State Transportation Improvement Program, FY 2014-2017 [2014]

Please send any comments to:
Ryan Walker STIP Project Manager Email STIPCoordinator@dot.ga.gov
Georgia Department of Transportation Office of Planning 600 W Peachtree
Atlanta, Georgia 30308
Phone (404) 631-1987

FY2014-2017 Programa Estatal para Mejoras al Sistema de Transporte

Pgina

Contenido

2

Introduccin y Resumen

6

Proceso de Participacin Pblica

9

Objetivos Estratgicos del Gobernador de Georgia

10

Contactos para las Organizacines Metropolitana de Planificacin

"Metropolitan Planning Organization" (MPO)

Mapa de las MPO Lista de contactos de las MPO en Georgia

13

Plan Financiero

STIP Proceso de Enmienda

34

Fondo "Cantidad Total" o "Lump Sum Funding"

MPO Lump Sum Process

36

Grfico de Fondos en el STIP por Categora

37

Entendiendo las anotaciones del STIP

38

Mapa de Georgia

39

ndice por condados



STIP Projects



Apndice A

Glosario



Apndice B (Mapas)

Sistema Ferroviario de Georgia

Actuales sistemas de transporte pblico Urbano y Rural

Sistema estatal de rutas para bicicletas

Programa del Gobernador para mejorar las carreteras, "Governor's Road

Improvement Program" (GRIP)

Propuesta para el Programa Estatal de Mejoras al Sistema de Transporte
Introduccin
Nos complace presentar esta propuesta para el Programa de Mejoras al Sistema de Transporte Estatal (STIP) para el ao fiscal 2014 hasta el 2017. El STIP detalla los proyectos de transporte que estn patrocinados por el gobierno federal y que estn localizados afuera del lmite de las Organizaciones Metropolitanas de Planificacin, "Metropolitan Planning Organization" (MPO).
Cada MPO elabora su propio programa de mejoras al transporte, "Transportation Improvement Program" (TIP), y preguntas sobre los proyectos en esas reas se pueden hacer directamente al MPO cuya informacin se puede encontrar en la seccin "Lista de contactos MPO en Georgia" en este documento. Los TIPs se incluyen en el STIP como referencia sin modificacin una vez que sean aprobadas por el MPO y el Gobernador o su representante.
Propsito
Para recibir dinero federal para proyectos del transporte, el Departamento del Transporte de Georgia, "Georgia Department of Transportation" (GDOT), elabora anualmente el STIP en el que se detalla todos los proyectos de carreteras, transporte pblico, y de mltiples modalidades que se propongan para financiamiento bajo el Titulo 23 (carreteras) y el Titulo 49 (trnsito) del Cdigo de EE.UU., "U.S. Code". El STIP propuesto tambin incluye proyectos de carreteras, puentes, bicicletas, peatones, seguridad, actividades para mejoramiento al transporte y del transporte pblico.
Se incluyen los costos relacionados al proyecto para proyectos de carreteras, como ingeniera preliminar "preliminary engineering" (PE), adquisicin de derechos de paso, "Right-of-Way" (ROW), y construccin (CST); para proyectos de transporte pblico se declaran los costos de capital y costos operacionales. Los proyectos estn en orden alfabtico por condado, con informacin sobre costo, descripcin y ao fiscal. Los proyectos que se extienden a travs de varios condados se encuentran en el STIP bajo el nombre de cada condado afectado. Por favor vea la seccin "Entendiendo las Anotaciones del STIP" para una explicacin detallada.
Desarrollo El STIP fue desarrollado bajo la estructura del Plan Estratgico de Transporte Estatal 2010-2030 (SSTP) en un esfuerzo para que coincidiera con los Objetivos Estratgicos para Georgia que tiene el Gobernador, y a lograr las metas trazadas de:
2

apoyar el crecimiento econmico y la competitividad de Georgia ; garantizar la seguridad; maximizar el valor de los bienes de Georgia; y minimizar el impacto al medio ambiente.
El STIP propuesto este ao da grandes pasos en la circulacin efectiva de carga alrededor del estado. Ampliaciones a lo largo de los corredores designado por el Programa de Mejoramiento Vial del Gobernador (GRIP) vea el Apndice D (mapa GRIP) y las conexiones clave hacia la interestatal, mejorar el flujo de cargas en todo el estado. Tambin hay numerosos proyectos para aliviar la congestin que incluye varias ampliaciones y carreteras de circunvalacin en rutas estatales. Sin embargo, como los fondos federales se limitan en el futuro, podemos esperar ms y ms proyectos que pueden ser clasificados como "manejo activo". El SSTP 2010-2030 est disponible en lnea en: www.it3.ga.gov.
Los proyectos enumerados en el STIP fueron identificados a travs del proceso continuo de planificacin del GDOT y son vitales para el sistema de transporte del estado. Los proyectos en el STIP hacen nfasis en el mantenimiento, seguridad, y mejoramiento a los medios de la transportacin y al del sistema de transporte pblico. Estos proyectos cumplen con la misin del GDOT de proveer un sistema de transporte seguro, sin interrupciones, y sostenible, y que apoye a la economa de Georgia y responda a las necesidades de sus ciudadanos y al medioambiente
El documento STIP da al pblico y a otras partes interesadas una forma de enterarse y hacer comentarios sobre las prioridades del sistema de transporte del estado por los prximos cuatro aos fiscales. En las reas que no estn en un MPO y que se incluyen en el STIP, los proyectos fueron identificados con la cooperacin de los gobiernos locales con reuniones programadas anualmente, cara-a-cara con oficiales del GDOT y tambin con reuniones y contactos continuos e informales durante el ao. Tambin se elabora con la participacin de partes interesadas (Stakeholders) y con el pblico en general.
El STIP se desarroll usando todas la guas e indicaciones del "Transportation Equity Act for the 21st Century (TEA-21)", adoptado por Congreso en 1998 y continuado por el "Avanzando para el Progreso en el siglo 21 (MAP-21)" pasado por el Congreso en 2012. El STIP se presenta a la administracin federal de carreteras, "Federal Highway Administration", y a la administracin federal de trnsito, "Federal Transit Administration", para su aprobacin final.
Participacin Pblica
A medida que el STIP se va desarrollando, se presenta para ser evaluado y obtener comentarios a travs de contactos directos con oficiales electos a nivel local, as como por partes interesadas y el pblico en general. Adems de las reuniones cara a cara con oficiales locales, el STIP propuesto se presenta en reuniones pblicas alrededor del estado donde el
3

personal del GDOT pide la activa participacin en forma de preguntas y respuestas. Estas reuniones se convocan en diferentes sitios y se anuncian por correo y con anuncios de prensa. Preguntas o comentarios se pueden hacer por correo, e-mail, telfono/ fax o al personal del GDOT a lo largo del ao. El STIP propuesto tambin esta en lnea en:
www.dot.ga.gov/stip
Financiamiento
El STIP propuesto est fiscalmente saldado e incluye solo aquellos proyectos con fondos o que van a tener fondos, en un tiempo razonable. Los fondos federales para los aos fiscales 2014, 2015, 2016 y 2017 son proyecciones de los programas y no sern finalizados hasta despus de que se implemente el presupuesto federal el 1ro de octubre de cada ao.
Los presupuestos de cada proyecto estn basados en nuestros mejores clculos de ingeniera. Estos costos pueden cambiar a lo largo de la vida del proyecto; desde ingeniera preliminar, a adquisicin de derechos de paso, y hasta construccin. Si el presupuesto de un proyecto cambia por qu ha cambiado el propsito original de la obra, se le harn cambios al STIP y se solicitar la participacin pblica de ser necesario. Si un incremento en el costo es causado por nuevas mejoras de ingeniera y no por un cambio en el trabajo actual, no es necesario hacer cambios en el STIP. Ms detalles se pueden encontrar en la seccin Plan Financiero en la pgina 13.
Los ltimos datos del censo (2010) indican que la poblacin de Georgia creci desde el 2000 hasta el 2010 en un 18.3%, el doble del promedio de los E.E.U.U que fue de un 9.7% sobre el mismo perodo. La economa de Georgia tambin est en crecimiento y esto resulta en un alza en las demandas al sistema de transportacin. El proceso STIP asegura que se obtengan los mximos beneficios de los fondos disponibles y que el sistema de transportacin de Georgia siga apoyando y promoviendo el crecimiento y la economa de Georgia.
Segn el Programa Nacional de Investigacin Cooperativa en Autopista (Proyecto NCHRP 20-24 (37)), Georgia invierte menos por habitante en el transporte que la mayora de los otros estados. A pesar de este hecho, Georgia ocupa el primer lugar por los proyectos de construccin en presupuesto en un 85% y ocupa el segundo para los proyectos de construccin entregados a tiempo el 85%. La clasificacin de Georgia se basa en un estudio de 39 estados.
Lista de Proyectos
La aparicin continua del Complejo de Puertos de Savannah como uno de los puertos de contenedores ms importantes de los Estados Unidos ha proporcionado a Georgia una posesin capital estratgica de transporte, dando al Estado un papel ms
4

importante en el comercio mundial. El crecimiento de Savannah ha introducido una serie de oportunidades de desarrollo econmico, en particular para la distribucin, el almacenamiento y la fabricacin. Volmenes de carga, principalmente en forma de contenedores manipulados por el Complejo de Puertos de Savannah, tienen un impacto directo en la autopista de Georgia y redes ferroviarias. Como tal, el Estado de Georgia, en colaboracin con el rea Costera (Savannah), la Organizacin Metropolitana de Planificacin y la Autoridad de Puertos de Georgia, estn llevando a cabo varios proyectos para alojar y servir eficientemente los volmenes de carga que se desplazan a travs de Georgia y la regin. Por ejemplo, los proyectos de carreteras que apoyan la carga y persiguen los fondos federales se reflejan en este documento del STIP FY2014-2017, as como en el 2014-2017 TIP del MPO de Savannah (que se incorpora por referencia), para apoyar el crecimiento continuo y la actividad esperada en el Complejo de Puertos de Savannah. El STIP propuesto est saldado fiscalmente y muestra los proyectos en las fases que se espera que estn en los aos indicados. Es bueno recordar que los tiempos indicados para cada fase son sujetos a los cambios por cuestiones y eventos que ocurren desde la planificacin de un proyecto hasta su terminacin y que pueden retrasar acelerar su progreso. Los presupuestos de cada proyecto estn basados en nuestros mejores clculos de ingeniera cuando se elabor el STIP. El costo final de una fase de un proyecto puede cambiar a lo largo del tiempo mientras que se refina durante su progreso, hasta su construccin.
Conclusin El Departamento de Transporte desea agradecer a todo el pblico y a los oficiales al nivel local por su tiempo y opinin en el desarrollo de este programa. Comentarios y preguntas pueden ser dirigidas a las personas nombradas en el interior de la portada del STIP propuesto.
5

Proceso de Participacin Pblica

Antecedentes sobre el Programa Estatal para Mejoras al Sistema de Transporte

La ley federal exige que cada estado produzca un Programa Estatal para Mejoras al Sistema de Transporte, "State Transportation Improvement Program" (STIP). El STIP identifica proyectos de transportacin pagados por el gobierno federal para los prximos cuatro aos, es actualizado y aprobado anualmente.

El mayor componente en el proceso de desarrollo del STIP es la participacin pblica. La Oficina de Planificacin supervisa el proceso de participacin pblica para los seis distritos rurales del GDOT y reparte el STIP a esos distritos para uso en reuniones pblicas y reuniones con oficiales al nivel local.



Reuniones Pblicas

Reuniones pblicas son programadas a lo largo del ao, para darle la oportunidad al pblico para que revise y opine. Todas las reuniones pblicas son sostenidas en localidades accesibles para minusvlidos (ADA). Para el ao 2013, once reuniones pblicas fueron programadas en las siguientes fechas:

21 de octubre - Cartersville 21 de octubre - Milledgeville 22 de octubre - Waycross 24 de octubre Helen 28 de octubre - Americus 29 de octubre - Jefferson

29 de octubre Dublin 4 de noviembre - Tifton 4 de noviembre - LaGrange 7 de noviembre - Carrollton 7 de noviembre - Statesboro

El Departamento invita a grupos grandes a estas reuniones. El departamento envi ms de 1,500 invitaciones individuales a oficiales electos a nivel local, y a la "familia de socios" (Family of Partners), un grupo con inters en el sistema de transportacin.
Peridicos publicaron anuncios y se enviaron avisos de prensa a peridicos locales avisando al pblico de las reuniones STIP. Anuncios de radio fueron transmitidos y avisos legales fueron colocados en todos los Legal Organs a travs del estado. Un panfleto explicando el proceso STIP fue publicado y distribuido en todas las reuniones pblicas.



Reuniones con Oficiales Electos a Nivel Local

Cada ao como parte del proceso de desarrollo del STIP, los ingenieros de planificacin y programacin del distrito se renen con lo oficiales electos de cada condado rural en su rea

6

para discutir los proyectos propuesto en el STIP y solicitar sus preguntas y comentarios. Durante estas reuniones se tratan una amplia gama de temas sobre el sistema transporte, algunas preguntas se envan a la oficina correspondiente del DOT para su respuesta. Se les pide a los oficiales locales que firman el "certificado de cooperacin con oficiales electos a nivel local", "Certificate of Cooperation with Elected Officials", como constancia de la consulta STIP.



El STIP en la Internet

El Departamento coloca una copia de la propuesta STIP en su pgina Web. La direccin para ver la propuesta STIP de Georgia es:

www.dot.ga.gov/stip
Informacin de contacto tambin se incluye en este sitio Web para los comentarios del pblico.



Comentarios

Los comentarios recibidos en las reuniones pblicas y con los oficiales electos a nivel local, se toman en cuenta en la formacin del STIP, preguntas o comentarios que no se puedan contestar en la reunin se envan al departamento adecuado del GDOT para su respuesta. Las preguntas y comentarios que normalmente se escuchan en las reuniones pblicas y en las reuniones con los oficiales locales abarcan comentarios generales tales como la necesidad de ms rutas de transporte pblico hasta preguntas especficas como la fecha del inicio de construccin de un proyecto.

Enve comentarios a la siguiente direccin:

Correo: Georgia Department of Transportation Attn: Office of Planning/STIP Project Manager 600 W. Peachtree ST SW Atlanta, Georgia 30308
Correo Electrnico: stipcoordinator@dot.state.ga.us

En las quince reas metropolitanas del estado, la participacin del pblico es la responsabilidad del la organizacin metropolitana de planificacin (MPO local); para respuestas a preguntas sobre los proyectos en estas reas por favor contacte las agencias correspondientes en las pginas 11-12 (siguiendo el mapa de MPO). El rea representado por el MPO nuevo del Condado de Cartersville Bartow, que fue designado en el a0 2013, permanecer en el STIP hasta que el MPO nuevo adopte sus documentos de planificacin del transporte.

7

Nathan Deal, Gobernador de Georgia
Liderazgo del Transporte en Georgia
El gobernador ha tomado un papel activo para garantizar que el estado tiene un plan que proporciona la visin, la direccin y las prioridades de desarrollo de los Objetivos Estratgicos del Gobernador de Georgia que se encuentra en la siguiente pgina. El Departamento de Transporte de Georgia se rige actualmente por una Junta Directiva del Transporte de 14 miembros, que proporciona liderazgo y establece polticas para el Departamento. La Junta se encarga de poderes que incluyen, pero no estn limitados a: nombrar al Comisario; designacin de las vas pblicas que se incluyen dentro del sistema estatal de carreteras, aprobar planes a largo plazo de transporte; supervisar la administracin de los contratos de construccin y autorizar los contratos de arrendamiento. Los miembros de la Junta son elegidos por una mayora de un caucus de la Asamblea General de cada uno de los trece distritos electorales de Georgia. Cada miembro de la Junta tiene un mandato de cinco aos.

10 Distrito Congresional 20 Distrito Congresional

Ann Purcell

Johnny Floyd

30 Distrito Congresional Sam Wellborn

40 Distrito Congresional Robert L. Brown, Jr.

50 Distrito Congresional Stacey Key

60 Distrito Congresional 70 Distrito Congresional

Dan Moody

Rudy Bowen

80 Distrito Congresional 90 Distrito Congresional Jay Shaw - Presidente Emily Dunn - Secretaria

100 Distrito Congresional Jamie Boswell

120 Distrito Congresional Don Grantham Vice Presidente

130 Distrito Congresional Dana Lemon

140 Distrito Congresional Roger Williams

GDOT- Comisionado Keith Golden

8

GDOT- Director de Planificacin Toby Carr

Visin:

Un gobierno estatal delgado y sensible que permite a las comunidades, los individuos y las empresas a prosperar.

Objetivos Estratgicos del Gobernador de Georgia

Educado:

Desarrollo de la vida, la universidad, y estudiantes listos para el trabajo Aumentar el nmero de estudiantes que leen a nivel de grado al finalizar el 3er Grado un punto de referencia estratgico para el aprendizaje permanente Aumentar el porcentaje de estudiantes que completan la educacin universitaria Mejorar y expandir la ciencia, la tecnologa, la ingeniera y las matemticas (STEM) Identificar e implementar estrategias innovadoras que aumentan la eficacia de los maestros y el logro del estudiante Aumentar el porcentaje de graduados de escuela secundaria que estn listos para la universidad y una carrera Empoderar a los ciudadanos con opciones de escuelas pblicas y flexibilidad local con el fin de mejorar el rendimiento estudiantil

Mvil:

Transporte de personas y productos en un 21o siglo Georgia Mejorar la circulacin de personas y mercancas a travs y dentro del estado Expandir el rol de Georgia como un centro logstico importante para el comercio global Aprovechar las alianzas pblico-privadas y mejorar la cooperacin intergubernamental para el desarrollo exitoso de la infraestructura

Crecimiento:

La creacin de empleo y crecimiento de las empresas Implementar las estrategias fiscales y las reformas regulatorias que hagan ms competitivo Georgia Promover el crecimiento de la pequea empresa y el espritu empresarial Maximizar el acceso al capital para nuevas empresas y empresas en crecimiento Conservar y mejorar los recursos naturales, con nfasis en el aumento de los suministros de agua del estado y de la seguridad

Saludable:

Cuidado accesible y estilos de vida activos Reducir la obesidad infantil en Georgia Aumentar el acceso a servicios de salud en todo el estado Incrementar la eleccin del consumidor y la responsabilidad personal en el cuidado de la salud Mejorar el acceso a las opciones de tratamiento y de la comunidad para las personas con discapacidad

Seguro:

La proteccin de la seguridad pblica Implementar opciones de sentencias alternativas para mejorar la rehabilitacin de
delincuentes Promover exitosamente el reingreso y el cumplimiento de delincuentes Reducir las lesiones y prdida de vidas en las carreteras de Georgia Promover comunidades seguras y familias estables, donde los nios prosperan

Gobierno responsable y eficiente: fiscalmente slida, con principios, conservador Mantener la calificacin de bonos AAA de Georgia Aumentar la disponibilidad de servicios pblicos a travs de soluciones tecnolgicas innovadoras Crear y mantener una fuerza laboral del gobierno estatal de calidad Concentrar los recursos del Estado en los servicios esenciales y emplear soluciones empresariales Conseguir apoyo de la comunidad y las asociaciones pblico-privadas para aprovechar los recursos disponibles
9

Albany (DARTS) Dougherty Area Regional Transportation Study Website: http://dartsmpo.org/ Address: Albany-Dougherty Planning/Comm. Dev.
240 Pine Avenue, Suite 300 Albany, Georgia 31701 Contact: Jennifer Nelson, Transportation Planner Phone: (229)446-2730 Email: JNewton@dougherty.ga.us ------------------------------------------------------------Athens (MACORTS) Madison-Athens-ClarkeOconee Transportation Study Website: www.macorts.org Address: Athens-Clarke Co. Planning Commission 120 W. Dougherty St. Athens, GA 30601 Contact: Sherry F. McDuffie, Transportation Planner Phone: (706) 613-3515 Email: macorts@athensclarkecounty.com --------------------------------------------------------------Atlanta (ARC) Atlanta Regional Commission Website: www.atlantaregional.com Address: 40 Courtland St. NE Atlanta, GA 30303 Contact: Douglas R. Hooker, Executive Director Phone: (404) 463-3100 Email: dhooker@atlantaregional.com ------------------------------------------------------------Augusta (ARTS) Augusta Regional Transportation Study Website: www.augustaga.gov/index.aspx?nid=680 Address: Augusta Planning and Development Department 525 Telfair St. Augusta, GA 30901-5867 Contact: Paul DeCamp, Planning Director Phone: (706) 821-1796 Email: pdecamp@augustaga.gov --------------------------------------------------------------Brunswick (BATS) Brunswick Area Transportation Study Website: www.glynncounty.org/ Address: Glynn Co. Community Development 1725 Reynolds St, Ste. 200 Brunswick, GA 31520 Contact: Eric Landon, Planner Phone: (912) 554-7436 Email: elandon@glynncounty-ga.gov -------------------------------------------------------------

Chattanooga (CUATS) Chattanooga Urban Area Transportation Study Website: www.chcrpa.org Address: Chattanooga-Hamilton Co. Regional
Planning Agency 1250 Market St., Ste. 2000 Chattanooga, TN 37402-2713 Contact: Karen Rennich, MPO Coordinator Phone: (423) 643-5903 Email: rennich_karen@chattanooga.gov ------------------------------------------------------------Columbus (CPCTS) Columbus-Phenix City Transportation Study Website: www.columbusga.com/mpo/ Address: Columbus Dept. of Engineering Transportation Planning Division 420 10th St. Columbus, GA 31902 Contact: Lynda Temples, Planner Phone: (706) 225-3938 Email: ltemples@columbusga.org ------------------------------------------------------------Dalton Dalton MPO Website:www.whitfieldcountyga.com/eng/mpo.htm Address: Whitfield County 301 W. Crawford St., Dalton, GA 30722 Mailing: P.O. BOX 248 Dalton, Georgia 30722 Contact: Susan Paredes, GDMPO Coordinator Phone: (706) 876-2559 Email: sparedes@whitfieldcountyga.com ------------------------------------------------------------Gainesville (GHTS) Gainesville Hall Transportation Study Website: www.ghmpo.org Address: Hall County Government Center, Department of Planning
2875 Browns Bridge Rd. Gainesville, GA 30504-5635
Contact: Srikanth Yamala, MPO Director Phone: (770) 531-6809 Email: syamala@hallcounty.org ------------------------------------------------------------Hinesville (HAMPO) Hinesville Area MPO Website: http://thelcpc.org/HAMPO/hampo_index.html Address: Hinesville Area MPO
100 Main Street, Suite 7520 Hinesville, GA 31313
Contact: Jeff Ricketson, Executive Director Phone: (912) 408-2033 Email: jricketson@thelcpc.org -------------------------------------------------------------

11

Macon (MATS) Macon Area Transportation Study Website: www.maconbibbpz.org Address: Macon-Bibb Co. Plan. & Zoning Comm.
682 Cherry St., Ste. 1000 Macon, GA 31201 Contact: Don Tussing, Senior Planner Phone: (478) 751-7460 Email: dtussing@mbpz.org ------------------------------------------------------------Rome (FRUTS) Floyd-Rome Urban Transportation Study Website:http://www.romefloyd.com/Infrastructure/ PlanningandZoning/tabid/333/Default.aspx Address: Rome-Floyd Co. Planning Commission PO Box 1433 Rome, GA 30162-1433 Contact: Sue Hiller, Executive Director Phone: (706) 236-5025 Email: shiller@romega.us ------------------------------------------------------------Savannah (CORE MPO) Coastal Region MPO Website: www.thempc.org Address: Metropolitan Planning Commission PO Box 8246 110 E. State St. Savannah, GA 31412-8246 Contact: Mark Wilkes, Dir. of Trans. Planning Phone: (912) 651-1477 Email: wilkesm@thempc.org -------------------------------------------------------------

Valdosta (VLMPO) Valdosta-Lowndes MPO Website: www.sgrc.us/transportation Address: Southern Georgia Regional Commission
327 West Savannah Ave. Valdosta, GA 31601 Contact: Corey Hull, MPO Coordinator Phone: (229) 333-5277 Email: chull@sgrc.com ------------------------------------------------------------Warner Robins (WRATS) Warner Robins Area Transportation Study Website: http://www.wrga.gov/node/52 Address: Warner Robins Dept. of City Development 700 Watson Blvd. Warner Robins, GA 31093 Contact: Jessica Bird, Transportation Planner Phone: (478) 929-1936 Email: jbird@warnerrobingsga.gov -------------------------------

12

Plan Financiero del Departamento de Transporte de Georgia
El programa estatal para mejoras al sistema de transporte de Georgia (STIP) se desarrolla de acuerdo al Cdigo Federal 23 de Regulaciones o 23 "Code of Federal Regulations" (CFR) Seccin 450.216 e incluye una lista de prioridades de carreteras, trenes de pasajeros y proyectos de transporte pblico para implementarse (Seccin 630.106(a) (2)).
Lo siguiente describe presupuestos para los programas de transporte que son financieramente limitados por ao en el plan financiero STIP o "STIP Financial Plan" (SFP) para los aos fiscales 2014-2017. Para cumplir con la Seccin 23CFR Seccin 630.110, "Modificacin de Acuerdos Originales," para la autorizacin de las fases de proyectos (Seccin 630.106(a)(2)) de un previo STIP, el SFP se reserva una parte de los fondos para estos propsitos y distribuye los fondos de transporte restantes para proyectos locales y estatales por un periodo de cuatro aos. El plan financiero incluye proyectos que se puede esperar con alguna certeza que haya fondos disponibles. Solo los proyectos o las fases de proyectos (ingeniera preliminar, adquisiciones, o construccin) para proyectos de carreteras o (capital o operacionales) para proyectos de trnsito son incluidos en el STIP.
El SFP para los aos 2014-2017 fue desarrollado basado en los balances de los fondos federales y estatales y proyecciones de ayuda federal y estatal para los aos 2014, 2015,2016 y 2017, para cada uno de los cuatro aos del STIP. Adems, el Programa de Mejoras de Transporte, o "Transportation Improvement Program" (TIP) y sus fondos, desarrollados por las quince organizaciones metropolitanas de planificacin de Georgia o "Metropolitan Planning Organizations"(MPO), estn incorporadas al STIP por referencia.
La suma total del SFP para el fiscal 2014-2017 para carreteras y transporte pblico equivale a $9.17 billones con $2.66 billones para el ao fiscal 2014. Los ingresos para este programa de cuatro aos, se compone de $6.44 billones en fondos federales, $1.60 billones en fondos estatales, y $1.13 billones en fondos locales. Este nivel de inversin en infraestructura es responsable por 385,165 empleos en la industria de la construccin, as como un sistema de transporte en buen estado que fomenta una economa saludable, proporcionando la infraestructura para el movimiento eficiente de bienes y personas.
Los presupuestos de los proyectos en el STIP estn basados en los mejores clculos de ingeniera disponibles en el momento en que se hicieron. Los costos finales para una fase de un proyecto pueden cambiar, el proceso de pre-construccin define los costos de derechos o de cantidades de diseo. Si por motivo de estos cambios se altera la intencin, diseo o mbito del proyecto, se tendr que seguir el proceso de cambios al STIP, que se encuentran en esta seccin. Los fondos tambin se reservan para estas enmiendas.
PROGRAMAS DE CARRETERAS financiado por MAP-21 (Moving Ahead for Progress in the 21st Century Act)
Programa Nacional de Rendimiento de Carreteras, "National Highway Performance Program" (NHPP) Bajo MAP-21, el realzado Sistema Nacional de Carreteras se compone de los caminos rurales y urbanas que sirven los grandes centros de poblacin, instalaciones intermodales de transporte y los principales destinos de viaje. Incluye el sistema interestatal, todas las arterias
13

principales, las carreteras que dan acceso de vehculos de motor entre el NHS y los principales centros intermodales de transporte y la red de carreteras importantes para la defensa estratgica de los EE.UU. (STRAHNET) y sus conexiones con las principales instalaciones militares. El avance se prev a medida que nuevas arterias urbanas principales se identifican, no ser un proceso/revisin independiente para determinar si son elegibles de NHS.
Programa de Superficies de Transportacin, "Surface Transportation Program" (STP) Los fondos de STP pueden ser utilizados por el Estado y las localidades para proyectos con el fin de preservar o mejorar las condiciones y el rendimiento en proyectos de ayuda federal ya sean de carretera, puente, en cualquier va pblica, facilidades para el transporte no motorizado, proyectos de trnsito de capitales y terminales de autobuses pblicos e instalaciones. La distribucin de los fondos de STP cuenta con el 50 por ciento para el uso en las zonas urbanas y rurales del Estado basado en la poblacin. El 50 por ciento restante se puede utilizar en cualquier rea del estado en la direccin del Departamento.
Programa de Mejoras a la Seguridad Vial, "Highway Safety Improvement Program" (HSIP) El programa de mejoras a la seguridad vial es un programa con el propsito de reducir significativamente las muertes de trfico y las lastimaduras serias en todos los caminos pblicos. Proyectos de seguridad incluyen eliminacin de peligros "Hazard Elimination", cruces de ferrocarril y aparatos de proteccin de ferrocarril.
Mitigacin de Congestin / Calidad de Aire, "Congestion Mitigation/Air Quality" (CMAQ) Estos fondos son para proyectos, que se pueda probar, ayudan a reducir la congestin de trfico y/o mejorar la calidad del aire en zonas de no cumplimiento, "non-attainment". Proyectos que califican para esto incluyen: estacionamientos cerca de la transporte pblico, "Park and Ride"; sincronizacin de seales; y carros compartidos, "ride share". Actualmente hay veinte y ocho condados en la zona de "no cumplimiento", "non-attainment": Barrow, Bartow, Bibb, Carroll, Catoosa, Cherokee, Clayton, Cobb, Coweta, DeKalb, Douglas, Fayette, Floyd, Forsyth, Fulton, Gwinnett, Hall, Heard, Henry, Monroe, Murray, Newton, Paulding, Putnam, Rockdale, Spalding, Walker y Walton.
Programa de Alternativas de Transporte, "Transportation Alternatives Program" (TAP) Establecido con MAP-21, este nuevo programa abarca proyectos que antes eran actividades elegibles bajo otros programas financiados por separado. Los proyectos que califican incluyen actividades de mejora de transporte, senderos recreativos, rutas seguras a la escuela, y la planificacin, el diseo o la construccin de carreteras dentro del derecho de va de las antiguas rutas interestatales u otras carreteras divididas.
Demostracin y de Alta Prioridad, "Demonstration or High Priority" (Demo, HPP) Estos fondos son autorizados por el congreso y designados para proyectos especficos.
FUENTES DE FINANCIACIN DE CARRETERAS
Procedencia de Fondos Estatales Los $1.53 billones de fondos estatales para carreteras se originan de diferentes fuentes que incluyen, impuestos a combustible, un impuesto a combustibles especiales (diesel), bonos del estado, y un impuesto del 3% en la venta de gasolina. Ochenta y dos por ciento de estos fondos se usan para la construccin y mantenimiento de carreteras. Un ocho por ciento est apartado para mejorar caminos locales. El resto no est programado para
14

ninguna ruta especfica. Los ingresos de estas fuentes incrementan alrededor de uno por ciento cada ao. Los fondos estatales son parte de la elaboracin del programa STIP, aproximadamente $1.09 billones se utilizan para igualar el aporte federal.
Procedencia de Fondos Federales los fondos federales para las carreteras incluidos en el STIP son aproximaciones basadas en las expectativas del Departamento del gasto que el Congreso autorice para el programa. El Departamento espera recibir por lo menos $5.09 billones en fondos federales para las carreteras en los prximos cuatro aos del "Fondo de Carreteras y Otros Fondos, "Highway Trust and Other Funds", y $1.20 billones de fondos prorrogados del SAFETEA-LU y de previas leyes sobre las carreteras. Solamente la parte que le corresponde a Georgia del fondo de carreteras se anticipa ser del 3.2% de un estimado $37.8 billones o $1.21 billones para el FY 2014. La cantidad mnima de fondos que recibir Georgia, tambin conocido como el "Techo de Obligacin", es el 95.3% de esa cantidad. Estos clculos pueden cambiar dependiendo de las asignaciones anuales y los niveles puestos por el Congreso.
Construccin Avanzada, "Advanced Construction" (AC) La ley federal permite que los estados pidan prestado de futuros fondos federales.
Hay cuatro proyectos en el STIP (PI # 0006373, 0006366, 0006367, 0006368) que establecen cantidades para el cambio por atender la deuda de bonos GARVEE que fueron financiados por fondos federales AC.
Procedencia de Fondos Locales para Carreteras Durante el programa de cuatro aos, se calcula que se necesiten $0.94 billones en fondos locales para igualar la asistencia federal para proyectos de carreteras locales y para las contribuciones para los mejoramientos al sistema estatal de carreteras.
Fuente de Financiamiento TIFIA (Financiamiento de Infraestructura de Transporte y la Ley de Innovacin) - Este programa ofrece asistencia de crdito Federal en forma de prstamos directos, garantas de prstamos y lneas de crdito contingente para financiar proyectos de transporte terrestre de importancia nacional y regional. Esta financiacin puede ayudar, los proyectos a gran escala calificados por adelantado que de otra manera podran ser retrasados o aplazados debido al tamao, complejidad o incertidumbre sobre el calendario de los ingresos.
Los Saldos No Comprometidos - Se refiere a la financiacin federal de aos anteriores que no han tenido sus distribuciones completamente agotadas. Estos fondos estn todava disponibles para ser utilizados como parte de la Autoridad de Obligacin del ao en curso, as como los nuevos prorrateos para el primer ao de este documento.
15

Resumen de Fondos Disponibles y Proyectos de Carretera

($ Millones)

Descripcin

FY 2014

FY 2015

FY 2016

FY 2017

Total de proyectos de carreteras Reserva - modificaciones y enmiendas Reserva para conversiones de AC Total de proyectos y modificaciones Fondos Totales Disponibles

$2,436 $133 $0
$2,569 $2,569

$1,790 $113 $0
$1,903 $1,903

1,862 $159
$0 $2,021 $2,021

$2,055 $94 $0
$2,149 $2,149

Total $8,143 $499 $0 $8,642 $8,642

Total Estimado de Fondos de Carretera y la Autoridad de Gastos Disponibles
($ Millones) Categora de Agrupaciones Groupings FY 2014 FY 2015 FY 2016 FY 2017 Total

Prorrateo Ejecucin de National Highway
Transporte Terrestre Mejoramiento de la Seguridad de Carreteras Mitigacin de Congestin Alternativas de Transporte Total de Prorrateo Saldos No Comprometidos Total

$733 $347 $83
$69 $33 $1,265 $1,197 $2,462

$740 $350 $84
$69 $33 $1,276
$1,276

$747 $354 $85
$70 $34 $1,290
$1,290

$755 $357 $85
$71 $34 $1,302
$1,302

$2,975 $1,408
$337
$279 $134 $5,133 $1,197 $6,330

Autoridad de los Gastos Federales Disponibles Frmula de Obligacin Mxima
Limitacin Especial de Alta Prioridad / Destinos Limitacin Especial Carretera de los Apalaches Carreteras de Bosques/Parques Nacionales Otros Fondos Federales
TIFIA (prstamo con respaldo federal)
Total de Disponibilidad de Fondos Federales Fondos Estatales con AC
Fondos Estatales (incluyen bonos estatales) Local funds
Gran Total

$1,304 $50
$14
$0
$1 $270 $1,639
$0 $566
$364 $2,569

$1,316 $33
$11
$0
$2 $0 $1,362
$0 $251
$290 $1,903

* El exceso de financiacin se utilizar para los ajustes

de costos del proyecto.

16

$1,328 $28
$35
$0
$3 $0 $1,394
$0 $499
$128 $2,021

$1,341 $37
$46
$0
$46 $0 $1,470
$0 $519
$160 $2,149

$5,289 $148
$106
$0
$52 $270 $5,865
$0 $1,835
$942 $8,642

Financiamiento de Proyectos de Carreteras - Aos Fiscales 2014-2017: Los $8.14 billones para el programa de carreteras para los aos fiscales 2014-2017 incluyen $5.67 billones en asistencia federal, $1.53 billones en fondos estatales y $0.94 billones en fondos locales. La tabla siguiente hace un resumen del financiamiento para los aos fiscales 2014-2017.

Fuente de Fondos
Asistencia Federal Fondos Estatales Fondos Locales Total Fondos de Bonos * (incluidos en Estatal y Local)

Proyectos de Carreteras para FY 2014-2017 ($ Millones)

FY 2014 FY 2015 FY 2016 FY 2017

Total

FY 2014-2017

$1,506 $1,249 $1,435 $1,476

$5,666

$566

$251

$299

$419

$1,535

$364

$290

$128

$160

$942

$2,436 $1,790 1,862 $2,055

$8,143

Promedio Anual
$1,417 $384 $236
$2,037

$0

$0

$0

$129

$129

$32

Distribucin de Programas

Seleccionados

NHPP

$255

$76

$66

$97

$494

$124

STP

($223)

($63) ($212) ($191)

($689)

($172)

Seguridad

$5

$8

$12

$13

$38

$10

CMAQ

$38

$31

$27

$12

$108

$27

Alt. de Transporte

$32

$32

$32

$32

$128

$32

Puentes

($16)

($4)

$0

$0

($20)

($5)

* Los saldos negativos representan la programacin de ms de una fuente de fondo en particular, pero el programa en general mantiene la restriccin financiera. La financiacin procedente de otras categoras puede ser transferida para cubrir los proyectos adicionales.
Resumen de los proyectos de carreteras por MPO rea FY 2014 -2017*

2014

2015

2016

2017

Total

Albany

$397,330

$45,000

$3,975,312

$4,419,584

$8,837,226

Athens

$10,390,104

$31,840,525

$0

$56,308

$42,286,937

Atlanta TMA

$1,281,555,681

$639,027,302

$634,373,843 $783,935,146 $3,338,891,972

Augusta TMA

$78,168,870

$29,479,264

$55,630,036 $22,146,265

$185,424,435

Brunswick

$13,000

$0

$0

$5,517,641

$5,530,641

Chattanooga TMA

$32,472,685

$6,682,120

$1,253,362

$3,383,500

$43,791,667

Columbus TMA

$13,516,439

$24,257,001

$467,450

$3,080,919

$41,321,809

Dalton

$224,322

$2,235,760

$15,384,483

$0

$17,844,565

Gainesville

$13,606,932

$27,534,211

$70,303,184 $28,128,139

$139,572,466

Hinesville

$20,157,123

$2,834,676

$0

$0

$22,991,799

Macon

$1,836,714

$13,435,426

$71,364,097 $25,769,821

$112,406,058

Rome

$25,649,689

$0

$12,922,014 $57,172,054

$95,743,757

Savannah TMA

$49,057,298

$41,753,945

$21,859,481 $13,279,850

$125,950,574

Valdosta

$20,008,000

$20,121,336

$35,820,355 $31,196,116

$107,145,807

Warner Robins

$32,179,535

$156,060

$0

$3,251,798

$35,587,393

Total de MPO

$1,579,233,722

$839,402,626

$923,353,617 $981,337,141 $4,323,327,106

rea Rural

$856,338,909

$950,737,174

$938,586,360 $1,072,972,606 $3,818,635,049

Total del Estado

$2,435,572,631 $1,790,139,800 $1,861,939,977 $2,054,309,747

* excluye los proyectos de trnsito

$8,141,962,155

17

Ley Avanzando para el Progreso en el Siglo 21, "Moving Ahead for Progress in the 21st Century Act" Programas de Ttulo 3 Trnsito, tren de pasajeros, aviacin, trenes de carga, y puertos unen con las carreteras formando los nodos del sistema intermodal de Georgia. Modalidades que no incluyen carreteras son financiados por Titulo 3 o dinero desviadas, "Flexed", del Titulo 1 como parte del STIP. Por su importancia al transporte de Georgia, se incluye en este documento, un resumen de programas que no incluye carreteras, y que estn financiadas por otros medios que no son el Map-21, pero que son administrados por el Departamento del Transporte de Georgia.
PROGRAMAS DE TRANSITO
El Departamento del Transporte de Georgia en cooperacin con la Administracin Federal de Trnsito (FTA) y las agencias estatales pblicas de trnsito, trabajan juntos para desarrollar programas de servicio y mejorar instalaciones para satisfacer las necesidades de transportacin del estado.
Una de las misiones del programa de transporte pblico del GDOT es de preservar y ampliar las instalaciones y equipo del transporte pblico urbano y rural. Los programas de transporte pblico listados en el STIP estn financiados con fondos de la Administracin Federal de Trnsito (por SAFETEA-LU y Map-21). Estos proyectos han sido identificados por los MPOs a travs del proceso de planificacin de transportacin y forman parte de programa de mejoras al transporte (TIP) en zonas urbanas. El departamento, en cooperacin con operadores de trnsito rurales identifican las necesidades de esas zonas. Los proyectos en zonas urbanas estn listadas por ciudades que tienen programas de trnsito en operacin Albany, Athens, Atlanta, Augusta, Columbus, Gainsville, Hinesville, Macon, Rome y Savannah.
Proyectos tpicos urbanos incluye, capital, planificacin, y operaciones (Seccin Federal de Trnsito 5307) y capital para proyectos estatales para ancianos / discapacitados (Seccin Federal de Trnsito 5310). GDOT est designada como el recipiente de fondos del FTA para reas con menos de 200,000 habitantes. El departamento recibe fondos del fondo general del estado para su contribucin hasta un lmite de la mitad de la aportacin local, para proyectos de trnsito en Albany, Athens, Gainesville, Hinesville, Macon y Rome. Adems, el departamento coordina con el departamento de recursos humanos de Georgia, Georgia Department of Human Services, (GDHS) en proyectos de transportacin para ancianos y personas discapacitadas.
Atlanta, Augusta, Savannah, y Columbus tienen ms de 200,000 habitantes y reciben fondos de trnsito directamente del FTA. El departamento tambin contribuye hasta con la mitad de la aportacin local, para proyectos de capital en estas localidades. El departamento ha tenido un papel importante contribuyendo una parte de la asistencia financiera para proyectos de transporte pblico como Dentro de las limitaciones del presupuesto del estado, el departamento presta asistencia financiera a proyectos de el "Cobb Community Transit" (CCT), el "Gwinnett County Transit", el "Metropolitan Atlanta Regional Transit Authority" (MARTA), el condado de Clayton y el Condado de Douglas.
18

Programas de Trnsito incluyen:
Programa de Formula para Areas Urbanizadas - La seccin 5307 de la FTA provee financiamiento para capital, operaciones, y asistencia de planificacin. Los fondos se reparten a nivel nacional en base a una frmula.
Programa de Modernizacin de Gua-Va Fijo o "Fixed Guideway" La seccin 5309 de la FTA provee fondos capitales para modernizacin de sistemas de ferrocarril existentes. (Modificado del programa "New Starts/Small Starts")
Programa de Formula para Ancianos y Personas con Discapacidad - La seccin 5310 de la FTA provee financiamiento a agencias sin fines de lucro privadas para mejoras de capital para su utilizacin en servicios de transporte a los ancianos y personas discapacitadas.
Programa de Formula en Zonas No Urbanizadas - La seccin 5311 de la FTA provee financiamiento en reas no urbanas, para mejorar el acceso del pblico a servicios de salud, compras, educacin, empleos, servicios pblicos y recreacin. Los fondos se pueden utilizar para gastos de capital, operaciones o administrativos. Este programa tambin incluye el Programa de Transporte de Asistencia Rural de los DOTs (Seccin 5311(b) (3) que proporciona financiacin para el entrenamiento, proyectos de asistencia tcnica, investigacin y otros servicios de apoyo para las operaciones de trnsito rural. La Seccin 5311 del programa tambin incluye un 15% retirado para tierras de apoyo de capital para los operadores privados de autobuses interurbanos (Seccin 5311(f)).
Acceso a Trabajos y Programas de Recorrido Inverso (Derogado y consolidado dentro de la seccin 5311 del programa FTA) Los fondos de la seccin 5316 del FTA que permanecen bajo SAFETEA-LU provee frmulas de financiamiento para los Estados y los Destinatarios Designados para apoyar el transporte de los beneficiarios de asistencia social y de bajos ingresos desde y hacia trabajos y actividades relacionadas con su empleo, incluyendo proyectos de recorrido inverso.
Programa Nueva Libertad (Derogado y consolidado dentro de la seccin 5310 del programa FTA) Los fondos de la seccin 5317 del FTA que permanecen bajo SAFETEALU provee fondos para nuevos servicios de transporte pblico adems de aquellos requeridos por la Acta de Americanos con Discapacidad de 1990 (ADA)", para asistir a individuos con discapacidades de acceso a servicios de transporte, incluyendo transporte de y hacia trabajos y los servicios de soporte de trabajo.
Manejo de Capital de Transito La seccin 5326 de la FTA provee nuevos requisitos para el trnsito asset management por los adjudicatarios de FTA, as como nuevos requisitos en materia de presentacin de informes para promover la rendicin de cuentas.
Vigilancia a la Seguridad/Seguridad de Trnsito La seccin 5329 de la FTA provee la autoridad de establecer y aplicar un nuevo marco global para velar por la seguridad de los servicios de transporte pblico en todo el territorio de los estados unidos en lo que se refiere a la fuerte rampa, tren ligero, autobuses, ferris, y los tranvas.
19

Concesin de Estado de Buena Reparacin La seccin 5337 de la FTA est dedicada a reparar y mejorar el sistema de ferrocarril de la nacin junto con los sistemas de bus de motor de alta intensidad que utilizan carriles para vehculos de alta ocupacin, incluyendo autobuses de trnsito rpido (BRT). Autobs y Facilidades de Autobs La seccin 5339 de la FTA provee fondos capitales para reemplazar, rehabilitar y comprar autobuses, equipo relacionado y para construir facilidades de relacionadas con autobuses.
***Los fondos autorizados y apropiados para los programas de SAFETEA-LU derogados estn disponibles para la obligacin (y los gastos) a travs de su perodo autorizado de disponibilidad, a menos que y hasta que el Congreso tome medidas dirigir lo contrario. Los programas incluidos en esta categora se incluyen el Programa Combustible Limpio, Acceso al Trabajo y Recorrido Inverso, Nueva Libertad, Trnsito en los Parques, Anlisis de Alternativas,
Autobuses e Instalaciones de Autobuses, Programa de Modernizacin de Gua-Va, y
Programa de Autobuses Sobre- la Carretera. Estos programas expiraron el 30 de septiembre de 2012 y sin nueva financiacin est autorizada ms all del ao fiscal 2012.
20

FUENTES DE FINANCIAMIENTO PARA EL TRANSITO
Fuentes Estatal de Financiamiento - La legislatura del estado contribuye la mitad del veinte por ciento requerido para obtener fondos federales para el transporte procedentes del fondo general del estado. Aproximadamente $43 millones provenientes del fondo general estn programados en el STIP.
Fuentes Federales de Financiamiento del Trnsito - Los $781 millones en fondos de asistencia federal estn basados en parte en clculos de los ingresos federales disponible para Georgia a travs del fondo "Transit Trust" y por fondos destinados bajo el SAFETEA-LU y MAP -21.
Fuentes Locales de Financiamiento de Trnsito - Durante los cuatro aos del programa se estima que se necesitaran $192 millones en fondos locales para igualar la ayuda federal. Estos fondos vienen de impuestos locales de ventas, distritos de impuestos especiales, impuestos de propiedad, al igual que el compendio general de impuestos.

Resumen de los Programas de Trnsito como resultado de MAPA-21 (Ley Avanzando para el Progreso en el Siglo 21)

Cambios al Programa de MAPA-21

Nuevo
Autoridad de Seguridad (5329)

Derogado
Subvencin de Combustibles Limpios
(5308)

Consolidado
Subvencin de Frmula en reas Urbanizadas (5307) [JARC]

Modificado
Subvencin a la Inversin de Capital Fijo (5309)

Subvencin de Estado de Buena Reparacin (5337)
Gestin de Activos (5326)
Autobuses y Facilidades de Autobuses (5339)
Alivio de Emergencia de Transporte Pblico (5324)
Subvencin Piloto de Planificacin TOD
(20005(b) of MAP-21)

Acceso a Trabajos y Programas de Recorrido
Inverso (5316) [JARC]
Programa Libertad Nueva (5317)
Trnsito en los Parques de Paul S. Sarbanes (5320)
Anlisis de Alternativas (5339)
Over-the-Road Bus (Sec. 3039 - TEA-21)

Movilidad Mejorada para Mayores y Personas con Incapacidades (5310) [New
Freedom]
Subvencin de Frmula en Areas Rurales (5311) [JARC]

Planificacin Metropolitana y a Travs del Estado (5303 &5304)
Investigacin y Desarrollo, Demostracin y Despliegue
(5312)
Asistencia Tcnica y Normas (5314)
Recursos Humanos y Entrenamiento (5322)

21

Proyectos de Trnsito FY 2014-2017 ($ Miles)

Fuente de Fondos
Fondos Federales Fondos Estatales Fondos Locales Total

FY 2014
$165,622 $16,414 $43,560
$225,596

FY 2015
$179,415 $19,365 $37,821
$236,601

FY 2016
$195,925 $12,163 $53,820
$261,908

FY 2017
$233,272 $14,434 $56,818
$304,524

Total FY 2014-2017
$774,234 $62,376
$192,019 $1,028,629

Promedio Anual $193,559 $15,594
$48,005 $257,157

Estimado de Fondos de Trnsito - FY 2014-2017 ($ Miles)

Categora
Programa de Formula para reas Urbanizadas (5307) Capital Programa de Formula para reas Urbanizadas (5307) - Operaciones Programas para Ancianos y Personas con Incapacitada (5310) Programa de Formula en Zonas No Urbanizadas (5311) Capital Programa de Formula en Zonas No Urbanizadas (5311) Operaciones Programa de Autobs Interurbano (5311f) Autoridad de Seguridad (5329)
Subvencin de Estado de Buena Reparacin (5337) Autobuses y Facilidades de Autobuses (5339) Otros Proyectos de Trnsito
Total del Desglose

FY 2014
$87,031 $10,444 $4,084 $7,023 $26,307
$2,574 $999
$73,063 $13,777
$294 $225,596

FY 2015
$83,263 $6,289 $3,961 $9,028 $25,985
$2,574 $999
$87,676 $16,532
$294 $236,601

FY 2016
$88,018 $9,258 $1,717 $6,555 $28,743
$1,568 $999
$105,212 $19,838
$0 $261,908

FY 2017
$101,649 $5,517 $2,060 $7,866 $34,492
$1,881 $999
$126,254 $23,806
$0 $304,524

Total FY 2014-2017
$359,961 $31,508 $11,822 $30,472 $115,527
$8,597 $3,996 $392,205 $73,953
$588 $1,028,629

22

PROGRAMAS DE AVIACIN
La misin del programa de aviacin del GDOT es de preservar y ampliar el sistema estatal de transportacin por aire para cumplir con las demandas de los usuarios. El programa provee apoyo financiero y tcnico a aeropuertos que son propiedad pblica y que estn abiertos al pblico. El Departamento de Transporte de Georgia est autorizado a planificar y apoyar a establecer, desarrollar y dar mantenimiento a la aviacin e instalaciones de aviacin. El programa apoyo a aeropuertos de Georgia, El "Georgia Airport Aid Program" (GAAP) provee fondos estatales de apoyo, designado por la asamblea general de Georgia, para capital, mantenimiento, acercamiento, y planificacin de proyectos. Los proyectos de desarrollo, mantenimiento, apoyo y planificacin estn financiados en un 75% por parte del estado o en un 50% por la asistencia del estado para los aeropuertos de la zona urbana sin apoyo federal. Todo proyecto de construccin aprobado por la administracin federal de aviacin, "Federal Aviation Administration" (FAA) reciben el 95% de fondos del FAA y el 2.5% de ayuda estatal. Las marcas de aeropuerto en proyectos estatales de desarrollo son elegibles para la 100% financiacin. Adems, el nivel de contratacin mnima por parte del estado en todos los proyectos GAAP es de $1,500. Proyectos estatales (no federales) son seleccionados cada ao usando el criterio del sistema de prioridades GAAP. Los proyectos con patrocinio federal reciben la ms alta prioridad para igualar el aporte del estado.
PROGRAMAS DE RIELES
La misin primordial del programa de rieles de GDOT es de preservar y ampliar el sistema estatal de rieles para el futuro desarrollo y ampliacin de trenes de carga y de pasajeros. Pasillos existentes en el plan del departamento de trenes de carga se identifican como adquiridos y rehabilitados o solo rehabilitados, esto para asegurar acceso estratgico al sistema de trenes de carga a las comunidades de Georgia. Desde 1992, GDOT ha adquirido 540 millas de lneas ferroviarias ligeras y desde 1981, GDOT ha rehabilitado793 millas de lneas ferroviarias ligeras.
El programa de trenes de pasajeros definido en el documento titulado: Programa intermodal para servicio de tren de pasajeros en Georgia, "Intermodal Program for Rail Passenger Service in Georgia", gua la implementacin de servicio de tren de pasajeros interestatal, interurbano y de transporte de trabajadores "Commuters", para establecer una alternativa multimodal en los locales donde ms se viaja en el estado. Siete (7) servicios de transporte al trabajador y seis (6) lneas de riel interurbano son identificadas por el programa para servir y conectar las zonas metropolitanas de Atlanta, Athens, Griffin, Macon, Bremen, Canton, Senoia, Albany, Savannah, Augusta y Columbus.
PROGRAMA DE PUERTOS
La misin del programa de puertos de GDOT es de trabajar en sociedad con el cuerpo de ingenieros para mantener la navegabilidad de la va fluvial nter costea Atlntica," Atlantic Intercostal Waterway" y de los puertos de profundidad en Savannah y Brunswick. Para mantener un canal navegable el cuerpo de ingenieros rastrea los puertos anualmente. El Departamento trabaja en sociedad con el cuerpo de ingenieros para proveer reas de contencin para los materiales rastreados para los proyectos federales de rastreo. El Departamento est requerido de compartir los costos de diques en lo que va de su diseo, construccin, y mitigacin del medio ambiente. GDOT aporta el 35% de costos de construccin de diques pero no del mantenimiento de las reas de contencin. Anualmente, el GDOT solicita fondos a la asamblea general de Georgia para cubrir estos costos y actividades.
23

Proceso de Enmiendas a los Programas Estatal para Mejoras al Sistema de Transporte (STIP) y Programa de Mejoras al Transporte (TIP)
La Administracin Federal de Carreteras, "Federal Highway Administration" (FHWA) y la Administracin Federal de Transito (FTA) establecieron las reglas finales para cambiar los reglamentos para hacer cambios al plan estatal y de planificacin metropolitana de transportacin adoptando cambios a la Ley Avanzando para el Progreso en el Siglo 21, Moving Ahead for Progress in the 21st Century Act (MAP-21) con una fecha efectiva de julio, 2012. Los nuevos reglamentos claramente definen a las modificaciones administrativos y enmiendas como acciones que actualizan planes o programas. El Cdigo 23 de los Reglamentos Federales (CFR) Parte 450.104 define edificaciones administrativas y enmiendas de la siguiente manera:
El termino Modificacin Administrativa "significa una leve revisin a un plan de largo alcance a nivel estatal o a un plan metropolitano de transporte, un programa de mejoras al transporte (TIP), o al programa de mejoras al sistema de transporte estatal (STIP) esto incluye cambios menores a los costos de un proyecto o fase, cambios menores en Fuentes de financiamiento de proyectos previamente incluidos, o cambios menores de fechas de comienzo de proyectos o fase. La Modificacin Administrativa no requiere evaluacin y comentario pblico, ni de re demonstracin de limitaciones fiscales, ni una determinacin de conformidad (en reas de "no cumplimiento" de mantenimiento)."
Enmienda "significa una revisin a un plan de largo alcance a nivel estatal o a un plan metropolitano de transporte, un TIP, o un STIP que significa grandes cambios en un proyecto que forma parte de un plan metropolitano de transporte, un TIP, o un STIP, incluyendo la adiccin o eliminacin de un proyecto, o un cambio mayor en proyecciones de costos, fecha de inicio de un proyecto o fase, o un cambio mayor en concepto o diseo (ejemplo: cambios en las terminales o numero de vas de trafico). Cambios a proyectos que son incluidos solo para propsitos de demostracin no requieren de una enmienda. Una enmienda es un revisin que requiere evaluacin y comentario pblico, re demonstracin de limitaciones fiscales, determinacin de conformidad (para planes de transportacin metropolitana o TIP con proyectos "no excepto en reas de "no cumplimiento" de mantenimiento). En el contexto de un plan de largo alcance a nivel estatal, una Enmienda es una revisin aprobada por el estado de acuerdo con el procedimiento de participacin del pblico."
Los siguientes procedimientos han sido elaborados para el procedimiento de modificaciones administrativas y enmiendas al STIP, Plan Metropolitano de Transporte (MPO), TIPs, y Planes de Transportacin de Largo Alcance (LRTP). Los procedimientos detallados a continuacin describen lo necesario para actualizar un STIP o TIP ya aprobado y los planes asociados, si esto es aplicable. Un elemento clave del proceso de enmiendas es el asegurase que se mantengan los balances de fondos.
24

Modificaciones Administrativas para las Autorizaciones Iniciales Las acciones siguientes califican como Modificaciones Administrativas al STIP/TIP/LRTP:
A. Actualizar la descripcin de un proyecto sin cambiar el mbito del proyecto, estar en conflicto con el documento ambiental, o la determinacin de conformidad en reas de "no cumplimiento" de mantenimiento (menos de 10% en un cambio de terminales). Este cambio no altera el mbito original del proyecto. B. Separacin o combinacin de proyectos. C. Cambio de categora de fondo federal. D. Cambios menores en gastos de proyectos de transito. E. Incrementos de los costos de fases en proyectos de carreteras menos de $2,000,000 o 20% de la cantidad por autorizar. F. Cambio de proyectos dentro de los cuatro aos del STIP, cuando ha sido presentada antes del 30 de septiembre. G. Los proyectos pueden ser financiados del "Lump Sum Bank" siempre y cuando sean consistentes con las definiciones de las categoras. Una Modificacin Administrativa se puede procesar de acuerdo con estos procedimientos siempre que: 1. No afecte la determinacin de conformidad de la calidad de aire. 2. No impacte las limitaciones financieras. 3. No requiera evaluacin y comentario pblico. El proceso de modificacin administrativa consiste en una lista mensual de notificaciones de GDOT a todas las partes implicadas, con resmenes de cambio enviadas en forma mensual a la FHWA y FTA por el GDOT. El GDOT presenta informes trimestrales al FHWA, detallando que proyectos han retirado de cual banco "Lump Sum", y cules son los balances restantes.
25

Enmiendas para las Autorizaciones Iniciales
Las acciones siguientes califican como Enmiendas al STIP/TIP/LRTP:
A. Adicin o eliminacin de un proyecto.
B. Adicin o eliminacin de una fase de un proyecto.
C. Incrementos de costos de fases en proyectos de carreteras que superan las limitaciones descritas en la seccin de Modificaciones Administrativas.
D. Adicin de un nuevo TIP anual.
E. Cambios mayores en el mbito de trabajo de un proyecto existente. Un cambio mayor sera cualquier cambio que altera la intencin original. Ejemplo: cambios en el nmero de vas de trfico o nmero de terminales de ms del 10 por ciento.
F. Cambio de proyectos dentro de los cuatro aos del STIP que requiere re demonstracin de limitacin fiscal o cuando la propuesta anual de STIP no ha sido presentada antes del 30 de septiembre. (Ver Modificacin Administrativa artculo F).
Enmiendas al STIP/TIP/LRTP se desarrollara de acuerdo con las provisiones del 23 CFR Parte 450. Esto requiere evaluacin y comentario pblico y respuestas a todos los comentarios individualmente, o en resumen. Para enmiendas en reas MPO el proceso de evaluacin pblica debe llevarse a cabo de acuerdo con el procedimiento delineado en el Plan de Participacin Pblica. El GDOT asegurara que los procesos de enmienda y de involucrar al pblico se sigan. Cambios a los costos en el segundo, tercero o cuarto ao del STIP sern saldados durante el proceso de actualizacin anual. Todas las enmiendas debern ser aprobadas por la FHWA y/o la FTA.
Notas:
1. La fecha que el TIP se hace efectivo es cuando el Gobernador o su representante lo aprueba. En tanto a las reas de "no cumplimiento" de mantenimiento, la fecha efectiva del TIP est basada en la fecha que el Departamento de Transportacin de los Estados Unidos rinda una determinacin de conformidad positiva.
2. La fecha efectiva del STIP es cuando la apruebe la FHWA y la FTA.
3. El STIP se desarrolla en el ao fiscal estatal, 1, Julio 30, Junio.
4. Fondos para cubrir los aumentos de costos vendrn de los fondos designados por el GDOT al plan financiero del STIP para modificaciones e incrementos de costos. Limitaciones Fiscales se mantendrn en el STIP todo el tiempo.
26

Solicitud de Financiamiento Adicional Despus de la Autorizacin Inicial Las solicitudes de financiamiento adicional para todas las fases posteriores a la recepcin de la autorizacin inicial para esas fases ser una modificacin y se informar al final de cada mes, excepto bajo las siguientes condiciones:
A. La autorizacin inicial de trabajo para la fase es mayor de 10 aos. B. La solicitud de financiamiento adicional supera a la autorizacin inicial de trabajo por ms
de $10 millones.
27

Directiva de Autorizacin De FMIS para PE and Adquisicin de Derecho de Paso (ROW) de FHWA/GDOT
Requisitos Adicionales para Sumisiones de PE: Estas polticas se refieren a modificaciones de FMIS incurridos despus de la autorizacin inicial. La autorizacin inicial tiene que ser programada durante el TIP / STIP para recibir fondos. La FHWA de Georgia se reserva el derecho de denegar la solicitud de modificacin de FMIS independientemente de si cumple con los siguientes requisitos. Las solicitudes adicionales de financiacin para las fases de PE despus de la recepcin de la autorizacin inicial deber ser una modificacin y deben ser informadas al final de cada mes. Las solicitudes que no cumplan con las siguientes expectativas o parecen no ser un candidato para fondos adicionales a travs de algunas modificaciones de FMIS debern tener programacin en el documento de planificacin en curso actualizado para reflejar la solicitud. Fases de mitigacin agregado como una modificacin de FMIS no ser aprobada y deben ser programadas por separado.
Si las solicitudes quedan fuera de las pautas a continuacin la solicitud tendr que ser programada en el documento de planificacin actual.
La autorizacin inicial de trabajo para la fase es mayor de 7 aos.
La solicitud de financiamiento adicional supera la autorizacin inicial de trabajo por ms de $2,000,000 o 20% de la cantidad de la autorizacin inicial, el que sea mayor.
Requisitos para todas las Sumisiones de ROW: Cada proyecto presentado a la FHWA para la autorizacin de financiamiento para la adquisicin del derecho de paso deber estar inscrito en el STIP/ TIP corriente. Todas las solicitudes de FMIS deben basarse en una estimacin del costo actual del GDOT ROW. Todos los proyectos deben tener aprobacin del los planes actuales/exactos de ROW. Todos los proyectos deben tener un documento aprobado por la actual NEPA.
Fase de ROW bajo $15 millones Las autorizaciones para proyectos de adquisicin de derecho de paso menor de $15 millones deben ser programados en un solo ao a travs del STIP / TIP corriente y ser autorizados por completo en ese mismo ao.
Proyecto de Financiamiento Dividido sobre $15 milln Los proyectos de adquisicin de derecho de paso sobre $15 millones pueden ser divididos financieramente en dos fases que sean programadas en aos consecutivos. La fase final de adquisicin de derecho de paso no debe caer en el mismo ao fiscal que la construccin. Un mnimo del 40% de toda la financiacin debe estar en el primer ao de autorizacin.
Si se necesitan ms fondos para la Adquisicin de Derecho de Paso Si fondos adicionales fueran necesarios para las siguientes situaciones: 1) Denuncia de excesos, 2) Cambio en el estimado de los costos debido a cambios en la aplicacin o cambios significativos del plan de una cantidad de hasta el 20% del costo original estimado podr ser autorizado de inmediato con la documentacin de dndes se obtuvieron los fondos en el programa de
28

