, instead of the old 16 feet and 18 feet widths. The greater widths are necessary for safety with the increased volume and speed of traffic. The following materials, either alone or in combination, have been used to most economically meet the drainage requirements: Cypress timber, treated pine, structural steel and reinforced concrete. A tabulation of these are shown elsewhere in this report.
There were designed in the Bridge Department, during this period, bridges having a total length of 53,613 lineal feet or 10.154 miles.
The two bridge paint crews worked a part of this period painting 5, 763 lineal feet of bridges with lead and oil and aluminum paint.
27
MAINTENANCE
All State highways have been maintained by an efficient maintenance organization headed by the State 1\faintenance Engineer. Excellent results have been accomplished with the funds available for maintenance.
The Maintenance Department has three major divisions which are as follows: Office, Field and Equipment. The Office division consists of the administrative and supervisory direction of all maintenance operations. The Field division consists of patrol sections with an experienced road man in charge of each. The length of each section is approximately fifty miles. The Equipment division consists of a superintendent of equipment at the head of a corps of mechanics who actually repair and rebuild all State owned equipment. The heavy work is done at the general shop at East Point which is a thoroughiy modern garage.
Reports of all known accidents are sent to the General Office to be tabulated and filed. Tables of these accidents are given elsewhere in this report.
The latest road information is kept by this department and road maps, based on this information, are published monthly for free distribution to the public.
STATE FORCES
The Board has two groups of forces doing work directly with hired help and with convicts. The first group is known as the Asphalt Department, and the second as the Convict Department. These outfits were operated under a supervisor for State Asphalt outfits and a Supervisor of Convict forces. These positions have been abolished and the administration of these outfits is now handled by the Division offices.
The three units in the Asphalt Department are equipped for laying local bases and for placing asphalt tops. These outfits have been continuously in operation on various new construction and repair projects.
The Convict Department is made up of ten main prison camps, consisting of a personnel of approximately 700 convicts. These forces work mainly on grading and top soiling roads and in building local timber bridges.
28
LABORATORY
'l'he Laboratory operated in connection with the General Office in Atlanta has continued its very efficient service in controlling the quality of all materials entering into road and bridge construction. It has further extended its activities into research and investigation of new materials and new combinations of old materials for advancement of highway construction.
GENERAL
The State, for administration purposes, was divided into six highway divisions at the beginning of the period covered by this report. This set-up was changed on October 1, 1933, to reduce this to three highway divisions with offices at Fitzgerald, ),lacon and East Point, for the Southern, Central and Northern territories, respectively.
The State System contained 8196.816 miles on July 1, 1932, and 8876.218 miles on June 30, 1934, which is an increase of 679.402 miles for the two year period. The total length of pavement, based on completed projects, was 3422.090 miles on June 30, 1934.
29
PURCHASING
All purchases are made under the direct superv1s1on of the Purchasing Agent and on approval of the Chairman of the Board.
During the fiscal year ending June 30, 1933, the Purchasing Department issued a total of 15,752 orders and during the fiscal year ending June 30, 1934, issued a total of 16,469. These orders are divided into four groups as follows:
1. Orders issued for the purchase of road building material, supplies for the General Office and Division Offices, and groceries, clothing, stock feed and general supplies for the various Convict Camps, located at eleven different points in Georgia.
2. Orders issued for the purpose of Truck and machine parts, and other items used exclusively by the East Point Shop for repairs on equipment. This group also includes stock placed in the Warehouse at East Point and later drawn out as needed and also stock for the Stationery and Supply Department.
3. Orders issued to the Warehouse for shipment of items carried in stock.
4. Orders issued to cover the cost of work performed by the East Point Shop in repairing and rebuilding Equipment.
Competitive bids are obtained on all commodities, and purchase awards made to the lowest bidder meeting specifications. Such items as nails, grader blades, shovels, lubricating oil and grease, center line paint, etc., are purchased under yearly contract. The purpose of this method of buying is to reduce the cost.
Legal notices advertising for bids are published in the official organ of the County where material is to be used. Invitations covering specifications and quantities of various items are mailed out to all known manufacturers and dealers.
All commodities purchased are strictly required to meet specifications of the State Highway Board, and it is the duty of the Purchasing Department to see that the grade and price are in accordance with the Purchase Order issued, and if there is a discrepancy reported in grade or price, the Purchasing Agent adjusts any discrepancies before clearing the purchase for payment.
The Purchasing Agent, in addition to other duties, has jurisdiction over the Stationery and Supply Department. He also has the responsibility of checking freight rates, and has a man who is an expert in checking freight rates among the personnel of the Purchasing Department.
Under the present Administration, the Purchasing Department is handling the largest volume of work, with less overhead, smaller personnel, and in a more efficient manner, than at any time since the creation of the Highway Department.
30
ALPHABETICAL LIST OF COUNTIES SHOWING COM'RS. DIST., CONG. DIST'S., ENG. DIV'S., AREA, POPULATION, STATE MILEAGE AND PERCENTAGES.
Eng. Eng.
County
Com. Cong. Div. Div.
Dist. Dist. (1933) (1934)
- - --
Appling ________ l
11
6
l
Atkinson _______ l
11
6
l
Bacon ____ -----
l
11
6
l
Baker_ __________ l
2
5
l
Baldwin ________ 2 10
4
2
Banks _____
3
9
2
3
Barrow _________ 3
9
2
3
Bartow _________ 3
7
l
3
Ben HilL ------ l
3
5
l
Berrien_________ l
11
5
l
Bibb ___________ 2
6
3
2
Bleckley ________ 2 12
4
2
Brantley________ l
11
6
l
Brooks __________ l
11
5
l
Bryan __________ l
l
6
l
Bulloch_________ 2
l
4
2
Burke __________ 2
1
4
2
Butts___________ 2
6
3
2
Calhoun________ l
2
5
l
Camden ________ l
11
6
l
Candler ________ 2
l
4
2
CarrolL _________ 3
4
l
3
Catoosa_________ 3
7
l
3
Charlton _______ l
11
6
l
Chatham _______ l
l
6
l
Chattahoochee 2
4
3
2
Chattooga ______ 3
7
l
3
Area Sq. Miles
454 330 271 357 307 222 168 471 256 455 277 205 434 514 431 668 956 203 284 711 228 492 169 792 370 218 328
Pop. 1930 Census
13,314 6,894 7,055 7,818
22,878 9,703 12,401
25,364 13,047 14,646 77,042
9,133 6,895 21,330 5,952 26,509 29,224 9,345 10,576 6,338 8,991 34,272 9,421 4,381 105,431 8,894 15,407
Pop. Per. I
1
Sq1.9M30ile I Mileage I Mileage Mileage
Census . 7-1-32 6-30-33 6-30-34
29
62.715 62.505 62.805
21
49.343 49.343 49.343
26
32.940 32.940 46.426
22
42.670 42.670 42.670
75
44.893 45.261 45.261
44
36.650 36.650 36.650
74
33.339 40.269 40.269
54
66.954 76.254 76.254
51
19.201 37.851 37.851
32
56.160 56.160 56.160
278
49.165 49.165 49.165
45
32.425 32.425 32.425
16
48.548 48.548 53.884
42
75.785 75.785 76.385
14
62.056 62.056 62.056
40
72.211 81.228 88.128
31
93.092 93.092 93.092
46
31.058 31.058 51.249
37
53.950 53.950 53.950
9
57.103 72.903 72.903
39
27.050 27.050 27.050
70
74.310 74.548 74.548
56
15.853 15.853 15.853
6
43.838 43.838 43.950
285
58.316 58.316 61.393
41
43.032 42.482 42.482
47
33.130 46.380 46.380
Percentages 7-1-32
.7651 .6020 .4019 .5206 .5477 .4471 .4067 .8168 .2343 .6852 .5998 .3956 .5923 .9246 .7571 .8810 1.1357 .3789 .6582 .6967 .3300 .9066 .1934 .5348 .7115 .5250 .4042
Per-
I " cent- cent-
ages ages 6-30-33 6-30-34
.7355 .5807 .3876 .5021 .5326 .4312 .4739 .8972 .4454 .6609 .5785 .3816 .5712 .8918 .7302 .9558 1.0954 .3655 .6348 .8579 .3183 .8772 .1865 .5159 .6862 .4999 .5457
.7076 .5559 .5230 .4808 .5099 .4129 .4536 .8591 .4265 .6327 .5539 .3653 .6070 .8606 .6991 .9929 1.0487 .5774 .6078 .8213 .3048 .8398 .1786 .4952 .6916 .4787 .5225
ALPHABETICAL LIST OF COUNTIES SHOWING COM'RS. DIST., CONG. DIST'S., ENG. DIV'S.,
AREA, POPULATION, STATE MILEAGE AND PERCENTAGES.
--
------------ ---
-----
- - - ~-------
---
--- - --- - -
--
County
I
I
I Eng. I Eng. I Area
Com.ICong.l Div. Div. Sq.
Pop. 1930
----- - - --- -- - - - - - - - - - -
1Pop. Per. ,
!
,
Per- Per-
1 1
S
q. Mile 1930
1
I Mileage
1
I cent-
Mileage i Mileage ages
I
centages
i I
Percentages
1 - - 1Dist. ~~ist. (1933) (1934;1 Miles I Census --~--- 1 ------
I Census
--------
7-1-32 6-30-33 , 6-30-34 I 7-1-32 I 6-30-33
---1 -- ---1-
- - - - ----
I 6-30-34
-----
Cherokee ______ 3 9 I 1
3
429 20,003
47
Clarke _________ 3 ' 8 2
3
114 25,613
225
I 56.579 I 56.579 56.579 I .6903 I 35.886 3E.886 35.886 .4378
.6658 .4223
.6374 .4043
1
Clay_ _ __ _____ 1 i 3 I 5
1
203
6,943
34
37.411
I
37.411
I I
37.411
.4564
.4402
.4215
Clayton_________ 1 3 . 6 1 1
3
142 10,260
72
38 .772 I 38.772 38.772 .4730 .4562 .4368
Clinch __________ j 1 11
6
1
747
7,015
9
69.311 69.311 69.311 .8456 .8156 .7808
Cobb_ --------1 3
7
1
3
353 35,408
100
Coffee __ - -----I 1
11
6
1
632 19,739
31
Colquitt -------1 1
2
5
1
529 30,622
58
Columbia ______ -~ 2 10
4
2
350
8,793
25
Cook ________ 1 11
5
1
241 11,311
47
49.782 58.380 77.880 52.513 44.470
49.782 59.830 77.880 52.513 44.470
60.992 .6073 60.195 .7122 78.858 .9501
52.513 1 .6407
44.470 ' .5425
.5858 .7040 .9164 .6180 .5233
.6872 .6781 .8884 .5917 .5010
1(5 Coweta _________ , 2
4
3
2
443 25,127
57
78.155 78.155 78.155 .9535 .9196 .8805
Crawford _______ ! 2
6
3
2
319
7,020
22
51.720 62.820 62.820. .6310 .7392 .7077
-I Crisp
1
Dade __________ 3
3 7
5 1
1 3
277 17,343
186
4,146
63 22
41.651 24.100
41.651 41.651 24.100 24.100
.5081 .2940
.4901 .2836
.4692 .2715
Dawson _________ I 3
9
2
3
216
3,502
16
44.104 44.104 44.104 .5381 .5190 .4969
Decatur_ ---- i 1
2
5! 1
583 23,622
41
DeKalb_ -------: 3
5
2
3
272 70,278
258
Dodge ______ Dooly __
---I
2 2
12 3
4 3
2 2
431 21,599 397 18,025
50 45
70.600 41.384 49.827 67.615 1
70.600 42.218 49.827 67.615
70.600 42.218 79.677 67.615
.8613 .5049 .6079 .8249
.8307 .4968 .5863 .7957
.7954 .4756 .8977 .7617
Dougherty Douglas_
~I
1 3
2 5
5 1
1 3
342 22,306
208
9,461
65 46
5o .433 1 50.433 51.262 .6153
22.975 ' 22.975 34.925 .2803
.5934 .2704
.5776 .3934
Early ____
1
2
5
1
524 18,273
35
67.440 1 69.440 69.440 .8472 .8171 .7823
Echols ______ --I 1 11
6
1
362
2,744
Effingham __ I 2
1
4
2
448 10,164
Elbert Emanuel
~~~~::I
3 2
8 12
2 4
3 2
361 18,485 764 24,101
8
55.500 i 55.500 62.900 .6771 .6530 .7087
23
34.454 I 34.454 44.254 .4203 .4055 .4985
E1
74.952 74.952 74.952 .9144 .8819 .8445
32 i 118.757 I 116.232 116.232 1.4488 1.3677 1.3094
Evans --- - ---I 1
1
6
1
287
7,102
25
20 .578 . 20 .E78 20.578 .2511 .2422 .2319
ALPHABETICAL LIST OF COUNTIES SHOWING COM'RS. DIST., CONG. DIST'S., ENG. DIV'S., AREA, POPULATION, STATE MILEAGE AND PERCENTAGES.
County
Eng. I Eng. Com. Cong. Div. Div. Dist. Dist. (1933) (1934)
~- ~-
Fannin_________ 3
9
1
3
Fayette_________ 2
6
3
2
Floyd ___________ 3
7
1
3
Forsyth_________ 3
9
2
3
Franklin _______ 3
8
2
3
Fulton _________ 3
5
1
3
Gilmer_ _____ ---- 3
9
1
3
Glascock _______ 2 10
4
2
Glynn __________ 1 11
6
1
Gordon_________ 3
7
1
3
Grady __________ 1
2
5
1
Greene _________ 3
8
2
3
Gwinnett _______ 3
9
2
3
Habersham_____ 3
9
2
3
HalL ___________ 3
9
2
3
Hancock ________ 2 10
4
2
Haralson _______ 3
7
1
3
Harris __________ 2
4
3
2
Hart ____________ 3
8
2
3
Heard __________ 2
4
3
2
Henry __________ 2
6
3
3
Houston ________ 2 12
3
2
Irwin___________ 1 11
5
1
Jackson ________ 3
9
2
3
Jasper_ _________ 2
6
3
2
Jeff Davis ______ 1 11
6
1
Jefferson _______ 2 10
4
2
Area Sq. Miles
401 234 502 247 279 541 440 170 439 375 444 416 440 290 437 530 284 501 261 285 324 443 378 355 321 300 646
Pop.
1930 Census
Pop. Per.
Sq. Mile 1930 Mileage Mileage Mileage
Census 7-1-32 6-30-33 6-30-34
Percentages
7-1-32
Percentages
6-30-33
12,969 8,665
48,667 10,624 15,902 335,220
7,344 4,388 19,400 16,846 19,200 12,616 27,853 12,748 30,313 13,070 13,263 11,140 15,174 9,102 15,924 11,280 12,199 21,609 8,594 8,118 20,727
32
45.008 45.008 45.008 .5491 .5296
37
23.610 23.610 23.610 .2880 .2778
97
88.367 88.367 88.367 1.0781 1.0398
43
37.390 37.390 37.390 .4562 .4400
57
60.840 60.840 60.840 .7422 .7159
620
78.582 78.582 90.572 .9587 .9247
17
51.759 58.409 58.409 .6315 .6873
26 44
I
25.975 53.792
25.975 53.792
30.875 53.792
.3169 .6563
.3056 .6330
45
56.245 56.245 56.245 .6862 .6618
43
56.020 73.527 ' 73.527 .6834 .8652
30
60.300 ' 60.300 I 60.300 .7357 .7096
63
94.020 94.020 94.020 1.1470 1.1063
44
53.870 53.870 59.570 .6572 .6339
69
75.887 75.970 75.970 .9258 .8940
25
62.800 62.800 62.800 .7662 .7389
47
36.065 36.065 36.065 .4400 .4244
22
43.560 43.560 67 .060 .5314 .5126
58
57.940 57.940 57.940 .7069 .6818
32
45.570 45.570 45.570 .5560 .5362
49
44.950 44.950 61.890 .5484 .5289
26
63.850 63.850 63.850 .7790 .7514
32
46.230 56.330 56.330 .5640 .6628
61
72.003 72.003 72.003 .8784 .8473
27
60.250 59.151 59.151 .7350 .6960
27
24.806 22.560 22.560 .3026 .2655
32
101.400 101.400 101.400 1.2371 1.1931
Percentages 6-30-34
.5070 .2660 .9956 .4212 .6854 1.0204 .6581 .3478 .6060 .6337 .8283 .6794 1.0592 .6711 .8559 .7075 .4063 .7555 .6528 .5134 .6972 .7194 .6346 .8112 .6664 .2541 1.1424
ALPHABETICAL LIST OF COUNTIES SHOWING COM'RS. DIST., CONG. DIST'S., ENG. DIV'S., AREA, POPULATION, STATE MILEAGE AND PERCENTAGES.
i
Eng. Eng. Area
County
Com.lcong. Div. Div. Sq.
Dist.j Dist. _(19_ 33) (1934) Miles
--
I Jenkins ______ _
Johnson ______ _ 22 121
4 4
2 2
342 292
Jones_ ____ __ Lamar _________ _ JanieL _______ _
2I 6
2I 6
1 11
3 3 6
2 2 1
377
184 191
I Laurens _______ _
Lee __________ _
2 1
123
4 5
2 1
806 326
I Liberty _______ _
Lincoln _______ _ 31 110
6 2
1 3
543 291
Long
1
1
6
1
393
;;: Lowndes __
1 11
5
1
483
Lumpkin _____ _ 3
9
2
3
280
Macon _________ _ 2
3
3I 2
332
Madison ____ _
3
8
2
3
284
Marion ________ _ 2
4
3
2
360
McDuffie ___ _
2 10
4
2
287
Mcintosh __
1
1
6
1
470
Meriwether __ _
2
4
3
2
496
Miller__ ____ ___ _ 1
2
5
1
253
Mitchell _____ _
1
2
5
1
548
Monroe __ _
2
6
3
2
470
Montgomery ___ _ 1 12
6
1
190
Morgan ________ _ 3
8
2
3
390
Murray_
3
7
1
3
342
Muscogee _____ _ 2 Newton _______ _ 3
4 8
I 3
2
2
3
235 262
Oconee _____ _ 3
8
2
3
172
-' - - - - -
I
I
Pop. 1930 Census
12,908
12,681
8,992
9,745
5,190
32,693
I
8,328 8,153
7,847
4,180
29,994
4,927
16,643
14,921
6,968
9,014
5,763
22,437
9,076
23,620
11,606
10,020
12,488
9,215
57,558
17,290
8,082
Pop. Per. Sq. Mile
1930 Census
38 43 24 53 27 41 26 15 27 11 62 18 50 53 19 31 I 12 45 36 43 25 53 32 27 245 66 47
Mileage 7-1-32
56.095 58.736 63.809 34.271 40.820 92.627 28.017 34.734 39.400 45.263 74.690 58.349 54.957 76.750 34.550 40.629 33.006 56.702 46.380 74.146 56.923 47.395 51.392 51.616 64.214 40.429 37.260
Percent-
Percent-
I ,
Percent-
Mileage Mileage ages ages I ages
6-30-33 6-30-34 7-1-32 6-30-33 16-30-34
---- -------
56.4121-".412- .6844 .6638 .6356
58.736 58.575 63.809 63.809
34.271 I 48.071
40.820 40.820 92 .627 113 .369
.7166 .7785 .4181 .4980 1.1300
.6912 .7508 .4033 .4803 1.0900
I .6599 .7188
I .5416 .4599 1.2772
28.017 33.117 .3418 .3297 i .3731
34.734 35.830 .4238 .4087 .4037
39.400 48.300 .4807 .4636 .5441
45.197 43.947 .5522 .5318 .4951
74.690 58.349
84.090 58.349
.9112 .7119
I
.8789 .6866
.9474 .6574
69.757 69.757 .6705 .8209 .7858
76.750 76.750 .9363 .9031 .8647
34.550 34.550 .4215 .4065 .3893
40.629 48.479 .4957 .4781 .5461
33.006 33.006 .4027 .3884 .3719
66.116 66.116 .6918 .7780 .7448
46.380 46.380 .5658 .5457 .5226
86.046 85.292 .9046 1.0125 .9609
71.623 71.623 .6945 .8428 .8069
47.395 46.802 .5782 .5577 .5272
65.292 65.292 .6270 .7683 .7356
51.616 51.616 .6297 .6074 .5815
64.792 64.792 .7834 .7624 .7300
47.832 67.782 .4932 .5629 .7636
50.760 50.760 .4546 .5973 .1>719
--- - - - - - - - - -
I
-----~----~-
ALPHABETICAL LIST OF COUNTIES SHOWING COM'RS. DIST., CONG. DIST'S., ENG. DIV'S.,
AREA, POPULATION, STATE MILEAGE AND PERCENTAGES.
County
Oglethorpe ___ _Paulding ___ _Peach ________ _
Pickens ________ _-
Pierce ______ _ -
Pike_
-
Polk_
PulaskL ____ _ -
Putnam _____ _
Quitman ___ _ ~Rabun _______ _-
Randolph ____ _Richmond Rockdale ___ _
Schley ___ _
Screven __ Seminole ____ _
Spalding ____ _Stephens _____ _
Stewart __ .
Sumter
Talbot __
Taliaferro __
Tattnall _
Taylor_
Telfair
TerrelL_
Com. Dist.
~~
3 3 2 3 1 2 3 2 2 1 3 1 2 3 2 2 1 2 3 1 1 2 3 1 2 1 1
Cong. Dist.
~~
8 7 12 9 11 6 7 12 8 3 9 3 10 5 3 1 2 6 9 3 3 4 10 1 3 12 3
Eng. Eng.
Div. Div.
(1933) (1934)
- - ~~
2I 3
1
3
3
2
1
3
6 3
I
1 2
1
3
3
2
4
2
5
1
2
3
5
1
4
2
2
3
3
2
4
2
5
1
3
2
2
3
5
1
5
1
3
2
2
3
6
1
3
2
6
1
5
1
Area Sq. Miles
---
504 324 179 231 345 237 317 258 361 144 377 412 319 119 154 794 240 209 166 411 456 312 212 466 340 373 322
Pop. 1930 Census
--~-
12,927 12,327 10,268 9,687 12,522 10,853 25,141
9,005 8,367 3,820 6,331 17,174 72,990 7,247 5,347 20,503 7,389 23,495 11,740 11,114 26,800 8,458 6,172 15,411 10,617 14,997 18,290
Pop. Per. Sq. Mile
1930 Census
--~
26 38 57 42 36 46 79 35 23 27 17 42 229 61 35 26 31 112 71 27 59 27 29 33 31 40 52
Mileage Mileage 7-1-32 6-30-33
------
58.500 58.500 54.377 54.377 30.090 30.090 42.080 55.080 21.896 22.698 38.942 38.942 49.972 58.146 55.236 55.236 58.790 58.790 36.660 36.660 58.559 58.559 40.174 40.174 68.835 68.835 19.235 19.235 28.760 28.760 60.900 74.803 25.500 25.500 39.262 40.382 25.659 25.548 67.300 67.300 75.718 75.718
56.546 56.546 24.986 ' 24.986 68.860 68.860 62.560 68.710
55.882 55.882 42.168 42.168
====P e~ r - ==P e~ r - ~~P~ e r cent- cent- cent-
Mileage ages ages ages 6-30-34 7-1-32 6-30-33 6-30-34
- - - - - - - - --~ -~-
58.500 .7137 .6883 .6590 54.377 .6634 .6399 .6127 30.090 .3671 .3541 .3390 55.080 .5134 .6481 .6205 42 .ll1 .2671 .2671 .4744 38.942 .4751 .4582 .4387 57.496 .6097 .6842 .6478 55.236 .6739 .6500 .6223 58.790 .7172 .6918 .6624 36.660 .4473 .4313 .4130 58.559 .7144 .6891 .6598 40.174 .4901 .4727 .4526 68.1'35 .8398 .8100 .7755 26.385 .2347 .2264 .2972 28.803 .3509 .3384 .3245 74.803 .7430 .8802 .8427 25.500 .3111 .3001 .2873 40.382 .4790 .4751 .4550 32.548 .3130 .3007 .3667 67.300 .8211 .7919 .7582 75.718 .9238 .8910 .8530 67.446 .6899 .6653 .7599 24.986 .3048 .2941 .2814 68.860 .8401 .8102 .7758 67.760 .7632 .8085 .7634 70.632 .6818 .6576 .7958 54.068 .5144 .4962 .6091
- - - - - - - - - - - - - - - - -~ -
-~-- - - - - - - - - - - - - - - - - - - - -
---- --
ALPHABETICAL LIST OF COUNTIES SHOWING COM'RS. DIST., CONG. DIST'S., ENG. DIV'S.,
County
AREA, POPULATION, STATE MILEAGE AND PERCENTAGES.
- - - - -- - - ------- -- - - - - -
-----
' I
I
I I Eng. I Eng. Area
'Pop. Per. I Pop. I Sq. Mile
I
' Percent-
a)l g~;4) Com. Cong1 Div
I Dist. Dist. (193
Sq.
1930 I 1930 Mileage Mileage Mileage ages
Miles Census I Census 7-1-32 6-30-33 6-30-34 7-1-32
-
Per- I Percent- centages ages 6-30-33 6-30-34
---------
---
Thomas
1
Tift_ Toombs_
1 1
Towns __ _ Treutlen.
~
Troup __ _
2
Turner ____ _
1
Twiggs _______ _ 2
Union
3
g; Upson__ __
2
Walker__
3
Walton _____ _
3
Ware ___ _
1
Warren_
2
Washington ___ _ 2
Wayne __
1
Webster_
1
Wheeler _____ _
1
White ________ _ 3
Whitfield ____ _ 3
Wilcox______ __ 1
Wilkes_
__ 3
Wilkinson _____ _ 2 Worth _________ _ 1
TOTALS ______ _
21 5
1
530 32,612
122 I 56
1 1
243 16,068 393 17,165
1~ I ~
3 2
181 262
4,346 7,488
4
3
2
435 36,752
3
5
1
231 11,196
12
4
2
314
8,372
9
2
3
324
6,340
6
3
2
317 19,509
7
1
3
432 26,206
8
2
3
331 21,118
11
6
1
771 26,558
10
4
2
440 11,181
10
4
2
669 25,030
11
6
1
615 12,647
3
5
1
302
5,032
12
6
1
264
9,149
9
2
3
245
6,056
7
1
3
283 20,808
12
5
1
403 13,439
8
2
3
458 15,944
10
4
2
472 10,844
2
5
1
651 21,094
---
58,725 2,908,506
62 66
II 73.046 48.040
73.046 56.690
90.826 56.690
.8912 .5861
.8595 1.0232 .6671 .6387
44
60.470 60.470 60.141 .7377 .7116 .6776
24
38.330 38.330 38.330 .4676 .4510 .4318
29
27.900 27.900 27.900 .3404 .3283 .3143
85
60.060 69.900 77.900 .7327 .8225 .8776
49
26.218 34.218 34.218 .3199 .4027 .3855
27
51.398 51.398 51.398 .6271 .6048 .5791
20
44.160 44.160 44.160 .5387 .5196 .4975
62
61.830 62.984 63.100 .7543 .7411 .7109
61
48.983 48.983 56.563 .5976 .5764 .6372
64
52.066 72.916 72.916 .6352 .8580 .8215
34
78.716 79.242 81.254 .9603 .9325 .9154
28
42.910 42.910 46.510 .5235 .5049 .5240
37
92.030 92.030 91.996 1.1228 1.0829 1.0364
21
75.438 75.271 75.459 .9203 .8857 .8502
17
24.110 24.110 24.110 .2941 .2838 .2716
35
46.339 46.339 46.339 .5653 .5452 .5220
25
44.900 44.900 44.900 .5478 .5284 .5059
74
47.109 47.109 47.109 .5747 .5543 .5307
33
44.290 44.290 44.290 .5403 .5212 .4990
35
59.347 59.347 59.347 .7240 .6983 .6686
23 32
I 59.044 59.044 58.999
I 55.370 63.870 63.870
.7203 .6755
.6948 .7515
.6647 .7196
49.5 8,196.816 ,8.498.300 8,876.218 100.0000100.0000 100.0000
DISTRIBUTION OF ONE CENT GASOLINE TAX TO COUNTIES FISCAL YEARS ENDING JUNE 30, 1932, JUNE 30, 1933, AND JUNE 30, 1934.
Total~Year
Total-Year
Total- Year
County -I-E_n_d_in_g_6_-_3o_-_32_ _E_n_d_in_g_6_-3_o_-3_3_ Ending 6-30-34
1
Appling _______ $ 17,384.76 $ 14,757.90
$ 15,763.75
Atkinson_____
13,678.01
11,630.39
12,429.33
Bacon__________
9,131.05
7,764.13
9,954.99
Baker______
10,950.53
10,057.53
10,748.42
Baldwin________
12,405.30
10,601.73
11,401.09
Banks_____ ____
9,556.26
8,638.59
9,232.01
Barrow _________ ,
9,386.17
8,401.76
10,143.60
Bartow_____
17,934.15
16,355.50
19,208.11
Ben HilL
4,039.63 '
7,773.53
9,534.53
Berrien___
15,567.69
13,237.20
14,146.50
Bibb_______
13,628.66
11,588.44
12,384.48
Bleckley________
8,988.29
7,642.74
8,167.75
Brantley_______
10,120.29
11,443.01
12,884.17
Brooks____ ___
21,400.05
17,862.91
18,263.55
Bryan______
17,198.16
14,626.91
15,631.70
Bulloch_____
20,017.06
19,163.28
21,749.42
Burke____ _
24,848.79
21,942.26
23,449.54
Butts____
8, 609.36
7,320.53
10,248.46
Calhoun______
13,802.75
12,716.29
13,589.81
Camden______
14,597.73
14,434.84
18,364.01
Candler__ _
7,498.33
6,375.82
6,813.80
CarrolL________
20,598.90
17,556.69
18,778.37
Catoosa____ __
4,437.01
3,736.63
3,993.31
Charlton...
8,844.85
10,332.84
11,049.69
Chatham___ __
16,165.34
13,745.38
14,884.12
Chattahoochee
11,151.77
10,013.23
10,701.05
Chattooga______
9,043.02
8,626.87
11,652.97
Cherokee________
14,454.14
13,335.96
14,252.05
Clarke___________
9,138.07
8,458.52
9,039.56
Clay__________
10,370.42
8,817.96
9,423.69
Clayton_______ Clinch__________
9,14l.E6 19,088 .38 1
9,138.75 16,336 .96
9,766.53 17,459 .19
Cobb____ ___ _
14,441.85
11,733.88
14,633.06
Coffee___________
14,084.44
14,033.34
15,094.04
Colquitt______
21,588.53
18,356.71
19,679.51
Columbia_______
10,492.62
12,377.58
13,227.84
Cook____
12,327.19
10,4Rl.81
11,201.83
Coweta_________
21,146.06
18,421.53
19,686.96
Crawford__
13,804.44
14,806.99
15,824.13
Crisp__________
11,545.76
9,817.36
10,491.74
Dade_____
6,680.59
5,680.48
6,070.70
Dawson__
10,406.49
10,395.55
11,109.64
Decatur________
18,274.08
16,640.78
17,783.89
Dekalb_ ___
11,086.51
9,899.66
10,634.55
Dodge __________
13,604.63
11,744.49
17,530.47
Dooly_
16,904.33
15,937.21
17,031.97
Dougherty__ ___
11,849.74
11,887 .32
12,756 .30
Douglas________
6,083.90
5,415.33
8,018.67
Early______ _
17,147.20
16,367.36
17,491.68
Echols__ _____
12,996.91
13,081.63
15,844.28
Effingham___
9,669.45
8,120.98
10,508.72
Elbert_______
20,754.05
17,666.57
18,880.13
EmanueL______
30,419.10
27,417.03
29,278.43
Evans__________
5, 704.28
4,850.34
5,183.53
Fannin______
12,476.33
10,608.62
11,337.35
Fayette_________
6,544.75
5,565.00
5,947.27
F_l_o..::y_d_______________-________23_,,'-0_41_._0_9___,_c--_ _20-','-8_28_.5_6_:____~_?_2,_2_59_.~-
37
DISTRIBUTION OF ONE CENT GASOLINE TAX TO COUNTIES FISCAL YEARS ENDING JUNE 30, 1932, JUNE 30, 1933, AND JUNE 30, 1934.
County
Forsyth_ Franklin
______-_-_
Fulton_ Gilmer ______
Glascock ____
Glynn ___ ---- --
Gordon ___ ----Grady ___
----
Greene
----
Gwinnett
Habersham ___
HalL
----
Hancock_ ----
Haralson_ ---
Harris ____ Hart ____
- ---
-----
Heard ___ Henry ____
-- ---
- -----
Houston __ Irwin ______
--------
Jackson ____
Jasper_ ________
Jeff Davis ___ Jefferson ____
--
--
Jenkins --- --
LLJJLooaaanhmnueniraesesrrn_o___s_n________________-_----_----_---_---
Lee _____________
L i b e r t y _________
Lincoln _________
Long __ Lownde
s-_-_-_-_-_-_-_-
Lumpkin _______ Macon __________
Madison ________
Marion _________
McDuffie _______
Mcintosh ___ ---Meriwether _____ Miller_ _____ ---MMiotncrhoeelL_________-_-_-_-
Montgomery_ Morgan ________ . Murray _________
Muscogee ______
Newton_ Oconee_
-
---
Oglethorpe ___
Paulding __ .. -Peach_ --- -PPiiecrkceen_s______-_-_-_-_--
Total-Year Ending 6-30-32
$ 9,608.30 14,842.75 19,992.71 11,804.04 4,677.95 14,913.88 15,591.25 15,528.88 16,715.32 24,269.62 13,743.15 21,159.36 17,408.31 9,702.89 12,074.94 15,291.52 11,638.69 12,460.25 17,699.38 11,999.65 17,838.57 16,701.45 6,878.78 27,159.85 13,966.04 10,207.51 15,561.43 9,206.48 11,315.41 24,561.56 7,593.00 9,628.34 10,921.77 12,547.01 20,704.25 14,303.00 15,073.25 17,404.74 9,577.35 11,310.46 9,149.33 15,492.55 12,856.66 18,956.02 13,744.93 9,288.61 14,254.98 14,308.08 15,667.80 11,168.37 10,328.56 16,216.34 12,271.95 8,407.63 12,260.70 6,069.62
Total-Year Ending 6-30-33
$ 8,813.03 14,340.30 18,522.18 12,610.37 6,122.44 12,679.04 13,257.24 14,193.56 14,213.02 22,160.99 12,697.43 17,896.57 14,802.28 8,500.60 10,267.31 13,656.76 10,741.08 10,594.95 15,049.77 13,277.27 16,971.48 14,009.85 5,586.52 23,900.50 13,277.08 13,844.38 15,040.11 8,077.84 9,621.48 21,832.65 6,603.75 8,186.98 9,286.79 10,661.08 17,604.91 13,753.16 13,867.29 18,090.36 8,143.62 9,576.47 7,779.69 13,946.10 10,932.01 18,211.19 16,881.91 11,171.26 12,971.44 12,166.16 15,271.81 10,387.59 9,615.75 13,788.75 12,816.94 7,092.37 10,720.99 5,523.98
38
Total-Year Ending 6-30-34
$ 9,418.39
15,325.39
22,033.32
14,713.01
6,852.79
13,550.01
14,167.91
18,521.18
15,189.35
23,683.30
15,005.46
19,136.57
15,819.10
9,084.64
15,095.29
14,594.88
11,478.91
13,980.09
16,083.58
14,189.34
18,137.30
14,899.92
I
5,682.78
25,542.29
14,209.98
14,785.20
16,073.25
11,209.52
10,282.41
I
28,644.68 8,009.68
8,818.65
11,016.07
11,305.92
21,181.97
14,697.91
17,571.54
19,333.04
8,703.02
11,196.91
8,314.09
16,654.38
11,682.96
21,627.01
18,041.59
11,901.13
16,446.82
13,001.88
16,320.86
13,511.94
12,786.25
14,735.93
13,697.37
i
7,579.58 13,874.46
I
8,145.33
DISTRIBUTION OF ONE CENT GASOLINE TAX TO COUNTIES FISCAL YEARS ENDING JUNE 30, 1932, JUNE 30, 1933,
AND JUNE 30, 1934.
County
Total-Year
Total-Year
Total-Year
Ending 6-30-32 Ending 6-30-33 Ending 6-30-34
Pike
$
Polk_
Pulaski_ __
Putnam __ _
Quitman ____ _
Rabun __
Randolph
Richmond
Rockdale ..
Schley_
Screven __
Seminole Spalding Stephens__ __
Stewart_ Sumter_ __ . Talbot ________ _
Taliaferro _____ TattnalL ______ _
Taylor_ __
Telfair ________ TerrelL ________ _
Thomas .. ____ . __ _
Tift. ___ ___ __I
Toombs _______ , Towns __________
Treutlen _____ --11
-I Troup___ ------1
Turner. _ ___ - Twiggs ______ 1
Union ___ - ---~ Upson ________ -
Walker_ __ ---Walton ... ------~1 Ware. __ -------
Warren_
1
Washington._--~
Wayne _____ -----
Webster - -----i Wheeler_ ___ - - - [
-I White ____ ------
Whitfield. _____
-I Wilcox_______ . --
Wilkes ______ - - -
Wilkinson_. __ _
Worth ________
1
1
10,793.88 12,411.88 15,265.71 16,298.29 10,162.24 12,309.71 11,023.05 19,907.50
3,736.73 7,977.34 16,881.62 5,578.51 10,841.37 7,112.73 18,797.07 21,123.02 14,784.46 5,928.95 19,088.16 14,945.64 13,836.04 10,771.57 20,256.92 13,316.80
14' 151.49 9,111.72 6,727.23 16,089.97 7,267.69
14,247.65 12,241.26 17,139.42 13,165.62 13,361.77 21,820.27 11,890.02 20,109.09 17,915.76
6,683.34 12,831.98
9,942.44 12,970.55 12,277.30 15,798.26 13,013.66 15,348.70
$
9,178.83
$
9,809.36
12,290.52
14,567.05
13,019.42
13,913.75
13,857.10
14,808.98
8,6405)6
9,234.53
13,802.66
14,750.81
9,469.22
10,119.67
16,224.76
17,339.29
4,533.79
5,722.00
6,778.88
7,247.26
17,750.86
18,842.61
6,010.48
6,423.35
9,449.29
10,172.09
6,035.09
8,198.72
15,862.95
16,952.64
17,847.12
19,073.09
13,328.19
16,989.40
5,889.33
6,293.88
16,230.65
17,345.59
15,125.37
17,247.74
13,171.68
15,885.18
9,939.21
12,843.97
17,217.32
20,580.28
13,362.13
14,280.01
14,253.08
15,211.36
9,034.57
9,655.18
6,576.18
7,027.91
14,763.89
18,588.56
6,673.57
8,619.39
12,114.77
12,946.97
10,408.74
11,123.74
14,774.61
15,872.78
11,545.55
12,817.86
14,101.37
18,367.28
18,614.75
20,087.97
10,114.11
11,036.47
21,691.94
23,173.47
17 '761.76
18,972.37
5,682.85
6,073.22
10,922.35
11,672.62
10,583.16
11,310.15
1
11,103.83 :
11,866.58
[
10,439.38 I
11,156.49
11---13_,1_938,_981_6..39_89_[~ _ _ _1144_,,_89740_9._1.32_0_
13,575.70
16,088.62
TOTALS ___ I$ 2,145,630.40 1$ 1,965,568.96 I$ 2,201,221.35
I
I
Mileag-e~0-n-S~tate System increased 301.484 miles for fiscal year 1933
over 1932. Gasoline Tax disbursements decreased $180,061.44 for fiscal
year 1933 under 1932.
Mileage on State System increased 377.918 miles for fiscal year 1934
over 1933. Gasoline Tax disbursements increased $235,652.39 for fiscal
year 1934 over 1933.
Disbursements are made to the Counties every three months.
39
STATE HIGHWAY BOARD OF GEORGIA
TABLE OF COMPLETED MILEAGE WITH FEDERAL AID, TEN SOUTHEASTERN STATES,
AT JUNE 30, 1932, 1933 AND 1934
State Co~~~~ted co!~~~e: coi~~ed I;n~~~:se--In~i~:sel;;~~a~:ll.~~~f=~;Jii~:~-;:fe~n
to June
30, 1932
Alabama________________ _ 2,393.9
Florida __________________ _
638.0
to June
30, 1933
2,344.31 661.1]
to June j.
30, 1934 2,585.6I 787.7 1
I
-49.6!I 23.1
I Mile
1933
241.3 126.6
I
1
3 10
I
Miles
1934
I
3
10
Miles
.---1 I 1933
I I
9 6
Miles
1934
5 9
GEORGIA--------------- 3,038.4 3.238.8 3,518.21 170.4 279.4 1
1. 1I 3
Kentucky ________________ _ 1,911.0 Louisiana.. ___________ .. __ _ 1,566.8
1,933.6 1
1,619.61'
2,190.9 1 1,673.3[
22.6 1 52.81.
257.3 53.7
6 9
6. 7
9
4
4 10
MississippL _ ________ __ 1,809.01 ~ North Carolina __________ 2,226.4
21,,385683..88 1
2,095.11 2,940.7
54.8 132.41
231.3 581.91
7 2
7 2
3 2
6 1
South Carolina ________ .. __ 2,013.6
1,962.5
2,258.41 -51.1
295.9
5
4
10
2
Tennessee _______________ _ 1,682.4
1,723.5
1,925.1
41.1 201.61 8
8
5
8
Virginia_________________ 1 1,992.9
1,994.3
2,223.7
1.4
229.41
4
5
8
7
TOTALS ___________ 1 19,302.41
19,700.3 ~198.7]--3-97.9 . 2,49~--4----------------------
1
Note: Information obtained from Magazine of Bureau of Public Roads, July 1932 and 1933 Issues, and Report of the Chief of the Bureau of Public Roads, 1934.
PART TWO
FISCAL YEAR ENDING JUNE 30, 1933
STATE HIGHWAY BOARD OF GEORGIA
Exhibit 11A"
STATEMENT OF ASSETS AND LIABILITIES-FUND BALANCES JUNE 30,1933.
ASSETS
Current Assets
Cash
In Banks
__ $
State Treasurer Account.
State Treasurer __ U. S. Government Vouchers in
Transit. .. _______ _
Accounts Receivable Advances. ___________ _
]03.063.73 48,880.30 $ 151.944.03
771, 148.65
376,874.97 51,338.01 46.882.88 $ 1,398,188.54
Deferred Assets
Inventory of Materials and Supplies
Shop Jobs in Process
_________ _
Undistributed Charges ____________ _
Undistributed Payrolls _.... __ __
Total Proprietary Assets .. _____ __ _
$ 105,269.79 16,797.69 19,488.55 38, 281.61
179,837.64
--------------------- $ 1,578,026.18
Capital Assets
Land. Buildings and Equipment (Schedule No. 4)
Land .. _____________________________ $ 176,445.25
Buildings ------------- ____________
315.229.00
Trucks .. ___ ------------------------Tractors______________________ ______
402,320.00 207.909.00
Other Road Equipment ______ _ __.
361, 169.00
Engineering Equipment... OfficeEquipment _________________
44,146.00 42,383.00
Shop Equipment
57,456.00
Laboratory Equipment_
17,053.00
Quarry Equipment
65,153.00$ 1,689,263.25
Roads and Bridges Construction Cost to Date: On Closed Projects............... $113,533,337.81 On Opened Projects.............. 9,967,978.53
123,501,316.34
Total Capital Assets ________ .. __ _
.. $125, 190,579.59
TotaL
..... $126.768,605.77
42
Exhibit "A"
STATE HIGHWAY BOARD OF GEORGIA
STATEMENT OF ASSETS AND LIABILITIES-FUND BALANCES JUNE 30, 1933.
LIABILITIES, FUND BALANCES AND SURPLUS
Current Liabilities
Accounts Payable__ ------------Due to Counties. Surveys and Plans
* none 103.499.09
Total Proprietary Liabilities_
Fund Balances (Schedule No.6) Construction Contracts and Allotments Unencumbered Balances_. Less: Contract Participation_
$ 103.499.09
$ 4. 720.037.39 26,454.89
Net Cash Liability_ Less: Cash Participation
Federal Aid . -----County Cash. Excess Participa-
tion _________________ _
OtherCash.
-----------
$ 4.693,582.50
l.I02. 961.55
l3,563.92CR 28,367.80 l.ll7,765.43
Net Cash State Liability ______ . Other Unencumbered Allotments
Survey Projects __________________ _
Reconstruction Projects _______ .... _-
Maintenance GeneraL------------Convict Farm ______________________ _
3,575,817.07
2.445.13 ll,335.83 55,507.92 68,584.51
137' 873,39
Maintenance Appropriation. ___ . __ .Unliquidated Purchase Orders. etc.
34,672.72 ll9, 037.32
Total Fund Balances _______ ------------------------------------- $
Capital Liabilities and Surplus
Capital Liabilities
Refunding Certificates-Due to
Counties-1936 thru 1945 (Schedule No. 5) ________________________ _
26,516,763.29
Surplus Invested in Plant and Equipment_ ________________________ _
1. 689,263.25
Surplus Invested in Highways_------
96,984,553.05
3,867,400.~0
Total Capital Liabilities and Surplus_--------------------------- $125,190,579.59
Current Fund Deficit Deficit State Funds, Encull\brance against 1933-34 Income-Exhibit "B" _ Less: Unrecorded Reserves: For Construction Detail Estimates, Counties-Execution of Contract not Complete_______________ $
For Revolving Fund to cover Inventories, Advances. etc.----------
$ 2, 961. 553.45
368,680.04 200.000.00
568.680.04
Deficit as per books. ___ ----------------------- _________ _ Total ____________________________________________ _
___ $2,392,873.41Dr. --- $126.768.605.77
43
Exhibit "B" STATE HIGHWAY BOARD OF GEORGIA RECONCILIATION OF FUND DEFICIT, REFLECTING FUND REVENUE, APPROPRIATIONS AND ALLOTMENTS
JULY 1, 1932 TO JUNE 30, 1933.
FUND DEFICIT, JULY 1, 1932___
Revenue Received (Schedule No. 7) Motor Vehicle_ Gasoline Taxes_ Miscellaneous Income__
FUND REVENUE
_____ $ Ll20,670.19 7, 786,322.58 18. 852.02
$ 8, 925,844.79
4,970,673.21
Estimate.d Participation Jl.ccru.-.ls
Federal Aid Allotments County Cash_ County Contract_ Other Cash Other Contract_
_____ $ 4,857,499.02 10,335. 26Dr. 337.585.93Dr 27,132.65 1.390.00 $4,538,100.48
Total Fund Revenue
13,463,945.27
Available for Allotments_____
___________________ $
APPROPRIATIONS AND ALLOTMENTS
Continuing Ailotrnent' (Schedule No. 6)
Construction Projects Regular Funds ________________ $ G,887,200.13
Convict Outfit Appropriation__ 551,185.15
Asphalt Dept. ApproPriation____ 332,170.41
Maintenance Appropriation_____ 78,030.34 $ 7,848,586.03
Survey Projects____________________ _
6,547 .86Cr.
Reconstruction Projects_
30,965.59
Maintenance General------------
l, 349,605.04
8, 493,272.06
Total Continuing Allotments____________________ $ 9, 222,608.80
Non-Continuing Allotments (Schedule No. 6)
Administration, General Administration Appropriation_
352,198.99
Maintenance Appropriation ________::_26:c'_:c8c:_50:.:._:c8cc4~ 379,049.83
Research and Analysis ____________ _ Collection of Revenue ____________ _
Quarry __ ---------------------------Equipment
Equipment Appropriation_______
38,113.83
7,096.29 79, 432.07
874.99
Maintenance Appropriation _______c2:..:0.:..,5:..:9:..:2.:...l:..:O:_____ Shop ________________________________ _
Legislative Transfers W. & A. Rentals __________________ $ 1,080,000.00
58,705.93 85.55Cr.
Motor Vehicle License Tags
23,790.39
l, 103,790.39
Total Non-Continuing Allotments ______________$ 1,628,863.95
Total Allotments __ ------------------------------- 10,851,472.75 Continuing Appropriation (Schedule No. 6)
Maintenance Appropriation______ .$ 1, 540, 631.08 Allotments__________________________ l, 505,958.36
Balance Forwarded to 1933-34 __ _
34,672.72
Total Allotments and Appropriations_---------------------------$
10,886,145.47
Fund Deficit as per records ________________________________________ - _________ $
Less: Unrecorded Reserves
Construction Detail Estimates Revolving Fund- ______________ _
$ 368,680.04 200,000.00
Fund Deficit June 30, 1933-Exhibit "A"
______ $
44
2. 392,873.41
568,680.04 2. 961,553.45
THE HIGHWAY DOLLAR
Gasoline ?.i>x 54.5 "k
INCOME
EXPENDITURES JULY 1,1932 -JUNE 30. 1933.
45
Exhibit "C" Page 1
STATE HIGHWAY BOARD OF GEORGIA
STATEMENT OF REVENUE RECEIPTS AND EXPENSE DISBURSEMENTS
JULY 1, 1932 TO JUNE 30, 1933.
REVENUE RECEIPTS
State Treasurer
Motor Vehicle License Tax Fuel Oil Tax_ --------------
1,120, 670.19 7, 786,322.58$
8,906,992.77
Counties Cash for Construction ___ . ________ _
Construction Contract Credits ____ _
3,228.66 272,914.61
276,143.27
Railroads, Cities, etc.
Cash for Construction Construction Contract Credits ____ _
$
9,241.74
3, 718.32
12,960.06
U. S. Government
Federal Aid Vouchers for Construction _______________________ _
Miscellaneous Income. ____________ _
Total Revenue Receipts _________ _
5,065,020.34 18,852.02
------------- .....$ 14,279,968.46
EXPENSE DISBURSEMENTS
Administration (Schedule No. 8-A1
General Administration General Office... ___________________ $
Division Offices __ Warehouse.
294,317.75 66,853.16 18,298.48$
Research ____________ _ Collection of Revenue_ Quarry_--------------------
379,469.39
7,103.81 79,507.38
876.49$
Construction (Schedule No. 8-B)
Surveys Actual Surveys_ _________________ $
Plans ____ _
63.894.45 63,421.99$
127,316.44
Construction
Supervision_
__________ $
672,861.64
Actual Construction _
10,696,769.96
ll, 369,631.60
Maintenance (Schedule No. 8-C)
General Supervision.------------- --------- $ Actual Maintenance ______________ _
82,674.30 1,306,631.06$ 1,389,305.36
Reconstruction Supervision. _______________ . _______ . Actual Reconstruction ____________ $
10 '022 .ll
10,022.ll
466,957.07 U,496,948.04 1,399' 327 .47
46
STATE HIGHWAY BOARD OF GEORGIA
Exhibit "C" Page 2
STATEMENT OF REVENUE RECEIPTS AND EXPENSE DISBURSEMENTS
JULY 1, 1932 TO JUNE 30, 1933.
Land, Buildings and Equipment (Schedule No. 8-D)
Administration Land and Buildings_
_______ . $
Euuipment _____ _
720.99 6,605.64 $
7,328.83
Construction Equipment. _____ _
Maintenance Land and Buildings_ Euuipment_ _________ _
-$
6, 523.88
14.284.80
36,341.97 20,808.48 $
84,477.08
Legislative Transfers (Schedule No. 8-El Prison Farm Purchase W. & A. Rental Discount. ________ _ Motor Vehicle License Tags_
Total Expense Disbursements_ Excess Disbursements over Receipts
DEDUCT Excess Proprietary Assets over Liabilities. July l. 1932 ____ _
Excess Proprietary Assets over Liabilities, June 30, 1933-Exhibit "A" ___ __
$
5,118.76
1,080,000.00
23,790.39
l, 108, 909 .15
14,536.618.81
$
256.650.35
l, 731,177.44 $ 1,474,527.09
RECONCILIATION
Excess Proprietary Assets over Liabilities (as above). Available for Liquidation of Fund Balances and Unrecorded Reserves ___________ _
Fund Balances (Contracts, Allotments.PurchaseOrders.etc.) _____ $
3,867,400.50
Unrecorded Reserves (Detail Estimates. Revolving Fund) __
568,680.04
1.474,527.09 4,438,080.54
Fund Deficit-Exhibit "A"
$ 2, 961,553.45
47
l p..
STATE mGHWAY BOARD OF GEORGIA LAND, BUILDINGS AND EQUIPMENT
June 30, 1933.
Schedule No. 4..
Description
Appraisal Value
July 1, 1932
Additions for Fiscal Year
1932-33
Total June 30, 1933
Depreciation for Fiscal Yr.
1932-33
Appraised Value
June 30, 1933
Land___
___ _ _ _____ $
Buildings_____ ___ __ __ __ ___
Automobiles ___________ . _. __
Trucks ____ __ _______ ____ ___
Tractors_
____ ______ __ __ __
~Other Road Equipt._ ____ __ ___
Engineering Equipt._____
OfficeEquipL ________________ ,
Shop Equipt. __ ___ ______ I
LaboratoryEquipt. ______ _____
Quarry Equipt.__ ___ ______
176,335.25 308,411.95 113,028.00 466,544.00
260,336.00
423,487.00 48,818.00 51,848.50 62,325.00 17,543.00 72,737.00
$
110.00
7,134.67
15,030.90
3,070.03
5,211.50
26,356.44
972.11
4,265.66
1,857.33
468.44
$ 176,445.25 315,546.62
128,058.90 469,614.03
265,547.50
I 449,843.44
49,790.11 56,114.16 64,182.33
18,011.44 72,737.00
$ 317.62
128,058.90 67,294.03
57,638.50
88,674.44 5,644.11 13,731.16 6,726.33
958.44 7,584.00
$ 176,445.25 315,229.00
402,320.00 207,909.00 361,169.00 44,146.00 42,383.00 57,456.00 17,053.00 65,153.00
_
_
_
T_o_ta_l
_-E_x_hi_bi_t
_"A_"________________:_=_2=_,0=_0=1_=,4_=1'_---'3_"'-'_.7=0_=--=_
__:1_______~~__,4__'7"_7'.__Q_8________
=2~,Oc-c6=5=,8=9=0=.7=8=-= lc=~3~76~,~62~7~-~53::..C*=
_ _ _ _ _ _ _ ___:____ _ _ _ _ _ _ __
_
I
_
,
~-9_,2_6_3~.2_5_
__
_
*Depreciation includes value of automobiles disposed of by the State Supervisor of Purchases on April1, 1933.