GDOT y a seguir con la Divisin de FHWA de Georgia dentro de los 30 das. Si la cantidad que se necesita es ms del 20% del costo estimado original de ROW, o por otros motivos que los indicados anteriormente, la FHWA y GDOT se ocuparn de estos temas en una base de caso por caso. La documentacin de donde se obtuvieron los fondos se remitirn a la oficina de la Divisin de FHWA de Georgia dentro de los 30 das siguientes a su aprobacin.
29

FONDO "SUMA GLOBAL"
Una porcin de los fondos STIP estn reservados para once grupos de proyectos que no afectan la capacidad de las carreteras. El programa Suma Global o "Lump Sum", est designado para proveer al departamento y los MPO la flexibilidad para responder de inmediato a proyectos de necesidades urgentes mientras a la vez cumplir con los requisitos del STIP. Los fondos se mantienen en bancos de Suma Global para financiar proyectos que se desarrollen despus de que el STIP sea aprobado. Estos bancos de Suma Global se encuentran en la seccin estatal en el ndice del STIP, y estn organizados por tipo de financiamiento y por ao, para que le sea ms conveniente al Departamento su manejo y contabilidad. Los bancos de Suma Global se encuentran en el TIP / STIP con las palabras "Lump Sum Bank" en el espacio descripcin del proyecto, "project description", e indican la cantidad de financiamiento para cada ao. Los fondos se retiran a lo largo del ao, y programas individuales son programados. Estos proyectos pueden incluir obras que se realizan en uno o varios sitios, como sea ms fcil para llevar su contabilidad. Los proyectos de Suma Global pueden ser autorizados en el actual ao fiscal. A seguir se encuentran los once grupos y la informacin sobre ellos. Con excepcin de los grupos para ingeniera preliminar", y para la adquisicin de derecho al paso, la suma total de estos fondos se muestra como construccin para simplificar la contabilidad, pero cuando se necesitan, fondos para ingeniera preliminar y adquisicin de derecho al paso se pueden retirar de esta cuenta cuando se necesiten para estas categora.
De manera que se van programando los proyectos se puede retirar los fondos del banco de Suma Global cuando se necesiten para ingeniera preliminar, adquisicin del derecho al paso, y construccin. Estos proyectos pueden recibir financiamiento del ao actual o de uno de los otros aos TIP/STIP. Los fondos para estos proyectos no se calculan hasta que no se autoriza un pedido para ellos. Cuando eso sucede, los costos actuales se deducen del balance del banco de Suma Global.
Para proveer al lector del TIP/STIP con la mayor informacin posible, futuros proyectos individuales que sean financiados por medio del banco de Suma Global se indicarn en el TIP/STIP con el ao 2014 y el costo estimado. Estos proyectos tambin se denominan por las palabras "Uses Lump Sum Bank PI # 000xxxx" en la extrema izquierda baja en el listado de los proyectos. Para evitar que estos proyectos se cuenten dos veces, estos no se incluyen en la cifra total por condado.
Grupo: Mantenimiento
Criterios: solo mantenimiento de sistemas actuales
Este grupo tiene seis tipos de trabajo/financiamiento: dos son para pintar y para el mantenimiento de puentes y los otros cuatro son para el mantenimiento de carreteras. En su mayora las clases de obras son: reparacin de las superficies de las carreteras, rehabilitacin del pavimento, medianas de las carreteras, atenuadores de impactos, letreros, cercados, marcas en el pavimento, jardinera, reas de descanso, barandillas, y las orillas de las carreteras. Tambin se incluyen ingeniera preliminar para la preparacin de planes, adquisicin de derecho al paso, para la reparacin de deslaves, conexiones de alcantarillado y control de erosin.
30

Grupo: Seguridad
Criterios: trabajos que califiquen bajo el programa de seguridad para peligros graves o "High Hazard Safety Program".
Este grupo incluye las siguientes tipos de obras: instalacin/mejoramiento de seales de trfico, instalacin de barandillas, dispositivos de seguridad en los cruces de ferrocarril, mejoramientos operacionales, eliminacin de peligros en cruces ferroviarios, eliminacin de peligros en las carreteras, y los estudios y programas para la seguridad.
Grupo: Ingeniera Preliminar
Criterios: servicios de planificacin, administracin y consultora en diseo Este grupo contiene una sola categora.
Grupo: Iluminacin de Carreteras / Intercambios
Criterios: Iluminacin Este grupo contiene una sola categora.
Grupo: Adquisicin de Derecho al Paso Compras Preventivas y Adquisiciones por Privacin.
Criterios: la compra de parcelas de terrenos para adquirir el derecho al paso, "Right of Way", (RW) para futuros proyectos que estn en peligro de ser desarrollados y tambin para adquisiciones por privacin. Proyectos que califican estn en proceso de ingeniera preliminar, "Preliminary Engineering", (PE) o que tienen una fase de PE, RW o construccin en el STIP. Para los condados que no estn en cumplimiento con la calidad del aire, los nicos proyectos que califican son los que tienen una fase de RW en el STIP. Este grupo contiene una sola categora.
Grupo: Programa de Alternativas del Transporte
Criterios: TAP provee fondos para programas y proyectos definidos como alternativas de transporte, incluidas las instalaciones para bicicletas y peatones en todo terreno y los proyectos de infraestructura para mejorar el acceso de no conductor del transporte pblico y mejora de la movilidad, las actividades de mejora de la comunidad, y la mitigacin ambiental, recreativo proyectos rastro del programa, rutas seguras a los proyectos escolares, y proyectos para la planificacin, el diseo, o la construccin de bulevares y otras carreteras en gran medida en el derecho de va de ex rutas sistema interestatal o autovas.
De acuerdo con lo permitido por la legislacin MAP-21, GDOT se reserva el derecho de transferir el 50% de los fondos disponibles de TAP a una de las categoras de financiacin ms flexibles disponibles. Esos dlares se pueden gastar en cualquier proyecto de ayuda federal elegibles para permitir GDOT para centrarse en la entrega de las mejoras en el transporte de larga necesarias que apoyen el movimiento seguro de personas y mercancas, de la manera ms eficiente.
El 50% restante de los fondos TAP consiste en dlares sub-asignados a MPOs ms de 200.000 en la poblacin, as como fondos de TAP celebrada en DOT estatales elegibles para su uso en zonas por
31

debajo de 200 000 habitantes. Los proyectos seleccionados para recibir estos fondos deben ser el resultado de un proceso de seleccin competitivo. Este grupo contiene dos tipos de financiamiento
Grupo: Iniciativa de Centros Habitables, "Livable Centers Initiative" (LCI)
Criterios: esos proyectos han sido cualificados por el programa LCI y seleccionados por la comisin regional de Atlanta o "Atlanta Regional Commission" (ARC).
Los proyectos de implementacin LCI son seleccionados en forma competitiva y las cantidades de financiamiento otorgadas del "Lump Sum" se hacen por medio de una tarifa razonable en cuanto a ingeniera, adquisicin y construccin para proyectos que incluyan el programa en su totalidad. Fondos para fases de un proyecto se pueden mover de un ao para otro como sea necesario, siempre y cuando tales cambios no afecten las fechas de implementacin de otros proyectos o que no se pasen de la cantidad de financiamiento por la Suma Global
Este grupo contiene una sola categora.
Grupo: Rutas Seguras a la Escuela
Criterios: que incentiven a los estudiantes, incluso a aquellos con discapacidades a caminar o andar en bicicleta a sus escuelas; hacer que el caminar y montar a bicicleta a la escuela sea ms seguro y atractivo, y para facilitar la planificacin, desarrollo y la implementacin de proyectos que mejoren la seguridad, reducir el trfico, el consumo de combustible y la contaminacin del aire en zonas escolares.
Este grupo contiene dos categoras, infraestructura y no-infraestructura.
Grupo: Rutas Rurales de Alto Riesgo o "High Risk Rural Roads" (HRRR)
Criterios: se le requiere a los estados que identifiquen estas carreteras (y que utilicen los fondos HRRR) de acuerdo a las siguientes definiciones:
Cualquier carretera que se clasifique como un acumulador rural menor o mayor, o un camino rural local y que:
A. en el cual, el ndice de accidentes fatales y lastimaduras que causan incapacidades supere el promedio a nivel estatal para carreteras similarmente clasificadas; o
B. que probablemente vern un aumento en el volumen de trfico que probablemente haga que la tasa de accidentes fatales y lesiones incapacitadles supere el promedio a nivel estatal para carreteras similarmente clasificadas.
32

Grupo: Mejoramiento de Seales de Trfico al Nivel Regional
Criterios: aplica al mantenimiento y operacin de aparatos para el control del trfico a nivel estatal. Posibles proyectos incluyen:
A. Conceptos Regionales de Operaciones de Trfico B. Operaciones de Trfico al Nivel Micro-Regional C. Contratos de Mantenimiento de Control del Trfico D. Sincronizacin de Seales E. Identificacin de proyectos menores de mejoramiento operacionales para ser sometidos como Proyectos Operacionales bajo otra categora de la Suma Global.
Los proyectos debern:
A. Apoyar el Concepto de Operaciones a Nivel Regional o Estatal. B. Enfocarse en la operacin y el mantenimiento de los componentes de los sistemas de control de trfico. C. Se permite hacer contratos con agencias locales o cuasi gubernamentales a nivel de proyecto. D. En el que la tasa de accidentes de las muertes y lesiones incapacitan ts supera el promedio estatal de las clases funcionales de carretera, o que probablemente tendr aumentos en el volumen de trfico que puedan crear un ndice de accidentes de vctimas mortales y incapacitan ts
Grupo: Puentes Bajo Impacto Criterios: Los candidatos para este proceso requerirn permisos mnimos, los impactos de menor importancia, utilidad mnima coordinacin FEMA, no desvos en lugar, y conocer a otras caractersticas de bajo impacto, como se seala en este documento. Los proyectos que finalmente califican para este proceso acelerado tambin no deben superar los umbrales de impacto ambiental establecido y as calificar como una Exclusin Categrica (CE) determinaciones de conformidad con la Ley Nacional de Poltica Ambiental (NEPA). El programa ha sido creado con tres grandes principios en mente - la seguridad, la custodia y la simplificacin.
A. La seguridad de los pasajeros es de vital importancia. Es la intencin de este programa el reducir el riesgo asociado con deficiencias estructurales, socavacin crtica, apuntalado temporalmente, o fracturar las estructuras crticas. B. En segundo lugar solamente a la seguridad, el programa fomentar la administracin de los recursos ambientales y financieros de Georgia. Los proyectos desarrollados en el marco del programa se tratarn de minimizar el impacto en el medio ambiente natural, mientras que el suministro de soluciones de ingeniera rentables a largo plazo. C. El Programa tendr como resultado acelerada, la entrega optimizada de todas las fases de la sustitucin del puente incluido, la planificacin, el diseo, la aprobacin ambiental y la construccin.
33

El Proceso de Suma Global de la MPO

Los tipos de proyectos que el Departamento programa con financiamiento de suma global siempre han respetado las Normas Federales establecidos en 23 CFR 450,16 (9) b, en el que se afirma (para STIP) los proyectos que no son considerados de escala adecuada para la identificacin individual en un ao determinado pueden ser agrupados por funcin, el tipo de trabajo, y/o rea geogrfica utilizando la clasificacin aplicable bajo 23 CFR 771,117 (c) y (d) y/o 40 CFR parte 51." Los proyectos de suma global del Departamento tambin siguen las reglas establecidas en el 23 CFR 771,117 (c) y (d). El objetivo del Programa de Suma Global es dar al Departamento y el MPO la flexibilidad necesaria para dirigir proyectos de necesidad inmediata al cumplir los requisitos de STIP.

Cada ao, al comienzo del proceso de desarrollo del TIP, se provee a cada MPO la informacin sobre el financiamiento de los "bancos" de Suma Global. Los bancos de Suma Global identificados por las MPO son parte de una serie ms amplia de los bancos estatales de suma global. El propsito de mostrar estos bancos de suma global en los TIP es permitir a los proyectos que son ms "de rutina" o "menor" que sean mostrados en los TIP, permitiendo que los fondos sean autorizados sin la necesidad de las acciones administrativas por parte de la MPO.

En un esfuerzo de permitir una mayor transparencia en el Programa de Suma Global para las reas de la MPO, se llevarn a cabo varios cambios en el programa. Estos cambios incluyen la distribucin de los Bancos de Suma Global por una frmula basada en la poblacin, el establecimiento de nuevos procedimientos para la revisin de los niveles de distribucin, y los permisos de los bancos por cada MPO. Creemos que un mayor nivel de transparencia ser logrado y mantenido, con la aplicacin de estos esfuerzos nuevos.

Comenzando con la evolucin anual de TIP de cada MPO, los fondos de financiamiento segn los clculos de la informacin disponible del censo ms reciente, cada MPO recibir la suma global para cada banco que califican. La cuota se calcular utilizando el porcentaje de la MPO de la poblacin total del estado, incluyendo las zonas rurales. Actualmente esas distribuciones son las siguientes:

MPO
Albany Athens Atlanta Augusta Brunswick Chattanooga Columbus Dalton Gainesville Hinesville Macon Rome Savannah Valdosta Warner Robins Total de MPO Total Rural
34

Censo del 2010
1.24% 1.57% 49.74% 3.19% 0.82% 1.03% 2.08% 1.06% 1.85% 0.73% 1.73% 0.99% 2.74% 1.14% 1.53% 71.44% 28.56%

En el caso que una MPO agote cualquier capacidad del banco de suma global anual y sea necesario incrementar el banco de la suma global, la MPO puede mover la futura financiacin bancaria de la suma global en el TIP de la misma clase para el ao en curso. La restriccin se mantendr del porcentaje anual de retiro de la autoridad de obligacin para las modificaciones. Los informes de los proyectos que son programados de estos bancos de suma global consistirn en dos mtodos de entrega. El primer mtodo consistir en dos Informes Suma Global fijados en el sitio web externo de GDOT. En el primer informe, aparecer una lista de proyectos y la informacin financiera por el banco de suma global. El usuario puede seleccionar el banco de suma global de inters y la informacin del proyecto en "tiempo real" para todos los proyectos financiados por este banco de suma global para el ao fiscal en curso ser listada. El informe incluir tambin el saldo inicial para el banco de suma global y su saldo actual y al final del ao fiscal, un informe completo del uso y los cambios realizados en el banco de suma global se publicar en la pgina web. El segundo informe ser del MPO donde el usuario puede seleccionar el plan de inters y un informe con la informacin con el "tiempo real" del banco de suma global de la MPO se generar que mostrar informacin del proyecto para todos los proyectos programados para todos los bancos suma global de MPO en el ao en curso. El Departamento solicitar que cada MPO configure un enlace desde su sitio web a estos informes para proveer otro punto de acceso a los reportes. Con estos cambios adicionales al Programa de Suma Global Programa, el Departamento podr proveer otro nivel de transparencia y, al mismo tiempo, ofrecer la informacin ms actualizada posible a cada MPO. El Departamento mantiene su compromiso de ofrecer un Programa de Suma Global con un proceso transparente y sencillo.
35

Index of Counties

County Appling Atkinson Bacon Baker Baldwin Banks Barrow Bartow Ben Hill Berrien Bibb Bleckley Brantley Brooks Bryan Bulloch Burke Butts Calhoun Camden Candler Carroll Catoosa Charlton Chatham Chattahoochee Chattooga Cherokee Clarke Clay Clayton Clinch Cobb Coffee Colquitt Columbia Cook Coweta Crawford Crisp Dade Dawson Decatur DeKalb

Page 65 67 68 69 71 73 75 77 83 85
In an MPO area 88 90 92 94 97 99 100 102 104 106 107 111 112
In an MPO area In an MPO area
115 In an MPO area In an MPO area
117 In an MPO area
118 In an MPO area
119 123 126 128 In an MPO area 129 131 133 135 137 In an MPO area

Dodge Dooly Dougherty Douglas Early Echols Effingham Elbert Emanuel Evans Fannin Fayette Floyd Forsyth Franklin Fulton Gilmer Glascock Glynn Gordon Grady Greene Gwinnett Habersham Hall Hancock Haralson Harris Hart Heard Henry Houston Irwin Jackson Jasper Jeff Davis Jefferson Jenkins Johnson Jones Lamar

39

139 141 In an MPO area In an MPO area 144 145 146 150 147 153 154 In an MPO area In an MPO area In an MPO area 155 In an MPO area 158 160 In an MPO area 161 164 166 In an MPO area 168 In an MPO area 170 172 174 176 177 In an MPO area In an MPO area 178 180 185 187 190 192 194 196 1 97

County Lanier Laurens Lee Liberty Lincoln Long Lowndes Lumpkin Macon Madison Marion McDuffie McIntosh Meriwether Miller Mitchell Monroe Montgomery Morgan Murray Muscogee Newton Oconee Oglethorpe Paulding Peach Pickens Pierce Pike Polk Pulaski Putnam Quitman Rabun Randolph Richmond Rockdale Schley Screven Seminole Spalding Stephens Stewart Sumter Talbot

Page 198 200 203
In an MPO area 205 207
In an MPO area 208 211 213 215 216 218 220 222 224 226 229 230 232
In an MPO area 234 238 239
In an MPO area 240 242 245 247 248 249 251 253 254 256
In an MPO area In an MPO area
257 258 259 260 262 264 266 267

County Taliaferro Tattnall Taylor Telfair Terrell Thomas Tift Toombs Towns Treutlen Troup Turner Twiggs Union Upson Walker Walton Ware Warren Washington Wayne Webster Wheeler White Whitfield Wilcox Wilkes Wilkinson Worth

40

Page 269 270 271 273 275 276 278 281 284 287 288 291 293 295 297 299 301 304 307 309 311 312 313 314
In an MPO area 316 317 319 320

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

All Counties
Project: 0000694 Type Work: Miscellaneous Improvements
Descp: OPERATE STATE AGENCY WIDE COMMERCIAL VEHICLE PERMIT SYSTEM Length: 0.00

Total Project Cost: Total Project Authorizations:

$500,000 $0

Phase CST

Fund STP

Year 2014

Federal $400,000

State $100,000

Other $0

Total $500,000

Project: 0005821 Type Work: Signing
Descp: SBR 15 CENTRAL RTE SBR 60 SBR70 NORTH CRESCENT BICYCLE SIGNS Length: 0.00

Phase PE CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations:

$459,190 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 0006122 Type Work: Miscellaneous Improvements
Descp: LUMP SUM TRANSPORTATION ENHANCEMENT (TE) PROJECTS - 2014 Length: 0.00

Phase ALL

Fund STP

Total Project Cost: Total Project Authorizations:

$19,000,000 $0

Year LUMP LUMP
Year 2014

Federal $41,745
$417,446
Federal $15,200,000

State $0 $0

Other $0 $0

Total $41,745
$417,446

State $0

Other $3,800,000

Total $19,000,000

Project: 0006123 Type Work: Miscellaneous Improvements
Descp: LUMP SUM TRANSPORTATION ENHANCEMENT (TE) PROJECTS - 2015 Length: 0.00

Total Project Cost: Total Project Authorizations:

$19,000,000 $0

Phase ALL

Fund STP

Year 2015

Federal $15,200,000

State $0

Other $3,800,000

Total $19,000,000

Project: 0006129 Type Work: Intersection Improvement Descp: LUMP SUM ROADWAY SAFETY FUNDS - 2014
Length:

Total Project Cost: Total Project Authorizations:

$60,000,000 $0

Phase ALL

Fund HSIP

Year 2014

Federal $54,000,000

State $6,000,000

Other $0

Total $60,000,000

Page 1 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0006130 Type Work: Intersection Improvement Descp: LUMP SUM ROADWAY SAFETY FUNDS - 2015

Length: 0.00

Total Project Cost: Total Project Authorizations:

$70,000,000 $0

Phase ALL

Fund HSIP

Year 2015

Federal $63,000,000

State $7,000,000

Other $0

Total $70,000,000

Project: 0006136 Type Work: Bridges
Descp: LUMP SUM BRIDGE MAINTENANCE/PAINTING 2014 Length: 0.00

Total Project Cost: Total Project Authorizations:

$6,000,000 $0

Phase ALL

Fund STP

Year 2014

Federal $4,800,000

State $1,200,000

Other $0

Total $6,000,000

Project: 0006137 Type Work: Bridges
Descp: LUMP SUM BRIDGE MAINTENANCE/PAINTING 2015 Length: 0.00

Total Project Cost: Total Project Authorizations:

$6,000,000 $0

Phase ALL

Fund STP

Year 2015

Federal $4,800,000

State $1,200,000

Other $0

Total $6,000,000

Project: 0006171 Type Work: Bridges
Descp: LUMP SUM INTERSTATE BRIDGE PAINTING/MAINTENANCE - 2014 Length: 0.00

Total Project Cost: Total Project Authorizations:

$10,000,000 $0

Phase ALL

Fund NHPP

Year 2014

Federal $9,000,000

State $1,000,000

Other $0

Total $10,000,000

Project: 0006172 Type Work: Bridges
Descp: LUMP SUM INTERSTATE BRIDGE PAINTING/MAINTENANCE - 2015 Length: 0.00

Total Project Cost: Total Project Authorizations:

$10,000,000 $0

Phase ALL

Fund NHPP

Year 2015

Federal $9,000,000

State $1,000,000

Other $0

Total $10,000,000

Page 2 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0006178 Type Work: Pavement Rehab Descp: LUMP SUM MAINTENANCE FOR ANY AREA - 2014

Length: 0.00

Total Project Cost: Total Project Authorizations:

$80,430,000 $0

Phase ALL

Fund STP

Year 2014

Federal $64,344,000

State $16,086,000

Other $0

Total $80,430,000

Project: 0006179 Type Work: Pavement Rehab Descp: LUMP SUM MAINTENANCE FOR ANY AREA - 2015
Length: 0.00

Total Project Cost: Total Project Authorizations:

$72,220,000 $0

Phase ALL

Fund STP

Year 2015

Federal $57,776,000

State $14,444,000

Other $0

Total $72,220,000

Project: 0006185 Type Work: Pavement Rehab
Descp: LUMP SUM MAINTENANCE FOR ANY AREA GT 200K - 2014 Length: 0.00

Total Project Cost: Total Project Authorizations:

$7,500,000 $0

Phase ALL

Fund STP

Year 2014

Federal $6,000,000

State $1,500,000

Other $0

Total $7,500,000

Project: 0006186 Type Work: Pavement Rehab
Descp: LUMP SUM MAINTENANCE FOR ANY AREA GT 200K - 2015 Length: 0.00

Total Project Cost: Total Project Authorizations:

$7,500,000 $0

Phase ALL

Fund STP

Year 2015

Federal $6,000,000

State $1,500,000

Other $0

Total $7,500,000

Project: 0006192 Type Work: Resurface & Maintenance
Descp: LUMP SUM MAINTENANCE ON NATIONAL HIGHWAY SYSTEM - 2014 Length: 0.00

Total Project Cost: Total Project Authorizations:

$35,000,000 $0

Phase ALL

Fund NHPP

Year 2014

Federal $28,000,000

State $7,000,000

Other $0

Total $35,000,000

Page 3 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0006193 Type Work: Resurface & Maintenance
Descp: LUMP SUM MAINTENANCE ON NATIONAL HIGHWAY SYSTEM - 2015 Length: 0.00

Total Project Cost: Total Project Authorizations:

$35,000,000 $0

Phase ALL

Fund NHPP

Year 2015

Federal $28,000,000

State $7,000,000

Other $0

Total $35,000,000

Project: 0006199 Type Work: Railroad Crossing
Descp: LUMP SUM RAILROAD CROSSING HAZARD ELIMINATION - 2014 Length: 0.00

Total Project Cost: Total Project Authorizations:

$4,400,000 $0

Phase ALL

Fund HSIP

Year 2014

Federal $4,400,000

State $0

Other $0

Total $4,400,000

Project: 0006200 Type Work: Railroad Crossing
Descp: LUMP SUM RAILROAD CROSSING HAZARD ELIMINATION - 2015 Length: 0.00

Total Project Cost: Total Project Authorizations:

$4,400,000 $0

Phase ALL

Fund HSIP

Year 2015

Federal $4,400,000

State $0

Other $0

Total $4,400,000

Project: 0006206 Type Work: Rights-Of-Way
Descp: LUMP SUM RIGHTS OF WAY PROTECTIVE BUYING - 2014 Length: 0.00

Total Project Cost: Total Project Authorizations:

$1,000,000 $0

Phase ALL

Fund STP

Year 2014

Federal $800,000

State $200,000

Other $0

Total $1,000,000

Project: 0006207 Type Work: Rights-Of-Way
Descp: LUMP SUM RIGHTS OF WAY PROTECTIVE BUYING - 2015 Length: 0.00

Total Project Cost: Total Project Authorizations:

$1,000,000 $0

Phase ALL

Fund STP

Year 2015

Federal $800,000

State $200,000

Other $0

Total $1,000,000

Page 4 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0006213 Type Work: Railroad Crossing Descp: LUMP SUM RRX PROTECTION DEVICE - 2014

Length: 0.00

Total Project Cost: Total Project Authorizations:

$3,800,000 $0

Phase ALL

Fund HSIP

Year 2014

Federal $3,800,000

State $0

Other $0

Total $3,800,000

Project: 0006214 Type Work: Railroad Crossing Descp: LUMP SUM RRX PROTECTION DEVICE - 2015
Length: 0.00

Total Project Cost: Total Project Authorizations:

$3,800,000 $0

Phase ALL

Fund HSIP

Year 2015

Federal $3,800,000

State $0

Other $0

Total $3,800,000

Project: 0006220 Type Work: Signals
Descp: LUMP SUM TRAF CONTROL DEVICES; UPGRADES&MAINT ANY AREA-2014 Length: 0.00

Total Project Cost: Total Project Authorizations:

$15,000,000 $0

Phase ALL

Fund STP

Year 2014

Federal $12,000,000

State $3,000,000

Other $0

Total $15,000,000

Project: 0006221 Type Work: Signals
Descp: LUMP SUM TRAF CONTROL DEVICES; UPGRADES&MAINT ANY AREA-2015 Length: 0.00

Total Project Cost: Total Project Authorizations:

$15,000,000 $0

Phase ALL

Fund STP

Year 2015

Federal $12,000,000

State $3,000,000

Other $0

Total $15,000,000

Project: 0006294 Type Work: Pedestrian Crossings
Descp: PEDESTRIAN IMPROVEMENTS @ 10 SR LOCATIONS IN DISTRICT 6 Length: 0.00

Phase CST OPR

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations:

$530,573 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Year LUMP LUMP

Federal $390,215 $87,300

State $43,357 $9,700

Other $0 $0

Total $433,573 $97,000

Page 5 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0006299 Type Work: TE-Landscape/Beautify
Descp: WILDFLOWER PROGRAM OVERHEAD ACCOUNT - PE ONLY Length: 0.00

Total Project Cost: Total Project Authorizations:

$918,000 $0

Phase PE

Fund STP

Year LUMP

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 0006366 Type Work: Miscellaneous Improvements
Descp: DEBT SERVICE FOR GARVEE TO PAY BACK BONDS - FY 2014 Length: 0.00

Phase CST

Fund NHPP

Year 2014

Total Project Cost: Total Project Authorizations:

$188,141,960 $0

Federal $734,400

State $183,600

Federal $150,513,568

State $37,628,392

Other $0

Total $918,000

Other $0

Total $188,141,960

Project: 0006367 Type Work: Miscellaneous Improvements
Descp: DEBT SERVICE FOR GARVEE TO PAY BACK BONDS - FY 2015 Length: 0.00

Total Project Cost: Total Project Authorizations:

$188,141,960 $0

Phase CST

Fund NHPP

Year 2015

Federal $150,513,568

State $37,628,392

Other $0

Total $188,141,960

Project: 0006368 Type Work: Miscellaneous Improvements
Descp: DEBT SERVICE FOR GARVEE TO PAY BACK BONDS - FY 2016 Length: 0.00

Total Project Cost: Total Project Authorizations:

$188,141,960 $0

Phase CST

Fund NHPP

Year 2016

Federal $150,513,568

State $37,628,392

Other $0

Total $188,141,960

Project: 0006369 Type Work: Miscellaneous Improvements
Descp: DEBT SERVICE FOR GARVEE TO PAY BACK BONDS - FY 2017 Length: 0.00

Total Project Cost: Total Project Authorizations:

$188,141,960 $0

Phase CST

Fund NHPP

Year 2017

Federal $150,513,568

State $37,628,392

Other $0

Total $188,141,960

Page 6 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0006461 Type Work: Pedestrian Crossings
Descp: PEDESTRIAN UPGRADES @ 12 SR INTERSECTIONS IN DISTRICT 6 Length: 0.00

Total Project Cost: Total Project Authorizations:

$394,381 $0

Phase CST

Fund HSIP

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 0006463 Type Work: Pedestrian Crossings
Descp: PEDESTRIAN UPGRADES @ 44 INTERSECTIONS IN DISTRICT 2 Length: 0.00

Phase CST

Fund HSIP

Total Project Cost: Total Project Authorizations:

$2,618,448 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 0006664 Type Work: Signals
Descp: SIGNAL HEAD REPLACEMENT @ VAR LOCATIONS IN SEVERAL DISTRICTS Length: 0.00

Phase PE CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations:

$1,215,407 $40,000

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 0006947 Type Work: Vegetation Removal
Descp: ENHANCED RECOVERY AREA - VEGETATION REMOVAL IN DISTRICT 6 Length: 0.00

Total Project Cost: Total Project Authorizations:

$537,792 $0

Phase CST

Fund HSIP

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 0007497 Type Work: Operational Improvement Descp: LUMP SUM OPERATIONS FOR ANY AREA - 2014
Length: 0.00

Phase ALL

Fund STP

Total Project Cost: Total Project Authorizations:

$16,000,000 $0

Year LUMP
Year LUMP
Year 2014 LUMP
Year LUMP
Year 2014

Federal $354,942

State $39,438

Federal $2,356,603

State $261,845

Federal $40,000
$1,175,407

State $0 $0

Federal $484,012

State $53,779

Federal $12,800,000

State $3,200,000

Other $0
Other $0
Other $0 $0
Other $0
Other $0

Total $394,381
Total $2,618,448
Total $40,000
$1,175,407
Total $537,792
Total $16,000,000

Page 7 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0007498 Type Work: Operational Improvement Descp: LUMP SUM OPERATIONS FOR ANY AREA - 2015

Length: 0.00

Total Project Cost: Total Project Authorizations:

$12,000,000 $0

Phase ALL

Fund STP

Year 2015

Federal $9,600,000

State $2,400,000

Other $0

Total $12,000,000

Project: 0007504 Type Work: Bicycle/Ped. Facility Descp: LUMP SUM RECREATIONAL TRAILS - 2014
Length: 0.00

Total Project Cost: Total Project Authorizations:

$1,250,000 $0

Phase ALL

Fund TAP

Year 2014

Federal $1,000,000

State $250,000

Other $0

Total $1,250,000

Project: 0007505 Type Work: Bicycle/Ped. Facility Descp: LUMP SUM RECREATIONAL TRAILS - 2015
Length: 0.00

Total Project Cost: Total Project Authorizations:

$1,250,000 $0

Phase ALL

Fund TAP

Year 2015

Federal $1,000,000

State $250,000

Other $0

Total $1,250,000

Project: 0007507 Type Work: Bicycle/Ped. Facility Descp: LUMP SUM RECREATIONAL TRAILS - 2016

Length: 0.00

Total Project Cost: Total Project Authorizations:

$1,250,000 $0

Phase ALL

Fund TAP

Year 2016

Federal $1,000,000

State $250,000

Other $0

Total $1,250,000

Project: 0007552 Type Work: Special Studies
Descp: SOUTHEASTERN ECONOMIC ALLIANCE HIGH SPEED RAIL DEVELOPEMENT Length: 0.00

Total Project Cost: Total Project Authorizations:

$2,249,750 $0

Phase PE

Fund HPP

Year 2014

Federal $1,799,800

State $449,950

Other $0

Total $2,249,750

Page 8 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0007699 Type Work: ATMS/ITS
Descp: ATMS: ITS OPERATIONS AND SUPPORT STATEWIDE - 2015 Length: 0.00

Total Project Cost: Total Project Authorizations:

$7,000,000 $0

Phase CST

Fund NHPP

Year 2015

Federal $5,600,000

State $1,400,000

Other $0

Total $7,000,000

Project: 0007700 Type Work: ATMS/ITS
Descp: ATMS: ITS OPERATIONS AND SUPPORT STATEWIDE - 2016 Length: 0.00

Total Project Cost: Total Project Authorizations:

$7,500,000 $0

Phase CST

Fund NHPP

Year 2016

Federal $6,000,000

State $1,500,000

Other $0

Total $7,500,000

Project: 0007701 Type Work: ATMS/ITS
Descp: ATMS: ITS OPERATIONS AND SUPPORT STATEWIDE - 2017 Length: 0.00

Total Project Cost: Total Project Authorizations:

$7,500,000 $0

Phase CST

Fund NHPP

Year 2017

Federal $6,000,000

State $1,500,000

Other $0

Total $7,500,000

Project: 0008325 Type Work: Miscellaneous Improvements
Descp: LUMP SUM SAFE ROUTES TO SCHOOL INFRASTRUCTURE - 2014 Length: 0.00

Total Project Cost: Total Project Authorizations:

$7,800,000 $0

Phase ALL

Fund Safety

Year 2014

Federal $7,800,000

State $0

Other $0

Total $7,800,000

Project: 0008332 Type Work: Miscellaneous Improvements
Descp: LUMP SUM SAFE ROUTES TO SCHOOL NON-INFRASTRUCTURE - 2014 Length: 0.00

Total Project Cost: Total Project Authorizations:

$450,000 $0

Phase ALL

Fund Safety

Year 2014

Federal $450,000

State $0

Other $0

Total $450,000

Page 9 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0008333 Type Work: Miscellaneous Improvements
Descp: LUMP SUM SAFE ROUTES TO SCHOOL NON-INFRASTRUCTURE - 2015 Length: 0.00

Total Project Cost: Total Project Authorizations:

$450,000 $0

Phase ALL

Fund Safety

Year 2015

Federal $450,000

State $0

Other $0

Total $450,000

Project: 0008334 Type Work: Miscellaneous Improvements
Descp: LUMP SUM SAFE ROUTES TO SCHOOL NON-INFRASTRUCTURE - 2016 Length: 0.00

Total Project Cost: Total Project Authorizations:

$450,000 $0

Phase ALL

Fund Safety

Year 2016

Federal $450,000

State $0

Other $0

Total $450,000

Project: 0008639 Type Work: Intersection Improvement Descp: LUMP SUM HIGH RISK RURAL ROADS - 2015
Length: 0.00

Total Project Cost: Total Project Authorizations:

$3,200,000 $0

Phase ALL

Fund Safety

Year 2015

Federal $2,880,000

State $320,000

Other $0

Total $3,200,000

Project: 0008645 Type Work: Intersection Improvement Descp: LUMP SUM HIGH RISK RURAL ROADS - 2014

Length: 0.00

Total Project Cost: Total Project Authorizations:

$3,500,000 $0

Phase ALL

Fund Safety

Year 2014

Federal $3,150,000

State $350,000

Other $0

Total $3,500,000

Project: 0008694 Type Work: Transit Projects
Descp: GRTA PURCHASE OF CLEAN FUEL BUSES FOR EXPRESS SERVICE-PH II Length: 0.00

Total Project Cost: Total Project Authorizations:

$21,075,000 $0

Phase CST CST

Fund State Other

Year 2014 2014

Federal $0 $0

State $4,215,000
$0

Other $0
$16,860,000

Total $4,215,000 $16,860,000

Page 10 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0009223 Type Work: Miscellaneous Improvements
Descp: LUMP SUM SAFE ROUTES TO SCHOOL ANY PROJECTS - 2014 Length: 0.00

Total Project Cost: Total Project Authorizations:

$3,120,000 $0

Phase ALL

Fund Safety

Year 2014

Federal $3,120,000

State $0

Other $0

Total $3,120,000

Project: 0009224 Type Work: Miscellaneous Improvements
Descp: LUMP SUM SAFE ROUTES TO SCHOOL ANY PROJECTS - 2015 Length: 0.00

Total Project Cost: Total Project Authorizations:

$180,000 $0

Phase ALL

Fund Safety

Year 2015

Federal $180,000

State $0

Other $0

Total $180,000

Project: 0009555 Type Work: Preliminary Engineering
Descp: QUALITY ASSURANCE REVIEW ON EROSION PLANS - FY 2015 Length: 0.00

Total Project Cost: Total Project Authorizations:

$350,000 $0

Phase PE

Fund STP

Year 2015

Federal $280,000

State $70,000

Other $0

Total $350,000

Project: 0009573 Type Work: Preliminary Engineering
Descp: STATEWIDE BRIDGE INSPECTION - FY 2015 - PE ONLY Length: 0.00

Total Project Cost: Total Project Authorizations:

$8,500,000 $0

Phase PE

Fund STP

Year 2015

Federal $6,800,000

State $1,700,000

Other $0

Total $8,500,000

Project: 0009574 Type Work: Preliminary Engineering
Descp: STATEWIDE BRIDGE INSPECTION - FY 2016 - PE ONLY Length: 0.00

Total Project Cost: Total Project Authorizations:

$8,500,000 $0

Phase PE

Fund STP

Year 2016

Federal $6,800,000

State $1,700,000

Other $0

Total $8,500,000

Page 11 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0009575 Type Work: Preliminary Engineering
Descp: STATEWIDE BRIDGE INSPECTION - FY 2017 - PE ONLY Length: 0.00

Total Project Cost: Total Project Authorizations:

$8,500,000 $0

Phase PE

Fund STP

Year 2017

Federal $6,800,000

State $1,700,000

Other $0

Total $8,500,000

Project: 0009577 Type Work: Preliminary Engineering
Descp: ENVIRONMENTAL ANALYSIS ON FED-AID PROJS BY CONSULTANT-FY 15 Length: 0.00

Total Project Cost: Total Project Authorizations:

$2,500,000 $0

Phase PE

Fund NHPPX

Year 2015

Federal $2,000,000

State $500,000

Other $0

Total $2,500,000

Project: 0009578 Type Work: Preliminary Engineering
Descp: ENVIRONMENTAL ANALYSIS ON FED-AID PROJS BY CONSULTANT-FY 17 Length: 0.00

Total Project Cost: Total Project Authorizations:

$2,500,000 $0

Phase PE

Fund NHPPX

Year 2017

Federal $2,000,000

State $500,000

Other $0

Total $2,500,000

Project: 0009580 Type Work: Miscellaneous Improvements
Descp: TASK ORDER CONTRACT-CONSTRUCTION MANAGEMENT FED & BOND-2014 Length: 0.00

Total Project Cost: Total Project Authorizations:

$17,000,000 $17,000,000

Phase CST

Fund NHPPX

Year 2014

Federal $13,600,000

State $3,400,000

Other $0

Total $17,000,000

Project: 0009581 Type Work: Miscellaneous Improvements
Descp: TASK ORDER CONTRACT-CONSTRUCTION MANAGEMENT FED & BOND-2015 Length: 0.00

Total Project Cost: Total Project Authorizations:

$28,785,000 $0

Phase CST

Fund NHPPX

Year 2015

Federal $23,028,000

State $5,757,000

Other $0

Total $28,785,000

Page 12 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0009582 Type Work: Miscellaneous Improvements
Descp: TASK ORDER CONTRACT-CONSTRUCTION MANAGEMENT FED & BOND-2016 Length: 0.00

Total Project Cost: Total Project Authorizations:

$29,072,000 $0

Phase CST

Fund NHPPX

Year 2016

Federal $23,257,600

State $5,814,400

Other $0

Total $29,072,000

Project: 0009583 Type Work: Miscellaneous Improvements
Descp: TASK ORDER CONTRACT-CONSTRUCTION MANAGEMENT FED & BOND-2017 Length: 0.00

Total Project Cost: Total Project Authorizations:

$29,657,215 $0

Phase CST

Fund NHPPX

Year 2017

Federal $23,725,772

State $5,931,443

Other $0

Total $29,657,215

Project: 0009587 Type Work: Preliminary Engineering Descp: DOT PERSONNEL TRAINING - FY 2015 - PE ONLY
Length: 0.00

Total Project Cost: Total Project Authorizations:

$1,000,000 $0

Phase PE

Fund STP

Year 2015

Federal $1,000,000

State $0

Other $0

Total $1,000,000

Project: 0009588 Type Work: Preliminary Engineering Descp: DOT PERSONNEL TRAINING - FY 2016 - PE ONLY

Length: 0.00

Total Project Cost: Total Project Authorizations:

$1,000,000 $0

Phase PE

Fund STP

Year 2016

Federal $1,000,000

State $0

Other $0

Total $1,000,000

Project: 0009589 Type Work: Preliminary Engineering Descp: DOT PERSONNEL TRAINING - FY 2017 - PE ONLY
Length: 0.00

Total Project Cost: Total Project Authorizations:

$1,000,000 $0

Phase PE

Fund STP

Year 2017

Federal $1,000,000

State $0

Other $0

Total $1,000,000

Page 13 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0009590 Type Work: Miscellaneous Improvements
Descp: STATEWIDE CMAQ - MEASUREMENT & NEEDS ASSESSMENT - FY 2015 Length: 0.00

Total Project Cost: Total Project Authorizations:

$1,200,000 $0

Phase PE

Fund CMAQ

Year 2015

Federal $960,000

State $240,000

Other $0

Total $1,200,000

Project: 0009591 Type Work: Miscellaneous Improvements
Descp: STATEWIDE CMAQ - MEASUREMENT & NEEDS ASSESSMENT - FY 2016 Length: 0.00

Total Project Cost: Total Project Authorizations:

$1,200,000 $0

Phase PE

Fund CMAQ

Year 2016

Federal $960,000

State $240,000

Other $0

Total $1,200,000

Project: 0009592 Type Work: Miscellaneous Improvements
Descp: STATEWIDE CMAQ - MEASUREMENT & NEEDS ASSESSMENT - FY 2017 Length: 0.00

Total Project Cost: Total Project Authorizations:

$1,200,000 $0

Phase PE

Fund CMAQ

Year 2017

Federal $960,000

State $240,000

Other $0

Total $1,200,000

Project: 0009593 Type Work: Miscellaneous Improvements
Descp: STATEWIDE CMAQ-TDM EMPLOYEE SERVICES & ADVERTISING - FY 2014 Length: 0.00

Total Project Cost: Total Project Authorizations:

$7,000,000 $0

Phase PE

Fund CMAQ

Year 2014

Federal $5,600,000

State $1,400,000

Other $0

Total $7,000,000

Project: 0009594 Type Work: Miscellaneous Improvements
Descp: STATEWIDE CMAQ-TDM EMPLOYEE SERVICES & ADVERTISING - FY 2015 Length: 0.00

Total Project Cost: Total Project Authorizations:

$7,000,000 $0

Phase PE

Fund CMAQ

Year 2015

Federal $5,600,000

State $1,400,000

Other $0

Total $7,000,000

Page 14 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0009595 Type Work: Miscellaneous Improvements
Descp: STATEWIDE CMAQ-TDM EMPLOYEE SERVICES & ADVERTISING - FY 2016 Length: 0.00

Total Project Cost: Total Project Authorizations:

$7,000,000 $0

Phase PE

Fund CMAQ

Year 2016

Federal $5,600,000

State $1,400,000

Other $0

Total $7,000,000

Project: 0009596 Type Work: Miscellaneous Improvements
Descp: STATEWIDE CMAQ-TDM EMPLOYEE SERVICES & ADVERTISING - FY 2017 Length: 0.00

Total Project Cost: Total Project Authorizations:

$7,000,000 $0

Phase PE

Fund CMAQ

Year 2017

Federal $5,600,000

State $1,400,000

Other $0

Total $7,000,000

Project: 0009738 Type Work: Miscellaneous Improvements
Descp: LUMP SUM TRANSPORTATION ENHANCEMENT (TE) PROJECTS - 2016 Length: 0.00

Total Project Cost: Total Project Authorizations:

$19,000,000 $0

Phase ALL

Fund STP

Year 2016

Federal $15,200,000

State $0

Other $3,800,000

Total $19,000,000

Project: 0009739 Type Work: Miscellaneous Improvements
Descp: LUMP SUM TRANSPORTATION ENHANCEMENT (TE) PROJECTS - 2017 Length: 0.00

Total Project Cost: Total Project Authorizations:

$19,000,000 $0

Phase ALL

Fund STP

Year 2017

Federal $15,200,000

State $0

Other $3,800,000

Total $19,000,000

Project: 0009742 Type Work: Intersection Improvement Descp: LUMP SUM ROADWAY SAFETY FUNDS - 2016
Length: 0.00

Total Project Cost: Total Project Authorizations:

$70,000,000 $0

Phase ALL

Fund HSIP

Year 2016

Federal $63,000,000

State $7,000,000

Other $0

Total $70,000,000

Page 15 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0009743 Type Work: Intersection Improvement Descp: LUMP SUM ROADWAY SAFETY FUNDS - 2017

Length: 0.00

Total Project Cost: Total Project Authorizations:

$70,000,000 $0

Phase ALL

Fund HSIP

Year 2017

Federal $63,000,000

State $7,000,000

Other $0

Total $70,000,000

Project: 0009746 Type Work: Bridges
Descp: LUMP SUM BRIDGE MAINTENANCE/PAINTING 2016 Length: 0.00

Total Project Cost: Total Project Authorizations:

$6,000,000 $0

Phase ALL

Fund STP

Year 2016

Federal $4,800,000

State $1,200,000

Other $0

Total $6,000,000

Project: 0009747 Type Work: Bridges
Descp: LUMP SUM BRIDGE MAINTENANCE/PAINTING 2017 Length: 0.00

Total Project Cost: Total Project Authorizations:

$6,000,000 $0

Phase ALL

Fund STP

Year 2017

Federal $4,800,000

State $1,200,000

Other $0

Total $6,000,000

Project: 0009754 Type Work: Lighting
Descp: LUMP SUM INTERCHANGE/ROADWAY LIGHTING - 2017 Length: 0.00

Total Project Cost: Total Project Authorizations:

$1,000,000 $0

Phase ALL

Fund NHPP

Year 2017

Federal $800,000

State $200,000

Other $0

Total $1,000,000

Project: 0009758 Type Work: Pavement Rehab Descp: LUMP SUM MAINTENANCE FOR ANY AREA - 2016
Length: 0.00

Total Project Cost: Total Project Authorizations:

$70,600,000 $0

Phase ALL

Fund STP

Year 2016

Federal $56,480,000

State $14,120,000

Other $0

Total $70,600,000

Page 16 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0009759 Type Work: Pavement Rehab Descp: LUMP SUM MAINTENANCE FOR ANY AREA - 2017

Length: 0.00

Total Project Cost: Total Project Authorizations:

$67,100,000 $0

Phase ALL

Fund STP

Year 2017

Federal $53,680,000

State $13,420,000

Other $0

Total $67,100,000

Project: 0009762 Type Work: Pavement Rehab
Descp: LUMP SUM MAINTENANCE FOR ANY AREA GT 200K - 2016 Length: 0.00

Total Project Cost: Total Project Authorizations:

$7,500,000 $0

Phase ALL

Fund STP

Year 2016

Federal $6,000,000

State $1,500,000

Other $0

Total $7,500,000

Project: 0009763 Type Work: Pavement Rehab
Descp: LUMP SUM MAINTENANCE FOR ANY AREA GT 200K - 2017 Length: 0.00

Total Project Cost: Total Project Authorizations:

$7,500,000 $0

Phase ALL

Fund STP

Year 2017

Federal $6,000,000

State $1,500,000

Other $0

Total $7,500,000

Project: 0009766 Type Work: Resurface & Maintenance
Descp: LUMP SUM MAINTENANCE ON NATIONAL HIGHWAY SYSTEM - 2016 Length: 0.00

Total Project Cost: Total Project Authorizations:

$35,000,000 $0

Phase ALL

Fund NHPP

Year 2016

Federal $28,000,000

State $7,000,000

Other $0

Total $35,000,000

Project: 0009767 Type Work: Resurface & Maintenance
Descp: LUMP SUM MAINTENANCE ON NATIONAL HIGHWAY SYSTEM - 2017 Length: 0.00

Total Project Cost: Total Project Authorizations:

$35,000,000 $0

Phase ALL

Fund NHPP

Year 2017

Federal $28,000,000

State $7,000,000

Other $0

Total $35,000,000

Page 17 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0009770 Type Work: Railroad Crossing
Descp: LUMP SUM RAILROAD CROSSING HAZARD ELIMINATION - 2016 Length: 0.00

Total Project Cost: Total Project Authorizations:

$4,400,000 $0

Phase ALL

Fund HSIP

Year 2016

Federal $4,400,000

State $0

Other $0

Total $4,400,000

Project: 0009771 Type Work: Railroad Crossing
Descp: LUMP SUM RAILROAD CROSSING HAZARD ELIMINATION - 2017 Length: 0.00

Total Project Cost: Total Project Authorizations:

$4,400,000 $0

Phase ALL

Fund HSIP

Year 2017

Federal $4,400,000

State $0

Other $0

Total $4,400,000

Project: 0009774 Type Work: Rights-Of-Way
Descp: LUMP SUM RIGHTS OF WAY PROTECTIVE BUYING - 2016 Length: 0.00

Total Project Cost: Total Project Authorizations:

$1,000,000 $0

Phase ALL

Fund STP

Year 2016

Federal $800,000

State $200,000

Other $0

Total $1,000,000

Project: 0009775 Type Work: Rights-Of-Way
Descp: LUMP SUM RIGHTS OF WAY PROTECTIVE BUYING - 2017 Length: 0.00

Total Project Cost: Total Project Authorizations:

$1,000,000 $0

Phase ALL

Fund STP

Year 2017

Federal $800,000

State $200,000

Other $0

Total $1,000,000

Project: 0009778 Type Work: Railroad Crossing Descp: LUMP SUM RRX PROTECTION DEVICE - 2016
Length: 0.00

Total Project Cost: Total Project Authorizations:

$3,800,000 $0

Phase ALL

Fund HSIP

Year 2016

Federal $3,800,000

State $0

Other $0

Total $3,800,000

Page 18 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0009779 Type Work: Railroad Crossing Descp: LUMP SUM RRX PROTECTION DEVICE - 2017

Length: 0.00

Total Project Cost: Total Project Authorizations:

$3,800,000 $0

Phase ALL

Fund HSIP

Year 2017

Federal $3,800,000

State $0

Other $0

Total $3,800,000

Project: 0009782 Type Work: Signals
Descp: LUMP SUM TRAF CONTROL DEVICES; UPGRADES&MAINT ANY AREA-2016 Length: 0.00

Total Project Cost: Total Project Authorizations:

$15,000,000 $0

Phase ALL

Fund STP

Year 2016

Federal $12,000,000

State $3,000,000

Other $0

Total $15,000,000

Project: 0009783 Type Work: Signals
Descp: LUMP SUM TRAF CONTROL DEVICES; UPGRADES&MAINT ANY AREA-2017 Length: 0.00

Total Project Cost: Total Project Authorizations:

$15,000,000 $0

Phase ALL

Fund STP

Year 2017

Federal $12,000,000

State $3,000,000

Other $0

Total $15,000,000

Project: 0009787 Type Work: Special Studies
Descp: LUMP SUM TRAF&REVENUE/DESIGN-BUILD/SPECIAL Length: 0.00

Total Project Cost: Total Project Authorizations:

$750,000 $0

Phase ALL

Fund STP

Year 2017

Federal $600,000

State $150,000

Other $0

Total $750,000

Project: 0009790 Type Work: Operational Improvement Descp: LUMP SUM OPERATIONS FOR ANY AREA - 2016
Length: 0.00

Total Project Cost: Total Project Authorizations:

$12,000,000 $0

Phase ALL

Fund STP

Year 2016

Federal $9,600,000

State $2,400,000

Other $0

Total $12,000,000

Page 19 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0009791 Type Work: Operational Improvement Descp: LUMP SUM OPERATIONS FOR ANY AREA - 2017

Length: 0.00

Total Project Cost: Total Project Authorizations:

$12,000,000 $0

Phase ALL

Fund STP

Year 2017

Federal $9,600,000

State $2,400,000

Other $0

Total $12,000,000

Project: 0009794 Type Work: Bicycle/Ped. Facility Descp: LUMP SUM RECREATIONAL TRAILS - 2017
Length: 0.00

Total Project Cost: Total Project Authorizations:

$1,250,000 $0

Phase ALL

Fund TAP

Year 2017

Federal $1,000,000

State $250,000

Other $0

Total $1,250,000

Project: 0009802 Type Work: Miscellaneous Improvements
Descp: LUMP SUM SAFE ROUTES TO SCHOOL NON-INFRASTRUCTURE - 2017 Length: 0.00

Total Project Cost: Total Project Authorizations:

$450,000 $0

Phase ALL

Fund Safety

Year 2017

Federal $450,000

State $0

Other $0

Total $450,000

Project: 0009982 Type Work: Guardrail
Descp: DISTRICT 1 & 2 @ SEV LOCS - GUARDRAIL ANCHOR REPLACEMENT Length: 0.00

Total Project Cost: Total Project Authorizations:

$731,537 $0

Phase CST

Fund HSIP

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 0009993 Type Work: Sharp Curve Treatments
Descp: SHARP CURVE TREATMENTS @ SEV LOCS IN DISTRICT 1 Length: 0.00

Phase CST

Fund HSIP

Total Project Cost: Total Project Authorizations:

$424,483 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Year LUMP
Year LUMP

Federal $731,537
Federal $382,035

State $0

Other $0

State $42,448

Other $0

Total $731,537
Total $424,483

Page 20 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0009994 Type Work: Sharp Curve Treatments
Descp: SHARP CURVE TREATMENTS @ SEV LOCS IN DISTRICT 2 Length: 0.00

Total Project Cost: Total Project Authorizations:

$424,483 $0

Phase CST

Fund HSIP

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 0009995 Type Work: Sharp Curve Treatments
Descp: SHARP CURVE TREATMENTS @ SEV LOCS IN DISTRICT 3 Length: 0.00

Phase CST

Fund HSIP

Total Project Cost: Total Project Authorizations:

$424,483 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 0009996 Type Work: Sharp Curve Treatments
Descp: SHARP CURVE TREATMENTS @ SEV LOCS IN DISTRICT 4 Length: 0.00

Phase CST

Fund HSIP

Total Project Cost: Total Project Authorizations:

$424,483 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 0009997 Type Work: Sharp Curve Treatments
Descp: SHARP CURVE TREATMENTS @ SEV LOCS IN DISTRICT 5 Length: 0.00

Total Project Cost: Total Project Authorizations:

$1,325,077 $0

Phase CST

Fund HSIP

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 0009998 Type Work: Sharp Curve Treatments
Descp: SHARP CURVE TREATMENTS @ SEV LOCS IN DISTRICT 6 Length: 0.00

Phase CST

Fund HSIP

Total Project Cost: Total Project Authorizations:

$424,483 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Year LUMP
Year LUMP
Year LUMP
Year LUMP
Year LUMP

Federal $382,035
Federal $382,035
Federal $382,035
Federal $1,192,569
Federal $382,035

State $42,448

Other $0

State $42,448

Other $0

State $42,448

Other $0

State $132,508

Other $0

State $42,448

Other $0

Total $424,483
Total $424,483
Total $424,483
Total $1,325,077
Total $424,483

Page 21 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0010151 Type Work: Preliminary Engineering
Descp: STATEWIDE SURPLUS PROPERTY MONITORING & DISPOSAL - FY 2015 Length: 0.00

Total Project Cost: Total Project Authorizations:

$350,000 $0

Phase PE

Fund STP

Year 2015

Federal $280,000

State $70,000

Other $0

Total $350,000

Project: 0010152 Type Work: Preliminary Engineering
Descp: STATEWIDE SURPLUS PROPERTY MONITORING & DISPOSAL - FY 2016 Length: 0.00

Total Project Cost: Total Project Authorizations:

$350,000 $0

Phase PE

Fund STP

Year 2016

Federal $280,000

State $70,000

Other $0

Total $350,000

Project: 0010153 Type Work: Preliminary Engineering
Descp: STATEWIDE SURPLUS PROPERTY MONITORING & DISPOSAL - FY 2017 Length: 0.00

Total Project Cost: Total Project Authorizations:

$350,000 $0

Phase PE

Fund STP

Year 2017

Federal $280,000

State $70,000

Other $0

Total $350,000

Project: 0010169 Type Work: Preliminary Engineering
Descp: OVERSIGHT SERVICES FOR L220/TE PROJECTS - FY 2015 Length: 0.00

Total Project Cost: Total Project Authorizations:

$100,000 $0

Phase PE

Fund STP

Year 2015

Federal $80,000

State $20,000

Other $0

Total $100,000

Project: 0010170 Type Work: Preliminary Engineering
Descp: OVERSIGHT SERVICES FOR L220/TE PROJECTS - FY 2016 Length: 0.00

Total Project Cost: Total Project Authorizations:

$100,000 $0

Phase PE

Fund STP

Year 2016

Federal $80,000

State $20,000

Other $0

Total $100,000

Page 22 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0010171 Type Work: Preliminary Engineering
Descp: OVERSIGHT SERVICES FOR L220/TE PROJECTS - FY 2017 Length: 0.00

Total Project Cost: Total Project Authorizations:

$100,000 $0

Phase PE

Fund STP

Year 2017

Federal $80,000

State $20,000

Other $0

Total $100,000

Project: 0010300 Type Work: Bridges
Descp: LUMP SUM INTERSTATE BRIDGE PAINTING/MAINTENANCE - 2016 Length: 0.00

Total Project Cost: Total Project Authorizations:

$10,000,000 $0

Phase ALL

Fund NHPP

Year 2016

Federal $9,000,000

State $1,000,000

Other $0

Total $10,000,000

Project: 0010301 Type Work: Bridges
Descp: LUMP SUM INTERSTATE BRIDGE PAINTING/MAINTENANCE - 2017 Length: 0.00

Total Project Cost: Total Project Authorizations:

$5,000,000 $0

Phase ALL

Fund NHPP

Year 2017

Federal $4,500,000

State $500,000

Other $0

Total $5,000,000

Project: 0010312 Type Work: Preliminary Engineering Descp: SR 400 - HERO EXPANSION

Length: 0.00

Total Project Cost: Total Project Authorizations:

$770,000 $110,000

Phase PE PE PE PE PE PE PE

Fund State State State State State State State

Year 2013 2014 2015 2016 2017 After 2017 After 2017

Federal $0 $0 $0 $0 $0 $0 $0

State $0 $0 $0 $0 $0 $0 $0

Other $110,000 $110,000 $110,000 $110,000 $110,000 $110,000 $110,000

Total $110,000 $110,000 $110,000 $110,000 $110,000 $110,000 $110,000

Project: 0010490 Type Work: Signals
Descp: STATEWIDE TRAFFIC SIGNAL MAINTENANCE & UPGRADES - FY 2014 Length: 0.00

Phase CST

Fund STP

Year 2014

Federal $3,200,000

Total Project Cost: Total Project Authorizations:

$4,000,000 $4,000,000

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2014 - FY 2017

State $800,000

Other $0

Total $4,000,000

Page 23 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0010491 Type Work: Signals
Descp: STATEWIDE TRAFFIC SIGNAL MAINTENANCE & UPGRADES - FY 2015 Length: 0.00

Total Project Cost: Total Project Authorizations:

$4,000,000 $0

Phase CST

Fund STP

Year LUMP

Federal $3,200,000

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2014 - FY 2017

Project: 0010566 Type Work: Preliminary Engineering Descp: STATEWIDE SIGNAL TIMING & DESIGN - 2015
Length: 0.00

Phase PE

Fund STP

Year LUMP

Federal $800,000

Total Project Cost: Total Project Authorizations:

$1,000,000 $0

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2014 - FY 2017

Project: 0010831 Type Work: Preliminary Engineering
Descp: ASSISTANCE FOR PRIORITY FED ENVIRONMENTAL PROJ REVIEW - 2014 Length: 0.00

Phase PE

Fund STP

Year 2014

Federal $1,040,000

Total Project Cost: Total Project Authorizations:

$1,300,000 $0

State $800,000

Other $0

State $200,000

Other $0

State $260,000

Other $0

Total $4,000,000
Total $1,000,000
Total $1,300,000

Project: 0010832 Type Work: Preliminary Engineering
Descp: ENVIRONMENTAL ANALYSIS ON STATE AID PROJ BY CONSULTANT-2015 Length: 0.00

Total Project Cost: Total Project Authorizations:

$500,000 $0

Phase PE

Fund STP

Year 2015

Federal $400,000

State $100,000

Other $0

Total $500,000

Project: 0010833 Type Work: Preliminary Engineering
Descp: ASSISTANCE FOR PRIORITY FED ENVIRONMENTAL PROJ REVIEW - 2015 Length: 0.00

Total Project Cost: Total Project Authorizations:

$1,200,000 $0

Phase PE

Fund STP

Year 2015

Federal $960,000

State $240,000

Other $0

Total $1,200,000

Page 24 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0010834 Type Work: Preliminary Engineering
Descp: ASSISTANCE FOR PRIORITY FED ENVIRONMENTAL PROJ REVIEW - 2016 Length: 0.00

Total Project Cost: Total Project Authorizations:

$1,200,000 $0

Phase PE

Fund STP

Year 2016

Federal $960,000

State $240,000

Other $0

Total $1,200,000

Project: 0010908 Type Work: Preliminary Engineering Descp: MS4 PERMIT COMPLIANCE - FY 2015
Length: 0.00

Total Project Cost: Total Project Authorizations:

$4,428,300 $0

Phase PE

Fund STP

Year 2015

Federal $3,542,640

State $885,660

Other $0

Total $4,428,300

Project: 0010909 Type Work: Preliminary Engineering Descp: MS4 PERMIT COMPLIANCE - FY 2016
Length: 0.00