Schedule No. 6 Page 1
STATE HIGHWAY BOARD OF GEORGIA STATEMENT OF REFUNDING CERTIFICATES
JUNE 30, 1933
.County
1----A_m_o_u_n_t________c_o_u_n_t_Y_____ ____A_m__o_u_n_t___
Applmg___________ !$
1
243,720.14 Elbert_____________ $
166,551.32
Atkinson__________ Bacon_____________
12,314.60 EmanueL_________ 26,272.90 Evans_____________
493,986.86 72,135.44
Baker_____________
24,969.42 Fannin ________ __
187,014.95
Baldwin___________
99,927.56 Fayette ___ ________
46,859.63
Banks_____________
75,191.59 Floyd_____________
430,838.77
Barrow____________
71,720.80 Forsyth________
65,191.97
Bartow____________
124,299.84 Franklin__________
108,765.48
Ben HilL_________ Bibb______________
61,400.58 Fulton____________ 898,356.10 Gilmer____________
113,926.08 56,130.62
Bleckley___ ___ __ ___
26,606.23 Glynn_____________
420,745.28
Brantley__________ Brooks____________
36,034.961 Gordon___________ 359,320.51 Grady_____________
91,044.59 111,967.53
Bryan_____________
30,623.58 Greene____________
61,662.97
Bulloch___________
123,758.98 Gwinnett_ _____ ___
206,029.29
Burke_____________ Butts_____________
243,630.66 Habersham________ 82,818.10 HalL_____________
341,736.71 400,391.36
Calhoun__________
9,977. 75 Hancock__________
75,923.85
Camden___________
13,152.00 Haralson__________
149,659.86
CampbelL________
205,893.32 Harris_ ___________
106,678.62
Candler___________
30,835.42 Hart______________
125,506.39
CarrolL___________
523,814.89 Heard_____________
19,131.75
Catoosa___________
23,142.85 Henry_____________
219,591.56
Charlton__________
81,348.22 Houston__________
291,391.43
Chatham__________ 1,310,079.46 Irwin______________
56,545.31
Chattahoochee____ Chattooga___ ___ ___
17,875.97 Jackson___________ 124, 788.ll Jasper_______
127,589.35 91,658.61
Cherokee__________ Clarke____________ Clay_______________
199,509.72 Jeff Davis_ 372,977.13 Jefferson_________ 47,141.09 Jenkins __ _____ ___
33,398.63 350,905.53 85,086.68
Clayton___________
49,202.42 Johnson__________
35,649.49
Clinch_ ___________
62, 153. 55 Jones_ ____________
42, 877 .44
Cobb______________
278,612.80 Lamar____________
19,499.10
Coffee__ ____ ______
75,961.09 Laurens___________
284,243.00
Colquitt__________
150,890.06 Lee________________
81,509.77
Columbia_________
61,865.28 Liberty __ ___ ______
31,332.06
Cook______________
209,732.93 Lincoln_ _________
32,830.45
Coweta____________
487,277.97 Long______________
38,174.64
Crawford Crisp______________
31,709.18 Lowndes__________ 91,539.61 Lumpkin__________
547,277.10 84,092.05
Dade______________
74,869.42 Macon_____________
193,593.06
Dawson___________
25,713.39 Madison___________
20,359.40
Decatur___________
371,629.87 Marion____________
22,817.86
DeKalb___________ Dodge_____________ Dooly______ ______ _
259,849.79 McDuffie__ 64,102.49 . Mcintosh_________ 192,022.91 Meriwether________
53,649.81 15,277.50 405,913.92
Dougherty________
493,915.221 Miller_____________
35,395.83
Douglas___________
44,494.34 Milton____________
20,713.10
Early______________ Effingham________
77,836.12 MitchelL_________ 57,391.06j1 Monroe____________
417,193.11 119,384.92
50
Schedule No. II Page 2
STATE HIGHWAY BOARD OF GEORGIA
STATEMENT OF REFUNDING CERTIFICATES
JUNE 30, 1933.
County
Montgomery _______ $ Morgan __________ _
Murray____ _
Muscogee Newton _________ _
Oconee _________ _
Oglethorpe ______ _ Paulding ________ _ Peach ____________ _
Pickens _________ _
Pierce ____________ _ Pike______________ _
Polk _____________ _
PulaskL _________ _ Putnam __________ _
Rabun ___________ _
Randolph________ _
Richmond Rockdale _________ _ Schley __________ _
Screven _________ _
Seminole ________ _
S p a l d i n g __
Stephens Stewart_
_ ~
~
~
-
:
:
::
I
Sumter __________ _
Talbot ___________ _
Taliaferro ________ _
TattnalL ________ _
Taylor ___________ _
Amount 11
County
Amount
124,580.70 Telfair.
__ _1$
74,387.83
259,212.39 TerrelL ___________ I
271,526.03
89,811.16 Thomas __________ _
391,611.67
827,817.07 Tift ______________ _
177,857.97
95,468.70 Toombs ______ _
205,582.07
26,106.42 Towns ______ _
45,084.25
39,279.24 Treutlen ______ _
2,000.00
19,157.24 Troup _______ _
631,255.57
8,194.69 Turner_ __________ _
24,384.28
120,956.51 Twiggs _________ _
22,555.36
169,875.66 Union ____________ _
50,680.00
12,808.02 Upson ___ _
121,586.46
183,409.70 VValker ___________ ,
187,076.07
242,410.52 VValton_ ___ -----
161,859.52
103,271.71 VVare ____ _
634,572.73
318,631.00 VVarren_ _ ___ _
22,603.85
82,788.81 VVashington _ ____ _
106,474.51
1,019,304.41 1VVayne
272,659.54
2,091.95 VVebster __________ _
13,740.18
55,521. 49! VVheeler __ _
133,062.67
40,751.20 VVhite ___ _
35,472.82
25,742.03 VVhitfield_
265,529.38
377,686.16 VVilcox___________ _
10,093.64
133,031.70 VVilkes ________ _
268,753.94
47,475.00 VVilkinson __ _
36,060.67
365,369.72 VVorth __ _
245,023.78
74,343.95 Coastal Highway _
882,898.87
15,691.86
1~-----
43,422.071 26,056.54
TotaL _______ $ 26,516,763.29
51
Schedule No. 6
STATE HIGHWAY BOARD OF GEORGIA
SUMMARY OF ALLOTMENTS, APPROPRIATIONS, AND FUND BALANCES; ALSO
REFLECTING RECONCILIATION WITH EXPENSE DISBURSEMENTS
- -~-----=------------~-=---~--=---=--=-=---
JULY 1, 1932 TO JUNE 30, 1933.
===~
I Not
Estimated
I
Net
/
I Fund Balances Participation FundBalances Allotments
Encum- Expenditures
Total
I I Estimated
Net
Fund Balances Participation Fund Balances
_
July 1, 1932. July 1,1932. July 1,1932.
[ brances
Charges Juno 30,1933. June 30, 1933./June 30, 1933
A~~~~~~::~~:~:ents -----------------------~------~-----~----- ---- . - - - -
1
. --
-~ - -
--------1 (Schedule N o.6-A) 1$5, 486,652.69 $2,659,686.18 $8,146,338.87 $ 7, 848,586.031$ 94.744.09 $11,369,631.60 $11, 274, 887.51 $ 4, 720,037.39 $1,144,220.32 $3,575,817.07
Surveys __ ----------- 136,041.86 ______ _ 136,041.86 CR6,547.86
267.57 127,316.44 127,048.871
2,445.131 _
2,445.13
~~~~~:~~;~!on.
_____________ ______ _____ _____ ____
30,965.59 DR9,607.65
10,022.11
19,629.76
11.335.83/ ____ __ j 11,335.83
(Schedule No.6-B)
67,112.55[------------
67,112.55[ 1,349,605.04 28,095.69 1,389,305.36 1,361.209.67
55,507.92[-------------~ 55,507.92
Convict Farm_
73,703.27._____________
73,703.27 1 ______________ ____________
5,118.76
5,118.76 1
68,584.51~------------
68,584.51
T~~~~t~~~~~uing
~~63,5:~~~~;~:.686~~:~~~=~:/,;::::8~~ 1
~~=~=~~~~2.
90~:~:
;2,
78~:~:~ 1 ~857,
:~;~~~:~:~:
~~=~90~:
Non-Continuing Allotments
I
Administration
.
I
(Schedule No.6-C)
$ 379,049.83$
419.56$ 379,469.39 $ 379,049.83
_____ __
Research (Schedule No. 6-C)___________
1
I
__ !
7.096.29,
7.52
7,103.81 1
7.096.29 __
:C?o~ulo~l~e:~c~~t~i~o~~n:hheedodufulleeRNevo-.1::~-~:::.::.
--~-----::::: 58,~~:~: 5,77~:~~- 64.:~~:~;~ 58,~~:~:1 -----1
I 79,432.07
75.31
79,507.38
79.432.oL ___________ , --------- --- -----------
j
::::::::::::1::::.:::::: :::::::::::::
~~~~=~ .~.;~. .,j~~=~:.::1: ,;::,;:;;~;:::~;:~.~:;. "'"'~~=;~.. ~::~r~e~~~~:~-----~::::__
u=~ '"'" --
-
1
-I
. I____ 1 1.0~~~~:~~ ______ ~ -5 55 i:iisa:iiiiii:iiii 1.0~~~:~~1::::_:::::::: :::::__ ,,oo.~ . --- ~. oo.w "~.~] - ...... - - ...
-
-.. -
Schedule No. 6
STATE HIGHWAY BOARD OF GEORGIA
SUMMARY OF ALLOTMENTS, APPROPRIATIONS, AND FUND BALANCES; ALSO
REFLECTING RECONCILIATION WITH EXPENSE DISBURSEMENTS
JULY 1. 1932 TO JUNE 30, 1933.
I I -========---====-~=-=-=======~====-=~-=--==-=-=-=-=--=====~===
Net
Estimated
Net
'
I I Estimated
Net
Fund Balances Participation Fund Balances 1\llotments
Encum- Expenditures
Total
Fund Balances Participation Fund Balances
July 1, 1932. July 1, 1932. July 1, 1932.
brances
Charges June 30,1933. June 30, 1003.1June 30, 1933.
-----r------- APPROPRIATI~-=----- ------ -------
----- ------~-- ------
----- -------- - - - ---
;;;:;~~ance 1 I Appro-
I
/
I 1
priation (Schedule (No. 6-F)....
_ __________ ____________ $ 1,540,631.08 Appropdat ion
I . ... . ... ---- .. -1-- ---- ... I --- --- ...
1 ~---- - - - - - - - ___ ____
1,505,958.36 ~~-Allot~= rlt_s____ !,_:_:_~~~~~!___3_4~672. '/:~'~~~~~- _ -~~'/::2: I
T~J~!~~~r-~~~~~--- ,__ ___
$ 34,672.72 ____
I
$ 34.672.72 .....
$ 34.672.72
1 N~~l~~~~93~a~~-~~~~:l$5,763,510.37
--~~
Estimated Participation. July I.
1932----------------- __
$2.659,686.18
Fund Balances. July I. 1932
$8,423,196.55
I
I I
I
[
~~ ~-~~~,
]
I
I
Allotments for Year-Exhibit "B".
$10,886,145.47
[
I
Encumbrancesforyear-NetLiuuidation.
--:$ ---
!!9,860.291
I
1,
Expenditures for Year-Exhibit "C" ____ Total Charges for Year.. .... ____
.
..-- $l4,5o0 6,6l8.Sl
I
-------- -~- ------1$14,416,758.52
FundBal2nces. June 30. 1933. _____________ Estimated Participation, June 30. 1933.
_____ .. --- $4,892,583.50
[
1
.
.
. _____________ $1.157,784.24
Net Fund Balances. June 30.1933.
______ $3,748,363.18
ADD Unliquidated Purchase Orders etc.
l!U, 037.32
Total Fund Balances. Net. June30. 1933-Exhi..cb_i_t_".::A=-'-'_-.::..c--'.-'_.:__.:__ _ _..c
$3,867,400.50 --------------
Schedule No. 6-A
STATE HIGHWAY BOARD OF GEORGIA
DETAIL OF CONSTRUCTION UNENCUMBERED ALLOTMENTS, BY CLASS OF PROJECT
JUNE 30, 1933
Unencumbered Allotments
Contracts Regular Contracts _____________________ $ 2,632, 735.67 Emergency Federal Aid Contracts _______ 1,617,779.33
Total Con tracts _____________________ _
$4,250,515.00
State Force Allotments
Division Forces ___________________________ $ 13,255.05 AsphaltForces_____________ _____________ 456,267.34
Total 8 tate Forces_ _____________________
469, 522.39
Total Unencumbered Allotments ______ _
$4,720,037.39
Less: County Contract Participation___ _
26,454.89
Net Cash Liability_____________________ _
$4,693,582.50
Less: Estimated Participation Federal Aid ______________________________ $ 1,102,961.55
County, Cash, Excess Participation______ Other Cash______________ ______ ___ __
13 ,563.92Cr 28,367.80 1,117, 765.43
Net St~te ~~ab~~ity, June 30, 1933Exhibit A. _______________________ - _
$3,575,817.07
=====
'-
Schedule No. 6-B.
STATE HIGHWAY BOARD OF GEORGIA
DETAIL OF MAINTENANCE UNENCUMBERED ALLOTMENTS, BY UNITS AND CONGRESSIONAL DISTRICTS
Unencumbered Allotments July 1, 1932
Allotments
JUNE 30, 1933
-
Net
Expenditures
Encumberances
DIVISION NO. 1.
T otal Charges
--
Unencumbered
Allotments June 30, 1933
1-4_____________ $ 1-5 _____________ 1-6____ --------1-7_____________ 1 - 9 ____________
Totals ______ $
-
438.75 704.52 1,236.93 6,593.20 983.64
9,957.04
2-5 _____________ $ 2 - 8 _____________ 22--190--_-_-_-_-_-_-_-__-_-_-_-
Totals ______ $
1,157.44 4,842.12 4,123.76
850.94
10,974.26
$ ll,024.12 13,001.85 5,7ll.97 106,650.17 36,442.47
$ 172,830.58
' $
7, 760.16
109,223.81
125,866.65
8,322.78
$ 251,173.40
$
377.52 $ ll ,291. 65
58.73
13,135.94
22.72
6,888.28
1,989.03
111,700.33
1,047.41
37,213.07
$ 3,495.41 $ 180,229.27
DIVISION NO. 2.
$
109.24 $ 8,801.64
2,908.24
110,361.31
2,262.96
126,745.63
222.53
9,292.17
$ 5,502.97 $ 255,200.75
$ 10,914.13 13,077.21 6,865.56 109,711.30 36,165.66
$ 176,733.86
$ 8,692.40 107,453.07 124,482.67 9,069.64
$ 249,697.78
$
548.74
629.16
83.34
3,532.07
1,260.45
1$
6,053.76
$
225.20
6,612.86
5,507.74
104.08
$ 12,449.88
------
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 6-B-Cont'd.
DETAIL OF MAINTENANCE UNENCUMBERED ALLOTMENTS, BY UNITS AND CONGRESSIONAL DISTRICTS
JUNE 30, 1933
c---=---=-----=-=-----=-===-=-====-=---==--- - - - - - - - - - - - - - = - - -_ - - __-_--_---==------'----=----=c..-=--=--~-~~--=--
Unencumbered I Allotments , Allotments July 1, 1932 1.
Net
Expenditures
Encumbrances
Unencumbered Total Charges Allotments
June 30, 1933
----------- -------'----------- ------------------- -----
DIVISION NO. 3.
01 0>
3-3_
3-4____ - -
1$
1,834.14 4,831.17
1$ I
32,398.10 81,455.21
1$ I
776.33
1$
33,644.06
I
$
32,867.73
I
$
998.50
84,605.51
83,607.01
1,364.51 2,679.37
3-6 --- -3-12 ___
6,194.50 I 104,194.41 I
-
1
-
,034.79
---
- I
22,830.90
----
-
I
1,783.93 1,032.90
I
108,584.49 22,563.29
106,800.56 21,530.39
3,588.35 2,335.30
--1----------------
Totals __ - $ 13,894.60
------- ----- -
-
I$ 240,878.62 [$
4,591.66 1$
I - - - - - - - -I- - - - - - - - - - - - -
__2_4_9,397. 35 -~---~4~~-05_._69--
_1$_ _9_._967. 53-
-
DIVISION NO. 4.
-- - --------------- ----------------;---- ---------------------
4-L __
4-8 -4-10 --4-12
$ 3,153.69
628.88
1$
I
53,639.71 8,882.24
I
1$
5,678.68 808.85 I
I 90,015.95
69,649.52
Totals
I
I
-!$ 10,270.10 ',$ 222,187.42 1$
- - - - - - - - - - - - - - -I- - - - - -
I
747.78 $ 54,515.01 II$ 53,767.23 $1 3,026.17
238.61
9,732.69
9,494.08
17.04
269.07
93,254.38
92,985.31
2,709.32
1,742.63
67,537.94 I 65,795.31
4,663.06
--;-------------1------
2,998.09 1$ 225,040.02 1$ 222,041.93 1$ 10,415.59
--------------'---
Schedule No. 6-B-Cont'd. STATE HIGHWAY BOARD OF GEORGIA DETAIL OF MAINTENANCE UNENCUMBERED ALLOTMENTS, BY UNITS AND CONGRESSIONAL DISTRICTS
JUNE 30, 1933
"___---_ = "---=------""~-=- '---===='--===='------'==:==
IU1R~f.:f.~:d I Allotm Enow_!_b_e~_a_n_c_e_s"___.__E_x_p_e_ndltn<~ I Total ChM_:_~:1~ri~~d
-------
5-2 -"
---'$
"'__,
5-3"---5-11 ---
5-12 -
DIVISION NO. 5.
--~ 39~ .54~ 0~ r ~ $ ~~ 11~ 7,7~ 46~ .2~ 1 -~ $-~~ 2,3" 9- 3.1- 9 --$~~ 1~ 15~ ,12~ 8.= 18
866.62 2,057.80
73,0!'.50 46,699.72 1
688.74 610.50
73,407.63 47,710.58
100.17
7,163.05
I-~ 23- 5.28 1-7- ,370.86
Totals
- $ 2,985.05
-----"" ------
i$ 244,691.48 l$ ----
3,927 0 71
$ 243,617.25
"------~-----"
112,734.99 $ 4, 971.68
1$ 72,718.89
1,230.23
47,100.08
1,657.44
I
7,135.58
127.64
---------
1$ 239,689.54 $ 7,986.99
"- _______" ____"_
6-L __
$ 4,946.52 ]$
6-1L_
--
9,736.14 :
6-12_
I 1
4,348.84 1
Totals
$19,"031:"5cl-i$
63,813.87 126,483.23 32,717.20
223,014.30
DIVISION NO. 6.
-------
-
-
1$
I
I
1,539.32 ]$
I 1,468.30 ! 598.53Dr
68,538.49 132,080.30 35,201.93
I!$ 66,999.17 130,612.00 35,800.46
$
I
1,761.22 5,607.37 1,265.58
1
$--2,409-:G9-$~~--i$-233,4il.63-l$--8,634.17 - -
~;i~ges~a~~t--,__-_--
.$
Crews__
1
I
_ - -_ _ _ _
-1
2,45l.36Cr $--~i.il-6--1----=-~" _ " _ I$ *2,45l.36Cr , _ _ ~ " _
J--*:_.719.~0~-~-_:___:_ 2,719.40Cr [__2,719.40_ 1_"-_____ _:_
___:_____ _:___:_:
_T_ot_a_ls-= _____-'-:$__67, 112.55 _/_$_1_,3_49_,605. 04_----'-i$_ ~, 095. 6~__$1 1,389, 3~. 36__ I 1, 361, :?(J9. 6'7'__ $ ~507. 92 __
*-Expenditures for Signs and Bridge Paint Crews are pro-rated to the Divisions.
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 6-B-Cont'd.
DETAIL OF MAINTENANCE UNENCUMBERED ALLOTMENTS, BY UNITS AND CONGRESSIONAL DISTRICTS
JUNE 30, 1933
Unencumbered Allotments July 1, 1932
Allotments
Net Encumbrances
Expenditures
Total Charges
Unencumbered Allotments June 30, 1933
Div. No.1_ _____ $
2____ --
01 00
3___ --4 ______
5 ______
6 ______
Totals ______ $
9,957.04 10,974.26 13,894.60 10,270.10 2,985.05 19,031.50
67,112.55
SUMMARIZED BY DIVISION UNITS
I
$ 172,830.58 '$ 251,173.40 240,878.62 222,187.42
244,691.48 223,014.30
3,495.41 5,502.97 4,591.66 2,998.09 3,927.71 2,409.09
180,229.27 1$ 255,200.75
249,397.35 I 225,040.02
243,617.25 235,820.72
$ 1,354,775.80 $ 22,924.93 $ 1,389,305.36
$ 176,733.86 249,697.78 244,805.69 222,041.93 239,689.54 233,411.63
$ 1,366,380.43
$ 6,053.76 12,449.88 9,967.53 10,415.59 7,986.99 8,634.17
$ 55,507.92
UNDISTRIBUTED BY DIVISION UNITS
G. 0. Signs _____________________ $ Bridge Paint
Crews _________________ _
2,451.36Cr $ 2,719.40Cr
2,451.36 2,719.40
j___________ _________
___ 1$
2,451.36Cr 2,719.40Cr
Totals______ ___ __ _____ ___ $
5 ,170. 76Cr -$~~5_,_17_0_._76~-i~~~~~~-i~~-5_,_17_0_.7_6_C_r_'~--- _ _ __
Totals ______ $ 67,112.55
$ 1,349,605.04
1
1
$ 28,095.69
$ 1,389,305.36 [$ 1,361,209.67
j$ 55,507.92
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 6-B-Cont'd.
DETAIL OF MAINTENANCE UNENCUMBERED ALLOTMENTS, BY UNITS AND CONGRESSIONAL DISTRICTS
JUNE 30, 1933
~- Unencumbered
\
Unencumbered
Allotments
Allotments
Net
[' Expenditures Total Charges
Allotments
I___J_u_l~y_1~,_1_93_2________________~E_n_c_u_m_b_r_a_n~ce~s________________________________ June30,1933
SUMMARIZED BY CONGRESSIONAL DISTRICTS
Dist. No. L ____ $ 8,100.21 $ 117,453.58 $ 2,287.10 $ 123,053.50 $ 120,766.40 $ 4,787.39
23_._-_-_-__-
39.540r 2,700.76
117,746.21 105,480.60
2,393.19 1,465.07
115,128.18 107,051.69
112,734.99 105,586.62
4,971.68 2,594.74
4.. - -
5,269.92
92,479.33
1,376.02
95,897.16
94,521.14
3,228.11
5.. - -6 _____
1,861.96 7,431.43
20,762.01 109,906.38
167.97 1,806.65
21,937.58 115,472.77
21,769.61 113,666.12
854.36 3,671.69
7 _____
6,593.20
106,650.17
1,989.03
111 '700.33
109,711.30
3,532.07
8 - --
5,471.00
118,106.05
3,146.85
120,094.00
116,947.15
6,629.90
109__-_-__
5,107.40 6,529.62
162,309.12 98,338.73
3,310.37 491.60
163,958.70 102,546.55
160,648.33 102,054.95
6,768.19 2,813.40
1L ___ 11,793.94
173,182.95
2,078.80
179,790.88
177,712.08
7,264.81
12.. ---
6,292.65
132,360.67
2,412.28
132,674.02
130,261.74
8,391.58
Totals ______ $ 67,112.55 $ 1,354,775.80 $ 22,924.93 $ 1,389,3C5.36 $ 1, 366' 380.43
UNDISTRIBUTED BY CONGRESSIONAL DISTRICTS
------ $ G. 0. Signs _____ - ~---- -
2,451.360r $
-- ~-~.451.36
----
Bridge Paint
-~ i$
Crews. ________ ---------- ----- -
2, 719.400r
2,719.40
- -- ---- ---
2,451.360 r 2,719.400 r
---- $ Totals ______ -- --- -----
5,170. 760r $
Totals ______ $ 67,112.55 [$ 1,349,605.04 i$
5,170.76 28.095.69
$ ----- --
---r$
5,170.760 r
$ 1,389,305.36
1,361,209.67
$ 55,507.92
---
1----------
55,507.92
STATE HIGHWAY BOARD OF GEORGIA DETAIL OF ADMINISTRATION UNENCUMBERED ALLOTMENTS, BY UNITS
JUNE 30, 1933
Schedule No. 6-C.
Unencumbered Allotments July 1, 1932
Allotments
Net Encumbrances
Expenditures
Total Charges
Unencumbered Allotments June 30, 1933
G. o. _______ _
G. o. Mtnc.
Mtnc. Claims ~ __ Magazine
----- .. --- - - $
----------~~~-- ---~--~~---
GENERAL ADMINISTRATION ALLOTMENTS
261,878.05 16,524.58
10,326.26 5,166.37
GENERAL OFFICE
315.05
-----
- - ~~~--
-~--~
$ 262,193.10 $ 261,878.05
-- -
1$
107.44
16,632.02
16,524.58
10,326.26 5,166.37
10,326.26 5,166.37
I- -
Totals __ _
-I Warehouse___
$ 293,895.26 -I$ 18,280.94
No. L_ ------- - --- ---
2 ___ 3___ -
---
-- --
-----
4___ ---
---
5 ___ ~
6___ --
1$ - - - -
----
Totals ___ - - ---- -----I$
Totals __ ~ - - ---
---
-$
9,629.08 10,604.66 10,362.35 12,608.98 11,232.10 12,436.46
66,873.63
379,049.83
1$
422.49 $ 294,317.75 $
------
WAREHOUSE
293,895.26 I - - - ----~
----~
I
1$ I
17.54 I$ 18,298.48 1$ 18,280.94 1- ---
DIVISIONS
j$
4.72 $ 9,633.80 j$ 9,629.08
15 .34Dr
10,589.32 I 10,604.66
72.G6Dr
10,289.69
10,362.35
95.82
12,704.80
12,608.98
18.08
11,250.18
11,232.10
51.09Dr
12,385.37
12.436.46
-
---. --
--
-- --
- -- ------
--
__ _ ____ _ __
$
20.47Dr ,$ 66,853.16 ~~66,873.63 -- ~--_-_.:_
1
j$
419.56 1$ 379,469.39 ,$ 379,049.133 I_
____ -----
----~
STATE IDGHWAY BOARD OF GEORGIA
Schedule No. 6-C-Cont'd.
DETAIL OF ADMINISTRATION UNENCUMBERED ALLOTMENTS, BY UNITS
JUNE 30, 1933
-----
Unencumbered
Allotments July 1, 1932
Allotments
Net Encumbrances
Expenditures
Total Charges
Unencumbered
Allotments June 30, 1933
OTHER ADMINISTRATION ALLOTMENTS RESEARCH AND ANALYSIS
"' Analysis_ ,_. Research_
Totals_ ___ _
$
9.81 i'$
7,086.48 I
-$
7,096.29
I
1$
I
1$ 9.81Dr
I
I
17.33
$
9.81
7,103.81
7,086.48
1--7.52 1$ 7,103.81
$
7,096.29 1- -
I
Totals_
COLLECTION OF REVENUE
_1$ 79,432.07 1$
i
I
--------~-~---~-----~-~--~----
75.31 1$ 79,507.38 1$ 79,432.07
I,
----------
Totals ____ -I
--- $
874.99 1$
$ 1$ Totals__
--~--------I--87-,4-0
~~-
3.35
QUARRY
1.50 1$
876.49
84.33 ,$ 87,487.68
--~---------
1$
874.99
I
1$ 87,403.35 I
STATE HIGHWAY BOARD OF GEORGIA
MAINTENANCE APPROPRIATION JUNE 30, 1933.
APPropriation. fiscal year,
1932-33- - ---------DEDUCT: Allotments for year
Maintenance General Division No. L .. Division No. 2... Division No.3.. .. Division No.4 Division No.5.... Division No. 6 ___________ _
Bridge Paint Crews. -----~ Less: Prorated to Divisions......
7, 758.53 10,477.93
$172,830.58 251,173.40 240,878.62 222.187.42 244,691.48 223,014.30
2, 719.40Cr.
Schedule No. 6-E $1,540,631.08
G. 0. Signs ______________ $ 4,535.72
Less: Prorated to Divi-
sions............
6, 987.08
2,451.36Cr. $1.349.605.04
Maintenance Administration General Office.. _________ _
Claims........ ___ ... __ .....
$ 16,524.58 10,326.26
26,850.84
Maintenance EQuipment. .. Reconstruction. ___________ _
Shop ___ --------------Less: Shop Billings_
$ 172,861.97 172,947.52
20,592.10 30,965.59
85.55Cr.
Total Allotments .
Construction Project Allotmer.ts
from Maintenance Appro.
Route 9-53Construction
23 Forsyth.. ______ $ 11,634.45 109 Dawson ________ _ 7,613.68
268 Dawson.. .
3, 864.79
283 Forsyth........ . 2, 922.61
317-BC Lumpkin. ____ _ 6,194. 76
321 Forsyth ________ _ 8,026.74
$1,427,928.02 $ 40,257.03
New Construction Projects 141 Richmond __ ....$ 370 Richmond ...... . 279 Cook __________ __
357 Lowndes _______ _ 451-A EmanueL ______ _
5, 914.56 8, 536.03 12,807.29 23,273.13 8, 053.27
$ 58,584.28
Revision l93l-32Projects
61 Wilkes.. .........$ 4, 941. 76Cr.
282 Lowndes ______ __ 14,927.49Cr.
387 Burke ......... ..
941. 72Cr.
20,810.97
Total Construction Projects .......... _________ 78,030.34
TotaL.__________________________________________________________ 1, 505,958.36
Appropriation Balance, June 30, 1933-Exhibit "A"--------------------------- ~2__!~
62
Schedule No. 6-F
STATE HIGHWAY BOARD OF GEORGIA
ADMINISTRATION APPROPRIATION
JUNE 30, 1933.
Appropriation
Appropriation for year 1932-33___ _ DEDUCT: Underrun closed into
Surplus, June 30, 1933 _________ _
497,523.51 57,921.17
Net Available _________ _
DEDUCT: Allotments tor year
General Administration Division No. L__ __________ _ Division No.2 Division No. a___ Division No. L __ Division No.5 __ _ Division No.6 _________________ _ General Office __________________ $ Less: Blue Print Billings____ __
------------------------------------- 43g, 602.34
$
325,520.04 63,641.99
9,629.08 10,604.66 10,362.35 12,608.98 ll,232.10 12,436.46
261,878.05
Magazine ______________________ _ Warehouse ____________________ _
5,166.37 18,280.94 $ 352,198.99
Other Administration Allotments Research and Analysis __ Less: Test Billings __________ _
$ 36,683.02 29,586.73
7,096.29
Collection of Revenue __ Quarry _______________ _
79,432.07 874.99
Total Allotments _____ _
439,602.34
Appropriation Balance, June 30. 1933 __ _
------------- ===0=.0=0
63
Schedule No. 6-G STATE HIGHWAY BOARD OF GEORGIA
SURVEY APPROPRIATION
JUNE 30, 1933
Appropriation
Appropriationforyear1932-33 _______ $ 300,000.00
Less: Write off of Survey Project ____ _
Balances in October 1932
306,547.86
Net Available
___ _
Deduct: Allotments for year
$ 6,547.86Dr 6,547.860r
Appropriation Balance, June 30, 1933 __
0.00
64
Schedule No. 7 STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ESTIMATED PARTICIPATION, ALSO REFLECTING RECONCILIATION
WITH REVENUE RECEIPTS
JULY 1, 1932 TO JUNE 30, 1933
Description
Estimated Participation July 1, 1932
Fund Revenue Revenue Receipts Accrued
Estimated
Participation June 30, 1933
State Treasurer Motor Vehicle_____________ _ Gas Tax __________________ _
Counties
Cash for Construction______ ___ _________ $ 699,442.67
Contract for Construction__ __________ _
636,784.78
a;, Railroads, Cities, etc.
01 Cash for Construction___ _
10,476.89
Contract for Construction____ _
2,498.97
Federal Aid
Cash for Construction_________________ _
1,310,482.87
Miscellaneous Income_______________________ ____ _____ _
$ 1,120,670.19 $ 1,120,670.19
7,786,322.58
7,786,322.58
709, 777. 93Dr 337, 585. 93Dr
3,228.66 272,914.61
27,132.65 1,390.00
9,241.74 3,718.32
4,857,499.02 18,852.02
5,065,020.34 18,852.02
------- ---- ---. ------ ------
$ 13,563.92Cr 26,284.24
28,367.80 170.65
1,102,961.55
-------------------
Estimated Participation, 7-1-32 ___________ ~ 2,~~~~~=~
Fund Revenue Accrued ______________ _ ADD : Reduction in Reserve for Doubtful
County Cash Due___________________________ _
Fund Revenue-Exhibit "B" _________ _ Revenue Receipts-Exhibit "C" ___________ _
Estimated Participation, 6-30-33-Exhibit "A" _
$ 12,764,502.60
699,442.67
----~--
I
!~=2~~~~~~== ~2~~~~~~==-
___ ----- ---------- ----1~=1!!~~~~==
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF EXPENSE DISBURSEMENTS, BY OBJECT OF EXPENDITURE
Schedule No.8
JULY 1. 1932 TO JUNE 30, 1933
I =====
(Analysos)
(Analysis) I (Analysis)
(Analysis)
(Analysis)
(Sche~ule
I (Schedule
(Schedule
(Schedule
(Schedule
No. 8-E)
, Total I Ntt E>pense I ---
-~-- -- -- -- - - - - -- - -
MEMORANDUM
'I
OBJECT OF EXPENDITUFiE
No. 8-A) 1 No. 8-B)
No. 8-C)
No. 8-DJ
Legoslative Disbursements Net Expense Inter-Depart-~ Gross Expense
Administration; Construction Maintenance Equipment
Transfers
Disbursements m.ental Billings, Disbursements
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ---~-~----- - - - - - - - - - - - - - - - : - - - - -
Personal Services_________________ $ 323,434.36$ 846,328.01!$ 722,889.88 ______________ ,~ 1,354_21,$ 1,894,006.46$ 1,894,006.46$ 141,673.821$ 2,035,680.28
Equipment Expense______________
16,563.46 197,396.041 478,240.901:------------j
1 ~~~::~c~~~~c~:~~~~~~::::::::: -----i7:o94:8o ----- 4:189:95 ------6:397:84 '~ . :~ 1 64 477 8
Heat. Light. Power and Water___
4,837.84
1,813.46
1,263.01 .. -----------~-
Rents-----------------------------
5,515.40
5,146.56
8,892.54~-- _________
7.221
2:33]
____ ___________
692,207.62
~~::~~:~:
7,914.31 19,554.50
692,207.621'
~i::~~:~: --
7,914.311
19,554.50
5,457,381
56a:99l
3,404.30' 51.001
697,665.00
~:::~~:~
11.318.61 19,605.50
Traveling Expenses_______________
"'Supplies and Materials___________ "'Insurance_________________________
46,872.57
6,603.65 6,063.47
76,000.48]
643.228.85' 3,546.67
25,091.78- _________
135,891.14 --------------~---
16,885.26~------- ______ __
362.53
1
148,327.36
785,723.64 26,495.40
148,327.36
785,723.64 26,495.40
2,527.57
111,889.221' 511.49
15C,854.93
897,612.86 27,006.89
Printing,Binding,Publicity, etc. Claims_____________________________
9,846.36
74.62
8.23----- ________ --------------
18,714.52 ______________ . __________ -~----- ___ __ __ _ __________ .. __
9,929.21 18,714.52
9,929.21 ______________ 18,714.52 __________ . ___
9,929.21 18,714.52
Payments to Contractors________ ______________ 9, 620,182.36
SpecialandMisc.Expenses ______ . ___1~4lO.~j
99,04l.04i
1
T~;~~.~~~:~~-t_r_~:~~~-~~~~~~~:..1$ 466,957.071
II
2,249.84 ______________ :____________ __
1 1,517.05 ::.::==::_:_J ~182.861
9,622,432.20 9,622,432.20 --------------~' 9,622,432.20
1,219,151.~ _l,219,15l.59 ___~o.47 ___:.~!),~~~
$14,536,618.81$ 266,176.24$14,802,795.05
Total Co~struction-Exhib.it.'.'c.': ------------- $11,496,948_04
1
Total Mamtenance-Exh1b1t C ---------------------------- $ 1.399, 327.471
I
Total Equipment-Exhibit "C"---------------------------------------------- $ 64,477.08
I
Total Legislative Transfers-Exhibit "0"------------------------------------------------- $ 1,108,909.15
Total Expense Disbursements-Exhibit 'C" -------- _________________ .. __ .. __ . ___________________________ !$14, 536,618.81
NOTE: For Summary by Congressional Districts. see Schedule No. 9. For Summary by Division Units, see Schedule No. 10.
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF ADMINISTRATION EXPENSE DISBURSEMENTS, BY OBJECT OF EXPENDITURE
JULY 1, 1932 TO JUNE 30,1933
Schedule No. 8-A
GENERAL ADMINISTRATION
--II RESEARI CH AND ANA LYSis_ _
i
OBJECT OF EXPEI\I>ITURE
'
I
Inter-Depart-
General
mental
Net General
Administration Billings Administration
1
1
Inter-Depart- 1
1
Research and I mental 1
Analysis j Billings ,
Net Research
Collection
1 of Revenue
I
Quarry
i Total
I NGt Expense
1, Disbursements
-P-ers_o_n_a_lS_e_r_VI_.c_e_s_-_-__-_-__-_-__-_-__-__-_-_ $
00
-'l Equipment Expenses______________ Communication Services_________ ~
RTHr=a~v~e~!Lm.-~g~~E-~x,_p~e-0n-~s-e~s~--~~--~---~---__a_t__~_~- - - -~
S u p p ! i e s a n d M a t e r i a l s ___________ Insurance_________________________ Printing,Binding,Publicity ,etc.
1 ~~~c~:i~d:M:i~~::E~~~;;s-~;_:::::: _ TOTALS .. ------------------$
329,205.66$ 55,621.24$ 273,584.42$ 23,444.97 $ 23,439.971$
5.00$ 49,121.04$
723.90$ 323,434.36
9,488.20--------------
9,488.20
1,390.67
914.16
476.51
6,589.68
9.07 16,563.46
16,662.23 ______________
;: ~~; :~~~1~~~ ~~ ~~~~~~~ ~~~
16,662.23'
20.40
20.40 -------------
432.57--------------
::~~~ :!~~------~:~~~~~ --- ---~:~~~:4 -~~:::::::::: i:::::::::::::: ::::::::::::::
17,094.80
i: ~~~ :!~
23,892.23 -- -----.
23,892.23
1,746.171
1,746.17 ------. ---
22,980.341______________
46,872.57
14,142.46,
8,020.751
6,121.711
2,428.841
1,962.52
466.32
12.73,
2.89
6,603.65
5,711.84 ----------9,836.66 ------
5,711.84
9,836 .66~
118.15
118.15 -----
7.78 -------'
7.78
211.00 1
140.63
1.92~'--------------
6,063.47 9,846.36
1~:~~!:~! -:::::::::::::I__J:~~~~~=6:i45-.32:_______cli2:8SI-----;;:;48:2ol=----;;ii:iol::::::::::::::l--~~_:_~~-~-:~_!
443,111.38$ 63,641.99_-$___ 379,469.39$ 36,690.541$ 29-,586.73$ 7,103.81
79,507.38$
876.49$ 466,957.07
Total Administration Expense Disbursements-Exhibit "0"----- __ _ ..-------------------.------------- - ------- ------ ----.--- -------1$ 466,957.07
Schedule No. 8-B STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF CONSTRUCTION EXPENSE DISBURSEMENTS, BY OBJECT OF EXPENDITURE
JULY 1, 1932 TO JUNE 30, 1933
Object of Expenditure
Actual
Surveys Plans I Total
Construction Supervision Direct I
I I
Total
Total _ Expense Dis-
bursements
Personal Services ___________ -- $ 44,629.51 -- -------- $ 44,6?9.51 $541,342.25$ 260,356.25$ 801,698.50$ 846,328.01
Equipment Expenses ______ ---
2,251.09 --
---
2,251.09 24,056.38 171,088.57 195,144.95 197,396.04
0> 00
Communication Services_ ----Heat, Light, Power and Water__
Rents ____________________
----
50.52- - -------9.44 ------- . - -25.28 --- ----- --
50.52 9.44 25.28
1,254 .4.0 26.50 919.68
2,885.03
1,777.52 4,201.60
4,139.43
1,804.02 5,121.28
4,189.95 1,813.46 5,146.56
Traveling Expenses ___________
15,256.73 -------
15,256.73 57,668.87
3,074.88
60,743.75
76,000.48
Supplies and Materials ________
1,658.18-- ----------
1,658.18 12,992.02 628,578.65 641,570.67 643,228.85
Insurance ___________________ ---
---
----
68.43
3,478.24
3,546.67
3,546.67
Printing, Binding, Publicity,
etc. __________________________
12.10 --- -- --
12.10
62.52 --------------
62.52
74.62
Payments to Contractors ____ -- ----- ---- . -----
- --------- 3,817.56 9,616,364.80 9,620,182.36 9,620,182.36
Special and Miscellaneous Ex-
penses ____________________ --
1.60 63,421.99 63,423.59 30,653.03
4, 964.42
35,617.45
99,041.04
TOTALS __________________ $ 63,894.45$ 63,421.99 $ 127,316.44 $ 672,861.64$10,696,769.96 $11,369,631.60$11,496,948.04
Total Construction Expense Disbursements-Exhibit "C" _________________ _
-----1$11,496,948.04
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF MAINTENANCE EXPENSE DISBURSEMENTS, BY OBJECT OF EXPENDITURE
JULY 1, 1932 TO JUNE 30, 1933
Schedule No. 8-C
OBJECT OF EXPENDITURE
GENERAL MAINTENANCE
Supervision
Direct
Total
RECONSTRUCTION
Supervision Direct
Total
Shop
SHOP
Inter-Departmental
Billings
Net Shop
Total Net Expense Disbursements
Personal Services__________________ $ 51,859.71$ 667,280.11 $
85 Eo.uipmentExpenses______________ 3,900.30 473,437.30
Communication Services_________ 5,622.51
775.33
Heat. Light, Power and Water...
161.25
1,101.76
Rents------------------------------ 2,273.00
6,619.54
Traveling Expenses_______________ 15,893.58
9,015.86
Supplies and Materials___________ 2,177.22 128,527.51
Insurance_________________________
778.50 16,106.76
Printing,Binding,Publicity,etc.
8.23--------------
Payments to Contractors________ ------------
2,249.84
Special and Misc. Expenses______ ____________
1,517.05
719,139.82------------$ 3,750.06$ 3,750.06$ 62,612.61 $ 62,612.61 ------------$
477,337.60 ____________
903.30
903.30 4,543.22 4.543.22------------
6,397.84------------ ---------- -----------
540.59
540.59------------
1,263.01 ____________ ------------ ____________ 2,016.06 2,016.06------------
8,892.54 ____________ ____________ ____________
51.00,
51.00------------
24,909.44 -----------
182.34
182.34
781.40
781.40------------
130,704.73 ------------ 5,186.41 5,186.41 101,905.95 101,905.95 __ ----------
16,885.26------------ ------------ ------------
393.34
393.34------------
8.23 ____________ ------------ ------------ ----------- ------------ ------------
2,249.84 ____________ ------------ ____________ ------------ ----------- -----------
1.517.05 ------------ ____________ ____________
103.35
103.35 ------------
722,889.88 478,240.90
6,397.84 1,263.01 8,892.54
25,091.78 135,891.14 16,885.26
8.23 2,249.84 1,517.05
TOTALS-----------------------;---;;,;~;;$ 1.306,631.06$ 1,389,305.36 ------------ $ 10,022.11$ 10,022.11 $ 172,947.52,$ 172,947.52 __________ __\$ 1,399,327.47
-------+ Total Maintenance Expense Disbursements-Exhibit "C"________________ --------------------------------------------- __________________ ....
1, 399,327.47
Schedule No. 8-D
STATE HIGHWAY BOARD OF GEORGIA
ANALYSIS OF EQUIPMENT EXPENSE DISBURSEMENTS BY OBJECT OF EXPENDITURE
JULY 1, 1932 TO JUNE 30, 1933
. - - - - - - - - - - - - - - - - - - - - - - - - - --- - - - - - - - - - - -
- - - - - - -------~
~-~
-~-
- - -------~-
~-,--
1
1
[
I 1
Object to Expenditure i, Admmis- Construe-
I Total Mainte- 'I DEixspbuenrssee-
! tration 'i tion
tenance ments
------1
I
I
Land & Buildings _____ j$ 720.99$ __________ $6,523.68 \$ 7,244.67
Automobiles __________ , 1,831.18, 9,586.89 3,612.83
15,030.90
I Trucks _______________ ' _ _______ 1,016.07 2,053.96 1 3,070.03
Tractors_________________ _____ ___ 5,319.00 107,50Cr 5,211.50
Road Machinery Misc.__ ______ __ __ 19,488.26 6,868.18
26,356.44
~~;~e~~~f~~~J)~ent 4 ' 2~g:~~ -----93i~75 ~~~~~~~~~~~:\
4,265.66 972.11
Shop EqUipment_______ ,___________ ___ ____ ____ 1,857.33
1,857.33
r - - - Laboratory Equipment_ I 468.44 _______ -- __ ,--- __ -- __ - _ 1
468.44
Totals _______ _____ I$ 7,326.63 $ 36 ,341.97[$20,808.48 I,$ 64,477.08
:~==--=~=~=~~~'-=!~~==~
Total Eq~:pn;,ent Expense Disbursements-
1
Exhibit 0 _________________________________________ -~~-~~()il
70
Schedule No. 8-E STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF LEGISLATIVE TRANSFER EXPENSE DISBURSEMENTS, BY OBJECT OF EXPENDITURE
JULY 1, 1932 TO JUNE 30, 1933
I E;;:~e I Motor
W. & A.
Object of Expenditure Vehicle Convict Rental I
License Farm Discount Disburse-
Tags
I ments - - -
--~~----
Personal Services.. ____ -1$- ____ [$1.354.21 $
1,354.21
Equipment Expenses ___ __ . _______ ,
7.22
7.22
Communication Ser-
HW!~:t~~h-t~-:p()~~~-&1_1 ____
1
__II__ _2.331. -
2.33
i
Rents_____ ___ Traveling Expenses_____ __
Supplies and Materials_ -
~~~;;~~~~el3in<iing:P-ul:>-\ -licity, etc. _____ _
_. ___ -I _
_ 362.53 __
-!
-1--
l1
1
1'1
.
_
,
362.53
--
Special & Misc., Ex-
1 1
1
penses Transfer of
Funds___ __ ___ 123,790.39,1 3,392.47/1,080,000.00[1,107,182.86
Totals ___
__ ~~, 790.~(jlI$
~--~~ 5,118. 76I$!Jl~().OOO.__()() :g_,l08,!)09-_!~
T~~~i~~fi~~.~ive -~~a~sfer Ex:_e_~se-~isb-~~~~~~~~_-l~-1~~0()~~
71
Schedule No. 9.
STATE HIGHWAY BOARD OF GEORGIA
SUMMARY OF EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS
JULY 1, 1932 TO JUNE 30, 1933
==~================
Districts
(Analysis) I (Analysis) fl (Analysis) !(Analysis) (Schedule (Schedule (Schedule (Schedule No. 10-B) No. 10-C) \ No. 10-D) No. 10-E) Construction I Surveys Maintenance Recon-
struction
Total
N~- $1,325,877.241$10,145.511$ 123,053.50$. _____ -1$1,459,076.25
----------I 2 1' 124,550.51. 13 '705.36 $ 115,128.181 412.64 1,253 '796.69
3
900,953.66 9,866.07 107,051.69
1,017,871.42
4
531,288.331 10,531.07 95,897.161 2,269.02 639,986.25
5 6
------1 237,911.70 4,299.78 21,937.58 137.721
648,152.23 11,848.13 115,472.771-
264,286.11 775,473.13
7
834,863.40 17,475.18 111,700.331-- -------
964,038.91
8 1,387,118.20 11,196.62 120,094.00-------- - 1,518,408.82
9
885,590.85 8,961.23 163,958. 70] 573.261 1,059,084.04
10
834,595.84 3,585.42[ 102,546.551 189.40
940,917.21
11 1,379,102.67 13,940.521 179' 790.881 6,440.071 1,579,274.14
12 ~9,626.~ 11,761.551~674.02!~~1 1,424,062.54
Totals $11,369,631.601$127,316 .44!$1 ,389,305 .36~$10,022.111
Total Expense Disbursements Distributed_J:>y Districts_c__J $1_:? ,8962.275.51
Undistributed by :Cistricts Administration General Office_ Warehouse _________ _
Division Offices _____ _ Research_ __________ __
Collection of Revenue Quarry_____________ _
_$ 294,317.75 18,298.48 66,853.16 7,103.81 79,507.38 876.49
TotalAdministration _______ _____ $ 466,957.07
Land, Buildings and Equipment_
64,477.08
Legislative Transfers
Convict Farm Purchase _____ $ 5,118. 76
W. & A. Rental Discount ___ 1,080,000.00
Motor Vehicle License Tags_ 23,790.39 1,108,909.15
Total Expense Disbursements Undistributed by Districts$ 1,640,343.30
Total Expense Disbursements-Exhibit "C" _
72
Divisions
No.L 2 3 L 5 __ 6__ _
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 10
. . SUMMARY OF EXPENSE DISBURSEMENTS, BY DIVISION UNITS JULY 1 1932 TO JUNE 30 1933. --
(Analysis)
I (Sch<3dule No. 10-B)
[. Construction 1 '703,196 .09$
(Analysis) (Schedule No. 10-C)
Surveys
I
I
(Analysis) (Schedule
No. 10-D)
Maintenance
I (Analysis) I (Analysis) I
(Schedule No. 10-E)
I
(Schedule No. 10-A)
R"construction Administratior
- ------- -
I
I
26,666.36$
180,229.27 $
783.87 $
9,633.80 1$
Total 1,920.E09.39
1,846,798.56
18,712.24
255,200.75
573.26
10,589.32
2,131,874.13
1,559,547.55
26,542.59
249,397.35
1,812.27
10,289.69
1,847,589.45
I
2,324,999.83
I
2,013,367.58 1,921,721.99
15,311.091 23,369.03 16,715.131
225,040.02 243,617.25 235,820.72
- 594.341 6,258.37[
12,704.80 11,250.18 12,385.37
2,578,055.74 2,292,198.38 2,192,901.58
Totals __ _ 1$ 11,369,631.60$
127.316 .441$ 1,389,305.36$
10,022 .ul$
66,853.16l
-
_, Total Expense Disbursements D1stnbuted by DivisiOns
- - - - - - - - - ------- - - - - -- ]$
"' Undistributed by Divisions
Administration
General Office __ ___ _____
_________ __ $
294,317.75
Warehouse__
_________ _
Research___ _______ ___________ _________________________________ _
18,298.48 7,103.81
Collection of Revenue______________________
_______ _
79,507.38
QuarrY. __
- - - - - - - - - -- -- - - -- -
876.49 $
400,103.91
12,963,128.67
Total Administration ___ _
Land Building and EqUipment Legislative Transfers
Convict Farm Purchases ______________________________________ _ $ Motor Vehicle License Tags _____________________________________ _ W. & A. Rental Discount_________________________________________ _
64,477.08
5 ,118. 76 23,790.39 1,080,000.00$
1,108,909.15
Total Expense Disbursements Undistributed by Divisions _______________________________________________ $ 1,573,490.14
Total Expense Disbursements-Exhibit "C" ______________________________________ _
-------------- $ 14,536,618.81
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF ADMINISTRATION EXPENSE DISBURSEMENTS, BY UNITS
JULY 1,1932 TO JUNE 30,1933.
Schedule No. 10-A
I Personal
I Services
I Furnishing!
1 Heat,
I Equipment Communi- 1 Light,
Expenses cation
Power
Rents
1
-
I
I Traveling Supplies
Expenses and !Insurance
Printing, Binding, Publicity,
-
Claims
Special
and Miscellaneous
Total
Services and Water
Materials
Etc.
Expenses
1~~-----------------1------------- ~-
GEN~~~~?s:~~~~rs ----------~----------1--------- ~------ -~-~'>~-
-1$ .............
Genera1Engineering_______
---1 P1ansforRoadways________
Plans forBridges........
31,449.71$1.127.36
$ 3,836.00----------1- - ..... ----
21,286.60 73,291.03
514774..2051-------------------+!--------------------,-------------------~
1,855.30 __________ 330.23 ----------'
I
------- $
_1_:8_-4_-o_-~col-
16,863.88 290.29 ----------!---------- ---------- 1,322.16---------- _
- --------$
I
- :: ____ --_:_:_-_-_-_-_:_,
36,413.07 23,689.15
75,635.27 18,476.33
Construction________________ ! 11,510.56 1,449.41 ----------~---------- ----------1 3,817.85--------
Accounts____________________ 59,752.45 412.46---------- ---------- __________ 2,097.54---------
16,777.82
--------1 62,262.45
Statistics___________________ 5,545.19 .......... ----------!---------- $3,177.00 53.00,$ 435.02
i _____ __________ 9,210.21
Purchasing__________________ 16,750.80
97.87 .......... ;.......... __________
152.71 1. . . . . . ____ _________
17,001.38
Maintenance............... 12,566.37 1,119.13 ---------~---------- __________ 2,835.75----------$ 164.52
_ $10,272.51,-
26,958.28
Publica.tion_________________ 2,277.00 __________ $ 459.321---------- 175.00----------
18.00
30.00 2,202.05 __________ ,$ 5.00 5,166.37
Undistributed ............... __16.148.47 1,442.14 10,409.97$4,623.87 ~-1,670.26 10,278.97 3,109.29 _ _5,767.01 8,041.991 4,723.44 66,369.41
TOTALS.---~-----:~------$ ==.:._:_ ==:.:..:: .:..:.== .:.:.==j .:.:.==j Less: Blue Pnnt Billmgs..
1
267,442.06$ 6,659.92$10,869.29$ 4,623.87$ 3,506.00$17,970.801$10,731.99$ 3,303.81 $ 9,809.06$18,314.50$ 4,728.441$ 357,959.74
55,621.24 ..........
8, 020.75 ---------- ------------ __________
63,641.99
':_~623 -~ 711.~~$ 1
TOTALS. _........... ____ . 1$ 211,820.82 $ 6, 659.92 $10,869.29
$ 3,506.00 $17,970 .80 $ 2,
3,303.81 $ 9, 809 .06l $18,314.50 $ 4, 728.44!'$ 294,317.75
WAREHOUSE..................... 1$ 16,271.05 $ 618.39 $ 120.20 $ 46.001$
i
1
9.00$ 184.67$ 489.941$ 147 .15! .... ________ ,$ 40.001$ 372.08$ 18,298.48
1
!
!
I
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF ADMINISTRATION EXPENSE DISBURSEMENTS, BY UNITS
JULY 1,1932 TO JUNE 30, 1933.
Schedule No. 10-A-Cont'd.
I Furnishing I
1 Heat,
j
Printing,
Special and
Personal Equipment Communi- light,
Traveling Supplies II
Binding,
Miscel-
Services Expenses cation Power
Rents Expenses and Insurance Publicity, Claims laneous
Total
Services and Water
Materials
Etc.
Expenses
---------------1----- --------------------- ---1----1---- -------
DIVI~~~N~ne. _ ----------------- $ 7,044.85 $ 265.28 $ 461.02 $ 36.09 $ 310.00 $ 850.37 $ 308.601$ 357 .591 ____________ ---------- ---------- $ 9,633.80
No. Two_____________________
~~: ~:~e::::::::::::::::::: No. Five.. -------------------1
No. Six______________________
7,760.35
~:~!~:;~
7,591.10 7,921.40
202.60 605.44
!~::~ ~:~:;:~~
264.68 1.064.88 522.54 1,446.00
27.00 365.40 881.34 348.22 397.97[------------ $ 1.00 __________ 10,589.32
!~:i: ;~~:~~ 1.~i:~; ::::;:1 ;~~:~~~:::::::::::: ----i97~co :::::::::: ~~:;~::~~
16.11 490.00 899.77 370.44 409.12$ 9.00 345.00 1,194.03 554.20 343.84[
13.06 131.02---------- 11,250.18
14.54 31.00
3.82 12,385.37
= - = = =r=r= = -----------~-------~~-----
TOTALS_______ --------_--_ $ 45,492.55 $ 2,209.89 $ 5, 672.74 $ 167.97 $ 2, 000.40 $ 5, 736.76 $ 2, 920.53 $ 2, 260.88 $
27.60 $ 360.02 $ 3.82 $ 66,853.16
-'1 TOTAL GENERAL
,
CJ1 Administration _________________ $ 273,584.42$9,488.20$16,662.23$4,837.84$5,515.40$23.892.23$6,121.71,$5,711.841$ 9,836.661$18,714.52$5,104.34$379,469.39
RESEARCH AND ANALYSIS
=
=
=
----
Division of Tests. ___________ $ 23,439.97$ 914.16$ 20.40.$ 1,388.24----------$1,746.17$ 1,962.5~ $ 118.15~------------ __________ CR2.88 $ 29,586.73
DiVision of Research.______
5.CO 476.51 __________ ---------- ---------- ---------- 466.32 __________
7.78---------- 6,148.20 7,103.81
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ---~~ - - - - - - - -
TOTALS-------------------$ 23,444.97$ 1,390.67$ 20.4C $ 1,388.24----------$ 1,746.17$2,428.84$ 118.15.$
7.78----------$6,145.32$ 36,690.54
Less: Test Billings_________ 23,439.97 914.16
20.40 1,388.24---------- 1,746.17 1,962.52 118.151____________ ~---------- CR2.88 29,586.73
TOTALS-------------------_$_ 5.00$ 476.51 ::_:==-:_:: ==-:_:::_: ::_:_::_:::_:::_:::_: ::_:_::_:::_:::_:::_: ~466 -~ ==-:_:::_:_1$_ _7.78,::..:.=::_:::_: $ 6,148.20$ 7,103.81
COLLECTION OF REVENUE
Enforcement ofM. V. Law. $ 83,595.56$ 4,153.54$ 388.83---------- ---------- $13,411.10$ 10.03$ 116.00$
1.92 _________ _.$ 158.10$ 51,834.58
Enforcement of Gas. Tax
Law________________________ 15,525.48 2,436.14
44.24 ---------- ---------- 9,569.24
2. 70 95.00---------------------- --------- 27,672.80
------------------------------1----l----------
TOTALS-------------------$ 49,121.04$ 6,589.68$ 432.57---------- ----------$22,980.34$ 12.73$ 211.00$
1.92----------$ 158.10$ 79,507.38
1----1-------------------------------------
QUARRY. ---------------------- $ 723.90 $ 9.07 ---------- ---------- ---------- ---------- $ 2.89$ 140.63------------ ---------- ---------- $ 876.49 ------------------ ------- ----1----1-----------
TOTAL ADMINISTRATION _________ $ 323,434.36 $16,563.46 $17,094.80 $ 4,837.841$ 5,515.40 $46,872.57 $ 6,603.65 $ 6,063.47 $ 9,846.36$18.714.52 $11,410.64 $ 466,957.07
Schedule No. lo-B
STATE HIGHWAY BOARD OF GEORGIA
ANALYSIS OF ACTUAL CONSTRUCTION EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1,1932 TO JUNE 30,1933
Personal Services
I
I
Furnishing I
I Communi- Heat, Light,'
Equipment cation Power and
Expenses Services Water
kents
I
Supplie Traveling and Expenses Materials
lnsur-
a nee
Printing, Binding, Payments to Publicity, Contractors
Etc.
I
CONSTRUCTION SUPERVISION BY CONGRESSIONAL DISTRICTS
Special and Miscellaneous Expenses
----
Total
~ ;::+ DistrictNo.
53,199.94 $ 2,667.521$ 343.42------------ ----------$6,218.60$ 1,490.56$
8.97$
11.93 -------------- $ 2,171.85 $ 66,112.79
52,365.88 1,830.99
L-1 37,160.77 1,560.091
4___ ,
~:::11
27' 147.45 14,546.62 33,126 '70
1,451.051 489.73
1,275.35
87.56 ------------
70.13 $
1.50
165.50 85.00
14.00 ------------ 14.03 ____________ ,
20.00 15.00
19.63------------1----------
5,329.44 4, 400.06
2,983.99 986.29
3,526.25
1,259.54
7.30
.42--------------
974.07 ---------- ------------ --------------
572.57 ---------- ------------ --------------
338.98---------- ------------ --------------
494.29 ---------- ------------ --------------
3,645.24 1, 944.29 1,247.36 1, 774.40 1, 791.74
64,691.87 46,195.91 33,436.42 18,165.05 40,233.96
7. . . 8__ _ 9__ _
10. . . 11.._
60,618.91
77' 831.43! 46,899.371 36,288.21 50,335,15
2, 920.07j 2, 710.01' 2,314.26 2,027.60 2,365.17
90.28 ------------1 340.50 142.17 ------------~----------
53.75------------
66.50
105.26------------
4C.OO
165.93
25.00
26.00
5,861.86
5,998.18 5,119.04 4,856.61 6,339.63
1,295.13
32.54------------ --------------
1,2SC.45 ----------
.79$ 3,817 .56i
~:~~~:~~ ~ :~~ :::::::::::: ::::::::::::::1
1,778.79
5.01
38.51 --------------
2,710.87 4,206.69 2, 320.94 2,356.99 2,183.95
73,870.16 95,997.28
57' 861.22 46,858.62 63,263.14
12. . .
51,821.82 2,444.54 148.24 ------------ 161.18 6,048.92 1.240.94
10.87-------------- 4,298.71
66,175.22
---- ---- ---- -------------- ---- --- -------- ---------
TOTALS....... $ 541,342.25$ 24,056.38$ 1,254.40$
26.50 $ 919 .68 $57' 668.87 $ 12,992.021$ 68.43 $
62.52 $ 3,817.56$ 30,653.031$ 672,861.64
Schedule No. lo-B-Cont'd.
STATE HIGHWAY BOARD OF GEORGIA
ANALYSIS OF ACTUAL CONSTRUCTION EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1, 1932 TO JUNE 30,1933
-
--
-
Furnishing Communi- Heat, Light,
Supplies I
I Printing,
Special and
Personal Equipment cation Power and Rents Traveling
and
lnsur-
Binding,
Payment~ to
Miscel-
Total
Services
Expenses Services Water
Expenses Materials
anee Publicity,
I Etc. I
Contractors
laneous Expenses
CONSTRUCTION DIRECT BY CONGRESSIONAL DISTRICTS
..,
~ Di"re' No L' ~:~:~1'};~ ~:~ } ~~ ~~~ :::1:::::..~~~ i milE...~~:: EE!~
5___
1,265.571
48.11 ----------!
3.26
5.oo'__________ 27,630.47 _________ _! ___________ 190,794.24 ____________ 219,746.65
6___
612.24------------ ----------'------------- ------- ---------- 22,138.31 __________ ............ 585,167.72 ............ 607,918.27
7... 60,138.59 38,843.54 924.15:
529.85 306.00 526.02 52,814.90 1,238.03 ............ 603,886.07 1,686.091 760,993.24
8...
5,519.35 3,273.66 26.51
11.5311,035.861 ....... --- 7,184.88 ...................... 1,274,06g_93 ............ 1,21,120.92
9... 68,301.98 50,522.75 776.73
372.77 1,662.60 502.13 68,036.08 477.50 ............ 634,552.59 2,524.EO 827,729.63
10... 15,162.95 11,372.92 145.23
125.451 57.00 84.80 33,427 _g6 280.87 ............ 726,917.53
162.61 7g7,737 .22
1L. 49,991.94 43,115.18 472.78
464.21 662.79 729.90 76,900.07 696.18------------ 1,142,449.05
357.43 1,315,839.53
~~:::$ TOTALS.. 2~:::::::!$ 171.:::::: ~ 2,88:::::~~::::1$ 4,2:::~ ~-~:~;~:~~ $ 6:~::::~~~-~:~~~:~: ::::::::::. $ ::~~::::::~---::~:~:~$1:::::::::.;
----------------------~----~~----~----------------- .
.
I
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 1Q-B-Cont'd.
ANALYSIS OF ACTUAL CONSTRUCTION EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1,1932 TO JUNE 30,1933
Personal Services
Equipment Expenses
Furnishing Communi- Heat, Light,
cation Power and Services Water
Rents
I
Traveling Expenses
Supplies and
Materials
lnsurance
CONSTRUCTION SUPERVISION BY DIVISION UNITS
I
Printing,
Special and
Binding, Payments to Miscel-
Publicity, Contractors
laneous
Etc.
Expenses
I
I
Total
$ ]$ Division No. L. $ 110,217.24$ 5,178.69$ 136.55------------ 442.001$10,081.36$ 2,559.93
38.161-----------J ------------- $ 5, 938.31 $ 134,592.24
2___ 100,357.94 3,803.00 186.53 ------------ __________ 8,727.65 I, 739.63
1.68$
. 791$ 3,817.56 5,586.29 124,221.07
cz
!::: :_:_:_:_:_:_:_: ::!!~:::
!:!;~:~~
2~i:~~ ~-------~~:~
2~~:~~ ~~:!~~:~~
~:::~:~~
-----16:28--------4:92:
-------------
-------------
3,838.36 5, 784.88
85,916.70 114,264.77
5___
95,728.45 3,627.74 173.43 ----------- 243.00 10,604.05 2,313.2811 12.31
.42,_ ------------- 5,707.73 118,410.41
2~~ --=~~~ 6... ___7_5,_9_7o_._oo_ _ _ 3_,7_2_5._9_9 ____4_7_4._89 _ _ _ _ _ I.Oo 8,888.87
-~-56.39-1--:--_-_--~--~--~- --3,-797~.46 ~-9-5,4-56-.45
1
1
TOTALS...... -$ 541,342.25$ 24,056.38$1,254.40.$
26.50$ 919.68$57,668.87$ 12,992.021$ 68.43$
I
,
62.521$ 3,817.56$ 30,653.03$ 672,861.64
Division No. L .. $
2.,_
3___ 4.,_
5.. . 6.. .
..!$ T O T A L S . . . . .
CONSTRUCTION DIRECT BY DIVISION UNITS
I
I
1
85,250.45$ 63,259.97$1,201.62$ 892.14$ 358.001$ 597.76$!27,630.58$1,544.78 ____________ !$!,284,134.11 3,734.44$1,568,603.85
5l,!i~:~~ ---~~:~~~:~ ____:~~~:: -------~:~~: --~:~~~~~~ ----4~~~~~ :~:~~~:~~ ----~70~:l:1::::::::::ll i::~~::::~ ------~:~~~~ i:~;;:~~:~
35,710.56 64,089.73 23,565.97
18,137.68 44,671.70 12,932.501
400.43 697.03 60.18
180.80 661.31 18.00
127.00 376.64
345.99 249,613.93 688.50 100,624.04
697875.C.6714-----------------------~-'
1,905,370.421 1,681,724.22
688.50:-~012.241 70,098.90~==~.: 1,717,744.96
162.61 2,210,735.06 446.93 1,894,957.17 144.29 1,826,265.54
260,356.25$171,088.571$ 2,885.0+ 1,777.521 4,201.601$3,074.881$628,578.651$ 3,478.241------------1* 9,616,364.8(11$ 4,964.42$10,696,769.96
---
Schedule No. 10-C
STATE HIGHWAY BOARD OF GEORGIA
ANALYSIS OF SURVEY EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1,1932 TO JUNE 30,1933
Personal Services
Equipment Expenses
Furnishing
Communi.. Heat, Light,
cation Power and
Services
I
I
Water
I
i
Rents
I
I
Traveling Expenses
Supplies
and Materials
I
lnsur .. arce
I
Printing, Binding, Publicity,
Etc.
Payments to Contractors
Special and Miscellaneous Expenses
Total
SURVEY ACTUAL BY CONGRESSIONAL DISTRICTS
L.l$ ------------!---)$ ~ ../$ ~ -----------------------~--------,---------------------~-----------------------~------~-------------------------
<0 District No.
1,773.91$ 273.69$
.75
833.54$
33.241----------1$
3.70.............. ...........
2,918.83
:2:.:.:.
5,007.75 !:~~:~~
L ;:mE
272.54 115.68
;~~
----r-------- .60 ............
5.18.. ....
25.28 2,123.67 928.75
i~~ :~r : ;m~
207.72, .......... ------------]---------- ............
107.59, _________________________________ $
1.25
~~~ 1 : ~M
7,637.56
,t*~1 :::i:: ~
10... 1L.
TOTAL' ": 0
590.42 5,216.74
.::: :: $
34.31..........
.20,.......... 456.69
16.31 ..................... '.............. ............
= ~ j;CC~ ~~ <Th.: : .--;: l 608.99 13.50 ............!.......... 2,056.35
' :, 0
::;:
*
289.71 .......... 0:
"'"~ ool; 8.40 .............. ............
$
;
1,097.93
8,193.69
~ :: ~
Schedule No. 10-C-Cont'd.
STATE HIGHWAY BOARD OF GEORGIA
ANALYSIS OF SURVEY EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1, 1932 TO JUNE 30, 1933
~
Personal Services
Equipment Expenses
Furnishing
Communi Heat, Light,
cation Power and
Services
Water
Rents
Supplies Traveling and Expenses Materials
lnsurance
Printing, Binding, Publicity,
Etc.
Payments to Contractors
Special and Miscellaneous Expenses
Total
- - --------~---~~---
--
SURVEY PLANS BY CONGRESSIONAL DISTRICTS
DistrictNo. L.- -------- ---------- I--------- I___ _
-------c--~-----------------------
:
I
I
I
7,226.681$ 7,226.68
6. 067.80
6,067.80
5. 521.501 4, 054.61
5,521.50 4,054.61
2,402.06
2, 402.06
7 567 39
7,567.39
4,342.23
5, 760.44
4,429.96
I
'
'
'
--
'
I
---~
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 10-C-Cont'd.
ANALYSIS OF SURVEY EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1,1932 TO JUNE 30,1933
Personal Services
Equipment Expenses
Furnishing Communi.. Heat, Light,
cation Power and Services Water
Rents
Traveling Expenses
I
I
I
'
Supplies and
Materials
ln~ur .. a nee
Printing, Binding, Publicity,
I Etc.
I
Payments to Contractors
Special and Miscellaneous Expenses
I
rota I
SURVEY ACTUAL BY DIVISION UNITS
Ll$ ~.24 474.69~----------1------ -----1-------------- ........... Division No. 2..1
11,922.82$ 7,395.5C
403.651,$ 252.271
----------- .......... $ 4,009.93$
2.00
6.01 .......... 1 2,060.21
$ 16,819.33
187.58'.................................... ------------
9,903.57
00
3..
9,807.001
345.401 22.13
3.43- -------- 3,006.36
396.86----------,------------ --------------
1.60 13,582.78
......
4..
1
1,950.001
5~.84 -------:[--------- -~-- ....... 982.421
71.35 ----------~------------ -------------- ------------
3,060.61
5..
8,424.16
46o.06
7.90 __________ $ 25.28 3.451.19
330.87 ________________________________________________
12.704.51
1,658.18~----------1$ 6..1-~0 -03/---=~r~l =--=-:..:.:..:.::..= =--=-:..:.:..:. __:746 -~~
[$ T O T A L S . . . . . . .
44,829.51 $ 2,251.09l$ 50.52!$
9.441$ 25.28 $15,256.73$
~~ .6~ 1
196.83[::.:.:.::.:..:::..=::.:.
=::.:.=::..=::.:. =::.:.=::.:.1.---7.823
12.10 1$ . . . . . . . . . . . . . .
1.601$ 63,894.4o
1
1
1
SURVEY PLANS BY DIVISION UNITS
9,847.03 $ 8,808.67 12,959.81 12,250.48
9,847.03 8,808.67 12,959.81 12,250.48
TOTALS.......
Schedule No. 1o-D STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF GENEflAL MAINTENANCE EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1, 1932 TO JUNE 30, 1933
Personal Services
Equipment Expenses
Furnishing Communi- Heat, Light,
cation Power and Services Water
Rents
Traveling Expenses
Supplieo and
Materials
lnsu ranc
Printing, Binding, Publicity,
Etc.
Payments to Contractors
Special and Miscellaneous Expenses
Total
---
MAINTENANCE SUPERVISION BY CONGRESSIONAL DISTRICTS
~District * 62.88]------------~~----- -------~----~------~-----.------~------~-----------.------.----
1
No. L.l$ 3,956.49$ 334.88 $ 550.321$
10.34 195.38$1,300.78$ 214.64$
____________________ $
6,625.71
2...
4,000.15
435.021 440.541____________ 233.57 1,447.52
155.80 76.69------------ -----
.. ............
6,789.29
3...
3,837.65
367.701 415.85:
9.19 137.2C 1,400.51
168.17 65.72 ____________ .....
.. ............
6,401.99
!::: ~:~~::::! 2:~:~~1 4!~:~~1 2::~~ :;:~~ 1,:~~:~~ ~~::;~ 5~8:7~1 ~ .. :::..._______ ________ :__.:__--_-_--_-j:_:___:_ :::::::: ~:~~!:~i
6...
4,266.13
320.74 457.93;
26.75
17.08 1,459.001
238.02
6,844.36
7...
5,773.42
215.36 449.321
28.01 274.29 1,001.621
148.77 75.55$
7.13
------ ....
7,973.47
8...
4,186.5S
282.57 353.58
6.27 260.91 1,286.651
124.41 54.59 ............ .............. ............
6,555.57
9...
5,995.77
345.26 490.98
14.65 355.95 1,575.87
207.43 79.18
1.10--------------------------
9,066.19
10... IL.
3,303.361 6,615.21
264.66 602.85
383.13 1
17.02
970.28 ............
170.82 1,378.41 344.10 1.774.87
202.19 262.12
51.64 ............ .............. ............ 110.(3 . . . . . . . . . _ -------------- . . . . . . . . . . . .
5,771.23 10,679.46
12... _ _4,738.51 __ 384.80 _605.13 --18.45 ~~~~3.711--~~~~::i1 -------- =~====---7,935.35
TOTALS....... $ 51,859.71$ 3,900.3C $ 5,622.51'$
161.25$ 2,273.00!1$15,893.58 $ 2.177.22$ 778.50 $
1
1
8.23 .............. ............ $
1
82,674.30
-"-
------
Schedule No.1 D-D-Cont'd.
STATE HIGHWAY BOARD OF GEORGIA
ANALYSIS OF GENERAL MAINTENANCE EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1,1932 TO JUNE 30, 1933
---
--
Personal Services
I Equipment
i Expenses
Furnishing Communi- Heat, Light,
cation Power and Services Water
Rents
Traveling Expenses
Supplies and
Materials
I
I
lnsura nee
Printing, Binding, Publicity,
Etc.
Payments to Contractorf1
Special and MiscelJaneous Expenses
Total
MAINTENANCE DIRECT BY CONGRESSIONAL DISTRICTS
DistrictNo. L $ 62,103.81 $ 42,836.48$ 100.201$
L-
55,511.93 44,656.82
32.16
69.63 $ 293.50 $ 608.19 $ 8,230.12 $ 1,430.15 ------------ $
655.12 $
67.04 332.94 885.23 5,150.60 1,557.35 ---------- ---------------
100.591$ 116,427.79 144.82 108,338.89
L-
52,298.89 41 '368 "05
18.88
71.74 270.63 713.99 4,423.11 1,369.42 ------------ --------------
114.99 100,649.70
4._-
48,894.92 29,267.83
8.29!
87.71 226.63 555.67 9, 315.32 1,101.95 -------- ---------------
107.07
89,565.3 9
L-
9, 977.741 6,619. 721 17.67
6 ___
57' 470.89 41,624.97
4.30
28.33 94.43
104.48 223.15
206.12 576.38
2,985.86 272.06 ------------ --------------
7,264.87 1,228.04 ------------ --------------
25.69 141.38
20,237.6 108,628.41
L-
51,655.89 33,563.02
74.78
g___
54,515.22 43,156.85
89.58
121.78 417.67 127.96 1, 072.45
953.02 15,623.26 1,193.65 ------------ --------------
859.33 12,309.52 1' 160.51 ------------
94.14
123.79 152.87
103,726.86 113,538.43
L-
71,276.12 48,738.33 113.50
168.45 2,274.88 1,145.82 29,499.25 1,518.03 ------------ --------------
158.13 154,892.51
10---
50,143.55 35,907.90
67.13
77.60 662.50 714.90 6, 940.02 1,274.53 ------------
872.97
114.22 96,775. 32
lL_
88,197.26 58,340.32 165.00
94.44 344.60 881.27 18,570.47 2,308.65 ------------ --------------
209.41 169,111.42
- - - - - - lL-
65,233.89 47,357.01
---------
83.84
92.65
----
396.11
-
915.94
---
-
8,215.11 --
1, 692.42
---
----------------
-
-
627.61
--
-
124.09
---
-
124,738.6
---
TOTALS _______ $ 667' 280.11 $ 473,437.30 $ 775.33 $ 1,101.76 $ 6,619.54 $ 9, 015.86 $ 128,527.51 $16,106.76 ------------ $ 2,249.84 $ 1,517.05 $ 1' 306,631. 06
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 1Q-D-Cont'd.
ANALYSIS OF GENERAL MAINTENANCE EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1, 1932 TO JUNE 30, 1933
""
========~======----
I
I
Ij .,.....;-
"'"Furnishing u .
I
Supplies
I Printi ng,
Special and
Personal Services
I
Equipment Expenses
cation Services
Power and Water
Rents Traveling
and
Expenses Materials
lnsurance
Bindi ng, Payments to Publicity, Contractors
Miscellaneous
Total
------
I
- ----- -----
'
Etc.
Expenses
I
---------------------
MAINTENANCE SUPERVISION BY DIVISION UNITS
L:]I* Division No.
1 9,517 .3o $
363.90 $_7_4_5_.4_21_*_" 48.741$ 455.ool* 1,663.381$
257 .o91* 125.o7l'*
1.131-------------- -------------~~~3
2- "
8,720.391
591.71 723.21
10.581 558.001 2,613.80
283.09 113.35
1.10 -------------- ------------
13,615.23
oo
L.
9,761.05
751.60 1,051.86
61.33---------- 3,509.34
~
L-
7.238.46!
580.93 863.00
40.60 360.00 3.127"05 '
5___
8,209.24:
877.451 904.791 ------------1 480.001 2,976.67
2,273.00~~~;3.581 $ 6__.
8,413.271
734.7111,334.23]------------,
TOTALS_______ ;--- 51,859.;: ;---;:900.30;5,622.51 $
- - - - - - - ' - - - - - - ' - -1'- - - - '
. 1
161.25 ; 1'
420.001 2,003.34,1 '
------------r-------------- ____________ 552.73
452.66
134.24~"------------~-------------- -----------115.68
302.431 157.34------------ -------------- ------------
;--;8.501;---~;;1:-:=:-:=:-: 329.221
2,177 ,;;
132.82, ____________ -------------- -----------==:-:r$
'
I
I
15,822.15 12.778.38 13,907.92 13,367.59
82,674.30
MAINTENANCE DIRECT BY DIVISION UNITS
:i-vi-sl-.o-n_N_o___1___-_']$--8-1-.7-72-.-19-,-l$_5_4-.2-24-.-42c-,$--12-0-.2-9-~$- 201.74$ 726.331$1,585.501$ 26,241.741$1,978.091----- __ __j ______________ l$ 195.94~$ 167,046.24
2..
113.712.08] 83.213.45 192.65
268.86 3.221.21 1.729.84 1 36.597.71 2.362.62 ____________ ______________
287.101 241.585.52
a__ _I 126,314.011 84,287.512----------
215.06 495.2511.292.14 17,838.44 1 2,835.85, ______ ---- --------- -
296.931 233,575.20
4 _ 109,682.45, 81,444.14 145.60 5___ 116.656.22 94.211.22 66.00
162.59 1.235.25 1,664.06 137.51 682.50 1,749.93
12,674.731 12.703.07
2,882.711. ___ -- _ 3.226.41 ____________
1$_______2_,1_4_6__.1_C_
224.01 276.47
212,261.64 229.709.33
;---;;;;~:~437 ;---;~~~;-~~;;;~~~~~~ ~;,~ ~~;;;J=:-::-::-:1~~~ ;-~;;;~;~;;~~z~ 6..-
T O T A L S . . _____
119,143.16 1 76,056.55 .30
1
250.791
116.001 259.001 994.39 22,471.8212,821.08------------ 1
103.74
236.60 222,453.13
District No.
Schedule No. 10-E
STATE HIGHWAY BOARD OF GEORGIA
ANALYSIS OF RECONSTRUCTION EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
Personal Services
JULY 1, 1932 TO JUNE 30, 1932
I I I
Equipn\i.nt Expenses
Furnishing CommJni- Heat, Light,
cation Power and Services Water
Rents
Traveling Expenses
Supplies and
Materials
i
lnsur-
a nee
Printing,
II Binding,
I PuJiicity,
Payments to Contractors
I I Etc.
I
Special and Miscellaneous Expenses
Total
RECONSTRUCTION SUPERVISION BY CONGRESSIONAL DISTRICTS
.
I
.
i
Schedule No. 1D-E-Cont'd. STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF RECONSTRUCTION EXi'ENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1, 1932TO JUNE 30,1933
Personal Services
Equipment Expenses
Furnishing
Communi- Heat, Light,
cation Power and
Services
Water
Rents
Traveling Expenses
Supplies and
Materials
lnsura nee
Printing 1
Binding, Publicity,
Etc.
Payments to Contractors
Special and Miscellaneous Expenses
I
Total
P.ECONSTF.UCTION DIF.ECT BY CONGRESSIONAL DISTRICTS
+ ~ No.;l, Dlli<tld
"i
~I
i
1 1 : : : ... : : 1~: -: ~7~ ~6~: : : : : 1 : : : : : : 1: : : : : : : ::::::::::::~:::::::~~~~~~
4___
1,650.841
363.481 --- --- - - --- --~---------- ----------1
249.701 _____ ------------------------ ---- ------------
2,269.02
.,J. .~: i ~ ~ J.:;:;;,;;.:j..!... . i.. I
!
.~ ~ ""~1 -~.~~-... =;";;; ~ k ...t =r .;~;.; -:;.!. TOTALS , ;:::
;.i. ;.; ....-.:. 1--
. :; ;
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 10-E-Cont'd.
ANALYSIS OF RECONSTRUCTION EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1,1932 TO JUNE 30,1933 --
Persoral Services
Equipment Expenses
Furnishing Communi- Heat, Light,
cation Power and Services Water
Rerts
Traveling Expenses
Supplies and
Materials
lnsur .. anee
Printing, Binding, Publicity,
Etc.
Payments to Contractors
Special and Miscellaneous Expenses
Total
L: : : oo Dlrl= No.
I :
RECONSTRUCTION SUPERVISION BY DIVIS~IO~N_U~N_IT~S--,-_ _ __
: . ~ J .
.....::::: -
-..":1
4___ --------------' ------------ ----------
----------!-------
--- ---------- ------------ ------------ - ---------- - --------------
~~ -1-~~~-~~~~~~~~~~~~~C ~ ~.:
TOTALS :
~~ =-== ~~ =~-=~
I
i
I
I
I
RECONSTRUCTION D IR EC~T_BY~D_IV~I~S_IO~N_.::.U~N~IT~S----------~-
L '~:~... ,::: : : : : 1464 90 ~:~ 615.95~~ i;o:.~~ _-_-_----------~---- Division No. L __ $
1
37.20 __ -------- ---- --- ---- ----------j---- ___ __J$
-I$ - -_-_-__- __ :_:::::- :: 1- :: _::::
783.87
3705~0.5_0961 :~~ ~~~ ~~ :__182.~ ~~~_:_ ----=1~--~1:_$-~~~~ 6__ __13
___
I
%UO .
..
... I
I
-----
_::l!J2.68 _:_ ____
TOTALS.. _____ $
903.30---------- ______
----------$ 182.34 5,186.41 ______ --- -------- --
1
10,022.11
OBJECT 0 F EXPENDITURE
PERSONAL SERVICES G. 0. Administration
00 00
Field Office Administration
Schedule No. 11.
STATE HIGHWAY BOARD OF GEORGIA
ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATION
ADMINISTRATION
JULY 1,1932 TO JUNE 30, 1933
I CONSTRUCTION
MAINTENANCE
====-:.:="-~--
I General Research Collection
Administra and
of
Quarry Construction
Maintenance I'
I Bu~::;'i~~s
Surveys I and Recon-
Strop
and
Leg isla live
Total
tion
Analysis Revenue
struction 1
I Equipment Transfers
71,109.60 211,128.51
21' 157.55 24,335.00
Supervifion
: : _: : : : : : : : : : : : : : : : : : : _ : : : : : : Direct Supervision_______ ------------ ___________ ---------------------$ 531,230.14-----------$ 35,697 .64~------------- -------- -----------
Dir::~~~:~~~~~~~~~~~~~~~- ~~~:::~:~:::
-----~~:~~~~~~ ~-:~:~:~:~~ ----~~:~~~~~~
~--::::::~;
MaintenancePatrolmen ------------ ----------- ----------- ---------- --------------,----------- 193,480 .10[ __________ _1 ___________ -----------
566,927.78 26,274.18
45,983.72 193,480.10
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATION
JULY 1, 1932 TO JUNE 30, 1933
Schedule No. 11-Cont'd.
ADMINISTRATION
CONSTRUCTION
MAINTENANCE
Land,
OBJECT OF EXPENDITURE
General Research Collection
Maintenance
Buildings Legisla-
Administra- and
of
Quarry Construction Surveys and Recon- Shop
and
tive
Total
lion
Analysis Revenue
~truction
Equipment Transfers
------------------------------------------------------------- ------
Direct Costs-Cont'd.
Constr.and Reconstr.
Foreman ________________ ------------ __________ ----------- __________
Equipment Operators____ -------------------------------------------Shop Employee's Field.-------------,--------------------------------
~i:m:~~::::::::::: ::::_:::::I::::::::: 1 73,249.33 ___________
60,623.15 ----------11,916.33-----------
74,628.82 177,995.82 41' 724.53
Sign Employees______________________ ----------- ----------- __________ -------------- -----------
Other Skilled Labor .. ________ .... ___ .......... __ .. ____ .. __ ........ __
50, 1!9 .84 .......... -
Common Labor______________________ -----------_____________________ 64,447.60-----------
17,707.09'----------- ---------------------16,413.84 ----------- ----------- ----------294,868.78----------- ----------- -----------
17' 707.09 66,533.68 359,316.38
~;a~~;~.:::-.:<O.:~ ~~::,~~ :~:~ Quarry
::::::: "
::::::::::: ::::::: ::::::::::1::::: :: : ..... E
1 TOTALS.................... ;-;~;;;;;-;~~;;~;-.;;~~;;;;;-~;~ ;-;;,;;:; ;~~~== ;---.:~ $ 2,035,680.28
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATION
JULY 1, 1932 TO JUNE 30, 1933
Schedule No. 11-Cont'd.
ADMINISTRATION
CONSTRUCTION
MAINTENANCE
Land,
OBJECT OF EXPENDITURE
General Research Collection
Maintenance
Buildings Leg isla-
Administra- and
of
Quarry Construction Survey!-! and Recon
Shop
and
tive
Total
tion
Analysis Revenue
struction
Equipment Transfers
- - - - - - - - - 1 - - - - - --------------~- -~-~
~---- ---~
---~~- --~--- ~--- ------1~------
EQUIPMENT EXPENSES
Automobile Maintenance Tires and Tubes__________ $ Accessories, Parts and Repairs________________ _
Greasing, Washing, Storage, etc. ___________ _
Road Equipment Expense Gas and OiL ___________ _ Tires and Tubes ________ _ Accessories, Parts and Repairs ________________ _
Miscellaneous Charges__ _
1,39l.C1 $
5,099.03
1,056.65
269.83 25.13
136.87 1.18
54.38$ 1,522.29 ----------
219.39 3,734.17 ----------
13.651 1,326.78----------
265.8C' ----------- $ 9.07 28.36 -- -------- ----------
615.18----------- ---------3.44 ----------- ----------
i$ 4, 259.37 $ 414.83 $ 1,936.13$ 68.87 ----------- -----------
9,646.88
15,474.25 1,434.62 2,880.50 211.71 -----------
5.47
29,059.14
3,886.88 336.65
391.46
1.00 -----------
1.75
7, 014.82
88,043.44 ----------- 223,810.88 8,755.19 ----------- 13,316.88
44.05 ----------- ----------24.00 ----------- -----------
312,443.07 22,149.56
68,382.24 ----------- 232,868.75
887.29-----------
1,382.43
192.01 ----------- ----------44.17----------- -----------
302,195.05 2,318.51
Rei> airs to Office Euuipt _. Repairs to Engineering
Euuipt. __________________ _
521.26
13.00 ----------- ----------
107.95--------------------------------
83.84 -----------
443.67
64.99
122.15 ----------- ----------- ----------1.53 ----------- -----------~-----------
740.25 618.14
Rei>airs to Machinery
Euuipt____________________ ----- ______ _ 177.47
6.44---------- ---------------
Rei>alrs and UI>kee];), Land
and Buildings ____________ /
879.29 ______________________________________________ -----------
10.85 740.33
2,398.80 ----------- ----------376.38 ___________ ___________
2, 593.56 1,996.00
Transportation ofEuuii>t. ____________ ___________ ___________ __________
4,928.78 ___________
779.C1 1,182.23 ___________ -----------
6,890.02
- - - - - - - - - - - - - .---------=~---------
~---
TOTALS__________________ [$ 9,488.20$ 1,390.6 $ 6,589.68$ 9.C7$ 195,144.95$ 2,251.09$ 478,240.901$ 4,543.22,
$
7.22 ,$ 697,665.00
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATION
JULY 1, 1932 TO JUNE 30, 1933
Schedule No. 11-Cont'd.
ADMINISTRATION
CONSTRUCTION
MAINTENANCE
Land,
OBJECT 0 F EXPENDITURE
General Research Collection
Maintenance
Buildings Legisla-
Adm inistra- and
of
Quarry Construclion Surveys and Recon- Shop
and
live
lion
Analysis Revenue
struction
Equipment Translers
Total
EQUIPMENT PURCHASES
Automobiles.. _____________________________________ -----------1---------- -------------- ----------- ------------- ___________ $ 15,030.90 ___________
!5,030.90
~~f;~:~c~~~....... . ~~~.,~~
Laboratory EQuipment .. __ ------------ ___________ ' ______________________________________________ -------------___________
468.44 ___________
468.44
Buildings.. _________________ ----------------------- _____________________ ------------------------- _____________ ----------- 7,134.67 ___________
7,134.67
L~od~~~~-:::::::::::::::: ~::::::::~1;;::.~~~::~~::::1::-. ~~~~==;~;~,;;~~::::: ;;~:::: .~~~:::::,_-~-~~ ~=~~~~;
COMMUNICATION SERVICES Telephone and Telegraph_ $ 9,503.21 $ 20.40$ Postage____________________ _ 7,159.02-----------
TOTALS.. ________________ $ 16,662.23$ 20.40 -~
294.05-------- . $ 138.52 ----------
432.57 ---------- $
2,799.77$ 1,339.66
4,139.43 $
20.20 $ 4. 267.27 $ 495.84 ------ -- $
30.32 2,130.57
44.75-----------
50.52$ 6,397.84$ 540.59----------
1.33 $ 17,402.07
1.00
10,843.84
2.33 $ 28,245.91
STATE HIGHWAY BOARD OF GEORGIA ANALVSI S OF EXPENSE Dl SBURSEM ENT S BY DETAIL OBJECT 0 F EXPENDITURE CLA SSI FICATI ON
JULY 1, 1932 TO JUNE 30,1933
Schedule No. 11-Cont'd.
ADMIN! STRATI ON
CONSTRUCTION
MAINTENANCE
Land,
OBJECT 0 F EXPENDITURE General Research Collection
Maintenance
Buildings Legisla-
Administra- and
of
Quarry Construction Surveys and Recon- Shop
and
live
Total
tion
Analysis Revenue
struction
Equipment Transfers
------------------------------1---------------------------------- ------
HEAT, LIGHTS, POWER
WATER, AND CLEANING-
SERVICES Furnishing of Heat ________ $
664.96$
31.20 ___________ ---------- -------------- ----------- $
12.41 $ 90.051 ___________ ----------- $
798.62
Furnishing of Lights...... 1,405.25 1,349.04 ___________ ..........
1,558.95 .......... .
745.05 348.03 ----------- -----------
5,406.32
Furnishing of Power..................................................
57.73 .......... .
32.96 1,354.84----------- ----------
1,445.53
Furnishing of Cleaning___ 1,960.60 ...................... __________ -------------- -----------
.51----------- ----------- -----------
1,961.11
Furnishing of Water...... -
807.03
8.00........... ..........
187.34$ 9.44
472.08 223.14 ----------- -----------
1, 707.03
------------- -----1----- ----------------------- ----
TOTALS.................. $ 4,837.84$ 1,388.24 ---------- .......... $ 1,804.02 $ 9.44$ 1,263.01$ 2,016.06 ---------- ---------- $ 11,318.61
---------------------- ------------------- ------
RENTS
Rents, Road Machinery ___ ----------------------- _____________________ $ 3,G77.96 ___________ $ 2. 560 ..83 ...... .. ._ .. ._._-_-_-_-_-__- _--_: ::::_-__--__-:: $ 5,638.79
Rents,B1dgs.andGrounds 2,175.40 ______________________ ----------
2,007.32
25.28 6 328 21
51 00 1
10,587.21
~:~~~: ~~f!~!C:~i~;;;~: ----~:~~~~~ ::::::::::: ::::::::::: :::::::::: :::::::::::::: ::::::::::: ::::::::::::: :::::::::::!::::::::::: ::::::::::: ------~:~:~~~~
Rents, Miscellaneous......
37.00----------- ___________ ----------
36.00-----------
3.50 -----------~----------- -----------
76.50
TOTALS... ---------------$ 5,515.40 -----------~----------'j"-- ....... $
1
1
5,121.28 $ 1
25.281$ 8,892.54 $
51.00~----------- ----------- $ 19,605.50
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS 0 F EXPENSE DISBURSEMENTS BY DETAIL OBJECT 0 F EXPENDITURE CLA SSI FICATI ON
JULY 1,1932 TO JUNE 30,1933
Schedule No. 11-Cont'd.
ADMIN I STRATI ON
CONSTRUCTION
MAINTENANCE
OBJECT OF EXPENDITURE
General Research Collection
Maintenance
Administra- and
of
Quarry Construction Surveys and Recon- Shop
lion
Analysis Revenue
~truction
Land, Buildings
and Equipment
Legislative
Transfers
Total
TRAVELING EXPENSES Subsistence_________________ $ Transportation Gas and OiL-----------Mileage Allowance______ _
Other Transportation.. -
8,326.35$
9,957.17 3, 283.74 2,324.97
535.35$ 12,989.69---------- $
616.72 137.55 456.55
9,507.10 ---------222.13 ---------261.42----------
5,089.61 $ 11,287.30$ 11,108.68$
40' 472.62 3, 916 .33
13,7 47.24
53.10
1,434.28 -----------
10,469.25 3,293.85 220.00
246.95 ----------- $ 296.25 $
283.09-----------
66.28
77.50 ----------- -----------
73.86 ----------- -----------
49,88C .18
75,288.56 20,915.11 4, 771.08
TOTALS----------------$ 23,892.23$ 1,746.17$ 22,980.34---------- $ 60,743.75$ 15,256.73$ 25,091.78$ 781.40----------- $ 362.53 $ 150,854.93
SUPPLIES AND MATERIALS
Office Supplies-------------$ 9,200.41$ 347.81$ 12.73----------$ 1,367.27$ 75.15$ 1,773.65$ 155.16---------------------- $
Drafting and Engineering
Supplies__________________ 3,405.10---------------------- ---------- 12,580.28 1,562.32
204.16---------------------- -----------
PhotographicSupplies____
254.73----------- _____________________ ------------------------- ------------- ----------- ___________ -----------
Cleaning and Toilet Sup-
plies______________________
993.33
5.00----------- __________
1,489.75-----------
25.5C
21.22 ___________ -----------
Laboratory Supplies and
Materials _________________ ------------ 2,076.03----------- __________ -------------- ___________ ------------- ___________ ----------- -----------
Forage and Supplies for
: : : : : : : : : : : : : : :.: : ::::_:::::: ::::::::::: ::::::::::: Animals__________________ -------------------------------------------
~~~J;Ji!~t~:~_:_::::t~~::~~;~~~
13,822.85----------- ------------- ----------- ---------- -----------
~u;u~ ::::::~~:~r:::::::::::
6,058.78 -----------~
381.05 ----------- ----------- -----------
12,932.18
17,751.85 254.73
2,534.80
2,C76.03
13,822.85 35,224.28 12,841.95 1,394.90 6,439.83
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATION
JULY 1,1932 TO JUNE 30,1933
Schedule No. 11-Cont'd.
j ______A_D_M_IN_I_S_T_R_AT_I_O_N_--:----
CONSTRUCTION
1- MAINTENANCE
Land,
OBJECT OF EXPENDITURE
General Research Collection
I Administra- and
of
Quarry
~--t-io_n ~alysis -~ RevenIue---------~------~"---~---- ~~ipm~t- __,.~~~~- SUPPLIES AND MATERIALS
__
'
Maintenance
Construction I Surveys and Recon1
ShOp
Buildings and
Legislative
Total
------
:: : _ : : : : : : ;~;::~~~~~~~~:::::::::::J:::_:zz~~~f:: ::::::1:. _:::::: -- -- ---- H!tE::___ _ 4-i~U~I ~-~~~:~t
UiU[
B~~~:fa~uv_~~i_e_~~-~~-- -----1---- ______ ... __
...! _ 6,86!.31 ______ ---[------ ...
I__
_ __ . . . .
___
__
6,86!.31
1 ~:~~~ s__::R~~tis -~n"d____ ---
-~----------- ----- -- --
358.03/ ______ 19,893.75 ____ --r---- ____ ,------ __ 1
20,25!.78
Bndges_:----------- __ _ ____________ ____ ______ ___
_ ______ 531.94!.35 ______
/ 105,440.981 _ _ ____ ___
637.382.33
1 1 ~~5~:_::_::_:_.:_.:_1 2~~ __:(}:_2~f-_:_-_:_:_:_:__ :_::_:_:~_ --~~:_a ~:!~:1:1~u~:~~s-...:R~;;d~-- ------------~- ---- --- ----------
---------------- __ _
1
and Bridges _______________ 38.06 :_:_:_::-.:_:__:_:_:_ _:_:_:__:_:_:_ _$__2.89
____ _____ __
1 99.977.57 __
1
__
99.977.57
INS~:A:::s- -------------- ~~~ 14,142.~~~_::.=28-~ ~--~~~~~~~ ~-641.~~~~~_1~~~~ ~ 135,89~~~~~1~~~~~~:_:_.:___:_:::__ :_:_:_:_:_:_:_:_ ~--~~~~
Fire Ins. B1dgs. and Fix-
I
Li~~~~t;:Fi;~:~1:~-.:-i;;~iv.[$
2.!~~:~: -----io3.i5 ::_:-:: __ $
140
63 .
$----;:i77:"7r
_ __
15,;~~:~~ $----336:34 ::.::::: :::::::::
21,;~::!~
~:~~,.i,:;";:!~~~;i;;; : ':~'"j. " oc, _"'oo .:..:::. _ uo oo
u~ ool m oo _:_::.:::. ::::.::.: '""
B:::~::~~~~~~~~--::::-1;-~;~r~-~~ ;.:..-~~ ~:.:~~ ~:.:~~; _::.::~~~=--~~;~ ~~~~~~~~~~~~~ 1;--~~~~
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATION
JULY 1, 1932 TO JUNE 30, 1933
Schedule No. 11-Cont'd.
OBJECT OF EXPENDITURE PRINTING, BINDING, PUB-
ADMINISTRATION
CONSTRUCTION
MAINTENANCE
Land,
General Research Collection
Maintenance
Buildings Leg isla-
Administra- and
of
Quaory Construction Surveys and Recon- Shop
and
tive
tion
Analysis Revenue
struction
Equipment Transfers
- - - - - - - - - - - - - - - - -------------~------
Total
LICITY, ETC.
Printing.Annua!Report.. Printing Maps............. .
3,133.09 .............................. 1.... . I, 186 .49 ..................... _ ...... .
$ 3,133.09 1,186.49
Publication-Georgia
Highways............... - 2,202.05 ........... ----------- ---------- ........................................ ..
2,202.05
Stenography, Typewriting
and Multigraphing, Job
Work -------------------Photo Printing and De-l
469.75 ---------- ---------- ----------
....... 1$ 12.10 --
481.85
veloping Job Work ......
71.61,$
7. 78 $
1.92 ......... $
62.521 .......... $
8.23 ----
152.06
Publication of Notices and
Advertising_____________ .
2,773.67 ............... ..
2, 773.67
1----1--------------------------------------- -----
TOTALS................. $ 9,836.66$
7. 78 $
!.92 ---------- $
62.52 $ l2.IC $
8.23 ........... ----------- -----------
9, 929.21
-------------- -----------1------------------------ -----
INDEMNITIES
Compensation-Medical
Service Claims and Costs$ 13,814.29 ...................... _.................................. ------------ ----------- ................... __ $ 13,814.29
Damage to Private Property______________________ _ 4,067.23 ........... ----------- .......... ------------------------- ............. ---------------------- ---------
4,067.23
Damage for Personal in-
juries_--------------------
833.CO ...................................................................... ___________ ----------- .......... .
833.00
-------------------------- ----------1-----
TOTALS................ --$ 18,714.52 .............................................. ----------- ........................ ---------------------- $ 18,714.52
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATION
JULY 1,1932 TO JUNE 30, 1933
Schedult No. 11-Cont'll.
ADMIN I STRATI ON
CONSTRUCTION
MAINTENANCE
OBJECT OF EXPENDITURE
General Research
Administra and
lion
Analysis
Collection of
Revenue
Quarry
Construction
Surveys
Mai ntonance and Reconstruction
Land,
Buildings Legiela-
Shop
and
live
Equipment Transfers
Total
PAYMENTS TO CONTRACTORS
Payments to Contractors.. ---------------------------------- __________ $ 9,610,964.03 ----------- $ 2,249.84 ___________ ---------- ------------ $ 9,613,213.87
Bonus_______________________ ------------ ___________ ---------------------
9,218.33 _____________________________________________ ------------
9,218.33
------------------------------------------ 1-----
<:0 0>
TOTALS.-------------------------------------------------------------$ 9,620,182.36----------- $ 2,249.84----------- ---------- ------------ $ 9,622,432.20
----1---- ----------------------------------- ------
SPECIAL AND MISC. EXPENSES
Misc. Camv Exvenses ______ ------------ ----------- ------------ ---------- $ 2.479.87 ----------- ------------- ----------- ---------- ------------ $
BluePrints-----------------$ 12.57----------- ----------- ----------
3.06$ 63,421.99------------- ----------- ---------- ------------
Tests------------------------------------$ 28.20----------- ---------- 30,646.47----------- $ 1,512.G2 $ 101.35---------- ------------
Traffic Counts _____________ ------------ 6,120.00----------- ---------- -------------- ----------- ------------- ----------- ---------- ------------
Subscriptions and Dues.. Incidentals........... ______
4,001.52[
5.00----------- ---------- -------------- ----------- ------------- ----------- ---------- ------------
516.85 CR7 .88 $ 37.15 ----- ____ .
147.80
1.60
5.03
2.00 ---------- ___________ .
2,479.87 63,437.62 32,288.04 6,120.00 4,006.52
702.55
Interest_____________________ ------------------------------------------------------------------------------------------------------------------- -------------Transfers ___________________ ----------------------- _____________________ -------------- ----------- ------------- ___________ ---------- $1,107,182.86 1,107,182.86
Burial Expenses____________ ----------------------- _____________________ ------------------------- _____________ --------------------------------- --------------
Rewards____________________ -----------------------_____________________
2,340.25----------- ------------- ----------- ---------- __________ __
2,340.25
Court Costs... _____________
573.40----------- 120.95 __________ -------------- ----------- ------------- ----------- ---------- ------------
694.35
1----1---------------------------------------- ------
TOTALS------------------$ 5,104.34,$ 6.145.321$ 158.10---------- $ 35,617.45$63,423.59$ 1,517.05$ 103.35~---------- $1,107,182.86 $1,219,252.05
TOTALS__________________ $ 443,11! .38~~~ ;-~;;~~l$11,369,631.60 $127,316 .44.~;;-::;. ~.;; ;;~ ;~~~ $14,802,795.05
Schedule No. 11-Cont'd.