Total Project Cost: Total Project Authorizations:

$5,048,900 $0

Phase PE

Fund STP

Year 2016

Federal $4,039,120

State $1,009,780

Other $0

Total $5,048,900

Project: 0010918 Type Work: Preliminary Engineering
Descp: STATEWIDE CMAQ - MEASUREMENT & NEEDS ASSESSMENT - FY 2014 Length: 0.00

Total Project Cost: Total Project Authorizations:

$1,200,000 $0

Phase PE

Fund CMAQ

Year 2014

Federal $960,000

State $240,000

Other $0

Total $1,200,000

Project: 0010919 Type Work: Preliminary Engineering
Descp: QUALITY ASSURANCE REVIEW ON EROSION PLANS - FY 2016 Length: 0.00

Total Project Cost: Total Project Authorizations:

$350,000 $0

Phase PE

Fund STP

Year 2016

Federal $280,000

State $70,000

Other $0

Total $350,000

Page 25 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0010920 Type Work: Preliminary Engineering
Descp: QUALITY ASSURANCE REVIEW ON EROSION PLANS - FY 2017 Length: 0.00

Total Project Cost: Total Project Authorizations:

$350,000 $0

Phase PE

Fund STP

Year 2017

Federal $280,000

State $70,000

Other $0

Total $350,000

Project: 0010938 Type Work: Preliminary Engineering
Descp: AERIAL PHOTOGRAPHY FOR MAPPING; EARTHWORK & CONCEPT DEVELOP Length: 0.00

Total Project Cost: Total Project Authorizations:

$156,060 $0

Phase PE

Fund STP

Year 2014

Federal $124,848

State $31,212

Other $0

Total $156,060

Project: 0011652 Type Work: Signing
Descp: STATE HIGHWAY-RAIL CROSSING SIGNING & MARKING ENG SERVICES Length: 0.00

Phase PE CST

Fund HSIP HSIP

Year LUMP LUMP

Total Project Cost: Total Project Authorizations:

$1,600,000 $0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2014 - FY 2017

Project: 0011837 Type Work: RRX Signing & Marking
Descp: SIGNING & PAVEMENT MARKINGS @ 85 RR LOCS IN DISTRICT 5 Length: 0.00

Total Project Cost: Total Project Authorizations:

$590,000 $0

Phase CST

Fund HSIP

Year LUMP

Uses Lump Sum Bank: RAILROAD CROSSING HAZARD ELIMINATION FOR FY 2014 - FY 2017

Project: 0012683 Type Work: Weigh Scales Descp: WEIGH-IN-MOTION SCALES - FY 2014
Length: 0.00

Phase PE CST

Fund NHPP NHPP

Year 2014 2014

Total Project Cost: Total Project Authorizations:

$5,000,000 $0

Federal $100,000
$1,500,000
Federal $590,000
Federal $450,000
$4,050,000

State $0 $0

Other $0 $0

State $0

Other $0

State $50,000
$450,000

Other $0 $0

Total $100,000
$1,500,000
Total $590,000
Total $500,000
$4,500,000

Page 26 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0012684 Type Work: Weigh Scales Descp: WEIGH-IN-MOTION SCALES - FY 2015

Length: 0.00

Total Project Cost: Total Project Authorizations:

$5,000,000 $0

Phase PE CST

Fund NHPP NHPP

Year 2015 2015

Federal $450,000
$4,050,000

State $50,000
$450,000

Other $0 $0

Total $500,000
$4,500,000

Project: 0012685 Type Work: Weigh Scales Descp: WEIGH-IN-MOTION SCALES - FY 2016
Length: 0.00

Total Project Cost: Total Project Authorizations:

$5,500,000 $0

Phase PE CST

Fund NHPP NHPP

Year 2016 2016

Federal $450,000
$4,500,000

State $50,000
$500,000

Other $0 $0

Total $500,000
$5,000,000

Project: 0012686 Type Work: Weigh Scales Descp: WEIGH-IN-MOTION SCALES - FY 2017
Length: 0.00

Total Project Cost: Total Project Authorizations:

$5,000,000 $0

Phase PE CST

Fund NHPP NHPP

Year 2017 2017

Federal $450,000
$4,050,000

State $50,000
$450,000

Other $0 $0

Total $500,000
$4,500,000

Project: 0012712 Type Work: Preliminary Engineering
Descp: DISADVANTAGED BUSINESS ENTERPRISE SUPPORTIVE SERVICES-CY2013 Length: 0.00

Total Project Cost: Total Project Authorizations:

$300,000 $0

Phase

Fund

PE Other Funds

Year 2014

Federal $300,000

State $0

Other $0

Total $300,000

Project: 0012713 Type Work: Preliminary Engineering
Descp: DISADVANTAGED BUSINESS ENTERPRISE SUPPORTIVE SERVICES-CY2014 Length: 0.00

Total Project Cost: Total Project Authorizations:

$300,000 $0

Phase

Fund

PE Other Funds

Year 2015

Federal $300,000

State $0

Other $0

Total $300,000

Page 27 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0012714 Type Work: Preliminary Engineering
Descp: DISADVANTAGED BUSINESS ENTERPRISE SUPPORTIVE SERVICES-CY2015 Length: 0.00

Total Project Cost: Total Project Authorizations:

$300,000 $0

Phase

Fund

PE Other Funds

Year 2016

Federal $300,000

State $0

Other $0

Total $300,000

Project: 0012715 Type Work: Preliminary Engineering
Descp: DISADVANTAGED BUSINESS ENTERPRISE SUPPORTIVE SERVICES-CY2016 Length: 0.00

Total Project Cost: Total Project Authorizations:

$300,000 $0

Phase

Fund

PE Other Funds

Year 2017

Federal $300,000

State $0

Other $0

Total $300,000

Project: 0012717 Type Work: Preliminary Engineering
Descp: ON-THE-JOB TRAINING SUPPORTIVE SERVICES CY 2013 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase

Fund

PE Other Funds

Year 2014

Federal $200,000

State $0

Other $0

Total $200,000

Project: 0012718 Type Work: Preliminary Engineering
Descp: ON-THE-JOB TRAINING SUPPORTIVE SERVICES CY 2014 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase

Fund

PE Other Funds

Year 2015

Federal $200,000

State $0

Other $0

Total $200,000

Project: 0012719 Type Work: Preliminary Engineering
Descp: ON-THE-JOB TRAINING SUPPORTIVE SERVICES CY 2015 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase

Fund

PE Other Funds

Year 2016

Federal $200,000

State $0

Other $0

Total $200,000

Page 28 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0012720 Type Work: Preliminary Engineering
Descp: ON-THE-JOB TRAINING SUPPORTIVE SERVICES CY 2016 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase

Fund

PE Other Funds

Year 2017

Federal $200,000

State $0

Other $0

Total $200,000

Project: 0012760 Type Work: Preliminary Engineering Descp: LOW IMPACT BRIDGE OVERSIGHT - FY 2014
Length: 0.00

Total Project Cost: Total Project Authorizations:

$600,000 $0

Phase PE

Fund STP

Year 2014

Federal $480,000

State $120,000

Other $0

Total $600,000

Project: 0012761 Type Work: Preliminary Engineering Descp: LOW IMPACT BRIDGE OVERSIGHT - FY 2015
Length: 0.00

Total Project Cost: Total Project Authorizations:

$600,000 $0

Phase PE

Fund STP

Year 2015

Federal $480,000

State $120,000

Other $0

Total $600,000

Project: 0012762 Type Work: Preliminary Engineering Descp: LOW IMPACT BRIDGE OVERSIGHT - FY 2016

Length: 0.00

Total Project Cost: Total Project Authorizations:

$600,000 $0

Phase PE

Fund STP

Year 2016

Federal $480,000

State $120,000

Other $0

Total $600,000

Project: 0012763 Type Work: Preliminary Engineering Descp: LOW IMPACT BRIDGE OVERSIGHT - FY 2017
Length: 0.00

Total Project Cost: Total Project Authorizations:

$600,000 $0

Phase PE

Fund STP

Year 2017

Federal $480,000

State $120,000

Other $0

Total $600,000

Page 29 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0012764 Type Work: Bridge Rehab Descp: LUMP SUM LOW IMPACT BRIDGES - 2014

Length: 0.00

Total Project Cost: Total Project Authorizations:

$5,000,000 $0

Phase ALL

Fund STP

Year 2014

Federal $4,000,000

State $1,000,000

Other $0

Total $5,000,000

Project: 0012765 Type Work: Bridge Rehab Descp: LUMP SUM LOW IMPACT BRIDGES - 2015
Length: 0.00

Total Project Cost: Total Project Authorizations:

$8,000,000 $0

Phase ALL

Fund STP

Year 2015

Federal $6,400,000

State $1,600,000

Other $0

Total $8,000,000

Project: 0012766 Type Work: Bridge Rehab Descp: LUMP SUM LOW IMPACT BRIDGES - 2016
Length: 0.00

Total Project Cost: Total Project Authorizations:

$8,000,000 $0

Phase ALL

Fund STP

Year 2016

Federal $6,400,000

State $1,600,000

Other $0

Total $8,000,000

Project: 0012767 Type Work: Bridge Rehab Descp: LUMP SUM LOW IMPACT BRIDGES - 2017

Length: 0.00

Total Project Cost: Total Project Authorizations:

$8,000,000 $0

Phase ALL

Fund STP

Year 2017

Federal $6,400,000

State $1,600,000

Other $0

Total $8,000,000

Project: 0012769 Type Work: Miscellaneous Improvements
Descp: SAFE ROUTES TO SCHOOLS RESOURCE CENTER - PHASE VI Length: 0.00

Phase PE

Fund Safety

Year LUMP

Federal $160,000

Total Project Cost: Total Project Authorizations:

$160,000 $0

Uses Lump Sum Bank: SAFE ROUTES TO SCHOOL NON-INFRASTRUCTURE FOR FY 2014 - FY 2017

State $0

Other $0

Total $160,000

Page 30 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0012770 Type Work: Miscellaneous Improvements
Descp: SAFE ROUTES TO SCHOOLS RESOURCE CENTER - PHASE VII Length: 0.00

Total Project Cost: Total Project Authorizations:

$160,000 $0

Phase PE

Fund Safety

Year LUMP

Federal $160,000

Uses Lump Sum Bank: SAFE ROUTES TO SCHOOL NON-INFRASTRUCTURE FOR FY 2014 - FY 2017

Project: 0012771 Type Work: Miscellaneous Improvements
Descp: SAFE ROUTES TO SCHOOLS RESOURCE CENTER - PHASE VIII Length: 0.00

Phase PE

Fund Safety

Year LUMP

Federal $160,000

Total Project Cost: Total Project Authorizations:

$160,000 $0

Uses Lump Sum Bank: SAFE ROUTES TO SCHOOL NON-INFRASTRUCTURE FOR FY 2014 - FY 2017

Project: 0012772 Type Work: Preliminary Engineering
Descp: LEAD ADOPTER INCENTIVE IMPLEMENTATION ASSIST FOR ECO-LOGICAL Length: 0.00

Phase

Fund

PE Other Funds

Year 2014

Federal $250,000

Total Project Cost: Total Project Authorizations:

$250,000 $250,000

State $0
State $0
State $0

Other $0
Other $0
Other $0

Total $160,000
Total $160,000
Total $250,000

Project: 0012802 Type Work: RRX Warning Device Descp: HAZARD INDEX STUDIES - FY 2014

Length: 0.00

Total Project Cost: Total Project Authorizations:

$250,000 $250,000

Phase PE

Fund HSIP

Year 2014

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2014 - FY 2017

Project: 0012804 Type Work: RRX Signing & Marking
Descp: SIGNING & PAVEMENT MARKINGS @ 124 RR LOCS IN DISTRICT 2 Length: 0.00

Phase PE CST

Fund HSIP HSIP

Year LUMP LUMP

Total Project Cost: Total Project Authorizations:

$726,000 $0

Uses Lump Sum Bank: RAILROAD CROSSING HAZARD ELIMINATION FOR FY 2014 - FY 2017

Federal $225,000

State $25,000

Other $0

Federal $66,000
$660,000

State $0 $0

Other $0 $0

Total $250,000
Total $66,000
$660,000

Page 31 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0012806 Type Work: Preliminary Engineering

Descp: GEORGIA HISTORIC BRIDGE MGT PLANS &

SURVEY (GHBS) - FY 2014

Lanes: Exist.

Prop.

Length: 0.00

Total Project Cost: Total Project Authorizations:

$300,000 $0

Phase PE

Fund STP

Year 2014

Federal $240,000

State $60,000

Other $0

Total $300,000

Project: 0012807 Type Work: Preliminary Engineering

Descp: GEORGIA HISTORIC BRIDGE MGT PLANS &

SURVEY (GHBS) - FY 2015

Lanes: Exist.

Prop.

Length: 0.00

Total Project Cost: Total Project Authorizations:

$300,000 $0

Phase PE

Fund STP

Year 2015

Federal $240,000

State $60,000

Other $0

Total $300,000

Project: 0012809 Type Work: Preliminary Engineering
Descp: AASHTO COMMITTEES & SPONSORED EVENTS FY 2014 Length: 0.00

Total Project Cost: Total Project Authorizations:

$115,000 $0

Phase PE

Fund STP

Year 2014

Federal $115,000

State $0

Other $0

Total $115,000

Project: 0012810 Type Work: Preliminary Engineering
Descp: AASHTO COMMITTEES & SPONSORED EVENTS FY 2015 Length: 0.00

Total Project Cost: Total Project Authorizations:

$115,000 $0

Phase PE

Fund STP

Year 2015

Federal $115,000

State $0

Other $0

Total $115,000

Project: 0012811 Type Work: Preliminary Engineering
Descp: AASHTO COMMITTEES & SPONSORED EVENTS FY 2016 Length: 0.00

Total Project Cost: Total Project Authorizations:

$115,000 $0

Phase PE

Fund STP

Year 2016

Federal $115,000

State $0

Other $0

Total $115,000

Page 32 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0012812 Type Work: Preliminary Engineering
Descp: AASHTO COMMITTEES & SPONSORED EVENTS FY 2017 Length: 0.00

Total Project Cost: Total Project Authorizations:

$115,000 $0

Phase PE

Fund STP

Year 2017

Federal $115,000

State $0

Other $0

Total $115,000

Project: 0012835 Type Work: Miscellaneous Improvements

Descp: STATEWIDE SUE CONSULTANT SERVICES - FY

2014

Lanes: Exist.

Prop.

Length: 0.00

Total Project Cost: Total Project Authorizations:

$4,500,000 $0

Phase UTL

Fund State

Year 2014

Federal $0

State $0

Other $4,500,000

Total $4,500,000

Project: 0012836 Type Work: RRX Signing & Marking
Descp: SIGNING & PAVEMENT MARKINGS @ 106 RR LOCS IN DISTRICT 2 & 5 Length: 0.00

Phase PE CST

Fund HSIP HSIP

Year LUMP LUMP

Total Project Cost: Total Project Authorizations:

$240,000 $0

Uses Lump Sum Bank: RAILROAD CROSSING HAZARD ELIMINATION FOR FY 2014 - FY 2017

Project: 0012851 Type Work: Preliminary Engineering Descp: SPECIAL DRAINAGE STUDIES - FY 2014

Lanes: Exist.

Prop.

Length: 0.00

Total Project Cost: Total Project Authorizations:

$300,000 $0

Phase PE

Fund STP

Year 2014

Federal $20,000
$220,000
Federal $240,000

State $0 $0

Other $0 $0

State $60,000

Other $0

Total $20,000
$220,000
Total $300,000

Project: 0012852 Type Work: Preliminary Engineering Descp: SPECIAL DRAINAGE STUDIES - FY 2015

Lanes: Exist.

Prop.

Length: 0.00

Total Project Cost: Total Project Authorizations:

$500,000 $0

Phase PE

Fund STP

Year 2015

Federal $400,000

State $100,000

Other $0

Total $500,000

Page 33 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0012853 Type Work: Preliminary Engineering Descp: SPECIAL DRAINAGE STUDY - FY 2016

Lanes: Exist.

Prop.

Length: 0.00

Total Project Cost: Total Project Authorizations:

$800,000 $0

Phase PE

Fund STP

Year 2016

Federal $640,000

State $160,000

Other $0

Total $800,000

Project: 0012864 Type Work: Road Safety Audit

Descp: RC CONTRACT FOR PLANNING

/ENVIRONMENT/LOC SERVICES - FY 2014

Lanes: Exist.

Prop.

Length: 0.00

Total Project Cost: Total Project Authorizations:

$1,500,000 $0

Phase PE

Fund STP

Year 2014

Federal $1,200,000

State $0

Other $300,000

Total $1,500,000

Project: 821055- Type Work: Bridges
Descp: OFF SYSTEM PILE ENCASEMENT PROJECT TO REPAIR 4 BRIDGES Length: 0.00

Phase CST

Fund STP

Total Project Cost: Total Project Authorizations:

$59,755 $0

Uses Lump Sum Bank: BRIDGE MAINTENANCE/PAINTING FOR FY 2014 - FY 2017

Project: M001854 Type Work: Bridges
Descp: PILE ENCASEMENT @ 17 SR LOCATIONS IN DIST 6 Length: 0.00

Total Project Cost: Total Project Authorizations:

$223,482 $0

Phase CST

Fund STP

Uses Lump Sum Bank: BRIDGE MAINTENANCE/PAINTING FOR FY 2014 - FY 2017

Project: M001911 Type Work: Preliminary Engineering Descp: LICENSE AND SUPPORT AGREEMENT HMMS
Length: 0.00

Phase PE

Fund STP

Total Project Cost: Total Project Authorizations:

$179,264 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Year LUMP
Year LUMP
Year LUMP

Federal $47,804
Federal $178,786
Federal $143,411

State $11,951

Other $0

State $44,696

Other $0

State $35,853

Other $0

Total $59,755
Total $223,482
Total $179,264

Page 34 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: M003376 Type Work: Miscellaneous Improvements
Descp: FORCE ACCOUNT MAINTENANCE ACTIVITIES FOR FY 2014 Length: 0.00

Total Project Cost: Total Project Authorizations:

$18,000,000 $18,000,000

Phase CST

Fund STP

Year 2014

Federal $14,400,000

State $3,600,000

Other $0

Total $18,000,000

Project: M003377 Type Work: Miscellaneous Improvements
Descp: FORCE ACCOUNT MAINTENANCE ACTIVITIES FOR FY 2015 Length: 0.00

Total Project Cost: Total Project Authorizations:

$18,000,000 $0

Phase CST

Fund STP

Year 2015

Federal $14,400,000

State $3,600,000

Other $0

Total $18,000,000

Project: M003378 Type Work: Miscellaneous Improvements
Descp: FORCE ACCOUNT MAINTENANCE ACTIVITIES FOR FY 2016 Length: 0.00

Total Project Cost: Total Project Authorizations:

$18,000,000 $0

Phase CST

Fund STP

Year 2016

Federal $14,400,000

State $3,600,000

Other $0

Total $18,000,000

Project: M003379 Type Work: Miscellaneous Improvements
Descp: FORCE ACCOUNT MAINTENANCE ACTIVITIES FOR FY 2017 Length: 0.00

Total Project Cost: Total Project Authorizations:

$15,000,000 $0

Phase CST

Fund STP

Year 2017

Federal $12,000,000

State $3,000,000

Other $0

Total $15,000,000

Project: M003820 Type Work: Weigh Station
Descp: WEIGH STATION UPGRADES @ 6 LOCATIONS PE ONLY - PHASE II Length: 0.00

Phase PE

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations:

$662,448 $0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Federal $596,204

State $66,245

Other $0

Total $662,448

Page 35 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: M004190 Type Work: Signing
Descp: I-16 @ 17 LOCS BETWEEN CANDLER COUNTY & CHATHAM COUNTY Length: 0.00

Total Project Cost: Total Project Authorizations:

$3,250,000 $0

Phase CST

Fund NHPP

Year LUMP

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Project: M004191 Type Work: Signing
Descp: I-20 @ 22 LOCS BETWEEN NEWTON COUNTY & RICHMOND COUNTY Length: 0.00

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations:

$3,820,000 $0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Project: M004767 Type Work: Welcome Center Facilities
Descp: WELCOME CENTER CONDITION ASSESSMENTS @ 8 LOCS Length: 0.00

Phase PE CST

Fund State State

Year 2014 2014

Total Project Cost: Total Project Authorizations:

$3,000,000 $0

Federal $3,250,000

State $0

Other $0

Federal $3,820,000

State $0

Other $0

Federal $0 $0

State $1,000,000 $2,000,000

Other $0 $0

Total $3,250,000
Total $3,820,000
Total $1,000,000 $2,000,000

Project: M004770 Type Work: Preliminary Engineering

Descp: MAINTENANCE PAVEMENT PRESERVATION -

PHASE II

Lanes: Exist.

Prop.

Length: 0.00

Total Project Cost: Total Project Authorizations:

$2,500,000 $2,500,000

Phase PE

Fund STP

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Project: M004783 Type Work: Pavement Markings
Descp: MAINTENANCE ON-SYSTEM STRIPING FOR DOT DISTRICT 1 Length: 0.00

Phase CST

Fund STP

Total Project Cost: Total Project Authorizations:

$2,000,000 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Year 2014
Year 2014

Federal $2,000,000

State $500,000

Other $0

Federal $2,000,000

State $0

Other $0

Total $2,500,000
Total $2,000,000

Page 36 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: M004784 Type Work: Pavement Markings
Descp: MAINTENANCE ON-SYSTEM STRIPING FOR DOT DISTRICT 2 Length: 0.00

Total Project Cost: Total Project Authorizations:

$2,000,000 $0

Phase CST

Fund STP

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Project: M004785 Type Work: Pavement Markings
Descp: MAINTENANCE ON-SYSTEM STRIPING FOR DOT DISTRICT 3 Length: 0.00

Phase CST

Fund STP

Total Project Cost: Total Project Authorizations:

$2,000,000 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Project: M004786 Type Work: Pavement Markings
Descp: MAINTENANCE ON-SYSTEM STRIPING FOR DOT DISTRICT 4 Length: 0.00

Phase CST

Fund STP

Total Project Cost: Total Project Authorizations:

$2,000,000 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Project: M004787 Type Work: Pavement Markings
Descp: MAINTENANCE ON-SYSTEM STRIPING FOR DOT DISTRICT 5 Length: 0.00

Total Project Cost: Total Project Authorizations:

$2,000,000 $2,000,000

Phase CST

Fund STP

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Project: M004788 Type Work: Pavement Markings
Descp: MAINTENANCE ON-SYSTEM STRIPING FOR DOT DISTRICT 6 Length: 0.00

Phase CST

Fund STP

Total Project Cost: Total Project Authorizations:

$2,000,000 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Year 2014
Year 2014
Year 2014
Year 2014
Year 2014

Federal $2,000,000

State $0

Other $0

Federal $2,000,000

State $0

Other $0

Federal $2,000,000

State $0

Other $0

Federal $2,000,000

State $0

Other $0

Federal $2,000,000

State $0

Other $0

Total $2,000,000
Total $2,000,000
Total $2,000,000
Total $2,000,000
Total $2,000,000

Page 37 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: M004789 Type Work: Pavement Markings
Descp: MAINTENANCE ON-SYSTEM STRIPING FOR DOT DISTRICT 7 Length: 0.00

Total Project Cost: Total Project Authorizations:

$2,000,000 $0

Phase CST

Fund STP

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Project: T003451 Type Work: Transit Projects
Descp: FY 2014 SECTION 5311 DISCRETIONARY CAPITAL Length: 0.00

Phase CST

Fund Transit

Total Project Cost: Total Project Authorizations:

$300,000 $0

Year 2014
Year 2014

Federal $2,000,000

State $0

Other $0

Federal $240,000

State $30,000

Other $30,000

Total $2,000,000
Total $300,000

Project: T003452 Type Work: Transit Projects
Descp: FY 2014 SECTION 5311F INTERCITY BUS PROGRAM Length: 0.00

Total Project Cost: Total Project Authorizations:

$2,573,843 $0

Phase CST

Fund Transit

Year 2014

Federal $2,059,074

State $257,384

Other $257,384

Total $2,573,843

Project: T003453 Type Work: Transit Projects
Descp: FY 2014 SECTION 5311 DISCRETIONARY OPERATING Length: 0.00

Total Project Cost: Total Project Authorizations:

$300,000 $0

Phase CST

Fund Transit

Year 2014

Federal $150,000

State $0

Other $150,000

Total $300,000

Project: T003767 Type Work: Transit Projects
Descp: FY 2014 SECTION 5310 CAPITAL FOR DHS DISTRICT 1 Length: 0.00

Total Project Cost: Total Project Authorizations:

$337,600 $0

Phase CST

Fund Transit

Year 2014

Federal $270,080

State $67,520

Other $0

Total $337,600

Page 38 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: T003768 Type Work: Transit Projects
Descp: FY 2014 SECTION 5310 CAPITAL FOR DHS DISTRICT 2 Length: 0.00

Total Project Cost: Total Project Authorizations:

$162,644 $0

Phase CST

Fund Transit

Year 2014

Federal $130,115

State $32,529

Other $0

Total $162,644

Project: T003769 Type Work: Transit Projects
Descp: FY 2014 SECTION 5310 CAPITAL FOR DHS DISTRICT 3 Length: 0.00

Total Project Cost: Total Project Authorizations:

$610,659 $0

Phase CST

Fund Transit

Year 2014

Federal $488,527

State $122,132

Other $0

Total $610,659

Project: T003770 Type Work: Transit Projects
Descp: FY 2014 SECTION 5310 CAPITAL FOR DHS DISTRICT 4 Length: 0.00

Total Project Cost: Total Project Authorizations:

$263,129 $0

Phase CST

Fund Transit

Year 2014

Federal $210,503

State $52,626

Other $0

Total $263,129

Project: T003771 Type Work: Transit Projects
Descp: FY 2014 SECTION 5310 CAPITAL FOR DHS DISTRICT 5 Length: 0.00

Total Project Cost: Total Project Authorizations:

$183,694 $0

Phase CST

Fund Transit

Year 2014

Federal $146,955

State $36,739

Other $0

Total $183,694

Project: T003772 Type Work: Transit Projects
Descp: FY 2014 SECTION 5310 CAPITAL FOR DHS DISTRICT 6 Length: 0.00

Total Project Cost: Total Project Authorizations:

$124,118 $0

Phase CST

Fund Transit

Year 2014

Federal $99,294

State $24,824

Other $0

Total $124,118

Page 39 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: T003773 Type Work: Transit Projects
Descp: FY 2014 SECTION 5310 CAPITAL FOR DHS DISTRICT 7 Length: 0.00

Total Project Cost: Total Project Authorizations:

$109,224 $0

Phase CST

Fund Transit

Year 2014

Federal $87,379

State $21,845

Other $0

Total $109,224

Project: T003774 Type Work: Transit Projects
Descp: FY 2014 SECTION 5310 CAPITAL FOR DHS DISTRICT 8 Length: 0.00

Total Project Cost: Total Project Authorizations:

$178,729 $0

Phase CST

Fund Transit

Year 2014

Federal $142,983

State $35,746

Other $0

Total $178,729

Project: T003775 Type Work: Transit Projects
Descp: FY 2014 SECTION 5310 CAPITAL FOR DHS DISTRICT 9 Length: 0.00

Total Project Cost: Total Project Authorizations:

$183,694 $0

Phase CST

Fund Transit

Year 2014

Federal $146,955

State $36,739

Other $0

Total $183,694

Project: T003776 Type Work: Transit Projects
Descp: FY 2014 SECTION 5310 CAPITAL FOR DHS DISTRICT 10 Length: 0.00

Total Project Cost: Total Project Authorizations:

$89,365 $0

Phase CST

Fund Transit

Year 2014

Federal $71,492

State $17,873

Other $0

Total $89,365

Project: T003777 Type Work: Transit Projects
Descp: FY 2014 SECTION 5310 CAPITAL FOR DHS DISTRICT 11 Length: 0.00

Total Project Cost: Total Project Authorizations:

$64,541 $0

Phase CST

Fund Transit

Year 2014

Federal $51,633

State $12,908

Other $0

Total $64,541

Page 40 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: T003778 Type Work: Transit Projects
Descp: FY 2014 SECTION 5310 CAPITAL FOR DHS DISTRICT 12 Length: 0.00

Total Project Cost: Total Project Authorizations:

$804,282 $0

Phase CST

Fund Transit

Year 2014

Federal $643,426

State $160,856

Other $0

Total $804,282

Project: T003958 Type Work: Transit Projects
Descp: FY 2014 SECTION 5311 CAPITAL FOR DOT DISTRICT 3 Length: 0.00

Total Project Cost: Total Project Authorizations:

$551,500 $0

Phase CST

Fund Transit

Year 2014

Federal $441,200

State $55,150

Other $55,150

Total $551,500

Project: T003959 Type Work: Transit Projects
Descp: FY 2015 SECTION 5311 CAPITAL FOR DOT DISTRICT 3 Length: 0.00

Total Project Cost: Total Project Authorizations:

$947,800 $0

Phase CST

Fund Transit

Year 2015

Federal $758,240

State $94,780

Other $94,780

Total $947,800

Project: T003962 Type Work: Operating
Descp: FY 2014 SECTION 5311 OPERATING FOR DOT DISTRICT 3 Length: 0.00

Total Project Cost: Total Project Authorizations:

$2,981,166 $0

Phase CST

Fund Transit

Year 2014

Federal $1,490,583

State $0

Other $1,490,583

Total $2,981,166

Project: T003963 Type Work: Operating
Descp: FY 2015 SECTION 5311 OPERATING FOR DOT DISTRICT 3 Length: 0.00

Total Project Cost: Total Project Authorizations:

$3,031,750 $0

Phase CST

Fund Transit

Year 2015

Federal $1,515,875

State $0

Other $1,515,875

Total $3,031,750

Page 41 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: T003966 Type Work: Operating
Descp: FY 2014 SECTION 5311 OPERATING FOR DOT DISTRICT 5 Length: 0.00

Total Project Cost: Total Project Authorizations:

$6,266,602 $0

Phase CST

Fund Transit

Year 2014

Federal $3,133,301

State $0

Other $3,133,301

Total $6,266,602

Project: T003967 Type Work: Operating
Descp: FY 2015 SECTION 5311 OPERATING FOR DOT DISTRICT 5 Length: 0.00

Total Project Cost: Total Project Authorizations:

$6,281,002 $0

Phase CST

Fund Transit

Year 2015

Federal $3,140,501

State $0

Other $3,140,501

Total $6,281,002

Project: T003970 Type Work: Transit Projects
Descp: FY 2014 SECTION 5311 CAPITAL FOR DOT DISTRICT 5 Length: 0.00

Total Project Cost: Total Project Authorizations:

$815,700 $0

Phase CST

Fund Transit

Year 2014

Federal $652,560

State $81,570

Other $81,570

Total $815,700

Project: T003971 Type Work: Transit Projects
Descp: FY 2015 SECTION 5311 CAPITAL FOR DOT DISTRICT 5 Length: 0.00

Total Project Cost: Total Project Authorizations:

$2,929,500 $0

Phase CST

Fund Transit

Year 2015

Federal $2,343,600

State $292,950

Other $292,950

Total $2,929,500

Project: T003985 Type Work: Operating
Descp: FY 2014 SECTION 5311 OPERATING FOR DOT DISTRICT 2 Length: 0.00

Total Project Cost: Total Project Authorizations:

$2,921,561 $0

Phase CST

Fund Transit

Year 2014

Federal $1,460,786

State $0

Other $1,460,775

Total $2,921,561

Page 42 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: T003986 Type Work: Operating
Descp: FY 2015 SECTION 5311 OPERATING FOR DOT DISTRICT 2 Length: 0.00

Total Project Cost: Total Project Authorizations:

$3,009,210 $0

Phase CST

Fund Transit

Year 2015

Federal $1,504,600

State $0

Other $1,504,610

Total $3,009,210

Project: T003989 Type Work: Transit Projects
Descp: FY 2014 SECTION 5311 CAPITAL FOR DOT DISTRICT 2 Length: 0.00

Total Project Cost: Total Project Authorizations:

$471,200 $0

Phase CST

Fund Transit

Year 2014

Federal $376,960

State $47,120

Other $47,120

Total $471,200

Project: T003990 Type Work: Transit Projects
Descp: FY 2015 SECTION 5311 CAPITAL FOR DOT DISTRICT 2 Length: 0.00

Total Project Cost: Total Project Authorizations:

$1,154,950 $0

Phase CST

Fund Transit

Year 2015

Federal $923,960

State $115,495

Other $115,495

Total $1,154,950

Project: T003993 Type Work: Operating
Descp: FY 2014 SECTION 5311 OPERATING FOR DOT DISTRICT 4 Length: 0.00

Total Project Cost: Total Project Authorizations:

$7,782,602 $0

Phase CST

Fund Transit

Year 2014

Federal $3,891,301

State $0

Other $3,891,301

Total $7,782,602

Project: T003994 Type Work: Operating
Descp: FY 2015 SECTION 5311 OPERATING FOR DOT DISTRICT 4 Length: 0.00

Total Project Cost: Total Project Authorizations:

$7,782,602 $0

Phase CST

Fund Transit

Year 2015

Federal $3,891,301

State $0

Other $3,891,301

Total $7,782,602

Page 43 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: T003997 Type Work: Operating
Descp: FY 2014 SECTION 5311 OPERATING FOR DOT DISTRICT 6 Length: 0.00

Total Project Cost: Total Project Authorizations:

$3,844,016 $0

Phase CST

Fund Transit

Year 2014

Federal $1,922,008

State $0

Other $1,922,008

Total $3,844,016

Project: T003998 Type Work: Operating
Descp: FY 2015 SECTION 5311 OPERATING FOR DOT DISTRICT 6 Length: 0.00

Total Project Cost: Total Project Authorizations:

$3,584,872 $0

Phase CST

Fund Transit

Year 2015

Federal $1,792,436

State $0

Other $1,792,436

Total $3,584,872

Project: T004001 Type Work: Transit Projects
Descp: FY 2014 SECTION 5311 CAPITAL FOR DOT DISTRICT 4 Length: 0.00

Total Project Cost: Total Project Authorizations:

$1,993,100 $0

Phase CST

Fund Transit

Year 2014

Federal $1,594,480

State $199,310

Other $199,310

Total $1,993,100

Project: T004002 Type Work: Transit Projects
Descp: FY 2015 SECTION 5311 CAPITAL FOR DOT DISTRICT 4 Length: 0.00

Total Project Cost: Total Project Authorizations:

$2,070,200 $0

Phase CST

Fund Transit

Year 2015

Federal $1,656,160

State $207,020

Other $207,020

Total $2,070,200

Project: T004005 Type Work: Transit Projects
Descp: FY 2014 SECTION 5311 CAPITAL FOR DOT DISTRICT 6 Length: 0.00

Total Project Cost: Total Project Authorizations:

$292,900 $0

Phase CST

Fund Transit

Year 2014

Federal $234,320

State $29,290

Other $29,290

Total $292,900

Page 44 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: T004006 Type Work: Transit Projects
Descp: FY 2015 SECTION 5311 CAPITAL FOR DOT DISTRICT 6 Length: 0.00

Total Project Cost: Total Project Authorizations:

$734,400 $0

Phase CST

Fund Transit

Year 2015

Federal $587,520

State $73,440

Other $73,440

Total $734,400

Project: T004009 Type Work: Operating
Descp: FY 2014 SECTION 5311 OPERATING FOR DOT DISTRICT 1 Length: 0.00

Total Project Cost: Total Project Authorizations:

$2,390,744 $0

Phase CST

Fund Transit

Year 2014

Federal $1,195,372

State $0

Other $1,195,372

Total $2,390,744

Project: T004013 Type Work: Transit Projects
Descp: FY 2014 SECTION 5311 CAPITAL FOR DOT DISTRICT 1 Length: 0.00

Total Project Cost: Total Project Authorizations:

$290,500 $0

Phase CST

Fund Transit

Year 2014

Federal $232,400

State $58,100

Other $0

Total $290,500

Project: T004016 Type Work: Transit Projects
Descp: FY 2015 SECTION 5311 CAPITAL FOR DOT DISTRICT 1 Length: 0.00

Total Project Cost: Total Project Authorizations:

$527,900 $0

Phase CST

Fund Transit

Year 2015

Federal $422,320

State $52,790

Other $52,790

Total $527,900

Project: T004017 Type Work: Operating
Descp: FY 2015 SECTION 5311 OPERATING FOR DOT DISTRICT 1 Length: 0.00

Total Project Cost: Total Project Authorizations:

$2,174,882 $0

Phase CST

Fund Transit

Year 2015

Federal $1,087,441

State $0

Other $1,087,441

Total $2,174,882

Page 45 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: T004061 Type Work: Transit Projects
Descp: FY 2015 SECTION 5311 DISCRETIONARY CAPITAL Length: 0.00

Total Project Cost: Total Project Authorizations:

$300,000 $0

Phase CST

Fund Transit

Year 2015

Federal $240,000

State $30,000

Other $30,000

Total $300,000

Project: T004062 Type Work: Transit Projects
Descp: FY 2015 SECTION 5311F INTERCITY BUS PROGRAM Length: 0.00

Total Project Cost: Total Project Authorizations:

$2,573,843 $0

Phase CST

Fund Transit

Year 2015

Federal $2,059,074

State $257,384

Other $257,384

Total $2,573,843

Project: T004063 Type Work: Transit Projects
Descp: FY 2015 SECTION 5311 DISCRETIONARY OPERATING Length: 0.00

Total Project Cost: Total Project Authorizations:

$318,362 $0

Phase CST

Fund Transit

Year 2015

Federal $159,181

State $0

Other $159,181

Total $318,362

Project: T004114 Type Work: Transit Projects
Descp: FY 2015 SECTION 5310 CAPITAL FOR DHS DISTRICT 1 Length: 0.00

Total Project Cost: Total Project Authorizations:

$337,600 $0

Phase CST

Fund Transit

Year 2015

Federal $270,080

State $67,520

Other $0

Total $337,600

Project: T004115 Type Work: Transit Projects
Descp: FY 2015 SECTION 5310 CAPITAL FOR DHS DISTRICT 2 Length: 0.00

Total Project Cost: Total Project Authorizations:

$162,644 $0

Phase CST

Fund Transit

Year 2015

Federal $130,115

State $32,529

Other $0

Total $162,644

Page 46 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: T004116 Type Work: Transit Projects
Descp: FY 2015 SECTION 5310 CAPITAL FOR DHS DISTRICT 3 Length: 0.00

Total Project Cost: Total Project Authorizations:

$610,659 $0

Phase CST

Fund Transit

Year 2015

Federal $488,527

State $122,132

Other $0

Total $610,659

Project: T004117 Type Work: Transit Projects
Descp: FY 2015 SECTION 5310 CAPITAL FOR DHS DISTRICT 4 Length: 0.00

Total Project Cost: Total Project Authorizations:

$263,129 $0

Phase CST

Fund Transit

Year 2015

Federal $210,503

State $52,626

Other $0

Total $263,129

Project: T004118 Type Work: Transit Projects
Descp: FY 2015 SECTION 5310 CAPITAL FOR DHS DISTRICT 5 Length: 0.00

Total Project Cost: Total Project Authorizations:

$183,694 $0

Phase CST

Fund Transit

Year 2015

Federal $146,955

State $36,739

Other $0

Total $183,694

Project: T004119 Type Work: Transit Projects
Descp: FY 2015 SECTION 5310 CAPITAL FOR DHS DISTRICT 6 Length: 0.00

Total Project Cost: Total Project Authorizations:

$124,118 $0

Phase CST

Fund Transit

Year 2015

Federal $99,294

State $24,824

Other $0

Total $124,118

Project: T004120 Type Work: Transit Projects
Descp: FY 2015 SECTION 5310 CAPITAL FOR DHS DISTRICT 7 Length: 0.00

Total Project Cost: Total Project Authorizations:

$109,224 $0

Phase CST

Fund Transit

Year 2015

Federal $87,379

State $21,845

Other $0

Total $109,224

Page 47 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: T004121 Type Work: Transit Projects
Descp: FY 2015 SECTION 5310 CAPITAL FOR DHS DISTRICT 8 Length: 0.00

Total Project Cost: Total Project Authorizations:

$178,729 $0

Phase CST

Fund Transit

Year 2015

Federal $142,983

State $35,746

Other $0

Total $178,729

Project: T004122 Type Work: Transit Projects
Descp: FY 2015 SECTION 5310 CAPITAL FOR DHS DISTRICT 9 Length: 0.00

Total Project Cost: Total Project Authorizations:

$183,694 $0

Phase CST

Fund Transit

Year 2015

Federal $146,955

State $36,739

Other $0

Total $183,694

Project: T004123 Type Work: Transit Projects
Descp: FY 2015 SECTION 5310 CAPITAL FOR DHS DISTRICT 10 Length: 0.00

Total Project Cost: Total Project Authorizations:

$89,365 $0

Phase CST

Fund Transit

Year 2015

Federal $71,492

State $17,873

Other $0

Total $89,365

Project: T004124 Type Work: Transit Projects
Descp: FY 2015 SECTION 5310 CAPITAL FOR DHS DISTRICT 11 Length: 0.00

Total Project Cost: Total Project Authorizations:

$64,541 $0

Phase CST

Fund Transit

Year 2015

Federal $51,633

State $12,908

Other $0

Total $64,541

Project: T004125 Type Work: Transit Projects
Descp: FY 2015 SECTION 5310 CAPITAL FOR DHS DISTRICT 12 Length: 0.00

Total Project Cost: Total Project Authorizations:

$804,282 $0

Phase CST

Fund Transit

Year 2015

Federal $643,426

State $160,856

Other $0

Total $804,282

Page 48 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: T004166 Type Work: Transit Projects
Descp: FY 2014 SECTION 5311 CAPITAL FOR DOT DISTRICT 1 Length: 0.00

Total Project Cost: Total Project Authorizations:

$1,963,780 $0

Phase CST

Fund Transit

Year 2014

Federal $1,905,680

State $29,050

Other $29,050

Total $1,963,780

Project: T004419 Type Work: Transit Projects
Descp: FY 2016 SECTION 5310 CAPITAL FOR DHS DISTRICT 1 Length: 0.00

Total Project Cost: Total Project Authorizations:

$202,968 $0

Phase CST

Fund Transit

Year 2016

Federal $162,374

State $40,594

Other $0

Total $202,968

Project: T004420 Type Work: Transit Projects
Descp: FY 2016 SECTION 5310 CAPITAL FOR DHS DISTRICT 2 Length: 0.00

Total Project Cost: Total Project Authorizations:

$121,314 $0

Phase CST

Fund Transit

Year 2016

Federal $97,051

State $24,263

Other $0

Total $121,314

Project: T004421 Type Work: Transit Projects
Descp: FY 2016 SECTION 5310 CAPITAL FOR DHS DISTRICT 4 Length: 0.00

Total Project Cost: Total Project Authorizations:

$123,647 $0

Phase CST

Fund Transit

Year 2016

Federal $98,918

State $24,729

Other $0

Total $123,647

Project: T004422 Type Work: Transit Projects
Descp: FY 2016 SECTION 5310 CAPITAL FOR DHS DISTRICT 5 Length: 0.00

Total Project Cost: Total Project Authorizations:

$109,650 $0

Phase CST

Fund Transit

Year 2016

Federal $87,720

State $21,930

Other $0

Total $109,650

Page 49 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: T004423 Type Work: Transit Projects
Descp: FY 2016 SECTION 5310 CAPITAL FOR DHS DISTRICT 6 Length: 0.00

Total Project Cost: Total Project Authorizations:

$118,981 $0

Phase CST

Fund Transit

Year 2016

Federal $95,185

State $23,796

Other $0

Total $118,981

Project: T004424 Type Work: Transit Projects
Descp: FY 2016 SECTION 5310 CAPITAL FOR DHS DISTRICT 7 Length: 0.00

Total Project Cost: Total Project Authorizations:

$143,941 $0

Phase CST

Fund Transit

Year 2016

Federal $115,153

State $28,788

Other $0

Total $143,941

Project: T004425 Type Work: Transit Projects
Descp: FY 2016 SECTION 5310 CAPITAL FOR DHS DISTRICT 8 Length: 0.00

Total Project Cost: Total Project Authorizations:

$156,567 $0

Phase CST

Fund Transit

Year 2016

Federal $125,254

State $31,313

Other $0

Total $156,567

Project: T004426 Type Work: Transit Projects
Descp: FY 2016 SECTION 5310 CAPITAL FOR DHS DISTRICT 9 Length: 0.00

Total Project Cost: Total Project Authorizations:

$86,320 $0

Phase CST

Fund Transit

Year 2016

Federal $69,056

State $17,264

Other $0

Total $86,320

Project: T004427 Type Work: Transit Projects
Descp: FY 2016 SECTION 5310 CAPITAL FOR DHS DISTRICT 10 Length: 0.00

Total Project Cost: Total Project Authorizations:

$121,314 $0

Phase CST

Fund Transit

Year 2016

Federal $97,051

State $24,263

Other $0

Total $121,314

Page 50 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: T004428 Type Work: Transit Projects
Descp: FY 2016 SECTION 5310 CAPITAL FOR DHS DISTRICT 11 Length: 0.00

Total Project Cost: Total Project Authorizations:

$114,316 $0

Phase CST

Fund Transit

Year 2016

Federal $91,453

State $22,863

Other $0

Total $114,316

Project: T004429 Type Work: Transit Projects
Descp: FY 2016 SECTION 5310 CAPITAL FOR DHS DISTRICT 12 Length: 0.00

Total Project Cost: Total Project Authorizations:

$417,602 $0

Phase CST

Fund Transit

Year 2016

Federal $334,082

State $83,520

Other $0

Total $417,602

Project: T004431 Type Work: Transit Projects
Descp: FY 2016 SECTION 5311F INTERCITY BUS PROGRAM Length: 0.00

Total Project Cost: Total Project Authorizations:

$1,567,729 $0

Phase CST

Fund Transit

Year 2016

Federal $1,254,183

State $156,773

Other $156,773

Total $1,567,729

Project: T004448 Type Work: Transit Projects
Descp: FY 2016 SECTION 5311 CAPITAL FOR DOT DISTRICT 1 Length: 0.00

Total Project Cost:

$0

Total Project Authorizations:

$0

Phase CST

Fund Transit

Year 2016

Federal $0

State $0

Other $0

Total $0

Project: T004449 Type Work: Transit Projects
Descp: FY 2016 SECTION 5311 CAPITAL FOR DOT DISTRICT 2 Length: 0.00

Total Project Cost: Total Project Authorizations:

$811,294 $0

Phase CST

Fund Transit

Year 2016

Federal $649,035

State $81,129

Other $81,129

Total $811,294

Page 51 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: T004450 Type Work: Operating
Descp: FY 2016 SECTION 5311 OPERATING FOR DOT DISTRICT 3 Length: 0.00

Total Project Cost: Total Project Authorizations:

$4,447,963 $0

Phase CST

Fund Transit

Year 2016

Federal $2,223,982

State $0

Other $2,223,982

Total $4,447,963

Project: T004451 Type Work: Operating
Descp: FY 2016 SECTION 5311 OPERATING FOR DOT DISTRICT 4 Length: 0.00

Total Project Cost: Total Project Authorizations:

$8,106,914 $0

Phase CST

Fund Transit

Year 2016

Federal $4,053,457

State $0

Other $4,053,457

Total $8,106,914

Project: T004452 Type Work: Operating
Descp: FY 2016 SECTION 5311 OPERATING FOR DOT DISTRICT 1 Length: 0.00

Total Project Cost: Total Project Authorizations:

$2,384,517 $0

Phase CST

Fund Transit

Year 2016

Federal $1,192,259

State $0

Other $1,192,259

Total $2,384,517

Project: T004453 Type Work: Operating
Descp: FY 2016 SECTION 5311 OPERATING FOR DOT DISTRICT 2 Length: 0.00

Total Project Cost: Total Project Authorizations:

$3,196,357 $0

Phase CST

Fund Transit

Year 2016

Federal $1,598,179

State $0

Other $1,598,179

Total $3,196,357

Project: T004454 Type Work: Transit Projects
Descp: FY 2016 SECTION 5311 CAPITAL FOR DOT DISTRICT 3 Length: 0.00

Total Project Cost: Total Project Authorizations:

$411,324 $0

Phase CST

Fund Transit

Year 2016

Federal $329,059

State $41,132

Other $41,132

Total $411,324

Page 52 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: T004455 Type Work: Transit Projects
Descp: FY 2016 SECTION 5311 CAPITAL FOR DOT DISTRICT 4 Length: 0.00

Total Project Cost: Total Project Authorizations:

$2,768,161 $0

Phase CST

Fund Transit

Year 2016

Federal $2,214,529

State $276,816

Other $276,816

Total $2,768,161

Project: T004456 Type Work: Transit Projects
Descp: FY 2016 SECTION 5311 CAPITAL FOR DOT DISTRICT 5 Length: 0.00

Total Project Cost: Total Project Authorizations:

$727,989 $0

Phase CST

Fund Transit

Year 2016

Federal $582,391

State $72,799

Other $72,799

Total $727,989

Project: T004457 Type Work: Operating
Descp: FY 2016 SECTION 5311 OPERATING FOR DOT DISTRICT 5 Length: 0.00

Total Project Cost: Total Project Authorizations:

$6,552,948 $0

Phase CST

Fund Transit

Year 2016

Federal $3,276,474

State $0

Other $3,276,474

Total $6,552,948

Project: T004458 Type Work: Operating
Descp: FY 2016 SECTION 5311 OPERATING FOR DOT DISTRICT 6 Length: 0.00

Total Project Cost: Total Project Authorizations:

$4,054,733 $0

Phase CST

Fund Transit

Year 2016

Federal $2,027,366

State $0

Other $2,027,366

Total $4,054,733

Project: T004459 Type Work: Transit Projects
Descp: FY 2016 SECTION 5311 CAPITAL FOR DOT DISTRICT 6 Length: 0.00

Total Project Cost: Total Project Authorizations:

$1,836,633 $0

Phase CST

Fund Transit

Year 2016

Federal $1,469,306

State $183,663

Other $183,663

Total $1,836,633

Page 53 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: T004810 Type Work: Transit Projects
Descp: FY 2017 SECTION 5311F INTERCITY BUS PROGRAM Length: 0.00

Total Project Cost: Total Project Authorizations:

$1,881,275 $0

Phase CAP

Fund Transit

Year 2017

Federal $1,505,020

State $188,127

Other $188,127

Total $1,881,275

Project: T004811 Type Work: Operating
Descp: FY 2017 SECTION 5311 OPERATING FOR DOT DISTRICT 6 Length: 0.00

Total Project Cost: Total Project Authorizations:

$4,865,679 $0

Phase OPR

Fund Transit

Year 2017

Federal $2,432,840

State $0

Other $2,432,840

Total $4,865,679

Project: T004812 Type Work: Operating
Descp: FY 2017 SECTION 5311 OPERATING FOR DOT DISTRICT 5 Length: 0.00

Total Project Cost: Total Project Authorizations:

$7,863,537 $0

Phase OPR

Fund Transit

Year 2017

Federal $3,931,769

State $0

Other $3,931,769

Total $7,863,537

Project: T004813 Type Work: Operating
Descp: FY 2017 SECTION 5311 OPERATING FOR DOT DISTRICT 4 Length: 0.00

Total Project Cost: Total Project Authorizations:

$9,728,297 $0

Phase OPR

Fund Transit

Year 2017

Federal $4,864,148

State $0

Other $4,864,148

Total $9,728,297

Project: T004814 Type Work: Operating
Descp: FY 2017 SECTION 5311 OPERATING FOR DOT DISTRICT 3 Length: 0.00

Total Project Cost: Total Project Authorizations:

$5,337,556 $0

Phase OPR

Fund Transit

Year 2017

Federal $2,668,778

State $0

Other $2,668,778

Total $5,337,556

Page 54 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: T004815 Type Work: Operating
Descp: FY 2017 SECTION 5311 OPERATING FOR DOT DISTRICT 2 Length: 0.00

Total Project Cost: Total Project Authorizations:

$3,835,629 $0

Phase OPR

Fund Transit

Year 2017

Federal $1,917,814

State $0

Other $1,917,814

Total $3,835,629

Project: T004816 Type Work: Operating
Descp: FY 2017 SECTION 5311 OPERATING FOR DOT DISTRICT 1 Length: 0.00

Total Project Cost: Total Project Authorizations:

$2,861,421 $0

Phase OPR

Fund Transit

Year 2017

Federal $1,430,710

State $0

Other $1,430,710

Total $2,861,421

Project: T004817 Type Work: Transit Projects
Descp: FY 2017 SECTION 5311 CAPITAL FOR DOT DISTRICT 6 Length: 0.00

Total Project Cost: Total Project Authorizations:

$2,203,959 $0

Phase CAP

Fund Transit

Year 2017

Federal $1,763,167

State $220,396

Other $220,396

Total $2,203,959

Project: T004818 Type Work: Transit Projects
Descp: FY 2017 SECTION 5311 CAPITAL FOR DOT DISTRICT 5 Length: 0.00

Total Project Cost: Total Project Authorizations:

$873,586 $0

Phase CAP

Fund Transit

Year 2017

Federal $698,869

State $87,359

Other $87,359

Total $873,586

Project: T004819 Type Work: Transit Projects
Descp: FY 2017 SECTION 5311 CAPITAL FOR DOT DISTRICT 4 Length: 0.00

Total Project Cost: Total Project Authorizations:

$3,321,793 $0

Phase CAP

Fund Transit

Year 2017

Federal $2,657,435

State $332,179

Other $332,179

Total $3,321,793

Page 55 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: T004820 Type Work: Transit Projects
Descp: FY 2017 SECTION 5311 CAPITAL FOR DOT DISTRICT 3 Length: 0.00

Total Project Cost: Total Project Authorizations:

$493,589 $0

Phase OPR

Fund Transit

Year 2017

Federal $394,871

State $49,359

Other $49,359

Total $493,589

Project: T004821 Type Work: Transit Projects
Descp: FY 2017 SECTION 5311 CAPITAL FOR DOT DISTRICT 2 Length: 0.00

Total Project Cost: Total Project Authorizations:

$973,552 $0

Phase CAP

Fund Transit

Year 2017

Federal $778,842

State $97,355

Other $97,355

Total $973,552

Project: T004822 Type Work: Transit Projects
Descp: FY 2017 SECTION 5310 CAPITAL FOR DHS DISTRICT 9 Length: 0.00

Total Project Cost: Total Project Authorizations:

$103,584 $0

Phase CAP

Fund Transit

Year 2017

Federal $82,867

State $20,717

Other $0

Total $103,584

Project: T004823 Type Work: Transit Projects
Descp: FY 2016 SECTION 5310 CAPITAL FOR DHS DISTRICT 8 Length: 0.00

Total Project Cost: Total Project Authorizations:

$187,881 $0

Phase CAP

Fund Transit

Year 2017

Federal $150,305

State $37,576

Other $0

Total $187,881

Project: T004824 Type Work: Transit Projects
Descp: FY 2017 SECTION 5310 CAPITAL FOR DHS DISTRICT 7 Length: 0.00

Total Project Cost: Total Project Authorizations:

$172,729 $0

Phase CAP

Fund Transit

Year 2017

Federal $138,183

State $34,546

Other $0

Total $172,729

Page 56 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: T004825 Type Work: Transit Projects
Descp: FY 2017 SECTION 5310 CAPITAL FOR DHS DISTRICT 6 Length: 0.00

Total Project Cost: Total Project Authorizations:

$142,777 $0

Phase CAP

Fund Transit

Year 2017

Federal $114,222

State $28,555

Other $0

Total $142,777

Project: T004826 Type Work: Transit Projects
Descp: FY 2017 SECTION 5310 CAPITAL FOR DHS DISTRICT 5 Length: 0.00

Total Project Cost: Total Project Authorizations:

$131,580 $0

Phase CAP

Fund Transit

Year 2017

Federal $105,264

State $26,316

Other $0

Total $131,580

Project: T004827 Type Work: Transit Projects
Descp: FY 2017 SECTION 5310 CAPITAL FOR DHS DISTRICT 4 Length: 0.00

Total Project Cost: Total Project Authorizations:

$148,376 $0

Phase CAP

Fund Transit

Year 2017

Federal $118,701

State $29,675

Other $0

Total $148,376

Project: T004828 Type Work: Transit Projects
Descp: FY 2017 SECTION 5310 CAPITAL FOR DHS DISTRICT 2 Length: 0.00

Total Project Cost: Total Project Authorizations:

$145,577 $0

Phase CAP

Fund Transit

Year 2017

Federal $116,461

State $29,115

Other $0

Total $145,577

Project: T004829 Type Work: Transit Projects
Descp: FY 2017 SECTION 5310 CAPITAL FOR DHS DISTRICT 12 Length: 0.00

Total Project Cost: Total Project Authorizations:

$501,000 $0

Phase CAP

Fund Transit

Year 2017

Federal $400,800

State $100,200

Other $0

Total $501,000

Page 57 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: T004830 Type Work: Transit Projects
Descp: FY 2017 SECTION 5310 CAPITAL FOR DHS DISTRICT 11 Length: 0.00

Total Project Cost: Total Project Authorizations:

$137,179 $0

Phase CAP

Fund Transit

Year 2017

Federal $109,743

State $27,436

Other $0

Total $137,179

Project: T004831 Type Work: Transit Projects
Descp: FY 2016 SECTION 5310 CAPITAL FOR DHS DISTRICT 10 Length: 0.00

Total Project Cost: Total Project Authorizations:

$145,577 $0

Phase OPR

Fund Transit

Year 2017

Federal $116,461

State $29,115

Other $0

Total $145,577

Project: T004832 Type Work: Transit Projects
Descp: FY 2017 SECTION 5310 CAPITAL FOR DHS DISTRICT 1 Length: 0.00

Total Project Cost: Total Project Authorizations:

$243,562 $0

Phase CAP

Fund Transit

Year 2017

Federal $194,849

State $48,712

Other $0

Total $243,562

Page 58 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project PI#
0000694 0006122 0006123 0006129 0006130 0006136 0006137 0006171 0006172 0006178 0006179 0006185 0006186 0006192 0006193 0006199 0006200 0006206 0006207 0006213 0006214 0006220 0006221 0006366 0006367 0006368 0006369 0007497 0007498 0007504 0007505 0007507 0007552 0007699 0007700 0007701 0008325 0008332 0008333 0008334 0008639 0008645 0008694 0008694 0009223 0009224 0009555 0009573 0009574

Year
2014 2014 2015 2014 2015 2014 2015 2014 2015 2014 2015 2014 2015 2014 2015 2014 2015 2014 2015 2014 2015 2014 2015 2014 2015 2016 2017 2014 2015 2014 2015 2016 2014 2015 2016 2017 2014 2014 2015 2016 2015 2014 2014 2014 2014 2015 2015 2015 2016

Phase
CST ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL CST CST CST CST ALL ALL ALL ALL ALL PE CST CST CST ALL ALL ALL ALL ALL ALL CST CST ALL ALL PE PE PE

All Counties Totals Summary
County Summary excludes lump sum projects.