STATE HIGHWAY BOARD OF GEORGIA
ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATION
JU LV 1, 1932 TO JUNE 30, 1933
ADMINISTRATION
I CONSTRUCTION
MAINTENANCE
Land,
OBJECT OF EXPENDITURE
I I General Research Collection
Administra- and
of
Quarry I Construction
Maintenance Surveys and Recon-
Shop
Buildings Logisla
and
live
Total
tion
Analysis Revenue
struction
Equipment Transfers
---------------------------------------------------------
-----
LESS: INTER-DEPARTMENTAL
BILLINGS
Blue Prints G. 0. Salaries____________ $ 55,621.24----------- ----------- ---------- -------------- ----------- ------------- ___________ ----------- ----------- $ 55,621.24
G. 0. Supplies and Materials____________ -- ___ -_
8,G20.75 ___________ - - - - - - - - - - - __________ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Shop
1
Re~~a;:~ ~~~:~~~ents ____ ,. ___________ ----------- ----------- __________ -------------- __________ _____________ 172,947.52 ----------- -----------
8, 020.75 172,947.52
1
=::=== Total Test Disbursements___________________ ------------
29,586.73 ==::_::~=::=:: __________ -------------- ___________ I
==~= ~=:: .:..:.:.=:==:: __2_9,_586_.7_3
1
TOTALS------------------$ 63,641.99$ 29,586.73----------- ---------- -------------- ___________ !_____________ $172,947.52----------- ----------- $ 266,176.24
----1----- - - - ---1-----1---- ---- -.---------- 1-----
NET EXPENSE DIS-
$
BURSEMENTS _________ $ 379,469.39$ 7,103.81 $ 79,507.38$ 876.49 $ll,369,631.6C $127,316.44$1,399,327.47----------- $ 64,477.031.108,909.15 $14,536,618.81
Schedule No. 12. STATE HIGHWAY BOARD OF GEORGIA
CONSTRUCTION ALLOTMENTS & DISBURSEMENTS BY TYPES
JULY 1, 1932 TO JUNE 30, 1933 --------=-=====,======
Description
July 1, 1932 j' Jan. 1, 1933\
To
To I Total
Dec. 31, 1932 June 30,_1-'-93_3_l__F_o_r_Y_e_a_r_
ALLOTMENTS
SoiL ______________________ !$1,400,281.52 1$742,573.00 1$2,142,854.52
GraveL _____________ . _____ , 15 ,236.87Cr, 58,448.79
Macadam __________________ 188,762.62 i 89,577.35
43,211.92 278,339.97
Surface Treatment___
2,239,388.52 1 30,461,61Cr 2,208,926.91
Bituminous Mixtures_ ___ 480,863.27 ! 16,650.60
497,513.87
Bituminous Concrete ______ i 42,583.70Crl 7,175.13Cr 49,758.83Cr Cement Concrete __________ i 2,588,833.85 11,534.85 2,600,368.70
~~;~~tlires~ ~~ ~: :::::::::-- --- 47~82o~iiii 1 1~.5~t95i.~~r 1~~.B.fis.~~cr
____ Totals_________
: _ ~~f3_,_~88,13Q_:~I$
960,455.83
I
$7,848,586.03
--~----=----=--==--'-
1
_cl_ _ _ _ __
EXPENDITURES
SoiL ______________________ !$1,870,065.22 i$1, 749,470.86 '1$3 ,619,536.08
GraveL ___________________ ! 130,866.431 125,831.90 256,698.33
Macadam__________________
80,229.56
95,589.61 175,819.17
Surface Treatment.______ 1,376,372.86 1,325,075.64 2, 701,448.50
B~tuminous Mixture _______ 122,609.59 342,610.69 465,220.28
B1tununous Concrete _____ ,1 157,402.59 i1 60,633.65 218,036.24
Cement Concrete __________ 1 2,009,653.79 ' 1,662,520.73 3,672,174.52
Brick____________ __
19,998.17
41,637.80
61,635.97
Structures .. _______________
71,136.23 127,926.28 199,062.51
Totals ___ _
$5,838,334.44 .$5,531,297.16 $11,369,631.60
~c - _ __:-~__:__ i___ - - - - - - - .. ---------
OR
Schedule No. 13.
STATE HIGHWAY BOARD OF GEORGIA
SUMMARY OF ACTUAL CONSTRUCTION ALLOTMENTS, BY CONGRESSIONAL DISTRICTS
(ALSO, A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)
JUNE 30, 1933.
-
-
I Distr. of Total
I ot Allotments
1 on Mileage
' Basis
Funds Actually Allotted
Excess Allot. Allot. Under
Over Mil- Mileage
eage Basis Basis Dis-
Distr.
tribution
CONSTRUCTION Beginning of Department to June SO, 1933.
------
DistrictNo. 1 10,871,306.71 1$ 10,635,439.24$ __
$ 235,867.47
2 10,742,890.831 11,146,744.96 403,854.13
3 11,046,651.48'1 7,935,376.54-
3,111,274.94
4' 9,309,850.36 9,964,556.45: 654,706.09-
5 I 2. 334,163. 3s 2. 544. oo8. 54: 2o9. 845.16
6 I 9,998,505.621 8,786,047.161
1,212,458.46
7 ' 10,153,010.8611 11,403,607.38 1 1,250,596.52
8 ' 11,358,051.59 9,000,583.50
. 2,357,4e8.09
9 13,510,537.71 17,887,880.50 4,377,342.79
10 9.824.491.57 8,626,887. 71
_ _
1,197.603.86
11 16,454,516.59; 19,182,284.44 2,727,767.85-
12 1~692,631.4~1_11,183,191.~---- - - - - 1,50~,439.72
1
Totals _ -,$128,296,608.17 $128,296,608.171
I
CONSTRUCTION January 1, 1930 to June 30, 1933.
District No.1 3,824,019.53$ 4,533,273.82$ 709,254.29$
2 4,017,352.75 4,084,805.65 67,452.90
3 3,601,926.30 2,824,100.261----- -- - 777,826.04
4 3,153,543.44 2,358,453 .001_---
- - 795,090.44
5
692,539.61 1,105,216.93 412,677.32
6 3,394,722.901 2,296,189.39 7 3,411,148.94 3,384,535.461
__I 1,098,533.51
-
i 26,613.48
8 I 4,063,542.40 4,200,716.431 137,174.031
9 i 4,776,812.19 4,909,516.19! 132,704.001
10 ' 3,422,201.43, 3,659,992.05 237,990.621
11 5,830,418.64 6,227,366.381 396,947.74
12 i 4,405,605.551 5,009,668.12 604,062.57 1------------ -,- ---------- --- ------ -
Totals .1$44,593,833.68$44,593,833.68.
i
I
:
SUMMARY OF ALLOTMENTS
January 1, 1930 to June 30, 1930 July 1, 1930 to June 30, 1931 July 1, 1931 to June 30, 1932 July 1, 1932 to June 30, 1933
- $ 7,514,305.57 ---- 16,551,385.83
12,679,556.25 7,848,586.03
Total __ _
$44,593,833.68
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 14.
SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL DISTRICTS rALSO, A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS!
JULY 1. 1932 TO JUNE 30, 1933
District
Distribution of Total of Allotments on Mileage Basis
Junet~~. July 1, 1932 to Dec. 31, 1932
I
Jan 1 19331 1933
Total for Year
Funds As Actually Allotted
i
I
I
~~. June~~. [ July 1, 1932 1 Jan. 1, 1933 1 Total
for Year
I Dec. 1932j
19331
-------------------~----------~---------
Excess Allotment
over Mileage Basis Distribution
Allotment under Mileage
Basis Dis-
tribution
,_.
CONSTRUCTION
0 0
July 1, 1932 to June 30, 1933
--------------------~------------------ ------------~---------- ---~~
--
1-
.. ------1~--~
No. L __ .. ___ $
2 ._ _____ _ 3___ -----4 ________ _ 5 ________ _
6.. _-----7________ _
89______-_-__-_-_--_
11n20._.._.._-. _-- _--_--_--_---_-
568,625.60$ 625,947.65 545,959.11 465,797.64 127,324.78 509,059.38 520,884.34 606,145.65 771,966.38 548,379.47 900,200.49 697,839.71
80,081.84$ 648,707.44$ 87,091.25 713,038.901
77,800.77 623,759.88 64,561.84 530,359.48 17,736.73 145,061.51 72,047.631 581,107.01 72,164.81 593,049.15 83,977.45 690,123.10 107,070.66 879,037.04 75,929.80 624,309.27
125,468.19 1,025,668.68 96,524.86 794,364.57
771,464.11$ 56,298.77 $ 722,407.51 129,154.54 I
493,854.39 62,133.08
563,470.79 115,059.81 91,767.32 66,435.60
519,864.96 164,814.63
608,813.87 130,261.03 903,440.84 44,319.31 567,485.79 10,190.33CR 146,397.26 78,164.62
640,939.92 3,738.81CR 858,223.44 127,743.58
827,762.881$ 179,055.44-----------851 ,562.05 138,523.15 _____ .. ____ _
555,987.47------------$ 67,772.41
678,530.60 148,171.12------- ---158,202.92 13,141.41 _____ ------
684,679.59 103,572.58----- ------
739,074.90 146,025.75 -----------947,760.15 257,637.05 -----------557,295.46 ____________ 321,741.58 224,561.88 __________ ._ 399,747.39
637,201.11 ------------ 388,467.57 985,967.02 191,602.45 ____ ._ _____ _
Totals ____ $ 6,888,130.20$ 960,455.83$ 7,848,586.03$ 6,888,130.20$ 960,455.83 $ 7,848,586.03 _______________________ _
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 14---Cont'd.
SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL DISTRICTS (ALSO, A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)
JULY 1, 1932 TO JUNE 30, 1933
Distribution of Total of Allotments on
Funds As Actually Allotted
I
I
______M_i_le_aco:g_e_B_a_s_is_ _ _ _ _ _ - - - - - - - - , - - - - - - - - - - - ! Excess Allotment
District
July 1, 1932 Jan. 1, 1933
to
to
Total
~ July 1, 19321! Jan. 1, 1933 I
Total
for Year
to
to
: for Year
All~!~rent ~ft~e 'I Mileage Basis Dis-
Dec. 31, 1932 June 30, 1933
i Dec. 31, 1932 June 30, 1933 !
Basis Dis- tribution
_ _ _ .---------~--- _____
------~__ tribution 1
......
MAINTENANCE
.0.....
July 1, 1932 to June 30, 1933
- - - - - - - - - - -
--
No. L _______ j$
2___ -. ---3___ -----4___ -----5___ --6___ -----7 _________
8___ -----g___ -----10___ -----1L _______
12___ -----
70,607.00 $ 78,748.08j
69,114.561 58,964 .47! 16 ,118.08' 62,975.54 65,939.57 76,733.86 97,725.13 69,421.04 113,383.93 88,465.83
40,570.451$ 44,121.50 39,414.82 32,707 .82i
8,985.651
36,500.221 36,559.58 42 ,544.00! 54,243.301
38,466.971 63,563.72 48,900.68
111 ,177.45 $ 122,869.58: 108 ,529. 38:
91,672.29 25,103.73 99,475.76 102,499.15 119,277.86 151 ,968.43 107,888.01 176,947.65 137,366.51
78,186.28
77,912.631 68,675.84 56,904.84 15,493.00 67,059.29 66,770.02 72,995.04 101,916.21 63,402.87 113,348.93 85,532.14
39,267 .30;$ 39,833.58 36,804.76 35,574.49
5,269.011 42,847.09 39,880.15 45,111.011 60,392.911 34 ,935.86, 59 ,834.02', 46,828.53
117,453.58$
6 ,276.13I 1 ___________ _
117 ,746.21j ____________ !$ 5,123.37
105,480.60 ------------ 3,048.78
92,479.33
807.04 ------------
20,762.01 ------------ 4,341.72
109,906.38 10,430.62 ------------
106,650.17 4,151.02 --- --------
118,106.05 ------------ 1,171.81
162,309.12 10,340.69 ------------
98,338.73
I
------------1
9,549.28
173,182.95 ------------ 3,764.70
132,360.67 ------------ 5,005.84
Totals ____ $
868,197.091$
I
I
486,578.711$ 1,354,775.801$
868,197.09 $
486,578. 7l $ 1,354,775.80 ------------ ------------
I
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 14-Cont'd.
SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL DISTRICT (ALSO, A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS'
JULY 1, 1932 TO JUNE 30, 1933
District
Distribution of Total of Allotments on Mileage Basis
July 1, 1932 Jan. 1, 1933
1
to
I
to
I Dec. 31, 1932 : June 30, 1933
Total for Year
Funds As Actually Allotted
July 1, 1932 I Jan. 1, 1933 I
to
,
to
1
Dec. 31, 1932 I June 30, 1933
i
Total for Year
Excess Allotment
over Mileage
Basis Distribution
Allotment under
Mileage Basis Distribution
....
0
""
No.1 _
2 3 4 5 __
6
7 8 9 10 __ 1L_ 12 ___
3,300 .OlCr $ 3,680.51Cr! 3 ,230.26Cr! 2 ,755.87Cr\
753.32Cr 1
2 ,943.34Cr 3 ,08l.87Cr 3 ,586.37Cr 4,567 .46Cr
3 ,244. 59Crj 5 ,299.32Cr
4 ,134.73Crl
Totals ___ $ 40 ,577. 65Crl $
I
------ --------
SURVEYS July 1, 1932 to June 30, 1933
2,837.37$
3,085.72
2 ,756.55,
2,287.48
628.43
2 ,552. 7l
2,556.86
2
,975.40
1
1
3,793.60
2,690.26
4,445.45
3,419.961
34,029.791$
462.64Cr$ 594.79Cri 473.7l0fl 468.39Cr 124.89Crl 390.63Cr; 525.01Cr' 6l0.97Cr 773.86Cr 554.33Crl 853.870rl 7l4.77Cr 1
6,547.86Cr;I$ I
I
I
1 ,666.41Cr $ ll ,646.82Cr 2 ,800. 78Cr
2 ,335.46!$ 669.05 $ 3,399.381 8,247 .44Cr
4,250.14, 1,449.36 1
1 ,131.69; -- - f$ 7,652.65
1 ,923.07,_-
2,265.28
1,540.84: 3,806.12
4,274.511
204.80
1 ,2o2 .c6: 1,406.86
1 ,531. 75
415.15Cr'
5,610.92 5,195.77
5,586.40-
1 ,821. 21
2,124.29 3,945.50
4,470.51 -
3 ,665.07Cr
3,279.52
385.55Cr
225.42
2,837.84Cr
3,554.931
717.09 !1 1,490.951
3,ll6.76Crl 20,624 .68Cr'
1,254.45: 1 ,862.31Cr!------------ 1,307.98 2,500.02 18,124.66Crl _________ 1 17,270.79
1 ,904. 57 1----~-_!)'77. 781 4,882.35 ' 5,597.121
40,577.65CrI 1
I
34,029.791I$ 6,547.86Cr I______
I
I
-----------~----------
- - - - - -
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 14-Cont'd.
SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL DISTRICTS (ALSO, A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS'
JULY 1, 1932 TO JUNE 30, 1933
-
1-D~istri~b~u~t~io-~~~~~l;~a_oi_!l_Bo_:s_!ll.otm~nts-on_ j '
Funds As Actually Allot:_e~------! Excess
I
j
; Allotment
District
! July 1, 1932
Jan. 1, 1933
1
1'
Total
July 1, 1932 1 Jan. 1, 1933
Total I over
to
to
for Year
to
to
for Year I Mileage
------~-----1~::~~1, 193~-~une 30, 1933! ------------~-61: 31, ~~~ Jun~~~3~11-
~r~~~t~~~
1
Allotment;
under Mileage
Basis Distribution
RECONSTRUCTION July 1, 1932 to June 30, 1933
2,581.88$ 2,807.871
2,508.341 2,081.51
571.84
2,322.851 2,326.63 2,707.48 3,452.011 2 ,448.02i
43,,101425..011511
.
,
I
2,581.881 ---- --- - i$ 2,807.87! ---- _______ _I
991.08$ 2,808.50
991.08: 2,808.50,$
- -:$ 1,590.80
.631' --
--
2,508.34[---------- ---1
341.11!
341.11, ----------- 2,167.23
2,081.511-------------1
4,600.001
4,600.00: 2,518.49
571.841--------------
400.001
400.001------------
171.84
~:~~~:!~,_ ~~~~~~~~~~-I=== :~~6~661 :~~6:66!~-~~~~~ ~ ~~ ~ :!~~:~~ 1 = =
===i
== === =i
== 1
1 := 3 ,452, 01 ______________ ,
~ :6!~:~; = =: =: == == == =[
1 ,000, 00
---is ~826~46
1 ,000. 00
----- is~s26~4o
__ _-------.
---14 ~ 775~25
I
!
_
_
_
_
2 ,452 01
2~~4~: 0~
1 1 3,112.01 --------------
754.50
754.50 ------------ 2' ,357.51
30,965.591--------------1$
30,965.591$ 30,965.591--------
~ i ----------
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 14--Cont'd
SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL DISTRICTS (ALSO, A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)
JULY 1, 1932 TO JUNE 30, 1933
District
....
0 tl>o
Distribution of Total of Allotments on Mileage Basis
July 1, 1932 Jan. 1, 1933
to
to
Dec. 31, 1932 June 30, 1933
Total for Year
Funds As Actually Allotted
July 1, 1932 Jan. 1, 1933
to
to
Dec. 31, 1932 June 30, 1933
Total for Year
TOTAL ALLOTMENTS July 1, 1932 to June 30, 1933
Excess I Allotment
Allotment under
over
Mileage
Mileage Basis Dis-
Basis Dis- tribution
tribution
No. L _______ $ 635,932.59$
23______-_-_-_-__-_4 _________ 5 _________
701,015.22
611,843.41 522,006.24
142,689.54
67___-_-_-_-_-_-_-_-
569,091.58 583,742.04
8___ -----9 _________ 10 _________
679,293.14
865,124.05 614,555.92
1l2l ______-_-_-_-__-_-
1,008,285.10 782,170.81
126 ,071. 54$ 762,004.13$ 137,106.34 838,121.56
122,480.48 734,323.89 101,638.65 623,644.89 27,922.65 170,612.19 113,423.41 682,514.99 113,607.88 697,349.92 132,204.33 811,497.47 168,559.57 1,033,683.62 l19,535.05 734,090.97
197,522.51 1,205,807.61 151,957.51 934,128.32
847,983.98$
788,673.32 559,729.45
622,640.91 107,465.12
956,509.10
677,405.10 972,770.81
666,564.16 206,683.37 733,664.17
945,660.15
98,892.61$ 175,196.00
103,529.09
946,876.59 963,869.32 663,258.54
$ 184 ,872.46 125,747.76
------------
--------------7--1-,0-6--5-.3-5-
156,775.14 779,416.05 155,771.16 ------------
73,306.67 213,272.64
180,771.79 799,781.74
10,159.60 117,266.75
-----------------------
172,265.47 849,670.57 152,320.65 ------------
93,959.84 1,066,730.65 255,233.18 ------------
54,757.51 721,321.67 ------------ 312,361.95
114,354.93 77,415.63
321,038.30 811,079.80
------------
------------
413,052.67 394,727.81
178,304.39 1,123,964.54 189,836.22 ------------
Totals ____ $ 7,715,749.64 $ 1,512,029.92 $ 9,227,779.56 $7,715,749.64 $ 1,512,029.92 $ 9,227,779.56 ------------ ------------
Schedule No. 14--Cont'd
STATE HIGHWAY BOARD OF GEORGIA
SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL DISTRICTS (ALSO, A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)
JULY 1, 1932 TO JUNE 30, 1933
Other Allotments Undistributed
Undistributed Maintenance___________________________________________________ ---_$ 5 ,170. 76Cr Administration _______________________________________________________________ ---- 379,049.83
Research and Analysis _____________________________ ----- _____ -- __ ----------------Collection of Revenue _________________________________________________ --- __ -------
7,096.29 79,432.07
E~uqaurirpYm--e--n-t-_-_-_-_-_-_-_-_-__-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_ Shop ____________________________________________________________________________ _
874.99 58,705.93
85.55Cr
MW.o&torAV. eRheicnltealLDiciesncsoeuTnat_g_s-_-_-_-_-_-_-_-_-_-_-_-_-_-_-__-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_----_-_-_-_-_-__-_-_-_--_
1,080,000.00 23,790.39
Total Allotments-Exhibit "B" ____________________________________________________ .$10,851 ,472. 75
STATE HIGHWAY BOARD OF GEORGIA ENGINEERING
STATE MILEAGE BY ENGINEERING DIVISIONS
AT JUNE 30, 1933.
--------~-----
. Div. No. / - No. of
Area Population II Mileage at Mileage at
Counties Sq. Miles 1930 Census July 1, 1932 June 30,
I
------~--
----,
1933
!----
1.
21
7' 113 694,705 . 1,032.618 . 1,083.230
2 3
30 28
I 8,811 i 457,327 1' 507.887 1,571.276
8.860 478.411 1.401.247 1.468.454
4.
24
11,025 431,648 1,425.291 1,446.371
5
30
11,342 484,282 ! 1,523.728 1,607.035
6
26
_1_1~,5~7~4~'--36_2_,1_3_3_i 1 '306. 045 1~-3_21~.9~34~-
Totals __ 159
58,725 12,908,506 18,1~6.81B 8,498.300
1
------~~-
1933 over 1932=301.484 miles.
--------------
STATE MILEAGE BY CONGRESSIONAL DISTRICTS
AT JUNE 30, 1933
---------
------------
~---------
Cong. Dist.
No. of
Area Population Mileage At Mileage At
Counties Sq. Miles 1930 Census July 1, 1932 June 30,
1933
L _______
13
t~~~~:~~\
5 ________ 6 ________
7 ________ 8 ________
13 15 10
4
13 13 13
9 ________ . 18
10 _______
12
lL
20
12 _______
15
6,396 5,528
4,563 3,777 1,140
3,614 4,366
4,193 5,449 4,657
9,465 5,557
260,291 242,276 189,719
220,708 422,206
221,050 262,219
198,927 218,496 212,934
248,290
211,390
666.615 743.475 652.520
556.699 162.176
594.562 622.553
724.452 912.646
655.415 1,070.481
835.222
689.786 790.032 700.120 576.219
163.010
621.537 653.277 780.105
939.198 655.783 1,096.536
832.697
Totals __ 159
58,725 2,908,506 8,196.816 18,498.300
---------
1933 over 1932=301.484 miles.
STATE MILEAGE BY COMMISSIONERS DIVISIONS AT JUNE 30, 1933
Comm. I No. of I Area Population Mileage at Div. Counties Sq. Miles 1930 Census July 1, 1932
----- 1',----!-----1----
L _______ 2 ________
56 52
22,916 19,885
846,415 2,829.773 910,059 2,826.538
3 ________
51
15,924 1,152,032 2,540.505
Mileage at June30, 1933
2,928.969 2,914.825 2,654.506
Totals __ 159
58,725 2,908,506 8,196.816 8,498.300
106
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ROADWAY MILEAGE PLACED UNDER CONSTRUCTION
DURING THE FISCAL YEAR ENDING JUNE 30, 1933
Surface
Graded, Top Gravel,
Treatment Surface
Proj.
County
ComJ Cong. Eng. Soil, and Chert, and Macadam Re-Surface on Miscel Treatment Bituminous Bituminous Cement
Brick
Sand Olay Selected
_:__ - - - - - Dist.l Dist. Div.
Material
laneous Bases
on
Mixtures
Lime Rock
Concrete
Concrete
- - - - - 1 - - - - 1 - - - - - - - - - - -------~-----~---- - - - - - - - - - - . - - -
22 Fulton .....- 3 I 23 , Forsyth_ ----i 3 24 ' Cherokee____ _
----------- ------------ ------------ ------------ ------------ ------------' 9.956 ------------ ------------
2 1
:::::::::::: ::::::::::::I:::::::::::: :::::::::::: ____:::~:~__ ::::::::::::i::::::::::::i::::::::::::
----8: i43--
25-B Candler..... .
29-D Johnson_
12
30-B Cobb-------- 3
34 Haralson ____ _ 3
52 64
Evans ________
i Glynn _______ _
l 1
11
76
1 Wheeler _____ _ 1
1
12
85 Haralson. ___ _ 3 7
86 Haralson____ _ 3 7
87 Haralson ____ _ 3 7
93 Taylor ______ _ 2 3
109 Dawson _____ _ 3
4 ------------ ------------ ------------ ------------
4.450 ------------ ----- ______ ! ____________ ------------
4
7.063.. ------------ ------------ ------------ ------------ ------------ ------------ ------------ ------------
1
0.872 ------------ ----------- ------------ ------------ ----------- ------------ ------------ ------------
1
5.650
------------1------------ ------------ ------------ ------------1 8.852 ------------ ------------ ------------
6
7.742 '------------ ------------ ------------ ------------'------------ ------------'------------ ------------
6 ------------ ------------ ------------ ------------ ------------ ------------ ------------! ------------ 9.123
1 ----------- ------------------------------------------------------------ ------------~' ------------ 5.194
l ------------ ------------ ------------ ----------- ------------ ------------ ------------ -----------
4.466
1 3 2
:::::~:~~~:: :::::::::::: :::::::::::: :::::::::::: :::::7:;~~:: :::::::::::: :::::::::::: -::::::::::: :::::~:~~;::1 ::::::::::
115-B Chattooga __ _ 3 118 Fannin _____ __ 3
7 9
1 ------------
4.762 ------------ ------------ ------------ ------------ ------------ ------------ ------------
1 ------------ ------------ ----------- ------------;
0.492
120 CarrolL ..... 3 135 Elbert...... 3
4 8
1 2
:::::::::::: :::::::::::: :::::::::::: ::::::::::::I:::::::::::: ::::::::::::!::::::::::::I::::::::::::
8.320 1.298
141 Richmond .. _ 2 10
144-A Peach._----- 2 12 144-C Peach....... . 2 12 153-A Newton_----- 3 8
::1: ~:.1 : ::: : : :: I :::,~;:: 4
2.500 ------------ ------------1------------ ------------ -----------
3
3 2
:::::::: :: :::: ::::::: :: :::::: I ::
:: I :
::
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ROADWAY MILEAGE PLACED UNDER CONSTRUCTION
DURING THE FISCAL YEAR ENDING JUNE 30 1933
Surface
Graded, Top Gravel,
Treatment Surface
Proj.
County Comm Cong. Eng. Soil, and Chert, and Macadam Re-Surface on Miscel- Treatment Bituminous Bituminous Cement
Brick
No.
Dis!. Dis!. Div. Sand Clay Selected
laneous
on
Mixtures Concrete Concrete
Material
Bases Lime Rock
- - - - - - - --~--
---l----1----l----l-----l----~--~----l-----l-----1
153-C Newton ______
8 2
!.833
159-B Miller_---- ___ 171-B Clay__________ 179-B Greene _______ 3
182 Jenkins_----- 2
..... 205 Effingham ___ 2
0 00
215 226-A
Banks ________ Liberty _______
3 1
226-B Liberty_______ l
2 3 8 l I 9 1 1
5
6.896 ------------ ------------ ------------ ------------ ------------ ------------ ------------ ------------
5
12.480 ------------ ------------------------ ------------ ------------ ------------ ------------ ------------
2 4 4 2
:
:~:~
:~:~:
:~:
:
:
;:~.:r:
~:~:
;:
:
l
:,:.~
l
;:
:;~:;.
::,.
:::::::;
~:
::
:~
:.
----------
241-A Hancock _____ 2 10 4
241-B Baldwin______ 2 10
244-A Colquitt. ____ 1 2
244-B Colquitt_____ 1 2
256-A AI>I>ling ______ 1 11
264 Early_________ 1
2
4 ------------ ------------ ------------ ------------
6.362 ------------ ------------ ------------ ------------
5
7.931 ------------ ------------ ------------ ------------
7.931 ------------ ------------ ------------
5
6.381
6
5
266 Dawson______ 3 9 2
267-A Stewart ______ I
3
5
268 UI>son. _______ 2 6 3 273-A Talbot _______ 2 4 3
273-B Talbot _______ 2 4 3
279 Cook_-------- 1 11 5
283 Forsyth.. ____ 3 9 2
284 Union. _______ 3
9
2
3.692
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ROADWAY MILEAGE PLACED UNDER CONSTRUCTION
DURING THE FISCAL YEAR ENDING JUNE 30, 1933
Surface
Graded, Top Gravel,
Treatment Surface
Proj.
County Comm Cong, Eng, Soil, and Chert, and Macadam Re-Surface on Miscel- Treatment Bituminous Bituminous Cement
No.
Dis!. Dist. Div. Sand Clay Selected
laneous
on
Mixtures Concrete Concrete
Material
Bases Lime Rock
285 Lumpkin ... 3 9 296-A McDuffie_____ 2 10
296-B McDuffie.. 2 10 310 Union ________ 3 9
312 Lumpkin---- 3 9
..... 315 Wilkes________ 3 8
0 <D
317-B
Lumpkin ..
3
9
321 Forsyth.. 3 9
347-C Stewart.. 1 3
351 Franklin.... 3 8 357 Lowndes _____ 1 11
369-B Toombs... 1 12
370 Richmond ... 2 lO
372-A Elbert .. 3 8
379-B Colquitt. ____ 1 2 386 Talbot _______ 2 4
390-A Crawford ____ 2 6
390-D Crawford.... 2 6 393-D Taylor________ 2 3 393-E Taylor________ 2 3
402-B Madison. -- 3 8 402-D Madison ______ 3 8 402-E Madison______ 3 8
2
6.830
4
7.700
4
4.495
2
3.415
2
3.020
2
10.569
2
5.851
2
7.578
7.578
5 ------------ ------------ --------- ------------ ------------
5.614 ----------- ------------ ------------
2
3.320 ------------ ------------ ------------ ------------ ------------ 5.038 ------------ -----------
5
11.400
6
3.200
4
5.000
2
3.674
5
11.669
3
0.253
3
4.931
3
2.430
3
10.510
3
3.278
2
5.179
2
3.207
2
1.050
Brick
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ROADWAY MILEAGE PLACED UNDER CONSTRUCTION
DURING THE FISCAL YEAR ENDING JUNE 30, 1933
Surface
II
Graded, Top Gravel,
Treatment Surfaeo
Pro].
County
Com. Cong. Eng, Soil, and Chert, and Macadam Re-Surface on Miscel- Treatment Bituminou Bituminou Cement
Brick
No,
Dist. Dist. Div. Sand Clay Selected
_ _ _ _ _ _ _ _ _ Material
----1---- laneous
Bases
on
Mixtures
Lime Rock
Concrete
Concreto I
408-A Stewart ______
408-B Stewart_----
409-A Putnam......
4W-D Putnam......
409-F Jones.........
..........
0
410-D 41G-E
Atkinson ..... Atkinson _____
41G-G Atkinson _____
41()-H Ware_________
H2-A Telfair________
412-B Telfair. ___ ...
418-0 Lamar........
m-D Wilcox........
424-S Polk..........
428-A Bryan .... ___ -
428-B Bryan........ 444-A Oconee_______ 444-B Morgan ______ 445-F Taylor________ 44g-c DeKalb ______
44Y-G Gwinnett. ... 465-B Johnson _____
468-B Oglethorpe___
1
1
1 3
2 8
2
8
4
2 6 3
1 11
6
1 11 6
1 11 6
1 11 6
1 12 6
1 12 6
2 6 3
1 12 5
3 7 1
1 1 6
1
8
3 8
: 2 3
3 5
3 2
1.,
r,
''" I
:1
+r::~~ --I~- --1 J 1 - :(:~-n:-I-: -
1
:
1
---------'-----'---- - - - - ---------
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ROADWAY Ml LEAGE PLACED UII'DER CONSTRUCTION
DURING THE FISCAL YEAR ENDING JUNE 30, 1933
Surface
Graded, Top Gravel,
Treatment Surface
Proj.
County
Com. Cong. Eng. Soil, and Chert, and Macadam Re-Surface on Miscel- Treatment Bituminous Bituminous
No.
Dist. Dist. Div. Sand Clay Selected
laneous
on
Mixtures Concrete
Material
Bases Lime Rock
- - 470-C Twiggs_______
471-B 478-A
W a r r e n _______ Long _________
~~
1
-- ~~~:~~~~~ :~:::~~:~~~~:::::::::: ::::::::::::~::::::::::~ :::::::::::: ::::::::::::1::::::::::::
.
I
478-B Liberty_______
1 6
479-A Heard-------- 2
3
...............
483-A 483-B 483-C
Madison ______ M a d i s o n ______ Madison ______
3 3 3
2
483-E Madison _____ 3 8
483-F Clarke________ 3 8
487-D Thomas______ 1 2
489-A Lanier_ _______ 1 11
490 Fulton _______ 3 5
577 Ghattah o o c h e e ____
.
I
I
580-A 580-B
Butts _________ B u t t s _________
679-B Jasper________
681 Jackson ______
9
2
725 Colquitt._._.
2 5
738-B CarrolL ______
1
805-A Chattooga ___ 3
1
805-D Chattooga ___ 3
1
- - - - - ' - - - - - - - - ' - - - ' - - - - - - - - - - - - - - -I . -- - - - -I - - - - - - I-
I
I
Cement Concrete
Brick
;::~~ I----
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ROADWAY MILEAGE PLACED UNDER CONSTRUCTION
DURING THE FISCAL YEAR ENDING JUNE 30, 1933
Surface
Proj.
County
I Graded, Top Gravel,
Treatment Surface
Comm Co11J1. Eng. Soil, and Chert, and Macadam Re-Surface on Miscel- Treatment Bituminous Bituminous Cement
Brick
No.
Dist. Dis! Div. Sand Clay Selected
laneous
on
Mixtures Concrete Concrete
Material
Bases Lime Rock
-----------------l-----l-------------1----r------------ ----
805-E Chsttooga.... 3 7
806-C Whitfield...... 3 7
817-B Meriwether... 2 4
823 Emanuel..... 2 12
828-A Wheeler ....... 1 12
..........
833-A 833-B
Effingham.. _ Effingham ....
2 2
1 1
~ 845-A TattnalL.... 1
1
853-A Coweta.... 2 4
857-E DeKalb ...... 3 5
862-A TattnalL.... 1 1
905-D Clinch-------- 1 11
907-C Wayne........ 1 11
1 ------------ ------------ ------------ ------------ ------------ ------------ 4.675 ------------ ------------
1 ------------ ------------ ------------ ------------
5.178 ------------ ------------ ------------ ------------
3
3.222 ------------~------------ ------------ ------------ ------------ ------------ ------------ ------------
j~ ~:: ~::r:~ 4
1.754 ------------ ------------ ------------
6
4
4
6
3
2 1::1
:! .,t
5.025 ------------ ------------ ------------ ------------
rl
,-----~:~~~-- :::::::::::: ::::::::::::I:::::::::::: 6
4.242 .............. ------------------------- ------------ ------------ ------- ----~------------ ------------
6 6
-----5:875-- ::::::::::::1 :::::::::::: :::::::::::: ::::::::::::
910-
A&B Decatur. 1 2
------------ 18.959 ------------ ------------ ------------ ------------ ------------ ------------ ------------
919-B Chatham_____ 1 928 Screven....... 2
1 1
6 4
-----;:;;8-- ~::::::::::: :::::::::::: ::::::::::::~:::::::::::: :::::::::::: -----~::::.. :::::::::::: ::::::::::::
932-D Wilcox......... 1 12 5 939-C Wilkinson.... 2 10 4 942-C Laurens....... 2 12 4 942-D Johnson ..... 2 12 4 944-B BleckleY------ 2 12 4 95o-D Macon ........ 2 3 3
4.139 ------------ ------------- ---------- ----------- ------------ ------------ ------------ ------------
3.257 ------------ ------------ ------------ ------------ ------------ ------------ ------------ ------------
3.888 ------------ ------------ ----------- ------------ ------------ ------------ ------------ ------------
0~:.9~2~3! :::::::::::: :::::::::::: :::::::::::: :::::::::::: :::::::::::: :::::::::::: :::::::::::r::::::::::
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ROADWAY MILEAGE PLACED UNDER CONSTRUCTION
DURING THE FISCAL YEAR ENDING JUNE 30, 1933
!
1
I j
Graded, Top Gravel,
Surface
I
Treatment Surface
Proj. No.
County
~e~:::~~ l~:::~s Lim;~ock Commi Cong Eng. Soil, and Chert. and Macadam Re-Surface on Miscel- Treatment Bituminous Bituminous Cement
Brick
DiEt. I Dist. l Div. Sand Clay
I
Mixtures I Concrete Concrete I
F~m ......
3
<;;
~.~,~_i=0~
1016=A
~g~!~~~~~~:~:~:~:::_:::::I
: ~
1016-C ColQuitt ___
1017-A Cook_________
1017-B Bernen _ ____
1
1021-A
Marion_______ 1
1022-A Jenkins ______ ! 2
1025-A Pulaski... ___ I 2
1025-B Houston_____ 2
1025-C Houston_____ 2
1032-A Tift.__________ I
1032-BI Berrien ______ 1
I1:~~
I
'
~
:::::7~.6:6~9ii~:r_:_:_:__~_:_~_;_;_:__:[I-:-:-:-:-:-':-:~--:"-:-l-:r:-:-:-:--:-:-:-:-:-:-:-1I:-:-:::-:--:-:--:~-:-~:-:-11---:-:--:--:--:-:--:---:--:-:--:-1:-:-:-~:-:--:-:--:---:--:-:--:-1:-:-::_-_:_:-_:-_:_:1_:-_:-:.:-.~-.---_--_-_--_-~_:_-~_-~_~-_-_--_'1,:--:--:--:---:---:--:--:--:--:
2 5
11 5
11 5
4 3
1 4
12 3
12 3
12 3
2
4.673
11
4.082
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ROADWAY Ml LEf..GE PLACED UNDER CONSTRUCTION
DUiil NG THE Fl SCAL YEAR ENDING JUNE 30, 1933
I
I
I
j
I
I
'I Graded, Top Gravel,
surface I
: I
I
Treatment Surface
Proj.
County IComm Cong. Eng. Soil, and Chert, and Macadam Re-Surface en Miscel- Treatment Bituminous Bituminous Cement
Brick
-- -1---- No. I
~--~--~--~- Dist. Dis!. I Div
~~
~--- Sand Clay
-~Se~le~ctied~-~-----
-----~-B_"slean_eso_usJ~_I'_"'on"_~~~-
Mixtures
- - ---
-~~
-~--' Concrete '
-C-o-n-cr-ete-~
1034-Aj Sumter _____
~~:;=! ~:~~~ord-. ~-,
2.472 1
.
..
1~!.:0~~3~ : ------ .:: :::__:::..~~~-:::::::::!::::::: __
, ________ _
1057-AI' Thomas _____
-----------
1063 Berrien ... ____ 1
11
~ 1065 , Schle, ------
3
12.302 1-----
2.595
.. ...
--I
1
----------- --------
---1
___________ _
-----------1---- ------------
~~~~~:: i;~~~~m~---1
1098 . Tift
11
~:~~~ ,-
---o:,,;sIr::::::..:::::-:
:I:::::::.::
1::::::::::::1
:1
:_:_--
__
.......
1.211 !
:1_: _- :_ :_ __ l.G52 ---------_--__ -__ -_-_:_-_:_:__-_:_:_:1_-_:_:_:_ _:__::_-_:_::_-:_- __
~~i~ I~:~"-~~_:::_
~~~! ~~i~~~-i~t_::::l 1
1506 Spalding_____
~;!~-AI :~~~=~~~~~::
~~
.~:::::::::::: 3.970 l.5GO
-----~::::~-
1
_:_ :::::.:-1 - .i.ooo 1.:::.:.:::: ~-::_
__
___
.....
:
1 ':
_
i-
------::::1:
::::::::: 1
::::::
---
:::::::1:::_::::_::_::: ::::_::::::_:1:::_::_::::1_ ---~:~~0 .1:::::::::::, ::::-:::::: ::::::::::1 :::::::
...... -
~-:_:::_ -~~--
--o:4~_1r::::~:-1::..~.~.~.~.~.~.~.~.!.~.-.-.:..:._:-~.~.~.~..~.~..~.:.~..Jo-~~-~:~J1
~:~~
.. ........ .
:::~) :~::~~-:
i TOTALS..
I 405.724
44.269 I 32.055 I 25.900 I 147.704 I 99.275 I 54.560 I o.coc I 122.896 : 0.000
------------------~
A TOTAL OF 187 PRO.TECTS COVERING 933.383 MILES OF ROADWAY WAS PUT UNDER CONSTRUCTION DURING THIS PERIOD.
STATE HIGHWAY BOARD OF GEORGIA
ROADWAY MILEAGE PLACED UNDER CONSTRUCTION BY ENGINEERING DIVISIONS
~--------
DURING FISCAL YEAR ENDING JUNE 30, 1933
---------------
- --------------------------- - - - - - - - - - - ~
Number of
, 1
Projects'
----
Type of Road
~-~ - - - - - - - - - - - - -
I Division : Division I
i
One (Miles',
1
Two (Miles'
- - , - - 1
----- -----
Division
Three rMiles:
Division Four (Miles'
Division Five "Miles
-----
---------- --
I
Division
Six rMiles;
i i '
Total (Miles;
- - -------
I
89 I Graded Earth, Top Soil and Sandi
;may
___
-~ 8.984
60.880
7 ;Gravel, Chert and Selected Ma-
teriaL_ 9 Macadam __
7.028 ! 10.338 1.088 30.967
4 Resurface
0.000
0.000
............ 22
Ol
Surface Treatment on Misc'Li
Bases
5.670
57.106
21 Surface Treatment on Lime Rock
Bases 12 Bituminous Mixtures __
0.000 ! 0.000 20.087 22.026
0 Bituminous Concrete_
0.000
0.000
23 Cement Concrete~ 0 Brick__
I 35.635 0.000
26.193 0.000
92.687
0.000 0.000 0.000
0.000
31.359 4.283 0.000 16.064 0.000
60.212
0.000 0.000 7.500
36.110
6.059 5.790 0.000 21.651 0.000
114.138
26.903 0.000 18.400
36.670
20.505 0.382 0.000 14.230 0.000
69.823
0.000 0.000 0.000
12.148
41.352 1.992 0.000 9.123 0.000
406.724
44.269 32.055 25.900
147.704
99.275 54.560
0.000 122.8!16
0.000
------ --------------- ---
---- ------------
------------
187
TOTALS
78.492 207.510
144.393 137.322
231.228 ' 134.438
!133.383
---------
-----
-- -----------
STATE HIGHWAY BOARD OF GEORGIA
ROADWAY MILEAGE PLACED UNDER CONSTRUCTION BY CONGRESSIONAL DISTRICTS DURING FISCAL YEAR ENDING JUNE 30, 1933
~;'Cl~~ [ 1
Type of Road
~-~~~~~~~~~~!~'i~~~~~'~i~l[~~&..~'i~l~~~~'~i~~~~'~i~~~'~i-!l~~z~'~i ~~G~)~'i~l~~~-~'~~il~~~'~il~j~~~~i~'il~-i~
Z P..
.o
o
o jo ,o ,o o o1
o ,o . o o
1
1
89 faraded Earth, Top Soil and' i
I
!
I
I ----~-~- - 1 -- -~- - ~~---~- -,---
1 Sand Clay_______________ I40.156J, 57.54236.796]30.427 o.ooo,42.208 5.872 49.723116.95m5.452 57.91353.6781406.724
7 .Gravel, Chert and Selected
1
:
j
I
'
I
I
I
i MateriaL _______ ..... ___ 0.000 26.903 0.000 0.000 0.000 0.000[ 7.028 0.000 10.3381 0.0001 0.000 0.000 44.269
9 jMacadam_____ ___
'0.000 0.0001 0.0001 0.000 7.598 0.000 0.000: 0.000124.457 0.000 0.000[ O.OOOj 32.055
4 !Resurface -- - ------ - I o.oool 0.000 0.000 0.0001 o.ooo, 0.000 0.000. 0.000 0.000 7.5oo, 18.400 0.000 25.900
22 Surface Treatment on
'
'1
I
I
I
'
! Misc'l. Bases __________ ,18.393 12.8831 o.oool o.ooo o.ooo, o.ooo_. 5.178 18.787 38.81118.965[. 18.008]16.6791147.704
21 Surface Treatment on Lime[
1
1
,
,
,
12
: RockBases _____________ 33.650114.89119.402 7.988 0.000 4.931 0.000 jBituminousMixtures_______ 7.782 0.3821 o.ooo o.ooo 9.37714.28313.887
0.000 8.893l1
09..09 05 06 11
0.000 0.000;
13.761 o.ooo
4.652[99.275 o.ooo! 54.560
0
Bituminous Concrete ____
I 0.0001
0.0001 0.000 0.000 0.000 0.000 0.000 1
0.000
o.oool 0.000
0.000. 0.000
0.000
23 [Cement Concrete__ _ _ __ 0.000 11.180 3.050 8.320 0.00016.06419.172 26.193 8.143] 5.9811 0.000 24.793.122.896
0 Brick____________ __ _ _ _ 0.000 0.000 0.00011 0.000 0.000 0.000 0.000 0.000 0.000! 0.000 0.000 0.0001 0.000
---
187
TOTALS____
---
---
99.981
---
123.781
1 -
59
--
.248
-
46.
1 ---- _
735116.975]67
_ .4_ 86~, _ 51_ .13_ 711_ 10_ 3.5-96-11-08-.-6612
--
47 .
--
898
-------
108.082[199.
--
802
i
9
----
33.383
1
I
1
--'
- - - - - I -
- - - -' -
'
1'
Proj. 470-C. Twiggs County- Concrete Pavement
Proj. 1094. Dougherty County- Brick Pavement
Proj. 393. Taylor County- Surface Treatment on Limerock Base
Proj. 468. Oglethorpe County- Concrete Pavement
Proj. 241. Baldwin County- Surface 'treatment on Gravel Base
Proj. 226-A. Liberty County- Surface Treated Road
------ ------------ -
Proj. 85. Haralllon County- Concrete Pavement
Proj. 22. Fulton County- Bituminousl'dacadam on Stone Base
Proj. 24. Cherokee County- Concrete Pavement.
Proj . 483-F. Clarke County- Cold Mix Asphalt Surfacing on Stabilized Top SoU Base
Proj. 402. Madison County- Concrete Pavement
Proj. 311. Elbert County- Concrete Pavement
STATE HIGHWAY BOARD OF GEORGIA
SUMMARY OF BRIDGES COMPLETED DURING THE FISCAL YEAR ENDING JUNE 30. 1933
I
Project No.I
County
I Comm.l Cong.l Eng.
No. Gf
1
1
I Timber, 1-Beams 1
CoPcrete
Concrete
a,1d Concrete
T1mbcr
~ Concrete BridgP i
Totals
- -;;;--! CarrolL
z:l
1 Forsyth
I Dis!. I Di't. [llv. Bridges
I I
--1- ---I:---
--- ....... .. _i 3 1 4
1
................ .! 3
9
(Lin. Ft.) >nd I-Se1ms1
Flocrs
1 (Lin. Ft.) 1 Culverts ' (Lin. Ft.J
I-~"'__Ft.).___(L~.-~t~- -1------~~- _(.=_tn._Ft~}-1------
.. .. ..
...
.
160.0 I
32.0
.........
32.0 160.0
24
Cherokee
855.0
24
, Cherokee.
96.0
24
Cherokee
32.0
2.)-A Candler .......
32.0
2.)-A Candler. .. ..
>-'
...... 1
<"=">
30-C Cobb ............... . ---------1
77
Charlton
I
ll
129.0 2!10.0 418.0
80
Glynn ...
!
ll
80.0
86
I Haralson
56.0
88
Brooks
ll
26.0
ll2 169
~~l~~~s ..1 :::::::::::::........
12 ll
783.0
::::_1.
783.0 424.0
173
Schley ...................... -;
--------
20.0
179-C 244-A
I gfr~~r~~:--::::::::::::::::::::::1
128.0 I 623.0
24-l-B 1
195.0
128.0 623.0 195.0
. ::-::_ ~f~l~~~~--::::::: 244-B
252-A 256-A
268
I
_::1
ll 6
310
Union............................ !
9
86.0 :
I
. ~~~:0.. 1
109.0
86.0
39.0
39.0
268.0
192.0
322-A Wayne............................ I
ll
I - - - - - - ~------------
32.0
32.0
1
i
STATE HIGHWAY BOARD OF GEORGIA
SUMMARY OF BRIDGES COMPLETED DURING THE FISCAL YEAR ENDING JUNE 30, 1933
I
'
:
I
i
j Timber, 1-Bea" I
Project No,
County
I
Comm. Dist.
Cong. Dist.
I 1
Eng. Div.
No. of
I
'
Concrete
I
Concrete
1
and Concrete
Timber / Concrete Bridge
Bridges (Lin. Ft.) I and 1-Beamsl
Floors
I (Lin. Ft.) I Culverts
Totals (Lin. Ft.)
::b 'iit;f E ffij ------1---------------------- ------- ---- (Lin. Ft.), ~-~~-~----]--(~~- --
379-B
I H
I
i
I
i
!
241.0 408.0 306.0 180.0
......
"0 "
~::::r 390-A
390-D 393-0 393-0
....
393-D Taylor_____________ ______________
21.0
3
I!- "__"__"___ ____________
< l
:::
32.0 226.0 47.0
223.0 ___________ 1 ---------------
223.0
393-E 393-E
~:~i~~:-_- :::::_____::::::::::::'
~~~:~--
::::::::~
-32:()-
1
::::::::::::. _____
___________
-------
120.0 32.0
:------- !:~:~~;_-_::::::: 402-B
408-0 410-G
Madison and Franklin._________
ll
~
1:::: :::::::,::::::::::::1 --- ~~:~-- ---481:()--1 - 208.0
------------~ --------------
1 -----------~
- -------1
:::::::::::::::,
208.0 108.0 481.0
410-I 410-I
Ware________________ Ware________________
ll
6~
ll
.
--------~-----------:
282.0
21.0
21.0
282.0
445-F Taylor____________
3
1
29.0
445-F Taylor--------------- ____________
3
449-0 471-B
~:r~~~~:~~~~~a~~::_::::::::
i~
473-A
1
1 1
306.0
t:-:::::::;_:
___
:--
340
0 .
21.0 Underpass
310.0 306.0
::-- 473-A
478-A
f~~=~~;:t:~~::-:::::::-:::
~~
478-A
_ :::::'::::: - 1: 100.0
32.0 100.0 47.0
STATE HIGHWAY BOARD OF GEORGIA
SUMMARY OF BRIDGES COMPLETED DURING THE FISCAL YEAR ENDING JUNE 30, 1933
~~-===-~=~=-~~=-=~========~========--==-~~-~-_-_~-~~--_-_-
Projct No.I
County
, Comm.
I
Dist.
----1
478-B 1 Liberty ___ -----------------479-A , Heard ___________________ _
483-0 Madison _________________________ _
483-F Clarke__________ _ 487-0 , Thomas _ _ _____ ___ ______ _ 578-0 Jenkins ________ _ ___ _____ 2
>-'
589-A 1 B1bb
-- -
--- -- -- i
<:;:> >-'
594
597
Burke_ Meriwether.
_________ _
__ j
615
Troup and Harris _______ _
785-A Whitfield. ______________ --------1,
785-B 788
Whitfield-----------------Heard ________ _
820-B Johnson
820-B Johnson
839-0 857-E 861-A
Bartow ..
I DeKalb. _
__________ _
Jeffer3on ____________ _
883
Effmgham __ _ _ -------------
905-D I Olmch _______ -----------907-F Wayne ___________ _
928
Screven_
932-0 Wilcox __ _
I 932-D Wilcox._
Timber,I-Beams
Cong. Eng. No. of Concrete Concrete and Concrete Timber Concrete Bridge
-;-1 ; 1-; : _: : -- l-- -,-- Dist. 1 Div. 1
Bridges
(Lin. Ft.)
~
I and 1-Beams
(Lin. Ft ),
1
Floors (Lin. Ft.)
::.~
(Lin. Ft.)
Culverts (Lin. Ft.)
26.0-
~:[1/: ~ - 1
I : :I ,ro "i--
: ' II I
I ]
';~:{l 1
------------
32.0
12 12
~ ;ooo
(4) 125.0
23.0
-
29.0
-----+'------- ------1'
124.0 45.0
10 11
' :
:
- -- -___ :
::o:~--
I
16ii0.0
46.0
11
1 U ,nderpas' I,___________ _
50.0
1
2
12
4
56.0
-----.-----~ -. -- -------1-
131.0
12
------------
86.0
Totals (Lin. Ft.)
26.0 229.0 220.0 29.0 96.0 240.0 21.0 126.0 53.0 29.0 235.0 278.0 23.0 29.0 580.0 124.0 45.0 340.0 46.0 1650.0 50.0 56.0 131.0 86.0
~~~~~-
STATE HIGHWAY BOARD OF GEORGIA
SUMMARY OF BRIDGES COMPLETED DURING THE FISCAL YEAR
ENDING JUNE 30, 1933
- - - - - - - - -~~-~----c
Project No.
County
I Comm.
Dist.
-----~-- - - - - - - - - - - - -
----1-- -
944-B I BJec1,ley____ _
I
950-D Macon __
980
Elbert _____ _
981
Dawson______
-------
1006-B I Rg_ndolph _________ --------- ---11
......
r"o '
1015-B 1017-A 1017-A
1 Thomas __________ _ 1 Cook __________________ _
Cook_
1018-A Lanier ____ _
1023-B ! Fannin ___ _
1034-A I Sumter._
Cong. Dist.
12 3
ll ll ll 9
TOTALS ____ _
Eng. I No. of Div. Bridges
Concrete (Lin. Ft.)
1
I Timber,I-Beams
Concrete I and Concrete I
and I-Beams
Floors
(Lin. Ft.)
1
!
(Lin. Ft.)
1-------- --------
Timber Concrete Bridge I
(Lin. Ft.)
Culverts
(Lin. Ft.)
----
'
3011.0
----1
150
2913.11
836.o 1
645o.o
3.Z24 .0
19:i3 .0
Totals (Lin. Ft.)
27.0 239.0 495.0 .211.0 64.0 96.0 180.0 tiO.O 27.0 300.0 79.0
l:i. 406 0
BRIDGE MILEAGE COMPLETED BY ENGINEERING DIVISIONS DURING FISCAL YEAR ENDING JUNE 30, 1933
-~=~~~=--~---~=~-~-~--=--~--------~
Number of
Bridges
Type of Structures
j Division I One
Miles
Division 1 Division !
Two
Three I
Miles ! Miles
- - - -----,~----------------
- - - - - - -- -~------- - - - - - - - -
24
Concrete_____________ __ __ 0.016
0.064
0.116
4
1 Concrete & !-beams__
0.117
0.042
0.000
41
!Timber,I-beam,concretefloor 0.248
0.184
0.131
15
ITimber______ ____ __
___ 0.000
0.094
0.000
--~6__J~oncrete bri~ge _c:_~verts~--~ _ 0~65 ___~4 __ 0.062
Division Four Miles
0.206 0.000 0.284 0.024 0.067
Division Five Miles
0.155 0.000 0.141 0.020 0.126
150
I Total Constructed____
0.446
0.398
0.309
0.581
0 .442
..... - - - - - - -
<: <:
BRIDGE MILEAGE COMPLETED BY CONGRESSIONAL DISTRICTS DURING FISCAL YEAR ENDING JUNE 30, 1933
I Division I Total
! Six
Miles
Miles I
0.000
0.557
0.000
0.159
0.234
1.222
0.472
0.610
0.036 i 0.370
-+----
o. 742 1 2.918
I
Number of
Bridges
Type of Structures
1---~
---- - Congressional Districts
~-~~~~
Miles
- --~
I
! Total
' One
I Two
T
h
r
e
e
1 1
Four
Five II
Six
SeveniEight Nine I Ten iElevenl Twelve'
Miles
24 Concrete______ ________ o:ooo~ 0.155 0.066 0.000 0.000 0.050 0.0001' 0.064 Q.Oi6!.0.0581--o.ooo!-0~48~~ 0.557
1
4 41
Concrete Timber,
&!-b!-ebaemams,s_Concrete~.
0.000
0.000 0.0001
I
0.000
0.000
o.ooo:
0.060 0.042
1
0.057 0.0001
!
'
0.0001
0.000
0.159
Floor_ _________________ 0.064 0.107 0.0881 0.043 0.000 0.000 0.067 0.077 0.287!0.130! 0.249 0.110 1.222
15 Timber______ _ __ ____ 0.024 0.000 0.020 0.000 0.000 0.000 0.000 1 0.094 0.000 0.000 0.472,1 0.000 0.610
66 Concrete Bridge Culverts _I 0.063 0.042 0.055 0.026 0.009 0.014 0.053 0.005 0.00610.006; 0.0391 0.052, 0.370
~;;-1
0~ 0~ -o~:o.282i 1
-_-!O.W Total Constructed___
0.304-0.229-0.069
1
2-:918 o.-36610.194I0-:76ol--o-.3l(y
A Typical Concrete Box Bridge Culvert
Proj. 906. Clinch County- Cypress Timber Bridge over Suwanee River
Proj. 24. Cherokee County- Bridge over L. & N. Railroad near Toonigh
Proj. 578. Jenkins County- Bridge over Central of Georgia Railroad near Millen
Proj . 24. Cherokee County- Combination Concrete Bridge with Creosoted Piling Approach Spans over Etowah River
Proj . 179. Greene County-Combinatio~, Concrete Bridge with Creosoted Piling Approach Spans over Apalachee River
Proj. 30-C. Cobb County- Concrete Bridge over Sweetwater Creek near Austell
STATE HIGHWAY BOARD OF GEORGIA
SUMMARY OF MAINTENANCE PERSONNEL BY DIVISIONS
I
Foremen ofl Special Outfits .
1
Patrol Sections
AS OF JUNE 30, 1933
-
-
-
~
I
I
: Patrolmen '
1. 1
,
1
;
I
Miles Paved
!
I
.'I Miles
Unpaved .
, 1
1,
Total Mileage
DIVISION NO. !--CARTERSVILLE
---
3
22
22
440.617 I 642.613
1,083.230
DIVISION NO. 2-GAINESVILLE
3
29
29
492.008 ' 1,079.268 : 1 ,571. 276
DIVISION NO. 3 THOMASTON
4
21
21
I, 547.3101 921.144 1,468.454
I
DIVISION NO. 4-LOUISVILLE
2
25
25
_ _ _._ - - - - - - - -
1~ 1 377.799 1,068.572
DIVISION NO. 5 -MOULTRIE
1,446.371
2
28
28
I 605.77411,001.261 I 1,607.035
4 Total :18
DIVISION NO. 6-WAYCROSS
-
- - -- ----
-
----- -
'
I
I
24
24
I 561.928 , 76o. oo6 ' 1, 321.934
149
149
!3,025.436 I 5,472.864 I 8,498.300
140
STATE HIGHWAY BOARD OF GEORGIA
ACCIDENTS REPORTED FOR FISCAL YEAR ENDING JUNE 30, 1933
--------------
Col. With
i
Col. With
I
1
Col.
With .
Drove
' Drove _I
At
. Ran .I Ran
Cause of Accident
Mtr. Veh. 1 Other : Parked I Off I off 1 R. R. I into into Total
in Motion ' Vehicle ' Vehicle , Roadway I or !nto Crossing Animal: Pe~es-
~t:~~~~ ~~ ~~~~t lights____
in Motion
1 Bndge '
, 1
tnan
- ------ --- -----1-
------
2
I
1
3 _--I-__---- 3 I 18
6" -j
__ __ 1
6
39
Deficient brakes_ _ Deficient lights___
3
,
6
1 2
9
9 4
1 5
5 1
1 :_
20
1 __- _ ~- 1
27
Deficient steering gear____
_ 1
2
4
4
10
Deficient tires_ _____ _______ _ __
1
________ ____
6
7
,_. Driver asleep___
1
1
3
2
3
10
:::; Driver intoxicated__
12
1
4
26
6
2
51
Failure to observe signs____
I
8
Pass car without right-of-way__
4
_________ . 1
3
3
8
14
l
14
Reckless, careless driving_______ _
52
18
3
28
9
13
4
17
144
~~~~~i~t-~~~ --------
--1 1~ 1-- 1
i
4~
1~
4
8 86
Wrong side of road__ ________ _
_ ___3 _ _ :___4___ '___2 ___ ___13
3 _ __
26
Totals___ ______ __
108
J __ ~- l __2i)___ 1 171
58
27
456
Accidents on curves__________
96
'I
14
~--1-6-~-- 89 ---27-,--8--
ll
262
AccidentsonStraightRoad ___ ~~~~~!
12
18
1
9
1
82
31 ! 19 1
15 i 194
Totals _______ _
1 l - - 1 - 0 8_ _ _
32
Persons killed_____________ Persons injured____________________
39~
8 53
25 - 171___ 58_j-271- -9- -26-!45-6-
- - I T 1 ~ - f~
~43
--=--:-= ---~~-~~~~~ -
1
Property damage only__ _
14
2
3
27 ____
2
5
______ 53
-~----=--------------~----------~----
Route 96. Taylor County- Machining Graded Earth Road
Richmond County- Local Stone Ditch Checka and Retaining Wall Placed by Maintenance Forces to Prevent Erosion
Route 3. Patching Old Bituminous Pavement Spraying Hot Asphalt to Seal Cracks in Old Asphalt Pavement
Route 9. Lumpkin County- Hightower River Bridge Being Constructed by Maintenance Forces
Steel and Wood Ferry Constructed at East Point Shops for Use on the Ocmulgee River on Route 31 at the TelfairCoffee County Line
Division Maintenance Sh~ps at Cartersville
STATE ffiGHWAY BOARD OF GEORGIA ASPHALT DEPARTMENT
The following projects, approximating 55 miles, wer_e_completed. d.uring_!_h_El_fiscal year ending June 30, 1933._____
Project No.
-~-----------
County
------------
Type
A14L _______ _
A205 ______ _
A370
A451
A1080 __
A725 __
A1501
A375 A&B _
:;;: A61 _____ _
oo A805 ODE __ _
A805 A99l
oA________
_Richmond Effingham Richmond Emanuel Bulloch
_I,Oolqmtt ,Colquitt IMitchell ____ iWilkes _Ohattooga _Ohattooga
.. iOhattooga_
_Double surface treatment
6" lime rock base with surface treatment
'Double surface treatment. __
i Surface treatment
__________ _
_ Prepanng base and surface treatment __
Oold mix surfacing
- _ _ _
_____ _
_ Lime rock base with surface treatment _
_ IPebble sml base with surface treatment ____ _
--12" _ 1}" mixed in place asphalt cold mix asphalt ___ _ _ 1~" cold mix asphalt ____ _
_ 2" cold mix asphalt __ _
- - - - - - - - - - - - - 1,
CONVICT DEPARTMENT
Thefoll<>wing projects were completed during the fiscal year ending June 30, 1933.
Miles
2.500 3.817 5.000 8.500 3.067 0.382 0.581 12.407 4.000 4.675 4.426 4.786
Pro.iect
1
County
No.
1
------- ------------- ---1-----------
0839 0 -
IBartow __
Type 1 Grading and drainage __
Miles 13.250
Proj . 1041-A. Baker County- Clearing and Grubbing Right of Way by State Convict Forces
Proj . 1041-A. Baker County- Grading by State Convict Forces
Berrien County- Road Graded by State Convict Forces
Proj. 1063. Berrien County- Drainage Structures Built and Road Gra(Jed by State Convict Forces
Proj. 376. Mitchell County- Surface Treatment on Pebble Soil Base Constructed by State Asphalt Forces
Proj . 806. Whitfield County- Road Surface Treated by State Asphalt Forces
STATE HIGHWAY BOARD OF GEORGIA LABORATORY
MATERIALS TESTED OR INSPECTED July 1st, 1932 to June 30th, 1933
Kind of Material
I
----
Item
Cement __ S a n d __ Water_ __
Coarse Aggregate Top SoiL Tar__
Limerock_ Fertilizer_ Grease __ _ Paint__ _
Asphalt Asphalt Filler_ Expansion Joint_ Sign MetaL __
Asphalt Sand_ Center Strip _ OiL _____ _
Guard RaiL __ Pine Tar_ ______ _
Creosote OiL __ _ Copper Flashing __
Concrete Cylinders_ Concrete Beams _ Concrete Cores _ Corrugated Metal Pipe_ Concrete Pipe
Reinforcing SteeL Timber__ Concrete Sign Post_
Samples_ ___ Samples__
-~Samples_
__ Samples _ ___1. SSaammpplleess__ _
Samples __ !S a m p l e s _ ____ ~Samples __ Samples_ __ Samples_ _Samples_ Samples ___ Samples_ S a m p l e s __ __ Samples Samples __ ___ Samples_ ___ Samples ______ Samples__ ___ Samples_
____ Shipments .Shipments ___ _
_-~Shipments Shipments_
__ Shipments
Total Samples and ShipmentsI__ _
Number
3572 446 135
810
1850 336 596
3 7 60 690 13 23 5 35 12 33 9 1 2 2 2659 349 987 552 140 256 50 18
13651
153
PART THREE
FISCAL YEAR ENDING JUNE 30, 193+
STATE HIGHWAY BOARD OF GEORGIA
STATEMENT OF ASSETS AND LIABILITIES-FUND BALANCES JUNE 30,1934.
Current Assets
ASSETS
Cash in Banks State Funds __
National Recovery Trust Fund Trust Funds, Miscellaneous
862,652.51
* 864,340.58 600.00 1,727,593.09
Exhibit "A"
State Treasurer, Highway Funds
U.S. Government, Vouchers in Transit
Federal Aid
-~
National Recovery
3, 539.652.63
7,836.54 111.688.94
122.525.48
Accounts Receivable_ Advances __________ _
49.546.47 l,\165.00 ~ 5.441.282.67
Deferred Assets Inventory of Supplies and Materials Shop .robs in Process Undistributed Payrolls_ Undistributed Charges _
Total Proprietary Assets __
105.408.47 20. 203.13 46,366.35 25,414.85
197.-122.80
-- ~ 5,638.705.47
Capital Assets
Land, Buildings and Equipment \Schedule No. 4)
Land______________
_____ $ 178,145.25
Buildings_ ____________
315,229.00
Trucks __ ------ ________
327.640.00
Tractors __
163,775.00
Other Road Equipment _
364,432.00
Engineering Equipment
38,153.00
Office Equipment_
41,575.00
Shop Equipment
53,183.00
Laboratory Equipment Quarry Equipment __
* 16,500 .OG
58.293.00 1,556,925.25
Roads and Bridges Construction Cost to Date On Closed Projects. ___ __ On Open Projects ____ _
- *125,419,506.80 6,955,131.90 l32,3H,638.70
Total Capital Assets _
133,931.563.95
TotaL ______________________ _
156
_____ $ 139,570,269.42
STATE HIGHWAY BOARD OF GEORGIA
STATEMENT 0 F ASSETS AND LIABILITIES--FUND BALANCES JUNE 30,1934.
LIABILITIES, FUND BALANCES AND SURPLUS
Current Liabilities
Accounts Payable ________ ------------
none
Trust Funds, Miscellaneous_--------
$
600.00
U.S. Government. Advance National
Recovery Fund__ -----------------
750,000.00
Exhibit "A"
Total Proprietar:; Liabilities __ Fund Balances (Schedule No. 6)
Construction Contract Balances Contracts __ -----------------Contracts. National Reco\'ery _
-------------------------- $ 750,600.00
$ 2,344,958.08 4,240,106.75
Totals --------------- ----
------------------- $ 6,585,064.83
Less: Contract ParticipatiOn. __
342,77
Net Cash Liability __ --------Less: Casl1 Participation
Federal Participation --------National Recovery ____ --------Other Cash __ --------------County Cash Refund_-_--------
------- $ 6,584,722.06
33,898.80 3,821,818.99
11,530.13 12, 215.50Cr.
3, 885,032.42
Net Cash State Liability ____ _
Other Unencumbered Allotments
Con ~truction. State Forces
.",'
Survey Projects_____________ _
Reconstruction Projects __________ _
Maintenance, General Convict Farm ________________ _
567,280.06 38,727.61 f',86:J.27 18.311.68 65,864.66
$ 2,699,689.64 697,047.28
Unliquidated Purchase Orders_
158,965.05
Total Fund Balanceo;. Capital Liabilities and SL"plus
Capital Liabilities Refunding Certificates- -Due to Counties~1936 thru 1945 (Schedule No.5) _________________________ _
Surplus Invested in Plant and Equipment_ ________________________ _
Surplus Invested in Highways. _____ _
3, 555,701.97
26,637,282.87 l, 556,925.25 105, 737. 355 '83
Total Capital Liabilities and Surplus
Current Fund Surplus (Exhibit "8") Surplus. State Funds _______________ _
Less: Unrecorded Reserves For County Construction Contracts. Detail Estimates Incomplete_______________________________ s
For Revolving Fund to cover Inventories. Advances. etc __________ _
88,578.20 290,464.40
133,931' 563.95 953,360.90
379,042.60
SurplUli as per books_ --------------------------------------------- 1,332,403.50
TotaL ------------------------- _______ -------------------------- $139,570.269.42
NOTE: Current Surplus, as above, does not include Unallotted Federal Funds amounting to $3,50.810.36.
157
Exhibit "B" STATE HIGHWAY BOARD OF GEORGIA RECONCILIATION OF FUND SURPLUS REFLECTING FUND REVENUE,
APPROPRIATIONS AND ALLOTMENTS
JULY 1, 1933 TO JUNE 30, 1934.
Fund Deficit, Juy 1, 1933
FUND REVENUE
Revenue Received (Schedule No.7) Motor Vehicle _____________ , _________$
1,233,125.52
Gasoline Taxes- ___ --------------Miscellaneous Income_____________ _
8. 779,497.63 12.244.63 $10,024,867.78
$ 2. 392.873.41
Estimated Participation Accruals (Schedule No.7) Federal Aid Allotments ____________ $ National Recovery Allotments__ Other Participation, Railroads. Cities. etc. ___ ---------------------
70,282.77 6, 730,977.21
28,863.67
$6,830.123.65
Total Fund Revenue.------------- _____________ -------------------- 16,854,991.43
Available for Allotments ________________ --------------- ______ _
$ 14.462,ll8.02
APPROPRIATIONS AND ALLOTMENTS
Continuing Allotments (Schedule No. 6)
Construction Projects
Contractors ___ ._----------- ____ .. _$ 1. 738,118.53
Contractors. National Recovery
7,072,055.38
Counties as Contractors ________ _ 1,440,053.13
State Forces and Materials-_
1.062,582.32 $11,312,809.36
Survey Projects ____________________ _
179,247.61
Reconstruction Projects ______ . ___ _ Maintenance. GeneraL ___________ _
52,218.51 1.133,177.47
~~--~-
Total Continuing Allotments __ ------------------- $12.677,452.95
Non-Continuing Allotments (Schedule No.6) Administration General Administration Appropriation_ Maintenance Avvrovriation ____ _ Research.---- _____________________ Collection of Revenue _____________ _ Quarry _____________________________ _
247,595.82 5,627.85 $
Equipment
Equipment Appropriation _______ $
ll6, 051.72
Maintenance Appropriation ________2_0_.9_3_5_.0_4
253,223.67 2,385.17 41. 812.ll 940.21
136.986.76
ShOD.----------------------------Motor Vehicle License Tags _______ _
61.83Cr. 51,648.20
Total Non-Continuing Allotments_______________ _ $ 486,934.29
Total Allotments_______________ Continuing Appropriation (Schedule No. 6)
Maintenance Aovrooriation _______ $
Less: Allotments __ ----------------
----------- $13' 164. 387 .24
1.125,005.81 1.159,678.53
Excess Allotments over Appro-
priation absorbed in Appropriation Balance 7-1-33________ _
34.672.72Cr
Total Allotments and Appropriation
13,129,714.52
Fund Surplus as per records _______________ _
Less: Unrecorded Reserves Construction Detail Estimates __ Revolving Fund ___ -------------
Fund Surplus, June 30. 1934-Exhihit "A"_
$ 1,332.403.50
88.578.20 290,464.40
-------------------- $
379.042.60 953,360.90
158
THE HIGHWAY DOLLAR
Covnh'e-5
ffoi/road.s
ere. 00." Yo
6o.so//ne Tax 62.2 7--
INCOME
Le9/.s/o//i.-e 7/-"on.srer.s oo.s~
-4o'/n71;,;~/ro//on 0.?. 8% LeN?cT 8vilehn .s B-?vi,<'l77en/0/.2;6
EXPENDITURES JULY I 1933 T 0 JUNE 30 1934
Exhibt "C"
STATE HIGHWAY BOARD OF GEORGIA
STATEMENT OF REVENUE RECEIPTS AND EXPENSE DISBURSEMENTS
JULY 1, 1933 TO JUNE 30, 1934.
REVENUE RECEIPTS
State Treasurer
Motor Vehicle License Tax ______ _ Fuel Oil TaX--------------------
*1,233,125.52
8, 779,497.63
* 10,012,623.15
Counties Cash for Construction, Refund __ Construction Contract Credits ___ _
.0, l, 3-18.42Cr.
26,284.24
Railroads, Cities, etc.
Cash for Construction ___________ _
Construction Contract Credits_
12.326.24 3.202.98
15, 529.22
U. S. Government
Federal Aid Vouchers for Construction. _________ ._._.
National Recovery Vouchers for Construction _____________ _
*l,l39, 345.52
2, 909,158.22
4,048,503.74
Miscellaneous Income_
12,244.63
Total Revenue Receipts....
~ 14,113,836.56
EXPENSE DISBURSEMENTS
Administration (Schedule No. 8-A)
General Administration General Office_ .. Division Offices _______ _
Warehouse._------------
200,819.7-1 39,104.74 13,509.19$ 253,433.67
Research. ____ ----------Collection of Revenue .. Quarry_---------------- __________ __
2. 480.03 41.812 .ll
940.21
Construction (Schedule No. 8-B)
Surveys Actual Surveys Plans _________ ----------------
71,670.68 71,236.03$ 142,906.71
Construction Supervision Actual Construction_
-------* 392,!!7.74 8, 481, 201.62 8, 873,322.35
Maintenance (Schedule No. 8-C)
----* General Supervision.---------- _______ Actual Maintenance__
79,507.15 1,051,282.24$1,130,789.39
Reconstruction
Supervision.-------------------Actual Reconstruction. _____ _
143.39 66,155,33
66,298.72
298,666.02 9,016,229.07 1,197,088.11
160
Exhibit "C" Cont'd.
STATE HIGHWAY BOARD OF GEORGIA
STATEMENT OF REVENUE RECEIPTS AND EXPENSE DISBURSEMENTS
JULY 1, 1933 TO JUNE 30, 1934.
Land, Buildings and Equipment (Schedule No. 8-D) Administration Equipment ____ .. ___ .. _. __________ _
Construction Equipment.... ____ .. ____ ._ ... _... _
Maintenance Land and Buildings_ .. _________ .. $ Equipment._._ ..... _... __ ..... ___ _
3, 231.33
110,340.56
1. 700.00 18, 635.04
20,335.04 $
133,906.il3
Legislative Transfers (Schedule No. 8-E)
Prison Farm Purchase_ Motor Vehicle License Tags ______ .
2,719.85 51.648.20
54,368.05
Total Expense Disbursements.______ __
__ ____________ $ 10J:Q0.2_~8~
Excess Receipts over Disbursements___
ADD Excess Proprietary Assets over Liabilities July 1. 1933_ -------------
$ 3, 413, 578.38 1, 474,527.09
Excess Proprietary Assets over Liabilities, June 30, 1934-Exhibit
"A"-- ----------------------------
RECONCILIATION
Excess Proprietary Assets over Liabilities (as above) Available for liquidation of Fund Balances and Unrecorded Reserves. _______ _
Fund Balances (Contracts-Allotments-Purchase Orders-etc.)._ ..$
Unrecorded Reserves (Detail Estimates-RevolvingFund) _________ _
$4,888,105.47 3, 555,701.97
379,042.60 3,934,744.57
FundSurvlus-Exh!blt "A" _______ _
953,360.90
161
STATE HIGHWAY BOARD OF GEORGIA COMPARATIVE STATEMENT OF REVENUE RECEIPTS AND EXPENSE DISBURSEMENTS
FOR FISCAL YEARS ENDED JUNE 30, 1931, 1932, 1933, 1934
Exhibit "D"
Motor Vehicle License Fees____________ _ Gasoline Taxes ____ ----- ___________ -----Counties________________________ _
Railroads, Cities, etc._ U.S. Government ____ _ Miscellaneous Income
FISCAL YEAR
FISCAL YEAR
FISCAL YEAR
FISCAL YEAR
ENDED JUNE 30, 1931
ENDED JUNE 30, 1932
ENDED JUNE 30, 1933
END ED JUNE 30, 1934
Detail
Amount
Detail
Amount
Detail
Amount
Detail
-------------------------------------------
REVENUE RECEIPTS
Amount
$ 4, 156,038.81
$ 3, 778,430.05
$ 1,120,670.19
$ 1,233,125.52
8,885,000.00
8,701,965.17
7' 786,322.58
8, 779,497.63
1,044,774.93
800,012.43
276,143.27
24,935.82
66,868.50
22,829.47
12,960.06
15,529.22
5,512,958.62
5,275,811.64
5, 065,020.34
4,048,503.74
47,422.47
24,406.85
18,852.02
12,244.63
Total Revenue Receipts._
$19,713,063.33
$18,603,455.61
$14,279,968.46
$14, !13, 836 .56
,..._.Administration
R5 General Administration
General Office ____________________ $
Division Offices____________ _ Warehouse__________________ _
326,327.02 81,377.35 19,458.25 $
EXPENSE DISBURSEMENTS
$ 353, 02!.11
$
81,650.93
427,162.62
20,509.14 $ 455,181.18
294,317.75 66,853.16 18,298.48 $
$ 379,469.39
200,819.74 39,104.74 13,509.19 $
253,433.67
Research_ Collection of Revenue _____________ _
Quarry____ ----------------------------
2,380.87 24,267.28 4,788.85
7,376.72 40,537.54 1,647.14
7,103.81 79,507 .38
876.49
2, 480.03 41,812.!1
940.21
Total Administration _____ _
$ 458,599.62
504,742.58
466,957 .07
$ 298,666.02
Construction Surveys _______________________ _
Construction Supervision__________________________ $ 551,916.54
Actual Construction ________________ 13,447,180.45
$ 199,766.43 13,999,096.99
$ 769. 599 .22 15,910,059.96
$ 255' 416 .53 16,679,659.18
$ 672,861.64 10,696,769.96
$ 127' 316.44 !!,369,631.60
$ 392,!!7.74 8,481,204.62
$ !42, 906.71 8,873,322.36
Total Construction ______________ _
$14,198,863.42
$16,935,075.71
$11,496,948.04
$ 9,016,229.07
STATE HIGHWAY BOARD OF GEORGIA COMPARATIVE STATEMENT OF REVENUE RECEIPTS AND EXPENSE DISBURSEMENTS
FOR FISCAL YEARS ENDED JUNE 30. 1931. 1932, 1933, 1934
Exhibit "D"-Cont"d.
FISCAL YEAR
ENDED JUNE 30, 1931
Detail
Amount
FISCAL YEAR
ENDED JUNE 30, 1932
Detail
Amount
FISCAL YEAR
ENDED JUNE 30, 1933
Data il
Amount
FISCAL YEAR
ENDED JUNE 30, 1934
Detail
Amount
Maintenance
Reconstruction __ --------------------General Maintenance
Supervision ____ ------------------- __ $ 97,502.71 Actual Maintenance________________ 2,026,622.98
$ 69,671.06 2,124,125.69
EXPENSES DISBURSEMENTS $ 12,662.55
$ 94,680.92
$ 82,674.30
2.022,984.30 2,117,665.22 1,306,631.06
$ 10,022.11 1,389,305.36
$ 79,507.15 1,051,282.24
$ 66,298.72 1,130,789.39
Total Maintenance--------------
Land, Buildings and Equipment__ ___________ _ ,_. Legislative Transfers _______________________ _
a;, 0-l
Total Expense Disbursements... _
$2,193,796.75
*. 614,771 .83 2,109.80
---~---
$17' 468,141.42
$ 2, 130.327.77
$ 521,950.31 664.186.93
-----
$20,756.283 .30
$ 1,399,327.47
$ 64,477.08 1,108,909.15
$14.536,618.81
$ 1,197,088.11
$ 133,906.93 54,368.05
$10,700,258.18
Excess Disbursements over Receipts.. _ Excess Receipts over Disbursements... ADD
Cash, Inventories, etc., beginning of Period. __ -------------------- _______ _
BALANCE Cash. Inventories. etc., end of Period
DEDUCT Fund Balances. Contracts, Allotments. Reserves, Purchase Orders. etc .. end of Period________________ __
$ 2, 244,921.91
1,639,083.22
-----
$ 3,884,005.13
8,249,819.32
$ 2, 152.827.69 3,884,005.13
$ 1,731,177.44 6, 901.850.65
$ 256,650.35 1, 731,177.44
$ 1,474,527.09 4, 436,080.54
$ 3,413,578.38 1,474,527.09
$ 4, 888,105.47
3,934,744.57
Fund Deficit. June 30, 1931. 1932. 1933 _ Fund Survlus. June 30, 1934 ----------
$ 4,365,814.19
$ 5,170,673.21
$ 2,961,553.45
* 953,360.90
STATE HIGHWAY BOARD OF GEORGIA LAND, BUILDINGS AND EQUIPMENT JUNE 30, 1934
Schedule No. 4
Description
Appraised
Additions for
Total
Depreciation I Appraised
Value July 1, 1933
Fiscal Year 1933-34
June 30, 1934
for Fiscal Year I
Value
1933-34
June 30, 1934
---------------------l-----------l------------l----------------------~-----------
Land ____________ _ Buildings _______ _
$
176,445.25$
315,229.00, --
178,145.25 --------- ----- - $ 315, 229. 00 - - - -- -- - - - - - - - - - '
178,145.25 315,229.00
Automobile ___ _ ,_. Trucks ________ .. __
--
402,320.00
42,763.96
445,083.96$
117,443.96
327,640.00
~ Tractors _____________ _
207,909.00
20,700.64
228,609.64
64,834.64
163,775.00
Other Road Equipment __
361,169.00
64,810.49
425,979.49
61,547.49
364,432.00
Engineering Equipment_ __
44,146.00-
__________ I
44,146.00
5,993.00
38,153.00
Office Equipment ___ _
42,383.00
3,326.691
45,709.69
4,134.69
41,575.00
Shop Equipment _________ _
57,456.00
512.771
57,968.77
4,785.77
53,183.00
Laboratory Equipment __ _
17,053.00
92.38
17,145.38
645.38
16,500.00
Quarry Equipment __ _
65,153.00 --
_________ 1_ _ _ _6_5_1, _5_3_.o_o _ _ _ _ 6_,8_6_o_.o_o _ _ _ _5_8_,2_9_3_o. _o
Totals ____________________ =$===1~~~_6!__._~ _$_--==~-!__,_~-~-~1$--=--~-~-2~_,!__7~~-:1B____==~~~~~~ 1
Total Appraised Value, June 30, 1934-Exhibit "A"- __
------
1
- 1$
_1_,556,92~
----------------- -------------. --------
Schedule No. 5.
STATE HIGHWAY BOARD OF GEORGIA
STATEMENT OF REFUNDING CERTIFICATES
JUNE 30, 1934.
Appl::u~-t~--- _l-$-:-:-3-.~-:-ot-.1-4-1 Elber~-~u~t~-----~~$--:-:-6-~-:5-~-t.-3-2-
Atkinson______ __
Bacon__________
Baker_
Baldwin_______ __
Banks_ ___ _____ _
Barrow __ .____
Bartow___________
Ben HilL___ ___ _
Bibb______
_
Bleckley ____ ___
Brantley_____ _
Brooks_________
Bryan-__________
Bulloch_
_ ~-
Burke ___ ~:::~:_:_
Butts____________
Calhoun______
Camden
__
CampbelL____ __
Candler______
CarrolL ___ ---
Catoosa__________
Charlton________
Chatham________
Chattahoochee
Chattooga__ ______
Cherokee ______ .
Clarke__ _________
Clay______ ______
Clayton __ . ___
Clinch__________
Cobb_____ ____
Coffee_________
Colquitt_ ____ __
Columbia______ __
Cook____________
Coweta_______ ___
Crawford______
Crisp______
Dade____________
Dawson__________
Decatur__________
DeKalb___________
Dodge____________
Dooly_____________
Dougherty________
Douglas__________
Early_____________
Effingham_______
12,314.60 26,272.90 24,969.42 99,927.56 75,191.59 71,720.80 124,299.84 61,400.58 898,356.10 26,606.23 36,034.96 359,320.51 30,623.58
123,758.98 243,630.66
82,818.10 9,977. 75 13,152.00
205,893.32 30,835.42
523,814.89 23,142.85
81,348.22 1,310,079.46
17,875.97 124,788.11 199,509.72 372,977.13
47,141.09 49,202.42 62,153.55 278,612.80 75,961.09 150,890.06 61,865.28 209,732.93 487,277.97 31,709.18 91,539.61 74,869.42 25,713.39 371,629.87 259,849.79 64,102.49 192,022.91 493,915.22 44,494.34 77,836.12 57,391.06
EmanueL________ Evans___________ Fannin ___________ , Fayette___________ Floyd_____________ Forsyth__________ Franklin _____ -___ Fulton_____ ___ _ Gilmer___________ Glynn___________ Gordon___________ Grady____________ Greene.__________
GwinnetL_______ Habersham.______ HalL____________ Hancock_________ Haralson_________ Harris______ _____ Hart_ ___ __ ____ __ _ Heard___________ Henry_ __________
Houston_________ Irwin_____________
Jackson__________ Jasper__________ Jeff Davis________ Jefferson________ Jenkins ________ Johnson___ ___ __ Jones____________ Lamar__ ___ .______ Laurens__________ Lee_______________ Liberty___________ Lincoln_________ Long_____________ Lowndes ________ Lumpkin__ _____ Macon____________ Madison__________ Marion___________ McDuffie________ Mcintosh_________ Meriwether_______ Miller_____________ Milton____________ MitchelL________ Monroe _____ __ ___
493,986.86 72,135.44
187,014.95 46,859.63 430,838.77 65,191.97 108,765.48 113,926.08 56,130.62 420,745.28 91,044.59 111,967.53 61,662.97
206,029.29 341,736.71 400,391.36
75,923.85 149,659.86 106,678.62 125,506.39
19,131.75 219,591.56
291,391.43 56,545.31
127,589.35 91,658.61 33,398.63
350,905.53 85,086.68 35,649.49 42,877.44 19,499.10 284,243.00 81,509.77 31,332.06 32,830.45 38,174.64 547,277.10 84,092.05 193,593.06 20,359.40 22,817.86 53,649.81 15,277.50 405,913.92 35,395.83 20,713.10 417,193.11 119,384.92
166
Schedule No. 5-Cont'd.
STATEMENT OF REFUNDING CERTIFICATES JUNE 30, 1934.
County
Amount
County
Amount
Montgomery _____ $ Morgan__________ _
Murray_______ _
Muscogee _________ _
Newton _____ _
Oconee
Oglethorpe __
Paulding ______ _ Peach ___________ _
Pickens _________ _
Pierce ________ _
Pike _ Polk_
Pulaski __
Putnam
__ _
Rabun __________ _
Randolph_______ _ Richmond ______ _
Rockdale________ _ Schley___________ _
Screven _________ _
Seminole ________ _
Spalding________ _
Stephens_ Stewart _________ _
Sumter_ _________ _
Talbot___________ _
Taliaferro ___ ___ TattnalL _______ _ Taylor_ __________ _
124,580.70 : Telfair___ ___ _____ $
74,387.83
259,212.39 TerrelL__ ____ -:
271,526.03
89,811.16 827,817.07
95,468.70 26,106.42 39,279.24 19,157.24
8,194.69 120,956.51 169,875.66
jThomas__
__
l~~dri;bs---- _ ~=-
Towns
___ _
'iTreutlen __ _ , Troup ______ _
Turner _____ _ Twiggs ______ _
IUnion ____ _
391,611.67 177,857.97 205,582.07 45,084.25
2,000.00 631,255.57
24,384.28 22,555.36 50,680.00
12,808.02 Upson __ _
121,586.46
183,409.70 242,410.52
[W Waallktoenr_
187,076.07 161,859.52
103,271.71 318,631.00
82,788.81 1,139,823.99
2,091.95 55,521.49 40,751.20 25,742.03 377,686.16 133,031.70 47,475.00 365,369.72 74,343.95
Ware ____ _ Warren__________ _
Washington ______ _ Wayne________ _ Webster_ ________ _
IWheeler ______ _
White __________ _
Whitfield_ Wilcox ___ _ Wilkes ___ _ Wilkinson _______ _ Worth ___________ _
Coastal Highway_
634,572.73 22,603.85 106,474.51 272,659.54 13,740.18 133,062.67 35,472.82 265,529.38 10,093.64 268,753.94 36,060.67 245,023.78 882,898.87
15,691.86 43,422.07 26,056.54
TotaL ______ $ 26,637,282.87
--=---=--==::=-___::-=-:==-=-:
167
STATE HIGHWAY BOARD OF GEORGIA
Schedule No.6
SUMMARY OF AlLOTMENTS, APPROPRIATIONS AND FUND BALANCES; ALSO,
REFlECTING RECONCILIATION WITH EXPENSE DISBURSEMENTS
JULY 1, 1933 TO JUNE 30, 1934
-"===========-='-===-============='-'==-----
Net
Estimated I
Net
Estimated
Net
DESCRIPTION
!Fund Balances Participation. Fund Balances Allotments
Encum- Expenditures
Total
Fund Balances Participation Fund Balances
1 -~---~--- ~~~~3- _}_"'~~=:3__i__J_u_ly_1_.__19_3__3_ __~---l--b,_ra_n_c_es__ --~-- --~:_ge_s_ ~u_n_e~~~3~ _J_u_n_3_o_,1-9~ ~"_"~!J._~34
1
ALLOTMENTS
,
Continuing Allotments
Construction Contracts__
1
I
I
$3,106,294 .681' $l,l44, 220.32 $ 4, 25C ,515 .CO $ 3, 178,171.66 $ CR745 .25 $ 5, 084,473.83 $ 5, 083,728,58 $ 2, 344,958.08 $ 63,556.20 $2,281, 4GL88
Contracts, Nat'!
Recovery
____ ---[-- _ _
___ 7,on,o55.3s 7,344.59 2,824,604.04 2,831,948.63 4,240,106.75 3,821,818.99 418,287.76
State Forces and 1
Matenals
-_
..
4_:::2.391_~
__
_
_:____:_:__1 __469,:2.39 _L~=--582.32 _ _~0.16 ___!)():244.~ __ :{):824.65 -~~~0.06 -:..==~ -~67,280.0~
1
Total Construe- I
i
I
I
I
tion .. __ -. _-
1$3,575,817.071$1.144,220 .32l $ 4, 720,037 .39 $11,312,809.36 $ 7,179.50 $ 8, 873,322.36 $ 8,880,501.86 $ 7, 152,344 .89[$3, 885,375.19 $3,266,969.70
Surveys _____ :_______
2,44~.13[ _ _ _ 1
2,44~.13[1 179,217.61
58.4~ 142,906.71 142,965.13
38,727.61 ____
, 38,727.61
~~~~:!r:~~on _____ 11,33c.8~l
_ _ [ 11,33o.83
52,218.51 CR9,607.65
66,298.72
:6,691.07
6,863.271___ _
6,863.27
1
C
<Schectu1eNo onvict Farm
._6-A--l11
-
55,5C7.92~-- ______
55,507.92
68,584.51
----
-__ -___-_ --~1 --68-,5- 84.-51
1,133,177.47 ______ _____ _
1 ----
39,584.32 1,130,789.39
___________
2,719.85
-------
1,1,0,373.71
18,311.681.
2,719.85
65,864.66
1 .
--~r---- 1
.I 18,311.68 65,864.66
E[$ 1 I _
T _
oAtlall ~Ctomnetni~n_u-i n_g-
I1 $!,
713,690.~~[~l,l44,22C
4.
857,91C.78 [$!2,677,4_52.9~
!___
~~~~ll:!'7_.ll3
$10,253,251.62$
I
7 ,282)12.11!$3,885,375
.19$3,396,736.92
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ALLO rMENTS, APPROPRIATIONS AND FUND BALANCES; ALSO,
REFLECTING RECONCILIATION WITH EXPENSE DISBURSEMENTS JULY 1, 1933 TO JUNE 30. 1934
Schedule No. 6-Cont'd.
DESCRIPTION
I Net
Estimated
I Fund Balances Participation Fun-d Balances
July 1,1933 July 1,1933 July 1, 1933
Allotm-ents
Net
Encumbrances
Expendit-ures
---;;~~:~~~-~:~~::ents -~--~~--~-~ - - - - - - - - - - - - - - --~--- - - - - - - - -
Total Charges
E~timated
Net
Fund Balances Participation Fund Balances
June 30, 1934 June 30, 1934 June 30, 1934
(ScheduleNo.B-B)__
'
253,223.67$ CR210.00 $ 253,433.67$ 253,223.67
Research(Schedule
No.6-B)_ Collection of Rev-
enue(Schedule No. 6-B). __________ ------------- ___
::J:~~~~he-~~;::: :: ::::
__ 1
2,385.17 CR94.86
2,480.03
2,385.17~--
I
____________ 41,812.!1_____________ 41,812.11 41,812.11
I
---- ----- 136,;::;! -----3:079:83 133,;~~:;; 136,;~~:;!/:::::::::: ::I::- j
~~1~i~~:~i~:---- ~~~~~~-==~~~-~~=~ --~~::::::~---~~6~::3=~;~~~:::1__ 5:::~~[: - - - - - ---~--- ______
Total Non-Con-
I
I
tinuingAllotments___________ ___ _ ___ _ __ _______ __
I
__ ___ $ 486,934.29$ 2,713.141$ 484,221.15$ 486,934.29
I
_____ J--
- - _-- __
Total Allotments ~;;~~~~~.;,;;;.; ;-z~~~ ~~~;;;;-:;; ;----;;;;~ $10,700,258.18!$10,740, 185.91 .;-7,28;,~~~;;~;;,37~~~;;~9~~;;
DESCRIPTION
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 6-Cont'd.
SUMMARY OF ALLOTMENTS, APPROPRIATIONS AND FUND BALANCES; ALSO,
REFLECTING RECONCILIATION WITH EXPENSE DISBUF>SEMENTS
JULY 1, 1933 TO JUNE 30. 1934
Fund:a~~nces IP:~:~%~:n I I I En~:~. Fund Balances Allotments I July 1, 1933 July 1, 1933 July 1, 1933
brances
I Expenditures
Total Charges
I Estimated
Net
FundBalances Participation FundBalances
I I June 30, 1934 June 30, 1934 June 30 1934
APPROPRIATION-
Continuing
Maintenance Ap-
propriation
(ScheduleNo.6-D). $ 34,672.72 ............. $ 34,672.72$ 1,125,005.81 Appropriation
'1- ------------,-- -------------------------------------
1,159,678.53 OR A!lotme nts
-~--- - - - - - ----~--1-~~~-1---~~- - - - - - - - - - - - - - - - - ---~~- -~~--
Total Appropria-
tion ------------ $ 34,672.72 _____________ $~-,;;34;:;,;;67;:;2c;,.7;;:2}$-~3;;4;;:;6;;7,;:;2;:;:,;:.72 CR. ______ _
- - - - - - - - - - --------------~;:;-;;:;-~-~--~-~--~;:;--~--~-;;:;-;;:;-;;:;-;;;:;
Net Fund Balances. July 1. 1933 ________ $3,748,363.18
Estimated Participation. July 1. 1933........... ------------------- $1,144,220.32
FundBalances.Ju1yl.l933. _-------------------- $ 4, 892,563.50
Allotments for Year-Exhibit' 'B" --------------------------- $13,129.714.52
Encumbrances for Year-Net l!.ncumbrances ----------------------------- $ 39,927.73
Expenditures for Y~~ar-Exhibit "0" --------------------------.----------- .............. $10,700, 258.18
Total Charges for Y~~ar --------- ___ ..... ------------ ___________________ ....... ____ ....................... $10,740,185.91
~:!!~a;~~;c~:~:~. ~:~-3~~-~~~~::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::.~-~:~~~:~~~~~~~$3,885,375.19
Net Fund Balances, June 30. 1934------------------------------------------------------------------------------------------------------------------ $3,396,736.92 ADD
Unliquidated Purcnase Orders, etc.. ----------------- ................ ----- .... _.............................................. ___ ................ 158,965.05
Total Fund Balances. Net, June 30. 1934-Exhibit "A"_----------------------------------------------------------------------------------------- $3,555,701.97
STATE HIGHWAY BOARD OF GEORGIA
DETAIL OF MAINTENANCE UNENCUMBERED ALLOTMENTS, BY UNITS AND CONGRESSIONAL DISTRICTS
JUNE 30, 1934
Schedule No. 6-A.
Districts
Unencumbered Allotments July 1, 1933
Allotments
Net Encumbrances
Expenditures
Total Charges
Unencumbered
Allotments June 30, 1934
SUMMARIZED BY DIVISION UNITS JULY THRU SEPTEMBER-DIVISION NOS. 5 AND 6
OCTOBER THRU JUNE-DIVISION NO. 1
1-L ____________ $ 1-2_____________ 1-3 _____________
1, 761.22 4,971.68
1,230.23
$
47,874.30 96,982.74
56,681.68
$
1-ll ____________
7,264.81
133,616.58
1-12 ____________
1,393.22
37,337.03
-
Totals ______ $ 16,621.16 $ 372,492.33 $
1,474.58 $ 46,303.19 $ 47,777.77 $
1,161.47
97,316.31
98,477.78
920.21
58,012.42
58,932.63
45.13
139,124.99
139,170.12
629.37Cr
39,802.52
39,173.15
2,972.02 $ 380,559.43 $ 383,531.45 $
1,857.75 3,476.64 1,020.720r 1, 711.27
442.900r
5,582.04
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 6-A-Cont'd.
DETAIL OF MAINTENANCE UNENCUMBERED ALLOTMENTS, BY UNITS AND CONGRESSIONAL DISTRICTS
JUNE 30, 1934
--~-_---~-----==========~~~=====-========-~=-~-=-===~========~~=-~====~~==
Districts
Unencumbered
I'
Allotments
Allotments
Net
I
Encumbrances Expenditures
Unencumbered
Total Charges
Allotments
July 1, 1933 I
June 30, 1934
--------
1
----
JULY THRU SEPTEMBER-DIVISIONS NOS. 3 AND 4
OCTOBER THRU JUNE-DIVISION NO. 2
------ --------
2-l. ___ ---- -----I$
2-3 -----------2-4_____________ 1
2-6_____________ 2-8 ____ ------ --2-10 ____________
2-12____________ 1
3,026.17 1,364.51 2,679.37
3,588.35 17.04
2. 709.32
6,998.36
Totals ____ --1$20,383.12
$ 1$ 1
1
59,479.95
30,921.15
I
64,098.64 I
I'
73,484.09
6,866.18
83,031.44 I
I'
87.903.98
$--405,785."43-- $
612.34 1$
738.70 I
188.820r I 720.81 185.990r 2,275.94 18,044.60 1
22,017.58 1$
58,968.82 29,509.13 66,118.90 75,165.42
6,826.11 86,073.95 74,379.38
397,041. 7l
1
----
59,581.16 30,247.83 65,930.08 75,886.23
6,640.12 88,349.89 92,423.98
419,059.29
2,924.96 2,037.83
847.93 1,186.21
243.10 2,609 .130r 2,478.36
7,109.26
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 6-A~Cont'd.
DETAIL OF MAINTENANCE UNENCUMBERED ALLOTMENTS, BY UNITS AND CONGRESSIONAL DISTRICTS
JUNE 30, 1934
Districts
I Unencumbered
Allotments
Allotments
July 1, 1933 ,
-- Net-
I
Encumbrances I Expenditures
Totai Charges
Unencumbered Allotments June 30, 1934
--~-----~----------
JULY THRU SEPTEMBER~DIVISIONS NO. 1 AND 2
---- - - - - - - - - -
--------~-
::;; ~- - - - - - - - - - - -
OCTOBER THRU JUNE~DIVISION NO. 3
-------~------------ - - - - - -
I
C 3-4 __________ __]$
548.74 1$ 10,094.07
91.86 $ 10,087.04 '$ 10,178.90
463.91
~=L:::::::::::I 8~~:~~ , i~:~~i:~~
~~~:~~
1~:~~~:~~
2g:~g~:~~
i:~~~:~~
3-7____________ i
3,532.07
89,220.64
5,113.22
3-8__ ----------! 6,612.86
88,252.95
1,059.87
~=~a:::::::::
~j:
-
-
-6-,
-i3-t-6-~-
-
-
12~ :~~~:~~
---~--------
-
-
-
7 ,3~6:
---
~~
-
-
-
88,258.82
91,098.35
12~;g;~: ~i
93,372.04
92,158.22
13i:~~~:~~
619.330r
2,707.59
~~~:~~or
Totals _____ _ll$ 18,503.64
$---3-5-4,-8-99-.-71---~1$,~$-1-4,-5-94-.-72----$---3I53~,-18-8-.2-5----$I--36-7-,7-8-2-.9-7----i$-~~$5-,6-2-0-.3-8
Totals. _____ 1,$ 55,507.92 $ 1,133,177.47
39,584.32 $ 1,130,789.39 $ 1,170,373.71
18,311.68
- - - - - - - - - - - - - - ' -!- - - - - - - - - - - - ' - - - - - - - - - - - - - - - - ~---~-~------ - - - - - - - - - -
STATE WGHWAY BOARD 01' GEORGIA.
Schedule No. 6-A-Cont'd.
DETAIL 01' MAINTENANCE UNENCUMBERED ALLOTMENTS, BY UNITS AND CONGRESSIONAL DISTRICTS
JUNE 30, 1934
Districts
Unencumbered Allotments July 1, 1933
Allotments
Net Encumbrances
Expenditures
Total Charges
Unencumbered Allotments June 30, 1934
SUMMARIZED BY CONGRESSIONAL DISTRICTS
No. 2L_-_-__-_-_-_-_-_-__- $
4,787.39 4,971.68
$ 107,354.25 96,982.74
$
2,086.92 $ 105,272.01 $ 107,358.93 $
1' 161.47
97,316.31
98,477.78
34 _-_-_-_-_-_-_-_-_-_-_-
2,594.74 3,228.11
87,602.83 74,192.71
1,658.91 96.96Cr
87,521.55 76,205.94
89,180.46 76,108.98
56______-_-_-_-__-_-_-_-
854.36 3,671.69
20,721.51 84,691.68
720.34 957.77
19,535.04 84,751.84
20,255.38 85,709.61
87_-_-_-_-_-_-_-_-_-_-_-
9 ___________ 10 ___________ 1L.- ________
3,532.07 6,629.90
6, 768.19 2,813.40 7,264.81
89,220.64 95,119.13
127,789.37 90,645.02 133,616.58
5,113.22 873.88
7,311.70 2,336.71
45.13
88,258.82
97,924.46 127,570.77
93,125.76 139,124.99
93,372.04 98,798.34 134,882.47
95,462.47 139,170.12
12___ -- ------
8,391.58
125,241.01
17,415.23
114,181.90
131,597.13
4,782.71
3,476.64 1,017.11
1,311.84 1,320.49 2,653.76
619.330r 2,950.69
324.9l0r 2,004.050r 1, 711.27 2,035.46
Totals ______ $ 55,507.92 1$ 1,133,177.47 $ 39,584.32 $ 1,130,789.39 $ 1,170,373.71 $ 18,311.68
STATE HIGHWAY BOARD OF GEORGIA DETAIL OF ADMINISTRATION UNENCUMBERED ALLOTMENTS, BY UNITS
JUNE 30, 1934
Schedule No. 6-B
I Unencumbered I Allotments
July 1, 1933
Allotments
Net Encumbrances
Expenditures I Total Charges
GENERAL ADMINISTRATION ALLOTMENTS GENERAL OFFICE
Unencumbered Allotments June 30, 1934
G. 0. __________ -----------------$
Mtnc. Claims __ -----------------
......
-'1
Oonst. Claims __ ----------------Other Claims ___ -----------------
C1
Totals ______ -----------------$
192,779.67 5,627.85 1,527.97 792.00
200,727.49
$
92.25Cr $
-----------------------------------
---------------
$
92.25Cr $
192,871.92 5,627.85 1,527.97 792.00
200,819.74
$ 192,779.67 5,627.85 1,527.97 792.00
$ 200,727.49
------------------------------------- - ------
---- -- --------
------------------
Warehouse_____ I_________________ j$ 13,560.94
No.!__ _________ 2 ___________ 3 ___________
-----------------$
---------------------------------
Totals ______ ----------------- $
Totals ______ -----------------$
12,616.07 12,660.05 13,659.12
38,935.24
253,223.67
WAREHOUSE
1$
51.75 1$
DIVISIONS
13,509.19
$
44.960r $ 12,661.03
130.38Cr
12,790.43
5.84
13,653.28
$
169.500r $ 39,104.74
$
210.000r $ 253,433.67
1$ 13,560.94
$ 12,616.07 12,660.05 13,659.12
$ 38,935.24 $ 253,223.67
1------------------
--------------------------------------------------------------------------------------
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 6-B-Cont'd.
DETAIL OF ADMINISTRATION UNENCUMBERED ALLOTMENTS, BY UNITS
JUNE 30, 1934
I Unencumbered 1 Allotments 1
Net
I Expenditures I Total Charges Unencumbered
~~----~____-!_uIll'A__lllo:t.m_
ents 1933
Encumbrances _1 _ _ _ _ _ _ _1 _ _ _ _ _ -----~~---~
~- ___ - -
Allotments Jun~e~3~0' ~~4 _
OTHER ADMINISTRATION ALLOTMENTS
RESEARCH AND ANALYSIS
------~------
1-' Analysis __
~ Research_
-!'
Totals -----1
if 1~$-~2~,4-~~:~~Or -~~$---~6~:-~_~g-~_ ---2,480.63
[$ 2,385.17
94.86Cr j$
2,480.03
------ - - - -------'
84.61Cr 2,469.78
2,385.17
-~--------~--------'-- --------~--~--~---------~- - - - - - - - - - - - - - - .
COLLECTION OF REVENUE
J ,
Totals _____
_____________
I
:$
940.21
-----
--
-~---
-~ Totals Admins. 1_::_ _
cJL 298,361.:lfl_ 1$
QUARRY
940.21
304.86Cr 1$ 298,666.02
--- --
- - .-~
---
I
940.21 I.--
'
298,361.16 I ------------
Schedule No. 6-D
STATE HIGHWAY BOARD OF GEORGIA MAINTENANCE APPROPRIATION
JUNE 30, 1934.
APPROPRIATION For Fiscal Year 1933-34, Based upon $10.00 per mile______________________ _
SI>ecial A.PI>roi>riation. Bridge ReI>airs. etc. ------------------------
Unallotted Balance. Fiscal Year 1932-33. ------------ ____ _,---- .. ------
$ 1,037,114.94 86,157.83 34,672.72
TotaL---- ___________ ---------- ____________________ ... ____ $1,157,945,49
ADD Funds provided for overrun in AI>AI>ropriation-To be deducted from 1934-35 API>ropriation .. ------------
1, 733.04
Total Available.-------- ____________ ------
-------------- _________$ 1.159, 678.53
DEDUCT: Allotments for Year
Maintenance General
July thru September Division No.!. ____________________$ 34,606.90
2__ -- -----------------
3.. -------------------
4.--------------------
5.-------------------6________ ------------
46,032.95 39,870.24 49,236.31 53,217.08 39,888.18$ 262,851.66
OctoberthruJune Division No. L_ ___________________$ 279,387.07
2.-------------------- 316,678.88
3______________
274,259.86$ 870.325.81 $1,133,177.47
Maintenance Administration Compensation Claims_______ _
Maintenance Equipment ___________ __
Shoi>. __ - __________ ------------------ __ Less: Shoi> Billings _______________ _
$ 200,519.64 200.581.47
$ 5,627.85 20,935.04
61.83Cr
Total Allotments ... _____ ------------ ___________________________ . ________$ 1,159, 678.53
Appropriation Balance. June 30, 1934. ______________ _
0.00
177
Schedule No. 6-E
STATE HIGHWAY BOARD OF GEORGIA
ADMINISTRATION APPROPRIATION
JUNE 30, 1934.
APPROPRIATION For Fiscal Year, 1933-34
$ 400,000.00
DEQUCT Underrun closed into Surplus. June 30,1934----------------------
107,266.69
Net Available _______________ _
$ 292,733.31
DEDUCT: Allotments for Year General Administration July thru September Division No. L ___________________ $
32__-___-_--__-_~_-_--__-_-_--_------
4____________________ _ 5 __________ _ 6___________ _
3, 004.00 2, 959.00 2,939.00 4,020.00 2,814.00 2,854.00 $ 18,590.00
October thru June Division No.!. ____________________ $ 2___________________ --
a____________________ _
6, 948.07 5, 701.05 7,696.12
20,345.24
Total Divisions.----------
____________ $ 38,935.24
General Office___________ _
----* 264,507.94
Less: Blue Print Billings ___ _
71,728.27 192,779.67
Compensation Claims_______ _ Warehouse ____________ _______ _
2,319.97 13,560.94 $ 247,595.82
Other Administration Allotments Research:and Analysis. ___________ _
Less: Test Billings ______________ ..