Fund STP STP STP HSIP HSIP STP STP NHPP NHPP STP STP STP STP NHPP NHPP HSIP HSIP STP STP HSIP HSIP STP STP NHPP NHPP NHPP NHPP STP STP TAP TAP TAP HPP NHPP NHPP NHPP Safety Safety Safety Safety Safety Safety Other State Safety Safety STP STP STP

Federal
$400,000 $15,200,000 $15,200,000 $54,000,000 $63,000,000
$4,800,000 $4,800,000 $9,000,000 $9,000,000 $64,344,000 $57,776,000 $6,000,000 $6,000,000 $28,000,000 $28,000,000 $4,400,000 $4,400,000
$800,000 $800,000 $3,800,000 $3,800,000 $12,000,000 $12,000,000 $150,513,568 $150,513,568 $150,513,568 $150,513,568 $12,800,000 $9,600,000 $1,000,000 $1,000,000 $1,000,000 $1,799,800 $5,600,000 $6,000,000 $6,000,000 $7,800,000 $450,000 $450,000 $450,000 $2,880,000 $3,150,000
$0 $0 $3,120,000 $180,000 $280,000 $6,800,000 $6,800,000

State
$100,000 $0 $0
$6,000,000 $7,000,000 $1,200,000 $1,200,000 $1,000,000 $1,000,000 $16,086,000 $14,444,000 $1,500,000 $1,500,000 $7,000,000 $7,000,000
$0 $0 $200,000 $200,000 $0 $0 $3,000,000 $3,000,000 $37,628,392 $37,628,392 $37,628,392 $37,628,392 $3,200,000 $2,400,000 $250,000 $250,000 $250,000 $449,950 $1,400,000 $1,500,000 $1,500,000 $0 $0 $0 $0 $320,000 $350,000 $0 $4,215,000 $0 $0 $70,000 $1,700,000 $1,700,000

Other
$0 $3,800,000 $3,800,000
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $16,860,000 $0 $0 $0 $0 $0 $0

Total
$500,000 $19,000,000 $19,000,000 $60,000,000 $70,000,000
$6,000,000 $6,000,000 $10,000,000 $10,000,000 $80,430,000 $72,220,000 $7,500,000 $7,500,000 $35,000,000 $35,000,000 $4,400,000 $4,400,000 $1,000,000 $1,000,000 $3,800,000 $3,800,000 $15,000,000 $15,000,000 $188,141,960 $188,141,960 $188,141,960 $188,141,960 $16,000,000 $12,000,000 $1,250,000 $1,250,000 $1,250,000 $2,249,750 $7,000,000 $7,500,000 $7,500,000 $7,800,000
$450,000 $450,000 $450,000 $3,200,000 $3,500,000 $16,860,000 $4,215,000 $3,120,000 $180,000 $350,000 $8,500,000 $8,500,000
Page 59 of 342

0009575 0009577 0009578 0009580 0009581 0009582 0009583 0009587 0009588 0009589 0009590 0009591 0009592 0009593 0009594 0009595 0009596 0009738 0009739 0009742 0009743 0009746 0009747 0009754 0009758 0009759 0009762 0009763 0009766 0009767 0009770 0009771 0009774 0009775 0009778 0009779 0009782 0009783 0009787 0009790 0009791 0009794 0009802 0010151 0010152 0010153 0010169 0010170 0010171 0010300 0010301 0010312 0010312

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

2017

PE

2015

PE

2017

PE

2014

CST

2015

CST

2016

CST

2017

CST

2015

PE

2016

PE

2017

PE

2015

PE

2016

PE

2017

PE

2014

PE

2015

PE

2016

PE

2017

PE

2016

ALL

2017

ALL

2016

ALL

2017

ALL

2016

ALL

2017

ALL

2017

ALL

2016

ALL

2017

ALL

2016

ALL

2017

ALL

2016

ALL

2017

ALL

2016

ALL

2017

ALL

2016

ALL

2017

ALL

2016

ALL

2017

ALL

2016

ALL

2017

ALL

2017

ALL

2016

ALL

2017

ALL

2017

ALL

2017

ALL

2015

PE

2016

PE

2017

PE

2015

PE

2016

PE

2017

PE

2016

ALL

2017

ALL

2014

PE

2017

PE

STP NHPPX NHPPX NHPPX NHPPX NHPPX NHPPX
STP STP STP CMAQ CMAQ CMAQ CMAQ CMAQ CMAQ CMAQ STP STP HSIP HSIP STP STP NHPP STP STP STP STP NHPP NHPP HSIP HSIP STP STP HSIP HSIP STP STP STP STP STP TAP Safety STP STP STP STP STP STP NHPP NHPP State State

$6,800,000 $2,000,000 $2,000,000 $13,600,000 $23,028,000 $23,257,600 $23,725,772 $1,000,000 $1,000,000 $1,000,000
$960,000 $960,000 $960,000 $5,600,000 $5,600,000 $5,600,000 $5,600,000 $15,200,000 $15,200,000 $63,000,000 $63,000,000 $4,800,000 $4,800,000 $800,000 $56,480,000 $53,680,000 $6,000,000 $6,000,000 $28,000,000 $28,000,000 $4,400,000 $4,400,000 $800,000 $800,000 $3,800,000 $3,800,000 $12,000,000 $12,000,000 $600,000 $9,600,000 $9,600,000 $1,000,000 $450,000 $280,000 $280,000 $280,000
$80,000 $80,000 $80,000 $9,000,000 $4,500,000
$0 $0

$1,700,000 $500,000 $500,000
$3,400,000 $5,757,000 $5,814,400 $5,931,443
$0 $0 $0 $240,000 $240,000 $240,000 $1,400,000 $1,400,000 $1,400,000 $1,400,000 $0 $0 $7,000,000 $7,000,000 $1,200,000 $1,200,000 $200,000 $14,120,000 $13,420,000 $1,500,000 $1,500,000 $7,000,000 $7,000,000 $0 $0 $200,000 $200,000 $0 $0 $3,000,000 $3,000,000 $150,000 $2,400,000 $2,400,000 $250,000 $0 $70,000 $70,000 $70,000 $20,000 $20,000 $20,000 $1,000,000 $500,000 $0 $0

$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $3,800,000 $3,800,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $110,000 $110,000

$8,500,000 $2,500,000 $2,500,000 $17,000,000 $28,785,000 $29,072,000 $29,657,215 $1,000,000 $1,000,000 $1,000,000 $1,200,000 $1,200,000 $1,200,000 $7,000,000 $7,000,000 $7,000,000 $7,000,000 $19,000,000 $19,000,000 $70,000,000 $70,000,000 $6,000,000 $6,000,000 $1,000,000 $70,600,000 $67,100,000 $7,500,000 $7,500,000 $35,000,000 $35,000,000 $4,400,000 $4,400,000 $1,000,000 $1,000,000 $3,800,000 $3,800,000 $15,000,000 $15,000,000
$750,000 $12,000,000 $12,000,000
$1,250,000 $450,000 $350,000 $350,000 $350,000 $100,000 $100,000 $100,000
$10,000,000 $5,000,000 $110,000 $110,000
Page 60 of 342

0010312 0010312 0010831 0010832 0010833 0010834 0010908 0010909 0010918 0010919 0010920 0010938 0012683 0012683 0012684 0012684 0012685 0012685 0012686 0012686 0012712 0012713 0012714 0012715 0012717 0012718 0012719 0012720 0012760 0012761 0012762 0012763 0012764 0012765 0012766 0012767 0012772 0012806 0012807 0012809 0012810 0012811 0012812 0012835 0012851 0012852 0012853 0012864 M003376 M003377 M003378 M003379 M004767

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

2016 2015 2014 2015 2015 2016 2015 2016 2014 2016 2017 2014 2014 2014 2015 2015 2016 2016 2017 2017 2014 2015 2016 2017 2014 2015 2016 2017 2014 2015 2016 2017 2014 2015 2016 2017 2014 2014 2015 2014 2015 2016 2017 2014 2014 2015 2016 2014 2014 2015 2016 2017 2014

PE

State

PE

State

PE

STP

PE

STP

PE

STP

PE

STP

PE

STP

PE

STP

PE

CMAQ

PE

STP

PE

STP

PE

STP

PE

NHPP

CST

NHPP

PE

NHPP

CST

NHPP

PE

NHPP

CST

NHPP

PE

NHPP

CST

NHPP

PE

Other Funds

PE

Other Funds

PE

Other Funds

PE

Other Funds

PE

Other Funds

PE

Other Funds

PE

Other Funds

PE

Other Funds

PE

STP

PE

STP

PE

STP

PE

STP

ALL

STP

ALL

STP

ALL

STP

ALL

STP

PE

Other Funds

PE

STP

PE

STP

PE

STP

PE

STP

PE

STP

PE

STP

UTL

State

PE

STP

PE

STP

PE

STP

PE

STP

CST

STP

CST

STP

CST

STP

CST

STP

PE

State

$0 $0 $1,040,000 $400,000 $960,000 $960,000 $3,542,640 $4,039,120 $960,000 $280,000 $280,000 $124,848 $450,000 $4,050,000 $450,000 $4,050,000 $450,000 $4,500,000 $450,000 $4,050,000 $300,000 $300,000 $300,000 $300,000 $200,000 $200,000 $200,000 $200,000 $480,000 $480,000 $480,000 $480,000 $4,000,000 $6,400,000 $6,400,000 $6,400,000 $250,000 $240,000 $240,000 $115,000 $115,000 $115,000 $115,000 $0 $240,000 $400,000 $640,000 $1,200,000 $14,400,000 $14,400,000 $14,400,000 $12,000,000 $0

$0 $0 $260,000 $100,000 $240,000 $240,000 $885,660 $1,009,780 $240,000 $70,000 $70,000 $31,212 $50,000 $450,000 $50,000 $450,000 $50,000 $500,000 $50,000 $450,000 $0 $0 $0 $0 $0 $0 $0 $0 $120,000 $120,000 $120,000 $120,000 $1,000,000 $1,600,000 $1,600,000 $1,600,000 $0 $60,000 $60,000 $0 $0 $0 $0 $0 $60,000 $100,000 $160,000 $0 $3,600,000 $3,600,000 $3,600,000 $3,000,000 $1,000,000

$110,000 $110,000
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $4,500,000 $0 $0 $0 $300,000 $0 $0 $0 $0 $0

$110,000 $110,000 $1,300,000 $500,000 $1,200,000 $1,200,000 $4,428,300 $5,048,900 $1,200,000 $350,000 $350,000 $156,060 $500,000 $4,500,000 $500,000 $4,500,000 $500,000 $5,000,000 $500,000 $4,500,000 $300,000 $300,000 $300,000 $300,000 $200,000 $200,000 $200,000 $200,000 $600,000 $600,000 $600,000 $600,000 $5,000,000 $8,000,000 $8,000,000 $8,000,000 $250,000 $300,000 $300,000 $115,000 $115,000 $115,000 $115,000 $4,500,000 $300,000 $500,000 $800,000 $1,500,000 $18,000,000 $18,000,000 $18,000,000 $15,000,000 $1,000,000
Page 61 of 342

M004767 T003451 T003452 T003453 T003767 T003768 T003769 T003770 T003771 T003772 T003773 T003774 T003775 T003776 T003777 T003778 T003958 T003959 T003962 T003963 T003966 T003967 T003970 T003971 T003985 T003986 T003989 T003990 T003993 T003994 T003997 T003998 T004001 T004002 T004005 T004006 T004009 T004013 T004016 T004017 T004061 T004062 T004063 T004114 T004115 T004116 T004117 T004118 T004119 T004120 T004121 T004122 T004123

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

2014

CST

2014

CST

2014

CST

2014

CST

2014

CST

2014

CST

2014

CST

2014

CST

2014

CST

2014

CST

2014

CST

2014

CST

2014

CST

2014

CST

2014

CST

2014

CST

2014

CST

2015

CST

2014

CST

2015

CST

2014

CST

2015

CST

2014

CST

2015

CST

2014

CST

2015

CST

2014

CST

2015

CST

2014

CST

2015

CST

2014

CST

2015

CST

2014

CST

2015

CST

2014

CST

2015

CST

2014

CST

2014

CST

2015

CST

2015

CST

2015

CST

2015

CST

2015

CST

2015

CST

2015

CST

2015

CST

2015

CST

2015

CST

2015

CST

2015

CST

2015

CST

2015

CST

2015

CST

State Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit

$0 $240,000 $2,059,074 $150,000 $270,080 $130,115 $488,527 $210,503 $146,955
$99,294 $87,379 $142,983 $146,955 $71,492 $51,633 $643,426 $441,200 $758,240 $1,490,583 $1,515,875 $3,133,301 $3,140,501 $652,560 $2,343,600 $1,460,786 $1,504,600 $376,960 $923,960 $3,891,301 $3,891,301 $1,922,008 $1,792,436 $1,594,480 $1,656,160 $234,320 $587,520 $1,195,372 $232,400 $422,320 $1,087,441 $240,000 $2,059,074 $159,181 $270,080 $130,115 $488,527 $210,503 $146,955 $99,294 $87,379 $142,983 $146,955 $71,492

$2,000,000 $30,000
$257,384 $0
$67,520 $32,529 $122,132 $52,626 $36,739 $24,824 $21,845 $35,746 $36,739 $17,873 $12,908 $160,856 $55,150 $94,780
$0 $0 $0 $0 $81,570 $292,950 $0 $0 $47,120 $115,495 $0 $0 $0 $0 $199,310 $207,020 $29,290 $73,440 $0 $58,100 $52,790 $0 $30,000 $257,384 $0 $67,520 $32,529 $122,132 $52,626 $36,739 $24,824 $21,845 $35,746 $36,739 $17,873

$0 $30,000 $257,384 $150,000
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $55,150 $94,780 $1,490,583 $1,515,875 $3,133,301 $3,140,501 $81,570 $292,950 $1,460,775 $1,504,610 $47,120 $115,495 $3,891,301 $3,891,301 $1,922,008 $1,792,436 $199,310 $207,020 $29,290 $73,440 $1,195,372 $0 $52,790 $1,087,441 $30,000 $257,384 $159,181 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

$2,000,000 $300,000
$2,573,843 $300,000 $337,600 $162,644 $610,659 $263,129 $183,694 $124,118 $109,224 $178,729 $183,694 $89,365 $64,541 $804,282 $551,500 $947,800
$2,981,166 $3,031,750 $6,266,602 $6,281,002
$815,700 $2,929,500 $2,921,561 $3,009,210
$471,200 $1,154,950 $7,782,602 $7,782,602 $3,844,016 $3,584,872 $1,993,100 $2,070,200
$292,900 $734,400 $2,390,744 $290,500 $527,900 $2,174,882 $300,000 $2,573,843 $318,362 $337,600 $162,644 $610,659 $263,129 $183,694 $124,118 $109,224 $178,729 $183,694
$89,365
Page 62 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

T004124 T004125 T004166 T004419 T004420 T004421 T004422 T004423 T004424 T004425 T004426 T004427 T004428 T004429 T004431 T004448 T004449 T004450 T004451 T004452 T004453 T004454 T004455 T004456 T004457 T004458 T004459 T004810 T004811 T004812 T004813 T004814 T004815 T004816 T004817 T004818 T004819 T004820 T004821 T004822 T004823 T004824 T004825 T004826 T004827 T004828 T004829 T004830 T004831 T004832

2015

CST

2015

CST

2014

CST

2016

CST

2016

CST

2016

CST

2016

CST

2016

CST

2016

CST

2016

CST

2016

CST

2016

CST

2016

CST

2016

CST

2016

CST

2016

CST

2016

CST

2016

CST

2016

CST

2016

CST

2016

CST

2016

CST

2016

CST

2016

CST

2016

CST

2016

CST

2016

CST

2017

CAP

2017

OPR

2017

OPR

2017

OPR

2017

OPR

2017

OPR

2017

OPR

2017

CAP

2017

CAP

2017

CAP

2017

OPR

2017

CAP

2017

CAP

2017

CAP

2017

CAP

2017

CAP

2017

CAP

2017

CAP

2017

CAP

2017

CAP

2017

CAP

2017

OPR

2017

CAP

Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit

$51,633 $643,426 $1,905,680 $162,374
$97,051 $98,918 $87,720 $95,185 $115,153 $125,254 $69,056 $97,051 $91,453 $334,082 $1,254,183
$0 $649,035 $2,223,982 $4,053,457 $1,192,259 $1,598,179 $329,059 $2,214,529 $582,391 $3,276,474 $2,027,366 $1,469,306 $1,505,020 $2,432,840 $3,931,769 $4,864,148 $2,668,778 $1,917,814 $1,430,710 $1,763,167 $698,869 $2,657,435 $394,871 $778,842
$82,867 $150,305 $138,183 $114,222 $105,264 $118,701 $116,461 $400,800 $109,743 $116,461 $194,849

$12,908 $160,856
$29,050 $40,594 $24,263 $24,729 $21,930 $23,796 $28,788 $31,313 $17,264 $24,263 $22,863 $83,520 $156,773
$0 $81,129
$0 $0 $0 $0 $41,132 $276,816 $72,799 $0 $0 $183,663 $188,127 $0 $0 $0 $0 $0 $0 $220,396 $87,359 $332,179 $49,359 $97,355 $20,717 $37,576 $34,546 $28,555 $26,316 $29,675 $29,115 $100,200 $27,436 $29,115 $48,712

$0 $0 $29,050 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $156,773 $0 $81,129 $2,223,982 $4,053,457 $1,192,259 $1,598,179 $41,132 $276,816 $72,799 $3,276,474 $2,027,366 $183,663 $188,127 $2,432,840 $3,931,769 $4,864,148 $2,668,778 $1,917,814 $1,430,710 $220,396 $87,359 $332,179 $49,359 $97,355 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

$64,541 $804,282 $1,963,780 $202,968 $121,314 $123,647 $109,650 $118,981 $143,941 $156,567
$86,320 $121,314 $114,316 $417,602 $1,567,729
$0 $811,294 $4,447,963 $8,106,914 $2,384,517 $3,196,357 $411,324 $2,768,161 $727,989 $6,552,948 $4,054,733 $1,836,633 $1,881,275 $4,865,679 $7,863,537 $9,728,297 $5,337,556 $3,835,629 $2,861,421 $2,203,959 $873,586 $3,321,793 $493,589 $973,552 $103,584 $187,881 $172,729 $142,777 $131,580 $148,376 $145,577 $501,000 $137,179 $145,577 $243,562

$1,846,218,610

$380,345,895

$98,892,282

$2,325,456,787

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 63 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Appling
Project: 0001216 Type Work: Replace Bridge
Descp: SR 4/US 1 @ ALTAMAHA RIVER; OVERFLOW & WILLIAMS CREEK - TIA Length: 1.56

Total Project Cost: Total Project Authorizations:

$24,572,708 $0

Phase CST CST UTL

Fund State NHPP NHPP

Year 2014 2014 2014

Project: 0008976 Type Work: TE-Landscape/Beautify
Descp: ALTAMAHA TECHNICAL COLLEGE LANDSCAPE IMPROVEMENTS Length: 0.00

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$106,250 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 531340- Type Work: Replace Bridge
Descp: CR 305/CR 530 @ BIG SATILLA CREEK & OVERFLOW Length: 0.60

Phase ROW CST UTL

Fund Local STP Local

Year 2014 2016 2016

Total Project Cost: Total Project Authorizations:

$4,186,650 $0

Project: M004795 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 5 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Project: M004830 Type Work: Resurface & Maintenance Descp: SR 144 FROM SR 27 TO SR 121
Length: 14.80

Phase CST

Fund STP

Total Project Cost: Total Project Authorizations:

$2,869,679 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Year LUMP

Federal $0
$15,337,827 $344,515

State $0
$3,834,457 $86,129

Other $4,969,781
$0 $0

Total $4,969,781 $19,172,283
$430,644

Federal $85,000

Also in Toombs County

State $0

Other $21,250

Total $106,250

Federal $0
$3,159,038 $0

State $0 $0 $0

Other $108,120 $789,760 $129,733

Total $108,120
$3,948,798 $129,733

Federal $0

Also in Pierce County

State $200,000

Other $0

Total $200,000

Federal $2,295,743

State

Also in Bacon, Brantley, Bryan,

Bulloch, Camden, Candler,

Charlton, Chatham, Effingham,

Evans, Glynn, Jeff Davis, Liberty,

Long, McIntosh, Montgomery,

Pierce, Tattnall, Telfair, Toombs,

Ware, Wayne, Wheeler County

Other

Total

$573,936

$0

$2,869,679

Page 64 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Appling Totals Summary
County Summary excludes lump sum projects.

Project PI#
0001216 0001216 0001216 531340531340531340M004795

Year
2014 2014 2014 2014 2016 2016 2014

Phase
CST CST UTL ROW CST UTL CST

Fund NHPP State NHPP Local STP Local State

Federal
$1,993,917 $0
$44,787 $0
$2,116,556 $0 $0

State
$498,479 $0
$11,197 $0 $0 $0
$8,000

Other
$0 $646,072
$0 $72,440 $529,139 $86,921
$0

$4,155,260

$517,676

$1,334,572

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $2,492,397 $646,072 $55,984 $72,440 $2,645,694 $86,921 $8,000
$6,007,508

Page 65 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Atkinson
Project: 0010572 Type Work: TE-Bike/Ped Facility
Descp: SR 520 FM CS 515/KIRKLAND ST TO NEW HEALTH DEPT; INC NEW LOC Length: 0.20

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$192,261 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 0010573 Type Work: TE-Bike/Ped Facility
Descp: CS 742/RAILROAD STREET FROM SR 135 TO CS 741/FLORIDA ROAD Length: 0.11

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$249,994 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 0010574 Type Work: TE-Bike/Ped Facility
Descp: CS 500/RAILROAD AVE FROM SR 31 TO CS 503/KING STREET Length: 0.86

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$187,500 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: M004794 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 4 Length: 0.00

Phase CST

Fund State

Year 2014

Total Project Cost: Total Project Authorizations:

$200,000 $0

Project: M004825 Type Work: Resurface & Maintenance
Descp: SR 520/US 82 FROM CR 212/KIRKLAND RD TO CS 515/KIRKLAND ST Length: 1.73

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations:

$689,515 $0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Federal $153,809
Federal $199,995
Federal $150,000
Federal $0
Federal $551,612

State $0

Other $38,452

Total $192,261

State $0

Other $49,999

Total $249,994

State $0

Other $37,500

Total $187,500

State $200,000

Other $0

Total $200,000

State

Also in Baker, Ben Hill, Berrien,

Brooks, Calhoun, Clay, Clinch,

Coffee, Colquitt, Cook, Crisp,

Decatur, Dougherty, Early,

Echols, Grady, Irwin, Lanier, Lee,

Lowndes, Miller, Mitchell,

Quitman, Randolph, Seminole,

Terrell, Thomas, Tift, Turner,

Wilcox, Worth County

Other

Total

$137,903

$0

$689,515

Page 66 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: M004826 Type Work: Resurface & Maintenance
Descp: SR 89/US 441 FROM CLINCH COUNTY LINE TO SR 31 Length: 5.80

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations:

$611,088 $0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Federal $488,870

State $122,218

Other $0

Total $611,088

Atkinson Totals Summary
County Summary excludes lump sum projects.

Project PI# M004794

Year 2014

Phase CST

Fund State

Federal $0

State $6,000

Other $0

$0

$6,000

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $6,000 $6,000

Page 67 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Bacon
Project: 0010575 Type Work: TE-Bike/Ped Facility
Descp: SR 32 FROM CS 512/CHURCH STREET TO SR 4/US 1 Length: 0.27

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$187,500 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 0012656 Type Work: Pavement Markings
Descp: OFF-SYSTEM SAFETY IMPROVEMENTS @ 14 LOCS IN BACON COUNTY Length: 0.00

Phase CST

Fund HSIP

Year LUMP

Total Project Cost: Total Project Authorizations:

$259,000 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: M004795 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 5 Length: 0.00

Phase CST

Fund State

Year 2014

Total Project Cost: Total Project Authorizations:

$200,000 $0

Project: M004831 Type Work: Resurface & Maintenance
Descp: SR 4 FROM N OF CR 118/BEACH RD TO N OF CR 252/TADPOLE TRAIL Length: 9.77

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations:

$764,520 $0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Project: M004832 Type Work: Resurface & Maintenance
Descp: SR 32 FROM HURRICANE CREEK TO CR 280/DEDGE FARM ROAD Length: 2.15

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations:

$803,993 $0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Federal $150,000
Federal $259,000
Federal $0
Federal $611,616
Federal $643,194

State $0

Other $37,500

Total $187,500

State $0

Other $0

Total $259,000

State $200,000

Other $0

Total $200,000

State

Also in Appling, Brantley, Bryan,

Bulloch, Camden, Candler,

Charlton, Chatham, Effingham,

Evans, Glynn, Jeff Davis, Liberty,

Long, McIntosh, Montgomery,

Pierce, Tattnall, Telfair, Toombs,

Ware, Wayne, Wheeler County

Other

Total

$152,904

$0

$764,520

State $160,799

Other $0

Total $803,993

Page 68 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Bacon Totals Summary
County Summary excludes lump sum projects.

Project PI# M004795

Year 2014

Phase CST

Fund State

Federal $0

State $4,000

Other $0

$0

$4,000

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $4,000 $4,000

Page 69 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Baker
Project: 0007153 Type Work: Replace Bridge Descp: SR 200 @ ICHAWAYNOCHAWAY CREEK
Length: 0.32

Total Project Cost: Total Project Authorizations:

$4,170,497 $0

Phase ROW CST

Fund STP STP

Year 2015 After 2017

Federal $93,220
$3,243,178

State $23,305
$810,794

Other $0 $0

Total $116,525
$4,053,972

Project: 0007154 Type Work: Replace Bridge Descp: SR 216 @ ICHAWAYNOCHAWAY CREEK
Length: 0.40

Total Project Cost: Total Project Authorizations:

$2,165,760 $0

Phase PE
ROW CST UTL

Fund STP STP STP STP

Year 2015 2015 2015 2015

Federal $8,000
$99,046 $1,608,199
$17,362

State $2,000
$24,762 $402,050
$4,341

Other $0 $0 $0 $0

Total $10,000
$123,808 $2,010,249
$21,703

Project: M004794 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 4 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Project: M004827 Type Work: Resurface & Maintenance
Descp: SR 91 FROM SR 37 TO DOUGHERTY COUNTY LINE Length: 10.80

Phase CST

Fund STP

Total Project Cost: Total Project Authorizations:

$1,325,059 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Project: M004828 Type Work: Resurface & Maintenance Descp: SR 200 FROM SR 91 TO EARLY COUNTY LINE
Length: 18.70

Phase CST

Fund STP

Total Project Cost: Total Project Authorizations:

$3,130,324 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Year LUMP
Year LUMP

Federal $0
Federal $1,060,047
Federal $2,504,259

State $200,000

Other $0

Total $200,000

State

Also in Atkinson, Ben Hill,

Berrien, Brooks, Calhoun, Clay,

Clinch, Coffee, Colquitt, Cook,

Crisp, Decatur, Dougherty, Early,

Echols, Grady, Irwin, Lanier, Lee,

Lowndes, Miller, Mitchell,

Quitman, Randolph, Seminole,

Terrell, Thomas, Tift, Turner,

Wilcox, Worth County

Other

Total

$265,012

$0

$1,325,059

State $626,065

Other $0

Total $3,130,324

Page 70 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Baker Totals Summary
County Summary excludes lump sum projects.

Project PI#
0007153 0007154 0007154 0007154 0007154 M004794

Year
2015 2015 2015 2015 2015 2014

Phase
ROW PE
ROW CST UTL CST

Fund STP STP STP STP STP State

Federal
$93,220 $8,000
$99,046 $1,608,199
$17,362 $0

State
$23,305 $2,000
$24,762 $402,050
$4,341 $6,000

Other
$0 $0 $0 $0 $0 $0

$1,825,828

$462,457

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $116,525 $10,000 $123,808
$2,010,249 $21,703 $6,000
$2,288,285

Page 71 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Baldwin
Project: 0010455 Type Work: Bicycle/Ped. Facility
Descp: BALDWIN COUNTY SCHOOL SYSTEM @ 5 SCHOOLS - SRTS Length: 0.00

Phase CST

Fund Safety

Year LUMP

Total Project Cost: Total Project Authorizations:

$540,103 $0

Uses Lump Sum Bank: SAFE ROUTES TO SCHOOL INFRASTRUCTURE FOR FY 2014 - FY 2017

Project: 0010711 Type Work: TE-Bike/Ped Facility
Descp: HISTORIC DOWNTOWN MILLEDGEVILLE STREETSCAPE @ 5 LOCS - PH IV Length: 0.76

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$1,100,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 0010712 Type Work: TE-Bike/Ped Facility
Descp: OCONEE RIVER GREENWAY & RIVERWALK @ FISHING CREEK - PH III Length: 1.50

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$1,250,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 231450- Type Work: Widening

Descp: SR 49 FM JUST W. OF FELTON RD TO EAST OF

MILLEDGEVILLE BYP

Lanes: Exist. 2 Prop. 4

Length: 2.80

Phase PE
ROW CST

Fund NHPP NHPP NHPP

Year 2014 2014 After 2017

Total Project Cost: Total Project Authorizations:

$13,105,972 $0

Federal $540,103
Federal $880,000
Federal $1,000,000
Federal $160,000
$2,929,766 $7,395,011

State $0
State $0
State $0
State $40,000
$732,442 $1,848,753

Other $0
Other $220,000
Other $250,000
Other $0 $0 $0

Total $540,103
Total $1,100,000
Total $1,250,000
Total $200,000
$3,662,208 $9,243,764

Project: 270900- Type Work: Replace Bridge
Descp: CS 685/BARROWS FERRY RD @ TOBLER CREEK NE MILLEDGEVILLE Length: 0.21

Total Project Cost: Total Project Authorizations:

$633,024 $0

Phase PE
ROW CST UTL

Uses Lump Sum Bank: LOW IMPACT BRIDGES FOR FY 2014 - FY 2017

Fund STP Local STP STP

Year LUMP 2016 LUMP LUMP

Federal $81,600 $0
$408,000 $8,160

State $20,400 $0
$102,000 $2,040

Other $0
$10,824 $0 $0

Total $102,000 $10,824 $510,000 $10,200

Page 72 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: M004792 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 2 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Project: M004815 Type Work: Resurface & Maintenance Descp: SR 24 FROM SR 22 TO CS 328/MARSHALL ROAD
Length: 4.12

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$1,642,084 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Project: M004816 Type Work: Resurface & Maintenance
Descp: SR 22 FROM JONES COUNTY LINE TO LITTLE FISHING CREEK Length: 7.00

Total Project Cost: Total Project Authorizations:

$1,341,310 $0

Phase CST

Fund NHPP

Year LUMP

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Project: M004817 Type Work: Resurface & Maintenance Descp: SR 49 FROM JONES COUNTY LINE TO SR 22
Length: 11.20

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations:

$4,120,570 $0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Project: M004818 Type Work: Resurface & Maintenance Descp: SR 212 FROM PUTNAM COUNTY LINE TO SR 22
Length: 10.70

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$2,296,326 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Federal $0
Federal $1,313,667
Federal $1,073,048
Federal $3,296,456
Federal $1,837,061

State $200,000

Other $0

Total $200,000

State

Also in Bleckley, Burke,

Columbia, Dodge, Emanuel,

Glascock, Greene, Hancock,

Jasper, Jefferson, Jenkins,

Johnson, Laurens, Lincoln,

McDuffie, Morgan, Newton,

Oglethorpe, Putnam, Richmond,

Screven, Taliaferro, Treutlen,

Warren, Washington, Wilkes,

Wilkinson County

Other

Total

$328,417

$0

$1,642,084

State $268,262

Other $0

Total $1,341,310

State $824,114

Other $0

Total $4,120,570

State $459,265

Other $0

Total $2,296,326

Page 73 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: M004819 Type Work: Resurface & Maintenance
Descp: SR 22 FM E OF CR 171/OLD COUNTRY CLUB RD TO HANCOCK CO LINE Length: 9.20

Phase CST

Fund STP

Total Project Cost: Total Project Authorizations:

$1,762,864 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Year LUMP

Federal $1,410,291

State $352,573

Other $0

Total $1,762,864

Baldwin Totals Summary
County Summary excludes lump sum projects.

Project PI# 231450231450M004792

Year 2014 2014 2014

Phase PE
ROW CST

Fund NHPP NHPP State

Federal $160,000
$2,929,766 $0

State $40,000
$732,442 $4,000

Other $0 $0 $0

$3,089,766

$776,442

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $200,000
$3,662,208 $4,000
$3,866,208

Page 74 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Banks
Project: 0007023 Type Work: Replace Bridge Descp: SR 59 @ GROVE CREEK
Length: 0.40

Total Project Cost: Total Project Authorizations:

$1,175,543 $0

Phase PE
ROW CST

Fund STP STP STP

Year 2014 2015 2017

Federal $80,000 $48,760
$811,675

State $20,000 $12,190
$202,919

Other $0 $0 $0

Total $100,000 $60,950
$1,014,593

Project: 0007156 Type Work: Replace Bridge
Descp: SR 98 @ HICKORY LEVEL CREEK 3.5 MI SW OF HOMER Length: 0.40

Total Project Cost: Total Project Authorizations:

$1,937,992 $0

Phase ROW CST UTL

Fund STP STP STP

Year 2015 2016 2016

Federal $258,019
$1,209,600 $82,774

State $64,505
$302,400 $20,694

Other $0 $0 $0

Total $322,524
$1,512,000 $103,468

Project: 0007157 Type Work: Replace Bridge
Descp: SR 323 @ GROVE CREEK 6.5 MI WEST OF HOMER Length: 0.40

Total Project Cost: Total Project Authorizations:

$1,689,124 $0

Phase ROW CST UTL

Fund STP STP Local

Year 2016 2017 2017

Federal $88,293
$1,120,126 $0

State $22,073
$280,031 $0

Other $0 $0
$178,601

Total $110,366
$1,400,157 $178,601

Project: 0007158 Type Work: Replace Bridge
Descp: SR 63 @ MIDDLE FORK BROAD RIVER 9 MI NE OF HOMER Length: 0.40

Total Project Cost: Total Project Authorizations:

$2,303,692 $0

Phase ROW CST UTL

Fund STP STP STP

Year 2015 2016 2016

Federal $24,750
$1,787,641 $30,563

State $6,188
$446,910 $7,641

Other $0 $0 $0

Total $30,938
$2,234,551 $38,203

Project: 0008411 Type Work: Replace Bridge Descp: CR 16/WILSON BRIDGE ROAD @ HUDSON RIVER
Length: 0.40

Total Project Cost: Total Project Authorizations:

$5,426,945 $0

Phase PE
ROW CST UTL

Fund STP Local STP STP

Year 2017 After 2017 After 2017 After 2017

Federal $284,531 $0
$3,849,821 $184,902

State $71,133 $0
$962,455 $46,226

Other $0
$27,877 $0 $0

Total $355,664 $27,877
$4,812,277 $231,128

Page 75 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0008412 Type Work: Replace Bridge Descp: CR 16/HARDEN BRIDGE ROAD @ GROVE CREEK

Length: 0.40

Total Project Cost: Total Project Authorizations:

$9,152,211 $0

Phase PE
ROW CST UTL

Fund STP Local STP STP

Year 2017 LOCL After 2017 After 2017

Federal $509,373 $0
$6,624,394 $170,657

State $127,343
$0 $1,656,099
$42,664

Other $0
$21,681 $0 $0

Total $636,716 $21,681
$8,280,493 $213,321

Project: M004791 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 1 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Project: M004808 Type Work: Resurface & Maintenance
Descp: I-85 FROM N OF SR 63/BANKS TO 0.50 MI S OF SR 17/FRANKLIN Length: 17.77

Phase PE

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations:

$50,000 $0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Project: M004810 Type Work: Resurface & Maintenance
Descp: SR 15/US 441 FROM JACKSON COUNTY LINE TO CR 18/FAULKNER ROAD Length: 1.30

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations:

$432,120 $0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Project: M004811 Type Work: Resurface & Maintenance
Descp: SR 15/US 441 FROM CR 18/FAULKNER ROAD TO SR 164 Length: 2.90

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations:

$1,204,950 $0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Federal $0
Federal $45,000
Federal $345,696
Federal $963,960

State $200,000

Other $0

Total $200,000

State

Also in Barrow, Clarke, Dawson,

Elbert, Forsyth, Franklin,

Gwinnett, Habersham, Hall, Hart,

Jackson, Lumpkin, Madison,

Oconee, Rabun, Stephens, Towns,

Union, Walton, White County

Other

Total

$5,000

$0

$50,000

Also in Franklin County

State $86,424

Other $0

Total $432,120

State $240,990

Other $0

Total $1,204,950

Page 76 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: M004919 Type Work: Resurface & Maintenance Descp: I-85 FROM SR 15 TO SR 63
Length: 5.40

Phase PE

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations:

$20,000 $0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Federal $18,000

State $2,000

Other $0

Total $20,000

Banks Totals Summary
County Summary excludes lump sum projects.

Project PI#
0007023 0007023 0007023 0007156 0007156 0007156 0007157 0007157 0007157 0007158 0007158 0007158 0008411 0008412 M004791

Year
2014 2015 2017 2015 2016 2016 2016 2017 2017 2015 2016 2016 2017 2017 2014

Phase
PE ROW CST ROW CST UTL ROW CST UTL ROW CST UTL
PE PE CST

Fund STP STP STP STP STP STP STP STP Local STP STP STP STP STP State

Federal
$80,000 $48,760 $811,675 $258,019 $1,209,600 $82,774 $88,293 $1,120,126
$0 $24,750 $1,787,641 $30,563 $284,531 $509,373
$0

State
$20,000 $12,190 $202,919 $64,505 $302,400 $20,694 $22,073 $280,031
$0 $6,188 $446,910 $7,641 $71,133 $127,343 $8,000

Other
$0 $0 $0 $0 $0 $0 $0 $0 $178,601 $0 $0 $0 $0 $0 $0

$6,336,104

$1,592,026

$178,601

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total
$100,000 $60,950
$1,014,593 $322,524
$1,512,000 $103,468 $110,366
$1,400,157 $178,601 $30,938
$2,234,551 $38,203
$355,664 $636,716
$8,000
$8,106,731

Page 77 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Barrow
Project: 0008430 Type Work: Interchange Descp: SR 316/US 29 @ SR 11
Length: 1.76

Total Project Cost: Total Project Authorizations:

$15,848,211 $0

Phase ROW CST UTL

Fund NHPP NHPP NHPP

Year 2016 After 2017 After 2017

Federal $2,458,420 $10,112,038
$108,112

State $614,605 $2,528,009
$27,028

Other $0 $0 $0

Total $3,073,025 $12,640,047
$135,139

Project: M004791 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 1 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Project: T003624 Type Work: Transit Projects
Descp: FY 2014 FTA SECTION 5307/5340 FORMULA FUNDS FOR BARROW Length: 0.00

Total Project Cost: Total Project Authorizations:

$46,312 $0

Phase CST

Fund State

Year 2014

Federal $0

State $200,000

Other $0

Total $200,000

Phase CST

Fund Transit

Year 2014

Federal $37,050

State

Also in Banks, Clarke, Dawson,

Elbert, Forsyth, Franklin,

Gwinnett, Habersham, Hall, Hart,

Jackson, Lumpkin, Madison,

Oconee, Rabun, Stephens, Towns,

Union, Walton, White County

Other

Total

$0

$9,262

$46,312

Project: T004075 Type Work: Transit Projects
Descp: FY 2015 FTA SECTION 5307/5340 FORMULA FUNDS FOR BARROW Length: 0.00

Total Project Cost: Total Project Authorizations:

$46,312 $0

Phase CST

Fund Transit

Year 2015

Federal $37,050

State $4,631

Other $4,631

Total $46,312

Project: T004393 Type Work: Transit Projects
Descp: FY 2016 FTA SECTION 5307/5340 FORMULA FUNDS FOR BARROW Length: 0.00

Total Project Cost: Total Project Authorizations:

$50,000 $0

Phase CST

Fund Transit

Year 2016

Federal $40,000

State $0

Other $10,000

Total $50,000

Page 78 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: T004859 Type Work: Transit Projects
Descp: FY 2017 FTA SECTION 5307/5340 FORMULA FUNDS FOR BARROW Length: 0.00

Total Project Cost: Total Project Authorizations:

$60,000 $0

Phase CST

Fund Transit

Year 2017

Federal $48,000

State $0

Other $12,000

Total $60,000

Project PI#
0008430 M004791 T003624 T004075 T004393 T004859

Year
2016 2014 2014 2015 2016 2017

Barrow Totals Summary

County Summary excludes lump sum projects.

This County is also located in a MPO area. Additional Projects may be listed in the MPO TIP.

Phase

Fund

Federal

State

Other

ROW CST CST CST CST CST

NHPP State Transit Transit Transit Transit

$2,458,420 $0
$37,050 $37,050 $40,000 $48,000

$614,605 $6,000 $0 $4,631 $0 $0

$0 $0 $9,262 $4,631 $10,000 $12,000

$2,620,520

$625,236

$35,893

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $3,073,025 $6,000 $46,312 $46,312 $50,000 $60,000
$3,281,649

Page 79 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Bartow

Project: 0002626 Type Work: Interchange

Descp: SR 3/US 41 AND SR 61/US 411 INTERCHANGE

RECONSTRUCTION

Lanes: Exist. 2 Prop. 4

Length: 1.00

Total Project Cost: Total Project Authorizations:

$25,514,057 $0

Phase CST UTL

Fund STP STP

Year 2014 2014

Federal $18,521,675
$1,889,570

State $4,630,419
$472,393

Other $0 $0

Total $23,152,094
$2,361,962

Project: 0004915 Type Work: Widening

Descp: SR 140 FM SR 53/FLOYD TO 0.3 MI W OF

OOTHKALOOGA CRK/BARTOW

Lanes: Exist. 2 Prop. 4

Length: 6.20

Total Project Cost: Total Project Authorizations:

$41,783,915 $100,000

Phase PE CST UTL

Fund STP STP STP

Year 2013 2016 2016

Federal $80,000
$25,736,149 $7,610,984

Project: 0007456 Type Work: Pedestrian Crossings
Descp: SR 2 @ 2 LOC; SR 3 @ 9 LOC; SR 5 @ 1 LOC IN BARTOW & FANNIN Length: 4.80

Phase ROW CST

Fund HSIP HSIP

Year LUMP LUMP

Total Project Cost: Total Project Authorizations:

$585,830 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 0007494 Type Work: Widening

Descp: CS 1054/DOUTHIT FERRY RD FM OLD ALABAMA

RD TO SR 61/SR 113

Lanes: Exist. 2 Prop. 4

Length: 2.42

Phase ROW CST UTL

Fund Local STP Local

Year 2015 After 2017 After 2017

Total Project Cost: Total Project Authorizations:

$20,759,532 $0

Federal $158,174 $369,073
Federal $0
$8,740,701 $0

State $20,000
$6,434,037 $1,902,746

Other $0 $0 $0

Total $100,000
$32,170,186 $9,513,730

Also in Floyd County

State $17,575 $41,008

Other $0 $0

Total $175,749 $410,081

Also in Fannin County

State $0
$2,185,175 $0

Other $8,971,369
$0 $862,287

Total $8,971,369 $10,925,876
$862,287

Project: 0008067 Type Work: TE-Bike/Ped Facility Descp: LEAKE MOUNDS-ETOWAH RIVERWALK LINK
Length: 1.85

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$938,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Federal $750,400

State $0

Other $187,600

Total $938,000

Page 80 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0008382 Type Work: Widening

Descp: SR 113 FM OLD ALA RD RELOC TO SR 61 @ NEW

ALIGNMENT - PH I

Lanes: Exist. 2 Prop. 4

Length: 1.10

Total Project Cost: Total Project Authorizations:

$8,110,286 $0

Phase CST

Fund STP

Year 2017

Federal $6,488,229

State $1,622,057

Other $0

Total $8,110,286

Project: 0009860 Type Work: Replace Bridge
Descp: SR 3 @ CR 122/OLD HWY 41 APPROX 4 MI S OF ADAIRSVILLE Length: 0.40

Total Project Cost: Total Project Authorizations:

$3,154,944 $0

Phase ROW CST UTL

Fund STP STP STP

Year 2014 2016 2016

Federal $272,169
$2,156,532 $95,254

State $68,042
$539,133 $23,814

Other $0 $0 $0

Total $340,211
$2,695,665 $119,068

Project: 0010700 Type Work: TE-Bike/Ped Facility Descp: PETTIT CREEK TRAIL - PHASE III
Length: 8.50

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$1,075,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 0010701 Type Work: TE-Bike/Ped Facility
Descp: RAILROAD ST @ 1 LOC; MAIN ST @ 1 LOC; & CHESTNUT ST @ 1 LOC Length: 0.35

Total Project Cost: Total Project Authorizations:

$540,000 $0

Phase CST

Fund STP

Year LUMP

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 0011834 Type Work: Pavement Markings
Descp: OFF-SYSTEM SAFETY IMPROVEMENTS @ 9 CR LOCS IN BARTOW COUNTY Length: 30.78

Phase CST

Fund HSIP

Year LUMP

Total Project Cost: Total Project Authorizations:

$233,581 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Federal $860,000
Federal $432,000
Federal $233,581

State $0

Other $215,000

State $0

Other $108,000

State $0

Other $0

Total $1,075,000
Total $540,000
Total $233,581

Page 81 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0012791 Type Work: RRX Warning Device
Descp: CS 551/KING STREET @ CSX #340490G IN ADAIRSVILLE Length: 0.20

Total Project Cost: Total Project Authorizations:

$226,089 $26,089

Phase PE CST

Fund HSIP HSIP

Year 2014 LUMP

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2014 - FY 2017

Project: 0012792 Type Work: RRX Consolidation
Descp: CS 524/PARK STREET @ CSX #340489M IN ADAIRSVILLE Length: 0.20

Phase PE CST

Fund HSIP HSIP

Year LUMP LUMP

Total Project Cost: Total Project Authorizations:

$10,500 $0

Uses Lump Sum Bank: RAILROAD CROSSING HAZARD ELIMINATION FOR FY 2014 - FY 2017

Project: 621410- Type Work: Widening

Descp: SR 113/OLD ALA RD RELOC FM SR 113

-PUMPKINVINE CK- TO CR 699

Lanes: Exist. 2 Prop. 4

Length: 5.35

Total Project Cost: Total Project Authorizations:

$38,888,328 $100,000

Phase PE CST UTL

Fund STP STP STP

Year 2013 2017 2017

Federal $26,089
$200,000

State $0 $0

Federal $3,000 $7,500

State $0 $0

Federal $80,000
$29,231,452 $1,799,210

State $20,000
$7,307,863 $449,803

Other $0 $0
Other $0 $0
Other $0 $0 $0

Total $26,089
$200,000
Total $3,000 $7,500
Total $100,000
$36,539,315 $2,249,013

Project: 621500- Type Work: Widening

Descp: SR 140 FM 0.3 MI W OF OOTHKALOOGA CRK TO

SR 3/US 41

Lanes: Exist. 2 Prop. 4

Length: 1.00

Total Project Cost: Total Project Authorizations:

$5,937,473 $93,362

Phase PE CST UTL

Fund STP STP Local

Year 2013 2016 2016

Federal $74,690
$3,928,931 $0

State $18,672
$982,233 $0

Other $0 $0
$932,948

Total $93,362
$4,911,163 $932,948

Project: 621505- Type Work: Replace Bridge

Descp: SR 140 @ OOTHKALOOGA CRK & CSX RR

Lanes: Exist. 2 Prop. 5

Length: 0.80

Total Project Cost: Total Project Authorizations:

$4,500,160 $90,000

Phase PE CST UTL

Fund Bridge STP STP

Year 2013 2016 2016

Federal $72,000
$3,410,971 $117,157

State $18,000
$852,743 $29,289

Other $0 $0 $0

Total $90,000
$4,263,713 $146,447

Page 82 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 661950- Type Work: New Construction

Descp: US 411 RELOC FM SR 3/US 41 TO I-75; INCL I-75

INTERCHANGE

Lanes: Exist. 0 Prop. 4

Length: 7.31

Total Project Cost: Total Project Authorizations:

$222,820,172 $100,000

Phase PE
ROW ROW ROW ROW ROW CST UTL

Fund STP STP HPP HPP HPP HPP STP STP

Year 2014 2017 2017 2017 2017 2017 After 2017 After 2017

Federal $80,000
$8,806,268 $3,644,028 $12,243,936
$855,472 $2,874,388 $142,211,934 $5,922,973

State $20,000
$2,201,567 $911,007
$3,060,984 $213,868 $0
$35,552,983 $1,480,743

Other $0 $0
$375,481 $1,261,618
$88,148 $1,014,775
$0 $0

Total $100,000
$11,007,836 $4,930,516
$16,566,537 $1,157,488 $3,889,163
$177,764,917 $7,403,716

Project: M004627 Type Work: Bridges
Descp: I-75 @ CR 179/CEDAR CREEK ROAD - BRIDGE BEARING REHAB &MAINT Length: 0.40

Phase PE CST

Fund IM NHPP

Year 2013 2014

Total Project Cost: Total Project Authorizations:

$1,799,967 $1,799,967

Uses Lump Sum Bank: INTERSTATE BRIDGE PAINTING/MAINTENANCE FOR FY 2014 - FY 2017

Project: M004796 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 6 Length: 0.00

Phase CST

Fund State

Year 2014

Total Project Cost: Total Project Authorizations:

$200,000 $0

Project: M004835 Type Work: Resurface & Maintenance
Descp: SR 3 FROM CS 841/MLK JR BLVD TO N OF SR 293 CONNECTOR Length: 6.20

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations:

$3,606,540 $0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Project: M004836 Type Work: Resurface & Maintenance Descp: SR 113 FROM SR 3 TO I-75
Length: 2.13

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations:

$767,007 $0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Federal $112,281
$1,507,689
Federal $0
Federal $2,885,232
Federal $613,606

State $12,476
$167,521

Other $0 $0

Total $124,757
$1,675,210

State $200,000

Other $0

Total $200,000

State

Also in Carroll, Catoosa,

Chattooga, Cherokee, Dade,

Fannin, Floyd, Gilmer, Gordon,

Haralson, Murray, Paulding,

Pickens, Polk, Walker, Whitfield

County

Other

Total

$721,308

$0

$3,606,540

State $153,401

Other $0

Total $767,007

Page 83 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: T003625 Type Work: Transit Projects
Descp: FY 2014 FTA SECTION 5307/5340 FORMULA FUNDS FOR BARTOW Length: 0.00

Total Project Cost: Total Project Authorizations:

$40,810 $0

Phase CST

Fund Transit

Year 2014

Federal $32,648

State $0

Other $8,162

Total $40,810

Project: T004076 Type Work: Transit Projects
Descp: FY 2015 FTA SECTION 5307/5340 FORMULA FUNDS FOR BARTOW Length: 0.00

Total Project Cost: Total Project Authorizations:

$40,810 $0

Phase CST

Fund Transit

Year 2015

Federal $32,648

State $4,081

Other $4,081

Total $40,810

Project: T004394 Type Work: Transit Projects
Descp: FY 2016 FTA SECTION 5307/5340 FORMULA FUNDS FOR BARTOW Length: 0.00

Total Project Cost: Total Project Authorizations:

$43,750 $0

Phase CST

Fund Transit

Year 2016

Federal $35,000

State $0

Other $8,750

Total $43,750

Project: T004858 Type Work: Transit Projects
Descp: FY 2017 FTA SECTION 5307/5340 FORMULA FUNDS FOR BARTOW Length: 0.00

Total Project Cost: Total Project Authorizations:

$52,500 $0

Phase CST

Fund Transit

Year 2017

Federal $42,000

State $0

Other $10,500

Total $52,500

Page 84 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project PI#
0002626 0002626 0004915 0004915 0007494 0008382 0009860 0009860 0009860 621410621410621500621500621505621505661950661950661950661950661950661950M004796 T003625 T004076 T004394 T004858

Year
2014 2014 2016 2016 2015 2017 2014 2016 2016 2017 2017 2016 2016 2016 2016 2014 2017 2017 2017 2017 2017 2014 2014 2015 2016 2017

Bartow Totals Summary

County Summary excludes lump sum projects.

This County is also located in a MPO area. Additional Projects may be listed in the MPO TIP.

Phase

Fund

Federal

State

Other

CST UTL CST UTL ROW CST ROW CST UTL CST UTL CST UTL CST UTL PE ROW ROW ROW ROW ROW CST CST CST CST CST

STP STP STP STP Local STP STP STP STP STP STP STP Local STP STP STP HPP HPP HPP HPP STP State Transit Transit Transit Transit

$18,521,675 $1,889,570
$17,757,942 $5,251,579 $0 $6,488,229 $272,169 $2,156,532 $95,254
$29,231,452 $1,799,210 $3,928,931 $0 $3,410,971 $117,157 $80,000 $2,874,388 $855,472
$12,243,936 $3,644,028 $8,806,268 $0 $32,648 $32,648 $35,000 $42,000

$4,630,419 $472,393
$4,439,486 $1,312,895
$0 $1,622,057
$68,042 $539,133
$23,814 $7,307,863
$449,803 $982,233
$0 $852,743
$29,289 $20,000
$0 $213,868 $3,060,984 $911,007 $2,201,567
$16,000 $0
$4,081 $0 $0

$0 $0 $0 $0 $8,971,369 $0 $0 $0 $0 $0 $0 $0 $932,948 $0 $0 $0 $1,014,775 $88,148 $1,261,618 $375,481 $0 $0 $8,162 $4,081 $8,750 $10,500

Total
$23,152,094 $2,361,962
$22,197,428 $6,564,474 $8,971,369 $8,110,286 $340,211 $2,695,665 $119,068
$36,539,315 $2,249,013 $4,911,163 $932,948 $4,263,713 $146,447 $100,000 $3,889,163 $1,157,488
$16,566,537 $4,930,516
$11,007,836 $16,000 $40,810 $40,810 $43,750 $52,500

$119,567,059

$29,157,675

$12,675,832

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

$161,400,566

Page 85 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Ben Hill
Project: 0006529 Type Work: TE-Bike/Ped Facility Descp: JEFFERSON DAVIS HERITAGE TRAIL
Length: 0.00

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$416,250 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 0007627 Type Work: Historic Preservation
Descp: PRESERVATION OF 1906 AB&A RAILROAD BUILDING IN FITZGERALD Length: 0.00

Phase PE CST

Fund Local HPP

Year LOCL 2015

Total Project Cost: Total Project Authorizations:

$618,683 $0

Federal $333,000

State $0

Other $83,250

Federal $0
$449,951

State $0 $0

Other $56,244
$112,488

Total $416,250
Total $56,244
$562,439

Project: 0011644 Type Work: RRX Warning Device Descp: CR 59/SHOP ROAD @ CSX #638277M
Length: 0.20

Phase PE CST

Fund Safety HSIP

Total Project Cost: Total Project Authorizations:

$220,349 $20,349

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2014 - FY 2017

Project: 0011676 Type Work: Replace Bridge Descp: SR 11 @ HOUSE CREEK 9.5 MI N OF FITZGERALD
Length: 0.40

Total Project Cost: Total Project Authorizations:

$2,508,560 $350,000

Phase PE
ROW CST UTL

Fund STP STP STP STP

Year 2013 LUMP
Year 2013 2015 2017 2017

Federal $20,349
$200,000

State $0 $0

Other $0 $0

Federal $280,000 $124,848
$1,558,702 $43,297

State $70,000 $31,212
$389,676 $10,824

Other $0 $0 $0 $0

Total $20,349
$200,000
Total $350,000 $156,060
$1,948,378 $54,122

Project: 0012861 Type Work: RRX Warning Device
Descp: CR 137/ANDERSON MEMORIAL CHURCH ROAD @ CSX #638256U Length: 0.20

Phase PE CST

Total Project Cost: Total Project Authorizations:

$225,000 $0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2014 - FY 2017

Fund HSIP HSIP

Year LUMP LUMP

Federal $25,000
$200,000

State $0 $0

Other $0 $0

Total $25,000
$200,000

Page 86 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: M004794 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 4 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Project: M004829 Type Work: Resurface & Maintenance
Descp: SR 11 FROM CS 629/BUSH AVE TO WILCOX COUNTY LINE Length: 9.05

Phase CST

Fund STP

Total Project Cost: Total Project Authorizations:

$1,271,360 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Year LUMP

Federal $0
Federal $1,017,088

State $200,000

Other $0

Total $200,000

State

Also in Atkinson, Baker, Berrien,

Brooks, Calhoun, Clay, Clinch,

Coffee, Colquitt, Cook, Crisp,

Decatur, Dougherty, Early,

Echols, Grady, Irwin, Lanier, Lee,

Lowndes, Miller, Mitchell,

Quitman, Randolph, Seminole,

Terrell, Thomas, Tift, Turner,

Wilcox, Worth County

Other

Total

$254,272

$0

$1,271,360

Ben Hill Totals Summary
County Summary excludes lump sum projects.

Project PI#
0007627 0011676 0011676 0011676 M004794

Year
2015 2015 2017 2017 2014

Phase
CST ROW CST UTL CST

Fund HPP STP STP STP State

Federal
$449,951 $124,848 $1,558,702
$43,297 $0

State
$0 $31,212 $389,676 $10,824
$4,000

Other
$112,488 $0 $0 $0 $0

$2,176,799

$435,712

$112,488

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $562,439 $156,060
$1,948,378 $54,122 $4,000
$2,724,998

Page 87 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Berrien
Project: 0010117 Type Work: Signals
Descp: SR 11 @ SR 125; @ SR 168 & @ CS 798 - SIGNAL UPGRADES Length: 1.20

Phase ROW CST UTL

Fund STP STP STP

Year 2013 LUMP LUMP

Federal $210,000 $300,530 $15,300

Total Project Cost: Total Project Authorizations:

$525,830 $210,000

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2014 - FY 2017

Project: 0010576 Type Work: TE-Bike/Ped Facility
Descp: SR 11; SR 76; S JEFFERSON & E WASHINGTON @ 4 LOCS - PH III Length: 0.70

Phase CST

Fund STP

Year LUMP

Federal $200,000

Total Project Cost: Total Project Authorizations:

$250,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 0010577 Type Work: TE-Bike/Ped Facility Descp: SR 37 FROM BAY STREET TO SR 125
Length: 0.25

Phase CST

Fund STP

Year LUMP

Federal $150,000

Total Project Cost: Total Project Authorizations:

$187,500 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 0010578 Type Work: TE-Bike/Ped Facility
Descp: SR 520 @ 1 LOC & CR 357/MAIN ST @ 2 LOCS IN ENIGMA Length: 0.47

Phase CST

Fund STP

Year LUMP

Federal $200,000

Total Project Cost: Total Project Authorizations:

$250,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 0010936 Type Work: TE-Bike/Ped Facility
Descp: CR 356/DOGWOOD STREET FROM SR 125 TO SR 76 Length: 1.01

Phase CST

Fund STP

Year LUMP

Federal $350,000

Total Project Cost: Total Project Authorizations:

$437,500 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

State $0 $0 $0
State $0
State $0
State $0
State $0

Other $0 $0 $0
Other $50,000
Other $37,500
Other $50,000
Other $87,500

Total $210,000 $300,530 $15,300
Total $250,000
Total $187,500
Total $250,000
Total $437,500

Page 88 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: M004794 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 4 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Project: T003698 Type Work: Operating Descp: FY 2014 SECTION 5311 OPERATING BERRIEN
Length: 0.00

Total Project Cost: Total Project Authorizations:

$120,266 $0

Phase CST

Fund State

Year 2014

Federal $0

State $200,000

Other $0

Total $200,000

Phase CST

Fund Transit

Year 2014

Federal $60,133

State

Also in Atkinson, Baker, Ben Hill,

Brooks, Calhoun, Clay, Clinch,

Coffee, Colquitt, Cook, Crisp,

Decatur, Dougherty, Early,

Echols, Grady, Irwin, Lanier, Lee,

Lowndes, Miller, Mitchell,

Quitman, Randolph, Seminole,

Terrell, Thomas, Tift, Turner,

Wilcox, Worth County

Other

Total

$0

$60,133

$120,266

Project: T003699 Type Work: Transit Projects Descp: FY 2014 SECTION 5311 CAPITAL BERRIEN

Length: 0.00

Total Project Cost: Total Project Authorizations:

$44,600 $0

Phase CST

Fund Transit

Year 2014

Federal $35,680

State $4,460

Other $4,460

Total $44,600

Project: T004110 Type Work: Operating Descp: FY 2015 SECTION 5311 OPERATING BERRIEN
Length: 0.00

Total Project Cost: Total Project Authorizations:

$120,266 $0

Phase CST

Fund Transit

Year 2015

Federal $60,133

State $0

Other $60,133

Total $120,266

Project: T004111 Type Work: Transit Projects Descp: FY 2015 SECTION 5311 CAPITAL BERRIEN
Length: 0.00

Total Project Cost: Total Project Authorizations:

$44,600 $0

Phase CST

Fund Transit

Year 2015

Federal $35,680

State $4,460

Other $4,460

Total $44,600

Page 89 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Berrien Totals Summary
County Summary excludes lump sum projects.

Project PI#
M004794 T003698 T003699 T004110 T004111

Year
2014 2014 2014 2015 2015

Phase
CST CST CST CST CST

Fund State Transit Transit Transit Transit

Federal
$0 $60,133 $35,680 $60,133 $35,680

State
$8,000 $0
$4,460 $0
$4,460

Other
$0 $60,133
$4,460 $60,133
$4,460

$191,626

$16,920

$129,186

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $8,000
$120,266 $44,600
$120,266 $44,600
$337,732

Page 90 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Bleckley

Project: 0003625 Type Work: Widening

Descp: SR 87 FM 0.2 MI N OF CR 141/FOSKEY RD TO CR

166/DYKES CIRCLE

Lanes: Exist. 2 Prop. 4

Length: 4.40

Total Project Cost: Total Project Authorizations:

$17,146,845 $0

Phase PE
ROW CST

Fund STP STP STP

Year 2014 2014 After 2017

Federal $120,000
$2,798,260 $10,799,216

State $30,000
$699,565 $2,699,804

Other $0 $0 $0

Total $150,000
$3,497,825 $13,499,020

Project: 222410- Type Work: Widening

Descp: SR 87/US 23 FM LOG CABIN/DODGE TO S OF SR

257/BLECKLEY-TIA

Lanes: Exist. 2 Prop. 4

Length: 9.50

Total Project Cost: Total Project Authorizations:

$31,471,131 $0

Phase PE CST CST UTL

Fund STP State STP Local

Year 2014 2017 2017 2017

Project: M004189 Type Work: Signing
Descp: I-16 @ 12 LOCS BETWEEN BLECKLEY COUNTY & EMANUEL COUNTY Length: 4.80

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations:

$1,700,000 $0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Project: M004792 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 2 Length: 0.00

Phase CST

Fund State

Year 2014

Total Project Cost: Total Project Authorizations:

$200,000 $0

Federal $120,000 $0
$18,501,910 $0

State $30,000 $0
$4,625,477 $0

Other $0
$7,459,999 $0
$733,745

Total $150,000
$7,459,999 $23,127,387
$733,745

Federal $1,700,000

Also in Dodge County

State $0

Other $0

Total $1,700,000

Federal $0

State

Also in Emanuel, Laurens,

Treutlen County

Other

Total

$200,000

$0

$200,000

Also in Baldwin, Burke, Columbia, Dodge, Emanuel, Glascock, Greene, Hancock, Jasper, Jefferson, Jenkins, Johnson, Laurens, Lincoln, McDuffie, Morgan, Newton, Oglethorpe, Putnam, Richmond, Screven, Taliaferro, Treutlen, Warren, Washington, Wilkes, Wilkinson County

Page 91 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Bleckley Totals Summary
County Summary excludes lump sum projects.

Project PI#
0003625 0003625 222410222410222410222410M004792

Year
2014 2014 2014 2017 2017 2017 2014

Phase
PE ROW
PE CST CST UTL CST

Fund STP STP STP STP State Local State

Federal
$120,000 $2,798,260
$19,200 $2,960,306
$0 $0 $0

State
$30,000 $699,565
$4,800 $740,076
$0 $0 $4,000

Other
$0 $0 $0 $0 $1,193,600 $117,399 $0

$5,897,765

$1,478,441

$1,310,999

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $150,000
$3,497,825 $24,000
$3,700,382 $1,193,600
$117,399 $4,000
$8,687,206

Page 92 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Brantley
Project: 0007161 Type Work: Replace Bridge
Descp: SR 32 @ LITTLE SATILLA RIVER OVERFLOW 6 MI NW OF PATTERSON Length: 0.25

Total Project Cost: Total Project Authorizations:

$1,304,207 $0

Phase PE
ROW CST

Fund NHPP NHPP NHPP

Year 2016 2015 2016

Federal $8,000
$41,616 $993,750

State $2,000
$10,404 $248,437

Other $0 $0 $0

Total $10,000 $52,020
$1,242,187

Project: M004596 Type Work: Resurface & Maintenance
Descp: SR 520 FM .20 MI W OF CR 184/PALOMA ST TO .02 MI W OF SR 110 Length: 6.58

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations:

$4,373,995 $0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Project: M004601 Type Work: Resurface & Maintenance
Descp: SR 520 FM CR 229/OLD POST RD/BRANTLEY TO COLLEGE CREEK/GLYNN Length: 6.70

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations:

$2,473,476 $0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Project: M004795 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 5 Length: 0.00

Phase CST

Fund State

Year 2014

Total Project Cost: Total Project Authorizations:

$200,000 $0

Project: M004833 Type Work: Resurface & Maintenance
Descp: SR 520 FROM E OF CR 278/GALLBERRY RD TO CR 168/BROWNTOWN RD Length: 2.90

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations:

$1,024,950 $0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Federal $3,499,196
Federal $1,978,781
Federal $0
Federal $819,960

State $874,799

Other $0

Total $4,373,995

State $494,695

Other $0

Total $2,473,476

Also in Glynn County

State $200,000

Other $0

Total $200,000

State

Also in Appling, Bacon, Bryan,

Bulloch, Camden, Candler,

Charlton, Chatham, Effingham,

Evans, Glynn, Jeff Davis, Liberty,

Long, McIntosh, Montgomery,

Pierce, Tattnall, Telfair, Toombs,

Ware, Wayne, Wheeler County

Other

Total

$204,990

$0

$1,024,950

Page 93 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: M004834 Type Work: Resurface & Maintenance
Descp: SR 520 FROM NAHUNTA CITY LIMITS TO E OF CS 528/MORGAN CIRCLE Length: 1.90

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations:

$842,075 $0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Federal $673,660

State $168,415

Other $0

Total $842,075

Brantley Totals Summary
County Summary excludes lump sum projects.

Project PI#
0007161 0007161 0007161 M004795

Year
2016 2015 2016 2014

Phase
PE ROW CST CST

Fund NHPP NHPP NHPP State

Federal
$8,000 $41,616 $993,750
$0

State
$2,000 $10,404 $248,437
$8,000

Other
$0 $0 $0 $0

$1,043,366

$268,841

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $10,000 $52,020
$1,242,187 $8,000
$1,312,207

Page 94 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Brooks

Project: 0000543 Type Work: Widening

Descp: SR 133 FM CR 276/TROUPEVILLE RD TO CR

10/PAULINE CHURCH RD

Lanes: Exist. 2 Prop. 4

Length: 6.67

Total Project Cost: Total Project Authorizations:

$21,627,617 $0

Phase PE CST UTL

Fund NHPP NHPP NHPP

Year 2014 2014 2014

Federal $150,400
$16,707,459 $444,235

State $37,600
$4,176,865 $111,059

Other $0 $0 $0

Total $188,000
$20,884,323 $555,294

Project: 0000544 Type Work: Widening

Descp: SR 133 FM CR 10/PAULINE CH RD TO CR 1/OLD

QUITMAN ADEL RD

Lanes: Exist. 2 Prop. 4

Length: 5.43

Total Project Cost: Total Project Authorizations:

$24,864,571 $0

Phase PE CST UTL

Fund NHPP NHPP NHPP

Year 2014 2017 2017

Federal $508,000
$18,156,393 $1,227,263

State $127,000 $4,539,098 $306,816

Other $0 $0 $0

Total $635,000
$22,695,492 $1,534,079

Project: 0000545 Type Work: Widening

Descp: SR 133 FM CR 1/OLD QUITMAN ADEL

RD/BROOKS TO CR 256/COLQUITT

Lanes: Exist. 2 Prop. 4

Length: 9.63

Total Project Cost: Total Project Authorizations:

$31,813,185 $0

Phase PE CST UTL

Fund NHPP NHPP NHPP

Year 2014 After 2017 After 2017

Federal $4,000
$25,069,284 $377,264

Project: 0010855 Type Work: Signals
Descp: SR 35 @ 5 LOC; SR 38 @ 3 LOC &SR 133 @ 1 LOC-SIGNAL UPGRADES Length: 3.60

Phase ROW CST

Fund STP STP

Year LUMP LUMP

Federal $408,000 $688,500

Total Project Cost: Total Project Authorizations:

$1,096,500 $0

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2014 - FY 2017

Project: 0011723 Type Work: RRX Warning Device
Descp: MLK JR DR @ CSX #643305Y; INC 3 CLOSURES IN QUITMAN Length: 1.75

Phase PE CST

Fund HSIP HSIP

Year LUMP LUMP

Federal $25,000
$250,000

Total Project Cost: Total Project Authorizations:

$275,000 $0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2014 - FY 2017

State $1,000
$6,267,321 $94,316

Other $0 $0 $0

Total $5,000
$31,336,605 $471,579

Also in Colquitt County

State $0 $0

Other $0 $0

Total $408,000 $688,500

Also in Colquitt County

State $0 $0

Other $0 $0

Total $25,000
$250,000

Page 95 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0012775 Type Work: Signing
Descp: OFF-SYSTEM SAFETY IMPROVEMENTS @ 9 CR LOCS IN BROOKS COUNTY Length: 38.51

Phase CST

Fund HSIP

Total Project Cost: Total Project Authorizations:

$166,146 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Year LUMP

Federal $166,146

State $0

Other $0

Total $166,146

Project: M004794 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 4 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Federal $0

Brooks Totals Summary
County Summary excludes lump sum projects.

State $200,000

Other $0

Total $200,000

Also in Atkinson, Baker, Ben Hill, Berrien, Calhoun, Clay, Clinch, Coffee, Colquitt, Cook, Crisp, Decatur, Dougherty, Early, Echols, Grady, Irwin, Lanier, Lee, Lowndes, Miller, Mitchell, Quitman, Randolph, Seminole, Terrell, Thomas, Tift, Turner, Wilcox, Worth County

Project PI#
0000543 0000543 0000543 0000544 0000544 0000544 0000545 M004794

Year
2014 2014 2014 2014 2017 2017 2014 2014

Phase
PE CST UTL PE CST UTL PE CST

Fund NHPP NHPP NHPP NHPP NHPP NHPP NHPP State

Federal
$150,400 $16,707,459
$444,235 $508,000 $18,156,393 $1,227,263
$3,080 $0

State
$37,600 $4,176,865
$111,059 $127,000 $4,539,098 $306,816
$770 $8,000

Other
$0 $0 $0 $0 $0 $0 $0 $0

$37,196,831

$9,307,208

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $188,000
$20,884,323 $555,294 $635,000
$22,695,492 $1,534,079 $3,850 $8,000
$46,504,038

Page 96 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Bryan
Project: 0010739 Type Work: Operational Improvement Descp: SR 144 @ I-95 SB & NB OFF RAMPS
Length: 0.40

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$816,000 $0

Uses Lump Sum Bank: OPERATIONS FOR ANY AREA FOR FY 2014 - FY 2017

Project: 0010913 Type Work: Slope Repair
Descp: SR 144 SPUR @OGEECHEE RIVER-INSTALL RIP RAP SCOUR PROTECTION Length: 0.28

Phase PE
ROW CST

Fund STP STP STP

Year 2013 2017 After 2017

Total Project Cost: Total Project Authorizations:

$5,651,917 $39,852

Federal $652,800
Federal $31,882
$119,241 $4,370,411

State $163,200
State $7,970
$29,810 $1,092,603

Other $0
Other $0 $0 $0

Total $816,000
Total $39,852
$149,051 $5,463,014

Project: 0012659 Type Work: Interchange

Descp: I-95 @ CR 90/BELFAST SIDING ROAD - NEW

INTERCHANGE

Lanes: Exist. 0 Prop. 6

Length: 0.40

Total Project Cost: Total Project Authorizations:

$12,046,949 $94,000

Phase PE PE
ROW CST

Fund Local Local Local STP

Year 2014 2014 2016 After 2017

Federal $0 $0 $0
$6,922,359

State $0 $0 $0
$1,730,590

Other $1,800,000
$94,000 $1,500,000
$0

Total $1,800,000
$94,000 $1,500,000 $8,652,949

Project: 0012746 Type Work: Preliminary Engineering
Descp: CS 513/SOUTH POPLAR STREET @ GCR #635946K Length: 0.20

Phase CST

Fund HSIP

Total Project Cost: Total Project Authorizations:

$300,000 $0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2014 - FY 2017

Project: 0012830 Type Work: Operational Improvement Descp: I-95 @ SR 25/US 17 - SB RAMPS
Length: 0.40

Phase PE CST

Fund STP STP

Total Project Cost: Total Project Authorizations:

$415,000 $0

Uses Lump Sum Bank: OPERATIONS FOR ANY AREA FOR FY 2014 - FY 2017

Year LUMP
Year LUMP LUMP

Federal $300,000
Federal $100,000 $232,000

State $0

Other $0

State $25,000 $58,000

Other $0 $0

Total $300,000
Total $125,000 $290,000

Page 97 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0012843 Type Work: Signals
Descp: SR 25 @ 4 LOC; SR 26 @ 5 LOC &SR 204 @ 1 LOC-SIGNAL UPGRADES Length: 4.00

Total Project Cost: Total Project Authorizations:

$1,350,000 $0

Phase PE
ROW CST

Fund STP STP STP

Year LUMP LUMP LUMP

Federal $125,000 $225,000
$1,000,000

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2014 - FY 2017

Project: 532370- Type Work: Widening

Descp: SR 144 EB FROM S OF CR 100 TO S OF CR 154

Lanes: Exist. 2 Prop. 4

Length: 4.60

Total Project Cost: Total Project Authorizations:

$25,009,157 $125,000

Phase PE PE
ROW CST UTL

Fund STP STP STP STP STP

Year 2013 2014 2014 2017 2017

Federal $100,000 $381,077
$6,672,709 $12,052,539
$801,000

State $0 $0 $0

Other $0 $0 $0

Total $125,000 $225,000
$1,000,000

Also in Chatham County

State $25,000 $95,269
$1,668,177 $3,013,135
$200,250

Other $0 $0 $0 $0 $0

Total $125,000 $476,346
$8,340,887 $15,065,674
$1,001,250

Project: M003079 Type Work: Bridges Descp: I-95 @ CSX RR - BRIDGE REHAB
Length: 0.40

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations:

$702,996 $0

Uses Lump Sum Bank: INTERSTATE BRIDGE PAINTING/MAINTENANCE FOR FY 2014 - FY 2017

Project: M004591 Type Work: Resurface & Maintenance
Descp: SR 144 FM FORT STEWART ENTRANCE/BRYAN TO TRINITY RD/LIBERTY Length: 11.62

Total Project Cost: Total Project Authorizations:

$1,795,437 $0

Phase CST

Fund NHPP

Year LUMP

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Project: M004599 Type Work: Resurface & Maintenance
Descp: SR 67 FROM SR 30/US 280 TO BULLOCH COUNTY LINE Length: 4.20

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations:

$561,427 $0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Federal $632,696
Federal $1,436,349
Federal $449,142

State $70,300

Other $0

Total $702,996

State $359,087

Other $0

Total $1,795,437

Also in Liberty County

State $112,285

Other $0

Total $561,427

Page 98 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: M004795 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 5 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Project: M004865 Type Work: Resurface & Maintenance Descp: SR 144 FROM I-95 TO SR 25/US 17
Length: 3.40

Phase CST

Fund STP

Total Project Cost: Total Project Authorizations:

$1,224,331 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Year LUMP

Federal $0
Federal $979,464

State $200,000

Other $0

Total $200,000

State

Also in Appling, Bacon, Brantley,

Bulloch, Camden, Candler,

Charlton, Chatham, Effingham,

Evans, Glynn, Jeff Davis, Liberty,

Long, McIntosh, Montgomery,

Pierce, Tattnall, Telfair, Toombs,

Ware, Wayne, Wheeler County

Other

Total

$244,866

$0

$1,224,331

Bryan Totals Summary
County Summary excludes lump sum projects.

Project PI#
0010913 0012659 0012659 0012659 532370532370532370532370M004795

Year
2017 2014 2014 2016 2014 2014 2017 2017 2014

Phase
ROW PE PE
ROW PE
ROW CST UTL CST

Fund STP Local Local Local STP STP STP STP State

Federal
$119,241 $0 $0 $0
$381,077 $6,672,709 $12,052,539
$801,000 $0

State
$29,810 $0 $0 $0
$95,269 $1,668,177 $3,013,135
$200,250 $8,000

Other
$0 $94,000 $1,800,000 $1,500,000
$0 $0 $0 $0 $0

$20,026,566

$5,014,642

$3,394,000

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $149,051 $94,000
$1,800,000 $1,500,000
$476,346 $8,340,887 $15,065,674 $1,001,250
$8,000
$28,435,208

Page 99 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Bulloch
Project: 0005829 Type Work: Passing Lanes
Descp: SR 26 FROM CR 491/AMANDA ROAD TO CR 423/OLD LEE FIELD ROAD Length: 3.10

Total Project Cost: Total Project Authorizations:

$4,965,557 $0

Phase PE
ROW CST UTL

Fund STP STP STP STP

Year 2014 2016 After 2017 After 2017

Federal $120,000 $961,879
$2,625,587 $264,979

State $30,000
$240,470 $656,397
$66,245

Other $0 $0 $0 $0

Total $150,000
$1,202,349 $3,281,984
$331,224

Project: 0008618 Type Work: Intersection Improvement Descp: SR 67 BYPASS @ CR 142/PULASKI ROAD
Length: 0.51

Phase ROW CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations:

$1,007,921 $300,000

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 0010364 Type Work: Intersection Improvement Descp: SR 26 @ CR 585/BURKHALTER ROAD
Length: 0.47

Phase ROW CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations:

$1,237,493 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 0010428 Type Work: Intersection Improvement
Descp: CR 248/LANGSTON CHAPEL ROAD @ CR 585/HARVILLE ROAD Length: 0.20

Phase PE CST

Fund Safety Safety

Total Project Cost: Total Project Authorizations:

$850,000 $0

Uses Lump Sum Bank: HIGH RISK RURAL ROADS FOR FY 2014 - FY 2017

Project: 0011765 Type Work: RRX Warning Device
Descp: CS 699/ZETTEROWER AVE @ GSFR #620181T IN STATESBORO Length: 0.40

Phase CST

Fund HSIP

Total Project Cost: Total Project Authorizations:

$265,000 $0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2014 - FY 2017

Year 2013 LUMP
Year LUMP LUMP
Year LUMP LUMP
Year LUMP

Federal $270,000 $637,129

State $30,000 $70,792

Other $0 $0

Federal $159,300 $954,444

State $17,700
$106,049

Other $0 $0

Federal $90,000
$675,000

State $10,000 $75,000

Other $0 $0

Federal $265,000

State $0

Other $0

Total $300,000 $707,921
Total $177,000
$1,060,493
Total $100,000 $750,000
Total $265,000

Page 100 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 522460- Type Work: Widening

Descp: SR 67 FM I-16 TO STATESBORO BYPASS

Lanes: Exist. 2 Prop. 4

Length: 10.86

Total Project Cost: Total Project Authorizations:

$36,431,468 $0

Phase ROW CST UTL

Fund STP STP STP

Year 2016 After 2017 After 2017

Federal $6,119,350 $22,399,537
$626,288

State $1,529,837 $5,599,884
$156,572

Other $0 $0 $0

Total $7,649,187 $27,999,421
$782,860

Project: M004594 Type Work: Resurface & Maintenance
Descp: SR 67 FROM 0.46 MI S OF CR 585/HARVILLE ROAD TO SR 73 Length: 3.33

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$2,260,759 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Project: M004598 Type Work: Resurface & Maintenance
Descp: SR 26/SR 67 FROM MILL CREEK TO CS 619/NORTH COLLEGE STREET Length: 6.78

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations:

$3,015,146 $0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Project: M004795 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 5 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Project: M004868 Type Work: Resurface & Maintenance
Descp: SR 26 FROM CS 720/CARMEL DRIVE TO CR 491/AMANDA ROAD Length: 2.70

Phase CST

Fund STP

Total Project Cost: Total Project Authorizations:

$972,263 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Year LUMP

Federal $1,808,607
Federal $2,412,117
Federal $0
Federal $777,810

State $452,152

Other $0

Total $2,260,759

State $603,029

Other $0

Total $3,015,146

State $200,000

Other $0

Total $200,000

State

Also in Appling, Bacon, Brantley,

Bryan, Camden, Candler,

Charlton, Chatham, Effingham,

Evans, Glynn, Jeff Davis, Liberty,

Long, McIntosh, Montgomery,

Pierce, Tattnall, Telfair, Toombs,

Ware, Wayne, Wheeler County

Other

Total

$194,453

$0

$972,263

Page 101 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Bulloch Totals Summary
County Summary excludes lump sum projects.

Project PI#
0005829 0005829 522460M004795

Year
2014 2016 2016 2014

Phase
PE ROW ROW CST

Fund STP STP STP State

Federal
$120,000 $961,879 $6,119,350
$0

State
$30,000 $240,470 $1,529,837
$12,000

Other
$0 $0 $0 $0

$7,201,229

$1,812,307

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $150,000
$1,202,349 $7,649,187
$12,000
$9,013,536

Page 102 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Burke
Project: 0012732 Type Work: Pavement Markings
Descp: OFF-SYSTEM SAFETY IMPROVEMENTS @ VAR LOCS IN WAYNESBORO Length: 0.00

Phase CST

Fund HSIP

Total Project Cost: Total Project Authorizations:

$200,000 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: M004792 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 2 Length: 0.00

Phase CST

Fund State

Total Project Cost: Total Project Authorizations:

$200,000 $0

Year LUMP
Year 2014

Federal $200,000
Federal $0

Burke Totals Summary
County Summary excludes lump sum projects.

State $0

Other $0

Total $200,000

State $200,000

Other $0

Total $200,000

Also in Baldwin, Bleckley, Columbia, Dodge, Emanuel, Glascock, Greene, Hancock, Jasper, Jefferson, Jenkins, Johnson, Laurens, Lincoln, McDuffie, Morgan, Newton, Oglethorpe, Putnam, Richmond, Screven, Taliaferro, Treutlen, Warren, Washington, Wilkes, Wilkinson County

Project PI# M004792

Year 2014

Phase CST

Fund State

Federal $0

State $14,000

Other $0

$0

$14,000

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $14,000 $14,000

Page 103 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Butts
Project: 0007580 Type Work: Sidewalks
Descp: ROAD IMPROVEMENTS & UTILITY RELOCATIONS IN JACKSON Length: 0.00

Total Project Cost: Total Project Authorizations:

$674,438 $0

Phase PE
ROW CST

Fund Local Local HPP

Year 2013 2014 After 2017

Federal $0 $0
$449,950

State $0 $0 $0

Other $62,000 $50,000
$112,488

Total $62,000 $50,000
$562,438

Project: 0009966 Type Work: Roundabout Descp: SR 42 @ SR 87
Length: 0.30

Phase PE CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations:

$1,061,208 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 333172- Type Work: Replace Bridge
Descp: SR 36 @ SOUTH RIVER @ BUTTS-NEWTON COUNTY LINE Length: 0.76

Phase PE
ROW CST

Fund STP Bridge STP

Total Project Cost: Total Project Authorizations:

$2,960,577 $1,587,000

Year LUMP LUMP
Year 2016 2013 2014

Project: M004793 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 3 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Project: M004824 Type Work: Resurface & Maintenance Descp: SR 16 FROM SR 42 TO JASPER COUNTY LINE
Length: 7.39

Phase CST

Fund STP

Total Project Cost: Total Project Authorizations:

$1,167,916 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Year LUMP

Federal $159,181 $902,027
Federal $8,000
$1,269,600 $1,090,862
Federal $0
Federal $934,333

State $0 $0

Other $0 $0

Total $159,181 $902,027

State $2,000
$317,400 $272,715

Other $0 $0 $0

Total $10,000
$1,587,000 $1,363,577

Also in Newton County

State $200,000

Other $0

Total $200,000

State

Also in Bibb, Chattahoochee,

Coweta, Crawford, Dooly,

Fayette, Harris, Heard, Henry,

Houston, Jones, Lamar, Macon,

Marion, Meriwether, Monroe,

Muscogee, Peach, Pike, Pulaski,

Schley, Spalding, Stewart, Sumter,

Talbot, Taylor, Troup, Twiggs,

Upson, Webster County

Other

Total

$233,583

$0

$1,167,916

Page 104 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Butts Totals Summary
County Summary excludes lump sum projects.

Project PI#
0007580 333172333172M004793

Year
2014 2016 2014 2014

Phase
ROW PE CST CST

Fund Local STP STP State

Federal
$0 $4,000 $545,431
$0

State
$0 $1,000 $136,358 $4,000

Other
$50,000 $0 $0 $0

$549,431

$141,358

$50,000

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $50,000 $5,000
$681,789 $4,000
$740,789

Page 105 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Calhoun
Project: 0009862 Type Work: Replace Bridge Descp: SR 45 @ CORDRAYS POND DRAIN & OVERFLOW
Length: 0.78

Total Project Cost: Total Project Authorizations:

$2,204,347 $0

Phase ROW CST

Fund STP STP

Year 2014 2016

Federal $84,864
$1,678,614

State $21,216
$419,653

Other $0 $0

Total $106,080
$2,098,267

Project: 0010597 Type Work: TE-Bike/Ped Facility
Descp: SR 37; SR 45; CS 555/COURT ST & CS 560/WHITNEY ST @ 4 LOCS Length: 0.32

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$266,324 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 442951- Type Work: Replace Bridge
Descp: SR 234 @ CHICKASAWHATCHEE CREEK 8 MI NE OF LEARY Length: 1.54

Phase PE
ROW CST

Fund Bridge STP STP

Year 2013 2014 2017

Total Project Cost: Total Project Authorizations:

$8,372,154 $97,339

Project: M004794 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 4 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Federal $213,059

State $0

Other $53,265

Total $266,324

Federal $77,871
$285,600 $6,334,252

State $19,468 $71,400
$1,583,563

Other $0 $0 $0

Total $97,339
$357,000 $7,917,815

Federal $0

Also in Dougherty County

State $200,000

Other $0

Total $200,000

Also in Atkinson, Baker, Ben Hill, Berrien, Brooks, Clay, Clinch, Coffee, Colquitt, Cook, Crisp, Decatur, Dougherty, Early, Echols, Grady, Irwin, Lanier, Lee, Lowndes, Miller, Mitchell, Quitman, Randolph, Seminole, Terrell, Thomas, Tift, Turner, Wilcox, Worth County

Page 106 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Calhoun Totals Summary
County Summary excludes lump sum projects.

Project PI#
0009862 0009862 442951442951M004794

Year
2014 2016 2014 2017 2014

Phase
ROW CST ROW CST CST

Fund STP STP STP STP State

Federal
$84,864 $1,678,614
$142,800 $3,167,126
$0

State
$21,216 $419,653
$35,700 $791,781
$4,000

Other
$0 $0 $0 $0 $0

$5,073,404

$1,272,351

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $106,080
$2,098,267 $178,500
$3,958,907 $4,000
$6,345,755

Page 107 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Camden

Project: 0000820 Type Work: Widening

Descp: SR 40 FM E OF ST MARYS RIVER TRIB TO E OF

CR 66/COLERAIN RD

Lanes: Exist. 2 Prop. 4

Length: 11.47

Total Project Cost: Total Project Authorizations:

$32,377,584 $0

Project: 0006701 Type Work: Pavement Rehab Descp: ST MARYS ROAD PAVING PROJECT
Length: 0.00

Total Project Cost: Total Project Authorizations:

$100,000 $0

Phase ROW ROW CST UTL

Fund HPP HPP NHPP NHPP

Year 2015 2015 After 2017 After 2017

Federal $1,812,278
$719,921 $23,087,224
$282,645

State $453,069 $179,980 $5,771,806
$70,661

Other $0 $0 $0 $0

Total $2,265,347
$899,901 $28,859,030
$353,306

Phase PE CST

Fund Local Local

Year 2013 2014

Federal $0 $0

Also in Charlton County

State $0 $0

Other $11,000 $89,000

Total $11,000 $89,000

Project: 0007414 Type Work: Widening

Descp: CR 90/COLERAIN ROAD FM W OF I-95 TO E OF

KINGS BAY ROAD

Lanes: Exist. 2 Prop. 4

Length: 5.85

Total Project Cost: Total Project Authorizations:

$34,193,546 $6,530,000

Phase ROW CST UTL

Fund STP STP STP

Year 2013 2017 2017

Federal $5,224,000 $19,746,022 $2,384,815

State $1,306,000 $4,936,505
$596,204

Other $0 $0 $0

Total $6,530,000 $24,682,527 $2,981,018

Project: 0008666 Type Work: Widening

Descp: KINGSLAND BYPASS FROM CR 61/VACUNA

ROAD TO W OF I-95

Lanes: Exist. 2 Prop. 4

Length: 4.85

Total Project Cost: Total Project Authorizations:

$22,210,848 $0

Phase ROW CST CST CST UTL

Fund HPP STP HPP HPP STP

Year 2016 After 2017 After 2017 After 2017 After 2017

Federal $2,127,200 $13,586,433 $1,497,356
$419,900 $137,789

State $531,800 $3,396,608 $374,339 $104,975
$34,447

Other $0 $0 $0 $0 $0

Total $2,659,000 $16,983,042 $1,871,695
$524,875 $172,237

Project: 0009436 Type Work: RRX Warning Device Descp: SR 40 SPUR @ SMR #861077N IN ST MARYS
Length: 0.40

Phase CST

Total Project Cost: Total Project Authorizations:

$159,181 $0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2014 - FY 2017

Fund HSIP

Year LUMP

Federal $159,181

State $0

Other $0

Total $159,181

Page 108 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0010579 Type Work: TE-Bike/Ped Facility
Descp: SR 40 FROM CS 456/WEST STREET TO CS 457/EAST STREET Length: 0.46

Total Project Cost: Total Project Authorizations:

$250,000 $0

Phase CST

Fund STP

Year LUMP

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 0010580 Type Work: TE-Bike/Ped Facility
Descp: ST MARYS FM READY ST TO WATERFRONT-MULTI-USE TRAIL - PH III Length: 0.00

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$250,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: M004795 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 5 Length: 0.00

Phase CST

Fund State

Year 2014

Total Project Cost: Total Project Authorizations:

$200,000 $0

Project: M004900 Type Work: Resurface & Maintenance
Descp: SR 40 FROM E OF CS 556//HENRIETTA ST TO CS 599/KINGS BAY RD Length: 4.17

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations:

$1,220,529 $0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Project: M004904 Type Work: Resurface & Maintenance
Descp: SR 40 FROM CS 432/JULIA STREET TO CS 416/CHURCH STREET Length: 1.94

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations:

$806,070 $0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Federal $200,000
Federal $200,000
Federal $0
Federal $976,423
Federal $644,856

State $0

Other $50,000

Total $250,000

State $0

Other $50,000

Total $250,000

State $200,000

Other $0

Total $200,000

State

Also in Appling, Bacon, Brantley,

Bryan, Bulloch, Candler,

Charlton, Chatham, Effingham,

Evans, Glynn, Jeff Davis, Liberty,

Long, McIntosh, Montgomery,

Pierce, Tattnall, Telfair, Toombs,

Ware, Wayne, Wheeler County

Other

Total

$244,106

$0

$1,220,529

State $161,214

Other $0

Total $806,070

Page 109 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Camden Totals Summary
County Summary excludes lump sum projects.

Project PI#
0000820 0000820 0006701 0007414 0007414 0008666 M004795

Year
2015 2015 2014 2017 2017 2016 2014

Phase
ROW ROW CST CST UTL ROW CST

Fund HPP HPP Local STP STP HPP State

Federal
$626,331 $1,576,682
$0 $19,746,022
$2,384,815 $2,127,200
$0

State
$156,583 $394,170
$0 $4,936,505
$596,204 $531,800
$14,000

Other
$0 $0 $89,000 $0 $0 $0 $0

$26,461,050

$6,629,262

$89,000

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $782,914
$1,970,852 $89,000
$24,682,527 $2,981,018 $2,659,000 $14,000
$33,179,312

Page 110 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Candler
Project: 0006495 Type Work: RRX Warning Device Descp: CS 587/MLK JR BLVD @ OGE RR #620236D
Length: 0.13

Phase CST

Fund HSIP

Year LUMP

Total Project Cost: Total Project Authorizations:

$179,264 $0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2014 - FY 2017

Project: 0010818 Type Work: TE-Bike/Ped Facility
Descp: METTER DOWNTOWN STREETSCAPES @ 4 LOCS - PHASE III Length: 0.25

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$291,034 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: M004795 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 5 Length: 0.00

Phase CST

Fund State

Year 2014

Total Project Cost: Total Project Authorizations:

$200,000 $0

Federal $179,264
Federal $232,827
Federal $0

Candler Totals Summary
County Summary excludes lump sum projects.

State $0

Other $0

Total $179,264

State $0

Other $58,207

Total $291,034

State $200,000

Other $0

Total $200,000

Also in Appling, Bacon, Brantley, Bryan, Bulloch, Camden, Charlton, Chatham, Effingham, Evans, Glynn, Jeff Davis, Liberty, Long, McIntosh, Montgomery, Pierce, Tattnall, Telfair, Toombs, Ware, Wayne, Wheeler County

Project PI# M004795

Year 2014

Phase CST

Fund State

Federal $0

State $4,000

Other $0

$0

$4,000

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $4,000 $4,000

Page 111 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Carroll

Project: 0000312 Type Work: Widening

Descp: SR 1/US 27 FROM CR 526/CENTRAL RD NORTH

TO DIXIE ST

Lanes: Exist. 4 Prop. 6

Length: 0.70

Total Project Cost: Total Project Authorizations:

$17,506,561 $0

Phase PE
ROW CST UTL

Fund NHPP NHPP NHPP NHPP

Year 2014 After 2017 After 2017 After 2017

Federal $202,741
$2,838,392 $10,111,995
$852,121

State $50,685
$709,598 $2,527,999
$213,030

Other $0 $0 $0 $0

Total $253,426
$3,547,991 $12,639,993
$1,065,151

Project: 0005827 Type Work: Intersection Improvement Descp: SR 166 @ HAYS MILL ROAD IN CARROLLTON
Length: 0.15

Total Project Cost: Total Project Authorizations:

$424,258 $0

Phase CST

Fund NHPP

Year 2016

Federal $339,406

State $84,852

Other $0

Total $424,258

Project: 0006026 Type Work: Intersection Improvement Descp: SR 5 @ SR 16/US 27 ALT
Length: 0.40

Phase ROW CST UTL

Fund HSIP HSIP HSIP

Total Project Cost: Total Project Authorizations:

$1,617,262 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 0007640 Type Work: Multi-use Trail
Descp: CHATTAHOOCHEE HILLS REGIONAL GREENWAY TRAIL - CARROLL Length: 0.00

Phase CST

Fund HPP

Total Project Cost: Total Project Authorizations:

$562,437 $0

Year LUMP LUMP LUMP
Year 2016

Federal $369,705 $728,693 $357,138
Federal $449,950

State $41,078 $80,966 $39,682

Other $0 $0 $0

State $0

Other $112,487

Total $410,783 $809,659 $396,820
Total $562,437

Project: 0010457 Type Work: TE-Bike/Ped Facility Descp: VILLA RICA TRAILHEAD
Length: 0.00

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$625,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Federal $500,000

State $0

Other $125,000

Total $625,000

Page 112 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0010493 Type Work: Signing
Descp: CR 392 FROM SR 61 TO CR 384 & CR 824 FROM SR 113 TO CR 753 Length: 2.82

Total Project Cost: Total Project Authorizations:

$45,000 $0

Phase PE CST

Fund Safety Safety

Year LUMP LUMP

Uses Lump Sum Bank: HIGH RISK RURAL ROADS FOR FY 2014 - FY 2017

Project: 0010948 Type Work: TE-Bike/Ped Facility
Descp: CARROLTON GREENBELT FM SR 166 BYPASS TO E OF STRICKLAND RD Length: 1.42

Phase CST CST

Fund HPP STP

Year 2015 LUMP

Total Project Cost: Total Project Authorizations:

$2,182,150 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 631490- Type Work: New Construction

Descp: VILLA RICA BYP EXTEND W FM PROPOSED SR

61 BYPASS TO SR 101

Lanes: Exist. 0 Prop. 2

Length: 2.42

Total Project Cost: Total Project Authorizations:

$11,226,488 $0

Phase ROW CST

Fund STP STP

Year 2016 After 2017

Federal $10,000 $35,000
Federal $251,972
$1,493,748
Federal $4,034,288 $4,946,902

State $0 $0
State $0 $0
State $1,008,572 $1,236,726

Other $0 $0
Other $62,993
$373,437
Other $0 $0

Total $10,000 $35,000
Total $314,965
$1,867,185
Total $5,042,860 $6,183,628

Project: 662540- Type Work: New Construction

Descp: SR 61 CONN FM SR 61 TO S OF SHORELINE

PKWY

Lanes: Exist. 0 Prop. 2

Length: 1.10

Total Project Cost: Total Project Authorizations:

$8,614,423 $0

Phase ROW CST

Fund STP STP

Year 2017 After 2017

Federal $3,931,411 $2,960,128

State $982,853 $740,032

Other $0 $0

Total $4,914,264 $3,700,160

Project: M003308 Type Work: Concrete Rehab Descp: I-20 FROM SR 1/US 27 TO SR 61
Length: 11.81

Total Project Cost: Total Project Authorizations:

$33,222,424 $100,000

Phase PE CST

Fund IM NHPP

Year 2013 2017

Federal $90,000
$29,810,182

State $10,000
$3,312,242

Other $0 $0

Total $100,000
$33,122,424

Page 113 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: M003688 Type Work: Weigh Station
Descp: I-20 FM PLEASANT RIDGE RD TO LEVANS RD NEW WEIGH STATION Length: 1.72

Total Project Cost: Total Project Authorizations:

$19,336,509 $0

Phase PE
ROW CST

Fund NHPP NHPP NHPP

Year LUMP LUMP After 2017

Federal $1,241,594
$253,387 $15,907,877

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Project: M004550 Type Work: Resurface & Maintenance
Descp: SR 5 FROM 0.07 MI S OF NS #719394H TO DOUGLAS COUNTY LINE Length: 7.73

Phase CST

Fund STP

Year 2014

Federal $1,028,598

Total Project Cost: Total Project Authorizations:

$1,285,748 $1,285,748

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Project: M004648 Type Work: Resurface & Maintenance
Descp: SR 1BU FROM N OF SR 1/CARROLL TO S OF SR 1/HARALSON Length: 4.74

Phase CST

Fund STP

Year LUMP

Federal $903,035

Total Project Cost: Total Project Authorizations:

$1,128,794 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Project: M004796 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 6 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Federal $0

Project: M004837 Type Work: Resurface & Maintenance Descp: SR 166 FROM DOUGLAS COUNTY LINE TO SR 61
Length: 5.94

Phase CST

Fund STP

Total Project Cost: Total Project Authorizations:

$1,037,417 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Year LUMP

Federal $829,933

State $137,955
$28,154 $1,767,542

Other $0 $0 $0

Total $1,379,549
$281,541 $17,675,419

State $257,150

Other $0

Total $1,285,748

State $225,759

Other $0

Total $1,128,794

Also in Haralson County

State $200,000

Other $0

Total $200,000

State

Also in Bartow, Catoosa,

Chattooga, Cherokee, Dade,

Fannin, Floyd, Gilmer, Gordon,

Haralson, Murray, Paulding,

Pickens, Polk, Walker, Whitfield

County

Other

Total

$207,483

$0

$1,037,417

Page 114 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: M004838 Type Work: Resurface & Maintenance Descp: SR 1/US 27 FROM NS #719232F TO SR 166

Length: 3.25

Total Project Cost: Total Project Authorizations:

$945,263 $0

Phase CST

Fund NHPP

Year LUMP

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Project: M004839 Type Work: Resurface & Maintenance
Descp: SR 8 FROM HARALSON COUNTY LINE TO DOUGLAS COUNTY LINE Length: 8.34

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$3,262,804 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Federal $756,210
Federal $2,610,243

State $189,053

Other $0

State $652,561

Other $0

Total $945,263
Total $3,262,804

Carroll Totals Summary
County Summary excludes lump sum projects.

Project PI#
0000312 0005827 0007640 631490662540M003308 M004796

Year
2014 2016 2016 2016 2017 2017 2014

Phase
PE CST CST ROW ROW CST CST

Fund NHPP NHPP HPP STP STP NHPP State

Federal
$202,741 $339,406 $449,950 $4,034,288 $3,931,411 $29,810,182
$0

State
$50,685 $84,852
$0 $1,008,572
$982,853 $3,312,242
$16,000

Other
$0 $0 $112,487 $0 $0 $0 $0

$38,767,978

$5,455,204

$112,487

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $253,426 $424,258 $562,437
$5,042,860 $4,914,264 $33,122,424
$16,000
$44,335,670

Page 115 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Catoosa
Project: 0010448 Type Work: Signals
Descp: SR 1 @ 3 LOC; SR 2 @ 5 LOC; SR 136 @ 3 LOC &SR 146 @ 2 LOC Length: 0.00

Phase ROW CST

Fund STP STP

Year LUMP LUMP

Federal $520,200
$1,014,390

State $0 $0

Other $0 $0

Total $520,200
$1,014,390

Total Project Cost: Total Project Authorizations:

$1,534,590 $0

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2014 - FY 2017

Also in Dade, Walker County

Project: M004796 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 6 Length: 0.00

Phase CST

Fund State

Year 2014

Federal $0

State $200,000

Other $0

Total $200,000

Total Project Cost: Total Project Authorizations:

$200,000 $0

Also in Bartow, Carroll, Chattooga, Cherokee, Dade, Fannin, Floyd, Gilmer, Gordon, Haralson, Murray, Paulding, Pickens, Polk, Walker, Whitfield County

Project PI# M004796

Year 2014

Catoosa Totals Summary

County Summary excludes lump sum projects.

This County is also located in a MPO area. Additional Projects may be listed in the MPO TIP.

Phase

Fund

Federal

State

Other

CST

State

$0

$6,000

$0

Total $6,000

$0

$6,000

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

$6,000

Page 116 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Charlton

Project: 0000820 Type Work: Widening

Descp: SR 40 FM E OF ST MARYS RIVER TRIB TO E OF

CR 66/COLERAIN RD

Lanes: Exist. 2 Prop. 4

Length: 11.47

Total Project Cost: Total Project Authorizations:

$32,377,584 $0

Project: 0000821 Type Work: Widening

Descp: SR 40 FM SR 40 CONN TO 0.36 MI EAST OF CR

82/MAY BLUFF ROAD

Lanes: Exist. 2 Prop. 4

Length: 1.65

Total Project Cost: Total Project Authorizations:

$6,388,905 $0

Phase ROW ROW CST UTL

Fund HPP HPP NHPP NHPP

Year 2015 2015 After 2017 After 2017

Federal $1,812,278
$719,921 $23,087,224
$282,645

State $453,069 $179,980 $5,771,806
$70,661

Other $0 $0 $0 $0

Total $2,265,347
$899,901 $28,859,030
$353,306

Phase ROW CST UTL

Fund NHPP NHPP NHPP

Year 2015 2016 2016

Federal $226,674
$4,759,754 $124,696

Also in Camden County

State $56,669
$1,189,939 $31,174

Other $0 $0 $0

Total $283,343
$5,949,693 $155,870

Project: 0007163 Type Work: Replace Bridge
Descp: SR 252 @ SATILLA RIVER OVERFLOWS 10 MI NORTHEAST OF FOLKSON Length: 0.85

Total Project Cost: Total Project Authorizations:

$3,816,635 $0

Phase PE
ROW CST

Fund STP STP STP

Year 2016 2014 2016

Federal $8,000
$127,296 $2,918,012

State $2,000
$31,824 $729,503

Other $0 $0 $0

Total $10,000
$159,120 $3,647,515

Project: 0007666 Type Work: Drainage Improvements
Descp: SR 4 FM BAY ST TO MAIN ST & SR 23 FM MAGNOLIA ST TO MAIN ST Length: 0.86

Total Project Cost: Total Project Authorizations:

$1,356,909 $0

Phase ROW CST

Fund NHPP NHPP

Year 2014 2016

Federal $107,369 $978,158

State $26,842
$244,540

Other $0 $0

Total $134,212
$1,222,698

Project: 0010581 Type Work: TE-Bike/Ped Facility
Descp: SR 40; CR 66/3RD STREET & CR 67/3RD STREET @ 3 LOCS - PH V Length: 0.15

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$250,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Federal $200,000

State $0

Other $50,000

Total $250,000

Page 117 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 570943- Type Work: Replace Bridge
Descp: CR 60 @ HATCHERS BRANCH 1 MI W OF FOLKSTON Length: 0.20

Total Project Cost: Total Project Authorizations:

$633,024 $0

Phase PE
ROW CST UTL

Fund STP Local STP STP

Year LUMP 2016 LUMP LUMP

Uses Lump Sum Bank: LOW IMPACT BRIDGES FOR FY 2014 - FY 2017

Project: M004086 Type Work: Bridges Descp: SR 4/US 1 @ SR 23/US 301 - BEAM REPAIR
Length: 0.40

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$60,000 $0

Uses Lump Sum Bank: BRIDGE MAINTENANCE/PAINTING FOR FY 2014 - FY 2017

Project: M004629 Type Work: Resurface & Maintenance Descp: SR 4 @ 1 LOC & SR 4 SO @ 1 LOC
Length: 1.71

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations:

$799,228 $0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Project: M004795 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 5 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Federal $81,600 $0
$408,000 $8,160
Federal $48,000
Federal $639,383
Federal $0

State $20,400 $0
$102,000 $2,040

Other $0
$10,824 $0 $0

Total $102,000 $10,824 $510,000 $10,200

State $12,000

Other $0

Total $60,000

State $159,846

Other $0

Total $799,228

State $200,000

Other $0

Total $200,000

Also in Appling, Bacon, Brantley, Bryan, Bulloch, Camden, Candler, Chatham, Effingham, Evans, Glynn, Jeff Davis, Liberty, Long, McIntosh, Montgomery, Pierce, Tattnall, Telfair, Toombs, Ware, Wayne, Wheeler County

Page 118 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Charlton Totals Summary
County Summary excludes lump sum projects.

Project PI#
0000820 0000820 0000821 0000821 0000821 0007163 0007163 0007163 0007666 0007666 M004795

Year
2015 2015 2015 2016 2016 2016 2014 2016 2014 2016 2014

Phase
ROW ROW ROW CST UTL
PE ROW CST ROW CST CST

Fund HPP HPP NHPP NHPP NHPP STP STP STP NHPP NHPP State

Federal
$93,590 $235,596 $226,674 $4,759,754 $124,696
$8,000 $127,296 $2,918,012 $107,369 $978,158
$0

State
$23,397 $58,899 $56,669 $1,189,939 $31,174
$2,000 $31,824 $729,503 $26,842 $244,540 $14,000

Other
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

$9,579,146

$2,408,786

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total
$116,987 $294,495 $283,343 $5,949,693 $155,870
$10,000 $159,120 $3,647,515 $134,212 $1,222,698
$14,000
$11,987,932

Page 119 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Chattooga
Project: 0003081 Type Work: Replace Bridge
Descp: CR 321/TALIAFERRO SPRINGS @ CHATTOOGA RIVER 1 MI S OF LYERLY Length: 0.19

Total Project Cost: Total Project Authorizations:

$2,844,917 $0

Phase PE
ROW CST UTL

Fund STP Local STP Local

Year 2015 2014 2015 2015

Federal $20,000 $0
$2,038,062 $0

State $5,000 $0
$509,515 $0

Other $0
$220,320 $0
$52,020

Total $25,000
$220,320 $2,547,577
$52,020

Project: 0005530 Type Work: Replace Bridge
Descp: SR 48 @ EAST FORK LITTLE RIVER 3.7 MI NE OF MENLO Length: 0.41

Total Project Cost: Total Project Authorizations:

$3,102,051 $0

Phase PE
ROW CST UTL

Fund STP STP STP STP

Year 2015 2015 2015 2015

Federal $8,323
$337,090 $1,904,594
$231,635

State $2,081
$84,272 $476,148
$57,909

Other $0 $0 $0 $0

Total $10,404
$421,362 $2,380,742
$289,543

Project: 0010702 Type Work: TE-Bike/Ped Facility
Descp: CS 588/WASHINGTON STREET FM SR 1 TO CS 590/UNIVERSITY STREET Length: 0.13

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$625,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 621082- Type Work: Widening

Descp: SR 1 FROM CR 329 TO N OF CR 325 @ SR 1/US27

Lanes: Exist. 2 Prop. 4

Length: 8.00

Total Project Cost: Total Project Authorizations:

$107,613,126 $720,768

Phase PE PE
ROW CST UTL

Fund State NHPP NHPP NHPP NHPP

Year 1993 2014 2015 2017 2017

Federal $500,000

State $0

Federal $0
$80,000 $10,697,809 $64,738,806
$9,997,272

State $720,768
$20,000 $2,674,452 $16,184,702 $2,499,318

Other $125,000
Other $0 $0 $0 $0 $0

Total $625,000
Total $720,768 $100,000
$13,372,261 $80,923,508 $12,496,589

Project: M004796 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 6 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Federal $0

State $200,000

Other $0

Total $200,000

Also in Bartow, Carroll, Catoosa, Cherokee, Dade, Fannin, Floyd, Gilmer, Gordon, Haralson, Murray, Paulding, Pickens, Polk, Walker, Whitfield County

Page 120 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Chattooga Totals Summary
County Summary excludes lump sum projects.

Project PI#
0003081 0003081 0003081 0003081 0005530 0005530 0005530 0005530 621082621082621082621082M004796

Year
2015 2014 2015 2015 2015 2015 2015 2015 2014 2015 2017 2017 2014

Phase
PE ROW CST UTL
PE ROW CST UTL
PE ROW CST UTL CST

Fund STP Local STP Local STP STP STP STP NHPP NHPP NHPP NHPP State

Federal
$20,000 $0
$2,038,062 $0
$8,323 $337,090 $1,904,594 $231,635
$80,000 $10,697,809 $64,738,806
$9,997,272 $0

State
$5,000 $0
$509,515 $0
$2,081 $84,272 $476,148 $57,909 $20,000 $2,674,452 $16,184,702 $2,499,318 $10,000

Other
$0 $220,320
$0 $52,020
$0 $0 $0 $0 $0 $0 $0 $0 $0

Total
$25,000 $220,320 $2,547,577
$52,020 $10,404 $421,362 $2,380,742 $289,543 $100,000 $13,372,261 $80,923,508 $12,496,589 $10,000

$90,053,589

$22,523,397

$272,340

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

$112,849,327

Page 121 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Clay
Project: M004794 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 4 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Federal $0

Clay Totals Summary
County Summary excludes lump sum projects.

State $200,000

Other $0

Total $200,000

Also in Atkinson, Baker, Ben Hill, Berrien, Brooks, Calhoun, Clinch, Coffee, Colquitt, Cook, Crisp, Decatur, Dougherty, Early, Echols, Grady, Irwin, Lanier, Lee, Lowndes, Miller, Mitchell, Quitman, Randolph, Seminole, Terrell, Thomas, Tift, Turner, Wilcox, Worth County

Project PI# M004794

Year 2014

Phase CST

Fund State

Federal $0

State $4,000

Other $0

$0

$4,000

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $4,000 $4,000

Page 122 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Clinch

Project: 422120- Type Work: Widening

Descp: SR 38 FM W OF WOODYARD CK/CLINCH TO W OF

GREASY BRANCH/WARE

Lanes: Exist. 2 Prop. 4

Length: 11.60

Total Project Cost: Total Project Authorizations:

$56,470,835 $0

Phase CST UTL

Fund NHPP NHPP

Year 2015 2015

Federal $44,391,370
$785,298

State $11,097,843
$196,325

Other $0 $0

Total $55,489,213
$981,623

Also in Ware County

Project: M004769 Type Work: Bridges
Descp: SR 38 @ WOODY CREEK & @ LITTLE SUWANNEE CREEK - BRIDGE REHAB Length: 0.80

Phase PE CST

Fund STP STP

Total Project Cost: Total Project Authorizations:

$150,000 $0

Uses Lump Sum Bank: BRIDGE MAINTENANCE/PAINTING FOR FY 2014 - FY 2017

Project: M004794 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 4 Length: 0.00

Phase CST

Fund State

Total Project Cost: Total Project Authorizations:

$200,000 $0

Year LUMP LUMP
Year 2014

Federal $40,000 $80,000
Federal $0

Clinch Totals Summary
County Summary excludes lump sum projects.

State $10,000 $20,000

Other $0 $0

Total $50,000
$100,000

State $200,000

Other $0

Total $200,000

Also in Atkinson, Baker, Ben Hill, Berrien, Brooks, Calhoun, Clay, Coffee, Colquitt, Cook, Crisp, Decatur, Dougherty, Early, Echols, Grady, Irwin, Lanier, Lee, Lowndes, Miller, Mitchell, Quitman, Randolph, Seminole, Terrell, Thomas, Tift, Turner, Wilcox, Worth County

Project PI# 422120422120M004794

Year 2015 2015 2014

Phase CST UTL CST

Fund NHPP NHPP State

Federal $28,854,391 $510,444 $0

State $7,213,598
$127,611 $12,000

Other $0 $0 $0

$29,364,834

$7,353,209

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $36,067,988
$638,055 $12,000
$36,718,043

Page 123 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Coffee
Project: 0007164 Type Work: Replace Bridge Descp: SR 64 @ 17 MILE RIVER 12 MI NE OF PEARSON
Length: 0.43

Total Project Cost: Total Project Authorizations:

$4,598,171 $0

Phase ROW CST UTL

Fund STP STP STP

Year 2014 2015 2015

Federal $165,648
$3,506,480 $6,409

State $41,412
$876,620 $1,602

Other $0 $0 $0

Total $207,060
$4,383,100 $8,011

Project: 0007165 Type Work: Replace Bridge
Descp: SR 158 @ SATILLA RIVER 12 MI WEST OF DOUGLAS Length: 0.39

Total Project Cost: Total Project Authorizations:

$2,982,202 $0

Phase ROW CST

Fund STP STP

Year 2015 2016

Federal $102,375
$2,283,386

State $25,594
$570,847

Other $0 $0

Total $127,969
$2,854,233

Project: 0010407 Type Work: Replace Bridge
Descp: SR 32 @ BEAR CREEK APPROX 4 MI SE OF AMBROSE Length: 0.19

Total Project Cost: Total Project Authorizations:

$2,172,266 $0

Phase ROW CST

Fund NHPP NHPP

Year 2014 2016

Federal $48,960
$1,688,853

State $12,240
$422,213

Other $0 $0

Total $61,200
$2,111,066

Project: 0010408 Type Work: Replace Bridge
Descp: SR 32 @ HURRICANE CREEK APPROX 0.4 MI W OF NICHOLLS Length: 0.30

Total Project Cost: Total Project Authorizations:

$2,264,184 $0

Phase ROW CST

Fund NHPP NHPP

Year 2014 2016

Federal $98,736
$1,712,611

State $24,684
$428,153

Other $0 $0

Total $123,420
$2,140,764

Project: 0010583 Type Work: TE-Bike/Ped Facility
Descp: SR 268 FROM CR 141/MAGNOLIA STREET TO CR 142/CYPRESS AVE Length: 0.22

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$187,500 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Federal $150,000

State $0

Other $37,500

Total $187,500

Page 124 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0010584 Type Work: TE-Bike/Ped Facility
Descp: SR 135 FROM SEVENTEEN MILE RIVER TO CR 399/GASKIN SPRINGS RD Length: 1.05

Total Project Cost: Total Project Authorizations:

$250,000 $0

Phase CST

Fund STP

Year LUMP

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 0011678 Type Work: Replace Bridge
Descp: SR 32 @ 17 MILE RIVER APPROX 3 MI E OF DOUGLAS Length: 0.40

Total Project Cost: Total Project Authorizations:

$3,049,776 $350,000

Phase PE
ROW CST UTL

Fund NHPP NHPP NHPP NHPP

Year 2013 2015 2017 2017

Federal $200,000

State $0

Other $50,000

Federal $280,000 $124,848
$1,991,675 $43,297

State $70,000 $31,212
$497,919 $10,824

Other $0 $0 $0 $0

Total $250,000
Total $350,000 $156,060
$2,489,594 $54,122

Project: 0011679 Type Work: Replace Bridge
Descp: SR 32 @ OTTER CREEK APPROX 5 MI E OF DOUGLAS Length: 0.40

Total Project Cost: Total Project Authorizations:

$2,075,587 $350,000

Phase PE
ROW CST UTL

Fund NHPP NHPP NHPP NHPP

Year 2013 2015 2017 2017

Federal $280,000 $124,848
$1,212,324 $43,297

State $70,000 $31,212
$303,081 $10,824

Other $0 $0 $0 $0

Total $350,000 $156,060
$1,515,405 $54,122

Project: 0011680 Type Work: Replace Bridge
Descp: SR 32 @ BEAR CREEK APPROX 1.2 MI W OF NICHOLS Length: 0.40

Total Project Cost: Total Project Authorizations:

$1,859,100 $350,000

Phase PE
ROW CST UTL

Fund NHPP NHPP NHPP NHPP

Year 2013 2015 2017 2017

Federal $280,000 $124,848
$1,039,135 $43,297

State $70,000 $31,212
$259,784 $10,824

Other $0 $0 $0 $0

Total $350,000 $156,060
$1,298,919 $54,122

Project: 0011770 Type Work: RRX Warning Device Descp: CR 296/MITCHELL ROAD @ CSX #638224N
Length: 0.40

Phase PE CST

Total Project Cost: Total Project Authorizations:

$268,590 $18,590

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2014 - FY 2017

Fund HSIP HSIP

Year 2014 LUMP

Federal $18,590
$250,000

State $0 $0

Other $0 $0

Total $18,590
$250,000

Page 125 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0011771 Type Work: RRX Warning Device Descp: CR 16/MITCHELL ROAD @ CSX #6378191D

Length: 0.20

Total Project Cost: Total Project Authorizations:

$275,000 $0

Phase PE CST

Fund HSIP HSIP

Year LUMP LUMP

Federal $25,000
$250,000

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2014 - FY 2017

Project: 0012745 Type Work: Preliminary Engineering Descp: CR 100/CHANEY ROAD @ CSX #638223G
Length: 0.40

Phase CST

Fund HSIP

Year LUMP

Federal $350,000

Total Project Cost: Total Project Authorizations:

$368,590 $18,590

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2014 - FY 2017

Project: 0012837 Type Work: RRX Warning Device Descp: CR 145/PALMETTO ROAD @ CSX #638228R
Length: 0.40

Phase PE CST

Fund HSIP HSIP

Year LUMP LUMP

Federal $20,000
$250,000

Total Project Cost: Total Project Authorizations:

$270,000 $0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2014 - FY 2017

Project: 421345- Type Work: Widening

Descp: SR 32 FM W OF CR 296 EAST TO WEST CITY

LIMITS OF DOUGLAS

Lanes: Exist. 2 Prop. 4

Length: 4.20

Total Project Cost: Total Project Authorizations:

$25,430,577 $75,000

Phase PE
ROW CST UTL

Fund STP NHPP NHPP NHPP

Year 2013 2014 After 2017 After 2017

Federal $60,000
$3,206,935 $15,900,563
$1,176,963

State $0 $0
State $0
State $0 $0
State $15,000
$801,734 $3,975,141
$294,241

Other $0 $0
Other $0
Other $0 $0
Other $0 $0 $0 $0

Total $25,000
$250,000
Total $350,000
Total $20,000
$250,000
Total $75,000
$4,008,669 $19,875,704
$1,471,204

Project: 431830- Type Work: Widening

Descp: SR 135 FM SR 31/US 441 EAST TO SR 32

INCLUDING RR SEPARATION

Lanes: Exist. 2 Prop. 4

Length: 2.76

Total Project Cost: Total Project Authorizations:

$27,022,885 $4,485,000

Phase PE
ROW CST UTL

Fund NHPP STP NHPP NHPP

Year 2013 2013 2016 2016

Federal $140,000
$3,448,000 $17,914,271
$116,037

State $35,000
$862,000 $4,478,568
$29,009

Other $0 $0 $0 $0

Total $175,000
$4,310,000 $22,392,839
$145,046

Page 126 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: M004794 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 4 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Federal $0

Coffee Totals Summary
County Summary excludes lump sum projects.

State $200,000

Other $0

Total $200,000

Also in Atkinson, Baker, Ben Hill, Berrien, Brooks, Calhoun, Clay, Clinch, Colquitt, Cook, Crisp, Decatur, Dougherty, Early, Echols, Grady, Irwin, Lanier, Lee, Lowndes, Miller, Mitchell, Quitman, Randolph, Seminole, Terrell, Thomas, Tift, Turner, Wilcox, Worth County

Project PI#
0007164 0007164 0007164 0007165 0007165 0010407 0010407 0010408 0010408 0011678 0011678 0011678 0011679 0011679 0011679 0011680 0011680 0011680 421345431830431830M004794

Year
2014 2015 2015 2015 2016 2014 2016 2014 2016 2015 2017 2017 2015 2017 2017 2015 2017 2017 2014 2016 2016 2014

Phase
ROW CST UTL ROW CST ROW CST ROW CST ROW CST UTL ROW CST UTL ROW CST UTL ROW CST UTL CST

Fund STP STP STP STP STP NHPP NHPP NHPP NHPP NHPP NHPP NHPP NHPP NHPP NHPP NHPP NHPP NHPP NHPP NHPP NHPP State

Federal
$165,648 $3,506,480
$6,409 $102,375 $2,283,386
$48,960 $1,688,853
$98,736 $1,712,611
$124,848 $1,991,675
$43,297 $124,848 $1,212,324
$43,297 $124,848 $1,039,135
$43,297 $3,206,935 $17,914,271
$116,037 $0

State
$41,412 $876,620
$1,602 $25,594 $570,847 $12,240 $422,213 $24,684 $428,153 $31,212 $497,919 $10,824 $31,212 $303,081 $10,824 $31,212 $259,784 $10,824 $801,734 $4,478,568 $29,009 $10,000

Other
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

$35,598,272

$8,909,568

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total
$207,060 $4,383,100
$8,011 $127,969 $2,854,233
$61,200 $2,111,066
$123,420 $2,140,764
$156,060 $2,489,594
$54,122 $156,060 $1,515,405
$54,122 $156,060 $1,298,919
$54,122 $4,008,669 $22,392,839
$145,046 $10,000
$44,507,840

Page 127 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Colquitt

Project: 0000520 Type Work: Widening

Descp: SR 133 FM S OF SR 35/US 319 TO N OF

COLQUITT COUNTY LINE

Lanes: Exist. 2 Prop. 4

Length: 13.87

Total Project Cost: Total Project Authorizations:

$64,902,793 $0

Project: 0000545 Type Work: Widening

Descp: SR 133 FM CR 1/OLD QUITMAN ADEL

RD/BROOKS TO CR 256/COLQUITT

Lanes: Exist. 2 Prop. 4

Length: 9.63

Total Project Cost: Total Project Authorizations:

$31,813,185 $0

Project: 0000546 Type Work: Widening

Descp: SR 133 FROM CR 256/OLD BERLIN ROAD TO CR

388/HAWTHORNE DRIVE

Lanes: Exist. 2 Prop. 4

Length: 7.86

Total Project Cost: Total Project Authorizations:

$27,941,146 $0

Phase PE
ROW CST UTL

Fund NHPP NHPP NHPP NHPP

Year 2014 2016 After 2017 After 2017

Federal $128,800
$11,544,269 $38,919,218
$1,329,947

State $32,200
$2,886,067 $9,729,805
$332,487

Other $0 $0 $0 $0

Total $161,000
$14,430,336 $48,649,023
$1,662,434

Phase PE CST UTL

Fund NHPP NHPP NHPP

Year 2014 After 2017 After 2017

Federal $4,000
$25,069,284 $377,264

Also in Worth County

State $1,000
$6,267,321 $94,316

Other $0 $0 $0

Total $5,000
$31,336,605 $471,579

Phase PE CST UTL

Fund NHPP NHPP NHPP

Year 2014 After 2017 After 2017

Federal $250,400
$21,792,272 $310,244

Also in Brooks County

State $62,600
$5,448,068 $77,561

Other $0 $0 $0

Total $313,000
$27,240,340 $387,805

Project: 0007479 Type Work: RRX Warning Device
Descp: CR 494/FUNSTON-DOERUN ROAD @ GFRR #723300L Length: 0.02

Phase PE CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations:

$171,062 $0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2014 - FY 2017

Project: 0009846 Type Work: Roundabout Descp: SR 33/US 319 @ SR 33 SO
Length: 0.27

Phase ROW CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations:

$2,022,447 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Year LUMP LUMP
Year 2014 LUMP

Federal $7,030
$164,032
Federal $490,000
$1,532,447

State $0 $0

Other $0 $0

State $0 $0

Other $0 $0

Total $7,030
$164,032
Total $490,000
$1,532,447

Page 128 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0009855 Type Work: Roundabout
Descp: SR 37 @ CR 238/INDUSTRIAL DRIVE/CR 477/COOL SPRINGS ROAD Length: 0.25

Total Project Cost: Total Project Authorizations:

$1,044,027 $0

Phase ROW CST

Fund HSIP HSIP

Year LUMP LUMP

Federal $142,000 $902,027

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 0010558 Type Work: Sidewalks Descp: C A GRAY JUNIOR HIGH SCHOOL - SRTS
Length: 0.42

Phase CST

Fund Safety

Year LUMP

Federal $171,770

Total Project Cost: Total Project Authorizations:

$171,770 $0

Uses Lump Sum Bank: SAFE ROUTES TO SCHOOL ANY PROJECTS FOR FY 2014 - FY 2017

Project: 0010849 Type Work: Intersection Improvement Descp: SR 35/US 319 @ CR 89 INDIAN LAKE DRIVE
Length: 0.40

Phase PE CST

Fund Safety HSIP

Year 2013 LUMP

Federal $225,000
$1,101,600

Total Project Cost: Total Project Authorizations:

$1,474,000 $250,000

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 0010855 Type Work: Signals
Descp: SR 35 @ 5 LOC; SR 38 @ 3 LOC &SR 133 @ 1 LOC-SIGNAL UPGRADES Length: 3.60

Total Project Cost: Total Project Authorizations:

$1,096,500 $0

Phase ROW CST

Fund STP STP

Year LUMP LUMP

Federal $408,000 $688,500

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2014 - FY 2017

Project: 431780- Type Work: Widening

Descp: SR 133 FM CR 388/HAWTHORNE DR TO SR 35/E

MOULTRIE BYPASS

Lanes: Exist. 4 Prop. 5

Length: 4.58

Total Project Cost: Total Project Authorizations:

$15,161,894 $0

Phase PE CST UTL

Fund NHPP NHPP NHPP

Year 2014 2014 2014

Federal $4,000
$12,047,995 $77,520

State $0 $0

Other $0 $0

Total $142,000 $902,027

State $0

Other $0

Total $171,770

State $25,000
$122,400

Other $0 $0

Total $250,000
$1,224,000

State $0 $0

Other $0 $0

Total $408,000 $688,500

Also in Brooks County

State $1,000
$3,011,999 $19,380

Other $0 $0 $0

Total $5,000
$15,059,994 $96,900

Page 129 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: M004794 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 4 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Project: M004898 Type Work: Resurface & Maintenance Descp: SR 133 FROM BROOKS COUNTY LINE TO SR 35
Length: 14.60

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations:

$5,371,457 $0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Federal $0

State $200,000

Other $0

Total $200,000

Federal $4,297,166

State

Also in Atkinson, Baker, Ben Hill,

Berrien, Brooks, Calhoun, Clay,

Clinch, Coffee, Cook, Crisp,

Decatur, Dougherty, Early,

Echols, Grady, Irwin, Lanier, Lee,

Lowndes, Miller, Mitchell,

Quitman, Randolph, Seminole,

Terrell, Thomas, Tift, Turner,

Wilcox, Worth County

Other

Total

$1,074,291

$0

$5,371,457

Colquitt Totals Summary
County Summary excludes lump sum projects.