* 27,035.64 24,650.47
2,385.17
Collection of Revenue ___________ _ Quarry ___________ _
41,812.11 940.21
Total Allotments
292,733.31
Appropriation Balance. June 30. 1934
0.00
178
Schedule No. 8-1' STATE mGHWAY BOARD OF GEORGIA
SURVEY APPROPRIATION JUNE 30, 1934
Appropriation For Fiscal Year 1933-34 ___________________ $ 100,000.00 Additional Appropriation__ _____________ 99,998.00
~otal ___________________________________ $ 199,998.00
Deduct Underrun closed into Surplus, June 30, 1934________________________________
20,750.39
Net available _____________________ _
$
Deduct Allotments for Year _________________________________ $
179,247.61 179,247.61
Appropriation Balance June 30, 1934_ _____ ___ _ ______
o.oo
179
Description
STATE HIGHWAY BOARD OF GEORGIA
SUMMARY OF ESTIMATED PARTICIPATION, ALSO
REFLECTING RECONCILIATION WITH REVENUE RECEIPTS
JULY 1, 1933 TO JUNE 30, 1934
Estimated Participation July 1, 1933
Fund Revenue Accrued
Revenue Receipts
Schedule No. 7
Estimated Participation June 30, 1934
State Treasurer Motor Vehicle~---------------------------~ ____________________ $ Gas Tax ___________________________________ ~-- _____________ ~ _~
Counties
,g...;.
Cash for Construction~-------------------$ Contract for Construction_______________ _
13,563.92Cr 26,284.24
Railroads, Cities, etc.
Cash for Construction~- _________________ _
28,367.80
Contract for Construction_______________ ~
170.65
Federal Aid Federal Aid______________________________ ~
1 ,102, 961. 55
National Recovery _________________________________________ _
Miscellaneous Income___ ____________________ ___________________ _
Estimated Participation, 7-1-33 ______________ $ 1,144,220.32
1,233,125.52 8,779,497.63
25,488.57 3,375.10 70,282.77 6,730,977.21 12,244.63
$ 1,233,125.52 8, 779,497.63
---------------------------------------
1,348.42Dr
12,215.50Cr
26,284.24 --------------------
12,326.24 3,202.98
41,530.13 342.77
1 '139 ,345.52 2,909,158.22
12,244.63
33,898.80 3,821,818.99
--------------------
Fund Revenue Accrued_~----- __________________________________ ==1=6"'',8=54~,9=9=1=.4=3=,= Revenue Receipts~~- ____________________________________________________________ _
14,113,836.56
Estimated Participation, June 30, 1934Exhibit "A" _____________________________ ~ ___________________________________________________________ ~ !__~~--
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF EXPENSE DISBURSEMENTS, BY OBJECT OF EXPENDITURE
Schedule No. 8
(Analysis) (Analysis)
OBJECT OF EXPENDITURE
I (Schedule
No. 8-A)
(Schedule No. 8-B)
- - - - - - - - - - - - - - I Administration'! Construction
JULY 1,1933 TO JUNE 30, 1934
(Analysis)
(Analysis)
I (Analysis)
(Schedule
Total
~J. -----M-:-E_M_O_R_A_N_D_U_M-;------
(Schedule No. 8-C)
Maintenance
(Schedule
No. 8-E) Net Expens
I I No. 8-D)
Legislative I Disbursements Net Expense Inter-Depart- Gross Expense
Equipment 1 Transfers
Disbursements mental Billings Disbursements
Personal Services_________________ $ 186,884.54$ 556,783.31$ 608,654.38-------------- --------------$ 1,352,322.23$ 1,352,322.231$ 136,044.71$ 1,488,366.94
Equii>mentExi>enses_____________
3,617.ll 179,462.6cl 403,623.01 ______________ -------------- 586,702.72 586,702.72
8,419.21 595,121.93
EqUii>ment Purchases.. -------- -------------- --------------'-------------- $ 133,9C6.93 _____________ _!
Communication Services_________ Heat. Light. Power and Water___
I8,ll2.13 3,494.33
3,205.28 2,496.51
--------------1 6,440.51 ______________ ,______________ 1
1,046.34 --------------
Rents _____________ ----------------_
5, 790.70
4,443.01
4,844 .C5 ____________________ --------
--------1 Traveling Expenses_______________
,_. SUPI>lies and Materials..
g: Ininpsurance ________________ :________
44,536.15
8,862.72 3,590.46[
84,169.79
496,959.44 6,493.061'
33,744.67-------------- --------------/
123,025.10-------------- --------------1
15,396.42----------------------------
l33,906.93j 27,757.92
7,C37 .18 1 15,077. 76i
162,450.611
628,847.26' 25,479.94/1
133,906.93 ______________ 1
27,757.92.
71C.65
7, 037.181 15,077. 76!
162,450.61
628,847.261 25,479.94
2. 730.96 50.00
3,613.1211
144,450.751
447.26
133,906.93 28,468.57
9, 768.14 15,127.76
166,063.73
773,298.01 25,927.20
rinting,Binding, Publicity, etc.
6, 724.18
30.79
7.00 -------------- --------------
6, 761.97
6, 761.97
40.18
6,802.15
demnities_______________________
10,744.96-------------- -------------- -------------- --------------
l0,744.96j 10,744.96--------------
10,744.96
ayments to Contractors_________ -------------- 7,559,828.89 -------------- ______________ .______________ 7,559,828.89' 7,559,828.89 -------------- 7,559,828.89
Special and Misc. EXPenses._____
6,308.74 122,356.39
306.63 --------------~~363.01; _ 183,339.~
183,339.81
453.37 183,793.18
1
Total Administration-Exhibit
1$10,700,258.18$ 296,960.21$10,997,218.39
"C"------------------------------ $ 298,666.02
Total Construction-Exhibit "C" -------------,* 9,016,229.07
Total Maintenance-Exhibit "C" ----------------------------1* 1,197,088.11
Total Equi:Dment-Exhibit "C" ---------------------------------------------- $ 133,906.93
Total Legislative Transfers-Exhibit "C" ------------------------------------------------- $ 54,368.05
Total Exvense Disbursements-Exhibit 'c '-------- ______________ ------- _________ ------ _________ ----- ___ ;$10, 700,258.18
NOTE: For Summary by Congressional Districts. see Schedule No. 9. For Summary by Division Units, see Schedule No. 10.
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF ADMINISTRATION EXPENSE DISBURSEMENTS, BY OBJECT OF EXPENDITURE
JULY 1, 1933 TO JUNE 30, 1934
Schedule No. 8-A
GENERAL ADMINISTRATION
RESEARCH AND ANALYSIS
OBJECT 0 F EXPENDITURE
Collection
Total
Intsr-D epart-
Inter-Depart-
of
Quarry
Nat Expense
Gsneral
mental
Net General ResEarch and
mental
Net
Revenue
Disburssments
Administration Billings Administration Analysis
Billings
Research
~Personal ~-:.342.19 ~~= ~4.229.: 18,580.:1~:--:580.:[~-~--~==J~-~~962.03 ~--~3.5C Services.-----------------
N Euuii>mentExoenses______________ Commu~ication Services_________
2,439.35 ----------- 17,927.80--------------
$-
2,439.35
1,563.46
17,927.8C
6.47
393.75.$ 1,169.711 6.47~--------------
$ 8.05 -----------184.33'~-------------
186,884.54 3,617.11 18,112.13
Heat. Light. Power and Water___
3,494.33--------------
3,494.33
1,032.98
1,032.98 _ ------ _____ ______________ ______________
3,494.33
~~~;=~~~-E"~~~~~~~:::~~~~~~~~~~~: 2~:1::~~ :::::::::::::: 2~:1~~:~~ ------2:3ii:ii ------2:237:76'[_________73-_35]- ---i9:6i:o:7al:::::::::::::: 4~:;~~:~~
Suovlies and Materials___________ 18,437.05
9,615.09
8,821.96
1,960.3611
1,919.60
40.76 ______________ --------------
8,862.72
Insurance_________________________
3,289.64--------------
3,289.64
96.37
96.37 ________ -----~
57.00,
243.82
3,590.46
Printing,Binding,Publicity,etc..
6,587.71--------------
6,587.71
176.65
40.181
136.47 --------------~--- __________
6,724.18
~~~~~!~~\ii~~:E~~-~~~~-s-_-::::: _l~~:i~ ::::~:::::::: _ 1~:;!!:i~~~~~4o2:~[=--34~~~~~i:oii9:~j::::::::~::::l~~~~~--2:~-- 1~:~~::~
TOTALS------------------------$ -2-25-,16-1.9-41-$ - -71,-72-8.2-71- $ -253,433.67i$ 27,130.501$ 24,650.47,$ 2,480.03$ 41,812.11,$
940.2d--------------
--1* Total Administration Exvense Disbursements-Exhibit' 'C" _______ ------- _____________________ ------- ___________ . _____ ------------ _------------
298,666.02
Schedule No. 8-B
STATE HIGHWAY BOARD OF GEORGIA
ANALYSIS OF CONSTRUCTION EXPENSE DISBURSEMENTS, BY OBJECT OF EXPENDITURE
JULY 1, 1933 TO JUNE 30,1934
~-=-=-=======c=========='j==---=-=-=------------=------~---=---=---=---=----
Object of Expenditure
Surveys
Construction
Total
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Expense Dis-
Actu~ Plans
1
1
Total 'Supervision! Direct ; Total
bursements
Personal Services ______________ $ 42,527.95 ____________ $ 42,527.951$ 278,008.14,$
Equipment Expenses__________
655. 75] ___ __ _______
655.75 3,157 .88!
Communication Services ______ -1
67.831 ___ ____ __ ___
67.83 1
,_. Heat, Light, Power and Water__~------------~------------____________
915.49' 8.25!
gJ Rents__________________________
82.50 ------------~
82.50
294.83:
Traveling Expenses____________ 6,497.66 ____________ 6,497.66 67,589.701
Supplies and Materials________ 2,027.17 ____________ 2,027.17 11,396.14
~~r~f:n~~e-:BiiiCii!li,--i>U.tii~ity~ ------------ ------------ ____________
14.631
236,247 .22J$ 175,648.97
2,221.96! 2,488.261 4,065.68 10,082.43 483,536.13
6,478.43
514,255.36 $ 178,806.85]
3,137.45 2,496.51 4,360.51 77,672.131 494,932.27 1
6,493.06
556,783.31 179,462.60
3,205.28 2,496.51 4,443.01 84,169.79 496,959.44
6,493.06
etc.__________________________
18.00 ____________
18.00
12.79'______________
12.79
30.79
Payments to Contractors_______ __ _________ _ _____ _______ ____________ 4,800.16 7,555 ,028. 73 7, 559,828.89 7, 559,828.89
Special and Misc. Expenses____ 19,793.82 71,236.03 91,029.85 25,919.73
5,406.81
31,326.54 122,356.39
Totals ____________________ $ 71,670.68 $ 71,236.03 $ 142,906.71 $ 39g_,ll7. 74 ~~481,~!_-!3~ !__tl,il'73 ,322 ~]-- ___________ _
T~f~bu~~~~!~~~=jf~hib~~~~g,~~ -I- _________ _- __________________________________________________________
-I$ 9,016,229.07
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF MAINTENANCE EXPENSE DISBURSEMENTS, BY OBJECT OF EXPENDITURE
JULY 1, 1933 TO JUNE 30, 1934
Schedule No. 8-C
GENERAL MAINTENANCE
RECONSTRUCTION
SHOP
-------------------------[------ ____ --------1----I OBJECT OF EXPENDITURE
Supervision
Direct
Total
Supervision
II1
Direct
Total
Shop
Inter-Departmental
Billings
Net Shop
Total Net Expense Disbursements
-----------1* Personal Services_________________ $ 46,820.94 $ 542,147.46$ 588,968.40
19,685.981$ 19.685.98$ 55,351.05 $ 55,351.05 ------------ $ 608,654.38
~ EQuiDmentExDenses............
252.33
1
397,507.041 397,759.37------------, 5,863.641 5,863.64 8,025.46 8,025.46------------
403,623.01
.,_Communication EXDenses______ _ 4,638.561
1,795.55
6,434.ll ------------
6.40
6.40
704.18
704.18 -----------
6,440.51
Heat, Light, Power and Water__ Rents____________________________ _
156.901 429.801
889.44 4,406.251
1,046.34------------ ____________ [______
4,836.05------------
8.coi
8.oo
1,697.98 5o.oo
1,697.98-----------50.oo -----------
1.046.34 4,844.05
Traveling EXDenses. _----------- _ 24,694.161
8,684.II 33,378.27------------
366.401
366.40 1,375.361 1,375.36 ----------
33,744.67
SuDDiies and Materials......... . 1,872.721 80,927.47 82,800.19------------ 40,224.91 40.224.911 132,916.06 1 132,916.06 ------------ 123,025.10
Insurance. __ ---------------------
484.40
Printing, Binding, Publicity,
I
s;~~i~i-;;~d'M'~~-.-:E~~;;_~-~~~~~~ ------157~34
14,912.021
!:~~~1
15,396.42 ------------ ------------1------
350.89
350.89------------
r~:~~ ;-----i43~3f.~~~:~~~~~~~~I------i43~39 ------iio~49 ------iio~49 :~~:~~:~~~~~
15,396.42
a~:~~
TOTALS---------------------- $ 79,507.15 $ 1,051,282.24,$ 1,130, 789.39 $
/~88 143.39,$ 66,155.331$ 66,298_.72 $ 200,581.471$ 200,581.47, ____________
.II
----/*I
Total Maintenance EXI>ense Disbursements-Exhibit' 'C"----------------------------------------------------- --------------------------------
I, 197,088 .II
Schedule No. 8-D
STATE HIGHWAY BOARD OF GEORGIA
ANALYSIS OF EQUIPMENT EXPENSE DISBURSEMENTS, BY OBJECT OF EXPENDITURE
JULY 1, 1933 TO JUNE 30, 1934
--
--.---
Object of Expenditure
Adm~nis-
1
I
! Con.struc-1
Mainte-
Total Expense
' trat10n ,
I
i
.
.
-------~~-~----~-~--~----;
t10n
. nance Disburse-
I ments
1.
j----
Land.~
~~~~$~~~
;$ ~~~-~~~-!$ 1,700.001$ 1,700.00
Trucks~~--~ ~~~~~~~ ~ ~
_ 33,633.34. 9,130.621 42,763.96
Tractors_~~~
i
~' 17,431.081 3,269.561 20,700.64
Road Machinery, Misc. i
~~I 59,262.871
Office Equipment_ ~~~ : 3,138.951
13.27
5,547.621 64,810.49 174.47j 3,326.69
Shop Equipment -~~ ~,~ ~ _ ~ ~ ~~~~~~ ~~~
512.771
512.77
-------:----1 (----- Laboratory Equipment 1
92.381~~-- ~~-~-1 -~~-~~ ~~--
!$___ :3,231. ~3:$1}_(),:3_40.561$ __2()_,~!)_.04,
92.38
; ~~- ~--. -~ i ~--- -~-----1
Total Equipment Expense Disbursements-Exhibit I
.. 0"- -- - - ~ - . - ~ . - - - - . - - - ~ - ~ - - ~ - -- - - ~ ~ - ~ - ~ ~ ~ ~ ~ - ~ -/~~~~~
185
Schedule No. 8-E STATE HIGHWAY BOARD OF GEORGIA
ANALYSIS OF LEGISLATIVE TRANSFER EXPENSE DISBURSEMENTS, BY OBJECT OF EXPENDITURE
JULY 1, 1933 TO JUNE 30, 1934
Object of Expenditure
Motor
Vehicle ' Convict
License
Farm
Tags
Total Expense Disburse-
ments
Special & Misc., Expense Trans-',
',
I
ferofFunds ~.
~ ~ ~_1i~~8.20j~-~~9.85~~-M,368.~
Totals~~ .
. 51,648.20$ 2,719.85 .,$
--
- ~-~~,.-
--
1 ..
Total Legislative Transfer Expense Disbursements-- 1.
Exhibit "0"~
-~-~ $
54,368.05
186
Schedule No. 9
STATE HIGHWAY BOARD OF GEORGIA
SUMMARY OF EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS
JULY 1, 1933 TO JUNE 30, 1934
~. 1
(Analysis)
1
(Analysis) 1 rAnalysis)
(Schedule I (Schedule (Schedule
1
Dis- 1
No. 10-B) ' No. 10-CJ i No. 10-D)
tricts I1 Construction . Surveys 1 Mainte-
nance
1
(Analysis) I (Schedule No.lO-E) I
i Reco!l- I' I structwn
Total
No. 1 1$ 861,583.8oll$ 3,926.99$ 105,272.03!$ 7,989.811_$_9_7-8,-7-72-.63
2
750,654.15 5,595.10I 97,316.311 2,134.94, 855,700.50
3
595,446.95i 28,065.43 87,521.531 340.661 711,374.57
4
629,296.66j 13,539.24 76,205.94, 4,567.31
723,609.15
5
103,812.47 5,401.691 19,535.04! 196.181 128,945.38
6 1,179,206.63 9,185.59 84,751.84 --------- 1,273,144.06
7
889,478.80 10,567 .26!, 88,258. 82'1 5' 859.52
989941.,116146 . 4304
8
779,798.99 7 ,099.97! 97 ,924.46[ 6,292. 92
9
635,249.08, 14,917.66, 127,570.771 7,526.301 785,263.81
10
588,271.311 10,695.221' 93,125.76 973.64
693,065.93
11
728,645.51 11,694.58 139,124.99 17,163.97
896,629.05
12 ~1,878.01\ 22,217.98 ~4,181.9~11 13,253.471_1_,2_8_1_,5_3_1_.3_6
, - - - Totals ~8, 87~~2. ~6,!42, 906.7!~~1_._!30,_78_!l_l~'$66,2~8. 721
----~---------
- - - -~-- - - -
Total Expense Disbursements Distributed by Districts ___ $10,213,317.18
Undistributed by Districts
Administration General Office ________________ $ 200,819.74
Warehouse___________________ 13,509.19
Divisions_____________________ 39,104.74 Research_ ____________________ 2, 480. 03
Collection of Revenue________ 41, 812.11
~uarry_______________________
940.21 $298,666.02
Land, Building & Equipment___
133,906.93
Legislative Transfers __________ _
Prison Farm Purchase ________ $ 2,719.85
Motor Vehicle License Tags___ 51,648.20 54,368.05
Tottraicl tEs _x_p_e_n_s_e__D__i_s_b_u__rs_e__m__e_n_t_s__U__n_d_i_s_t_r_i_b_u_t_e_d__b__y__D_i_s_-__ $
486,941.0~
Total Expense Disbursements-Exhibit "0" ____________ 1Q_.'7'()~8._~~
187
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 10
SUMMARY OF EXPENSE DISBURSEMENTS, BY DIVISION UNITS
JULY 1, 1933 TO JUNE 30, 1934
- --~~~alysi~;-- ~(~nalysis) ---ll An~;;:is~-
(Analysis) I 'Analysis!
Divisions
(Schedule
No. 10-B)
Construction
New~~~~$ 1,975,803.lll$
OldNo.5 __ ---1
417,842.221
OldNo.6 ____ 1
300,762.21!
(Schedule No. 10-C) Surveys
I (Schedule
(Schedule 1 (Schedule
No. 10-D) , No. 10-E'
No. 10-A~,
jl
Maintenance i Reconstruction I Administration
Total
48,414.08!$
292,659.21,_$_____ g,-7l6.6o!$-- 7,794.57 1$ 2,334,387.57
1,986.511
45,297.98
1,890.77! __ 42,602.24:-
2,387.78i
2,390.091
469,904.58
17,690.391------~76.371 ___ 365,4_::.:_~~
'"""" Total No. L.i$
&5
I
2,694,407.54: $ 1
NewNo.2______ ,$ 2,781,944.071$
OldNo.3 ____ OldNo.4_
Total No.2
-11~$--3,5543925,425,,798806.238..8922311$
52,291.36;,$
'
40,368.151$
33,,644189..6230~,
47 ,435.98~$
380,559.43, $
1
29,794.77 $ 1
12,661.03$ 3,169,714.13
309,987.89$ 41,562.21
I
124,,178537..1208'1$
.
7,587.281$ 2,318.90,
3,154,644.67 474,496.23
45,491.611 ________ ----1
2,89l.75i
404,665.92
397 ,041.71]$
16 ,940.38~-$--12,797 .9S~-$--4-,0-3-3-,8-0-6-.8-2
NewNo.3__ ---1$
Old No. L
I
Old No.2 ____ I
2,022960,,455674..3798,:1$ 302,301.831
',
I
Total No. 3___ r$ 2,619,324 001$
Totals___ !$_ -~~fl'i'3 ,322_:~!$
38,307.38'$
273,685.25:$
15,922.73'1$
8,059.141$ 2,362,431.89
4,071.83: 800.16[
31,240.62; 48,262.381
2,966.741 674.101
2,958.411 2,628.23
331,802.38 354,666.70
i
I
I
7 43,179.371$
353,188.25,$
~J!2_:9~6.7!;t~1 ,130_:?89.3~:!-~~-
169~,c5'623.9587.1$~1t=-=
13,645.781$ 3,048,900.97
39 ,1~:!_-'i"!l=~--- ------- =
Total Expense Disbursements Distributed by Divisions___
_____ . _____ _____ . _ __ _____
______ .$ 10 ,252 ,421. 92 I
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF EXPENSE DISBURSEMENTS, BY DIVISION UNITS
JULY 1, 1933, TO JUNE 30, 1934
Schedule No. 10-Cont'd
Undistributed by Divisions Administration General Office ___________________________ _ Warehouse________________________ __ __ ________ _ Research__________ .. _________________ _________ . Collection of Revenue_____________ _
...., Quarry ______________________________ ______________ _ gs
Land, Buildings and Equipment___ ___ Legislative Transfers
Prison Farm Purchase ____ .. _______ .. ______ _ Motor Vehicle License Tags_ -----
Total Expense Disbursements Undistributed by Divisions. _
Total Expense Disbursements-Exhibit "C" ___ _
Note. Division Units have been consolidated in accordance with present set-up of three Divisions.
200,819.74 13,509.19 2,480.03 41,812.11 940.21
2,719.85 51,648.20
$ 259,561.28 $ 133,906.93
54,368.05
447,836.26
STATE HIGHWAY BOARD OF GEORGIA
Schedule No.1 D-A-Cont'd.
ANALYSIS OF ADMINISTRATION EXPENSE DISBURSEMENTS, BY UNITS
JULY 1,1933 TO JUNE 30, 1934
Personal Services
1 Furnishing!
1
1
, Heat,
1 Equipment! Communi-1!1 Light,
1
1 Expenses , cation
Power
I
1
! Services ' and
I Water
Rents
1
I
1
Traveling Supplies
Expense< and Insurance
Materials I
I l I - - - -- -~-=-=-=-;-c-=~~~I Special
I I Printing, i lndemni and
Binding, I ties
Mlscel-
Total
Publicity, Etc. '
, laneous
I Expenses [
DIV~~0~~:~~===-~~-5,99~:~~-~3.34 $~,78~~31~~=~~=~0~:$-~780.:1$ 466.:i$ 397.35:---5.33:~~=~:---::~~2,661:
No. TWO---------------------: 6,147.12: 162.22 l,99l.36i 98.21, 374.40: 2,270.951 1,109.82: 639.30; ____________ ;__________
4.55~ 12,797.93
- - - - - - - -- ----- ____,___ ------1- - -- ---- No. Three__________________
7,543.52 1
14.50 1,657.96'
-~--
100.80 1,149.13: 1,946.05!
748.221
485.60'------------
--+'--------------; --1-3,6-45-.7-8
TOTALS .. ________________ .$ 19,685.96$ 220.C6R 6,134.15 1,
1
222.41 $
2,6o8.53!$
5,997.21
~
1 2,324.59$1,522.25 $
5.33'---------- $ 34.25,1$ 39,104.74
* ]()I" :* __ 1 t0 TOTAL GENERAL
,_. Administration ______ __ _____ __ RESEARCH AND ANALYSIS
I
I
I
I
164,229.01,'
2, 439~35,,~17, 927.Y.O
~
3~ 494
.33~.~
5,_'790
.70
'
1
$
24,
8
6
2
.
I
8~821. 96 II~
3,
I
289.64
I
'
'
,
1
1
1
6, 587.71 $10,_~44c96;1 ~-":_246.11 $ 253.433.67
Division of Test~-----------* 18,580.18!R 393.75$ 6.47$ 1,G32.98j---------- $ 2.2;7.7~!* 1,919.60$ 96.37*
40.1~ __________ $ 3;2-~8,$ 24,650.47
- --- -- -;--- - - -------!---- - ________ _:____ Dlnswn of Research. . ____________ , 1,169.71 ____________________ ,__________ ~- -~--1----
i3.3n
40.76----------
136.1' __________ ,1 1,0u9.141 2,480.03
!--~ -----~ ~--t---~----~-
TOTALS___________________ $ 18,580.48:$1,563.46$
6.4.7 8 1,(32.98 __________ $2,311.11 1$ 1,960.3e,$ 96.37$
176.65 __________ $ 1,402.62,$ 27,130.50
Less:
Test Billings ________ -~580.4(_393 ~~ --~7_4 _1.C32.98:.:.:.== _=-.2~7~'7fj~
1:91~~(j[Ji_~
_ _ _40~
1
-=:.:_:_:_:::_
342.88)~~
COLL:C:~O:L:-F-~~:~~~~-------:=~=i$1,169:~:~-==~.:.:.==~1===-- *--~~3~$ -~o~g=.:.:.~~:*-~~,.:.:.:.:.=.-__1*_1,059.74[~__:480.03
Enforcement of RevenueLaws .. $ 21,962.03,
----------'~ ----------!-- ________ 8.05l$ 184.33
:$19,600.70 _________ ,$ 57 .00! ____________ 1__________
41,812.11
QUARRY_....------ _______________ ~~-- 693.50 ~- ___ ---~~-- _~=-:_:-- .~~_...-- ~~---- ----i------ -~~~ -~:~_::- ---~~ ;-~3 .St.:.:.------~:.:.:..:.:..:.:.----.$ -~~~>8 -9~~~~
TOTAL ADMINISTRATION ------1~_!.86,884.54.~1_7.2J:$_1~~.l.ak_3,494.-a.s.!_[i~'l(J,$44,~~._1~$-_fl,862.72$ 3,590.46$ 6,724.18 j$10,744.96 $6,308.74.$ 298~_&'6.02
NOTE: Division Units have been consolidated in Accordance with present set-up of three divisions.
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 1D-B
ANALYSIS OF ACTUAL CONSTRUCTION EXPENSE DISBURSEMENTS, BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1, 1933 TO JUNE 30, 1934
Personal Services
Equipment Expenses
Furnishing Communi Heat, Light,
cation Power and Services Water
Rents
Traveling Expenses
Supplies
and
II Materials
lnsurance
Printing, Binding, Publicity,
Etc.
Payments to Contractors
Special and Miscellaneous Expenses
CONSTRUCTION SUPERVISION BY CONGRESSIONAL DISfRICTS
Total -----
~ DIStrict No.
1---$ 2...
{<)
3___
L-
~::: L-j
8.. 9... 1 10---.'1
24,336.701$ 28,354.981 20.120.01
14,425.22
2!: :;; :~~
29,512.38
29,684.451 29,107.231
17,535.821
59.181$ 110.67 , 216.59
1~3~1~2.:2:3~ 11
320.89 674.8ZI 463.801
128.25!
135.071-------- ---~~----------1$ 7,254.881$
94.16 -----------$ 66.8C 6,527.53
61.02 1 $
1.50. 30.00, 5.598.66
4. 8.261'------ -----~~---------- 1
2~ :~:- -------4~00 ::::-:_:::1
3,6~9~;9.:8~~0~11
64.971------------1 85.oo e,297.85
106.891 CRI0.80 ----- ----~ 5,781.75
48.311
1o.8o1 5.0t 5,477 .06.1
89.63, ... --------1 12.381 5,198.391'
1,116.23! __ -------1~
1$ 1.651 ______________
823.20j _________ ------------1--------------
--------------! 999.011______ 1-----------r--------------
51:.96!$ 2.93j
3.57
1. ~~~:~i~--- -- 2:9ai:::::: ::::::[$- ----1:ii8ii~ool
993.a8
5.86
3.56 ______________
1,622.011 ------- I
.551 3,720.16
818.811 _ ____ ----- ______ /___ __________
5~8.;9:----------j-- ________ !__ --- -----11
2,329.601$ 2,441.69]
1.620.501 1,519.391
2.!~~ :~~~1
2,o21.24
2,786.46 1 1,873.791
2,2:9.29
35,233.31 38,419.03 28.647.29
20,489.36
a:::;~:~;
39,305.13
44,366.29 37,804.80
25,752.25
1L-1 12 _
23,384.78 33.339.69
97.391 283.53:
158.33'------------
123.62,
2.75
1--
-----95.651
6,869.56 9.455.611
1,2o8.99 __ ----
3.46-------------
1.430.46
2.91 ____________________
2,2,0.271 3.784.241
34,C42.78 48.518.46
T~~~~~-~~~8,008.14_$_3-,1-57-.-sf-~15.49~---~-2+~ 294.831$67,589.~~~~~396 ..~41-I~~--$--~~~;-~00.16j;-;9119.7~~$--;2,117.~
1
1
1
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 1OB-Cont'd.
ANALYSIS OF ACTUAL CONSTRUCTION EXPENSE DISBURSEMENTS, BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
Personal Services
---
Equipment Expenses
JULY 1, 1933 TO JUNE 30, 1934
Furnishing Communi- Heat, Light,
cation Power and Services Wat<r
Rents
Supplies
Traveling
and
Expenses Materials
lnsurance
-
CONSTRUCTION DIRECT BY CONGRESSIONAL DISTRICTS
Printing, Binding, Publicity,
Etc.
Payments to Contractors
Special and Miscellaneous Expenses
Total
District No. L .. $ 2___ 3... 4___
31,851.23 $ 19,894.21$
16,046.63 14,095.51
5,903.17
110.44
19,606.09 21,424.49
239.29$
I
97.02$ 660.25$ 2,240.10$ 58,658.00$ 442.56 ------------ $
191.28
314.23 318.67 588.26 25,407.85 503.55------------
2.49------------ 1,372.62 110.66 3,031.40 56.67------------
73.15
97.10 70.86 527.80 23,665.05 1,126.07------------
711,801.02$ 653,995.17 556,105.68 541,961.29
1
466.81 $ 773.97
106.53 255.4C
826,350.49 712,235.12 566,799.66 608,807.30
5___ -------------- ------------ ---------- ------------ ---------- ----------
6. -
3,651.07 1,792.94----------
14.68 24.00 124.70
7...
40,358.98 25,550.50 472.68
646.64 904.09 1,678.60
8...
l2,09l.9C 8,299.44
6.50------------ 118.30 73.70
9___
28,637.79 25,311.95 292.66
260.71 43.50 1,513.41
10.. -
8,546.77 9,516.18 109.90
118.46 85.50 501.33
lL.. 41,296.65 30,236.63 469.99
485.54 420.39 1,325.46
12..
28,256.94 ~6.68 ~~ --~3.88 _ _47 .5o 1,398.41
2.00 ---------- ------------
98,947.51 ------------
98,949.51
13.406.69---------- ------------ 1,125,516.47------------1 1.144,530.55
67,529.92 811.15[----------- 711,281.37
939.74 850,173.67
5,741.28
2.00 _____ ____
709,099.58------------ 735,432.70
63,061.76 769.201__________
476,979.41
573.69 597,444.28
15,497.92---------- ------------ 527,977.39
165.61 562,519.06
106,903.32 980.25------------ 512,126.12
358.38 694,602.73
1 100,630.74 1. 786.!!f![--~~~- -~9_2_9._2__37_.7_2_ _~1_,7_66_._68_: __1._08_3_,3_5_9._55
TOTALS. ______ $ 236,247.22$ 175,648.97$ 2,221.96$ 2,488.26$ 4,065.68$10,082.43$ 483,536.13$ 6,478.43 _ ---------- $ 7,555,028.73 $ 5,406.811$ 8,48l,2C4.62
I
--'-'~----'-----~~~~~---''--~~~-'--~~~1 ~~~~~ ~~~~-
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 1D-B-Cont'd.
ANALYSIS OF ACTUAL CONSTRUCTION EXPENSE DISBURSEMENTS, BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1, 1933 TO JUNE 30, 1934
Personal Services
Equipment Expenses
Furnishing Communi Heat, Light,
cation Power and Services Water
I
Rents
Traveling Expenses
Supplies and
Materials
lnsura nee
Printing, Binding, Publicity,
Etc.
Payments to Contractors
Special and Miscellaneous Expenses
Total
CONSTRUCTION SUPERVISION BY DIVISION UNITS
D ivision No. L . $
2___
L-
TOTALS_______ $
91,374.23 $ 87,846.88 98,787.03
278,008.14 $
374.11 $ 487.131~
I 2.751$ 123.80 $23,532.18'$ 3, 731.10 ----------$
5.11 -------------- $
973.09 198.62
5.50
81.03 24,737.01 3, 773.45 $ 8.77 ------------ $ 1,080.00
1,810.68 229.74 ____________
90.00 19.320.51 3.891.59
5.86
7.68
3,720.16
-------------------
3,157.88 $ 915.491$
8.25'$ 294.831$67,589.70$ 11,396.14$ 14.63 $
1
12.791$ 4,800.16 $
8,616.83 $ 9,525.18 7' 777.72
25,919.73$
128,247.24 128,229.53 135,640.97
392,117.74
CONSTRUCTION DIRECT BY DIVISION UNITS
Division No. L- $ 2 __ _
3.__
89,910.311$ 58,874.01 $ 743. 90! $ 842.27 $ 2,659.68 $ 3, 787.48 $ 177' 576.49 $ 1,950 .361_ ----------- $ 2, 228,534.27 $ 1'281.53 $ 2,566,160.30
65,159.66 57,613.07 706.22
738.64 340.11 2,762.44 168,552.17 2,945.72------------ 3,129,931.41 2,611.85 3,431,361.29
81,177 .251~161.89 ~~-- 907.35 1,065.89 3,532.51 ~407 .47 1,582.35 ------------ 2,196,563.05 _ _1,513.43 __:483,683.03
TOTALS...... $ 236,247.221$ 175,648.97$ 2,221.96$ 2,488.26$4,065.68$10,082.43$483,536.13$6,478.43 ------------1* 7,555,028.73$ 5,406.81$8,481,204.6
Note: Division Units have been consolidated in accordance with present set-uv of three Divisions.
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF SURVEY EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1, 1933 TO JUNE 30, 1934
Schedule No. 10-C
Personal Services
Equipment Expenses
Communication Services
I Furnishing Heat, Light, Power and
Water
I
Rents
Traveling Expenses
Supplies and
Materials
lnsur .. a nee
Printing, Binding, Publicity,
Etc.
Special and
Miscellaneous Expenses
Total
SURVEY ACTUAL BY CONGRESSIONAL DISTRICTS
L-1$ ~ DistrictNo.
01
2---
3__ _
4__ _
5__ _
6 __ _
L8__ _ 9__ _ 10__ _ 1L __
12-..
TOTALS-------I$
d~!:H1 ,::EI'
5,208.24
51.381
::_: lEl - ;: .!ll~1 ~:~i I. ::: ;;:~ E~w. ~:!~~
.811------~------- 75.00
593.16
151.52---------- --------------
310.57
6,390.68
1,123.75,
11.78,
.75'-------------- ----------
125.09
27.11 __________ --------------
1,600.00
2,888.48
2,703.88
3.351
.32-------------- ----------
303.001
123.2'7 ---------- --------------
120.50
3,254.32
3,371.581
61.99
4.62 -------------- ----------
300.31
153.01 ---------- --------------
741.25
4,632.76
544.40,
25.31 -------------- -------------- ----------
138.60
38.55---------- --------------
230.00
976.86
6,114.661
41.91
9.00-------------- ----------
812.61
361.04---------- --------------
1,257.93
8,597.15
~:~ :1- ,.:: ;,-~..:;: ;.~-$--1-:-:-:-:8-~: -$-:-:-:-:-:-~: 3,233.00
91.90--------------------------------------
: -$---6:-:-:.:-:r. ;
524.75
241.00'---------- --------------
-$- 2-:-::-:-::1- r
81.40
4,172.05
8
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 10-C-Cont'd.
ANALYSIS OF SURVEY EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1, 1933 TO JUNE 30, 1934
Personal Services
Equipment Expenses
Communication Services
Furnishing Heat, Light,
Power and Water
Rents
Traveling Expenses
Supplies and
Materials
lnsura nee
Printing, Binding, Publicity,
Etc.
Special and Miscellaneous Expenses
Total
SURVEY PLANS BY CONGRESSIONAL DISTRICTS
~District No. i:J:::::::::::::I:::::::::::::: ::::::::::::::1::::::::::::::1:::::::::: :::::::::::: :::::::::::: :::::::::: :::::::::::::: $
4 - -------------- -------------- -------------- ______________ !__________ ------------ ------------ ---------- --------------
5___ -------------- -------------- -------------- -------------- ---------- ------------ ------------ ---------- --------------
6... --- ---------- --------------' -------------- -------------- ---------- ------------ ------------ ---------- --------------
7___ -------------- -------------- -------------- -------------- ---------- ------------ ------------ ---------- --------------
8.. -------------- --------------'-------------- -------------- ---------- ------------ ------------ ---------- --------------
9___ -------------- --------------'--------------:-------------- ---------- ------------ ------------ ---------- --------------
~~::: ::::::::::::::~:::::::::::::: :::::::::::::: :::::::::::::: :::::::::: :::::::::::: :::::::::::: :::::::::: ::::::::::::::
T
~:::: OTALS..
I
:::::::::::::r::::::::::::
::::::::::::::
;
:::::::::::::r::::::::
::::::::::::
:::::::::::r::::::::
::::::::::::::
$
3,231.80 $ 3,685.71 7,827.50 7,148.56 2, 513.21 5,931.27 5,934.50 6,123.11 6, 320.51 6,523.17 4, 986.51 11,010.18
71,236.03
3,231.80 3,685.71 7,827.50 7,148.56 2, 513.21 5,931.27 5,934.50 6,123.11 6,320.51 6, 523.17 4, 986 .51 11,010.18
71,236.03
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 10-C-Cont"d
ANALYSIS 01' SURVEY EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
Personal Services
JULY 1, 1933 TO JUNE 30 1934
Equipment Expenses
Communication Services
Furnishing Heat, Light,
Power and Water
Rents
Traveling Expenses
Supplies and
Materials
lnsura nee
Printing, Binding, Publicity,
Etc.
Special and
Miscellaneous Expenses
-
Total
SURVEY ACTUAL BY DIVISON UNITS
~Division No. L. $ 16,904.601$
333.33$
787.7~~--------- 48.7?. --------------$ 7.501$ 3,142.10!$
$
18.00$ 11.660.06 $ 32, 9G2 .02
--<
2.-- 11,871.01
134.01
4.20--------- ----
75.00 1,701.741
613.111---------- --- ----------
4,288.08
18,692.26
3___
13.752.34
188.41
14.. 88 ________________________ 1 1.653.82
621.27 __________ ______________
3.845.68
20,076.40
1
TOTALS------. -$--42-.-527-.-95~1-$---6-55-.7-5 -$~---;;7 .83 --------------~-=~;--8-2.;1-$-6-,4-97-.; -$~2,-02-7.-1r------------ ~-$~--1-8.-00 ;--1-9-7,-93-.8-2 -$--71-.6-70-.6-8
1
1
1
SURVEY PLANS BY DIVISION UNITS
"'""'=No.L:::: : : :::: : : ::: : 1.: : :: :.:. : :t: ..:::' .: ::/' !!:~~ ' ~m;;
----------====r------------1---------- -------------- TOTALs_______ -------------- -----------------------------------------
'----:---- - - - - - ;-~~~ ;-~;,-:;
NOTE: Division Units have been consolidated in accordance with present set-up of three Divisions.
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF GENERAL MAINTENANCE EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1,1933 TO JUNE 30,1934
Schedule No. 1OD
Personal Services
Equipment Expenses
Communi cation Services
Furnishing Heat, Light,
Power and Water
Rents
Traveling Expenses
I
I Supplies and
Materials
lnsurance
Printing, Binding, Publicity,
Etc.
Special a"d Miscellaneous Expenses
Total
,_.
co
DistrictNo.
00
L.$ 2 ___
3 ___
4 ___
5 ___
6 ___
7 ___
8 ___ 9 ___
10 ___
1L. 12.._
I
3, 985 .54'$ 4,063.60 3, 785.18 3,427.11
829.87 3, 731.75 3, 533.85 3,857.59 4, 852.61 3, 696.37 6,173.57 4,883.90
TOTALS------- $ 46,820.941$
MAINTENANCE SUPERVISION BY CONGRESSIONAL DISTRICTS
19.81 $ 24.68 20.48 15.72 4.C4 16.97 17.18 20.57 38.76 17.93 32.64 23.55
252.33,$
I
387 .08 $ 417.31 380.32 328.94 77.60 344.21 331.28 417.37 498.87 386.11 584.31 485.16
4, 638.56 $
I
I
16 .87'$ 49.90 $ 1,997.611$ 142.80 $
2.45 11.35
103.39 50.60
2,184.691 2,036.93
191.15 119.27
22.21
10.49 1,839.83 133.90
1.12 ----------
447.27
22.72
23.31
11.24 2,012.01 161.62
4.85 ---------- 1' 890.06 105.77
7.79
1.23 2,120.62 145.82
7.07 ----------
25.39
12 .~7
2,653.74 223.17 1,856.79' 165.89
3.41 145.17 3,161.68 145.31
31.08 45.41 2,492.93 315.30
- - - ---- ---
156.901$ 429.80 $ 24,694.16 $ 1,872.72$
42.82 -------------- $
34.90 -------------36.69 --------------
39 .36~-------------8.781 ______ -------41.66 -------------42.82 -------------36.681-------------47.47 -------------43.97, ______________
55.96)-------------53 .291 ______________
484 .401 ______________ 1$
I 1.321 $ 10.74 6.40 10.94 1.93 13.25 7.23 57.89 11.89 .70 4.49 30.56
6,643.7 7,032.9 6,447.2 5,828.5 1 '393 .33 6, 356. 02 5,933. 04 6, 665.56 8,333.5 8 6, 205.52 10,306.5 4 8, 361.1
157.34 $ 79,507.1
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 1D-D-Cont'd.
ANALYSIS OF GENERAL MAINTENANCE EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1,1933 TO JUNE 30,1934
Personal Services
Equipment Expenses
Communi .. cation Services
Furnishing I Heat, Light, I
Power and Water
Rents
Traveling Expenses
Supplies and
Materials
lnsuranee
Printing, Binding, Publicity,
Etc.
Special and Miscel laneous Expenses
Total
MAINTENANCE DIRECT BY CONGRESSIONAL DISTRICTS
----------------------------~--------------------------------~----~------~-------------------------
1
1
DistrictNo. L __ $ 49,361.10$ 38,187.681$
109.061 $
26.21$ 243.56 $ 714.02$8,751.68$ 1,234.07--------------$
.90 $ 98,628.28
2,__
46,523.09
32,414.04
98.70
72.77 322.72
807.39 8,656.41 1,388.28-------------- --------------
90,283.40
3,__
42,532.52
33,746.27
104.96
60.56 305.54
641.52 2,444.82 1,238.12 -------------- --------------
81,074.31
4,__
41,223.48
25,751.51
99.58
38.51 130.65
486.53 1,581.84 1,065.34----------------------------
70,377.44
5,__
9,662.16
5,990.93
6__ _ 42,805.04. 29,580.94
50.95 105.69
24.67 72.39
187.43 155.37
177.87 1,794.43
253.27----------------------------
545.88 4,023.74 1,105.77--------------1--------------
18,141.71 78,395.82
7,__
40,946.87
32,628.96
220.13
104.14 649.63
782.58 5,896.93 1,096.54 ______________ ]______________
82,325.78
8__ _
44,391.79
34,219.47
g___
62,020.75
44,678.15
252.531 318.29 1
98.42 130.C7
558.94 787.491
778.18 9,678.32 999.59 8,733.17
1,276.25--------------
5.00
1,569.68----------------------------
91,258.90 119,237.19
10.. - 42.980.48 33.009.96
131.77
65.46 473.83
676.05 8.402.341 1.173.35$
7.00 ______________
86.920.24
l!___ 12...
66,994.37 49,453.76
153.20
68.44 243.70 1,130.50 8,813.60'1 1,960.88-------------- -------------- 128,818.45
1
52,705.811---37,845.37 _ _ _150.69 _ _
127.80 -~7 .391 ___944.00 12,150.19 --~549.471=~='~=== ~:820.72
1
TOTALS-------$ 542,147.461$ 397,507.04 $ 1,795.5+
889.44 $4,406.251$ 8,684.11$80,927.471$ 14,912.C2$
7.C+
5.901$1,051,282.24
1
1
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 1().D-Cont'd.
ANALYSIS OF GENERAL MAINTENANCE EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1, 1933 TO JUNE 30, 1934
Personal Services
I
I Equipment Expen~es
I
I
Furnishing
I Communi- Heat, Light,
cation
Power and
Services
Water
-I
Rents
Traveling
Expense~
I
I I
Supplies and
Materials
MAINTENANCE SUPEii\ ISION BY DIVISION UNITS
lnsura nee
-
Printing, Binding, Publicity,
Etc.
Special and Miscellaneous Expenses
Total
~-~~--- -~-------~---------
r:g Division No. L. $ 15,977.24
88.781$ 1,549.84 1$
I 14.18$ 369.80$ 8,332.901I$ 554.39$
142.00~I --------------
I
$
24.50 $ 27,053.63
0
2___ 17.015.60
78.75
1,683.96 1
122.72 60.00 8.813.18 787 .JJ
200.40 ______________
51.38
28.813.10
;-~~ ~~~;-~ ;-~~~;~-~~~===r;-~ 3... 13,828.10
84.80
1 TOTALS.._____ -$--46-,8-2-0-.9-4;'-$_ _ _25-2-.3-3
1,40L761
20.00---------- 7,548.08 531.22
142.00 .. -----------
1
81.46
23,640.42
-$-7-9-,5-07-.1-5
1
MAINTENANCE DI.,ECT BY DIVISON UNITS
Division No. L .. $ 184,157 .24$ 2... 192,747.28 3... 165,242.94
TOTALS.______ ~2,147 .46 ;-
1
132,733.02 $ 139,424.17
388.01 $ 506.37
I
235.01 $ 973.761$ 268.16 1,163.70
125,349.85
901.17 ____386_.27_ 2,268.79
397,507 .~ -$-1. 79;-:~~$
889.441$ 4. 406 .251;-
3,120.64$26,717.13$ 2,643.53 26,192.55
2,919.94 28,017.79
I
1
5,180.09--------------1$
.90 $ 353,505.80
5,275.85$
7.00-------------- 368,228.61
4,456.08--------------.1---5.00 _329,547 .83
8,684.11 $80,927 .47];---;912.02 $
7 .OOi$
5.90 $ 1,051,282.24
NOTE: Di Viliion Units have been consolidated in accordance with :t>resent set-U:t> of three Divisions.
-
N
.0..... District No.
Schedule No. 1D-E
STATE HIGHWAY BOARD OF GEORGIA
ANALYSIS OF RECONSTRUCTION EXP'ENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
Personal Services
j
Equipment Expenses
-
JULY 1, 1933 TO JUNE 30, 1934
---
-
I
Communi . . cation Services
Furnishing
Heat, Light, I
Power and
Water
I
Rents
Traveling Expenses
'
Supplies Insurance and
Materials
I
Printing, Binding, Publicity,
Etc.
Special nd Miscellaneous Expenses
Total
' -----
RECONSTRUCTION SUPERVISION BY CONGRESSIONAL DISTRICTS
I
--------~-- ----------- ~-- --- -------1--------------
--- ----------------
143.39.
143 .3Q
Schedule No. 10-E-Cont'd.
STATE HIGHWAY BOARD OF GEORGIA
ANALYSIS OF RECONSTRUCTION EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1, 1933 TO JUNE 30, 1934
Personal Serwices
Equipment Expenses
Communication Services
I
I Furnishing Heat, Light,
Power and
I Water
I
I
Rents
I
I Traveling Supplies
I Expenses
and
Materials
I
Insurance
Printing, Binding, Publicity,
Etc.
Special nd Miscel-
I I
laneous I
Expenses I
I
Total
--~-
RECONSTRUCTION DIRECT BY CONGRESSIONAL DISTRICTS
~
District No. L- $
3,535.64'$
1,677.02 --------------1--------------1----------1* llOAOj$ 2,666.75~------------[--------------~------------ --1 $
7,989.81
;:~~1:--~~llii)l))::i ;~~))1)):)1:: ---:~~ t_)-..... 8...
1. 356.91
1~::: 4,;{~:;;
1
1
J_____________ 1 245.07 ____________
~ ----l----------1 ______________ ______
I_-- 4. 641.90 __________________________
:~~:~~ :::::::::::::':::::::::::::: :::::::::: :::::::::-1 2,77~:~~ :::::::::::1::::::::::::::1:::::~::::::::
6. 243.88
7,~~~::~
~~::: i: :~:~:r 1.~~~:~;~~---------~:~~ ::::::_:::::::~~-----~:~~ 2i~:~~~ ~~: ~~~:~~~1:::::::::::: ::::::::::::::r:::::::::::::_ g:!!:::;
TOTALS....... 19,685.98 $ 5,863.6?
6.40 ------- -----~~ ~ ;---;~~==~~===r--------------1 66.155.33
1
1
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 10-E-Cont'd.
ANALYSIS OF RECONSTRUCTION EXPENSE DISBURSEMENTS BY CONGRESSIONAL DISTRICTS AND DIVISION UNITS
JULY 1, 1933 TO JUNE 30, 1934
Personal Services
I
I
Equipment I
Expenses I
I
Communi~
cation Services
I
Furnishing
I Heat, Light, I Power and
Water I
I
i
Rents
I
I
Traveling Supplies Insurance
Expenses
and
Mlterials I
I
I
Printing, Binding, Publicity,
Etc.
I
Special nd I Miscel laneous Expenses
Total
RECONSTRUCTION SUPERVISION BY DIVISION UNITS
50.00 93.39
143.3~
RECONSTRUCTION DIRECT BY DIVISION UNITS
Division No. L .. $ 2.. L.
8. 601.06 $ 4, 051.03 7,033.89
TOTALS... $ 19,685.98$
I
11 3,988.401I~
6.4011 I$
407 .2sj ..........
8.00I$
I 339.05I$ 16, 801.86. - .......
27.35 12,454.72 .......................
::::: :::~~-------- :::r::::.::::::.j~--- ~:0~1: ~:::+ 10,968.33 -- --
40,224.91:-11 $
NOTE: Division Units have been consolidated in accordance with present set-up of three Divisions.
29,744.77 16,940.38 19,470.18
66,155.33
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATIONS
JULY 1, 1933 TO JUNE 30, 1934
Schedule No. 11
ADMINISTRATION
CONSTRUCTION
MAINTENANCE
OBJECT OF EXPENDITURE
General Research
Administra- and
tion
Analy>is
Gollection of
Revenue
Quarry
Construction
Surveys
Maintenance and Recon-
struction
Shop
Land, Buildings
and Equipment
Legislative
Transfers
Total
PERSONAL SERVICES
G. 0. Administration
Administrative..... $ 37,652.85 ----------- ----------- ---------- -------------- ----------- ------------- ----------- ----------- -----------$
Others_____________________ 163,922.67 ---------- ---------- ---------- -------------- ________________________ ----------- ----------- -----------
Field Office Administration
Administrative____________ 13,445.991 ___________ ---------- _ ---------- -------------- ----------- ------------- ----------- ----------- -----------
Others.. ------------------
6, 239.97 1 ----------- ----------- _____________ ----------- ___________ ------------- ----------- ----------- __________ _
R~=~~~~~~~~~~:::::::::: :::::::::::: $ 1;::~~:~~~::::::::::. :::::::::: ::::::::::::::1::::::::::: ::::::::::::: ::::::::::: ::::::::::: :::::::::::
37,652.85 163,922.67
13,445.99 6, 239.97
2, 971.00 15,609.48
2,481.00 7,116.29 45, 753.76
286,385.71 38,443.37
42,527.95 161.164.09
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATIONS
JULY 1, 1933 TO JUNE 30, 1934
Schedule No. 11-Cont'd.
ADMINISTRATION
CONSTRUCTIOIII
MAINTENANCE
OBJECT OF EXPENDITURE
General Administra-
tion
Research and
Analysis
Collection of
Revenue
Quarry
Construction
Surveys
Maintenance and Recon-
struction
Shop
Land, Buildings
and Equipment
Legislative
Transfers
Total
Direct Costs-Cont'd.
Constr. and Reconstr.
Foremen_________________ -----------------------,---------------------$ 63,741.14-----------$ 4,013.60 ----------- ----------- ----------- $
i~:::~t%:~~~~~~~~~:: :::::::::::: ::::::1::::::::::: :::::::::: -----~~:~~;:~~ :::::::::: 1 ::::
83,992.12----------- ----------- ----------24,359.79----------- ----------- ----------6,939.66----------- ----------- -----------
:::::::::::: :::::::::::[:::::::::: :::::::::: ::::::::::: g~~~~:~:~!~~~~::::::
~~:~;~:~~
13,187.89 ----------- ----------- ----------265,176.29 ----------- ----------- .......... .