Project PI#
0000520 0000520 0000545 0000546 431780431780431780M004794

Year
2014 2016 2014 2014 2014 2014 2014 2014

Phase
PE ROW
PE PE PE CST UTL CST

Fund NHPP NHPP NHPP NHPP NHPP NHPP NHPP State

Federal
$124,936 $11,197,941
$920 $250,400
$4,000 $12,047,995
$77,520 $0

State
$31,234 $2,799,485
$230 $62,600
$1,000 $3,011,999
$19,380 $8,000

Other
$0 $0 $0 $0 $0 $0 $0 $0

$23,703,712

$5,933,928

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $156,170
$13,997,426 $1,150
$313,000 $5,000
$15,059,994 $96,900 $8,000
$29,637,640

Page 130 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Columbia
Project: 0007168 Type Work: Replace Bridge
Descp: SR 47 @ GREENBRIER CREEK 2.5 MI NE OF APPLING CITY Length: 0.18

Total Project Cost: Total Project Authorizations:

$1,886,271 $180,000

Phase PE CST

Fund STP STP

Year 2015 2014

Federal $8,000
$1,357,016

State $2,000
$339,254

Other $0 $0

Total $10,000
$1,696,271

Project: 0011733 Type Work: TE-Bike/Ped Facility
Descp: SR 47 FROM SR 10 TO CS 513/SOUTH HICKS STREET IN HARLEM Length: 0.09

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$250,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 231350- Type Work: Passing Lanes

Descp: SR 47 SB FROM S OF CR 46/RIDGE ROAD TO N

OF KEG CREEK

Lanes: Exist. 2 Prop. 3

Length: 1.48

Total Project Cost: Total Project Authorizations:

$4,301,631 $0

Phase PE CST

Fund STP STP

Year 2014 After 2017

Federal $200,000
Federal $40,000
$3,401,305

State $0

Other $50,000

State $10,000
$850,326

Other $0 $0

Total $250,000
Total $50,000
$4,251,631

Project: 232310- Type Work: Replace Bridge
Descp: SR 47 @ LITTLE RIVER 10.5 MI SE OF LINCOLNTON Length: 1.34

Total Project Cost: Total Project Authorizations:

$20,611,147 $0

Phase PE
ROW CST

Fund STP STP Bridge

Project: M004706 Type Work: Resurface & Maintenance
Descp: SR 223 FROM MCDUFFIE COUNTY LINE TO W OF CS 696/CREEKSIDE DR Length: 11.74

Phase CST

Fund STP

Total Project Cost: Total Project Authorizations:

$2,055,495 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Year 2014 2014 2014
Year LUMP

Federal $8,000
$49,240 $16,431,678

State $2,000
$12,310 $4,107,919

Other $0 $0 $0

Total $10,000 $61,550
$20,539,597

Federal $1,644,396

Also in Lincoln County

State $411,099

Other $0

Total $2,055,495

Page 131 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: M004792 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 2 Length: 0.00

Phase CST

Fund State

Year 2014

Federal $0

State $200,000

Other $0

Total $200,000

Total Project Cost: Total Project Authorizations:

$200,000 $0

Also in Baldwin, Bleckley, Burke, Dodge, Emanuel, Glascock, Greene, Hancock, Jasper, Jefferson, Jenkins, Johnson, Laurens, Lincoln, McDuffie, Morgan, Newton, Oglethorpe, Putnam, Richmond, Screven, Taliaferro, Treutlen, Warren, Washington, Wilkes, Wilkinson County

Project PI#
0007168 0007168 231350232310232310232310M004792

Year
2015 2014 2014 2014 2014 2014 2014

Columbia Totals Summary

County Summary excludes lump sum projects.

This County is also located in a MPO area. Additional Projects may be listed in the MPO TIP.

Phase

Fund

Federal

State

Other

PE

STP

$8,000

$2,000

$0

CST

STP

$1,357,016

$339,254

$0

PE

STP

$40,000

$10,000

$0

PE

STP

$4,000

$1,000

$0

ROW

STP

$24,620

$6,155

$0

CST

Bridge

$8,215,839

$2,053,960

$0

CST

State

$0

$6,000

$0

Total
$10,000 $1,696,271
$50,000 $5,000
$30,775 $10,269,799
$6,000

$9,649,475

$2,418,369

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

$12,067,844

Page 132 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Cook
Project: 0010585 Type Work: TE-Bike/Ped Facility
Descp: SR 7 FROM CS 666/7TH STREET TO CS 733/EAST ROGERS STREET Length: 0.53

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$312,500 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: M004794 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 4 Length: 0.00

Phase CST

Fund State

Year 2014

Total Project Cost: Total Project Authorizations:

$200,000 $0

Federal $250,000
Federal $0

Cook Totals Summary
County Summary excludes lump sum projects.

State $0

Other $62,500

Total $312,500

State $200,000

Other $0

Total $200,000

Also in Atkinson, Baker, Ben Hill, Berrien, Brooks, Calhoun, Clay, Clinch, Coffee, Colquitt, Crisp, Decatur, Dougherty, Early, Echols, Grady, Irwin, Lanier, Lee, Lowndes, Miller, Mitchell, Quitman, Randolph, Seminole, Terrell, Thomas, Tift, Turner, Wilcox, Worth County

Project PI# M004794

Year 2014

Phase CST

Fund State

Federal $0

State $4,000

Other $0

$0

$4,000

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $4,000 $4,000

Page 133 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Crawford
Project: 0010452 Type Work: Sidewalks
Descp: CRAWFORD COUNTY ELEMENTARY; MIDDLE & THE EAGLES NEST - SRTS Length: 0.69

Phase CST

Fund Safety

Year LUMP

Total Project Cost: Total Project Authorizations:

$234,536 $0

Uses Lump Sum Bank: SAFE ROUTES TO SCHOOL INFRASTRUCTURE FOR FY 2014 - FY 2017

Project: 0011681 Type Work: Replace Bridge Descp: SR 22 @ BAILEY BRANCH 8 MI W OF ROBERTA
Length: 0.40

Total Project Cost: Total Project Authorizations:

$1,239,841 $488,443

Phase PE
ROW CST UTL

Fund STP STP STP STP

Year 2013 2015 2017 2017

Federal $234,536

State $0

Other $0

Federal $390,755 $124,848 $432,973 $43,297

State $97,689 $31,212
$108,243 $10,824

Other $0 $0 $0 $0

Total $234,536
Total $488,443 $156,060 $541,216 $54,122

Project: M004569 Type Work: Bridges
Descp: SR 22 @ CULPEPPER CREEK - CULVERT REHAB & SCOUR REPAIR Length: 0.40

Phase CST

Fund STP

Year 2014

Total Project Cost: Total Project Authorizations:

$79,794 $79,794

Uses Lump Sum Bank: BRIDGE MAINTENANCE/PAINTING FOR FY 2014 - FY 2017

Project: M004779 Type Work: Pavement Markings
Descp: I-75 FROM N OF SR 96/PEACH TO N OF ECHECONNEE CREEK/BIBB Length: 10.16

Phase CST

Fund NHPP

Year 2014

Total Project Cost: Total Project Authorizations:

$1,742,418 $1,742,418

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Project: M004793 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 3 Length: 0.00

Phase CST

Fund State

Year 2014

Total Project Cost: Total Project Authorizations:

$200,000 $0

Federal $63,835

State $15,959

Other $0

Total $79,794

Federal $1,742,418

State $0

Other $0

Total $1,742,418

Federal $0

Also in Bibb, Peach County

State $200,000

Other $0

Total $200,000

Also in Bibb, Butts, Chattahoochee, Coweta, Dooly, Fayette, Harris, Heard, Henry, Houston, Jones, Lamar, Macon, Marion, Meriwether, Monroe, Muscogee, Peach, Pike, Pulaski, Schley, Spalding, Stewart, Sumter, Talbot, Taylor, Troup, Twiggs, Upson, Webster County

Page 134 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Crawford Totals Summary
County Summary excludes lump sum projects.

Project PI#
0011681 0011681 0011681 M004793

Year
2015 2017 2017 2014

Phase
ROW CST UTL CST

Fund STP STP STP State

Federal
$124,848 $432,973
$43,297 $0

State
$31,212 $108,243
$10,824 $6,000

Other
$0 $0 $0 $0

$601,118

$156,280

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $156,060 $541,216 $54,122 $6,000
$757,398

Page 135 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Crisp

Project: 0000481 Type Work: Widening

Descp: SR 30/SR 90 FROM 4 LN @ I-75 TO MIDWAY RD IN

CORDELE

Lanes: Exist. 3 Prop. 5

Length: 0.25

Total Project Cost: Total Project Authorizations:

$4,745,665 $0

Phase ROW CST UTL

Fund NHPP NHPP NHPP

Year 2015 2016 2016

Federal $401,362
$3,045,601 $349,568

State $100,341 $761,400
$87,392

Other $0 $0 $0

Total $501,703
$3,807,002 $436,960

Project: 0010598 Type Work: TE-Bike/Ped Facility
Descp: CR 1/PATEVILLE RD; CR 468/10TH ST & CS 624/25TH AVE @ 3 LOCS Length: 0.68

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$500,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 0011747 Type Work: TE-Bike/Ped Facility
Descp: CS 688/PECAN ST FM SR 30/SR 90 TO CS 655/8TH AVE IN CORDELE Length: 0.63

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$250,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 0012693 Type Work: RRX Warning Device
Descp: CR 365/24TH AVE @ HGR #723158K SW OF CORDELE Length: 0.20

Phase CST

Fund HSIP

Year 2014

Total Project Cost: Total Project Authorizations:

$122,114 $0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2014 - FY 2017

Project: 0012797 Type Work: RRX Signing & Marking
Descp: SIGNING & MARKING @ 47 RR LOCS IN CRISP; DODGE & WILCOX Length: 0.00

Phase PE CST

Fund HSIP HSIP

Year LUMP LUMP

Total Project Cost: Total Project Authorizations:

$275,000 $0

Uses Lump Sum Bank: RAILROAD CROSSING HAZARD ELIMINATION FOR FY 2014 - FY 2017

Federal $400,000
Federal $200,000
Federal $122,114
Federal $25,000
$250,000

State $0

Other $100,000

Total $500,000

State $0

Other $50,000

Total $250,000

State $0

Other $0

Total $122,114

State $0 $0

Other $0 $0

Total $25,000
$250,000

Also in Dodge, Wilcox County

Page 136 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: M004794 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 4 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Project: M004803 Type Work: Resurface & Maintenance
Descp: SR 300 FROM S OF CR 29/OLD CONLEY ROAD TO S OF SR 300 CONN Length: 5.60

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$2,150,000 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Project: M004805 Type Work: Resurface & Maintenance
Descp: I-75 FROM SR 159/TURNER TO N OF CR 355/OLD HATLEY RD/CRISP Length: 14.37

Total Project Cost: Total Project Authorizations:

$50,000 $0

Phase PE

Fund NHPP

Year LUMP

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Federal $0
Federal $1,720,000
Federal $45,000

State $200,000

Other $0

Total $200,000

State

Also in Atkinson, Baker, Ben Hill,

Berrien, Brooks, Calhoun, Clay,

Clinch, Coffee, Colquitt, Cook,

Decatur, Dougherty, Early,

Echols, Grady, Irwin, Lanier, Lee,

Lowndes, Miller, Mitchell,

Quitman, Randolph, Seminole,

Terrell, Thomas, Tift, Turner,

Wilcox, Worth County

Other

Total

$430,000

$0

$2,150,000

State $5,000

Other $0

Total $50,000

Also in Turner County

Crisp Totals Summary
County Summary excludes lump sum projects.

Project PI#
0000481 0000481 0000481 M004794

Year
2015 2016 2016 2014

Phase
ROW CST UTL CST

Fund NHPP NHPP NHPP State

Federal
$401,362 $3,045,601
$349,568 $0

State
$100,341 $761,400
$87,392 $4,000

Other
$0 $0 $0 $0

$3,796,532

$953,133

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $501,703
$3,807,002 $436,960 $4,000
$4,749,665

Page 137 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Dade
Project: 0009021 Type Work: TE-Bike/Ped Facility Descp: TRENTON DOWNTOWN STREETSCAPING
Length: 0.00

Phase CST

Fund STP

Year LUMP

Federal $288,400

Total Project Cost: Total Project Authorizations:

$360,500 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 0010114 Type Work: Lighting Descp: I-59 @ SR 136 INTERCHANGE - LIGHTING
Length: 0.40

Phase CST

Fund NHPP

Year LUMP

Federal $558,743

Total Project Cost: Total Project Authorizations:

$620,826 $0

Uses Lump Sum Bank: INTERCHANGE/ROADWAY LIGHTING FOR FY 2014 - FY 2017

Project: 0010448 Type Work: Signals
Descp: SR 1 @ 3 LOC; SR 2 @ 5 LOC; SR 136 @ 3 LOC &SR 146 @ 2 LOC Length: 0.00

Phase ROW CST

Fund STP STP

Year LUMP LUMP

Federal $520,200
$1,014,390

Total Project Cost: Total Project Authorizations:

$1,534,590 $0

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2014 - FY 2017

Project: M004513 Type Work: Signing Descp: I-59 @ 4 LOCS - SIGN UPGRADES
Length: 1.60

Phase PE CST

Fund NHPP NHPP

Year LUMP LUMP

Federal $10,000
$970,919

Total Project Cost: Total Project Authorizations:

$980,919 $0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Project: M004514 Type Work: Signing Descp: I-24 @ I-59 & @ SR 299 - SIGN UPGRADES
Length: 0.80

Phase PE CST

Fund NHPP NHPP

Year LUMP LUMP

Federal $10,000
$1,148,781

Total Project Cost: Total Project Authorizations:

$1,158,781 $0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

State $0

Other $72,100

Total $360,500

State $62,083

Other $0

Total $620,826

State $0 $0

Other $0 $0

Total $520,200
$1,014,390

Also in Catoosa, Walker County

State $0 $0

Other $0 $0

Total $10,000
$970,919

State $0 $0

Other $0 $0

Total $10,000
$1,148,781

Page 138 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: M004796 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 6 Length: 0.00

Phase CST

Fund State

Year 2014

Federal $0

State $200,000

Other $0

Total $200,000

Total Project Cost: Total Project Authorizations:

$200,000 $0

Also in Bartow, Carroll, Catoosa, Chattooga, Cherokee, Fannin, Floyd, Gilmer, Gordon, Haralson, Murray, Paulding, Pickens, Polk, Walker, Whitfield County

Project PI# M004796

Year 2014

Dade Totals Summary

County Summary excludes lump sum projects.

This County is also located in a MPO area. Additional Projects may be listed in the MPO TIP.

Phase

Fund

Federal

State

Other

CST

State

$0

$6,000

$0

Total $6,000

$0

$6,000

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

$6,000

Page 139 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Dawson

Project: 0000315 Type Work: Intersection Improvement

Descp: SR 52 RELOCATION @ SR 183 EXTENSION / MP

3.7 TO 5.3

Lanes: Exist. 0 Prop. 4

Length: 1.60

Total Project Cost: Total Project Authorizations:

$5,627,473 $489,889

Phase ROW CST

Fund NHPP NHPP

Year 2017 After 2017

Federal $263,896
$3,846,171

State $65,974
$961,543

Other $0 $0

Total $329,870
$4,807,714

Project: 0007030 Type Work: Replace Bridge Descp: SR 9 @ ETOWAH RIVER
Length: 0.40

Total Project Cost: Total Project Authorizations:

$3,436,260 $0

Phase PE
ROW CST UTL

Fund STP STP STP STP

Year 2015 2014 2015 2015

Federal $8,000
$134,640 $1,767,903
$838,464

State $2,000
$33,660 $441,976 $209,616

Other $0 $0 $0 $0

Total $10,000
$168,300 $2,209,879 $1,048,080

Project: 0007169 Type Work: Replace Bridge
Descp: SR 136 @ ETOWAH RIVER 5.7 MI EAST OF DAWSONVILLE Length: 0.32

Total Project Cost: Total Project Authorizations:

$2,222,090 $0

Phase PE
ROW CST

Fund STP STP STP

Year 2015 2015 2017

Federal $8,000
$155,361 $1,614,311

State $2,000
$38,840 $403,578

Other $0 $0 $0

Total $10,000
$194,201 $2,017,889

Project: 0009022 Type Work: TE-Bike/Ped Facility
Descp: DAWSON COUNTY COMMUNITY CULTURAL TRAILWAY - PHASE I Length: 0.00

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$482,241 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 0009938 Type Work: Roundabout Descp: SR 53 @ SR 183
Length: 0.56

Phase ROW CST UTL

Fund HSIP HSIP HSIP

Year LUMP LUMP LUMP

Total Project Cost: Total Project Authorizations:

$2,326,528 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Federal $385,793
Federal $842,000
$1,466,528 $18,000

State $0

Other $96,448

State $0 $0 $0

Other $0 $0 $0

Total $482,241
Total $842,000
$1,466,528 $18,000

Page 140 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 132790- Type Work: Intersection Improvement Descp: SR 400 @ SR 53/CORR A1

Length: 1.37

Total Project Cost: Total Project Authorizations:

$18,474,369 $9,590,000

Phase ROW ROW ROW ROW CST UTL

Fund App Dev App Dev App Dev App Dev App Dev
Local

Year 2013 2013 2013 2013 2015 2015

Federal $228,197
$2,187,165 $3,847,087 $1,409,551 $8,403,369
$0

State $57,049
$546,791 $961,772 $352,388
$0 $0

Other $0 $0 $0 $0 $0
$481,000

Total $285,246
$2,733,956 $4,808,859 $1,761,939 $8,403,369
$481,000

Project: M004697 Type Work: Bridges
Descp: SR 136 @ SHOAL CREEK & @ BURT CREEK & SR 56 @ OPEN CREEK Length: 1.20

Phase PE CST

Fund STP STP

Total Project Cost: Total Project Authorizations:

$366,144 $116,144

Uses Lump Sum Bank: BRIDGE MAINTENANCE/PAINTING FOR FY 2014 - FY 2017

Project: M004791 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 1 Length: 0.00

Phase CST

Fund State

Total Project Cost: Total Project Authorizations:

$200,000 $0

Year 2013 LUMP
Year 2014

Federal $92,915
$200,000
Federal $0

Dawson Totals Summary
County Summary excludes lump sum projects.

State $23,229 $50,000

Other $0 $0

Total $116,144 $250,000

Also in Emanuel County

State $200,000

Other $0

Total $200,000

Also in Banks, Barrow, Clarke, Elbert, Forsyth, Franklin, Gwinnett, Habersham, Hall, Hart, Jackson, Lumpkin, Madison, Oconee, Rabun, Stephens, Towns, Union, Walton, White County

Project PI#
0000315 0007030 0007030 0007030 0007030 0007169 0007169 0007169 132790132790M004791

Year
2017 2015 2014 2015 2015 2015 2015 2017 2015 2015 2014

Phase
ROW PE
ROW CST UTL PE ROW CST CST UTL CST

Fund NHPP STP STP STP STP STP STP STP App Dev Local State

Federal
$263,896 $8,000
$134,640 $1,767,903
$838,464 $8,000
$155,361 $1,614,311 $8,403,369
$0 $0

State
$65,974 $2,000
$33,660 $441,976 $209,616
$2,000 $38,840 $403,578
$0 $0 $8,000

Other
$0 $0 $0 $0 $0 $0 $0 $0 $0 $481,000 $0

$13,193,944

$1,205,644

$481,000

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total
$329,870 $10,000
$168,300 $2,209,879 $1,048,080
$10,000 $194,201 $2,017,889 $8,403,369 $481,000
$8,000
$14,880,588

Page 141 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Decatur
Project: 0007171 Type Work: Replace Bridge
Descp: SR 97 @ BIG SLOUGH 3.2 MI NORTHEAST OF BAINBRIDGE Length: 0.45

Total Project Cost: Total Project Authorizations:

$2,243,061 $0

Phase ROW CST UTL

Fund STP STP STP

Year 2014 2015 2015

Federal $147,696
$1,605,969 $40,784

State $36,924
$401,492 $10,196

Other $0 $0 $0

Total $184,620
$2,007,461 $50,980

Project: 0007608 Type Work: Streetscapes
Descp: DOWNTOWN STREETSCAPE IN BAINBRIDGE PHASE III Length: 0.12

Total Project Cost: Total Project Authorizations:

$224,975 $224,975

Phase CST CST

Fund HPP HPP

Year 2014 2014

Federal $145,761 $34,219

State $0 $0

Other $36,440 $8,555

Total $182,201 $42,774

Project: 0010599 Type Work: TE-Bike/Ped Facility
Descp: CS 617/W WATER ST @ 1 LOC & CS 618/W BROUGHTON ST @ 1 LOC Length: 0.56

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$812,500 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 0010926 Type Work: Intersection Improvement Descp: SR 38BU/US 84BU @ SR 38/US 84
Length: 0.40

Phase CST

Fund HSIP

Year LUMP

Total Project Cost: Total Project Authorizations:

$612,000 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 0011683 Type Work: Replace Bridge
Descp: SR 253 @ SPRING CREEK 12 MI SW OF BAINBRIDGE Length: 0.40

Total Project Cost: Total Project Authorizations:

$2,508,560 $350,000

Phase PE
ROW CST UTL

Fund STP STP STP STP

Year 2013 2015 2017 2017

Federal $650,000

State $0

Other $162,500

Federal $550,800

State $61,200

Other $0

Federal $280,000 $124,848
$1,558,702 $43,297

State $70,000 $31,212
$389,676 $10,824

Other $0 $0 $0 $0

Total $812,500
Total $612,000
Total $350,000 $156,060
$1,948,378 $54,122

Page 142 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: M004389 Type Work: Resurface & Maintenance Descp: SR 1BU FROM SR 38BU TO SR 97

Length: 0.82

Total Project Cost: Total Project Authorizations:

$138,605 $0

Phase CST

Fund NHPP

Year LUMP

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Project: M004794 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 4 Length: 0.00

Phase CST

Fund State

Year 2014

Total Project Cost: Total Project Authorizations:

$200,000 $0

Project: M004895 Type Work: Resurface & Maintenance Descp: SR 1/US 27 FROM SR 38 TO SR 38
Length: 3.20

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations:

$1,067,658 $0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Federal $110,884
Federal $0
Federal $854,126

State $27,721

Other $0

Total $138,605

State $200,000

Other $0

Total $200,000

State

Also in Atkinson, Baker, Ben Hill,

Berrien, Brooks, Calhoun, Clay,

Clinch, Coffee, Colquitt, Cook,

Crisp, Dougherty, Early, Echols,

Grady, Irwin, Lanier, Lee,

Lowndes, Miller, Mitchell,

Quitman, Randolph, Seminole,

Terrell, Thomas, Tift, Turner,

Wilcox, Worth County

Other

Total

$213,532

$0

$1,067,658

Decatur Totals Summary
County Summary excludes lump sum projects.

Project PI#
0007171 0007171 0007171 0007608 0007608 0011683 0011683 0011683 M004794

Year
2014 2015 2015 2014 2014 2015 2017 2017 2014

Phase
ROW CST UTL CST CST ROW CST UTL CST

Fund STP STP STP HPP HPP STP STP STP State

Federal
$147,696 $1,605,969
$40,784 $34,219 $145,761 $124,848 $1,558,702 $43,297
$0

State
$36,924 $401,492
$10,196 $0 $0
$31,212 $389,676
$10,824 $10,000

Other
$0 $0 $0 $8,555 $36,440 $0 $0 $0 $0

$3,701,276

$890,324

$44,995

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $184,620
$2,007,461 $50,980 $42,774
$182,201 $156,060 $1,948,378
$54,122 $10,000
$4,636,595

Page 143 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Dodge
Project: 0008953 Type Work: RRX Warning Device
Descp: CR 228/GARRISON ROAD/CLARENCE BROWN ROAD @ NS #729365A Length: 0.20

Phase CST

Fund HSIP

Year LUMP

Total Project Cost: Total Project Authorizations:

$189,426 $0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2014 - FY 2017

Project: 0012797 Type Work: RRX Signing & Marking
Descp: SIGNING & MARKING @ 47 RR LOCS IN CRISP; DODGE & WILCOX Length: 0.00

Phase PE CST

Fund HSIP HSIP

Year LUMP LUMP

Total Project Cost: Total Project Authorizations:

$275,000 $0

Uses Lump Sum Bank: RAILROAD CROSSING HAZARD ELIMINATION FOR FY 2014 - FY 2017

Project: 0012842 Type Work: RRX Consolidation
Descp: CS 711/WILCOX STREET@ NS #729355U IN CHAUNCEY Length: 0.02

Phase CST

Fund HSIP

Year 2014

Total Project Cost: Total Project Authorizations:

$7,500 $7,500

Uses Lump Sum Bank: RAILROAD CROSSING HAZARD ELIMINATION FOR FY 2014 - FY 2017

Project: 221975- Type Work: New Construction

Descp: NW EASTMAN BYP FM SR 27/US 341 NE TO SR

87/US 23 -TIA

Lanes: Exist. 0 Prop. 4

Length: 2.50

Phase PE CST CST

Fund STP State STP

Year 2013 2014 2014

Total Project Cost: Total Project Authorizations:

$9,006,175 $9,006,175

Federal $189,426

State $0

Other $0

Total $189,426

Federal $25,000
$250,000

State $0 $0

Other $0 $0

Total $25,000
$250,000

Federal $7,500

Also in Crisp, Wilcox County

State $0

Other $0

Total $7,500

Federal $620,000 $0
$5,222,440

State $155,000
$0 $1,305,610

Other $0
$1,703,125 $0

Total $775,000
$1,703,125 $6,528,050

Project: 222410- Type Work: Widening

Descp: SR 87/US 23 FM LOG CABIN/DODGE TO S OF SR

257/BLECKLEY-TIA

Lanes: Exist. 2 Prop. 4

Length: 9.50

Total Project Cost: Total Project Authorizations:

$31,471,131 $0

Phase PE CST CST UTL

Fund STP State STP Local

Year 2014 2017 2017 2017

Federal $120,000 $0
$18,501,910 $0

State $30,000 $0
$4,625,477 $0

Other $0
$7,459,999 $0
$733,745

Total $150,000
$7,459,999 $23,127,387
$733,745

Also in Bleckley County

Page 144 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: M004792 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 2 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Federal $0

Dodge Totals Summary
County Summary excludes lump sum projects.

State $200,000

Other $0

Total $200,000

Also in Baldwin, Bleckley, Burke, Columbia, Emanuel, Glascock, Greene, Hancock, Jasper, Jefferson, Jenkins, Johnson, Laurens, Lincoln, McDuffie, Morgan, Newton, Oglethorpe, Putnam, Richmond, Screven, Taliaferro, Treutlen, Warren, Washington, Wilkes, Wilkinson County

Project PI#
221975221975222410222410222410222410M004792

Year
2014 2014 2014 2017 2017 2017 2014

Phase
CST CST PE CST CST UTL CST

Fund STP State STP STP State Local State

Federal
$5,222,440 $0
$100,800 $15,541,604
$0 $0 $0

State
$1,305,610 $0
$25,200 $3,885,401
$0 $0 $8,000

Other
$0 $1,703,125
$0 $0 $6,266,399 $616,346 $0

$20,864,844

$5,224,211

$8,585,870

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $6,528,050 $1,703,125 $126,000
$19,427,005 $6,266,399 $616,346 $8,000
$34,674,925

Page 145 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Dooly
Project: 0005320 Type Work: Interchange Descp: I-75 @ SR 215
Length: 1.89

Total Project Cost: Total Project Authorizations:

$18,633,032 $3,800,000

Phase PE
ROW CST UTL

Fund NHPP NHPP NHPP NHPP

Year 2014 2014 2015 2015

Federal $640,000
$3,040,000 $10,060,433
$1,165,992

State $160,000 $760,000 $2,515,108 $291,498

Other $0 $0 $0 $0

Total $800,000
$3,800,000 $12,575,542
$1,457,490

Project: 0007172 Type Work: Replace Bridge Descp: SR 230 @ TURKEY CREEK S OF BYROMVILLE
Length: 0.40

Total Project Cost: Total Project Authorizations:

$1,240,936 $0

Phase ROW CST

Fund STP STP

Year 2014 2016

Federal $87,312
$905,436

State $21,828
$226,359

Other $0 $0

Total $109,140
$1,131,796

Project: 0007173 Type Work: Replace Bridge
Descp: SR 230 @ TURKEY CREEK 5.5 MI NORTHEAST OF BYROMVILLE Length: 0.14

Total Project Cost: Total Project Authorizations:

$1,250,833 $90,000

Phase PE
ROW CST UTL

Fund STP STP STP STP

Year 2016 2013 2014 2014

Federal $8,000
$72,000 $902,314
$18,353

State $2,000
$18,000 $225,579
$4,588

Other $0 $0 $0 $0

Total $10,000 $90,000
$1,127,893 $22,941

Project: 0010600 Type Work: TE-Bike/Ped Facility
Descp: SR 7 @ 2 LOCS & CS 741/COTTON STREET @ 1 LOC IN VIENNA Length: 0.28

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$293,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 0010601 Type Work: TE-Bike/Ped Facility
Descp: SR 7 @ 1 LOC; SR 230 @ 1 LOC & CS 533/THIRD STREET @ 1 LOC Length: 0.27

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$625,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Federal $234,400
Federal $500,000

State $0

Other $58,600

State $0

Other $125,000

Total $293,000
Total $625,000

Page 146 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 311665- Type Work: Interchange Descp: I-75 @ SR 27 - WIDEN BRIDGE & RAMPS

Length: 0.70

Total Project Cost: Total Project Authorizations:

$19,104,950 $0

Phase PE CST UTL

Fund NHPP NHPP NHPP

Year 2014 2015 2015

Federal $40,000
$14,342,300 $901,660

State $10,000
$3,585,575 $225,415

Other $0 $0 $0

Total $50,000
$17,927,875 $1,127,075

Project: M004618 Type Work: Resurface & Maintenance
Descp: SR 7 FROM N OF I-75/DOOLY TO S OF SR 124/SR 224/HOUSTON Length: 15.18

Phase CST

Fund STP

Total Project Cost: Total Project Authorizations:

$2,553,538 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Project: M004793 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 3 Length: 0.00

Phase CST

Fund State

Total Project Cost: Total Project Authorizations:

$200,000 $0

Year LUMP
Year 2014

Federal $2,042,831
Federal $0

State $510,708

Other $0

Total $2,553,538

Also in Houston County

State $200,000

Other $0

Total $200,000

Also in Bibb, Butts, Chattahoochee, Coweta, Crawford, Fayette, Harris, Heard, Henry, Houston, Jones, Lamar, Macon, Marion, Meriwether, Monroe, Muscogee, Peach, Pike, Pulaski, Schley, Spalding, Stewart, Sumter, Talbot, Taylor, Troup, Twiggs, Upson, Webster County

Page 147 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Dooly Totals Summary
County Summary excludes lump sum projects.

Project PI#
0005320 0005320 0005320 0005320 0007172 0007172 0007173 0007173 0007173 311665311665311665M004793

Year
2014 2014 2015 2015 2014 2016 2016 2014 2014 2014 2015 2015 2014

Phase
PE ROW CST UTL ROW CST
PE CST UTL PE CST UTL CST

Fund NHPP NHPP NHPP NHPP STP STP STP STP STP NHPP NHPP NHPP State

Federal
$640,000 $3,040,000 $10,060,433 $1,165,992
$87,312 $905,436
$8,000 $902,314
$18,353 $40,000 $14,342,300 $901,660
$0

State
$160,000 $760,000 $2,515,108 $291,498
$21,828 $226,359
$2,000 $225,579
$4,588 $10,000 $3,585,575 $225,415
$8,000

Other
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

$32,111,801

$8,035,950

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total
$800,000 $3,800,000 $12,575,542 $1,457,490
$109,140 $1,131,796
$10,000 $1,127,893
$22,941 $50,000 $17,927,875 $1,127,075
$8,000
$40,147,751

Page 148 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Early
Project: 0006112 Type Work: RRX Warning Device Descp: CS 630/ARLINGTON AVE @ NS #733632H
Length: 0.40

Phase CST

Fund HSIP

Year LUMP

Total Project Cost: Total Project Authorizations:

$185,239 $0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2014 - FY 2017

Project: 0009036 Type Work: TE-Bike/Ped Facility Descp: BLAKELY GATEWAY PROJECT
Length: 0.00

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$1,000,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: M004794 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 4 Length: 0.00

Phase CST

Fund State

Year 2014

Total Project Cost: Total Project Authorizations:

$200,000 $0

Federal $185,239
Federal $800,000
Federal $0

Early Totals Summary
County Summary excludes lump sum projects.

State $0

Other $0

Total $185,239

State $0

Other $200,000

Total $1,000,000

State $200,000

Other $0

Total $200,000

Also in Atkinson, Baker, Ben Hill, Berrien, Brooks, Calhoun, Clay, Clinch, Coffee, Colquitt, Cook, Crisp, Decatur, Dougherty, Echols, Grady, Irwin, Lanier, Lee, Lowndes, Miller, Mitchell, Quitman, Randolph, Seminole, Terrell, Thomas, Tift, Turner, Wilcox, Worth County

Project PI# M004794

Year 2014

Phase CST

Fund State

Federal $0

State $8,000

Other $0

$0

$8,000

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $8,000 $8,000

Page 149 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Echols
Project: M004794 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 4 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Project: M004801 Type Work: Resurface & Maintenance Descp: SR 7 FROM FLORIDA STATE LINE TO NSR
Length: 5.30

Phase CST

Fund STP

Total Project Cost: Total Project Authorizations:

$1,100,000 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Year LUMP

Federal $0
Federal $880,000

State $200,000

Other $0

Total $200,000

State

Also in Atkinson, Baker, Ben Hill,

Berrien, Brooks, Calhoun, Clay,

Clinch, Coffee, Colquitt, Cook,

Crisp, Decatur, Dougherty, Early,

Grady, Irwin, Lanier, Lee,

Lowndes, Miller, Mitchell,

Quitman, Randolph, Seminole,

Terrell, Thomas, Tift, Turner,

Wilcox, Worth County

Other

Total

$220,000

$0

$1,100,000

Also in Lowndes County

Echols Totals Summary
County Summary excludes lump sum projects.

Project PI# M004794

Year 2014

Phase CST

Fund State

Federal $0

State $6,000

Other $0

$0

$6,000

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $6,000 $6,000

Page 150 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Effingham

Project: 0004913 Type Work: Widening

Descp: SR 119 FROM USHER ROAD TO SR 21 FOR

CENTER TURN LANE

Lanes: Exist. 2 Prop. 3

Length: 3.00

Total Project Cost: Total Project Authorizations:

$2,032,706 $0

Phase ROW CST

Fund STP STP

Year 2015 After 2017

Federal $394,520
$1,231,645

State $98,630
$307,911

Other $0 $0

Total $493,150
$1,539,557

Project: 0006700 Type Work: New Construction

Descp: EFFINGHAM PKWY FROM SR 119/EFFINGHAM TO

SR 30/CHATHAM

Lanes: Exist. 0 Prop. 4

Length: 14.40

Total Project Cost: Total Project Authorizations:

$105,202,837 $0

Phase PE
ROW CST UTL

Fund STP Local STP Local

Year After 2017
2015 After 2017 After 2017

Federal $87,768 $0
$63,316,110 $0

State $21,942 $0
$15,829,027 $0

Other $0
$24,752,156 $0
$1,195,834

Total $109,710
$24,752,156 $79,145,137
$1,195,834

Also in Chatham County

Project: 0009437 Type Work: RRX Surface Rehab/Recst Descp: CR 115/INDIGO ROAD @ CSX #635134E
Length: 0.40

Phase CST

Fund HSIP

Year LUMP

Federal $79,591

State $0

Other $0

Total $79,591

Total Project Cost: Total Project Authorizations:

$79,591 $0

Uses Lump Sum Bank: RAILROAD CROSSING HAZARD ELIMINATION FOR FY 2014 - FY 2017

Project: 0009870 Type Work: Roundabout Descp: SR 17 @ SR 119
Length: 0.50

Phase ROW CST UTL

Fund HSIP HSIP HSIP

Year LUMP LUMP LUMP

Federal $242,000
$1,746,000 $75,000

State $0 $0 $0

Other $0 $0 $0

Total $242,000
$1,746,000 $75,000

Total Project Cost: Total Project Authorizations:

$2,063,000 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 0009872 Type Work: Roundabout Descp: SR 275 @ CR 307/RINCON-STILL ROAD
Length: 0.40

Phase ROW CST

Fund Safety Safety

Year LUMP LUMP

Federal $150,000 $884,340

State $0 $0

Other $0 $0

Total $150,000 $884,340

Total Project Cost: Total Project Authorizations:

$1,034,340 $0

Uses Lump Sum Bank: HIGH RISK RURAL ROADS FOR FY 2014 - FY 2017

Page 151 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0010434 Type Work: Intersection Improvement
Descp: CR 156/BLUE JAY RD/BLANFORD RD @ CR 143/CR 176/MCCALL RD Length: 0.40

Total Project Cost: Total Project Authorizations:

$905,000 $0

Phase PE CST

Fund Safety Safety

Year LUMP LUMP

Uses Lump Sum Bank: HIGH RISK RURAL ROADS FOR FY 2014 - FY 2017

Project: 0010869 Type Work: TE-Bike/Ped Facility
Descp: SR 21BU FROM CS 610/1ST STREET TO SR 119 IN SPRINGFIELD Length: 0.19

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$375,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: M004630 Type Work: Resurface & Maintenance
Descp: SR 21 FROM 0.20 MI N OF NS #916917C TO JACKS BRANCH Length: 6.64

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations:

$6,352,428 $0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Project: M004795 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 5 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Federal $225,000 $589,500
Federal $300,000
Federal $5,081,942
Federal $0

Effingham Totals Summary
County Summary excludes lump sum projects.

State $25,000 $65,500

Other $0 $0

Total $250,000 $655,000

State $0

Other $75,000

Total $375,000

State $1,270,486

Other $0

Total $6,352,428

State $200,000

Other $0

Total $200,000

Also in Appling, Bacon, Brantley, Bryan, Bulloch, Camden, Candler, Charlton, Chatham, Evans, Glynn, Jeff Davis, Liberty, Long, McIntosh, Montgomery, Pierce, Tattnall, Telfair, Toombs, Ware, Wayne, Wheeler County

Project PI# 0004913 0006700 M004795

Year 2015 2015 2014

Phase ROW ROW CST

Fund STP Local State

Federal $394,520 $0 $0

State $98,630 $0 $8,000

Other $0
$22,771,984 $0

$394,520

$106,630

$22,771,984

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $493,150
$22,771,984 $8,000
$23,273,133

Page 152 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Elbert
Project: 0009863 Type Work: Replace Bridge Descp: SR 368 @ PICKENS CREEK
Length: 0.40

Total Project Cost: Total Project Authorizations:

$1,602,773 $0

Phase ROW CST UTL

Fund STP STP STP

Year 2014 2015 2015

Federal $133,008
$1,090,948 $58,262

State $33,252
$272,737 $14,566

Other $0 $0 $0

Total $166,260
$1,363,685 $72,828

Project: 122650- Type Work: Widening

Descp: SR 72 FM WEST CITY LIMITS OF COMER TO E OF

BROAD RVR/ELBERT

Lanes: Exist. 2 Prop. 4

Length: 9.33

Total Project Cost: Total Project Authorizations:

$59,195,999 $330,000

Phase PE CST UTL

Fund NHS NHPP NHPP

Year 2013 2015 2015

Federal $264,000
$46,697,838 $394,961

State $66,000
$11,674,460 $98,740

Other $0 $0 $0

Total $330,000
$58,372,298 $493,701

Also in Madison County

Project: M004791 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 1 Length: 0.00

Phase CST

Fund State

Year 2014

Federal $0

State $200,000

Other $0

Total $200,000

Total Project Cost: Total Project Authorizations:

$200,000 $0

Elbert Totals Summary
County Summary excludes lump sum projects.

Also in Banks, Barrow, Clarke, Dawson, Forsyth, Franklin, Gwinnett, Habersham, Hall, Hart, Jackson, Lumpkin, Madison, Oconee, Rabun, Stephens, Towns, Union, Walton, White County

Project PI#
0009863 0009863 0009863 122650122650M004791

Year
2014 2015 2015 2015 2015 2014

Phase
ROW CST UTL CST UTL CST

Fund STP STP STP NHPP NHPP State

Federal
$133,008 $1,090,948
$58,262 $31,754,530
$268,573 $0

State
$33,252 $272,737
$14,566 $7,938,632
$67,143 $12,000

Other
$0 $0 $0 $0 $0 $0

$33,305,321

$8,338,330

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $166,260
$1,363,685 $72,828
$39,693,162 $335,717 $12,000
$41,643,652

Page 153 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Emanuel
Project: 0006109 Type Work: RRX Warning Device Descp: CS 818/COLEMAN STREET @ OGE #732673J
Length: 0.20

Phase CST

Fund HSIP

Year LUMP

Total Project Cost: Total Project Authorizations:

$161,338 $0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2014 - FY 2017

Project: 0006516 Type Work: RRX Warning Device Descp: CS 893/GREENE STREET @ G&F #732671V
Length: 0.40

Phase CST

Fund HSIP

Year LUMP

Total Project Cost: Total Project Authorizations:

$191,215 $0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2014 - FY 2017

Project: 0006517 Type Work: RRX Warning Device Descp: CS 814/PINE STREET @ NS/OGE #732680U
Length: 0.40

Phase CST

Fund HSIP

Year LUMP

Total Project Cost: Total Project Authorizations:

$179,264 $0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2014 - FY 2017

Project: 0009917 Type Work: Roundabout Descp: SR 4/US 1 @ SR 57
Length: 0.12

Phase PE CST

Fund HSIP HSIP

Year LUMP LUMP

Total Project Cost: Total Project Authorizations:

$1,061,208 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 0010718 Type Work: TE-Bike/Ped Facility
Descp: SWAINSBORO DOWNTOWN STREETSCAPE IMPROVEMENTS @ 5 LOCS Length: 0.74

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$668,260 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Federal $161,338
Federal $191,215
Federal $179,264
Federal $159,181 $902,027
Federal $534,608

State $0

Other $0

State $0

Other $0

State $0

Other $0

State $0 $0

Other $0 $0

State $0

Other $133,652

Total $161,338
Total $191,215
Total $179,264
Total $159,181 $902,027
Total $668,260

Page 154 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 222630- Type Work: Widening

Descp: SR 4BU/US 1BU FM SWAINSBORO BYPASS N TO

CR 382/INJUNCTION RD

Lanes: Exist. 2 Prop. 5

Length: 1.96

Total Project Cost: Total Project Authorizations:

$5,999,098 $0

Phase PE CST

Fund NHPP NHPP

Year 2014 2014

Federal $112,000
$4,687,278

State $28,000
$1,171,820

Other $0 $0

Total $140,000
$5,859,098

Project: M003880 Type Work: Bridges
Descp: I-16 @ 1 LOC; I-285 @ 4 LOCS - STEEL BEAM REPAIR Length: 2.00

Phase PE CST

Fund NHPP NHPP

Year LUMP LUMP

Total Project Cost: Total Project Authorizations:

$143,531 $0

Uses Lump Sum Bank: INTERSTATE BRIDGE PAINTING/MAINTENANCE FOR FY 2014 - FY 2017

Project: M004189 Type Work: Signing
Descp: I-16 @ 12 LOCS BETWEEN BLECKLEY COUNTY & EMANUEL COUNTY Length: 4.80

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations:

$1,700,000 $0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Project: M004697 Type Work: Bridges
Descp: SR 136 @ SHOAL CREEK & @ BURT CREEK & SR 56 @ OPEN CREEK Length: 1.20

Total Project Cost: Total Project Authorizations:

$366,144 $116,144

Phase PE CST

Fund STP STP

Year 2013 LUMP

Uses Lump Sum Bank: BRIDGE MAINTENANCE/PAINTING FOR FY 2014 - FY 2017

Project: M004792 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 2 Length: 0.00

Phase CST

Fund State

Year 2014

Total Project Cost: Total Project Authorizations:

$200,000 $0

Federal $24,842
$104,336
Federal $1,700,000
Federal $92,915
$200,000
Federal $0

State $2,760
$11,593

Other $0 $0

Total $27,602
$115,928

Also in DeKalb, Fulton County

State $0

Other $0

Total $1,700,000

State

Also in Bleckley, Laurens,

Treutlen County

Other

Total

$23,229

$0

$116,144

$50,000

$0

$250,000

Also in Dawson County

State $200,000

Other $0

Total $200,000

Also in Baldwin, Bleckley, Burke, Columbia, Dodge, Glascock, Greene, Hancock, Jasper, Jefferson, Jenkins, Johnson, Laurens, Lincoln, McDuffie, Morgan, Newton, Oglethorpe, Putnam, Richmond, Screven, Taliaferro, Treutlen, Warren, Washington, Wilkes, Wilkinson County

Page 155 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Emanuel Totals Summary
County Summary excludes lump sum projects.

Project PI# 222630222630M004792

Year 2014 2014 2014

Phase PE CST CST

Fund NHPP NHPP State

Federal $112,000
$4,687,278 $0

State $28,000
$1,171,820 $12,000

Other $0 $0 $0

$4,799,278

$1,211,820

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $140,000
$5,859,098 $12,000
$6,011,098

Page 156 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Evans
Project: 0008297 Type Work: Replace Bridge
Descp: CR 77/DAVID TIPPINS ROAD @ BULL CREEK 5 MI E OF CLAXTON Length: 0.40

Total Project Cost: Total Project Authorizations:

$633,024 $0

Phase PE
ROW CST UTL

Fund STP Local STP STP

Uses Lump Sum Bank: LOW IMPACT BRIDGES FOR FY 2014 - FY 2017

Project: 0012844 Type Work: Signing
Descp: OFF-SYSTEM SAFETY IMPROVEMENTS @ 32 LOCS IN EVANS COUNTY Length: 0.00

Phase CST

Fund HSIP

Total Project Cost: Total Project Authorizations:

$77,000 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: M004795 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 5 Length: 0.00

Phase CST

Fund State

Total Project Cost: Total Project Authorizations:

$200,000 $0

Year LUMP 2016 LUMP LUMP
Year LUMP
Year 2014

Federal $81,600 $0
$408,000 $8,160
Federal $77,000
Federal $0

Evans Totals Summary
County Summary excludes lump sum projects.

State $20,400 $0
$102,000 $2,040

Other $0
$10,824 $0 $0

Total $102,000 $10,824 $510,000 $10,200

State $0

Other $0

Total $77,000

State $200,000

Other $0

Total $200,000

Also in Appling, Bacon, Brantley, Bryan, Bulloch, Camden, Candler, Charlton, Chatham, Effingham, Glynn, Jeff Davis, Liberty, Long, McIntosh, Montgomery, Pierce, Tattnall, Telfair, Toombs, Ware, Wayne, Wheeler County

Project PI# M004795

Year 2014

Phase CST

Fund State

Federal $0

State $4,000

Other $0

$0

$4,000

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $4,000 $4,000

Page 157 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Fannin
Project: 0007456 Type Work: Pedestrian Crossings
Descp: SR 2 @ 2 LOC; SR 3 @ 9 LOC; SR 5 @ 1 LOC IN BARTOW & FANNIN Length: 4.80

Phase ROW CST

Fund HSIP HSIP

Year LUMP LUMP

Total Project Cost: Total Project Authorizations:

$585,830 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 0010677 Type Work: TE-Bike/Ped Facility
Descp: CS 548/EAST MAIN ST FM CS 571/DEPOT ST TO CS 592/MOUNTAIN ST Length: 0.26

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$468,750 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 620490- Type Work: New Construction

Descp: SR 771 FM SR 5 NEAR CR 18 S/MCCAYSVILLE TO

TENN STATE LINE

Lanes: Exist. 0 Prop. 5

Length: 2.05

Total Project Cost: Total Project Authorizations:

$8,939,000 $1,500,000

Phase PE
ROW CST

Fund STP STP STP

Year 2013 2015 After 2017

Federal $158,174 $369,073
Federal $375,000
Federal $1,200,000
$396,800 $5,554,400

State $17,575 $41,008

Other $0 $0

Total $175,749 $410,081

Also in Bartow County

State $0

Other $93,750

Total $468,750

State $300,000
$99,200 $1,388,600

Other $0 $0 $0

Total $1,500,000
$496,000 $6,943,000

Project: 621340- Type Work: Widening

Descp: SR 5 FM SR 2/BLUE RIDGE N TO PROP

MCCAYSVILLE BYP NR CR 138

Lanes: Exist. 2 Prop. 5

Length: 8.00

Total Project Cost: Total Project Authorizations:

$43,964,000 $2,000,000

Phase PE
ROW CST

Fund App Dev App Dev App Dev

Year 2013 2014 2017

Federal $2,000,000 $13,327,000 $28,637,000

State $0 $0 $0

Other $0 $0 $0

Total $2,000,000 $13,327,000 $28,637,000

Project: M003371 Type Work: Miscellaneous Improvements
Descp: SR 60 @ 2 LOCS BTWN CR 5 & CR 244 EMERGENCY SLOPE REPAIR Length: 0.80

Phase ROW CST

Fund STP STP

Total Project Cost: Total Project Authorizations:

$209,775 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Year LUMP LUMP

Federal $30,914
$136,906

State $7,729
$34,227

Other $0 $0

Total $38,643
$171,133

Page 158 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: M004796 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 6 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Federal $0

Fannin Totals Summary
County Summary excludes lump sum projects.

State $200,000

Other $0

Total $200,000

Also in Bartow, Carroll, Catoosa, Chattooga, Cherokee, Dade, Floyd, Gilmer, Gordon, Haralson, Murray, Paulding, Pickens, Polk, Walker, Whitfield County

Project PI#
620490621340621340M004796

Year
2015 2014 2017 2014

Phase
ROW ROW CST CST

Fund STP
App Dev App Dev
State

Federal
$396,800 $13,327,000 $28,637,000
$0

State
$99,200 $0 $0
$14,000

Other
$0 $0 $0 $0

$42,360,800

$113,200

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $496,000
$13,327,000 $28,637,000
$14,000
$42,474,000

Page 159 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Franklin
Project: 0007457 Type Work: Pedestrian Crossings Descp: I-85; SR 8; SR 17; SR 59 & SR 72 @ 12 LOCS
Length: 4.80

Phase ROW CST

Fund HSIP HSIP

Year 2013 LUMP

Total Project Cost: Total Project Authorizations:

$1,822,762 $150,000

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 0010691 Type Work: TE-Bike/Ped Facility
Descp: LAVONIA DOWNTOWN STREETSCAPE ENHANCEMENT @ 5 LOCS - PHASE II Length: 0.39

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$250,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 0010695 Type Work: TE-Bike/Ped Facility
Descp: CS 815/RAILROAD ST @ 1 LOC & CS 830/CS 858/BOWERS ST @ 1 LOC Length: 0.20

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$437,500 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: M004791 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 1 Length: 0.00

Phase CST

Fund State

Year 2014

Total Project Cost: Total Project Authorizations:

$200,000 $0

Project: M004808 Type Work: Resurface & Maintenance
Descp: I-85 FROM N OF SR 63/BANKS TO 0.50 MI S OF SR 17/FRANKLIN Length: 17.77

Phase PE

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations:

$50,000 $0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Federal $135,000
$1,505,486
Federal $200,000
Federal $350,000
Federal $0
Federal $45,000

State $15,000
$167,276

Other $0 $0

Total $150,000
$1,672,762

Also in Hart, Madison County

State $0

Other $50,000

Total $250,000

State $0

Other $87,500

Total $437,500

State $200,000

Other $0

Total $200,000

State

Also in Banks, Barrow, Clarke,

Dawson, Elbert, Forsyth,

Gwinnett, Habersham, Hall, Hart,

Jackson, Lumpkin, Madison,

Oconee, Rabun, Stephens, Towns,

Union, Walton, White County

Other

Total

$5,000

$0

$50,000

Also in Banks County

Page 160 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Franklin Totals Summary
County Summary excludes lump sum projects.

Project PI# M004791

Year 2014

Phase CST

Fund State

Federal $0

State $10,000

Other $0

$0

$10,000

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $10,000 $10,000

Page 161 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Gilmer
Project: 0006612 Type Work: TE-Bike/Ped Facility
Descp: ELLIJAY STREETSCAPE FM SR 282 TO SPRING STREET - PHASE III Length: 0.00

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$375,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 0009061 Type Work: TE-Bike/Ped Facility Descp: ELLIJAY STREETSCAPE - PHASE V
Length: 0.00

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$375,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 631260- Type Work: New Construction

Descp: SR 382 EXT FM CR 239 TO SR 5/SR 515 NEW APD

CORRIDOR

Lanes: Exist. 0 Prop. 2

Length: 0.79

Total Project Cost: Total Project Authorizations:

$9,020,051 $0

Phase ROW CST UTL

Fund STP STP STP

Year 2016 2017 2017

Federal $300,000
Federal $300,000
Federal $2,671,697 $3,944,243
$600,100

State $0

Other $75,000

State $0

Other $75,000

State $667,924 $986,061 $150,025

Other $0 $0 $0

Total $375,000
Total $375,000
Total $3,339,622 $4,930,304
$750,125

Project: M003646 Type Work: Shoulder Work
Descp: SR 282 FROM COURIER STREET TO CR 239/MAIN STREET Length: 0.22

Phase

Fund

CST Emergency

Year LUMP

Total Project Cost: Total Project Authorizations:

$7,000 $0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Project: M004796 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 6 Length: 0.00

Phase CST

Fund State

Year 2014

Total Project Cost: Total Project Authorizations:

$200,000 $0

Federal $5,600
Federal $0

State $1,400

Other $0

Total $7,000

State $200,000

Other $0

Total $200,000

Also in Bartow, Carroll, Catoosa, Chattooga, Cherokee, Dade, Fannin, Floyd, Gordon, Haralson, Murray, Paulding, Pickens, Polk, Walker, Whitfield County

Page 162 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Gilmer Totals Summary
County Summary excludes lump sum projects.

Project PI#
631260631260631260M004796

Year
2016 2017 2017 2014

Phase
ROW CST UTL CST

Fund STP STP STP State

Federal
$2,671,697 $3,944,243
$600,100 $0

State
$667,924 $986,061 $150,025
$14,000

Other
$0 $0 $0 $0

$7,216,041

$1,818,010

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $3,339,622 $4,930,304 $750,125 $14,000
$9,034,051

Page 163 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Glascock
Project: 270710- Type Work: Replace Bridge Descp: CR 50 @ JOES CREEK SW OF GIBSON
Length: 0.20

Total Project Cost: Total Project Authorizations:

$633,024 $0

Phase PE
ROW CST UTL

Uses Lump Sum Bank: LOW IMPACT BRIDGES FOR FY 2014 - FY 2017

Project: M004792 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 2 Length: 0.00

Phase CST

Total Project Cost: Total Project Authorizations:

$200,000 $0

Fund STP Local STP STP
Fund State

Year LUMP 2016 LUMP LUMP
Year 2014

Federal $81,600 $0
$408,000 $8,160
Federal $0

Glascock Totals Summary
County Summary excludes lump sum projects.

State $20,400 $0
$102,000 $2,040

Other $0
$10,824 $0 $0

Total $102,000 $10,824 $510,000 $10,200

State $200,000

Other $0

Total $200,000

Also in Baldwin, Bleckley, Burke, Columbia, Dodge, Emanuel, Greene, Hancock, Jasper, Jefferson, Jenkins, Johnson, Laurens, Lincoln, McDuffie, Morgan, Newton, Oglethorpe, Putnam, Richmond, Screven, Taliaferro, Treutlen, Warren, Washington, Wilkes, Wilkinson County

Project PI# M004792

Year 2014

Phase CST

Fund State

Federal $0

State $2,000

Other $0

$0

$2,000

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $2,000 $2,000

Page 164 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Gordon
Project: 0006416 Type Work: Realignment
Descp: SR 53 FM E OF CR 269/RYO MOUNTAIN RD TO W OF CR 178/DAVIS RD Length: 1.50

Total Project Cost: Total Project Authorizations:

$13,577,571 $0

Phase PE
ROW CST UTL

Fund HSIP HSIP HSIP HSIP

Year LUMP LUMP LUMP LUMP

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 0009066 Type Work: TE-Bike/Ped Facility Descp: FAIRMOUNT STREETSCAPE PHASE 1
Length: 4.78

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$250,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 0010409 Type Work: Replace Bridge Descp: SR 3 @ LYNN CREEK 5 MI S OF CALHOUN
Length: 0.30

Phase ROW CST UTL

Fund STP STP STP

Year 2016 2017 2017

Total Project Cost: Total Project Authorizations:

$887,460 $0

Federal $35,100
$2,952,000 $8,660,840
$571,873
Federal $200,000
Federal $88,326
$576,595 $45,047

State $3,900
$328,000 $962,316
$63,542

Other $0 $0 $0 $0

Total $39,000
$3,280,000 $9,623,156
$635,415

Also in Pickens County

State $0

Other $50,000

Total $250,000

State $22,082
$144,149 $11,262

Other $0 $0 $0

Total $110,408 $720,744 $56,308

Project: 0010410 Type Work: Replace Bridge Descp: SR 156 @ CSX #340683F 2 MI N OF RANGER
Length: 0.40

Total Project Cost: Total Project Authorizations:

$1,245,667 $0

Phase ROW CST UTL

Fund STP STP STP

Year 2015 2017 2017

Federal $86,595
$864,893 $45,047

State $21,649
$216,223 $11,262

Other $0 $0 $0

Total $108,243
$1,081,116 $56,308

Project: 0010708 Type Work: TE-Bike/Ped Facility
Descp: SR 3 FROM CS 746/HICKS STREET TO CS 738/PIEDMONT STREET Length: 0.33

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$500,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Federal $400,000

State $0

Other $100,000

Total $500,000

Page 165 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 631570- Type Work: Replace Bridge
Descp: SR 225 @ NEW TOWN CREEK & COOSAWATTEE RIVER NE OF CALHOUN Length: 1.00

Total Project Cost: Total Project Authorizations:

$7,076,264 $0

Phase CST UTL

Fund STP STP

Year 2014 2014

Federal $5,360,430
$300,581

State $1,340,108
$75,145

Other $0 $0

Total $6,700,538
$375,726

Project: 632670- Type Work: Widening

Descp: SR 3 FROM SR 136/GORDON TO SR 3

CONN/WHITFIELD

Lanes: Exist. 2 Prop. 4

Length: 8.57

Total Project Cost: Total Project Authorizations:

$74,312,350 $0

Project: 662510- Type Work: New Construction

Descp: SOUTH CALHOUN BYPASS FM SR 53 @ CR 13

EAST TO SR 53 @ CR 64

Lanes: Exist. 0 Prop. 4

Length: 6.80

Total Project Cost: Total Project Authorizations:

$33,609,939 $450,000

Phase SCP PE ROW CST UTL

Fund STP STP STP STP STP

Year 2016 After 2017 After 2017 After 2017 After 2017

Federal $2,000,000 $1,034,807 $9,251,711 $43,409,951 $3,753,411

State $500,000 $258,702 $2,312,928 $10,852,488 $938,353

Other $0 $0 $0 $0 $0

Total $2,500,000 $1,293,509 $11,564,639 $54,262,438 $4,691,763

Phase PE CST UTL

Fund STP STP STP

Year 2013 2016 2016

Federal $360,000
$24,993,182 $1,534,769

Also in Whitfield County

State $90,000
$6,248,296 $383,692

Other $0 $0 $0

Total $450,000
$31,241,478 $1,918,461

Project: M004796 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 6 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Project: M004922 Type Work: Resurface & Maintenance
Descp: I-75 FROM SR 156/GORDON TO SR 3/US 41/WHITFIELD Length: 20.65

Phase PE

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations:

$20,000 $0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Federal $0
Federal $18,000

State $200,000

Other $0

Total $200,000

State

Also in Bartow, Carroll, Catoosa,

Chattooga, Cherokee, Dade,

Fannin, Floyd, Gilmer, Haralson,

Murray, Paulding, Pickens, Polk,

Walker, Whitfield County

Other

Total

$2,000

$0

$20,000

Also in Whitfield County

Page 166 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Gordon Totals Summary
County Summary excludes lump sum projects.

Project PI#
0010409 0010409 0010409 0010410 0010410 0010410 631570631570632670662510662510M004796

Year
2016 2017 2017 2015 2017 2017 2014 2014 2016 2016 2016 2014

Phase
ROW CST UTL ROW CST UTL CST UTL SCP CST UTL CST

Fund STP STP STP STP STP STP STP STP STP STP STP State

Federal
$88,326 $576,595
$45,047 $86,595 $864,893 $45,047 $5,360,430 $300,581 $620,000 $24,993,182 $1,534,769
$0

State
$22,082 $144,149
$11,262 $21,649 $216,223 $11,262 $1,340,108 $75,145 $155,000 $6,248,296 $383,692 $12,000

Other
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

$34,515,465

$8,640,866

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total
$110,408 $720,744
$56,308 $108,243 $1,081,116
$56,308 $6,700,538
$375,726 $775,000 $31,241,478 $1,918,461
$12,000
$43,156,331

Page 167 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Grady
Project: 0010602 Type Work: TE-Bike/Ped Facility
Descp: BROAD STREET FROM CSX #636831U TO CS 551/2ND AVE SE Length: 0.13

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$875,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: M004432 Type Work: Bridge Painting
Descp: SR 93 @ LITTLE TIRED CREEK TRIB & SR 195 @ MUCKALEE CREEK Length: 0.80

Phase PE CST

Fund STP STP

Year LUMP LUMP

Total Project Cost: Total Project Authorizations:

$204,000 $0

Uses Lump Sum Bank: BRIDGE MAINTENANCE/PAINTING FOR FY 2014 - FY 2017

Project: M004794 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 4 Length: 0.00

Phase CST

Fund State

Year 2014

Total Project Cost: Total Project Authorizations:

$200,000 $0

Project: M004802 Type Work: Resurface & Maintenance Descp: SR 112 FROM SR 38 TO MITCHELL COUNTY LINE
Length: 12.90

Phase CST

Fund STP

Total Project Cost: Total Project Authorizations:

$3,150,000 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Year LUMP

Federal $700,000
Federal $3,200
$160,000
Federal $0
Federal $2,520,000

State $0

Other $175,000

Total $875,000

State $800
$40,000

Other $0 $0

Total $4,000
$200,000

Also in Lee County

State $200,000

Other $0

Total $200,000

State

Also in Atkinson, Baker, Ben Hill,

Berrien, Brooks, Calhoun, Clay,

Clinch, Coffee, Colquitt, Cook,

Crisp, Decatur, Dougherty, Early,

Echols, Irwin, Lanier, Lee,

Lowndes, Miller, Mitchell,

Quitman, Randolph, Seminole,

Terrell, Thomas, Tift, Turner,

Wilcox, Worth County

Other

Total

$630,000

$0

$3,150,000

Grady Totals Summary
County Summary excludes lump sum projects.