67,754.74 126,604.95 34,917.85
6, 939.66 71,463.71 326,235.66
Qua~ry
1
Drrect Quarry .. ___________ ----------------------------------$ 693.50-------------- ----------- ------------- ----------- ----------- -----------
693.50
:::::nruFoo; u: : :: ' ;; : ~; :I; :;,;;: ~ ;-: ,;;;, ::: : : :: ' L~ : : Collection of Revenue____ -----------------------~$ 21,962.03 ---------- -------------- ----------- ------------- ----------- ----------- -----------
$
=I ,; ;: ;;' :; --;;::;,; ;;;,; ;;,
21,962.03
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATIONS
JULY 1, 1933 TO JUNE 30, 1934
Schedule No. 11-Cont"d.
OBJECT OF EXPENDITURE
ADMINISTRATION
CONSTRUCTION
MAINTENANCE
Construction
Surveys
Maintenance and Recon-
struction
Shop
Land, Buildings
and Equipment
Leg islative
Transfers
Total
1,579.83
1, 931.03
323.82
300,101.90 27,045.61
242,038.86 1,847.49 978.14
673.79
3, 876.07
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATIONS
JULY 1,1933 TO JUNE 30,1934
Schedule No. 11-Cont'd.
AD MINI STRATI ON
CONSTRUCTION
MAINTENANCE
Land,
OBJECT OF EXPENDITURE
General Research Collection
Maintenance
Buildings Legisla-
Administra- and
of
Quarry Construction Surveys and Recon-
Shop
and
tive
tion
Analysis Revenue
struction
Equipment Transfers
roE~:~:~;~~:~:~~:~~~~~:~:::::-'::::::::::::::::::::::_:~~::::::::::::::::::: ::::::::::::_:1::-:_::::::11::::::::::::: -:-:::::::-$ :~:;~~::~ ::::::::::-$
~ Road Machinery. Misc. ____ ------------~----------- -----------~---------- --------------~---------- ____________ ___________ 64,810.49 ___________ Office Equipment___________ ---------------------- ----------- ----------~-------------- -----------, ----------- ___________ : 3,326.69 -----------
~~~~r~~~~~~~~~~~~t-:: ::::::::::::,::::::::::_':::::::::_,:::::::::: :::::::::::::: ::::::::::_ :::::::::::::::::::::: I 5~~:~~ :::::::::::
Total
:~:;~;;
64,810.49 3,326.69
5~~:~~
Telephone and TelegraPh--'~$ 10,436.03 $
6.47$ 30.51 __________ $
1 Postage______________________ ~1.77~=~1 ::..:=1- 153.~ ~== TOTALS-------------------~e 17,927.801$ 6.47~$ 184.33----------1$
!,688.36.$ 1,449.091
3,137.45'$
22.62$ 4,296.07$ 45.21 _ _2._144.44
67.831$ 6,440.511$
-----------1 659.68[-----------~'-----------'$
44.5l_::..:::..:_:_:
704.18~-----------:----------~$
17,139.74 1!,328.83
28,468.57
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATIONS
JULY 1, 1933 TO JUNE 30, 1934
Schedule No. 11 -Cont'd.
ADMI;>,il STRATI ON
I
CONSTRUCTION
MAINTENANCE
OBJECT OF EXPENDITURE
AdGmienniesrtarla-~I
Research and
I
I Collection I I of
-
Quarry
~----
I - - ~-----;---
I I j
Maintenance
I Construction Surveys and Recon-
Shop
Bu~~;i~gs Legisla-
and
tive
Total
HEAT,
1 LIGHTS,-----;;;-;,;,
-~o_".__
-~naly~~~--~\'(l~lJI)-,I-~--~~-- ---~-----~~~~ ------=quipmen~~ansfe~_______
1
r,:, WATER, AND CLEANING
5 SERVICES
i~~~E~~l[~~L-::_1$ l,::u~~.~."~ .''~ ~~ ~, ,E ~:i~ :!~ FurnishingofWater. ______
1 ''""I= I TOTAL'............
1
::;1
M'
'
658.89 --------- . . -
.. ....
754.51 ---------
493.66
150.54 ---------~-----------
2,C57.60
~'", ,""~[ ---:-1~ ~_];1 -_ ,
1;- ~;;,,.['-""":"' c=:::_cc:::
~~1 9,768.14
R~e~ts. -------~~$ --------~-- 1 Road Machinery____!______ _ [___
.. $ 2,845.21 ...
81.77'
--- ---1-----------$ 2,926.98
Rents,Bldgs.andGrounds.$ 2,645.13____
. :
1,488.75$
5.00
4,760.04$ 50.00.----------,-- ______ 1 8,948.92
RReennttss,.EngmeenngEqmpt_,1 ____________ Offi~eEuuipmenL.
3,120.57 ____
1 ___________ ----------
,------
---~-------------- ______________________________________________ ' __
-------[
_____
__
.80
77.50 ___________ , ___________________ -----------
3,120.57 78.30
5,790.70~---------- l.---------1~ Rents. Miscellaneous.. TOTALS .. _________________ $
25.00~:1.:.:.:.:_:_:_:~ :_::_::_:_:__:_:_ ~ ~~ ...:_:::.:.:..:.::.:__1
224.. :_:::.._::~:_::_:f_..:....:.=.:.:..:..:_:_: :_:_:__:_:...:.:::_:1___5~==
4,360.51$ 82.50$ 4,844.05$ 50.0l---------,----------- $ 15,127.76
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATIONS
JULY 1, 1933 ro JUNE 30, 1934
I - - - - -AD-MI-NIS-TR-AT-IO-N - - - - -C-ON-STR-UC-TI-ON- - ! -MA-ll\-TEN-AN-CE- - Land,
Schedule No. 11-Cont'd.
OBJECT OF EXPENDITURE
General Research Collection
Maictenance
Buildings Leg isla-
Administra- and
of
Quarry Construction Surveys and Recon-
Shop
and
live
Total
-----~----- -=~~:e~ _T~_ns_fe~- -----------l--t-io_n__ _A_n_a_ly_s_is_ _R_ev_e_nu_e_
_ _ _ _ _ _s_tr_uc_ti_on______
------
1
1
TRAVELING EXPENSES
I
Subsistence.................. $ 6,090.62. $ 491.85$ 5,455.22 .......... $ 2,708.67;$ 125.50$ 7,347.60 8 202.35....................... $ 22,421.81
ll:> 0
"'
O:h;::::~~~~~~-t~~-~::.- ;---;~~~~~~~~~~;-;~~~~~~=~ : : : : : ~~~ Transportation Gas and OiL ............. $ 52.95 Mileage Allowance........ 18,193.7311
1
167.45 1,564.94
12.56 .......... 14,065.48 ..........
$ 24.:::::: $ 2.3:::::$ 19,6::::: ::::::::::
I
4,302.22 1,433.41 69,954.29, 4,827.80;1
4,578.11
14.45: .......... ...........
21,772.50I 1,157.51 ..................... i
10,561.15 131,536.25
gi~~:ie:~~~~~~~~~~~~~~1$ ~::::::::c. ~::: SUPPLIES AND MATERIALS Photographic Supplies.....
I 23
::::::::: 205.57 .......... ..........
1:::~::::1* 2.027:::,$ z.o::::: :....~:~:~~ :::::::.::: :::::::::_ 10.24 ............................................ ,........... ,
Cleaning and Toilet Sup-
_ _ _ _ _ _ plies....................... 2,359.39
:E:r;l~r:~~:-:~~~-~:~---
4.411.--- . . . . . . J.........
i
2,392.87 ...........
72.98 ................................ .
1.692.52 __________
~----------
________________________________________________________ ' _________ _
15,413.60
19,703.37 215.81
4, 829.65
1,692.52
F~o~~~~~~i~;:::::::::::::::1:::::::::::::::::::::::1:1:::::::::: ::::::::::,
wearing AppareL ... --------~---- _______ -1--- ________ ..... _______ ... _______ .
Medwa1Supplles............
18.41~-----------~----------- ----------,1
~::~~~:!~1~::::::
: ::::::::::::: :::::::--:: ::::::::::: :::: ::::::
23,482.92 ... --------,
15.45: _______________ .... ______________ i
2,209.01 ---------~------ ---- ~-----------~-----------~- ---------~
~---------
52,598.15 66,413.53 23,498.37 2, 227.42
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATIONS
JULY 1, 1933 TO JUNE 30, 1934
Schedule No. 11-Cont'd.
OBJECT OF EXPENDITURE
ADMINISTRATION
General Research
Administra- and
lion
Analysis
Collection of
Revenue
Quarry
CONSTRUCTION Construction Surveys
MAINTENANCE
Maintenance and Recon-
struction
Shop
Land, Buildings
and Equipment
Leg islative
Transfers
Total
---~
SUPPLIES AND MATERIALS-
Con!' d.
Camp Supplies, Misc........ ___________ ---------- ----------- ----------
Tools________________________
.25
.20 ---------- ----------
11,823.401---- .. ---- -~------- ------
7,114.08 -----------
4. 084.72
-------1--.4--81--------.-.-----------~----------------------
11,823.40 11,200.73
Fuel Supplies_______________
188.99 ___________ ----------- ----------
Explosives ___________________ ------------ _______________________________ _
{...\..j.
0
Building Supplies and Materials.................. ---------------------------------.. ----------
Signs________________________________________________ ----------- ----------
4,821.031-----------
2:::::::t~~-~~~~--
3.60 -----------
1,252.64 1,248.89 ----------- -----------
39:::: ~~~~~~~~~~~ -~::~~-~~~- ~~~~~~~:~:~
4,825.59 ----------- ----------- -----------
7,511.55 9, 826.88
24,239.94 4,829.19
Materials-Roads and
-i Bridges. __ ----------------- ___________ _ _____ __ ____ ___________ ________ ____ 2_6__1_9_8__1_1_2_ -_-_: ::__-_-_-_-____ 1_o_8_:o_3__3_.5_5_ - ... . . .._- . _-_-_ :_-_-__ -_-_-_: _-_:_-_-_:: -_-_-_
376,015.27
G=~~~~~::Sli~~~~~~~~--- ............ __________ ---------- ---------- 7,602.37~- ---.1..-....-..... ---------- Materials-Shop............. ------------ ----------- ----------- ---------
31 479 671
131,479.67
--
-----------
-~---~-
.
2.176.59 ..........
9, 778.96
1----1-:~--f--~--
TOTALS ................... $ 18,437.05 $ 1, 960.36 ----------- -------- .. I$ 494,932.27 $ 2. 027.17 $ 123,025.10 $132,916.061- ____ ...... ______ ----- $ 773,298.01
INSURANCE
----~-----r
Fire Insurance-Buildings
and Fixtures .............. $ 296.50 ----------- -----------$ 221.25$ 2,500.00 ----------- $
441.48 ...................... ----------- $ 3,459.23
Liability, Fire, etc.. Equipt.
446.43 $ 72.37 ----------- ----------
2, 882.71 ----------- 13,937.94 $ 243.89 ......................
17,583.3~
Bond Premiums............. Casualty Insurance. Boiler
----2-,-5-4-6-.-7-1-1~~-----2-4-.0-0:1$----5-7.-00------------~--~-
550.35 _ _ _560.00
=--~----.-:-_--:-~-
1,017.00
=:=-:.:_:..:_
9.00 ---------- ----------98.00----------- ...........
4,204.06 680.57
TOTALS................... $ 3, 289.64 $ 96.31 $ 57 .oof$ 243.82 $ 6, 493.061........... $ 15,396.42 $ 350.8J __________ ----------- $ 25,927.20
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATIONS
JULY 1, 1933 TO JUNE 30, 1934
Schedule No. 11-Cont'd.
ADM INl STRA TION
CONSTRUCTION
MAINTENANCE
Land,
OBJECT OF EXPENDITURE General Research Collection
Maintenance
Buildings Leg isla-
Administra and
of
Quarry Construction Surveys and Recon- Shop
and
live
Total
tion
Analysis Revenue
struction
Equipment Transfers
-----------1----1---~ - - - - - - - - - ' - - - - - - - - - - - - - - - - - - - - - - - 1 - - - - 1 - - - - -
PRINTING, BINDING, PUB-
LICITY, ETC.
Printing Maps ______________ $ 888.40- .... ------- ----------- ---------- -------------- ----------- ----
------ ----------- ........... $
888.40
r......o......
Stenography, Typewriting and Multigraphing, Job
Work . . . . . . . . . . . . . . . . . . . . . . .
Photo Printing and Developing Job Work _______ _
__::::::::: 1::::: ~----:~:::r::::::::
~--------:~:~: 6.00 -------------!----------- ----------- -----------
$ 12.00 $
7.00 ---------- -------- .......... -
25.98 345.11
Publication of Notices and
Advertising.............. .. 5,542.661 ___________ ----------- --------
5,542.66
1----1----------------------1----- -------1----1-----
TOTALS................... $ 6,587.71$ 176.65 ---------- ----------$
12.79$ 18.00 1$
7.00 ___________ ----------- ---------- $ 6,802.15
1----1-----1----1---- ----1----1----- ------- -----1-----
INDEMNITIES
Compensation-Medical
Service, Claims and Costs_ $ 7,947.82----------- ----------- ------------------------- ----------- ------------- ................................. $
Damage to Private Property 2,624.69----------- ----------- ---------- -------------- ----------- ------------ ----------- ----------- ----------Damage for Personal Inju-
7, 947.82
2,624.6~
ries................ -------
172.45 -------- ----------- ---------- -------------- ----------- ----------- ...................... -----------
172.45
1----11-------------1------ ----1------1----1---1----[-----
TOTALS............ -------$ 10,744.96---------------------- .......... -------------- ......................................................... $ 10,744.96
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATIONS
JULY 1, 1933 TO JUNE 30, 1934
Schedule No. 11-Cont'd.
ADMIN I STRATI ON
CONSTRUCTION
MAINTENANCE
Land,
OBJECT OF EXPENDITURE General Research Collection
Maintenance
Buildings Legisla-
Administra- and
of
Quarry Construction Surveys and Recon- Shop
and
tive
tion
Analysis Revenue
struction
Equipment Transfers
Total
PAYMEN rs TO CONTRACTORS
PaY!llents to Contractors..................................... __________ $ 7,559,828.89 ......................................................... $ 7,559,828.89
!.-...:.>.
----1----1----1--~ - - - - - - 1 - - - - 1 - - - - - 1 - - - - - - - - - - -~-- ~---
!-.:> SPECIAL AND MISC. EXPENSES
Miscellaneous Camps Exp............... ----------- ----------- .......... $ 2, 667.97 ----------- ....................... _ ........... ----------- $
Blue Prints......................................... ----------- ..........
3.40 $ 71,236.03 ............. ---------- _ .................... ..
Tests......................... $
4.55$ 1.383.12 ........... ..........
25,917.82 1,071.72$
270.73$ 110.49 .................... ..
Subscriptions and Dues.... 4,182.20
19.50 .......................................................................................... ..
Incidentals..................
164.60 ...................... $ 2.89
100.30
52.63
35.90 .................................
Interest.................................. ----------- ........... ..........
465.52 ....................................................... ..
Transfers................................................................ -------------- ................................... -----------$ 54,368.05
2, 667.97 71,239.43 28, 758.43 4, 201.70
356.32 465.52 54,368.05
Burial Expenses ............ ............ ........... ........... ..........
100.03 .........................................................
100.03
Rewards............................................ ........... ..........
2,071.50 ----------- ........................ --------- ......... ..
Court Costs.................
894.76 ........... ........... .......... .............. 876.66 ............................................. .
2, 071.50 1, 771.42
Right of WaY-Purchases.......................... ----------- ........ -- .............. 17,792.81 ............................................ .. 17,792.81
TOTALS.................. $ 5,246.11$ 1.402.62 ........... $ 2.89$ 31.326.54$ 91,029.85$
306.63 $ 110.49 ----------- $ 54,368.05 $ 183,793.18
- - - - 1 - - - - - - - - - - - - --~- - - - - 1 - - - - - 1 - - - - ~-- - - - - - - - 1 - - - - -
TOTALS ................... $ 325,161.94 $ 27, 130.50 $ 41,812.11 $ 940.21 $ 8, 873, 322.36 $142,906.71 $l,l97, 088.11 $200,581.47 $133,906.93 $ 54,368.05 $10,997,218.39
STATE HIGHWAY BOARD OF GEORGIA ANALYSIS OF EXPENSE DISBURSEMENTS BY DETAIL OBJECT OF EXPENDITURE CLASSIFICATIONS
JULY 1, 1933 TO JUNE 30, 1934
Schedule No. 11-Cont'd,
ADMINISTRATION
CONSTRUCTION
MAINTENANCE
Land,
OBJECT OF EXPENDITURE
General Research Collection
Maintenance
Buildings Legisla-
Administra- and
of
Quarry Construction Surveys and Recon-
Shop
and
tive
tion
Analysis Revenue
structiOn
Equipment fransfers
-----------l----l---l----l---------------1-----!-----
LESS: INTER-DEPARTMENTAL
BILLINGS
Blue Prints
G. 0. Salaries_____________ $ 62,113.18 ----------- ----------- ---------- -------------- ----------- ------------- ----------- ----------- ----------- $
G. o. Supplies____________
Shop
9, 615.09 ----------- ----------- ---------- -------------- ----------- -------------.----------- ----------- -----------~
Total Disbursements..... --------------------------------------------------------------------- -------------.$200,581.47 ----------- -----------
Research and Analysis
1
T;;~::.~-~-~~::_e-~~~~~~~ ~--~::~:~::7;;;~~ ~ :::::::::::::: ::::::::::: ::::::_ ~:0~::~::~7~=~~~ :::::::::::$
Total
62,113.18 9,615.09 200,581.47
2:::::::::
NET EXPENSE DISBURSEMENTS------------ $ 253,433.67 $ 2, 480.03 $ 41,812.11 $
1
I
940.21 $ 8, 873,322.36 $142,906.71 $1, 197,088.11 _____ ------ $133,906.93 $ 54,368.05 $10,700,258.18
1
1
1
Schedule No. 12 STATE HIGHWAY BOARD OF GEORGIA CONSTRUCTION ALLOTMENTS & DISBURSEMENTS, BY TYPES
JULY 1, 1933 TO JUNE 30, 1934
Description
I July 1, 1933 Jan. 1, 1934
To
To
Dec.~31, 1933 June 30, 1934
I
ALLOTMENT s
Total For Year
Graded Earth and Soil ___ $ GraveL _____________ .. Macadam ______________ _
I
998,860.04$ 1,054,137.15 $ 2,052,997.19
299,791.84 1,013,372.10 1,313,163.94
106,490.68
61,447.36 167,938.04
Surface Treatment __
722,855.62 2,453,128.30 3,175,983.92
Bituminous Mixtures
185,007.13 303,486.56
Cement Concrete _____ _
1,152,099.5411,521,913.24
Brick_______________________ ____________ _.
25,114.82
Structures ________________ _ 597,921.26 817,183.72
488,493.69
2,674,012. 78 25,114.82
1,415,104.98
Totals _______________ --~~3 ,026.111$ 7,249,783.251$11,312,80~36
EXPENSE DISBURSEMENTS
Graded
Earth
and
SoiL ___ _
$
1,881,166.44$
I
1,303,875.47'$
3,185,041.91
GraveL ____________________ _ 189,255.83 490,414.50 679,670.33
Macadam __________________ _ 212,717.03
66,760.46 279,477.49
Surface Treatment ________ _ 985,513.38 1,354,492.67 2,340,006.05
Bituminous Mixtures ______ _ 210,556.1 4
77,803.89 288,360.03
Cement Concrete __________ _ Brick______________________ _
538,900.39 1,286,649.61 1,825,550.00
21,091.90
5,877.55
26,969.45
Structures ________________ _
56,671.52 191,575.58 248,247.10
Totals __________________ $ 4,095,872.63$ 4,777,449.73 $ 8,873,322.36
===
214
STATE HIGHWAY BOARD OF GEORGIA CONSTRUCTION ALLOTMENTS AND DISBURSEMENTS, BY CLASS OF PROJECT
JULY 1,1933 TO JUNE 30,1934
:Ochodule No. 13
Personal Services
Equipment Expenses
Furnishing Communi- Heat,
cation Lights, Services Power and
Water
Rents
Traveling Expenses
Supplies and
Materials
I nsurance
Printing, Binding, Publicity,
Etc.
Payments to Contractors
Special and
Miscel laneous Expenses
Total
EXPENSE Dl SBURSEMENTS
~SUPERVISION CONTRACTS StateAid.............. $100,717.82$ Federal Aid............ 55,944.45 National Recovery____ 86,412.77
TOTALS............. $ 243,075.04$
621.97$ 569.08 1,814.89
3.005.94$
I
I
1
301.961$ 2.75'!$
175.201
5.50
376.59 ----------~'
8~3.75 $ 8.25$
I
I
I
141.52$27,492.62,$ 3,460.131.......... $ 3.19$ 4.800.16$9,086.81$
59.76 11,341.33 28.55 18,516.76
1,696.60 __________ 9.60--------------
1 5,237.72 ~ ==~ ~==~~
1
1
4,942.49 9,225.21
229.83'$57,350.71 $ 10,394.45 .......... $ 12.79$ 4,800.16$23,254.51 $
146,628.9 74,744.0 121,612.4
342,985.4
sr;;!v~c~~:r~es........ -27,814.14~-~:---= ~=~ -~ 8,209.52 874.147~-= =~~~== -=~:- 38,271.08
Asphalt Forces........ 6,644.68
.25 18.43 ---------- 10.00 1,855.60
107.11
5.8t--------- -------------- 1,531.04 10,172.97
D::::~=~.~~~:~~::::~~~.:::::1:.:~~~~~~:.~.:::~~:~~~~.,~~;=,='":::::1: ~:.:::
STATE HIGHWAY BOARD OF GEORGIA CONSTRUCTION ALLOTMENTS AND DISBURSEMENTS, BY CLASS OF PROJECT
JULY 1,1933 TO JUNE 30,1934
Schedule No. 13-Cont'd.
Personal ServicE's
Equipment Expenses
I 1 Furnishing!
Communi- Heat,
1
cation
Lights,
Services I Power and 1 [ Water j
Rents
. I Supplies
rravel mg : and Expenses I Materials
I
i
Insurance
Prirting,
Bin~ing,
Publicity,
I Etc.
I
Payrrents to Contractors
I Special I and
i Mi~cel-
laneous
Expenses I
l
I
I
Total
EXPENSE DISBURSEMENTS
--------
~~;:[;L :-.: :, ~; ".: 1 Dl:t~~TA~dONTRACTS
:~
.
".:
I
::.J
:
I
[.
~
.~d.I
,~.
I
-i
;,;,-j
I
-;0,;1
:
:
I
:
:
!l
il
~
I
.
:
~
.:l~
ill
!1
1 TOTALS---------$ 5,903.17$ 110.44~~ 2.49:~~---------- $ 1,372.621$--110.661$ 3~03=.:~1$ 5~~~~~~~~ ;-~555,028.73.$ 476.26$7,566,092.44
STATE FORCES Convict Forces_
1
$ 122.930.27 $ 113,338.82 $ 1, 745.98!$ 2. 270.03 $ 688.63 $ 7, 288.06 $ 292, 53C. 7011$ 5,948.16:-------- - --------------:$ 4, 857.35 $ 551,598.00
Asphalt Forces________ 70,229.24 34,495.42 Division Forces_______ 37,184.54 27,704.29
454.54 18.951
216.23 535.09 1,989.56 163,932.83 473.60 __________ --------------~ 73.20 272,399.71
==---: 2.00 l, 469.34 694.15 24,041.20 ------::..:..:..:_
~= ::_::::_:~~ ~ 91,114.47
--------------18 ~~;-;,-488.26 ;-2, TOTALS_____________ $ 230,344.05 $ 175,538.53
693.061$
9, 971.77,1$
480,504.731$
1 6, 421.76 ----------
4, 930.551$ 915,112.18
2,221.96~~2,488.261 4,065.~~~~o82.43j$ 48~36.1r 6,47;~1=~=1$ Total Direct _____________ ;-236,247.22 $175,648.971$
$
7,555,o28.73[;-5,4o6.81$ 8,481,204.62
932.27,~~;-~1~828.8~1$31, ~;~~~~;;;2.36 d$ Total Disbursements. __ $ 514,255.36 $ 178,806 .85($ 3,137.45 $ 2, 496 .51[$ 4, 360 .51($77, 672. 494,
Schedule No. 13-Cont'd. STATE HIGHWAY BOARD OF GEORGIA CONSTRUCTION ALLOTMENTS AND DISBURSEMENTS, BY CLASS OF PROJECT
JULY 1, 1933 TO JUNE 30, 1934
ALLOTMENTS
New Contracts Revisions
Total
CONTRACTS
State Aid
Contractors-----------------------[$ l, 536,955.74 $
531.58
Counties __ ------- .. ---------------1 !,354, 268.!!
85,785.02
$ 1,537,487.32 1,440,053.13
Federal Aid. ________ ------------------ 520,471.74 National Recovery ____ , ______________ ,,_ 6,973,625.86
319,840 .53Cr. 200, 63!.21
98,429.52
7' 072,055.38
----------------
TOTALS ___ _ ______ .. _ .. _______ $10,385,321.45$ 135,094.4!Cr. $10,250,227.04
STATE FORCES
Convict Forces ______ , ... _______________ , __ $ 615.422.13$ 99,264.76 $ 7!4, 686.89
Asvhalt Forces ______________ ...... _. _______ _ 363,342.38 155,630.96Cr. 207' 7!!.42
Division Forces and Materials____________ _ !!8,180.81 22,003.20
140,184.01
----- -------1---
TOTALS .................................. $ 1.096,945.32$ 34,363.00Cr. $ 1.062,582.32
Total Allotments ........................... $!!,482,266.77 $ 169,457.4!Cr.l$!!,312,809.36
217
Schedule No. a
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ACTUAL CON STRUCTION ALLOTMENTS
BY COMMISSIONERS DISTRICTS JUNE 30, 1934
Distric~
No. 1, 2, 3,
1, 2, 3,
1, 2, 3,
i,
!,
3,
I Amount
CONSTRU CTION Beginning of Department to June
30, 1933
Southern CentraL __
Northern_
------ --- ----- - $ 45,099,763.46 - --------- ------- 39,788,179.25 ----------- --- ---- 43 '408 '665 .46
TotaL __ -----------
---
---r$
128,296,608.17
=====
CONSTRU CTION Beginning of Department to June
30, 1934
Southern ___ _-------------------$ 48,067,239.25 CentraL ___ _----------- ------- 44,459,537.09 Northern___ _-------------- ---- 47,082,641.19
TotaL __ ----------------
--$ 139,609,417.53
=====
CONSTRU CTION July 1, 1933 to J une 30, 1934
CONSTRUCTION REGULAR
S o u t h e r n __ CentraL ___
__--
---
---
---------- ----------------
$
Northern___ _-------------------
TotaL __ -------------------$
I
CONSTRUCTION NATIONAL RECOV ERY
CSoenuttrhaelr_n________-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_--_ $ Northern______________________ _
TotaL _____________________ $
680,909.05 2,298,128.67 1,261 '716.26 4,240,753.98
2,286,566.74 2,373,229.17 2,412,259.47 7,072,055.38
CONSTRUCTION TOTAL
1,
2,
--------------------------------------$
2,967,475.79 4,671,357.84
3,
3,673,975.73
TotaL _____________________ $ 11,312,809.36
218
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 16
SUMMARY OF ACTUAL CONSTRUCTION ALLOTMENTS, BY CONGRESSIONAL DISTRICTS (ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)
JUNE 30, 1934
District
Distr. of Total of
Allotments on Mileage Basis
Funds as Actually Allotted
Excess Allotment Over Mileage
Basis Distr.
Allotment Under Mileage Basis Distribution
CONSTRUCTION Beginning of Department to June 30, 1933
~!1:>No.~~~~~~~~~~~~~~~~~===$ ig;~1~;~~g:~~
i~;~~~;~ft~~
$
20,731.85 403,854.13
$-----------------------
3___________________
11,046,651.48
7 ,935,37'6.54
3,111,274.94
4___________________
9,309,850.36
9,964,556.45
654,706.09
5___________________
2,334,163.38
2,544,008.54
209,845.16
6___________________
9,998,505.62
8,786,047.16
1 ,212,458.46
7___________________
10,153,010.86
$
11,403,607.38
1,250,596.52
8___________________
11,358,051.59
9,000,583.50
2,357,468.09
9___________________
13,510,537.71
17,887,880.50
4,377,342.79
10___________________
9,824,491.57
8,626,887.71
1,197,603.86
11___________________
16,454,516.59
18,925,685.12
2,471,168.53
------------------------
12___________________
12.692,631.47
11,183,191.75
------------------------
1,509,439.72
Totals ____________ ~-$-==-,1-=-2=-8~-,-2=-9=-6-~,-6~-0-=8-=.-1=-7-==1= 1~-$=-=-1=-2=-8~-,2-=9-=6-~,-6=-0=-8=-.,-1-~-7-=-=-1=-==============!~======;,;~===~'~
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 16-Cont'd.
SUMMARY OF ACTUAL CONSTRUCTION ALLOTMENTS, BY CONGRESSIONAL DISTRICTS (ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)
JUNE 30, 1934:
District
Distr. of Total of Allotments on Mileage Basis
Funds as Actually Allotted
B:s:cess Allotment Over Mileage Basis Distr.
Allotment Under Mileage Basis Distribution
CONSTRUCTION Beginning of Department to June 30, 1934:
ii ~No. 1:1:) ~~===::::::::::::::= $
;+~~ ;~~:g~
$ ii ;~~g ;~g;:g~
$
100,850.66 12,962.28
$ ______________________ _
3___________________
11,977,130.31
8,623,585.93
3,353,544.38
4___________________
10,090,792.62
10,751,992.01
661,199.39
5___________________
2,554,413.40
2,792,006.35
237,592.95
6___________________
10,838,782.55
10,397,825.05
440,957.50
7___________________
11,017,342.87
12,469,670.20
1,452,327.33
8___________________
12,379,010.38
10,436,946.88
1,942,063.50
9___________________
14,769,407.99
18,692,612.17
3,923,204.18
10___________________
10,682,697.28
9,355,611.44
1,327,085.84
11___________________
17,911,578.98
19,828,231.34
1,916,652.36
12___________________
13,823,426.83
12,582,288.90
1,241,137.93
I-------------------I------------------I-----------------I-----------------
Totals____________ F$~~~1;;3:,;9~,6;;0:,;9~,4;;1~7;;.5;;3==+$~=::;;13;;9~,6::;;0;;9~,4;;1~7~.5;;3===I=--~-=--~-~-=--~-=--~-~-=--~-=--~-~-=--~-,I~-~-=--~-=--~-~-=--;;-;:,-=--~-=--;;-;:,--=-~--
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 16.
SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL DISTRICTS (ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)
JUNE 30, 1934
District
Distr. of Total of Allotments on Mileage Basis
Funds as Actually Allotted
Excess Allotment Over Mileage Basis Distr.
Allotment Under Mileage Basis Distribution
CONSTRUCTION-REGULAR
JULY 1, 1933 TO JUNE 30, 1934
.~....------------------------------------------------------------------------~-----------------
No. !_ __________________ $ 2 __________________ _ 3 __________________ _ 4 __________________ _
5 __________________ _ 6 __________________ _ 7 __________________ _ 8 __________________ _
9 __________________ _ 10 __________________ _
11 __________________ _ 12 __________________ _
343,541.62
$
387,685.78
348,706.84
292,821.28
82,324.88
314,720.51
323,967.31
382,817.60
472,024.54
321,791.96
546,338.51
424,013.15
241,977.81 105,128.82
135,091.16 295,090.74
14,738.83 910,836.75
539,049.57 534,671.69
313,417.93
156,559.45 219,856.50 774,334.73
$ _______________________ $
2,269.46 596,116.24 215,082.26 151,854.09
350,321.58
101,563.81 282,556.96 213,615.68
67,586.05
158,606.61 165,232.51 326,482.01
Totals __________ --,~$===4"=,2~4~0"=,7~5~3~9=8==,/~$~=~4~,2~4~0~,7~5~3=.9=8== ------------------------ ------------------------
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 16--Cont'd.
SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL DISTRICTS (ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)
JUNE 30, 1934
..
District
Distribution of Total of Allotments on Mileage Basis
Funds as Actually Allotted
Excess Allotment over Mileage Basis
Distribution
Allotment under Mileage Basis
Distribution
CONSTRUCTION-NATIONAL RECOVERY
JULY 1, 1933 TO JUNE 30, 1934
~----------------~-------------------------------------~----------------------------------
{1;)
No.!_ __________________ $
573,153.02
$
754,835.64
$
181,682.62
$______________________ _
2___________________
646,256.36
537,921.47
108,334.89
3___________________
581,771.99
553,118.23
28,653.76
4___________________
488,120.98
492,344.82
4,223.84
5___________________
137,925.14
233,258.98
95,333.84
6___________________
525,556.42
700,941.14
175,384.72
7___________________ 8___________________
540,364.70 638,141.19
527,013.25 901,691.69
263,550.50
13,351.45
9___________________
786,845.74
491,313.74
295,532.00
10___________________
536,413.75
572,164.28
35,750.53
11___________________
910,723.88
682,689.72
228,034.16
12___________________
706,782.21
624,762.42
82,019.79
1-------------------1-------------------
1 1 Totals ____________ ;$==~7~,0~7~2~,0~5~5;;3 ~8==, ~$~==7~,0=7=2~,0=5~5=.3=8== ------------------------ ------------------------
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 16-Cont'd.
SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL DISTRICTS (ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)
JUNE 30, 1934
District
Distribution of Total of Allotments on Mileage Basis
Funds as Actually Allotted
Excess Allotment
over Mileage Basis Distribution
Allotment under Mileage Basis
Distribution
CONSTRUCTION-TOTAL
JULY 1, 1933 TO JUNE 30, 1934
""~-------------------------------------------------------------------------------------------
No. L __________________ $
916,694.64
$
996,813.45
$
80,118.81
$ ______________________ _
2___________________
1,033,942.14
643,050.29
390,891.85
3___________________
930,478.83
688,209.39
242,269.44
4___________________
780,942.26
787,435.56
6,493.30
5__ ----------------6___________________
220,250.02 840,276.93
247,997.81 1,611,777.89
27,747.79 771,500.96
7___________________
864,332.01
1,066,062.82
201,730.81
8___________________
1,020,958.79
1,436,363.38
415,404.59
9___________________
1,258,870.28
804,731.67
454,138.61
10___________________
858,205.71
728,723.73
129,481.98
11___________________
1,457,062.39
902,546.22
554,516.17
12___________________
1,130,795.36
1,399,097.15
268,301.79
------------------------
1-------------------J------------------J-----------------
1 Totals ____________ ~$===1=1='3=1=2='8=09==3=6==,i=$===1=1=,3=1=2=,80=9=3. =6==oi,-=-=-=-=-=--=-=-=--=-=--=-=-=--=-=-=-=-I=-=-=--=-=--=-=-=-=-=--==-=-==-==-=--=-~--
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 16-Cont'd.
SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL DISTRICTS (ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)
JUNE 30, 1934
District
Distribution of Total of Allotments on Mileage Basis
Funds as Actually Allotted
Excess Allotment
over Mileage Basis Distribution
Allotment under Mileage Basis
Distribution
MAINTENANCE
JULY 1, 1933 TO JUNE 30, 1934
!\:) ~------------------------~-----------------
No. !_ __________________ $
2___________________ 3___________________ 4___________________ 5___________________ 6___________________ 7___________________ 8___________________
90,676.86
$
103,682.34
92,041.20
79,399.48
23,629.02
84,913.52
85,203.61
100,561.57
107,354.25
$
96,982.74
87,602.83
74,192.71
20,721.51
84,691.68
89,220.64
95,119.13
16,677.39 4,017.03
$______________________ _
6,699.60 4,438.37 5,206.77 2,907.51
221.84
5,442.44
9___________________ 10___________________
123,459.69 86,314.12
127,789.37 90,645.02
4,329.68 4,330.90
-----------------------,------------------------
1121______________________________________
111457,,390932..0988
112353,,264116..0518
------------------------1
9,937.93
-------
14,376.40
-
-
1 Totals____________ $----~~-1~-=1-3=-3~-=1~7-7=-=4~7~~~~-!l-$------1-,1-3_3_,1_7_7_.4_7__-=_-=_-=: 1~~~~~~~~~1==~~ ~ ~ ~ ~ ~ ~ ~ ~ ~- ~ ~-
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 16-Cont'd.
SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL DISTRICTS (ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)
JUNE 30, 1934
Distribution of Total
District
of Allotments on
Mileage Basis
_ _ _ _ _ _ _ __ -~~ -~-
..._
Funds as Actually Allotted
Excess Allotment over Mileage Basis
Distribution
RECONSTRUCTION
JULY 1, 1933 TO JUNE 30, 1934
Allotment under Mileage Basis Distribution
No. L __________________ ]$
2 __________________ , 3_ ___ _____________ __
4,178.52
1,$
4,777.84
4,241.39
6,167.77
1$
1,989.25
------------------------
260.92Cr .45Cr
!!-______________________________________________
5,038.76 4,241.84
4 __ ---------------5 __________________ , 6 ___________________ :
3,658.85 1,088.86 3,912.94
i
2,236.33
1------------------------
I
66.10Cr I__________________ ____
'r- __ __ ___ ____________ ______________________ __
1,422.52 1,154.96 3,912.94
g-___ __ 7-------------------~
~== -------~=-=-= --1
3,926.31
1
4,634.03
!
\!: : : _ :::1-----~-:~~r~_:!_! --- - -----------
5,689.21
'
__l
6,259.52 8 ,095 . 83
;::~~ ~ 6 1483 14 .......
2,333.21 3,461.80
t:7~9_3r.:9~3
1------------------------
I ______________________ __
~~~~~--~~-- '--~,_-=- ------------------------
Totals _____________ 1$ ==5=2~,218.51
j$ -=~~~~18.51==[--,-
~
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 16---Cont'd.
SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL DISTRICTS (ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)
JUNE 30, 1934
District
Distribution of Total of Allotments on Mileage Basis
Funds as Actually Allotted
Excess Allotment over Mileage Basis
Distribution
Allotment under Mileage Basis Distribution
SURVEY July 1, 1933 to June 30, 1934
No. L __________ $
2___________ 3___________
14,343.39
$
16,400.62
14,559.21
5,413.95
16,713.04 29,377.61
$-------------------- -- $ 312.42
14,818.40
4___________ 5___________
6___________
12,559.52 3,737.67
13,431.74
13,892.19 7,480.93
11,347.80
1,332.67 3,743.26
7___________
13,477.63
14,272.48
794.85
8___________
15,906.97
8,913.12
9___________
19,529.02
16,025.96
10___________
13,653.29
13,025.49
11___________
23,409.74
18,710.74
12___________
18,238.81
24,074.30
5,835.49
1-------------------1
Totals __________ 1 ;$====1~7~9~,2~4~7.:,::6~1==,l=$~===1:;:7~9~,2:,::4""7~.6;;1=========='=~===
8,929.44
2,083.94 6,993.85 3,503.06
627.80 4,699.00
---------
STATE HIGHWAY BOARD OF GEORGIA
Schedule No. 16-Cont'd.
SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL DISTRICTS (ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)
JUNE 30, 1934
-
District
Distribution of Total of Allotments on Mileage Basis
Funds as Actually Allotted
Excess Allotment
over Mileage Basis Distribution
Allotment under
Mileage Basis Distribution
--
TOTAL ALLOTMENTS
July 1, 1933 to June 30, 1934
_,{';)
{';)
No. L __ ------- $
2 ___
I
3 ___ 4 _______
-
~I
1 ,025 ,893.41 1,158,802.94 1,041,320.63
876,560.11
:$
~I 5--- ---
6_-----
248,705.57 942,535.13
87_-_-_-_--- ~~~I
966,939.56 1 ,142,061.36
9 ___
---
1,407,548.20
-I 10___
1L ______ ---
962,150.60 1,635,284.85
12 ___ -- -I
1,269,650.59
1,115,749.42 756,485.15 805,189.38 877,756.79 276,134.15
1,707,817.37 1,175,815.46 1 ,548 ,491.46
955,030.14 832,394.24 1,063,176.93 1 ,563 ,412.46
89,856.01
1$
--------------------
----------------
1,196.68
27,428.58 756,282.24
208,875.90 406,430.10
---------- -----
293,761.87
i-
---------------402,317.79 236,131.25
---------
----------------
----------
452,518.06 129,756.36 572,107.92
Totals_ ---- __ ,I$
I
12,677,452.95_~1!- - 12,677,452.95
I
--1
_I
,--
Schedule No. 16-Cont'd.
SUMMARY OF ACTUAL ALLOTMENTS BY CONGRESSIONAL DISTRICTS, (ALSO A COMPARISON WITH THE ALLOTMENTS DISTRIBUTED ON A MILEAGE BASIS)
JUNE 30, 1934
Other Allotments Undistributed
Administration_________________
____________ _____________________________________ $
253,223.67
Research_ _____________ _ ______
_____________ _____ ____________________________________
2 ,385 .17
Collection of Revenue_ _______ __________
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
41 ,812.11
Quarry_________________ ___________ _________________________ ____________________ ____________
940.21
Shop________________________________________________
_________ ______ ______________________
61.83Cr
Equipment______________________________________
_________ ______________________ ____
136,986.76
Motor Vehicle License Tags______________________ _________ __________ ______________ __ _________
51 ,648.20
------------------
Total Allotments-Exhibit "B" _____________ __________ ___ _______ __ __ __ ______ __ _ _ _. ____ $===13='=1=64='=3=87==2=4===
STATE HIGHWAY BOARD OF GEORGIA
ENGINEERING
STATE MILEAGE BY ENGEERING DIVISIONS AT JUNE 30, 1934
(Divisions reduced from 6 to 3 on October 1, 1933)
--
--
---------
Div.
No. of
Area Population Mileage at ] Mileage at
No. Count1es Sq. Miles 1930 Census July 1, 19331 June 30,
1934
- - - - - - --~---
1
56 I 22,916
846,415 2,928.969 I 3,040.165
2
51
19,561
894,135 2,869.8751 3,028.877
3
52
16,2481 1,167,956 2,699.4561 _:,807~76
Totals_ 159
58,7251
-
1934 over 1933=377.918 miles
2,908,506 8,498.300 I 8,876.218
-----
STATE MILEAGE BY CONGRESSIONAL DISTRICTS AT JUNE 30, 1934
--
Cong. No. of Dist. Counties
1
13
2
13
3
15
4
10
5
4
6
13
7
13
8
13
9
18
10
12
11
20
12
15
Totals_ 159
Area Population Mileage at Mileage at
Sq. Miles 1930 Census July 1, 1933 June 30,
1934
----
6396
260,291
689.786
709.409
5528
242,276 790.032
808.86 5
4563
189,719 700.120
716.21 3
3777
220,708
576.219 I 618.619
1140
422,206
163.010
194.100
3614
221,050 621.537
672.58 4
4366
262,219
653.277
671.41 7
4193
198,927: 780.105
800.05 5
5449
218,4961 939.198
951.89 8
4657
212,934 655.783
680.95 4
9465
248,290, 1,096.536 1,155.148
5557
211,3901 832.697
896.95 6
58,725
--~
2,908,5061 8,498.300 8,876.218
-----
1934 over 1933=377.918 miles
-------- -
---
STATE MILEAGE BY COMMISSIONERS DIVISIONS AT JUNE 30, 1934
---
Comm. No. of
Area Population Mileage at Mileage at
Div. Counties Sq. Miles 1930 Census July 1,1933 June 30,
1934
1
56
22,916
2
52
19,885
3
51
15,924
Totals_! 159
58,725 I
1004 over 1933=377.918 miles
894160,,4015591 1,152,032
2,908,5061
2,928.969
2,914.825 2,654.506
3,040 .165 3,090 .767 2,745 .286
~--
8,498.300 8,876 .218
229
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ROADWAY MILEAGE PLACED UNDER CONSTRUCTION
DURING THE Fl SCAL YEAR ENDING JUNE 30, 1934 NOTE: The Engineering Divisions were reducej from six to three and made to correspond with the Co.nmissioner's Districts on October 1. 1933.
Graded,Top
ProJ.
County
Com. Gong. Eng. Soil and
No.
Dist. Dist. Div. Sand Clay
----
1-AF Spalding. __ _ 2 6 1-AF Spalding ___ _ 2 6
4 Oconee_____ _ 3 8
"" 4 Walton.. _
8 3
1::3 15 Columbia ... 2 10 2
17 Wilkes___ _
3 8 3
20 CarrolL ____ _ 3 4 3
20 CarrolL ..... 3
3
21 Heard ______ _ 2
2
23 Forsyth_. ___ 3
3
23 Forsyth ____ _
3
28-AB Paulding__ __
3
28-AB Paulding___ _
3
28-AB Paulding__ __
7 3
29-A EmanueL .. .
12 2
29-E EmanueL .. . 2 12 2
29-E EmanueL.- 2 i 12 2 3D-A Cobb _______ _ 3
30-A Fulton ______ 3
30-B Cobb ....... - 3
1
Gravel, Chert and Selected Material
Macadam
Re-Surface
Surface
Treatment
on Miscellaneous Bases
Surface Treatment
on Lime Rock
Bituminous Mixtures
Bituminous Concrete
Cement Concrete
Brick
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ROADWAY MILEAGE PLACED UNDER CONSTRUCTION
DURING THE FISCAL YEAR ENDING JUNE 30, 1934
Surface
I
Graded, Top Gravel
Treatment Surface
Proj.
County
Com. Gong. Eng. Soil and
Chert and Macadam Re-Surface on Miscel- Treatment Bituminous Bituminous Cement
Brick
No.
Dist. Dis!. Div. Sand Clay Selected
laneous
on
Mixtures Concrete Concrete
Material
Bases Lirre Rock
------ -----1-----i---- -----!----:-----1-----1------1-----1----
52 Evans_______ l
l
l
52 BrYan_______ l
l
l
0.073 2.399
56 Gwinnett_ __ 3 9 3
11.626
61-C Wilkes_______ 3
8
3
0.702
64
tv
c....:.>..
64 68
80
84
84
Glynn _______ 1 ll
Glynn _______
ll
W a l t o n ______
8
Glynn _______
ll
W a l t o n ______
8
Walton ______ 3 8
l l
-----~:~~~-- :::::::::::: :::::::::: :::::::::::::: ::::::::::::1
i:~:~ :::::::::::: :::::::::::: :::::::::::: ::::::::::
3 ------------ ------------ ---------- -------------- ------------ ------------ ------------ ------------
0.864
l 3 3
:::::::::::: :::::::::::: :::::::::: ::::::::::::::
-----n~~-"1:::::~:~~~:: :::::::::::: :::::::::::: :::::::::::: ::::::::::
88-A Brooks ______ l ll
l
1 ------------ ------------ ---------- -------------- ____________ _____ ------- ------------ ------------
1.701
-~ ~ ~- 88-A Brooks______ l ll
l
93 UI>Son _______ 96-B Floyd________ 102 Cobb ________
2 3 3
6
2 3 3
:::::::::j ::::::::::::
::::::::::
::::::::::::::
::::::::::}:::::::::::
::::::::::::' ::::::::::::
-
-
0.289
115-A Chattooga __ 3
7
3 ------------ ------------ ---------- --------------
0.284 ------------ ------------ ------------ ------------ ----------
115-B Chattooga __ 3
7
3 ------------ ------------ ---------- --------------
4.726 ------------ ------------ ------------ ------------ ----------
129 129 134
Clarke_______ C l a r k e _______ C o w e t a ______
3 3 2
8 8 4
3 3
:::::::::::: :::::;:~~~:: :::::::::: :::::::::::::: :::::::::::: ::::::::::::1:::::::::::: :::::::::::: -----~:;~;__ ::::::::::
STATE HIGHWAY BOARD OF GEORGIA
SUMMARY OF ROADWAY MILEAGE PLACED UNDER CONSTRUCTION
DURING THE FISCAL YEAR ENDING JUNE 30, 1934
Proj. No.
County
1
I
,
'IGraded,Top I Gravel, I
I ,
I ; Surface 1
I Treatment 1 Surface
Com. 1Cong.IEng. 1 Soil and
I Chert and Macadam Re-Surface on Miscel- I Treatment Bituminous Bituminous
'"' I ""I "' i ""' '"' ! :;;;:,~
' 1
I . ;:::; u.:~""l "' ! '""""'
= Cement
Brick
'"~""'
-----~----
l4Q-B !Hancock____
154-A IWayne ... ____
154-A Wayn8------ _
158 !Twiggs ______
159-B Miller_- __ . ___
""w 164-A 164-B
Macon Macon _______
"" 164-B Macon __
165
!Polk. __ ~---
171-B :Olay ________
171-B Clay__
171-D Calhoun ____
171-D Oslhoun ____ 179-A Greene _______ ,
179-B Greene ______ l 179-B ,Greene ______
179-B !Morgan_~---:
186-A !Johnson ____
186-A !Johnson ____ i
192-B IBibb. -----
12 2 3 2 I 2 I 3
2 I 8
3 3 2 12
12
6.896
------------
1.961--I---- _:1-::::::_:::I_- ~:~~~ !-- ::::::I::_::::::::: :::::::::::!:::::::::::::!::::::::::
2.013 'I____
'
2.978
0.965
1 ________________________ ' ____________ -------
--
0.888 :--_::::-:::r:::::::::-1 i:~~i :::::::::::r::::::::: ::_::::::::: :::::::::::: ::::::::::
1_-_-_::o:c9i- :()95--I::::::::::::I:::::::::::: ::::::::::::!:::::::::: --- __
1
1 : _ : _ : _ - _ -_ - _ - - _ _ - : : : : _ . _ : : : _ - :__ -__ : _ : _ : _ - _ -
0.164
---.- ()
_
1.508
______
_ _____________________________ _
-------- 1----------- 1--
0.089 1----------
1
1
1
1
Proj.
County
~-1----
194-A 'Fayette._. __ ,
194-A :Fayette.. ____ I
194-B jFayette .. _..
207-C !Chatham __ _
IHal ________ _ ~ 218 IPolk. _______ _
CJJ 220-D
221 :Houston __ ._
12
226-B ;Liberty_ ---236 Jenkins ____ _
241-A jHancock ___ _
10
241-C Hancock ....
lO
243 'I Houston. ___ '
12
2~6-AB Appling ____ _
ll
2o6-AB Applmg ____ _
ll
256-B :Appling____ _
ll
258-A Clayton ____ _
6
258-C 'Fulton ________ 258-C DeKalb ..... 264 [EarlY-------
1
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ROADWAY Ml LEAGE PLACED UNDER CONSTRUCTION
DURING THE FISCAL YEAR ENDING JUNE 30, 1934
3.005 0.216 1.268
0.092 3.308 4.931
6.487
0.815 ~---------0.500 ----------
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ROADWAY MILEAGE PLACED UNDER CONSTRUCTION
DURING THE FISCAL YEAR ENDING JUNE 30, 1934
I
Graded,Top Gravel,
Surface Treatment
Surface
Proj.
County
No. I
Com. 11 Cong. Eng. Soil and Chert and Macadam Re-Surface I on Miscel- rreatment Bituminous Bituminous Cement
Dis!. Dis!..I Div. Sand Clay Select~d
llaneous
on
Mixtures Concrete Concrete
Brick
~--,~1~-;;-~=!---;,-'-~--2-1~~~-~~-M~a-ter~ia~l i
-------- ~-----
Ba~es
Lime Rock
13.527
'+---- - 279-A Cook........ , l ll
l
--~
23 . 000000
II
-
Cook........
ll
Chatham....
:.: ...... .
295 'Wilkes......
1
~ 296-A McDuffie... .
2
"'" 296-A IMcDuffie... .
2
296-B McDuffie ____ ,
2
296-B McDuffie... .
296-C IMcDuffie... .
lO
296-C Wilkes ...... . 1
8
297 Clay. _______ _
3
299 [Pulaski.. ... .
12
. ...
0.347 .
304 ;Haralson....
309-A !Wayne .....
ll
311-A Elbert. ______ ,
316 Early_ .. ___ ._
317-BC /Lumpkin ....
1
1
318 [Chatham.... I
0.808
324-B ]Troup_______ ]
4
l
--------------
STATE HIGHWAY BOARD OF GEORGIA
SUMMAhY OF ROADWAY MILEAGE PLACED UNDER CONSTRUCTION
DURING THE FISCAL YEAR ENDING JUNE 30, 1934
I Graded ,Top I Gravel,
I
) 1
1
T~:::~~ent
[
Surface I
I
Proj.
County
No.
~~~~[Troup
I Carr.. Cong. Eng. I So1l and 1 Chert and
Dit. Dis!. Div. 1 Sand Clay Selected
Macadam Re-Surface on Miscel- ! Treatment [ Bituminous , Bituminous 1 llaneous 1 on 1 Mixtures Concrete
-_-_- -:=:-_- Material
Bases I Lime Rock I
1---.;- ~2
--2~1 ===--r---_- --r'--_- -___-~-___--__-__-_-__--_ -___-__- __-_
r
341-A B2ldwin ___ _ 341-A Baldwin____ _ 343-AB Randolph __ _ 343-AB Randolph__ _ 347-B Webster. __ _ 3-17-B Webster ____ _ 351 ,Franklin____ 1
li10
2 I : : :::::::]
I ::::7_4;;::r
- - _---1_--__:___ ::------_-_,1:_: __ -_-_-_- __-_ I
4.038
3
i:aaa 1:::__ _
~:~~~
r-:J
357 :Lowndes ___ _
u
I ll.5oo
36Q-D r'Warren _____ _
10
360-D Warren _____ _
10
369-A !Toombs ____ _
12
369-A [Toombs _____ !