Project PI# M004794

Year 2014

Phase CST

Fund State

Federal $0

State $8,000

Other $0

$0

$8,000

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $8,000 $8,000

Page 168 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Greene
Project: 0006605 Type Work: TE-Bike/Ped Facility Descp: GREENSBORO STREETSCAPE PLAN - PHASE III
Length: 0.00

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$750,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 0011814 Type Work: RRX Warning Device
Descp: CS 775/VEAZY ST/SCOTT ST @ CSX #279569S IN UNION POINT Length: 0.20

Phase PE CST

Fund STP HSIP

Year 2013 LUMP

Total Project Cost: Total Project Authorizations:

$270,379 $20,379

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2014 - FY 2017

Project: 0012730 Type Work: Pavement Markings
Descp: OFF-SYSTEM SAFETY IMPROVEMENTS @ VAR LOCS IN GREENSBORO Length: 0.00

Phase CST

Fund HSIP

Year LUMP

Total Project Cost: Total Project Authorizations:

$225,000 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 0012862 Type Work: RRX Warning Device Descp: CR 110/CUNNINGHAM ROAD @ CSX #279573G
Length: 0.40

Phase PE CST

Fund HSIP HSIP

Year LUMP LUMP

Total Project Cost: Total Project Authorizations:

$225,000 $0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2014 - FY 2017

Project: 270683- Type Work: Replace Bridge
Descp: CR 25/COPELAND ROAD @ GREENBRIER CREEK SW OF PENFIELD Length: 0.20

Total Project Cost: Total Project Authorizations:

$633,024 $0

Phase PE
ROW CST UTL

Fund STP Local STP STP

Year LUMP 2016 LUMP LUMP

Uses Lump Sum Bank: LOW IMPACT BRIDGES FOR FY 2014 - FY 2017

Federal $600,000

State $0

Other $150,000

Federal $20,379
$250,000

State $0 $0

Other $0 $0

Federal $225,000

State $0

Other $0

Federal $25,000
$200,000

State $0 $0

Other $0 $0

Federal $81,600 $0
$408,000 $8,160

State $20,400 $0
$102,000 $2,040

Other $0
$10,824 $0 $0

Total $750,000
Total $20,379
$250,000
Total $225,000
Total $25,000
$200,000
Total $102,000 $10,824 $510,000 $10,200

Page 169 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: M004722 Type Work: Bridges
Descp: I-20 EB & WB @ RICHLAND CREEK - SCOUR REHAB Length: 0.80

Phase PE CST

Fund NHPP NHPP

Year 2013 LUMP

Total Project Cost: Total Project Authorizations:

$400,000 $100,000

Uses Lump Sum Bank: INTERSTATE BRIDGE PAINTING/MAINTENANCE FOR FY 2014 - FY 2017

Federal $90,000
$270,000

State $10,000 $30,000

Other $0 $0

Total $100,000 $300,000

Project: M004792 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 2 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Federal $0

Greene Totals Summary
County Summary excludes lump sum projects.

State $200,000

Other $0

Total $200,000

Also in Baldwin, Bleckley, Burke, Columbia, Dodge, Emanuel, Glascock, Hancock, Jasper, Jefferson, Jenkins, Johnson, Laurens, Lincoln, McDuffie, Morgan, Newton, Oglethorpe, Putnam, Richmond, Screven, Taliaferro, Treutlen, Warren, Washington, Wilkes, Wilkinson County

Project PI# M004792

Year 2014

Phase CST

Fund State

Federal $0

State $8,000

Other $0

$0

$8,000

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $8,000 $8,000

Page 170 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Habersham
Project: 0009945 Type Work: Roundabout Descp: SR 384 @ CR 382/PEA RIDGE ROAD
Length: 0.26

Phase CST

Fund HSIP

Year LUMP

Federal $902,027

Total Project Cost: Total Project Authorizations:

$902,027 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 0010334 Type Work: Signals
Descp: SR 15 @ 2 LOCS; SR 17 @ 1 LOC & SR 105 @ 4 LOCS Length: 2.80

Phase ROW CST

Fund STP STP

Year LUMP LUMP

Federal $93,636
$611,755

Total Project Cost: Total Project Authorizations:

$705,391 $0

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2014 - FY 2017

Project: 0010400 Type Work: Sidewalks Descp: CORNELIA ELEMENTARY SCHOOL - SRTS
Length: 0.00

Phase CST

Fund Safety

Year LUMP

Federal $411,593

Total Project Cost: Total Project Authorizations:

$411,593 $0

Uses Lump Sum Bank: SAFE ROUTES TO SCHOOL INFRASTRUCTURE FOR FY 2014 - FY 2017

Project: 0010692 Type Work: TE-Bike/Ped Facility
Descp: SR 385 FROM CR 387/MT AIRY HWY TO CS 627/FLORIDA STREET Length: 0.74

Phase CST

Fund STP

Year LUMP

Federal $300,000

Total Project Cost: Total Project Authorizations:

$375,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 0010693 Type Work: TE-Bike/Ped Facility
Descp: CS 879/LEVEL GROVE RD FM CS 878/IRVIN ST TO SR 15/US 411 BYP Length: 0.94

Phase CST

Fund STP

Year LUMP

Federal $300,000

Total Project Cost: Total Project Authorizations:

$375,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

State $0

Other $0

State $0 $0

Other $0 $0

State $0

Other $0

State $0

Other $75,000

State $0

Other $75,000

Total $902,027
Total $93,636
$611,755
Total $411,593
Total $375,000
Total $375,000

Page 171 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0012829 Type Work: Operational Improvement Descp: SR 105/US 441 @ SR 15/US 23

Length: 0.40

Total Project Cost: Total Project Authorizations:

$390,000 $0

Phase PE CST

Fund STP STP

Year LUMP LUMP

Uses Lump Sum Bank: OPERATIONS FOR ANY AREA FOR FY 2014 - FY 2017

Project: M003643 Type Work: Drainage Improvements
Descp: SR 15/US 441 FROM CR 123/JOHN WOOD RD TO CR 125/TOM BORN RD Length: 2.02

Phase

Fund

CST Emergency

Year LUMP

Total Project Cost: Total Project Authorizations:

$43,000 $0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Project: M004791 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 1 Length: 0.00

Phase CST

Fund State

Year 2014

Total Project Cost: Total Project Authorizations:

$200,000 $0

Federal $120,000 $192,000
Federal $34,400
Federal $0

Habersham Totals Summary
County Summary excludes lump sum projects.

State $30,000 $48,000

Other $0 $0

Total $150,000 $240,000

State $8,600

Other $0

Total $43,000

State $200,000

Other $0

Total $200,000

Also in Banks, Barrow, Clarke, Dawson, Elbert, Forsyth, Franklin, Gwinnett, Hall, Hart, Jackson, Lumpkin, Madison, Oconee, Rabun, Stephens, Towns, Union, Walton, White County

Project PI# M004791

Year 2014

Phase CST

Fund State

Federal $0

State $10,000

Other $0

$0

$10,000

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $10,000 $10,000

Page 172 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Hancock
Project: 0010411 Type Work: Replace Bridge
Descp: SR 16 @ LITTLE SHOULDERBONE CREEK 8.6 MI NW OF SPARTA Length: 0.34

Total Project Cost: Total Project Authorizations:

$870,059 $0

Phase ROW CST UTL

Fund STP STP STP

Year 2015 2016 2016

Federal $86,595
$565,289 $44,163

State $21,649
$141,322 $11,041

Other $0 $0 $0

Total $108,243 $706,612 $55,204

Project: 0010713 Type Work: TE-Rehab Hist Trans Bldg Descp: HANCOCK COUNTY DEPOT WELCOME CENTER
Length: 0.40

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$656,300 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 0010719 Type Work: TE-Bike/Ped Facility Descp: SR 15 FROM CR 79/COURT STREET TO SR 16
Length: 0.67

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$625,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 0012726 Type Work: Pavement Markings
Descp: OFF-SYSTEM SAFETY IMPROVEMENTS @ VAR LOCS IN HANCOCK COUNTY Length: 0.00

Phase CST

Fund HSIP

Year LUMP

Total Project Cost: Total Project Authorizations:

$480,000 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: M004710 Type Work: Resurface & Maintenance Descp: SR 22 FROM BALDWIN COUNTY LINE TO SR 16
Length: 12.45

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$2,190,845 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Federal $525,040
Federal $500,000
Federal $480,000
Federal $1,752,676

State $0

Other $131,260

State $0

Other $125,000

State $0

Other $0

State $438,169

Other $0

Total $656,300
Total $625,000
Total $480,000
Total $2,190,845

Page 173 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: M004792 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 2 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Federal $0

Hancock Totals Summary
County Summary excludes lump sum projects.

State $200,000

Other $0

Total $200,000

Also in Baldwin, Bleckley, Burke, Columbia, Dodge, Emanuel, Glascock, Greene, Jasper, Jefferson, Jenkins, Johnson, Laurens, Lincoln, McDuffie, Morgan, Newton, Oglethorpe, Putnam, Richmond, Screven, Taliaferro, Treutlen, Warren, Washington, Wilkes, Wilkinson County

Project PI#
0010411 0010411 0010411 M004792

Year
2015 2016 2016 2014

Phase
ROW CST UTL CST

Fund STP STP STP State

Federal
$86,595 $565,289
$44,163 $0

State
$21,649 $141,322
$11,041 $8,000

Other
$0 $0 $0 $0

$696,047

$182,012

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $108,243 $706,612 $55,204 $8,000
$878,059

Page 174 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Haralson
Project: 0000761 Type Work: Intersection Improvement
Descp: SR 100 FM SR 8 TO SR 120 IN TALLAPOOSA&DRAINAGE IMPROVEMENTS Length: 0.85

Total Project Cost: Total Project Authorizations:

$1,474,284 $0

Phase ROW CST

Fund STP STP

Year 2015 After 2017

Federal $29,841
$1,149,587

State $7,460
$287,397

Other $0 $0

Total $37,301
$1,436,983

Project: 0008426 Type Work: Widening
Descp: CR 324/MCBRAYER ROAD BUSINESS PARK LOCAL ACCESS ROAD Length: 0.85

Total Project Cost: Total Project Authorizations:

$532,000 $0

Phase PE CST

Fund Local App Dev

Year 2013 2015

Federal $0
$490,000

State $0 $0

Other $42,000 $0

Total $42,000
$490,000

Project: 0009089 Type Work: TE-Bike/Ped Facility Descp: TALLAPOOSA STREETSCAPE - PHASE III
Length: 0.00

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$531,250 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 0009864 Type Work: Replace Bridge Descp: SR 120 @ BEACH CREEK E OF TALLAPOOSA
Length: 0.30

Phase ROW CST UTL

Fund STP STP STP

Year 2015 2016 2016

Total Project Cost: Total Project Authorizations:

$4,108,793 $0

Federal $425,000
Federal $80,735
$3,141,862 $64,437

State $0

Other $106,250

State $20,184
$785,466 $16,109

Other $0 $0 $0

Total $531,250
Total $100,919
$3,927,328 $80,546

Project: 0009901 Type Work: Roundabout Descp: I-20 @ SR 348/WACO ROAD - EB & WB RAMPS
Length: 0.43

Phase PE CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations:

$1,804,054 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Year LUMP LUMP

Federal $212,242
$1,591,812

State $0 $0

Other $0 $0

Total $212,242
$1,591,812

Page 175 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: M004551 Type Work: Resurface & Maintenance
Descp: SR 8 FROM ALABAMA STATE LINE TO 0.02 MI W OF SR 1/US 27 Length: 12.56

Phase CST

Fund STP

Total Project Cost: Total Project Authorizations:

$2,037,820 $2,037,820

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Year 2014

Federal $1,630,256

State $407,564

Other $0

Total $2,037,820

Project: M004648 Type Work: Resurface & Maintenance
Descp: SR 1BU FROM N OF SR 1/CARROLL TO S OF SR 1/HARALSON Length: 4.74

Phase CST

Fund STP

Total Project Cost: Total Project Authorizations:

$1,128,794 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Year LUMP

Federal $903,035

State $225,759

Other $0

Total $1,128,794

Also in Carroll County

Project: M004796 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 6 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Federal $0

Haralson Totals Summary
County Summary excludes lump sum projects.

State $200,000

Other $0

Total $200,000

Also in Bartow, Carroll, Catoosa, Chattooga, Cherokee, Dade, Fannin, Floyd, Gilmer, Gordon, Murray, Paulding, Pickens, Polk, Walker, Whitfield County

Project PI#
0000761 0008426 0009864 0009864 0009864 M004796

Year
2015 2015 2015 2016 2016 2014

Phase
ROW CST ROW CST UTL CST

Fund STP
App Dev STP STP STP State

Federal
$29,841 $490,000
$80,735 $3,141,862
$64,437 $0

State
$7,460 $0
$20,184 $785,466
$16,109 $10,000

Other
$0 $0 $0 $0 $0 $0

$3,806,875

$839,219

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $37,301
$490,000 $100,919 $3,927,328
$80,546 $10,000
$4,646,094

Page 176 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Harris
Project: 0007036 Type Work: Replace Bridge
Descp: SR 219 @ MOUNTAIN OAK CREEK SOUTH OF WHITESVILLE Length: 0.40

Total Project Cost: Total Project Authorizations:

$5,620,639 $382,033

Phase ROW CST

Fund STP STP

Year 2016 After 2017

Federal $54,586
$4,136,299

State $13,646
$1,034,075

Other $0 $0

Total $68,232
$5,170,374

Project: 0008600 Type Work: Replace Bridge
Descp: CR 386/FORTSON ROAD @ STANDING BOY CREEK Length: 0.40

Total Project Cost: Total Project Authorizations:

$675,260 $0

Phase PE
ROW CST UTL

Fund STP Local STP STP

Year LUMP 2015 LUMP LUMP

Uses Lump Sum Bank: LOW IMPACT BRIDGES FOR FY 2014 - FY 2017

Project: 0009090 Type Work: TE-Bike/Ped Facility
Descp: HAMILTON/PALMETTO CREEK - WALKING TRAIL AMENITIES Length: 0.00

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$200,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 0010615 Type Work: TE-Rail to Trail Descp: SR 1 FROM CR 387/D STREET TO SR 18
Length: 4.07

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$640,591 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 371150- Type Work: Replace Bridge
Descp: CR 215/EBENEZER CHURCH RD @ WILLIAMS CREEK SE OF HAMILTON I Length: 0.20

Total Project Cost: Total Project Authorizations:

$633,024 $0

Phase PE
ROW CST UTL

Fund STP Local STP STP

Year LUMP 2016 LUMP LUMP

Uses Lump Sum Bank: LOW IMPACT BRIDGES FOR FY 2014 - FY 2017

Federal $81,600 $0
$408,000 $8,160

State $20,400 $0
$102,000 $2,040

Other $0
$53,060 $0 $0

Federal $160,000

State $0

Other $40,000

Federal $512,473

State $0

Other $128,118

Federal $81,600 $0
$408,000 $8,160

State $20,400 $0
$102,000 $2,040

Other $0
$10,824 $0 $0

Total $102,000 $53,060 $510,000 $10,200
Total $200,000
Total $640,591
Total $102,000 $10,824 $510,000 $10,200

Page 177 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: M004517 Type Work: Signing Descp: I-185 @ 16 LOCS - SIGN UPGRADES

Length: 0.00

Total Project Cost: Total Project Authorizations:

$6,943,886 $0

Phase PE CST

Fund NHPP NHPP

Year LUMP LUMP

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Project: M004793 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 3 Length: 0.00

Phase CST

Fund State

Year 2014

Total Project Cost: Total Project Authorizations:

$200,000 $0

Project: M004921 Type Work: Resurface & Maintenance Descp: I-85 FROM ALABAMA STATE LINE TO SR 219
Length: 13.00

Phase PE

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations:

$20,000 $0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Federal $80,000
$6,863,886
Federal $0
Federal $18,000

State $0 $0

Other $0 $0

Total $80,000
$6,863,886

Also in Muscogee, Troup County

State $200,000

Other $0

Total $200,000

State

Also in Bibb, Butts,

Chattahoochee, Coweta,

Crawford, Dooly, Fayette, Heard,

Henry, Houston, Jones, Lamar,

Macon, Marion, Meriwether,

Monroe, Muscogee, Peach, Pike,

Pulaski, Schley, Spalding,

Stewart, Sumter, Talbot, Taylor,

Troup, Twiggs, Upson, Webster

County

Other

Total

$2,000

$0

$20,000

Also in Troup County

Harris Totals Summary
County Summary excludes lump sum projects.

Project PI# 0007036 M004793

Year 2016 2014

Phase ROW CST

Fund STP State

Federal $54,586 $0

State $13,646 $10,000

Other $0 $0

$54,586

$23,646

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $68,232 $10,000
$78,232

Page 178 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Hart
Project: 0007457 Type Work: Pedestrian Crossings Descp: I-85; SR 8; SR 17; SR 59 & SR 72 @ 12 LOCS
Length: 4.80

Phase ROW CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations:

$1,822,762 $150,000

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Year 2013 LUMP

Federal $135,000
$1,505,486

State $15,000
$167,276

Other $0 $0

Total $150,000
$1,672,762

Also in Franklin, Madison County

Project: M004791 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 1 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Federal $0

Hart Totals Summary
County Summary excludes lump sum projects.

State $200,000

Other $0

Total $200,000

Also in Banks, Barrow, Clarke, Dawson, Elbert, Forsyth, Franklin, Gwinnett, Habersham, Hall, Jackson, Lumpkin, Madison, Oconee, Rabun, Stephens, Towns, Union, Walton, White County

Project PI# M004791

Year 2014

Phase CST

Fund State

Federal $0

State $8,000

Other $0

$0

$8,000

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $8,000 $8,000

Page 179 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Heard
Project: M004793 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 3 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Project: M004915 Type Work: Bridges
Descp: SR 34 @ CHATTAHOOCHEE RIVER - BRIDGE REHAB & REPAIRS Length: 0.40

Phase PE CST

Fund STP STP

Total Project Cost: Total Project Authorizations:

$280,000 $0

Uses Lump Sum Bank: BRIDGE MAINTENANCE/PAINTING FOR FY 2014 - FY 2017

Year LUMP LUMP

Federal $0
Federal $64,000
$160,000

State $200,000

Other $0

Total $200,000

State

Also in Bibb, Butts,

Chattahoochee, Coweta,

Crawford, Dooly, Fayette, Harris,

Henry, Houston, Jones, Lamar,

Macon, Marion, Meriwether,

Monroe, Muscogee, Peach, Pike,

Pulaski, Schley, Spalding,

Stewart, Sumter, Talbot, Taylor,

Troup, Twiggs, Upson, Webster

County

Other

Total

$16,000

$0

$80,000

$40,000

$0

$200,000

Heard Totals Summary
County Summary excludes lump sum projects.

Project PI# M004793

Year 2014

Phase CST

Fund State

Federal $0

State $6,000

Other $0

$0

$6,000

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $6,000 $6,000

Page 180 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Irwin
Project: 0007591 Type Work: Sidewalks
Descp: SIDEWALKS; LIGHTING & LANDSCAPING IN OCILLA Length: 0.36

Total Project Cost: Total Project Authorizations:

$512,839 $0

Phase CST

Fund HPP

Year 2015

Federal $410,271

State $0

Other $102,568

Total $512,839

Project: 0007959 Type Work: Replace Bridge Descp: CR 252/FRANK ROAD @ WILLACOOCHEE RIVER
Length: 0.26

Total Project Cost: Total Project Authorizations:

$1,742,628 $146,000

Phase PE
ROW CST

Fund STP Local STP

Year 2017 2014 2014

Federal $8,000 $0
$1,269,302

State $2,000 $0
$317,326

Other $0
$146,000 $0

Total $10,000
$146,000 $1,586,628

Project: 0007960 Type Work: Replace Bridge
Descp: CR 252/FRANK ROAD @ WILLACOOCHEE RIVER OVERFLOW Length: 0.18

Total Project Cost: Total Project Authorizations:

$776,262 $123,000

Phase PE
ROW CST

Fund STP Local STP

Year 2017 2014 2014

Federal $8,000 $0
$514,610

State $2,000 $0
$128,652

Other $0
$123,000 $0

Total $10,000
$123,000 $643,262

Project: 0010669 Type Work: TE-Bike/Ped Facility
Descp: SR 32 FROM CR 252/OAK STREET TO CS 524/RUTHERFORD DRIVE Length: 0.65

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$437,500 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: M004794 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 4 Length: 0.00

Phase CST

Fund State

Year 2014

Total Project Cost: Total Project Authorizations:

$200,000 $0

Federal $350,000
Federal $0

State $0

Other $87,500

Total $437,500

State $200,000

Other $0

Total $200,000

Also in Atkinson, Baker, Ben Hill, Berrien, Brooks, Calhoun, Clay, Clinch, Coffee, Colquitt, Cook, Crisp, Decatur, Dougherty, Early, Echols, Grady, Lanier, Lee, Lowndes, Miller, Mitchell, Quitman, Randolph, Seminole, Terrell, Thomas, Tift, Turner, Wilcox, Worth County

Page 181 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Irwin Totals Summary
County Summary excludes lump sum projects.

Project PI#
0007591 0007959 0007959 0007959 0007960 0007960 0007960 M004794

Year
2015 2017 2014 2014 2017 2014 2014 2014

Phase
CST PE ROW CST PE ROW CST CST

Fund HPP STP Local STP STP Local STP State

Federal
$410,271 $8,000 $0
$1,269,302 $8,000 $0
$514,610 $0

State
$0 $2,000
$0 $317,326
$2,000 $0
$128,652 $6,000

Other
$102,568 $0
$146,000 $0 $0
$123,000 $0 $0

$2,210,183

$455,978

$371,568

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $512,839 $10,000 $146,000
$1,586,628 $10,000
$123,000 $643,262
$6,000
$3,037,729

Page 182 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Jackson
Project: 0007176 Type Work: Replace Bridge
Descp: SR 82 SPUR @ NORTH OCONNEE RIVER 6.8 MI NORTH OF JEFFERSON Length: 0.40

Total Project Cost: Total Project Authorizations:

$5,391,820 $0

Phase PE
ROW CST UTL

Fund STP STP STP STP

Year 2014 2016 After 2017 After 2017

Federal $273,483 $103,713
$3,700,335 $235,926

State $68,371 $25,928
$925,084 $58,981

Other $0 $0 $0 $0

Total $341,854 $129,641
$4,625,418 $294,907

Project: 0007177 Type Work: Replace Bridge
Descp: SR 334 @ SANDY CREEK 11.5 MI SOUTHEAST OF JEFFERSON Length: 0.40

Total Project Cost: Total Project Authorizations:

$8,284,937 $0

Phase PE
ROW CST UTL

Fund STP STP STP STP

Year 2014 2016 After 2017 After 2017

Federal $441,033 $83,243
$5,967,348 $136,327

State $110,258
$20,811 $1,491,837
$34,082

Other $0 $0 $0 $0

Total $551,291 $104,054
$7,459,185 $170,408

Project: 0007291 Type Work: RRX Warning Device Descp: SR 98 @ NS #717696D
Length: 0.22

Phase CST

Fund HSIP

Year LUMP

Total Project Cost: Total Project Authorizations:

$769,619 $0

Uses Lump Sum Bank: RAILROAD CROSSING HAZARD ELIMINATION FOR FY 2014 - FY 2017

Project: 0010022 Type Work: Sidewalks Descp: JEFFERSON CITY SCHOOL SYSTEM - SRTS
Length: 1.06

Phase CST

Fund Safety

Year LUMP

Total Project Cost: Total Project Authorizations:

$485,197 $0

Uses Lump Sum Bank: SAFE ROUTES TO SCHOOL INFRASTRUCTURE FOR FY 2014 - FY 2017

Project: 0010231 Type Work: New Construction

Descp: CITY OF BRASELTON INDUSTRIAL PARKWAY

EXTENSION - PHASE I

Lanes: Exist. 0 Prop. 2

Length: 0.25

Total Project Cost: Total Project Authorizations:

$3,037,555 $0

Phase ROW CST

Fund App Dev App Dev

Year 2016 2016

Federal $769,619
Federal $485,197
Federal $1,471,200
$958,844

State $0

Other $0

State $0

Other $0

State $0 $0

Other $367,800 $239,711

Total $769,619
Total $485,197
Total $1,839,000 $1,198,555

Page 183 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0010697 Type Work: TE-Bike/Ped Facility Descp: SR 53 @ SR 124 IN BRASELTON

Length: 0.40

Total Project Cost: Total Project Authorizations:

$312,500 $0

Phase CST

Fund STP

Year LUMP

Federal $250,000

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 0010699 Type Work: TE-Bike/Ped Facility
Descp: SR 15 ALT FM CS 749/LAKEVIEW DRIVE TO COMMERCE MIDDLE SCHOOL Length: 1.21

Phase CST

Fund STP

Year LUMP

Federal $250,000

Total Project Cost: Total Project Authorizations:

$312,500 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 0011672 Type Work: Signals
Descp: I-85 @3 LOC; SR 11 @4 LOC & SR 15 ALT @2 LOC-SIGNAL UPGRADES Length: 3.60

Phase ROW CST

Fund STP STP

Year LUMP LUMP

Federal $357,000 $918,000

Total Project Cost: Total Project Authorizations:

$1,275,000 $0

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2014 - FY 2017

Project: 0011677 Type Work: Replace Bridge
Descp: SR 11 @ MULBERRY RIVER TRIBUTARY 6.3 MI SW OF JEFFERSON Length: 0.40

Total Project Cost: Total Project Authorizations:

$1,173,082 $421,685

Phase PE
ROW CST UTL

Fund Bridge STP STP STP

Year 2013 2015 2017 2017

Federal $337,348 $124,848 $432,973 $43,297

State $0
State $0
State $0 $0
State $84,337 $31,212
$108,243 $10,824

Other $62,500
Other $62,500
Other $0 $0
Other $0 $0 $0 $0

Total $312,500
Total $312,500
Total $357,000 $918,000
Total $421,685 $156,060 $541,216 $54,122

Project: 0012681 Type Work: Signals Descp: SR 11BU @ CS 936/OLD PENDERGRASS ROAD
Length: 0.40

Phase PE CST

Fund STP STP

Year 2013 LUMP

Federal $50,000
$180,000

Total Project Cost: Total Project Authorizations:

$230,000 $50,000

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2014 - FY 2017

State $0 $0

Other $0 $0

Total $50,000
$180,000

Page 184 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 110630- Type Work: Widening

Descp: I-85 FM N OF SR 53/GREEN ST TO N OF SR 11/US

129/LEE ST

Lanes: Exist. 4 Prop. 6

Length: 8.00

Total Project Cost: Total Project Authorizations:

$86,779,226 $0

Phase PE CST

Fund NHPP NHPP

Year 2014 After 2017

Federal $320,000
$69,103,380

State $80,000
$17,275,845

Other $0 $0

Total $400,000
$86,379,226

Project: 121340- Type Work: Replace Bridge
Descp: SR 11/US 129 @ ALLEN CREEK NORTH OF TALMO Length: 0.40

Total Project Cost: Total Project Authorizations:

$2,574,416 $0

Phase PE CST

Fund NHPP NHPP

Year 2014 2015

Federal $16,000
$2,043,533

State $4,000
$510,883

Other $0 $0

Total $20,000
$2,554,416

Project: 122150- Type Work: Widening

Descp: SR 11/US 129 FM SR 332 @ TALMO/JACKSON TO

SR 323/HALL

Lanes: Exist. 2 Prop. 4

Length: 6.72

Total Project Cost: Total Project Authorizations:

$36,939,292 $1,000,000

Project: 122510- Type Work: Widening

Descp: SR 15 ALT FM STOREY ST TO SR 82; INCL NEW

BRIDGES@ CURRY CRK

Lanes: Exist. 2 Prop. 3

Length: 0.70

Total Project Cost: Total Project Authorizations:

$5,712,723 $30,000

Phase PE CST UTL

Fund NHS NHPP NHPP

Year 2013 2016 2016

Federal $800,000
$28,124,239 $627,195

State $200,000 $7,031,060 $156,799

Other $0 $0 $0

Total $1,000,000 $35,155,299
$783,994

Phase PE CST UTL

Fund Bridge STP STP

Year 2013 2014 2014

Federal $24,000
$4,100,234 $445,944

Also in Hall County

State $6,000
$1,025,059 $111,486

Other $0 $0 $0

Total $30,000
$5,125,293 $557,430

Project: M004559 Type Work: Culvert
Descp: SR 334 @ SANDY CREEK & SR 400 @ SETTINGDOWN CREEK Length: 0.80

Phase CST

Fund STP

Total Project Cost: Total Project Authorizations:

$108,191 $108,191

Uses Lump Sum Bank: BRIDGE MAINTENANCE/PAINTING FOR FY 2014 - FY 2017

Year 2014

Federal $86,553

State $21,638

Other $0

Total $108,191

Also in Forsyth County

Page 185 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: M004774 Type Work: Resurface & Maintenance Descp: SR 98 FROM I-85 TO SR 98WE
Length: 2.70

Phase CST

Fund STP

Total Project Cost: Total Project Authorizations:

$700,000 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Year LUMP

Federal $560,000

State $140,000

Other $0

Total $700,000

Project: M004791 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 1 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Federal $0

Jackson Totals Summary
County Summary excludes lump sum projects.

State $200,000

Other $0

Total $200,000

Also in Banks, Barrow, Clarke, Dawson, Elbert, Forsyth, Franklin, Gwinnett, Habersham, Hall, Hart, Lumpkin, Madison, Oconee, Rabun, Stephens, Towns, Union, Walton, White County

Project PI#
0007176 0007176 0007177 0007177 0010231 0010231 0011677 0011677 0011677 110630121340121340122150122150122510122510M004791

Year
2014 2016 2014 2016 2016 2016 2015 2017 2017 2014 2014 2015 2016 2016 2014 2014 2014

Phase
PE ROW
PE ROW ROW CST ROW CST UTL
PE PE CST CST UTL CST UTL CST

Fund STP STP STP STP
App Dev App Dev
STP STP STP NHPP NHPP NHPP NHPP NHPP STP STP State

Federal
$273,483 $103,713 $441,033
$83,243 $1,471,200
$958,844 $124,848 $432,973
$43,297 $320,000
$16,000 $2,043,533 $8,718,514
$194,430 $4,100,234
$445,944 $0

State
$68,371 $25,928 $110,258 $20,811
$0 $0 $31,212 $108,243 $10,824 $80,000 $4,000 $510,883 $2,179,629 $48,608 $1,025,059 $111,486 $12,000

Other
$0 $0 $0 $0 $367,800 $239,711 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

$19,771,289

$4,347,311

$607,511

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total
$341,854 $129,641 $551,291 $104,054 $1,839,000 $1,198,555 $156,060 $541,216
$54,122 $400,000
$20,000 $2,554,416 $10,898,143
$243,038 $5,125,293
$557,430 $12,000
$24,726,111

Page 186 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Jasper

Project: 0001939 Type Work: New Construction

Descp: MONTICELLO NE BYPASS FM SR 16 TO SR 83

Lanes: Exist. 0 Prop. 2

Length: 3.28

Total Project Cost: Total Project Authorizations:

$15,765,956 $200,000

Phase PE
ROW CST

Fund STP STP STP

Year 2013 2015 After 2017

Federal $160,000
$1,269,288 $11,183,477

State $40,000
$317,322 $2,795,869

Other $0 $0 $0

Total $200,000
$1,586,610 $13,979,346

Project: 0002337 Type Work: TE-Landscape/Beautify
Descp: MONTICELLO DOWNTOWN STREETSCAPE AND SCENIC BYWAY BIKEWAY Length: 0.00

Phase CST

Fund STP

Year 2014

Total Project Cost: Total Project Authorizations:

$500,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 0004444 Type Work: Guardrail
Descp: SR 212 @ LAKE JACKSON GUARDRAIL @ APPROACHES Length: 0.40

Phase ROW CST

Fund HSIP HSIP

Year LUMP LUMP

Total Project Cost: Total Project Authorizations:

$334,626 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 0007593 Type Work: Sidewalks
Descp: SIDEWALKS; LIGHTING & LANDSCAPING IN MONTICELLO Length: 0.00

Phase CST CST

Fund HPP Local

Year 2015 2015

Total Project Cost: Total Project Authorizations:

$763,123 $0

Federal $400,000
Federal $172,093 $162,533
Federal $329,950 $0

State $0

Other $100,000

Total $500,000

State $0 $0

Other $0 $0

Total $172,093 $162,533

Also in Newton County

State $0 $0

Other $82,488
$350,685

Total $412,438 $350,685

Project: 0010670 Type Work: TE-Rehab Hist Trans Bldg
Descp: SEVEN ISLANDS ROAD INTERPRETATIVE MUSEUM & VISITORS CENTER Length: 0.40

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$312,500 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Federal $250,000

State $0

Other $62,500

Total $312,500

Page 187 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0012735 Type Work: Pavement Markings
Descp: OFF-SYSTEM SAFETY IMPROVEMENTS @ VAR LOCS IN MONTICELLO Length: 0.00

Total Project Cost: Total Project Authorizations:

$225,000 $0

Phase CST

Fund HSIP

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 231730- Type Work: Passing Lanes

Descp: SR 83 FM N OF CR 73 TO S OF CR 77 & CR 144

TO S OF CR 133

Lanes: Exist. 2 Prop. 3

Length: 2.48

Total Project Cost: Total Project Authorizations:

$4,306,638 $590,000

Phase PE
ROW CST

Fund STP STP STP

Year LUMP
Year 2014 2013 2015

Federal $225,000

State $0

Other $0

Federal $120,000 $472,000
$2,853,311

State $30,000
$118,000 $713,328

Other $0 $0 $0

Total $225,000
Total $150,000 $590,000
$3,566,638

Project: M004792 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 2 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Federal $0

Jasper Totals Summary
County Summary excludes lump sum projects.

State $200,000

Other $0

Total $200,000

Also in Baldwin, Bleckley, Burke, Columbia, Dodge, Emanuel, Glascock, Greene, Hancock, Jefferson, Jenkins, Johnson, Laurens, Lincoln, McDuffie, Morgan, Newton, Oglethorpe, Putnam, Richmond, Screven, Taliaferro, Treutlen, Warren, Washington, Wilkes, Wilkinson County

Project PI#
0001939 0007593 0007593 231730231730M004792

Year
2015 2015 2015 2014 2015 2014

Phase
ROW CST CST PE CST CST

Fund STP Local HPP STP STP State

Federal
$1,269,288 $0
$329,950 $120,000 $2,853,311
$0

State
$317,322 $0 $0
$30,000 $713,328
$6,000

Other
$0 $350,685
$82,488 $0 $0 $0

$4,572,549

$1,066,650

$433,173

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $1,586,610 $350,685 $412,438 $150,000 $3,566,638 $6,000
$6,072,371

Page 188 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Jeff Davis
Project: 0001810 Type Work: Railroad Crossing
Descp: SR 19/US 23 OVERPASS @ NORFOLK-SOUTHERN RR GRADE CROSSING Length: 0.40

Total Project Cost: Total Project Authorizations:

$3,510,079 $0

Phase ROW CST

Fund STP STP

Year 2015 2017

Federal $514,943
$2,293,120

State $128,736 $573,280

Other $0 $0

Total $643,679
$2,866,400

Project: 0007037 Type Work: Replace Bridge Descp: SR 135 @ ALTAMAHA RIVER - TIA
Length: 0.60

Total Project Cost: Total Project Authorizations:

$10,303,111 $0

Phase PE
ROW CST CST

Fund STP STP State STP

Year 2017 2017 After 2017 After 2017

Project: 0009875 Type Work: Roundabout Descp: SR 19/US 23 @ SR 135 CONN
Length: 0.50

Phase ROW CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations:

$1,195,027 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 0009876 Type Work: Roundabout Descp: SR 107 @ SR 268
Length: 1.00

Phase PE CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations:

$1,061,208 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 0012657 Type Work: Pavement Markings
Descp: OFF-SYSTEM SAFETY IMPROVEMENTS @ 9 CR LOCS IN JEFF DAVIS CO Length: 33.54

Phase CST

Fund HSIP

Total Project Cost: Total Project Authorizations:

$226,000 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Year LUMP LUMP
Year LUMP LUMP
Year LUMP

Federal $8,000
$50,730 $0
$6,346,165
Federal $293,000 $902,027
Federal $159,181 $902,027
Federal $226,000

State $2,000
$12,682 $0
$1,586,541

Other $0 $0
$2,296,992 $0

Total $10,000 $63,412
$2,296,992 $7,932,706

Also in Montgomery County

State $0 $0

Other $0 $0

Total $293,000 $902,027

State $0 $0

Other $0 $0

Total $159,181 $902,027

State $0

Other $0

Total $226,000

Page 189 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0012850 Type Work: RRX Consolidation
Descp: CS 545 @NS #732590V; CS 550@NS #729020E & CS 663@NS #732582D Length: 0.82

Total Project Cost: Total Project Authorizations:

$290,000 $0

Phase CST

Fund HSIP

Year LUMP

Uses Lump Sum Bank: RAILROAD CROSSING HAZARD ELIMINATION FOR FY 2014 - FY 2017

Project: 533176- Type Work: Replace Bridge Descp: SR 135 @ WHITEHEAD CREEK 1 MI OF DENTON
Length: 0.61

Phase PE
ROW CST

Fund Bridge STP STP

Year 2013 2014 2015

Total Project Cost: Total Project Authorizations:

$3,659,310 $75,000

Federal $290,000

State $0

Other $0

Federal $60,000
$142,800 $2,724,648

State $15,000 $35,700
$681,162

Other $0 $0 $0

Total $290,000
Total $75,000
$178,500 $3,405,810

Project: M004554 Type Work: Resurface & Maintenance
Descp: SR 268 FROM COFFEE COUNTY LINE TO 0.02 MI E OF SR 107 Length: 8.12

Phase CST

Fund STP

Total Project Cost: Total Project Authorizations:

$900,538 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Project: M004595 Type Work: Resurface & Maintenance
Descp: SR 135 CONN FROM SR 19 TO 0.01 MI E OF SR 135 IN HAZLEHURST Length: 0.70

Total Project Cost: Total Project Authorizations:

$271,361 $0

Phase CST

Fund STP

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Project: M004600 Type Work: Resurface & Maintenance Descp: SR 107 FROM COFFEE COUNTY LINE TO SR 135
Length: 8.77

Phase CST

Fund STP

Total Project Cost: Total Project Authorizations:

$1,399,303 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Year LUMP
Year LUMP
Year LUMP

Federal $720,430
Federal $217,089
Federal $1,119,442

State $180,108

Other $0

State $54,272

Other $0

State $279,861

Other $0

Total $900,538
Total $271,361
Total $1,399,303

Page 190 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: M004795 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 5 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Federal $0

Jeff Davis Totals Summary
County Summary excludes lump sum projects.

State $200,000

Other $0

Total $200,000

Also in Appling, Bacon, Brantley, Bryan, Bulloch, Camden, Candler, Charlton, Chatham, Effingham, Evans, Glynn, Liberty, Long, McIntosh, Montgomery, Pierce, Tattnall, Telfair, Toombs, Ware, Wayne, Wheeler County

Project PI#
0001810 0001810 0007037 0007037 533176533176M004795

Year
2015 2017 2017 2017 2014 2015 2014

Phase
ROW CST PE ROW ROW CST CST

Fund STP STP STP STP STP STP State

Federal
$514,943 $2,293,120
$4,000 $25,365 $142,800 $2,724,648
$0

State
$128,736 $573,280
$1,000 $6,341 $35,700 $681,162 $6,000

Other
$0 $0 $0 $0 $0 $0 $0

$5,704,876

$1,432,219

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $643,679
$2,866,400 $5,000
$31,706 $178,500 $3,405,810
$6,000
$7,137,095

Page 191 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Jefferson
Project: 0007041 Type Work: Replace Bridge Descp: SR 47 @ BIG BRIER CREEK
Length: 0.51

Total Project Cost: Total Project Authorizations:

$4,009,449 $80,000

Project: 222150- Type Work: Widening

Descp: SR 4/US 1/LOUISVILLE BYP FM SR 4 BU/US 1BU

TO CR 325 - TIA

Lanes: Exist. 2 Prop. 4

Length: 2.54

Total Project Cost: Total Project Authorizations:

$24,930,357 $730,300

Phase ROW CST UTL

Fund Bridge STP STP

Year 2013 2014 2014

Federal $64,000
$3,061,959 $81,600

State $16,000
$765,490 $20,400

Other $0 $0 $0

Total $80,000
$3,827,449 $102,000

Phase PE
ROW CST CST

Fund NHS NHPP State NHPP

Year 2013 2015 2017 2017

Federal $584,240 $888,460 $0
$13,691,215

Also in McDuffie County

State $146,060 $222,115
$0 $3,422,804

Other $0 $0
$5,975,463 $0

Total $730,300
$1,110,575 $5,975,463 $17,114,018

Project: M004792 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 2 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Federal $0

Jefferson Totals Summary
County Summary excludes lump sum projects.

State $200,000

Other $0

Total $200,000

Also in Baldwin, Bleckley, Burke, Columbia, Dodge, Emanuel, Glascock, Greene, Hancock, Jasper, Jenkins, Johnson, Laurens, Lincoln, McDuffie, Morgan, Newton, Oglethorpe, Putnam, Richmond, Screven, Taliaferro, Treutlen, Warren, Washington, Wilkes, Wilkinson County

Project PI#
0007041 0007041 222150222150222150M004792

Year
2014 2014 2015 2017 2017 2014

Phase
CST UTL ROW CST CST CST

Fund STP STP NHPP NHPP State State

Federal
$1,530,980 $40,800
$888,460 $13,691,215
$0 $0

State
$382,745 $10,200
$222,115 $3,422,804
$0 $10,000

Other
$0 $0 $0 $0 $5,975,463 $0

$16,151,455

$4,047,864

$5,975,463

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $1,913,725 $51,000 $1,110,575
$17,114,018 $5,975,463 $10,000
$26,174,781

Page 192 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Jenkins
Project: 0006319 Type Work: Replace Bridge
Descp: CR 200/OLD SAVANNAH ROAD @ SCULLS CREEK 5.3 MI S OF MILLEN Length: 0.47

Total Project Cost: Total Project Authorizations:

$1,276,960 $0

Phase PE
ROW CST

Fund STP Local STP

Year 2016 2014 2015

Federal $8,000 $0
$884,640

State $2,000 $0
$221,160

Other $0
$161,160 $0

Total $10,000
$161,160 $1,105,800

Project: 0010716 Type Work: TE-Bike/Ped Facility
Descp: MILLEN DOWNTOWN STREETSCAPE/GREENSPACE PRESERVATION Length: 0.92

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$1,250,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 0011756 Type Work: Scenic Hwy Program
Descp: MILLEN-JENKINS COUNTY SCENIC BYWAY INTERPRETIVE VISTOR CTR Length: 0.00

Phase CST

Fund Byways

Year 2016

Total Project Cost: Total Project Authorizations:

$834,680 $0

Federal $1,000,000
Federal $667,744

State $0

Other $250,000

State $0

Other $166,936

Total $1,250,000
Total $834,680

Project: 0012733 Type Work: Pavement Markings
Descp: OFF-SYSTEM SAFETY IMPROVEMENTS @ VAR LOCS IN MILLEN Length: 0.00

Phase CST

Fund HSIP

Total Project Cost: Total Project Authorizations:

$175,000 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 231150- Type Work: Replace Bridge
Descp: CR 191 @ OGEECHEE RIVER OVERFLOW N OF EMANUEL COUNTY LINE Length: 0.30

Phase PE
ROW CST

Fund STP Local STP

Total Project Cost: Total Project Authorizations:

$1,554,835 $94,000

Year LUMP
Year 2014 2013 2014

Federal $175,000

State $0

Other $0

Federal $8,000 $0
$1,160,668

State $2,000 $0
$290,167

Other $0
$94,000 $0

Total $175,000
Total $10,000 $94,000
$1,450,835

Page 193 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 231152- Type Work: Replace Bridge
Descp: CR 191 @ OGEECHEE RIVER NORTH OF EMANUEL COUNTY LINE Length: 0.50

Total Project Cost: Total Project Authorizations:

$4,351,675 $147,000

Phase PE
ROW CST

Fund STP Local STP

Year 2014 2013 2014

Federal $8,000 $0
$3,355,740

State $2,000 $0
$838,935

Other $0
$147,000 $0

Total $10,000
$147,000 $4,194,675

Project: M004792 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 2 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Federal $0

Jenkins Totals Summary
County Summary excludes lump sum projects.

State $200,000

Other $0

Total $200,000

Also in Baldwin, Bleckley, Burke, Columbia, Dodge, Emanuel, Glascock, Greene, Hancock, Jasper, Jefferson, Johnson, Laurens, Lincoln, McDuffie, Morgan, Newton, Oglethorpe, Putnam, Richmond, Screven, Taliaferro, Treutlen, Warren, Washington, Wilkes, Wilkinson County

Project PI#
0006319 0006319 0006319 0011756 231150231150231152231152M004792

Year
2016 2014 2015 2016 2014 2014 2014 2014 2014

Phase
PE ROW CST CST
PE CST PE CST CST

Fund STP Local STP
Byways STP STP STP STP State

Federal
$8,000 $0
$884,640 $667,744
$8,000 $1,160,668
$8,000 $3,355,740
$0

State
$2,000 $0
$221,160 $0
$2,000 $290,167
$2,000 $838,935
$6,000

Other
$0 $161,160
$0 $166,936
$0 $0 $0 $0 $0

$6,092,792

$1,362,262

$328,096

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $10,000
$161,160 $1,105,800
$834,680 $10,000
$1,450,835 $10,000
$4,194,675 $6,000
$7,783,150

Page 194 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Johnson
Project: 0007178 Type Work: Replace Bridge Descp: SR 171 @ HOLTEN CREEK 0.6 MI S OF KITE
Length: 0.32

Total Project Cost: Total Project Authorizations:

$1,343,145 $0

Phase ROW CST

Fund STP STP

Year 2014 2017

Federal $116,688 $957,828

State $29,172
$239,457

Other $0 $0

Total $145,860
$1,197,285

Project: 0007180 Type Work: Replace Bridge
Descp: SR 171 @ LITTLE OHOOPEE RIVER 2.7 MI N OF KITE Length: 0.18

Total Project Cost: Total Project Authorizations:

$1,928,586 $0

Phase ROW CST UTL

Fund STP STP STP

Year 2014 2017 2017

Federal $73,440
$1,438,254 $31,174

State $18,360
$359,564 $7,794

Other $0 $0 $0

Total $91,800
$1,797,818 $38,968

Project: 222190- Type Work: Passing Lanes

Descp: SR 15 @ 2 LOCS BTWN WRIGHTSVILLE &

TENNILLE

Lanes: Exist. 2 Prop. 3

Length: 2.56

Total Project Cost: Total Project Authorizations:

$4,611,290 $59,000

Project: M004792 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 2 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase PE CST

Fund STP NHPP

Year 2013 2014

Federal $47,200
$3,641,832

State $11,800
$910,458

Other $0 $0

Total $59,000
$4,552,290

Phase CST

Fund State

Year 2014

Federal $0

Also in Washington County

State $200,000

Other $0

Total $200,000

Also in Baldwin, Bleckley, Burke, Columbia, Dodge, Emanuel, Glascock, Greene, Hancock, Jasper, Jefferson, Jenkins, Laurens, Lincoln, McDuffie, Morgan, Newton, Oglethorpe, Putnam, Richmond, Screven, Taliaferro, Treutlen, Warren, Washington, Wilkes, Wilkinson County

Page 195 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Johnson Totals Summary
County Summary excludes lump sum projects.

Project PI#
0007178 0007178 0007180 0007180 0007180 222190M004792

Year
2014 2017 2014 2017 2017 2014 2014

Phase
ROW CST ROW CST UTL CST CST

Fund STP STP STP STP STP NHPP State

Federal
$116,688 $957,828
$73,440 $1,438,254
$31,174 $2,658,537
$0

State
$29,172 $239,457
$18,360 $359,564
$7,794 $664,634
$6,000

Other
$0 $0 $0 $0 $0 $0 $0

$5,275,921

$1,324,980

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $145,860
$1,197,285 $91,800
$1,797,818 $38,968
$3,323,172 $6,000
$6,600,902

Page 196 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Jones
Project: 0010671 Type Work: TE-Bike/Ped Facility Descp: JONES COUNTY TRAILS @ 6 LOCS - PHASE II
Length: 2.93

Phase CST

Fund STP

Year LUMP

Federal $651,200

State $0

Other $162,800

Total $814,000

Total Project Cost: Total Project Authorizations:

$814,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 370860- Type Work: Replace Bridge Descp: CR 28 @ CHEHAW CREEK W OF CLINTON
Length: 0.20

Total Project Cost: Total Project Authorizations:

$633,024 $0

Phase PE
ROW CST UTL

Fund STP Local STP STP

Year LUMP 2016 LUMP LUMP

Federal $81,600 $0
$408,000 $8,160

State $20,400 $0
$102,000 $2,040

Other $0
$10,824 $0 $0

Total $102,000 $10,824 $510,000 $10,200

Uses Lump Sum Bank: LOW IMPACT BRIDGES FOR FY 2014 - FY 2017

Project: M004793 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 3 Length: 0.00

Phase CST

Fund State

Year 2014

Federal $0

State $200,000

Other $0

Total $200,000

Total Project Cost: Total Project Authorizations:

$200,000 $0

Also in Bibb, Butts, Chattahoochee, Coweta, Crawford, Dooly, Fayette, Harris, Heard, Henry, Houston, Lamar, Macon, Marion, Meriwether, Monroe, Muscogee, Peach, Pike, Pulaski, Schley, Spalding, Stewart, Sumter, Talbot, Taylor, Troup, Twiggs, Upson, Webster County

Project PI# M004793

Year 2014

Jones Totals Summary

County Summary excludes lump sum projects.

This County is also located in a MPO area. Additional Projects may be listed in the MPO TIP.

Phase

Fund

Federal

State

Other

CST

State

$0

$8,000

$0

Total $8,000

$0

$8,000

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

$8,000

Page 197 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Lamar
Project: 0010617 Type Work: TE-Bike/Ped Facility
Descp: CS 586/HOUSTON ST @ 1 LOC & CS 587/SUMMERS FIELD RD @ 1 LOC Length: 0.54

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$937,500 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 371173- Type Work: Replace Bridge
Descp: CR 219/RUFFIN ROAD @ POTATO CREEK IN PIEDMONT Length: 0.22

Total Project Cost: Total Project Authorizations:

$633,024 $0

Phase PE
ROW CST UTL

Fund STP Local STP STP

Year LUMP 2016 LUMP LUMP

Uses Lump Sum Bank: LOW IMPACT BRIDGES FOR FY 2014 - FY 2017

Project: M004793 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 3 Length: 0.00

Phase CST

Fund State

Year 2014

Total Project Cost: Total Project Authorizations:

$200,000 $0

Federal $750,000
Federal $81,600 $0
$408,000 $8,160
Federal $0

Lamar Totals Summary
County Summary excludes lump sum projects.

State $0

Other $187,500

Total $937,500

State $20,400 $0
$102,000 $2,040

Other $0
$10,824 $0 $0

Total $102,000 $10,824 $510,000 $10,200

State $200,000

Other $0

Total $200,000

Also in Bibb, Butts, Chattahoochee, Coweta, Crawford, Dooly, Fayette, Harris, Heard, Henry, Houston, Jones, Macon, Marion, Meriwether, Monroe, Muscogee, Peach, Pike, Pulaski, Schley, Spalding, Stewart, Sumter, Talbot, Taylor, Troup, Twiggs, Upson, Webster County

Project PI# M004793

Year 2014

Phase CST

Fund State

Federal $0

State $4,000

Other $0

$0

$4,000

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $4,000 $4,000

Page 198 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Lanier
Project: 0007181 Type Work: Replace Bridge
Descp: SR 64 @ TEN MILE CREEK 6.5 MI NORTHWEST OF LAKELAND Length: 0.27

Total Project Cost: Total Project Authorizations:

$2,820,360 $0

Phase ROW CST UTL

Fund STP STP STP

Year 2015 2017 2017

Federal $21,674
$1,966,844 $267,771

State $5,418
$491,711 $66,943

Other $0 $0 $0

Total $27,092
$2,458,555 $334,714

Project: 0007182 Type Work: Replace Bridge
Descp: SR 64 @ FIVE MILE CREEK 5 MI NORTH OF LAKELAND Length: 0.14

Total Project Cost: Total Project Authorizations:

$2,633,922 $0

Phase ROW CST UTL

Fund STP STP STP

Year 2015 2017 2017

Federal $62,849
$1,594,540 $449,748

State $15,712
$398,635 $112,437

Other $0 $0 $0

Total $78,561
$1,993,176 $562,186

Project: 0010451 Type Work: Sidewalks
Descp: LANIER COUNTY PRIMARY; ELEMENTARY & MIDDLE SCHOOLS - SRTS Length: 0.00

Phase CST

Fund Safety

Year LUMP

Total Project Cost: Total Project Authorizations:

$178,400 $0

Uses Lump Sum Bank: SAFE ROUTES TO SCHOOL ANY PROJECTS FOR FY 2014 - FY 2017

Project: 0010589 Type Work: TE-Bike/Ped Facility
Descp: SR 135 FROM CR 47/SIMPSON AVE TO CR 324/BURNT CHURCH ROAD Length: 7.02

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$312,500 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: M004794 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 4 Length: 0.00

Phase CST

Fund State

Year 2014

Total Project Cost: Total Project Authorizations:

$200,000 $0

Federal $178,400
Federal $250,000
Federal $0

State $0

Other $0

Total $178,400

State $0

Other $62,500

Total $312,500

State $200,000

Other $0

Total $200,000

Also in Atkinson, Baker, Ben Hill, Berrien, Brooks, Calhoun, Clay, Clinch, Coffee, Colquitt, Cook, Crisp, Decatur, Dougherty, Early, Echols, Grady, Irwin, Lee, Lowndes, Miller, Mitchell, Quitman, Randolph, Seminole, Terrell, Thomas, Tift, Turner, Wilcox, Worth County

Page 199 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project PI#
0007181 0007181 0007181 0007182 0007182 0007182 M004794

Year
2015 2017 2017 2015 2017 2017 2014

Lanier Totals Summary

County Summary excludes lump sum projects.

This County is also located in a MPO area. Additional Projects may be listed in the MPO TIP.

Phase

Fund

Federal

State

Other

ROW

STP

$21,674

$5,418

$0

CST

STP

$1,966,844

$491,711

$0

UTL

STP

$267,771

$66,943

$0

ROW

STP

$62,849

$15,712

$0

CST

STP

$1,594,540

$398,635

$0

UTL

STP

$449,748

$112,437

$0

CST

State

$0

$4,000

$0

$4,363,426

$1,094,857

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $27,092
$2,458,555 $334,714 $78,561
$1,993,176 $562,186 $4,000
$5,458,283

Page 200 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Laurens

Project: 0000833 Type Work: Bridges

Descp: NEW OCONEE RVR X'ING FM COUNTRY CLUB TO

BLACKSHEAR&FERRY-TIA

Lanes: Exist. 0 Prop. 2

Length: 2.60

Total Project Cost: Total Project Authorizations:

$13,337,556 $0

Phase ROW CST CST

Fund Local State STP

Year 2014 2014 2014

Federal $0 $0
$4,225,500

State $0 $0
$1,056,375

Other $514,080 $7,541,601
$0

Total $514,080
$7,541,601 $5,281,875

Project: 0007413 Type Work: Widening

Descp: HILLCREST PKWY FM CR 493/INDUSTRIAL BLVD

TO SR 29/SR 441-TIA

Lanes: Exist. 2 Prop. 4

Length: 2.50

Total Project Cost: Total Project Authorizations:

$22,949,209 $1,874,814

Phase PE PE
ROW CST CST UTL

Fund State Local State State STP State

Year 2014 LOCL 2015 After 2017 After 2017 After 2017

Federal $0 $0 $0 $0
$2,931,041 $0

State $0 $0 $0 $0
$732,760 $0

Other $1,874,814 $1,802,013 $9,078,000 $3,380,292
$0 $3,150,289

Total $1,874,814 $1,802,013 $9,078,000 $3,380,292 $3,663,801 $3,150,289

Project: 0010398 Type Work: Sidewalks
Descp: SUSIE DASHER & SAXON HEIGHTS ELEMENTARY SCHOOLS - SRTS Length: 0.00

Phase CST

Fund Safety

Year LUMP

Federal $290,770

Total Project Cost: Total Project Authorizations:

$290,770 $0

Uses Lump Sum Bank: SAFE ROUTES TO SCHOOL INFRASTRUCTURE FOR FY 2014 - FY 2017

Project: 262027- Type Work: Widening

Descp: SR 31/US 441 FM N OF CR 272 TO JUST S OF I-16

@ CR 354

Lanes: Exist. 2 Prop. 4

Length: 7.93

Phase ROW CST

Fund NHPP NHPP

Year 2016 After 2017

Federal $13,930,408 $27,487,837

Total Project Cost: Total Project Authorizations:

$51,772,806 $0

State $0
State $3,482,602 $6,871,959

Other $0

Total $290,770

Other $0 $0

Total $17,413,010 $34,359,796

Project: 270724- Type Work: Replace Bridge Descp: CR 393 @ TURKEY CREEK N OF MONTROSE
Length: 0.20

Total Project Cost: Total Project Authorizations:

$633,024 $0

Phase PE
ROW CST UTL

Uses Lump Sum Bank: LOW IMPACT BRIDGES FOR FY 2014 - FY 2017

Fund STP Local STP STP

Year LUMP 2016 LUMP LUMP

Federal $81,600 $0
$408,000 $8,160

State $20,400 $0
$102,000 $2,040

Other $0
$10,824 $0 $0

Total $102,000 $10,824 $510,000 $10,200

Page 201 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 270725- Type Work: Replace Bridge Descp: CR 264 @ LIME SINK CREEK SE OF CADWELL

Length: 0.20

Total Project Cost: Total Project Authorizations:

$633,024 $0

Phase PE
ROW CST UTL

Fund STP Local STP STP

Year LUMP 2016 LUMP LUMP

Uses Lump Sum Bank: LOW IMPACT BRIDGES FOR FY 2014 - FY 2017

Project: 270746- Type Work: Replace Bridge Descp: CR 423 NW OF DUBLIN @ SANDY CREEK
Length: 0.20

Total Project Cost: Total Project Authorizations:

$633,024 $0

Phase PE
ROW CST UTL

Fund STP Local STP STP

Year LUMP 2016 LUMP LUMP

Uses Lump Sum Bank: LOW IMPACT BRIDGES FOR FY 2014 - FY 2017

Project: M004189 Type Work: Signing
Descp: I-16 @ 12 LOCS BETWEEN BLECKLEY COUNTY & EMANUEL COUNTY Length: 4.80

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations:

$1,700,000 $0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Project: M004704 Type Work: Resurface & Maintenance Descp: SR 31/US 319 FROM I-16 TO SR 26

Length: 4.43

Total Project Cost: Total Project Authorizations:

$3,501,621 $0

Phase CST

Fund NHPP

Year LUMP

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Project: M004705 Type Work: Resurface & Maintenance
Descp: SR 257 FROM 0.04 MI N OF CS 493/INDUSTRIAL BLVD TO SR 31 Length: 1.78

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$549,729 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Federal $81,600 $0
$408,000 $8,160
Federal $81,600 $0
$408,000 $8,160
Federal $1,700,000
Federal $2,801,297
Federal $439,783

State $20,400 $0
$102,000 $2,040

Other $0
$10,824 $0 $0

Total $102,000 $10,824 $510,000 $10,200

State $20,400 $0
$102,000 $2,040

Other $0
$10,824 $0 $0

Total $102,000 $10,824 $510,000 $10,200

State $0

Other $0

Total $1,700,000

State

Also in Bleckley, Emanuel,

Treutlen County

Other

Total

$700,324

$0

$3,501,621

State $109,946

Other $0

Total $549,729

Page 202 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: M004792 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 2 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Project: M004889 Type Work: Resurface & Maintenance
Descp: SR 29 FROM SR 26 TO CR 471/ED SWINSON ROAD Length: 5.37

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations:

$2,263,767 $0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Federal $0
Federal $1,811,014

State $200,000

Other $0

Total $200,000

State

Also in Baldwin, Bleckley, Burke,

Columbia, Dodge, Emanuel,

Glascock, Greene, Hancock,

Jasper, Jefferson, Jenkins,

Johnson, Lincoln, McDuffie,

Morgan, Newton, Oglethorpe,

Putnam, Richmond, Screven,

Taliaferro, Treutlen, Warren,

Washington, Wilkes, Wilkinson

County

Other

Total

$452,753

$0

$2,263,767

Laurens Totals Summary
County Summary excludes lump sum projects.

Project PI#
0000833 0000833 0000833 0007413 0007413 262027M004792

Year
2014 2014 2014 2014 2015 2016 2014

Phase
ROW CST CST PE ROW ROW CST

Fund Local STP State State State NHPP State

Federal
$0 $4,225,500
$0 $0 $0 $13,930,408 $0

State
$0 $1,056,375
$0 $0 $0 $3,482,602 $14,000

Other
$514,080 $0
$7,541,601 $1,874,814 $9,078,000
$0 $0

$18,155,908

$4,552,977

$19,008,495

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $514,080
$5,281,875 $7,541,601 $1,874,814 $9,078,000 $17,413,010
$14,000
$41,717,380

Page 203 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Lee
Project: 0009264 Type Work: Miscellaneous Improvements
Descp: LEESBURG TRAIN DEPOT - RENOVATION & PRESERVATION Length: 0.00

Total Project Cost: Total Project Authorizations:

$291,395 $0

Phase

Fund

CST Other Funds

Year 2015

Federal $233,116

State $58,279

Other $0

Total $291,395

Project: 0009865 Type Work: Replace Bridge Descp: SR 118 @ MUCKALOOCHEE CREEK
Length: 0.10

Total Project Cost: Total Project Authorizations:

$1,083,341 $0

Phase ROW CST

Fund STP STP

Year 2014 2015

Federal $84,064
$782,609

State $21,016
$195,652

Other $0 $0

Total $105,080 $978,261

Project: M004432 Type Work: Bridge Painting
Descp: SR 93 @ LITTLE TIRED CREEK TRIB & SR 195 @ MUCKALEE CREEK Length: 0.80

Phase PE CST

Fund STP STP

Total Project Cost: Total Project Authorizations:

$204,000 $0

Uses Lump Sum Bank: BRIDGE MAINTENANCE/PAINTING FOR FY 2014 - FY 2017

Project: M004794 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 4 Length: 0.00

Phase CST

Fund State

Total Project Cost: Total Project Authorizations:

$200,000 $0

Year LUMP LUMP
Year 2014

Project: M004804 Type Work: Resurface & Maintenance
Descp: SR 118 FROM KINCHAFOONEE CREEK TO SUMTER COUNTY Length: 11.63

Phase CST

Fund STP

Total Project Cost: Total Project Authorizations:

$1,800,000 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Year LUMP

Federal $3,200
$160,000
Federal $0
Federal $1,440,000

State $800
$40,000

Other $0 $0

Total $4,000
$200,000

Also in Grady County

State $200,000

Other $0

Total $200,000

State

Also in Atkinson, Baker, Ben Hill,

Berrien, Brooks, Calhoun, Clay,

Clinch, Coffee, Colquitt, Cook,

Crisp, Decatur, Dougherty, Early,

Echols, Grady, Irwin, Lanier,

Lowndes, Miller, Mitchell,

Quitman, Randolph, Seminole,

Terrell, Thomas, Tift, Turner,

Wilcox, Worth County

Other

Total

$360,000

$0

$1,800,000

Page 204 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project PI#
0009264 0009865 0009865 M004794

Year
2015 2014 2015 2014

Lee Totals Summary

County Summary excludes lump sum projects.