12
::::::::::::]
1.::: 0.895
1.430
369-B Toombs ____ _
12
0.532 i ----------- --
36~-B !Toombs ____ _ 369-B. Toombs __ ... 371-AB Cobb _______ _
386 Talbot. ____ _ 386 Talbot. ____ _ 387-A Burke. _____ _
12 12
4 4 1
1 , ~ :~.1 ::0.460 _--_-_-_-_-_-__-_--_:-_1---_-_-_
-:'-----------------------['------------
-1
--
-------------~----------~-----
Cement Concrete
Brick
1---
1
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ROADWAY Ml LEAGE PLACED UNDER CONSTRUCTION
DURING THE FISCAL YEAR ENDING JUNE 30, 1934
Surface
Proj.
County
Graded,Top Gravel,
I Com. Cong. Eng. Soil and Chert and I Macadam
Treatment Surface
Re-Surface I on Miscel- Treatment Bituminous Bituminous
Cement
Brick
No.
Dist. Dist. Div. Sand Clay Selected
laneous
on
Mixtures Concrete Concrete
Material
Bases Lime Rock
- - - - - - - - ~-- - - - - - - - - - - - - - - - - - ) - - - - 1 - - - - - - - - - - - - - - - . - - - - - - - - - - - - - -
387-E Burke _______ 2
2
387-E Burke_ .. ____ 2
2
389-B Fulton ______ 3 5 3
396-D [Crawford.... 2 6 2
390-D Crawford.... 2 6 2
~ 401-B Houston_____ 2 12
2
a> 401-C Houston .. __ 2 12 2
403-A Tift__ ________ l
2 1
403-B Berrien.. -- __ l ll 403-B Berrien______ 1 ll 406-C Coweta______ 2 4 2
406-C Coweta .. ____ 2 408-D Stewart. ____ 1
4 2
3' 1
408-D Stewart _____ 1 3 1 409-A Putnam_____ 2 8 2
409-B Jones-------- 2 6 2
409-C Putnam _____ 2 8
409-D Putnam _____
2.259
409-D Jones ________
1
409-F !Jones--------
------------1------------
10.200
1.920 ------------ -----------, ----------- ---------3.593 ------------ ------------~------------ ----------
~:~~: 1::::::::::::1::::::::::::::::::::::::: ::::::::::
STATE HIGHWAY BOARD OF GEORGIA
SUMMARY Of ROADWAY MILEAGE PLACED UNDER CONSTRUCTION
DURING THE FISCAL YEAR ENDING JUNE 30, 1934
Surface
Graded,Top Gravel,
Treatment Surface
Proj,
County
Com. Cong. Eng. Soil and
Chert and Macadam Re-Surface on Miscel- Treatment Bituminous Bituminous Cement
Brick
No.
Dis!. Dist. Div. Sand Clay Selected
laneous
on
Mixtures Concrete Concrete
--------
Material
Bases
Lime Rock
41Q-A Atkinson____
4lo-D Berrien ______
Tl H-1-T:::::::::::: ::::::::::~:::::::::::: :::::::::::: :::::~:~~~:: -----~:~~-- :::::::::::::::::::::::: :::::::::::: :::::::::: 41Q-G Atkinson.___
410-I Ware _________
l
ll I ------------ ------------ ------------ ------------ ------------
4.499 ------------ ------------ ------------ ----------
412-B Telfair
i w1\:) 412-B Telfair ______
~
i;
1-----~:~~~-- :::::::::::: :::::::::::: :::::::::::: :::::::::::: ~:~!~ :::::::::::: :::::::::::: :::::;:~;~:: ::::::::::
: : : : : -'1 418-0 418-D 424-B 428-0
Lamar _______
Lamar...... P o l k _________ Bryan _______
~
6
~ [:-~:~~~:: :::~:~~~::~~ :~~~~~:~~~~~ ~~:~~~~~~~~: :~~~~~:~;~~~ :::::~~~i~::l:~~~~~~~~~~~ :~~~~~~~~~~~ -----~:~~~--
433-A Haralson __ -- 3
3 ----------- ------------ ------------ ----------- ------------ ------------ ------------ ------------ 0.381
433-A Haralson... 3
3 ------------ ------------ ------------ ------------ ____________ ,____________ ------------ ------------ 0.619
433-B 433-B 439-B 443-A 443-A 443-B 446-A 446-A
H a r a l s o n ____ H a r a l s o n ____ Baldwin _____
Jasper------ Jasper..... J a s p e r. . . . . . . Wilkinson ... Wilkinson ___
!3 7
~ i~j
: :- _: : :: :_ : .: : :-: -' :il : ;;"-: - -I _: _-_ :-.: ~': .:::::: 3 ------------ ----------- ------------ ------------ ------------'------------ ------------ ------------
2.999 ----------
i ::: _
::::::::::::11::: ::::: : :::: : : : : :: iill t : ll:::::::::j:::::::::::: ::::::::::
I
I
I
-I
.
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ROADWAY MILEAGE PLACED UNDER CONSTRUCTION
DURING THE Fl SCAL YEAR ENDING JUNE 30, 1934
I I
I
I
I f
I 1Graded,Top , Gravel, I
I
I ITreSautmrfaecnet
Surface
I
Proj. I' County
Com. Gong. Eng. Soil and
I Chert and Macadam Re-Surface 1 on Miscel- Treatment Bituminous Bituminous Cement
Brick
No.
Dist. Dist. Div. Sand Clay Selected
I
laneous
on
Mixtures Concrete Concrete
~~;~;-I-~;~~_n_________ ,
__ Materi_~_l _1'--'=im_"~o~l--- __
_ _ _ _ _ _ __
_ _ _ _ _ _ _ _ _ _ _ Base_s
_ _ _ _ 1 - - - - - [ _-_ -_______ _
11 11
o 490
I
/ .: J__ - - - !~E~ ~=:-:::: ~ 1
:-r --1- 1.079 I -- : . - [: ---J-:::~-~~!-f ~-::-:::: __:_:---
~ m~i ~im~~~~::l + . I ~ ~,,1 3
-:1 : i
. :: i :
47D-A Laurens_____
12
470-A Laurens _____
12
I ___
47D-0 Wilkinson ___
10
470-0 Wilkinson_
10
471-B Warren ______ I
10
:I
477-B rPutnam _____
477-C !Morgan _____
I
477-C Morgan _____ 3
I
479-A Heard _______ 2
483-A 483-A
1MMaaddiissoonn
_____ _____
l
3 3
483-B !Madison _____ ; 3
I
I
I
I
.. I
iffi I ...... ....... ... ....
!
l:lj 1"_:_",_. 1_.-_-._:_-:_~: 1
I .,,
1 . 1 . . . ' ' "
!
)
1 1 I t~r: ! ~~
STATE HIGHWAY BOARD OF GEORGIA
SUMMARY OF ROADWAY MILEAGE PLACED UNDER CONSTRUCTION
DURING THE FISCAL YEAR ENDING JUNE 30, 1934
=======-"=====~=---~
I I I
iEng.l Proj.
County
Com. ICong.
Graded,Top Gravel, Soil and Chert and [Macadam
No.
Dist. Dis!. I1 Div. Sand Clay Selected I
Re-Surface
Surface Treatment on Miscel-
laneous
---- ------------------
I
J
Surface
I[Treatment [Bituminous Bituminous Cement
on
Mixtures Concrete Concrete
Brick
1 1
Material
Bases Lime Rock I
--~--~~- - - ; - -~- ~3-~~~~-~-~--~~--~---~~~--~- -~~- ~---- -~--- ~~~ ~~-- ~~483-D lEibert_ ______ 483-D Madison _____
486-A ITattnaJL ___
]
492 DooJy _______ 2
492 DooJy _______ 2
"""" 493-A iHenry _______
"' 493-A Henry_______
3 3
,;
1/
494-A Irwin ________ l
1... .8.112 :~: 1
494-A Irwin ________ 1 u
495-A Quitman ____ 496-A IGwinnett ___ 496-B GwinnetL .. 3 9 496-0 IGwinnett ___ 3 9
i 1
1
j::::::::::_:~------;;:~~2
-~1
: - ~---- -I -- o--.-375--
r:::::;:~~~::l ____;:~5~--~ : - --1 -----::1:--- 1.
: :: 1
--~- _:::::::r_::::_-::1 :::::::::
196-D 497 499-B 500 501-B 502 502
Gwinnett- .. Newton _____ Pulaski _____
Worth----FloYd.------Long ________
TattnaJ]__ ___
3 3
9
12 2 7 1 l
~;: ;~;!~ "~ 11~ ; 11: i...i
. !-:
I
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ROADWAY Ml LEAGE PLACED UNDER CONSTRUCTION
DURING THE FISCAL YEAR ENDING JUNE 30, 1934
Brick
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ROADWAY Ml LEAGE PLACED UNDER CONSTRUCTION
DURING THE FISCAL YEAR ENDING JUNE 30, 1934
Graded, Top Gravel,
Proj.
County
Com. Cong. Eng. Soil and Chert and
No.
Dis!. Dis!. Div. Sand Clay Selected
1 -;9-A .Emanuel= ~-2-~-;- ~-2-
579-B Treutlen~ ~-- 2 12
2 I
4.114 11.195
Material
592
1 Sumter~-----
1
1 3
1 I
593cA ]Burke_______ 2 1
593-B Burke. _____ _
s:e 616 TrOUP----~--
4
,_. 617 ITrouP------~
696-A Gilmer_ ____ _
696-B ,Murray_____ _
I
~~~~~~:83~~~1 3.417
4.439 1 0.196
12.981 1 11.765
706-A 706-B
755-A 786 788
793 796
!EmanueL __ _ Trelltlen __ _
Banks~-----~ Bryan_--~
Heard ______ _
Screven __ _ !Burke ______ _
12 12
n~~
1
I~~~~~~""~.1~
....
6~~~/I
1.315
I~:::::~:::::1-- -------1
800~B Morgan __ ~ _~
I
____
1.263
804 Peach ___ --~-
12
817-B Meriwether__
1:::::::: 13.772
2.007
820-A Johnson
12
0.594 1---
Macadam
Surface
Treatment Surface
Re-Surface on Miscel- Treatment Bituminous Bituminous Cement
Brick
laneous
on
Mixtures Concrete Concrete
Bases LimeRock
-------1----1----1------------
I
~~~~~~~~~~~~~~~---------------~-
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ROADWAY Ml LEAGE PLACED UNDER CONSTRUCTION
DURING THE FISCAL YEAR ENDING JUNE 30, 1934
Graded, Top Gravel,
'
Surface Treatment
I 1
Surface
' 1
-- ----- 'I -------- Proj.
County
Com. Cong. Eng. Soil and Chert and I Macadam Re-Surface on Miscel- Treatment Bituminous 1 Bituminous Cement
Brick
No.
Dis!. Dis! Div. Sand Clay Selected I
laneous
on
Mixtures Concrete Concrete
~---r-~~~~~ -~,~-- ~~~~ -~ ~~M-aterial -~~~~-
-~ Base- s -Li-me~Roc-k -~~~~- 1 -~-~-r---~~-l~~~-~
88~243 o
Emanuel -!Dodge___
2 12 2 12
2 2
r_-_____-_____-T:_
2.010 _I__-__-_ -----1 -
-
- - __- --------.. --
- I- -
1.412
--1' --- ---- ------
---
--[
-- -- ----
828-A Wheel~~::
832-A /Jeff Da lS
1 12 ll
1 j ------3-.-8-0-3--1 --
-~---- -----1 --
-[-- ----- --- 1 - ------1- --'
3.000 1-----
-- 1-
____ ,__ __
1\:l 835 Heard _____ I
4
,.. 836 Banks
I
9
"" 839-A ,Gordon .
8~3~9;--Bo !~B~~a~rt\o~wso~__--_~
1~7
~;~=~ lg~~:~~ - ~
I
4.194
___
-1
I
,
-----~
I - ---~ z.oc6
I
I 1.380 I 1.607
4.874
j
__ _
.. -.--
!
1
-+1
I
I
--
--1-
I -------1
I
: 1----
-1:: :r::
J
1-- :::::1:::
--1-- ---
861 ,Jefferson
~~~=~ ~~~~~;u-
2 10 1
I I I
7.417 1-
I
-~-
_ _ __
_
__
1
------- ,__ __
901 Jones
6
_ 8.600
1 .
----------1
90j-E Echols.
ll
905-F Clinch.
ll
-- --- -
1
1
j
932-D ,Wilcox_______
12
939-0 !IWilkinson.__
1G
._
4. 779 ,
1-
1
-- i I - - - - - - - - - - - -
i-
1
1
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ROADWAY Ml LEAGE PLACED UNDER CONSTRUCTION
DURING THE FISCAL YEAR ENDING JUNE 30, 1934
Surface
Proj.
County
Graded, Top Gravel, Com. Cong. Eng. Soil and Chert and
Treatment Surface
I Macadam Re-Surface on Miscel- Treatment Bituminous Bituminous
Cement
Brick
No.
Dist. Dist. Div. Sand Clay Selected
laneous
on
Mixtures Concrete Concrete
-~2-1--;-- --~- -------
942-D Johnson.
--;-/
5.081
Material
- ~--~~~~-~ -L-i~~-~~~~ I~~~~~~~~~=~:~=~~----~
944-B Bleckley_
2 12
944-C Dodge_______ 2 12
9H-D Twiggs __ - - -- 2 1~
2
1.152
---- ------------ ------------ ------------1
I 2
0.876 ------------
- ------------ ------------ ------------ -------- ---
2
5.568 ___
_ __________________________________________________________ _
------------
970-A Monroe... __ -
5.326
....1\:) 970-B !Monroe______
C;j 974-B Btltts________
2
981 Dawson _____ 3
991-C Chattooga __ 3
998-C Fannin ______ 3
1002-A Worth _______
!~ I1::::::":_'_"_
,2i I I. I
I ' '"" I
4.998 ------- . -
----- ::::: _____ '
3.181 3.283
1003-B Candler_____ 2 1 2
4.049 ! ____________ -
1013 Effingham .. 2 1 1016-B Cook ________ 1 11
102l"B Schley_- .. __ - 2 3 1022 Jenkins. ____ 2 1
2
3.844 ------------ ------------ ------------
1 ------------
7.676
1025-A Pulaski.. .... 2 12
1025-C Houston .... 2 12 1032-A Tift _______ --- 1 2
1032-B Berrien.. __ -- 1 11
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ROADWAY MILEAGE PLACED UNDER CONSTRUCTION
DURING THE FISCAL YEAR ENDING JUNE 30, 1934
Proj, No.
County
Com. Cong Dist. Dist.
Graded, Top Eng. Soil and Div. San~ Clay
Gravel, Chert and Selected Material
Macadarr
Re-Surface
Surface Treatment on Miscel-
laneous Bases
Surface Treatment
on Lime Rock
Bituminous Bituminous Mixtures Concrete
Cement Concrete
Brick
ro33-A ;herokee______3___9_-;---~.607-1===
_____________________________________________ ~=======
i~!:=! ~~~:~;;:::: I 3 i ;:~~~ ~- -- ----- _::::::::::: ::::::::::: ::::::::::: -_:::::::::: _::::::_:::: ::::::::::: ::::::::::: ::::::::::
1044 Lincoln
10 3
3.405 ___________ _! ____________ ------------ ------------ ------------ ------------ ------------ ------------ ----------
1045-A Crawford____ ~ 1053-A Lanier.______
6 2 11 l
1.898
__ ------------ ------------ ------------ ____________ ------------ ------------ ------------ ________ __ 1.780 ------------ ------------ ------------ ------------ _----------- ------------ ------------ ----------
""' 1057-B Thomas_____
2
I ____________
3.314 ------------ ------------ ------------ ------------ ------------ ------------ ------------ ________ __
1065-B Macon_______
3 2
8.979 ------------ ------------ ------------ ------------ _________ _,_ ------------ ------------ ------------ ----------
1069-B Brantley____ I II
I ------------
3.735 ------------ ------------ ------------ ------------ ------------------------------------ ----------
mh H : : : : : : g~~Et::::: ~
2 ~:~~~_t:::::::::: ::::::::::::~_::::::::::: -----~:~:~--
:::::::::~ 1
:::::::::::: :::::::::::: ::::::::::::
1086 Clayton_____ 3 6
1096 CarrolL____ 3 4
z 1097-A Taylor___ __
3
1~m ~!~:~~~::: ~ :~
~;~~-A ~~:~~~~:::: : ~
0.843 [____________ ------------ ------------ ------------ ----------- ____________ ------------ ------------ ----------
:::::::::::r:::::::::: :::::::::: 1.157 ------------
1.1.57 ------------
1.157 ------------ ---------- ------------ ____________ ----------
1 5.694 ------------ ------------ ------------ ----------- ----------- ::::::::::::
2
~:~~; :::::~:~~~:: 1_____
__
:::::::::::: :::::::::::: -::::::::::: ::::::::::::,:::::::::::: :::::::::::: :::::::::::: ::::::::::
: ----i:i:i6--r-----~:~~:- ::::::::::::[:::::::::::: :::::::::::: :::::::::::r::::::::::l:::::::::::: :::::::::::r::::::::
1
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF ROADWAY MILEAGE PLACED UNDER CONSTRUCTION
DURING THE FISCAL YEAR ENDING JUNE 30, 1934
Surface 1
Graded, Top Gravel,
Treatment Surface
Proj.
County
Com. Cong. Eng. Soil and Chert and Macadam Re-Surface on Miscel.. Treatment Bituminous Bituminous Cement
Brick
No.
Dis!. Dist. Div. Sand Clay Selected
laneous
on
Mixtures Concrete Concrete
Material
Bases Lime Rock
---1---- ------1----1----1------1-----1----
I508-B Cherokee....
9 3
I5IO-A Montgomery 1514 Tift__________ l5I6-A Upson _______
IZ 1 2 1 6 2
I521-A Ben HilL ___ ~ I524-A Turner ______ 01 1528 Dougherty __
3 I 3 I 2 1
I530-A TerrelL.....
3
1533-A Laurens_____ 2 12
I546-A Newton _____ 3
3
1550 Habersham. 3 9 3
:.:.: _ _:_:_:_:_:_:_: 1.400
1.649 -----------~~~ ~__:___=
==-~ ~::____:~~::__1' -~~-
TOTALS ..
260.638 165.762
26.373
47.333 224.065
74.521
30.795
15.653 I26.926 0.209
A TOTAL OF 334 PROJECTS COVERING 972.355 MILES OF ROADWAY WAS PUT UNDER CONSTRUCTION DURING THIS PERIOD.
STATE HIGHWAY BOARD OF GEORGIA
ROADWAY MILEAGE PLACED UNDER CONSTRUCTION BY ENGINEERING DIVISIONS AND COMMISSIONERS DISTRICTS
DURING FISCAL YEAR ENDING JUNE 30, 1934.
Note: The Engineering Divisions were reduced from Six to Three and made to correspond with the Commissioners Districts on October 1, 1933.
Number of
Projects
Type of Road
-----
I
...1\:)
85
IGraded Earth, Top Soil and Sand Clay_
0>
49
~ravel, Chert and Selected MateriaL __
ll
:r.~acadam_ _______________ _____________
9
'Resurface_ - -- --
----------
66
'Surface Treatment on Misc'l. Bases____
44
Surface Treatment on Lime Rock Bases
10
Bituminous Mixtures ___
3
Bituminous Concrete_______
56
Cement Concrete__
___1_ _1Brick_____
-------
334
TOTALS ____
I
---- I
Division and District One (Miles)
Division and District
Two (Miles)
Division and District
Three (Miles)
Total (Miles)
--------
56.283 87.630 0.000 16.500 78.916 30.920 0.000 0.000 3.291 0.000
273.540
133.922
70.433
52.670
25.462
11.019
15.354
16.423
14.410
73.569
71.580
43.601
0.000
14.459
16.336
4.896
10.757
68.165
55.470
_ _ _ _ _0_.00_0_ _ _ , _ _ _ _0_.28_9 _ _ _ ,
418.724
280.091
260.638 165.762 26.373 47.333 224.065
74.521 30.795 15.653 126.926
0.289
972.355
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ____.
STATE HIGHWAY BOARD OF GEORGIA ROADWAY MILEAGE PLACED UNDER CONSTRUCTION BY CONGRESSIONAL DISTRICTS
DURING FISCAL YEAR ENDING JUNE 30, 1934
Num bor of Pro jocts
TYPE OF ROAD
Cong. Dist.
Con g. Dist.
Con g. Dis!.
Cong. Cong
I Cong. Cong. Cong. Cong. Cong. Cong.
Dist. Dist. Dist. Dis!. Dist. Dist. Dist. Dist.
Con g. Dist.
Tot I
One Two Three Four Five
Six Seven Eight Nine Ten Eleven Twelve (Miles)
(Miles) (Miles) (Miles) (Miles) (Miles) (Miles) (Miles) (Miles) (Miles) (Miles) (Miles) (Miles)
- - - - - - - - - - - - - ~~-.---
~~----
~~-
~~-
~~-
~~-
85 Graded Earth. Top Soil and Sand Clay_ 18.524 14.911 34.650 30.655 3.400 9.446 22.258 17.194 24.435 8.632 11.846 64.687 260.638
49 Gravel. Chert and Selected MateriaL .. __ 21.866 19.764 25.980 11.150 0.000 0.000 4.301 7.550 13.611 16.204 23.804 21.532 165.762
11 Macadam---------------------------------- 0.000 0.000 0.000 12.176 2.815 0.000 7.353 1.000 3.029 0.000 0.000 0.000 26.373
1 9
66
~~~~~a~~~;t~~;;t-~~--Mi~~-~ ~~-~~~-~~-----
0.000 I 0.000
0.000
0.000
0.000
0.000
2.784
0.000 11.626 I
0.000 16.500 16.423 47.333
Bases.------------------------------------125.916! 38.630 12.093 15.412 0.000 28.733 10.035 40.580 12.426 18.060 11.259 i 10.921 224.065
44 Surface Treatment on Lime Rock Bases I 4.350 8.455 9.516 0.000 0.000 13.460 0.000 9.044 0.000 3.630 17.987 8.079 74.521
10 Bituminous Mixtures ___ --------
-- 10.218 0.000 0.000 4.241 0.000 0.000 4.786 0.702 10.848 0.000 0.000 0.000 30.795
3 Bituminous Concrete.. _ -- ------- -----
o .ooo o .ooo 1 0.000 0.000 0.000 0.000 I 0.000 I 15.653 0.000 o.oco 0.000 o.coo 15.653
56 Cement Concrete____ ---------------
_ o.845 o.ooo 1 0.000 4.217 3.860 49.402 23.322]18.831 I 2.715 7.036 2.446 14.252 126.926
1 Brick............. ---- - --------
---
I 0.000 I 0.000 I 0.000 0.000 0.000 0.000 0.289 0.000 0.000 0.000 0.000 0.000 0.289
-------~~-
- - --~- ' --~-
-~ ---~---
334
TOTALS __________________________ --- - 81.719 81.760 82.239 77.851 10.075 1101.041 175.1281110.554 78.690 53.562 83.842 1135.8941972.355
Proj. 470-A. Laurens County- Concrete Pavement
Proj. 506. Bleckley County- Surface Treatment on Limerock Base
Proj. 403-A. Tift County- Surface Treatment on Pebble Soil Base
Proj . 424-B. Polk County- Concrete Pavement
Proj. 264. Early County- Surface Treatment on Limerock Base
Proj. 424-B. Polk County- Concrete Pavement
Proj. 369. Toombs County- Surface Treatment on Pebble Soil Base
Proj. 409-F. Jones County- Concrete Pavement
Proj. 409. Putnam County- Surface Treatment on Limerock Base
Proj. 612-B. Schley County- Surface Treatment on Limerock Base Proj. 296-B. McDuffie County- Surface Treatment on Gravel Base
with Concrete Pavement in Background
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF BRIDGES COMPLETED DURING THE FISCAL YEAR
ENDING JUNE 30, 1934 NOTE: The Engineering Divisions were reduced from Six to Three and made to correspond with the Commissioners Districts on October l. 1933.
Project No.
County
4 15 17 29-A 29-D 64 87 115-A 179-C 226-B 211-A 241-A 264 273-A 296-A 386 389-B 390-A 409-G 410-G 412-C 424-B 421-S
Walton._ Columbia Wilkes .. Emanuel Emanuel Glynn __
Haralson. Chattooga Greene ancl Morg "n Liberty_ Hancock Hancock_ Early ________ _
Talbot __
McDuffie Talbot Fulton_ Crawford __ Jones._ Atkinson ___ _
Telfair and Wheeler Polk __ I Polk __
Comm. Cong. Eng. No. of Concrete
!
I Timber,I-Beams
CiJncrete 1 and Concrete
I
I
Timber ! Concrete Bridge '
Totals
Dist. Dist. Div.
(Lin. Ft.) and 1-Beams!
Floors
I Lin. Ft.)
Culverts 1 (Lin. Ft.)
llin. Ft.)
(Lin. Ft.J
(Lin. Ft.) I
!-
46 .u
46.0
10
212.0
212.0
200.0
200.0
1.8
(3) 7-10.0
1832.0
12
22.0
22.0
ll
120.0
120.0
127.0
427.0
82.0
82.0
1595.0
1595.0
48.0
48.0
10
23.0
23.0
10
100.0
100.0
136.0
lO
360.0
90.0
72.0
22.0
256.0
11
24.0
12
958.0
174.0
174.0
!
30.0
30.0
Project No.
County
STATE HIGHWAY BOARD OF GEORGIA
SUMMARY OF BRIDGES COMPLETED DURING THE FISCAL YEAR ENDING JUNE 30, 1934.
853-A
859-B
862
""c:;n
00
942-D 944-B
988-0
1018-B
1022-A
1028-A
1044
1098
1504-A
1508-B
Totals (Lin. Ft.)
120.0 35.0 107.0 160.0 32.0 100.0 360.0 32.0 160.0 193.0 22.0 470.0 250.0 749.0 160.0 130.0
1C.C09.0
STATE HIGHWAY BOARD OF GEORGIA
BRIDGE MILEAGE COMPLETED BY ENGINEERING DIVISIONS AND COMMISSIONERS DISTRICTS DURING FISCAL YEAR ENDING JUNE 30, 1934.
======. ----
Number
Division I Division ! Division
of
Typo of Stmotmo
I
Ono
I
Two
I
Tlu"
Total
__Bri:g~-~ Concrete ____ -- ---------------------- -----:~0::-- -~1 ---- -:~~~-----j----~~~--~---~-~~-:-:---
3
Concrete and !-beams ________________ :
0.000
0.139
I
0.025
j
0.164
2~ i~~~:~:~bea-~~,con~r~t~f-1~~r~~~~~~~~~ 1
g:i!~ I
I g:6~~
g:86~
1
6:~~i
16
Concrete bridge culverts _____ --------1
0.046
1
0.023
1
0.027
I
0.096
"' ___5_5___
Total Constructed _________ ------~
0.507
I
0.776
~- -- 0.612
1.895
g ------------ ---------
----'-
BRIDGE MILEAGE COMPLETED BY CONGRESSIONAL DISTRICTS
DURING FISCAL YEAR ENDING JUNE 30, 1934
. - - - - - - ~-====---
Congressional Districts
Number of Bndges
T pe of Structure Y
~-~:-~-Two
I Three
-F-=~T::"
----:;~
Miles 1 :even
~-:in-er-;c~-~ Eight
Total
Eleven i Twelve Miles
----7--: Concrete ------------------------~~000 ~ o.ooo -0.01; ~~~~--o.ooo 0.048 -c.ooo ~~~~ooo I o.ooo ~~~-0.133
3 1 Concrete and !-beams................ 0.000 0.000 '1 0.000 0.000 0.000 1 0.000 0.000 0.000 I 0.025 1 0.000' 0.000 0.139 1 0.164
27
] Timber. !-beams. Concrete Floor.... 0.042 1 0.049 0.000 1 0.056 0.0141 0.048 C.lll 0.340 1 0.000 ~ 0.1751 0.053 0.383 1 1.271
16
I Tunber................................. 0.000 0.071 1 0.000 0.000 0.000 0.089 0.000 0.000 1 0.000' 0.000 0.071 0.000 I 0.231
1 Concrete Bridge Culverts............ 0.013 0.000 1 O.OQO 0.000, 0.000 0.004 0.018 0.009 I 0.000 0.004 0.011 1 0.037 0.096
55 : ~:~1-c_o:~~:c~~d---~-~~----- --~- _ o.o~~--~~1z~l o.ooo___o~o7~~--~~~r1o.l41 1~~ o.34;-f_o_-~25 _ o.l7~l o.1~J~~~7I 1.s95
Proj. 1504.-A. Miller County- Concrete Deck Bridge with Steel I-beams on Creosoted Piling
Proj. 606-A. Blackley County- Bridge over Southern Railroad in Cochran
Proj . 412-C. Telfair and Wheeler Counties- Old Bridge over Gum Creek (Above) Replaced by New
Concrete Deck, Steel 1-Beams and Creosoted Piling Bridge (Below)
Proj. 696 . Murray County- Concrete Bridge Built on a Curve over Mountain Town Creek
Proj . 696. Murray County- Concrete Bridge Built on a Curve over Mountain Town Creek
MAINTENANCE ORGANIZATION CHART
STATE
HIGHWAY BOARD ----I
STATE HIGHWAY ENGINEER
t.wNTENAJE ENGINEER
SUPT EQUIPMENT
OFFICE
I
ROAD INfORMATION
ASSISTANT
I
OFFICE
SIG,J DEP.T.
M A INT. SUPERVISOR
SUPT. SHOPS
T
MECHf.NICS
WAREHOUSE
ASST. MAINT. SUPERVISOR
I
~TROLMAN
T
LABORERS T.&T. DRIVERS
DIV. MECH. DIV. SHOPS
STATE HIGHWAY BOARD OF GEORGIA SUMMARY OF MAINTENANCE PERSONNEL BY DIVISIONS AS
OF JUNE 30, 1934
Foremen of
Special Outfits
Patrol Sections
Patrolmen Miles
I Miles
Total
Paved i Unpaved Mileage
DIVISION NO. 1-FITZGERALD
5
50
50
1 ' 303 .928 1 '736 .237 3,040.165
DIVISION NO. 2- MACON
5
51
51
1,046.53211,982.3451 3,028.877
DIVISION NO. 3 -EAST POINT
6
Total: 16
52
!
52
1,071.63011,735.546 2,807.176
153
--153- I 3,422.oool5,454.12sf --s,876~218-
PERSONNEL COMPRISING A TYPICAL PATROL SECTION:
1 Patrolman 1 Tractor Operator 1 Truck Driver 2 Machine Operators 2 Laborers
EQUIPMENT COMPRISING A TYPICAL PATROL SECTION:
1 5-ton tractor 2 n-ton dump trucks 1 1-man patrol or 3-ton truck 1 tar or asphalt heater Miscellaneous small tools
266
Cause of Accident
Blinded by bright lights Blinded by dust Deficient brakes Deficient lights Deficient steering gear Deficient tires .. "' Driver intoxicated_
3l Driver asleep
Failure to observe signs Pass car without right-of-way Reckless, careless driving Skidding_ Speeding_ Wrong side of road
Totals_
Accidents on curves Accidents on straight road
Totals_
Persons killed Persons injured Property damage only_
STATE HIGHWAY BOARD OF GEORGIA ACCIDENTS REPORTED
FISCAL YEAR ENDING JUNE 30, 1934.
'
I
At
Col. with I Col. with 1 Col. with Drove Drove I RailMtr. Veh. Other Veh. Parked I Off ~ Off or 1 road
Ran . Ran Into 1 Into 1
in Motion 'I in Motion Vehicle Roadway into ' Cross- I Animal Pedes- '
Bridge, ing
1 trian
1
4 --~-- 2
1
16
7
2
9
1
1
1
2
1
2
1
3
2
8
9
3
2
6
5
2
3
8
14
2
9
4
3
4
5
6
3
2
4
8
3
5
2
46
18
23
2
19
2
3
1
2
18
4
39
16
6
1
6
2
Total
41 2 10 24 13
ll 33
18
6
18 108
8 83
9
1C5
5
38
8
7
40
384
84 21
5
5
-----
1
4
-- -------~~----
9
3
29
5
28
8
23
1
18
12
3
3
8
214
4
i:2
170
_____ , ___ --
7
40 ' 384
28
145
ll
196
4
64
STATE HIGHWAY BOARD OF GEORGIA
SUMMARY OF TRUCKS, TRACTORS, GRADERS AND OTHER HEAVY ROAD EQUIPMENT FOR MAINTENANCE AND CONSTRUCTION AS OF JUNE 30, 1934
MAINTENANCE
I CONSTRUCTION
DESCRIPTION
Division Division Division
Total Asphalt & Grand
No.1
No.2
No.3
Shop Laboratory Maint. Convicts
Total
- - - - - - ~-------------- -------+-----1~----- ----~- ----~
--~----1-----
Trucks_ __________________ 192
183
153
7
2
537
116
653
Tractors_ _________ _____
67
66
62 ____ _
195
26
221
Graders__________ _______ 112
151
146 I
409
20
429
~ o~~~~::~tH-~~d _____ _ 53
36 1
35
_-__-_-_-_-_-_-_-_-____ -_-_-_-1 _--_-_-_--_-__
124 1 400
524
00
Totals
_ --:t24- --436_1_-----a96__
7
1
2
~--1265-1 --5;--1~27-
Note: The above totals represent heavy road working equipment and animals in use, but does not include light road equipment, Shop, Garage, Warehouse, Quarry, Engineering, Office and Convict Camp equipment, nor Real Estate and Build-
ings.
Ditch Being Cleaned by Maintenance Forces One-man Auto Patrol with Light Road Grader in Tow
Surface Maintenance on Sand Clay Road
Roadside Grass Being Mowed by Maintenance Forces
Proj. 694. Burke County- Maintenance Forces Placing Local Material Base
Proj. 694. Burke County- Maintenance Forces Sahping Local Material Base
Maintenance Forces Operating Portable Rock Crusher 853-A. Coweta County- Broken Stone Base Being
Constructed by Maintenance Forces
This SO-Foot Steel Span (Left), Being Placed by Maintenance Forces over the Pataula Creek on Route 39 in Clay County , Was Salvaged from an Abandon.ed Bridge in Another County. The Old Bridge (Right) Will Be Replaced by This Salvaged Span. This Is a Graphic Dlustration of Economy as Practiced by the Present State ~hway Board
3! Ton Liberty Truck Before and After It Was Rebuilt in East Point Shops
STATE HIGHWAY BOARD OF GEORGIA ASPHALT DEPARTMENT
The following projects, approximating llO miles, were completed during the fiscal year ending June 30th, 1934.
Project No.
County
A-785-A&B.
Whitfield.
A-806-A&B
Whitfield
A-998-C __
Fannin __
A-ll8-A __
Fannin
A-56
_ Gwinnett _
""A-1082-A._ _
Coffee __
~ A-1546____
Newton_
A-1514 ____ .
Tift_
A-226-B ____ .
Liberty
A-1017-B_____
Berrien.
A-1017-A__
Cook_
221-243-401-ABC _____ ;Houston_ _ _ _.
A-279-A-357_____
_!Lowndes and Cook __
A-409__ ____ ____
iJones_
A-471-B _________ ___ 1Warren.
A-582___
_________ McDuffie__
A-833-A&B___ _ ____ Effingham_
A-90L__
Jones
A-1002___
_______ Worth_
Type
Miles
i
________ !_______ --- ----
i
' Shaping base and crushing stone
_I
Cold mixture surface treatment
Surface treatment
Surface treatment_.
Seal coat
Pebble soil base with surface treatment
Chert base with surface treatment ___ _
_ Pebble soil base with surface treatment __
Pebble soil base with surface treatment_
Pebble soil base with surface treatment_
__ Pebble soil base with surface treatment__
Resurfacing_ ..
Seal coat ... __
__ Surface treatment_
Surface treatment _
, Surface treatment
-----------------
Lime rock base with surface treatment_ _______________ _
Surface treatment_
______________ _
Surface treatment.
8.000 5.188 1.088 0.500 10.200 1.813 1.400 2.000 6.104 4.974 7.159 16.423 11.500 10.200 1.080 0.427 8.850 8.600 4.998
STATE HIGHWAY BOARD OF GEORGIA CONVICT DEPARTMENT
The following projects, approximating 80 mile8, were completed during the fiscal year ending June 30th, 1934.
Project
I
County
/
Type
Miles
No.
1-~~------
I C-285_________________ Lumpkin__________
C-785-A&B ___________ -~Whitfield_____
_Widening road__ ________ _Grading and drainage____
_ _____________ _ _______________________ _
6.830 14.500
C-1023 _________________ Fannm___ ____
C-1018________________ i Berrien_______
_____ Grading and drainage__
_____________ _
Grading, drainage and bridges _______________________ _
9.880 11.650
C-1063________________ :Berrien_______ ________________ Grading and drainage________________________________ _ 12.302
"" C-1072 _________________ 1 Berrien ________________________ ,Grading and drainage______ ________ ______ ____
__, 2.255
~ C-241-A_______________ Hancock ______________________ IGradmg and dramage _____________________________ _ C-1053________________ Lanier.___________ ________ __ Gradmg and dramage___ __ ______ ____ ______________ _
7.300 1.780
C-788________________ !Heard______________ _________ IClay bound macadam_ _____ ___________________ _
2.161
C-28-A&B _____________ Paulding_____ ___ ______ __ Gradmg, dramage and bndges ____________________ _
C-1082-B_ _____________ Coffee_______
__________ Bndge____________
_______ _
8.873 0.151
C-177_________________ Bryan-Liberty-Mcintosh______ 115 bridges________
____ _____ _____ _ . __________ _
C-310_________________ Union__________________________ Widening road____
_____________
I 3.415
1
STATE HIGHWAY BOARD OF GEORGIA
ASPHALT DEPARTMENT
The following projects, approximating 55 miles, are now under construction.
--- --~----=c---=-=-=======
Project No.
County
Type
Miles
----------~----~--:-~~--~------ ------------ -! --- ----~~------~-- --- ----~--------- ---------~------ ----
A-785-A&B__________ !Whitfield________________ _
A-241-A_______________ 1Hancock
___________ _
A-283 & 32L __________ :Forsyth
A-236 & 452_________ 'Jenkins_
A-436 & 436- S _________ iPulaskL __ _
~ A-1096_______________ _1CarrolL _____ _
~ A-1025 ___ __________ iPulaskL ______ . _________ ---
A-309 _________________ Wayne________ _
A-832-A_ __
IJeff Davis ____ _
Chert surfacing and surface treatment
Clay gravel base, Class A, double surface treatment_
Bituminous road mixture with surface on base __
Sand clay base double surface treatment_
' Resurfacing___ _
, Surface treatment_____________ _
1 Gravel base double surface treatment __ ._
Grading__
_
__
Pebble soil base with surface treatment_
14.360
6.487 10.105 2.104 6.936
1.157 7.555 3.734
3.000
STATE HIGHWAY BOARD OF GEORGIA CONVICT DEPARTMENT
The following projects, approximating 107 miles, are now under construction.
Project
i
County
No.
I
:
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -------~-~~--
,
-----~----
Type
C-1041-A_ ______ -----!'Baker _________ _ C-1087 _______________ Lamer_ _______ _ C-944-D _____________ -!Twiggs ____ .. ____ _ C-804 _______ .- _________ IPeach _________________ _
C-579-A&B ___________ ITreutlen __ . N C-706-A&R_. ____ --- _,Treutlen __ _ ;2 C-579-A_____________ :EmanueL_
C-479-A__ _____ __ :Heard____ _
g=~k-------- .~ ~ ~ ~ ~- ~~~~~~~==~ ~: ~::-:
C-30-R__ ______ __-!Cobb __ C-1043-B_ ____________ White __ C-1069-R _____________ Brantley____ _ C-1550____________ . ___ Habersham___________ _ C-696-A&R_______ . ___ Gilmer-Murray________ _
Grading, drainage and bridges_ __
:Clearing, grubbing and bridge __ _
Grading, drainage and bridges_
Grading, drainage and bridges __ _
Grading, drainage and bridges __ ..
Grading, drainage and bridges ___ _
Grading and drainage____ _
Macadam base 6" compacted_.
Grading, drainage and bridge __ _
Grading and drainage ____ _
Grading and drainage___
_
Grading, drainage and bridge_ __ _. _ 2 bridges________ _______________ _
4" loose rock___ __ __ _____________ _
Grading and drainage____ __ ____ _
Miles
--1---------
12.407 7.371 11.757 13.772 10.600 1.205 4.114 8.858 3.655 4.194 3.561 10.945 0.019 1.649 12.981
Proj. 696. Murray County- Graded Road Completed by State Convict Forces
Proj. 696. Murray County- Graded Mountain-top Road Completed by State Convict Forces
Route 9. Surface Treated Road Constructed by State Asphalt Forces
Proj . 1082-A. Coffee County- New Satilla River Bridge Constructed by State Convict Forces to Replace Old Dilapidated Bridge
Proj . 696. Gilmer County- A Relocation, Completed by State Convict Forces, That Eliminated Old Road and Covered Bridge (Right)
STATE ffiGHWAY BOARD OF GEORGIA LABORATORY
MATERIALS TESTED OR INSPECTED July 1st, 1933 to June 30th, 1934
j___ _-----~ind of ~ate_r_ia_I__
I_t_e_ m __
Number
Cement___
I Samples_
1574
Sand__
_ _ _
Samples __
433
Coarse Aggregate___
ISamples_______ _
978
Water_____
__
-~Samples ______ _
187
Clay, Gravel, Chert, Top Soil _ Samples______ _
3725
Asphalt __ _
_ Samples_____ _
451
Asphalt Mixtures_
.Samples___ _
88
Asphalt Sand___
___ :Samples__
35
Asphalt Cores_
Samples_
4
Tar____
__ Samples__
315
Limerock
__ Samples__
233
Grease___ OiL__
__ Samples ___ _
-
66
____ .Samples__ _
133
Paint____ Fertilizer_ ___
ISamples_ _ Samples_
-I
66 11
Guard RaiL
_ Samples
32
Brass___
Samples__ _
2
Expansion Joint__
-~Samples ___ _
29
Copper Flashing___
Samples__ _
1
Wood Preservative__
Samples __
1
Center Strip__
I Samples_
8
Filler_
Samples
10
Sign MetaL ___
Samples
5
Concrete Cylinders
I _ _ _-
1300
Concrete Cores_
564
Concrete Beams_
206
Concrete Pipe___
___ Ishipments __
70
Corrugated Metal Pipe__
_ 'I Shipments_
Reinforcing SteeL_ Timber__
_ Shipments_ __ Shipments_
---1
410
2~~
R/W Markers__ Concrete Posts_ ____
- ::1 __ Shipments_
___ :Shipments_
~
I
j-----
Total Samples or Shipments I_
------
11265
285
STATE HIGHWAY BOARD OF GEORGIA
INDEX
Page
A
No.
Accidents Reported )933'__
141
Accidents Reported i1934)___
267
Accounting- -Alphabetical Index as Follows:
Administration Appropriation rl933;
__ Schedule 6-F 63
Administration Appropriation 11934)
Schedule 6-E 178
Administration Expense Disbursements by Object of Ex-
penditure, Analysis of (1933:r_____
Schedule 8-A 67
Administration Expense Disbursements by Object of Ex-
penditure, Analysis of (1934)_ _________
Schedule 8-A 182
Administration Expense Disbursements by Units, Analysis
of (1933) ___
Schedule 10-A 74
Administration Expense Disbursements by Units, Analysis of
(1934)
_ Schedule 10-A 190
Administration Unencumbered Allotments by Units, Detail of
i1933)
_Schedule 6-C 60
Administration Unencumbered Allotments by Units. Detail of
(1934;
Schedule 6-B 175
Allotments Appropriations and Fund Balances Reflecting Re-
conciliation ',l,ith Expense Disbursements, Summary of
(1933)
Schedule 6 52
Allotments, Appropriations and Fund Balances, Reflecting Re-
conciliation with Expense Disbursements, Summary of
(1934)_
Schedule 6 168
Allotments by Congressional Districts, Summary of
(1933L____
____ S..:hedule 14 100
Allotments by Congressional Bistricts, Surrmary of
(1934)
______ ___
_________ Schedule 16 221
Assets and_ Liabilities, Statement of (1933) _
__Exhibit A
42
Assets and Liabilities, Statement of (1934}_-
__ Exhibit A 156
Chart of Revenue and Expenditure Percentages (1933)
45
Chart of Revenue and Expenditure Percentages (1934)
159
Collection of Revenue Expense Disbursements by Object of Ex-
penditure, Analysis of (19331__
Schedule 8-A 67
Collection of Revenue Expense Disbursements by Object of Ex-
penditure, Analysis of (1934) _
Schedule 8-A 182
Comments
12
Construction Allotments by Commissioners Districts since be-
ginning of Department, Summary of (1934)___
Schedule 14 218
Construction Allotments by Congressional Districts since begin-
ning of Department, Summary of 11933)_
____ Schedule 13 99
Construction Allotments by Congressional Districts since begin-
ning of Department, Summary of 1)934)
_Schedule 15 219
Construction Allotments and Disbursements by Types, Analysis
of (1933)
_ Schedule 12 98
286
INDEX-Continued
Construction Allotments and Disbursements by Types, Analysis
of (1934) __
_ . Schedule 12 214
Construction Allotments and Disbursements by Class of Project,
Analysis of Cl934)_
_Schedule 13 215
Construction Expense Disbursements by Ob.i ect of Expenditure,
Analysis of (19331
Schedule 8-B 68
Construction Expense Disbursements by Ob.i ect of Expenditure,
Analysis of (1934).
Schedule 8-B 183
Construction Expense Disbursements by Congressional Districts
and Division Units, Analysis of r1933)
_Schedule 10-B 76
Construction Expense Disbursements by Congressional Districts
and Division Units, Analysis ot (1934)
___ Schedule 10-B 192
Construction Unencumbered Allotments by Class of Project,
Detail of (1933)_
_Schedule 6-A 54
Disbursements, Statement of (1933;
. Exhibit C
46
Disbursements, Statement of (19341
.Exhibit C 160
Equipment Expense Disbursements by Object of Expenditure,
Analysis of '1933) _
___ Schedule 8-D 70
Equipment Expense Disbursements by Object or Expenditure,
Analysis of (1934)_
.Schedule 8-D 185
Estimated Participation, Reflecting ReconcJliation with Revenue
Receipts, Summary of (1933)_ _
Schedule 7 65
Estimated Participation, Reflecting Reconciliation with Revenue
Receipts, Summary of (19341
____ Schedule 7 180
Expense Disbursements by Object of Expenditure, Summary of
(1933).
_Schedule 8 66
Expense Disbursements by Object of Expenditure, Summary of
(1934) _
.Schedule 8 181
Expense Disbursements by Congressional Districts, Summary of
(19331
___ Schedule 9 72
Expense Disbursements by Congressional Districts, Summary of
(1934)
Schedule 9 187
Expense Disbursements by Division Units, Summary of
(1933)
. Schedule 10 73
Expense Disbursements by Division Units, Summary of
(1934)
_Schedule 10 188
Expense r:: isbursements by r: etail Object of Expenditure Classifi-
cation, Analysis of (1933)
Schedule 11 88
Expense Disbursements by Detail Object of Expenditure Classifi-
cation, Analysis of (1934}
_ Schedule 11 204
Financial Condition, Statement of ~)933)
Exhibit A 42
Financial Condition, Statement of (1934)
Exhibit A 156
Fund Deficit, Reflecting Fund Revenue, Appropriations and
Allotments, Reconciliation of (1933)__
___ Exhibit B 44
Fund Surplus, Reflecting Fund Revenue, Appropriations and
Allotments, Reconciliation of (1934)
.Exhibit B 158
Land, Buildings and Equipment 1933)
Schedule 4 49
287
INDEX-Continued
Land, Buildings and Equipment (1934) ____________ Schedule4 165
LegislativeTransferExpenseDisbursements by Object of Expenditure, Analysis of (1933) _________________________ Schedule 8-E 71
Legislative Transfer Expense Disbursements by Object of Expenditure, Analysis of (1934) _____________________ Schedule 8-E 186
Maintenance Appwpriation (1933) ___________________ Schedule 6-E 62
Maintenance Appropriation (1934) __________________ Schedule 6-D 177
Maintenance Expense Disbursements by Object of Expenditure, Analysis of (1933) _________________________________ Schedule 8-C 69
Maintenance Expense Disbursements by Object of Expenditure,
Analysis of (1934)
_____ _ _ _ ___ Schedule 8-C 184
Maintenance Expense Disbursements by Congressional Districts and Division Units, Analysis of (1933) __________ Schedule 10-D 82
Maintenance Expense Disbursements by Congressional Districts
and Division Units, Analysis of C1934)_ ___
__Schedule 10-D 198
Maintenance Unencumbered Allotments by CongressionalDistricts
and Division Units, Detail of (1933)
Schedule 6-B 55
Maintenance Unencumbered Allotments byCongressionalDistlicts
and Division Units, Detail of (1934)----
__ Schedule 6-A 171
Quarry Expense Disbursements by Object of Expenditure, Analy-
sis of (1933)-. _
____ Schedule 8-A 67
Quarry Expense Disbursements by Object of Expenditure, Analy-
sis of (1934)__________ _________
_____ Schedule 8-A 182
Receipts, Statement of (1933)___ _________
______ Exhibit C
46
Re0eipts, Statement of (1934).__
__Exhibit C 160
Reconstruction Expense Disbursements by Object of Expenditure,
Analysis of (1933). _
__Schedule 8-C 69
Reconstruction Expense Disbursements by Object of Expenditure,
Analysis of (1934)_________
_____________ Schedule 8-C 184
Reconstruction Expense Disbursements by CongressionalDistricts and Division Units, Analysis of (1933) ______________ Schedule 10-E 85
ReconstructionExpenseDisbursements by Congressional Districts and Division Units, Analysis of (1934) ___________ Schedule10-E201
Refunding Certificates, Statement of (1933)_ _ _____ Schedule 5 50 Refunding Certificates, Statement of (1934) _________ Schedule 5 166
Research and Analysis Expense Disbursements by Object of Ex-
penditure, Analysis of (1933). _
__ Schedule 8-A 67
Research and Analysis Expense Disbursements by Object of Ex-
penditure, Analysis ot (1934) __________ . _________ Schedule 8-A 182
Revenue Receipts and Expense Disbursements, Statement of (1933) _ . ________________ . ___ . _______________________ Exhibit C 46
Revenue Receipts and Expense Disbursements, Statement of (1934) __ -------- ___________________________________ Exhibit C 160
Revenue Receipts and Expense Disbursements for 1931, 1932, 1933, and 1934, Comparative Statement oL ____ _____ ___ Exhibit D 162
Shop Expense Disbursements by Object of Expenditure, Analysis
of (1933)___ ___
_____ ___
Schedule 8-C 69
288
INDEX-Continued
Shop Expense Disbursements by ObJect of Expenditure, Analysis
of (1934)_
Schedule 8-C 184
Survey Appropriation (1933:_ ___
Schedule 6-G 64
Survey Appropriation (1934;
Schedule 6-F 179
Survey Expense Disbursements by ObJect of Expenditure, Analy-
sis of (19331
Schedule 8-B 68
Survey Expense Disbursements by ObJect of Expenditure, Analy-
sis of (1934~,
Schedule 8-B 183
Survey Expense Disbursements by Congressional Districts and
Division Units, Analysis of (1933'
Schedule 10-C 79
Survey Expense Disbursements by Congressional Districts and
D-,ivision Units, Analysis of r1934j
__ Schedule 10-C 195
Asphalt Department-Completed ProJects (1933j
148
Asphalt Department-Completed ProJects (1934::
276
Asphalt Department -Projects under Construction (1934:,
278
B
Bridge Mileage Completed by Congressional Districts :1933)
133
Bridge Mileage Completed by Congressional Districts r1934) _
259
Bridge Mileage Completed by Engineering Divisions (1933> _
133
Bridge Mileage Completed by Engineering Divisions (1934) _
259
Bridges Completed (1933) _
129
Bridges Completed r1934]
257
c
Comments-Engineering
27
Bridges
27
General
29
Laboratory
29
Maintenance
28
Roads
27
State Forces_
28
Convict Department-Completed Projects (1933)
148
Convict Department-Completed Projects (1934)
277
Con viet Department- Projects under Construction (1934)
279
F
Federal Aid -Completed Mileage in Ten Southeastern States
40
G Gasoline Tax, Distribution of, to Counties __
--- 37
H
History of State Highway Board Membership__
8
289
INDEX - -Continued
L
Laboratory -Materials Tested '1933)_
153
Laboratory- Materials Tested ~1934~
285
Letter of Transmittal
7
M
Maintenance Organization Chart
265
Maintenance Personnel by Engineering Divisions r1933',
140
Maintenance Personnel by Engineering Vi visions 1934,_
266
Maintenance- Typical Personnel and Equipment in Patrol __
266
Mileage by CommissiOners Divisions (1933)
106
Mileage by Commissioners Divisions r1934)_
229
Mileage by Congressional Districts )933: _
106
Mileage by Congressional Districts 1934',
229
Mileage by Counties -Showing Commissioners Districts, Congres-
sional Districts, Engineering Divisions, Area, Population and
Percentages__
31
Mileage by Engineering Divisions 11933',
106
Mileage by Engineering Divisions )934'
229
0
Officials and Personnel of the State Highway Department
10
Organization Chart
ll
p
Purchasing
30
R
Roadway Mileage Placed under Construction r1933)
107
Roadway Mileage Placed under Construction r1934)
__ 230
Roadway Mileage Placed under Construction by Congressional Dis-
tricts (1933)
__ 116
Roadway Mileage Placed under Construction by Congressional Dis-
W~)~~
W
Roadway Mileage Placed under Construction by Engineering Divi-
sions (1933)
115
Roadway Mileage Placed under Construction by Engineering Divi-
sions '1934_'
246
T Trucks, Tractors, Graders, etc., Inventory of
-- 268
290