This County is also located in a MPO area. Additional Projects may be listed in the MPO TIP.

Phase

Fund

Federal

State

Other

CST

Other Funds

$233,116

$58,279

$0

ROW

STP

$84,064

$21,016

$0

CST

STP

$782,609

$195,652

$0

CST

State

$0

$6,000

$0

$1,099,789

$280,947

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $291,395 $105,080 $978,261 $6,000
$1,380,736

Page 205 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Lincoln
Project: 0007040 Type Work: Replace Bridge
Descp: SR 43 @ LITTLE RIVER @ LINCOLN/MCDUFFIE COUNTY LINE Length: 0.65

Total Project Cost: Total Project Authorizations:

$7,010,182 $120,000

Phase ROW CST UTL

Fund Bridge STP STP

Year 2013 2015 2015

Project: 0008169 Type Work: TE-Bike/Ped Facility
Descp: LINCOLNTON DOWNTOWN STREETSCAPE PHASE II Length: 0.57

Phase CST

Fund STP

Year 2014

Total Project Cost: Total Project Authorizations:

$515,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 0010413 Type Work: Replace Bridge Descp: SR 43 @ SOAP CREEK 4 MI E OF LINCOLNTON
Length: 0.56

Phase ROW CST

Fund STP STP

Year 2014 After 2017

Total Project Cost: Total Project Authorizations:

$4,905,433 $0

Federal $96,000
$5,200,838 $311,307
Federal $412,000
Federal $234,192
$3,690,154

State $24,000
$1,300,210 $77,827

Other $0 $0 $0

Total $120,000
$6,501,048 $389,134

Also in McDuffie County

State $0

Other $103,000

Total $515,000

State $58,548
$922,539

Other $0 $0

Total $292,740
$4,612,693

Project: 0010698 Type Work: TE-Bike/Ped Facility
Descp: LINCOLNTON DOWNTOWN STREETSCAPES @ 5 LOCS - PHASE III Length: 0.98

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$281,250 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 231920- Type Work: Widening

Descp: SR 43/47 TRAFFIC IMPROVEMENTS IN

LINCOLNTON

Lanes: Exist. 2 Prop. 3

Length: 1.70

Total Project Cost: Total Project Authorizations:

$5,500,914 $10,000

Phase PE PE
ROW CST

Fund STP STP STP STP

Year 2013 2014 2016 After 2017

Federal $225,000
Federal $8,000
$80,000 $1,070,547 $3,242,184

State $0
State $2,000
$20,000 $267,637 $810,546

Other $56,250
Other $0 $0 $0 $0

Total $281,250
Total $10,000
$100,000 $1,338,183 $4,052,730

Page 206 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 232310- Type Work: Replace Bridge
Descp: SR 47 @ LITTLE RIVER 10.5 MI SE OF LINCOLNTON Length: 1.34

Total Project Cost: Total Project Authorizations:

$20,611,147 $0

Phase PE
ROW CST

Fund STP STP Bridge

Year 2014 2014 2014

Federal $8,000
$49,240 $16,431,678

State $2,000
$12,310 $4,107,919

Other $0 $0 $0

Total $10,000 $61,550
$20,539,597

Also in Columbia County

Project: M004701 Type Work: Resurface & Maintenance Descp: SR 44 FROM SR 17/WILKES TO SR 79/LINCOLN
Length: 15.21

Phase CST

Fund STP

Total Project Cost: Total Project Authorizations:

$2,447,110 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Project: M004792 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 2 Length: 0.00

Phase CST

Fund State

Total Project Cost: Total Project Authorizations:

$200,000 $0

Year LUMP
Year 2014

Federal $1,957,688
Federal $0

Lincoln Totals Summary
County Summary excludes lump sum projects.

State $489,422

Other $0

Total $2,447,110

Also in Wilkes County

State $200,000

Other $0

Total $200,000

Also in Baldwin, Bleckley, Burke, Columbia, Dodge, Emanuel, Glascock, Greene, Hancock, Jasper, Jefferson, Jenkins, Johnson, Laurens, McDuffie, Morgan, Newton, Oglethorpe, Putnam, Richmond, Screven, Taliaferro, Treutlen, Warren, Washington, Wilkes, Wilkinson County

Project PI#
0007040 0007040 0010413 231920231920232310232310232310M004792

Year
2015 2015 2014 2014 2016 2014 2014 2014 2014

Phase
CST UTL ROW PE ROW PE ROW CST CST

Fund STP STP STP STP STP STP STP
Bridge State

Federal
$2,600,419 $155,654 $234,192 $80,000
$1,070,547 $4,000
$24,620 $8,215,839
$0

State
$650,105 $38,913 $58,548 $20,000
$267,637 $1,000 $6,155
$2,053,960 $4,000

Other
$0 $0 $0 $0 $0 $0 $0 $0 $0

$12,385,270

$3,100,318

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $3,250,524 $194,567 $292,740 $100,000 $1,338,183 $5,000 $30,775
$10,269,799 $4,000
$15,485,588

Page 207 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Long
Project: M004593 Type Work: Resurface & Maintenance
Descp: SR 38/US 84 FROM SR 57/LONG TO 0.04 MI W OF SR 119/LIBERTY Length: 7.79

Phase CST

Fund NHPP

Year LUMP

Federal $3,051,057

State $762,764

Other $0

Total $3,813,821

Total Project Cost: Total Project Authorizations:

$3,813,821 $0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Also in Liberty County

Project: M004795 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 5 Length: 0.00

Phase CST

Fund State

Year 2014

Federal $0

State $200,000

Other $0

Total $200,000

Total Project Cost: Total Project Authorizations:

$200,000 $0

Also in Appling, Bacon, Brantley, Bryan, Bulloch, Camden, Candler, Charlton, Chatham, Effingham, Evans, Glynn, Jeff Davis, Liberty, McIntosh, Montgomery, Pierce, Tattnall, Telfair, Toombs, Ware, Wayne, Wheeler County

Project PI# M004795

Year 2014

Long Totals Summary

County Summary excludes lump sum projects.

This County is also located in a MPO area. Additional Projects may be listed in the MPO TIP.

Phase

Fund

Federal

State

Other

CST

State

$0

$6,000

$0

Total $6,000

$0

$6,000

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

$6,000

Page 208 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Lumpkin
Project: 0007495 Type Work: Pedestrian Crossings
Descp: PEDESTRIAN UPGRADES @ 20 SR LOCATIONS IN DISTRICT 1 Length: 0.00

Phase CST

Fund HSIP

Year LUMP

Total Project Cost: Total Project Authorizations:

$3,146,613 $560,000

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 0008912 Type Work: Streetscapes
Descp: DOWNTOWN DEVELOPMENT AUTHORITY DIST STREETSCAPE IN DAHLONEGA Length: 0.10

Total Project Cost: Total Project Authorizations:

$1,256,070 $0

Phase

Fund

ROW Local

CST Other Funds

CST TCSP

UTL

Local

Year LOCL 2014 2014 2014

Federal $2,327,952
Federal $0
$40,553 $369,741
$0

State $258,661

Other $0

Total $2,586,613

State

Also in Towns, Union, White

County

Other

Total

$0

$83,000

$83,000

$0

$0

$40,553

$0

$312,776

$682,517

$0

$450,000

$450,000

Project: 0009104 Type Work: TE-Bike/Ped Facility
Descp: DOWNTOWN DAHLONEGA PEDESTRIAN & LANDSCAPE IMPROVEMENTS Length: 0.15

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$126,250 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 0009105 Type Work: TE-Landscape/Beautify
Descp: ENTRANCE CORRIDOR BEAUTIFICATION PROJECT Length: 0.00

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$131,250 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 0009948 Type Work: Roundabout Descp: SR 52 @ SR 115/CR 41/COPPER MINE ROAD
Length: 0.26

Phase ROW CST

Fund HSIP HSIP

Year LUMP LUMP

Total Project Cost: Total Project Authorizations:

$1,647,027 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Federal $101,000
Federal $105,000
Federal $745,000 $902,027

State $0

Other $25,250

State $0

Other $26,250

State $0 $0

Other $0 $0

Total $126,250
Total $131,250
Total $745,000 $902,027

Page 209 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0009949 Type Work: Roundabout Descp: SR 9 @ SR 52

Length: 0.26

Total Project Cost: Total Project Authorizations:

$1,191,027 $0

Phase ROW CST

Fund HSIP HSIP

Year LUMP LUMP

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 0009950 Type Work: Roundabout Descp: SR 9 @ SR 60
Length: 0.26

Phase ROW CST

Fund HSIP HSIP

Year LUMP LUMP

Total Project Cost: Total Project Authorizations:

$1,511,027 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 0010681 Type Work: TE-Bike/Ped Facility
Descp: SR 60 BU FROM CS 522/CHOICE ST TO CS 530/CHURCH ST Length: 0.20

Phase ROW CST UTL

Fund Local STP Local

Year LOCL LUMP LOCL

Total Project Cost: Total Project Authorizations:

$1,476,972 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: M004488 Type Work: Resurface & Maintenance Descp: SR 60BU FROM SR 9 TO SR 9

Length: 4.18

Total Project Cost: Total Project Authorizations:

$1,032,882 $1,032,882

Phase

Fund

CST NHPP

CST Other Funds

Year 2014 2014

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Project: M004791 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 1 Length: 0.00

Phase CST

Fund State

Year 2014

Total Project Cost: Total Project Authorizations:

$200,000 $0

Federal $289,000 $902,027
Federal $609,000 $902,027
Federal $0
$500,000 $0
Federal $730,306 $120,000
Federal $0

State $0 $0

Other $0 $0

Total $289,000 $902,027

State $0 $0

Other $0 $0

Total $609,000 $902,027

State $0 $0 $0

Other $253,000 $352,472 $371,500

Total $253,000 $852,472 $371,500

State $182,576
$0

Other $0 $0

Total $912,882 $120,000

State $200,000

Other $0

Total $200,000

Also in Banks, Barrow, Clarke, Dawson, Elbert, Forsyth, Franklin, Gwinnett, Habersham, Hall, Hart, Jackson, Madison, Oconee, Rabun, Stephens, Towns, Union, Walton, White County

Page 210 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Lumpkin Totals Summary
County Summary excludes lump sum projects.

Project PI#
0008912 0008912 0008912 M004791

Year
2014 2014 2014 2014

Phase
CST CST UTL CST

Fund TCSP Other Funds Local State

Federal
$369,741 $40,553 $0 $0

State
$0 $0 $0 $10,000

Other
$312,776 $0
$450,000 $0

$410,294

$10,000

$762,776

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $682,517 $40,553 $450,000 $10,000
$1,183,070

Page 211 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Macon
Project: 0007042 Type Work: Replace Bridge
Descp: SR 128 @ WHITEWATER CREEK 4 MI N OF OGLETHORPE - TIA Length: 0.40

Total Project Cost: Total Project Authorizations:

$5,921,070 $500,000

Phase PE
ROW CST CST UTL

Fund State STP State STP STP

Year 2014 2016 2017 2017 2017

Federal $0
$136,463 $0
$2,390,985 $209,408

State $0
$34,116 $0
$597,746 $52,352

Other $500,000
$0 $2,000,000
$0 $0

Total $500,000 $170,579
$2,000,000 $2,988,731
$261,760

Project: 0010603 Type Work: TE-Bike/Ped Facility
Descp: SR 26 & SR 49 FM CR 15/CLIFTON BRADLEY DRIVE TO FLINT RIVER Length: 1.81

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$375,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: M004793 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 3 Length: 0.00

Phase CST

Fund State

Year 2014

Total Project Cost: Total Project Authorizations:

$200,000 $0

Federal $300,000
Federal $0

Macon Totals Summary
County Summary excludes lump sum projects.

State $0

Other $75,000

Total $375,000

State $200,000

Other $0

Total $200,000

Also in Bibb, Butts, Chattahoochee, Coweta, Crawford, Dooly, Fayette, Harris, Heard, Henry, Houston, Jones, Lamar, Marion, Meriwether, Monroe, Muscogee, Peach, Pike, Pulaski, Schley, Spalding, Stewart, Sumter, Talbot, Taylor, Troup, Twiggs, Upson, Webster County

Project PI#
0007042 0007042 0007042 0007042 0007042 M004793

Year
2014 2016 2017 2017 2017 2014

Phase
PE ROW CST CST UTL CST

Fund State STP STP State STP State

Federal
$0 $136,463 $2,390,985
$0 $209,408
$0

State
$0 $34,116 $597,746
$0 $52,352
$8,000

Other
$500,000 $0 $0
$2,000,000 $0 $0

$2,736,856

$692,214

$2,500,000

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $500,000 $170,579
$2,988,731 $2,000,000
$261,760 $8,000
$5,929,070

Page 212 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Madison
Project: 0007457 Type Work: Pedestrian Crossings Descp: I-85; SR 8; SR 17; SR 59 & SR 72 @ 12 LOCS
Length: 4.80

Phase ROW CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations:

$1,822,762 $150,000

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 0012694 Type Work: RRX Warning Device
Descp: CS 607/7TH STREET @ CSX #638792M IN CARLTON Length: 0.20

Phase CST

Fund HSIP

Total Project Cost: Total Project Authorizations:

$218,990 $18,990

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2014 - FY 2017

Project: 0012695 Type Work: RRX Warning Device
Descp: CS 610/CROSSOVER STREET @ CSX #638794B IN CARLTON Length: 0.02

Phase CST

Fund HSIP

Total Project Cost: Total Project Authorizations:

$218,990 $18,990

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2014 - FY 2017

Project: 122100- Type Work: Widening

Descp: SR 72 FM EAST OF SR 172 TO THE WEST CITY

LIMITS OF COMER

Lanes: Exist. 2 Prop. 4

Length: 2.75

Phase CST UTL

Fund NHPP Local

Total Project Cost: Total Project Authorizations:

$17,907,449 $0

Year 2013 LUMP
Year LUMP
Year LUMP
Year 2014 2014

Federal $135,000
$1,505,486

State $15,000
$167,276

Other $0 $0

Total $150,000
$1,672,762

Federal $200,000

Also in Franklin, Hart County

State $0

Other $0

Total $200,000

Federal $200,000

State $0

Other $0

Total $200,000

Federal $14,270,080
$0

State $3,567,520
$0

Other $0
$69,850

Total $17,837,600
$69,850

Project: 122650- Type Work: Widening

Descp: SR 72 FM WEST CITY LIMITS OF COMER TO E OF

BROAD RVR/ELBERT

Lanes: Exist. 2 Prop. 4

Length: 9.33

Total Project Cost: Total Project Authorizations:

$59,195,999 $330,000

Phase PE CST UTL

Fund NHS NHPP NHPP

Year 2013 2015 2015

Federal $264,000
$46,697,838 $394,961

State $66,000
$11,674,460 $98,740

Other $0 $0 $0

Total $330,000
$58,372,298 $493,701

Also in Elbert County

Page 213 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: M003887 Type Work: Resurface & Maintenance
Descp: SR 72 FROM W OF COMER CITY LIMIT TO W OF CR 287/RIVER ROAD Length: 9.44

Total Project Cost: Total Project Authorizations:

$2,116,155 $0

Phase CST

Fund NHPP

Year LUMP

Federal $1,692,924

State $423,231

Other $0

Total $2,116,155

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Project: M004791 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 1 Length: 0.00

Phase CST

Fund State

Year 2014

Federal $0

State $200,000

Other $0

Total $200,000

Total Project Cost: Total Project Authorizations:

$200,000 $0

Also in Banks, Barrow, Clarke, Dawson, Elbert, Forsyth, Franklin, Gwinnett, Habersham, Hall, Hart, Jackson, Lumpkin, Oconee, Rabun, Stephens, Towns, Union, Walton, White County

Project PI#
122100122100122650122650M004791

Year
2014 2014 2015 2015 2014

Madison Totals Summary

County Summary excludes lump sum projects.

This County is also located in a MPO area. Additional Projects may be listed in the MPO TIP.

Phase

Fund

Federal

State

Other

CST

NHPP

UTL

Local

CST

NHPP

UTL

NHPP

CST

State

$14,270,080 $0
$14,943,308 $126,387 $0

$3,567,520 $0
$3,735,827 $31,597 $10,000

$0 $69,850
$0 $0 $0

Total
$17,837,600 $69,850
$18,679,135 $157,984 $10,000

$29,339,775

$7,344,944

$69,850

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

$36,754,569

Page 214 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Marion
Project: 0008647 Type Work: Replace Bridge
Descp: CR 99/BOB SAVEL ROAD @ LANAHASSEE CREEK TRIBUTARY Length: 0.40

Total Project Cost: Total Project Authorizations:

$633,024 $0

Phase PE
ROW CST UTL

Uses Lump Sum Bank: LOW IMPACT BRIDGES FOR FY 2014 - FY 2017

Fund STP Local STP STP

Year LUMP 2016 LUMP LUMP

Federal $81,600 $0
$408,000 $8,160

State $20,400 $0
$102,000 $2,040

Other $0
$10,824 $0 $0

Total $102,000 $10,824 $510,000 $10,200

Project: 371120- Type Work: Replace Bridge
Descp: CR 7/WALTER WELLS ROAD @ SHOAL CREEK NW TAZEWELL CL Length: 0.20

Total Project Cost: Total Project Authorizations:

$633,024 $0

Phase PE
ROW CST UTL

Uses Lump Sum Bank: LOW IMPACT BRIDGES FOR FY 2014 - FY 2017

Fund STP Local STP STP

Year LUMP 2016 LUMP LUMP

Federal $81,600 $0
$408,000 $8,160

State $20,400 $0
$102,000 $2,040

Other $0
$10,824 $0 $0

Total $102,000 $10,824 $510,000 $10,200

Project: M004619 Type Work: Resurface & Maintenance Descp: SR 240 FROM SR 127 TO SR 137
Length: 5.47

Phase CST

Fund STP

Total Project Cost: Total Project Authorizations:

$729,393 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Year LUMP

Federal $583,515

State $145,879

Other $0

Total $729,393

Project: M004793 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 3 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Federal $0

Marion Totals Summary
County Summary excludes lump sum projects.

State $200,000

Other $0

Total $200,000

Also in Bibb, Butts, Chattahoochee, Coweta, Crawford, Dooly, Fayette, Harris, Heard, Henry, Houston, Jones, Lamar, Macon, Meriwether, Monroe, Muscogee, Peach, Pike, Pulaski, Schley, Spalding, Stewart, Sumter, Talbot, Taylor, Troup, Twiggs, Upson, Webster County

Project PI# M004793

Year 2014

Phase CST

Fund State

Federal $0

State $8,000

Other $0

$0

$8,000

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $8,000 $8,000

Page 215 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

McDuffie
Project: 0007040 Type Work: Replace Bridge
Descp: SR 43 @ LITTLE RIVER @ LINCOLN/MCDUFFIE COUNTY LINE Length: 0.65

Total Project Cost: Total Project Authorizations:

$7,010,182 $120,000

Project: 0007041 Type Work: Replace Bridge Descp: SR 47 @ BIG BRIER CREEK
Length: 0.51

Total Project Cost: Total Project Authorizations:

$4,009,449 $80,000

Project: 222250- Type Work: Widening

Descp: SR 10/SR 17/US 78 FROM SR 43 TO CR 6/SMITH

MILL ROAD - TIA

Lanes: Exist. 2 Prop. 5

Length: 5.74

Total Project Cost: Total Project Authorizations:

$25,698,343 $0

Phase ROW CST UTL

Fund Bridge STP STP

Year 2013 2015 2015

Federal $96,000
$5,200,838 $311,307

State $24,000
$1,300,210 $77,827

Other $0 $0 $0

Total $120,000
$6,501,048 $389,134

Phase ROW CST UTL

Fund Bridge STP STP

Year 2013 2014 2014

Federal $64,000
$3,061,959 $81,600

Also in Lincoln County

State $16,000
$765,490 $20,400

Other $0 $0 $0

Total $80,000
$3,827,449 $102,000

Phase PE CST CST UTL

Fund NHPP State NHPP NHPP

Year 2014 2015 2015 2015

Federal $80,000 $0
$16,656,428 $426,381

Also in Jefferson County

State $20,000 $0
$4,164,107 $106,595

Other $0
$4,244,832 $0 $0

Total $100,000
$4,244,832 $20,820,534
$532,976

Project: 222255- Type Work: Widening

Descp: SR 10/SR 17 FM SMITH MILL RD TO

WASHINGTON BYP/WILKES - TIA

Lanes: Exist. 2 Prop. 4

Length: 12.00

Total Project Cost: Total Project Authorizations:

$43,406,018 $4,210,000

Project: 227815- Type Work: Replace Bridge
Descp: SR 10/17/US 78 @ HART CREEK 9.5 MI N OF THOMSON Length: 0.23

Total Project Cost: Total Project Authorizations:

$657,677 $0

Phase PE
ROW CST CST UTL

Fund NHPP NHS State NHPP NHPP

Year 2014 2013 2016 2016 2016

Federal $100,000
$3,368,000 $0
$26,374,231 $1,682,583

State $25,000
$842,000 $0
$6,593,558 $420,646

Other $0 $0
$4,000,000 $0 $0

Total $125,000
$4,210,000 $4,000,000 $32,967,789 $2,103,229

Phase PE CST

Fund NHPP NHPP

Year 2014 2017

Federal $8,000
$518,142

Also in Wilkes County

State $2,000
$129,536

Other $0 $0

Total $10,000
$647,677

Page 216 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 227816- Type Work: Replace Bridge Descp: SR 10/US 78 @ BIG CREEK 8 MI N OF THOMSON

Length: 0.24

Total Project Cost: Total Project Authorizations:

$2,284,386 $0

Phase PE CST

Fund NHPP NHPP

Year 2014 2017

Federal $4,000
$1,823,509

State $1,000
$455,877

Other $0 $0

Total $5,000
$2,279,386

Project: M004792 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 2 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Project: M004920 Type Work: Resurface & Maintenance Descp: I-20 FROM SR 12/WARREN TO SR 17/MCDUFFIE
Length: 17.78

Phase PE

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations:

$20,000 $0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Federal $0
Federal $18,000

State $200,000

Other $0

Total $200,000

State

Also in Baldwin, Bleckley, Burke,

Columbia, Dodge, Emanuel,

Glascock, Greene, Hancock,

Jasper, Jefferson, Jenkins,

Johnson, Laurens, Lincoln,

Morgan, Newton, Oglethorpe,

Putnam, Richmond, Screven,

Taliaferro, Treutlen, Warren,

Washington, Wilkes, Wilkinson

County

Other

Total

$2,000

$0

$20,000

Also in Warren County

Page 217 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

McDuffie Totals Summary
County Summary excludes lump sum projects.

Project PI#
0007040 0007040 0007041 0007041 222250222250222250222250222255222255222255222255227815227815227816227816M004792

Year
2015 2015 2014 2014 2014 2015 2015 2015 2014 2016 2016 2016 2014 2017 2014 2017 2014

Phase
CST UTL CST UTL PE CST CST UTL PE CST CST UTL PE CST PE CST CST

Fund STP STP STP STP NHPP NHPP State NHPP NHPP NHPP State NHPP NHPP NHPP NHPP NHPP State

Federal
$2,600,419 $155,654
$1,530,980 $40,800 $80,000
$16,656,428 $0
$426,381 $26,000
$6,857,300 $0
$437,472 $8,000
$518,142 $4,000
$1,823,509 $0

State
$650,105 $38,913
$382,745 $10,200 $20,000
$4,164,107 $0
$106,595 $6,500
$1,714,325 $0
$109,368 $2,000
$129,536 $1,000
$455,877 $4,000

Other
$0 $0 $0 $0 $0 $0 $4,244,832 $0 $0 $0 $1,040,000 $0 $0 $0 $0 $0 $0

$31,165,083

$7,795,271

$5,284,832

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total
$3,250,524 $194,567
$1,913,725 $51,000
$100,000 $20,820,534
$4,244,832 $532,976 $32,500
$8,571,625 $1,040,000
$546,840 $10,000
$647,677 $5,000
$2,279,386 $4,000
$44,245,186

Page 218 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

McIntosh
Project: 0010594 Type Work: TE-Bike/Ped Facility Descp: SR 25 FROM SR 251 TO DARIEN RIVER
Length: 1.53

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$187,500 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Federal $150,000

State $0

Other $37,500

Total $187,500

Project: 0011713 Type Work: Lighting Descp: I-95 @ SR 57/SR 99 - INTERCHANGE LIGHTING
Length: 0.80

Phase PE CST

Fund NHPP NHPP

Total Project Cost: Total Project Authorizations:

$1,458,600 $0

Uses Lump Sum Bank: INTERCHANGE/ROADWAY LIGHTING FOR FY 2014 - FY 2017

Year LUMP LUMP

Federal $146,880
$1,020,000

State $36,720
$255,000

Other $0 $0

Total $183,600
$1,275,000

Project: M004628 Type Work: Resurface & Maintenance
Descp: SR 25 FM SOUTH ALTAMAHA RIVER/GLYNN TO N OF SR 251/MCINTOSH Length: 4.59

Phase CST

Fund STP

Total Project Cost: Total Project Authorizations:

$1,008,620 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Year LUMP

Federal $806,896

State $201,724

Other $0

Total $1,008,620

Also in Glynn County

Project: M004795 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 5 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Federal $0

McIntosh Totals Summary
County Summary excludes lump sum projects.

State $200,000

Other $0

Total $200,000

Also in Appling, Bacon, Brantley, Bryan, Bulloch, Camden, Candler, Charlton, Chatham, Effingham, Evans, Glynn, Jeff Davis, Liberty, Long, Montgomery, Pierce, Tattnall, Telfair, Toombs, Ware, Wayne, Wheeler County

Project PI# M004795

Year 2014

Phase CST

Fund State

Federal $0

State $10,000

Other $0

$0

$10,000

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $10,000 $10,000

Page 219 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Meriwether
Project: 0005532 Type Work: Replace Bridge Descp: SR 85 @ CSX #638677F IN MANCHESTER
Length: 0.14

Total Project Cost: Total Project Authorizations:

$1,612,484 $106,611

Phase PE CST UTL

Fund Bridge STP STP

Year 2013 2014 2014

Federal $85,289
$1,134,297 $70,401

State $21,322
$283,574 $17,600

Other $0 $0 $0

Total $106,611
$1,417,871 $88,002

Project: 0007043 Type Work: Replace Bridge Descp: SR 18 @ CSX RR
Length: 0.40

Total Project Cost: Total Project Authorizations:

$8,640,884 $0

Phase PE
ROW CST UTL

Fund STP STP STP STP

Year 2014 2016 After 2017 After 2017

Federal $443,702 $136,463
$6,003,471 $329,071

State $110,926
$34,116 $1,500,868
$82,268

Other $0 $0 $0 $0

Total $554,628 $170,579
$7,504,339 $411,339

Project: 0007044 Type Work: Replace Bridge
Descp: SR 85 @ CS 081117 LANE STREET IN MANCHESTER Length: 0.40

Total Project Cost: Total Project Authorizations:

$12,639,713 $0

Phase PE
ROW CST UTL

Fund STP STP STP STP

Year 2016 After 2017 After 2017 After 2017

Federal $645,436 $170,371
$8,733,013 $562,950

State $161,359
$42,593 $2,183,253
$140,738

Other $0 $0 $0 $0

Total $806,795 $212,964
$10,916,266 $703,688

Project: 0010414 Type Work: Replace Bridge Descp: SR 109 SPUR @ RED OAK CREEK 2 MI W OF GAY
Length: 0.40

Total Project Cost: Total Project Authorizations:

$1,944,818 $0

Phase ROW CST UTL

Fund STP STP STP

Year 2015 2016 2016

Federal $174,787
$1,338,618 $42,448

State $43,697
$334,655 $10,612

Other $0 $0 $0

Total $218,484
$1,673,273 $53,060

Project: 0010618 Type Work: TE-Bike/Ped Facility
Descp: SR 18 SO/SR 41 SO; SR 109 & CS 799/DEPOT ST @ 3 LOCS - PH II Length: 0.18

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$375,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Federal $300,000

State $0

Other $75,000

Total $375,000

Page 220 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: M004793 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 3 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Federal $0

Meriwether Totals Summary
County Summary excludes lump sum projects.

State $200,000

Other $0

Total $200,000

Also in Bibb, Butts, Chattahoochee, Coweta, Crawford, Dooly, Fayette, Harris, Heard, Henry, Houston, Jones, Lamar, Macon, Marion, Monroe, Muscogee, Peach, Pike, Pulaski, Schley, Spalding, Stewart, Sumter, Talbot, Taylor, Troup, Twiggs, Upson, Webster County

Project PI#
0005532 0005532 0007043 0007043 0007044 0010414 0010414 0010414 M004793

Year
2014 2014 2014 2016 2016 2015 2016 2016 2014

Phase
CST UTL PE ROW PE ROW CST UTL CST

Fund STP STP STP STP STP STP STP STP State

Federal
$1,134,297 $70,401
$443,702 $136,463 $645,436 $174,787 $1,338,618
$42,448 $0

State
$283,574 $17,600
$110,926 $34,116
$161,359 $43,697
$334,655 $10,612 $10,000

Other
$0 $0 $0 $0 $0 $0 $0 $0 $0

$3,986,154

$1,006,539

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $1,417,871 $88,002 $554,628 $170,579 $806,795 $218,484 $1,673,273 $53,060 $10,000
$4,992,693

Page 221 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Miller
Project: 0008667 Type Work: Drainage Improvements Descp: SR 1 @ 1 LOC & CS 500/CUTHBERT ST @ 1 LOC
Length: 0.68

Total Project Cost: Total Project Authorizations:

$1,050,999 $0

Phase ROW CST UTL

Fund NHPP NHPP NHPP

Year 2014 2015 2015

Federal $279,888 $519,296 $41,616

State $69,972
$129,824 $10,404

Other $0 $0 $0

Total $349,860 $649,119 $52,020

Project: 0009111 Type Work: TE-Bike/Ped Facility
Descp: MILFORD STREET/PHILLIPSBURG ROAD SIDEWALKS/WALKING LANE Length: 0.00

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$500,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 0012776 Type Work: Signing
Descp: OFF-SYSTEM SAFETY IMPROVEMENTS @ 8 CR LOCS IN MILLER COUNTY Length: 41.07

Phase CST

Fund HSIP

Year LUMP

Total Project Cost: Total Project Authorizations:

$127,292 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: M004794 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 4 Length: 0.00

Phase CST

Fund State

Year 2014

Total Project Cost: Total Project Authorizations:

$200,000 $0

Federal $400,000
Federal $127,292
Federal $0

State $0

Other $100,000

Total $500,000

State $0

Other $0

Total $127,292

State $200,000

Other $0

Total $200,000

Also in Atkinson, Baker, Ben Hill, Berrien, Brooks, Calhoun, Clay, Clinch, Coffee, Colquitt, Cook, Crisp, Decatur, Dougherty, Early, Echols, Grady, Irwin, Lanier, Lee, Lowndes, Mitchell, Quitman, Randolph, Seminole, Terrell, Thomas, Tift, Turner, Wilcox, Worth County

Page 222 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Miller Totals Summary
County Summary excludes lump sum projects.

Project PI#
0008667 0008667 0008667 M004794

Year
2014 2015 2015 2014

Phase
ROW CST UTL CST

Fund NHPP NHPP NHPP State

Federal
$279,888 $519,296
$41,616 $0

State
$69,972 $129,824
$10,404 $4,000

Other
$0 $0 $0 $0

$840,800

$214,200

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $349,860 $649,119 $52,020 $4,000
$1,054,999

Page 223 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Mitchell
Project: 0008446 Type Work: Replace Bridge Descp: CR 133/STAGE COACH ROAD @ LITTLE CREEK
Length: 0.40

Total Project Cost: Total Project Authorizations:

$633,024 $0

Phase PE
ROW CST UTL

Uses Lump Sum Bank: LOW IMPACT BRIDGES FOR FY 2014 - FY 2017

Project: 0008453 Type Work: Replace Bridge Descp: CR 288/WHIGHAM RD @ BIG SLOUGH
Length: 0.40

Phase PE CST

Total Project Cost: Total Project Authorizations:

$772,480 $0

Fund STP Local STP STP

Year LUMP 2016 LUMP LUMP

Fund STP STP

Year 2017 After 2017

Federal $81,600 $0
$408,000 $8,160
Federal $52,719
$565,265

State $20,400 $0
$102,000 $2,040
State $13,180
$141,316

Other $0
$10,824 $0 $0
Other $0 $0

Total $102,000 $10,824 $510,000 $10,200
Total $65,899
$706,581

Project: 0010611 Type Work: TE-Bike/Ped Facility
Descp: SR 93; CR 305/E RAILROAD ST & CS 704/W RAILROAD ST @ 3 LOCS Length: 0.94

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$312,500 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: M004794 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 4 Length: 0.00

Phase CST

Fund State

Year 2014

Total Project Cost: Total Project Authorizations:

$200,000 $0

Federal $250,000
Federal $0

State $0

Other $62,500

Total $312,500

State $200,000

Other $0

Total $200,000

Also in Atkinson, Baker, Ben Hill, Berrien, Brooks, Calhoun, Clay, Clinch, Coffee, Colquitt, Cook, Crisp, Decatur, Dougherty, Early, Echols, Grady, Irwin, Lanier, Lee, Lowndes, Miller, Quitman, Randolph, Seminole, Terrell, Thomas, Tift, Turner, Wilcox, Worth County

Page 224 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Mitchell Totals Summary
County Summary excludes lump sum projects.

Project PI# 0008453 M004794

Year 2017 2014

Phase PE CST

Fund STP State

Federal $52,719 $0

State $13,180 $8,000

Other $0 $0

$52,719

$21,180

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $65,899 $8,000
$73,899

Page 225 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Monroe
Project: 0007046 Type Work: Replace Bridge Descp: SR 83 @ TOWALIGA RIVER
Length: 0.40

Total Project Cost: Total Project Authorizations:

$6,576,119 $388,970

Phase ROW CST UTL

Fund STP STP STP

Year 2016 After 2017 After 2017

Federal $81,878
$4,538,769 $329,071

State $20,470
$1,134,692 $82,268

Other $0 $0 $0

Total $102,348
$5,673,461 $411,339

Project: 0008884 Type Work: Roundabout Descp: SR 18 @ SR 87
Length: 0.18

Phase ROW CST UTL

Fund Safety Safety Safety

Year LUMP LUMP LUMP

Total Project Cost: Total Project Authorizations:

$1,683,836 $0

Uses Lump Sum Bank: HIGH RISK RURAL ROADS FOR FY 2014 - FY 2017

Project: 0009336 Type Work: RRX Consolidation
Descp: INDIAN SPRINGS RD CROSSOVER @NS #718327K &RR AVE@NS #718328S Length: 0.04

Phase CST

Fund HSIP

Year LUMP

Total Project Cost: Total Project Authorizations:

$16,236 $0

Uses Lump Sum Bank: RAILROAD CROSSING HAZARD ELIMINATION FOR FY 2014 - FY 2017

Project: 0010304 Type Work: TE-Bike/Ped Facility
Descp: CR 271/TIFT COLLEGE DR FM SR 42/SR 83 TO CR 290/PATROL RD Length: 0.78

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$750,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: M004519 Type Work: Signing Descp: I-475 @ 5 LOCS - SIGN UPGRADES
Length: 2.00

Phase PE CST

Fund NHPP NHPP

Year LUMP LUMP

Total Project Cost: Total Project Authorizations:

$2,919,222 $0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Federal $249,696
$1,154,140 $280,000
Federal $16,236
Federal $600,000
Federal $40,000
$2,879,222

State $0 $0 $0

Other $0 $0 $0

Total $249,696
$1,154,140 $280,000

State $0

Other $0

Total $16,236

State $0

Other $150,000

Total $750,000

State $0 $0

Other $0 $0

Total $40,000
$2,879,222

Also in Bibb County

Page 226 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: M004615 Type Work: Resurface & Maintenance Descp: SR 19 FROM BIBB COUNTY LINE TO SE OF SR 18
Length: 12.84

Phase CST

Fund STP

Total Project Cost: Total Project Authorizations:

$2,231,646 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Year LUMP

Federal $1,785,317

State $446,329

Other $0

Total $2,231,646

Project: M004793 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 3 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Federal $0

Monroe Totals Summary
County Summary excludes lump sum projects.

State $200,000

Other $0

Total $200,000

Also in Bibb, Butts, Chattahoochee, Coweta, Crawford, Dooly, Fayette, Harris, Heard, Henry, Houston, Jones, Lamar, Macon, Marion, Meriwether, Muscogee, Peach, Pike, Pulaski, Schley, Spalding, Stewart, Sumter, Talbot, Taylor, Troup, Twiggs, Upson, Webster County

Project PI# 0007046 M004793

Year 2016 2014

Phase ROW CST

Fund STP State

Federal $81,878 $0

State $20,470 $8,000

Other $0 $0

$81,878

$28,470

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $102,348 $8,000
$110,348

Page 227 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Montgomery
Project: 0007037 Type Work: Replace Bridge Descp: SR 135 @ ALTAMAHA RIVER - TIA
Length: 0.60

Total Project Cost: Total Project Authorizations:

$10,303,111 $0

Phase PE
ROW CST CST

Fund STP STP State STP

Year 2017 2017 After 2017 After 2017

Federal $8,000
$50,730 $0
$6,346,165

State $2,000
$12,682 $0
$1,586,541

Other $0 $0
$2,296,992 $0

Total $10,000 $63,412
$2,296,992 $7,932,706

Also in Jeff Davis County

Project: 0012768 Type Work: Pavement Markings
Descp: OFF-SYSTEM SAFETY IMPROVEMENTS @ 18 LOC IN MONTGOMERY COUNTY Length: 0.00

Phase CST

Fund HSIP

Total Project Cost: Total Project Authorizations:

$310,000 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Year LUMP

Federal $310,000

State $0

Other $0

Total $310,000

Project: 0012841 Type Work: RRX Warning Device Descp: SR 56 @ HGR #635163P IN MT VERNON
Length: 0.40

Phase CST

Total Project Cost: Total Project Authorizations:

$220,000 $0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2014 - FY 2017

Fund HSIP

Year LUMP

Federal $220,000

State $0

Other $0

Total $220,000

Project: M004795 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 5 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Federal $0

Montgomery Totals Summary
County Summary excludes lump sum projects.

State $200,000

Other $0

Total $200,000

Also in Appling, Bacon, Brantley, Bryan, Bulloch, Camden, Candler, Charlton, Chatham, Effingham, Evans, Glynn, Jeff Davis, Liberty, Long, McIntosh, Pierce, Tattnall, Telfair, Toombs, Ware, Wayne, Wheeler County

Project PI# 0007037 0007037 M004795

Year 2017 2017 2014

Phase PE
ROW CST

Fund STP STP State

Federal $4,000
$25,365 $0

State $1,000 $6,341 $4,000

Other $0 $0 $0

$29,365

$11,341

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $5,000
$31,706 $4,000
$40,706

Page 228 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Morgan
Project: 0009832 Type Work: Roundabout Descp: SR 24 BYPASS @ CR 252/BETHANY ROAD
Length: 0.40

Phase PE CST

Fund HSIP HSIP

Year 2013 LUMP

Federal $300,000 $212,242

Total Project Cost: Total Project Authorizations:

$512,242 $300,000

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 0010345 Type Work: TE-Bike/Ped Facility Descp: BOSTWICK STREETSCAPE - PHASE II
Length: 0.00

Phase CST

Fund STP

Year LUMP

Federal $100,000

Total Project Cost: Total Project Authorizations:

$125,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 0012734 Type Work: Pavement Markings
Descp: OFF-SYSTEM SAFETY IMPROVEMENTS @ VAR LOCS IN MADISON CITY Length: 0.00

Phase CST

Fund HSIP

Year LUMP

Federal $225,000

Total Project Cost: Total Project Authorizations:

$225,000 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 0012742 Type Work: RRX Warning Device Descp: CS 610/BUCKHEAD ROAD @ CSX #279593T
Length: 0.40

Phase CST

Fund HSIP

Year LUMP

Federal $200,000

Total Project Cost: Total Project Authorizations:

$221,326 $21,326

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2014 - FY 2017

Project: 222570- Type Work: Widening

Descp: SR 24/US 441 FM PUTNAM COUNTY TO N OF CR

121/PIERCE DAIRY RD

Lanes: Exist. 2 Prop. 4

Length: 8.10

Total Project Cost: Total Project Authorizations:

$40,573,317 $0

Phase ROW CST

Fund NHPP NHPP

Year 2016 After 2017

Federal $6,029,359 $26,429,294

State $0 $0
State $0
State $0
State $0
State $1,507,340 $6,607,324

Other $0 $0
Other $25,000
Other $0
Other $0
Other $0 $0

Total $300,000 $212,242
Total $125,000
Total $225,000
Total $200,000
Total $7,536,699 $33,036,618

Page 229 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: M004792 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 2 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Project: M004936 Type Work: Resurface & Maintenance Descp: SR 24 FROM PUTNAM COUNTY LINE TO I-20
Length: 8.05

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations:

$2,221,245 $0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Federal $0
Federal $1,776,996

State $200,000

Other $0

Total $200,000

State

Also in Baldwin, Bleckley, Burke,

Columbia, Dodge, Emanuel,

Glascock, Greene, Hancock,

Jasper, Jefferson, Jenkins,

Johnson, Laurens, Lincoln,

McDuffie, Newton, Oglethorpe,

Putnam, Richmond, Screven,

Taliaferro, Treutlen, Warren,

Washington, Wilkes, Wilkinson

County

Other

Total

$444,249

$0

$2,221,245

Morgan Totals Summary
County Summary excludes lump sum projects.

Project PI# 222570M004792

Year 2016 2014

Phase ROW CST

Fund NHPP State

Federal $6,029,359 $0

State $1,507,340
$6,000

Other $0 $0

$6,029,359

$1,513,340

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $7,536,699 $6,000
$7,542,699

Page 230 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Murray
Project: 0006064 Type Work: Turn Lanes
Descp: SR 286 @ COBB ROAD AND @ TOM GREGORY ROAD Length: 0.80

Total Project Cost: Total Project Authorizations:

$1,553,119 $0

Phase PE
ROW CST UTL

Fund STP STP STP STP

Year 2015 After 2017 After 2017 After 2017

Federal $84,897
$340,744 $225,360 $591,495

State $21,224 $85,186 $56,340
$147,874

Other $0 $0 $0 $0

Total $106,121 $425,930 $281,699 $739,369

Project: 0007047 Type Work: Replace Bridge Descp: SR 52 ALT @ TOWN BRANCH
Length: 0.40

Total Project Cost: Total Project Authorizations:

$425,708 $0

Phase PE
ROW CST

Fund STP STP STP

Year 2015 2017 After 2017

Federal $160,000 $50,730 $129,837

State $40,000 $12,682 $32,459

Other $0 $0 $0

Total $200,000 $63,412 $162,296

Project: 0009620 Type Work: Roundabout
Descp: SR 225 @ CR 132/MT CARMEL CHURCH ROAD/MITCHELL BRIDGE ROAD Length: 0.30

Phase ROW CST UTL

Fund HSIP HSIP HSIP

Total Project Cost: Total Project Authorizations:

$2,040,220 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 0010494 Type Work: Signing
Descp: CR 34 FM CS 621 TO SR 52 & CR 106/109 FM SR 225 TO WHITFIELD Length: 3.68

Phase PE CST

Fund Safety Safety

Total Project Cost: Total Project Authorizations:

$35,000 $0

Uses Lump Sum Bank: HIGH RISK RURAL ROADS FOR FY 2014 - FY 2017

Project: 0011686 Type Work: Replace Bridge Descp: SR 61 @ CSX #340636X 7.9 MI N OF CRANDALL
Length: 0.40

Total Project Cost: Total Project Authorizations:

$2,508,560 $350,000

Phase PE
ROW CST UTL

Fund Bridge STP STP STP

Year LUMP LUMP LUMP
Year LUMP LUMP
Year 2013 2015 2017 2017

Federal $418,000
$1,586,220 $36,000

State $0 $0 $0

Other $0 $0 $0

Federal $10,000 $25,000

State $0 $0

Other $0 $0

Federal $280,000 $124,848
$1,558,702 $43,297

State $70,000 $31,212
$389,676 $10,824

Other $0 $0 $0 $0

Total $418,000
$1,586,220 $36,000
Total $10,000 $25,000
Total $350,000 $156,060
$1,948,378 $54,122

Page 231 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0012697 Type Work: Pavement Markings
Descp: OFF SYSTEM SAFETY IMPROVEMENTS @ 48 CR LOCS IN MURRAY COUNTY Length: 0.00

Total Project Cost: Total Project Authorizations:

$202,323 $0

Phase CST

Fund HSIP

Year LUMP

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 631550- Type Work: New Construction

Descp: SR 225 BYP FM CR 105/IMPERIAL BLVD TO SR

52/US 76

Lanes: Exist. 0 Prop. 2

Length: 2.90

Total Project Cost: Total Project Authorizations:

$23,952,699 $1,237,298

Phase PE
ROW CST UTL

Fund STP STP STP STP

Year 2013 2016 After 2017 After 2017

Federal $202,323
Federal $989,838
$8,545,696 $7,761,073 $1,865,552

State $0
State $247,460 $2,136,424 $1,940,268 $466,388

Other $0
Other $0 $0 $0 $0

Total $202,323
Total $1,237,298 $10,682,120 $9,701,341 $2,331,940

Project: M004796 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 6 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Federal $0

Murray Totals Summary
County Summary excludes lump sum projects.

State $200,000

Other $0

Total $200,000

Also in Bartow, Carroll, Catoosa, Chattooga, Cherokee, Dade, Fannin, Floyd, Gilmer, Gordon, Haralson, Paulding, Pickens, Polk, Walker, Whitfield County

Project PI#
0006064 0007047 0007047 0011686 0011686 0011686 631550M004796

Year
2015 2015 2017 2015 2017 2017 2016 2014

Phase
PE PE ROW ROW CST UTL ROW CST

Fund STP STP STP STP STP STP STP State

Federal
$84,897 $160,000
$50,730 $124,848 $1,558,702
$43,297 $8,545,696
$0

State
$21,224 $40,000 $12,682 $31,212 $389,676 $10,824 $2,136,424 $12,000

Other
$0 $0 $0 $0 $0 $0 $0 $0

$10,568,170

$2,654,042

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $106,121 $200,000 $63,412 $156,060
$1,948,378 $54,122
$10,682,120 $12,000
$13,222,212

Page 232 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Newton
Project: 0004444 Type Work: Guardrail
Descp: SR 212 @ LAKE JACKSON GUARDRAIL @ APPROACHES Length: 0.40

Phase ROW CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations:

$334,626 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 0007049 Type Work: Replace Bridge Descp: SR 36 @ YELLOW RIVER 14 MI S OF COVINGTON
Length: 0.50

Phase ROW CST UTL

Fund STP STP STP

Total Project Cost: Total Project Authorizations:

$4,932,753 $0

Year LUMP LUMP
Year 2014 2016 2016

Federal $172,093 $162,533
Federal $290,496
$3,545,935 $109,771

State $0 $0

Other $0 $0

Total $172,093 $162,533

Also in Jasper County

State $72,624
$886,484 $27,443

Other $0 $0 $0

Total $363,120
$4,432,419 $137,214

Project: 0007592 Type Work: Sidewalks
Descp: YELLOW RIVER MULTI-USE TRAIL IN NEWTON COUNTY Length: 2.36

Total Project Cost: Total Project Authorizations:

$909,000 $0

Phase CST

Fund HPP

Year 2014

Federal $524,925

State $0

Other $384,075

Total $909,000

Project: 0009928 Type Work: Roundabout Descp: SR 11 @ SR 142
Length: 0.12

Phase PE CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations:

$1,061,208 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 0012729 Type Work: Pavement Markings
Descp: OFF-SYSTEM SAFETY IMPROVEMENTS @ VAR LOCS IN COVINGTON Length: 0.00

Phase CST

Fund HSIP

Total Project Cost: Total Project Authorizations:

$350,000 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Year LUMP LUMP
Year LUMP

Federal $159,181 $902,027
Federal $350,000

State $0 $0

Other $0 $0

State $0

Other $0

Total $159,181 $902,027
Total $350,000

Page 233 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0012741 Type Work: RRX Warning Device Descp: CR 75/HAZELBRAND ROAD @ CSX #279637R

Length: 0.20

Total Project Cost: Total Project Authorizations:

$224,989 $24,989

Phase CST

Fund HSIP

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2014 - FY 2017

Project: 231630- Type Work: Widening

Descp: SR 12/US 278 FM COVINGTON CITY LIMITS TO E

OF SR 142

Lanes: Exist. 2 Prop. 4

Length: 2.46

Total Project Cost: Total Project Authorizations:

$11,561,606 $0

Phase PE
ROW CST

Fund STP STP STP

Year LUMP
Year 2014 2014 2016

Federal $200,000

State $0

Other $0

Federal $160,000
$2,560,608 $6,528,677

State $40,000
$640,152 $1,632,169

Other $0 $0 $0

Total $200,000
Total $200,000
$3,200,760 $8,160,846

Project: 242230- Type Work: Widening Descp: SR 142 FM I-20 TO ALCOVY RD IN COVINGTON

Lanes: Exist. 2 Prop. 4

Length: 1.70

Total Project Cost: Total Project Authorizations:

$15,897,130 $0

Phase CST

Fund NHPP

Year 2016

Federal $12,717,704

State $3,179,426

Other $0

Total $15,897,130

Project: 333172- Type Work: Replace Bridge
Descp: SR 36 @ SOUTH RIVER @ BUTTS-NEWTON COUNTY LINE Length: 0.76

Total Project Cost: Total Project Authorizations:

$2,960,577 $1,587,000

Phase PE
ROW CST

Fund STP Bridge STP

Year 2016 2013 2014

Project: M004708 Type Work: Resurface & Maintenance
Descp: SR 36 FROM BUTTS COUNTY LINE TO CR 653/COVINGTON BYPASS ROAD Length: 13.72

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$3,049,937 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA GT 200K FOR FY 2014 - FY 2017

Federal $8,000
$1,269,600 $1,090,862
Federal $2,439,950

State $2,000
$317,400 $272,715

Other $0 $0 $0

Total $10,000
$1,587,000 $1,363,577

Also in Butts County

State $609,987

Other $0

Total $3,049,937

Page 234 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: M004792 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 2 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Project: T003636 Type Work: Transit Projects
Descp: FY 2014 FTA SECTION 5307/5340 FORMULA FUNDS FOR NEWTON Length: 0.00

Total Project Cost: Total Project Authorizations:

$199,764 $0

Phase CST

Fund State

Year 2014

Federal $0

State $200,000

Other $0

Total $200,000

Phase CST

Fund Transit

Year 2014

Federal $159,811

State

Also in Baldwin, Bleckley, Burke,

Columbia, Dodge, Emanuel,

Glascock, Greene, Hancock,

Jasper, Jefferson, Jenkins,

Johnson, Laurens, Lincoln,

McDuffie, Morgan, Oglethorpe,

Putnam, Richmond, Screven,

Taliaferro, Treutlen, Warren,

Washington, Wilkes, Wilkinson

County

Other

Total

$0

$39,953

$199,764

Project: T004087 Type Work: Transit Projects
Descp: FY 2015 FTA SECTION 5307/5340 FORMULA FUNDS FOR NEWTON Length: 0.00

Total Project Cost: Total Project Authorizations:

$199,764 $0

Phase CST

Fund Transit

Year 2015

Federal $159,811

State $19,976

Other $19,976

Total $199,764

Project: T004407 Type Work: Transit Projects
Descp: FY 2016 FTA SECTION 5307/5340 FORMULA FUNDS FOR NEWTON Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund Transit

Year 2016

Federal $160,000

State $0

Other $40,000

Total $200,000

Project: T004864 Type Work: Transit Projects
Descp: FY 2017 FTA SECTION 5307/5340 FORMULA FUNDS FOR NEWTON Length: 0.00

Total Project Cost: Total Project Authorizations:

$240,000 $0

Phase CST

Fund Transit

Year 2017

Federal $192,000

State $0

Other $48,000

Total $240,000

Page 235 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project PI#
0007049 0007049 0007049 0007592 231630231630231630242230333172333172M004792 T003636 T004087 T004407 T004864

Year
2014 2016 2016 2014 2014 2014 2016 2016 2016 2014 2014 2014 2015 2016 2017

Newton Totals Summary

County Summary excludes lump sum projects.

This County is also located in a MPO area. Additional Projects may be listed in the MPO TIP.

Phase

Fund

Federal

State

Other

ROW CST UTL CST PE ROW CST CST PE CST CST CST CST CST CST

STP STP STP HPP STP STP STP NHPP STP STP State Transit Transit Transit Transit

$290,496 $3,545,935
$109,771 $524,925 $160,000 $2,560,608 $6,528,677 $12,717,704
$4,000 $545,431
$0 $159,811 $159,811 $160,000 $192,000

$72,624 $886,484
$27,443 $0
$40,000 $640,152 $1,632,169 $3,179,426
$1,000 $136,358
$4,000 $0
$19,976 $0 $0

$0 $0 $0 $384,075 $0 $0 $0 $0 $0 $0 $0 $39,953 $19,976 $40,000 $48,000

$27,659,169

$6,639,632

$532,004

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total
$363,120 $4,432,419
$137,214 $909,000 $200,000 $3,200,760 $8,160,846 $15,897,130
$5,000 $681,789
$4,000 $199,764 $199,764 $200,000 $240,000
$34,830,805

Page 236 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Oconee
Project: M004791 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 1 Length: 0.00

Phase CST

Fund State

Year 2014

Federal $0

State $200,000

Other $0

Total $200,000

Total Project Cost: Total Project Authorizations:

$200,000 $0

Also in Banks, Barrow, Clarke, Dawson, Elbert, Forsyth, Franklin, Gwinnett, Habersham, Hall, Hart, Jackson, Lumpkin, Madison, Rabun, Stephens, Towns, Union, Walton, White County

Project PI# M004791

Year 2014

Oconee Totals Summary

County Summary excludes lump sum projects.

This County is also located in a MPO area. Additional Projects may be listed in the MPO TIP.

Phase

Fund

Federal

State

Other

CST

State

$0

$6,000

$0

$0

$6,000

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $6,000 $6,000

Page 237 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Oglethorpe
Project: 0010690 Type Work: TE-Rehab Hist Trans Bldg Descp: CRAWFORD DEPOT REHABILITATION
Length: 0.40

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$375,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 222460- Type Work: Passing Lanes

Descp: SR 10:OGLETHORPE 13.7-15;15.3-16.2 &WILKES

0-1.5;5.5-7.0-TIA

Lanes: Exist. 2 Prop. 3

Length: 5.32

Total Project Cost: Total Project Authorizations:

$8,058,287 $100,866

Phase PE PE CST

Fund STP State NHPP

Year 2013 2014 After 2017

Federal $300,000
Federal $80,693 $0
$6,205,937

Project: M004792 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 2 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Federal $0

Oglethorpe Totals Summary
County Summary excludes lump sum projects.

State $0

Other $75,000

Total $375,000

State $20,173 $0
$1,551,484

Other $0
$200,000 $0

Total $100,866 $200,000
$7,757,421

Also in Wilkes County

State $200,000

Other $0

Total $200,000

Also in Baldwin, Bleckley, Burke, Columbia, Dodge, Emanuel, Glascock, Greene, Hancock, Jasper, Jefferson, Jenkins, Johnson, Laurens, Lincoln, McDuffie, Morgan, Newton, Putnam, Richmond, Screven, Taliaferro, Treutlen, Warren, Washington, Wilkes, Wilkinson County

Project PI# 222460M004792

Year 2014 2014

Phase PE CST

Fund State State

Federal $0 $0

State $0
$8,000

Other $84,000 $0

$0

$8,000

$84,000

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $84,000 $8,000
$92,000

Page 238 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Peach

Project: 0000405 Type Work: Widening

Descp: SR 7/US 341 FROM SR 96/PEACH TO

4-LN/HOUSTON & PART NEW LOC

Lanes: Exist. 2 Prop. 4

Length: 9.20

Total Project Cost: Total Project Authorizations:

$65,349,153 $0

Project: 0007623 Type Work: Bridge Rehab
Descp: CR 183/MOSLEY RD @ MULE CREEK IN PEACH COUNTY Length: 0.40

Total Project Cost: Total Project Authorizations:

$275,989 $275,989

Phase PE
ROW CST UTL

Fund STP STP STP STP

Year 2017 After 2017 After 2017 After 2017

Federal $3,304,999 $4,440,057 $42,981,512 $1,552,755

State $826,250 $1,110,014 $10,745,378 $388,189

Other $0 $0 $0 $0

Total $4,131,249 $5,550,071 $53,726,890 $1,940,944

Phase CST CST

Fund HPP HPP

Year 2014 2014

Federal $183,798 $36,993

Also in Houston County

State $45,950 $9,248

Other $0 $0

Total $229,748 $46,241

Project: 0008189 Type Work: TE-Historic Preservation
Descp: FORT VALLEY FREIGHT DEPOT REHABILITATION IN PEACH COUNTY Length: 0.00

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$1,070,265 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 0009731 Type Work: RRX Warning Device Descp: CS 622/EAST MAIN STREET @ NS #733427C
Length: 0.16

Phase CST

Fund HSIP

Year LUMP

Total Project Cost: Total Project Authorizations:

$318,362 $0

Uses Lump Sum Bank: RAILROAD CROSSING HAZARD ELIMINATION FOR FY 2014 - FY 2017

Project: 0010604 Type Work: TE-Bike/Ped Facility
Descp: FORT VALLEY STATE UNIVERSITY PEDESTRIAN IMPROVEMENTS Length: 0.00

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$375,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Federal $856,212
Federal $318,362
Federal $300,000

State $0

Other $214,053

State $0

Other $0

State $0

Other $75,000

Total $1,070,265
Total $318,362
Total $375,000

Page 239 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0012838 Type Work: RRX Warning Device
Descp: CS 617/TULIP DRIVE @ GSR #718515A IN FORT VALLEY Length: 0.40

Total Project Cost: Total Project Authorizations:

$220,000 $0

Phase CST

Fund HSIP

Year LUMP

Federal $220,000

State $0

Other $0

Total $220,000

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2014 - FY 2017

Project: M004779 Type Work: Pavement Markings
Descp: I-75 FROM N OF SR 96/PEACH TO N OF ECHECONNEE CREEK/BIBB Length: 10.16

Phase CST

Fund NHPP

Year 2014

Federal $1,742,418

State $0

Other $0

Total $1,742,418

Total Project Cost: Total Project Authorizations:

$1,742,418 $1,742,418

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Also in Bibb, Crawford County

Project: M004793 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 3 Length: 0.00

Phase CST

Fund State

Year 2014

Federal $0

State $200,000

Other $0

Total $200,000

Total Project Cost: Total Project Authorizations:

$200,000 $0

Also in Bibb, Butts, Chattahoochee, Coweta, Crawford, Dooly, Fayette, Harris, Heard, Henry, Houston, Jones, Lamar, Macon, Marion, Meriwether, Monroe, Muscogee, Pike, Pulaski, Schley, Spalding, Stewart, Sumter, Talbot, Taylor, Troup, Twiggs, Upson, Webster County

Project PI#
0000405 0007623 0007623 M004793

Year
2017 2014 2014 2014

Peach Totals Summary

County Summary excludes lump sum projects.

This County is also located in a MPO area. Additional Projects may be listed in the MPO TIP.

Phase

Fund

Federal

State

Other

PE

STP

$2,478,749

$619,687

$0

CST

HPP

$36,993

$9,248

$0

CST

HPP

$183,798

$45,950

$0

CST

State

$0

$4,000

$0

Total
$3,098,437 $46,241
$229,748 $4,000

$2,699,541

$678,885

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

$3,378,426

Page 240 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Pickens
Project: 0006416 Type Work: Realignment
Descp: SR 53 FM E OF CR 269/RYO MOUNTAIN RD TO W OF CR 178/DAVIS RD Length: 1.50

Total Project Cost: Total Project Authorizations:

$13,577,571 $0

Phase PE
ROW CST UTL

Fund HSIP HSIP HSIP HSIP

Year LUMP LUMP LUMP LUMP

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 0008043 Type Work: Acceleration / Decel Lane
Descp: SR 515/US 76 @ CR 250/ANTIOCH CHURCH ROAD Length: 1.10

Phase ROW CST

Fund NHPP NHPP

Year 2015 After 2017

Total Project Cost: Total Project Authorizations:

$1,227,360 $0

Federal $35,100
$2,952,000 $8,660,840
$571,873
Federal $202,688 $779,200

State $3,900
$328,000 $962,316
$63,542

Other $0 $0 $0 $0

Total $39,000
$3,280,000 $9,623,156
$635,415

Also in Gordon County

State $50,672
$194,800

Other $0 $0

Total $253,360 $974,000

Project: 0008190 Type Work: TE-Scenic Hwy/Welcome Ctr Descp: SR 53 @ TATE DEPOT IN PICKENS COUNTY
Length: 0.40

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$1,500,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 0008314 Type Work: Realignment Descp: SR 136 FROM SR 136 CONN TO SR 515
Length: 2.68

Phase ROW CST

Fund HSIP HSIP

Year LUMP LUMP

Total Project Cost: Total Project Authorizations:

$9,181,128 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 0009889 Type Work: Roundabout Descp: SR 53 @ SR 53BU
Length: 0.25

Phase PE CST

Fund HSIP HSIP

Year LUMP LUMP

Total Project Cost: Total Project Authorizations:

$1,061,208 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Federal $1,200,000
Federal $1,778,372 $6,484,643
Federal $159,181 $902,027

State $0

Other $300,000

State $197,597 $720,516

Other $0 $0

State $0 $0

Other $0 $0

Total $1,500,000
Total $1,975,969 $7,205,159
Total $159,181 $902,027

Page 241 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0010769 Type Work: RRX Warning Device Descp: SR 53 @ GNR #340856T IN TATE

Length: 0.40

Total Project Cost: Total Project Authorizations:

$209,100 $0

Phase PE CST

Fund HSIP HSIP

Year LUMP LUMP

Federal $5,100
$204,000

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2014 - FY 2017

Project: 621490- Type Work: Widening

Descp: SR 53BU FM SR 515/APD TO CR 243/INDUSTRIAL

BLVD

Lanes: Exist. 2 Prop. 4

Length: 2.60

Total Project Cost: Total Project Authorizations:

$25,793,657 $0

Phase PE
ROW CST UTL

Fund NHPP NHPP NHPP NHPP

Year 2014 2015 After 2017 After 2017

Federal $360,000
$8,172,550 $10,774,405
$1,327,971

State $0 $0
State $90,000
$2,043,138 $2,693,601
$331,993

Other $0 $0

Total $5,100
$204,000

Other $0 $0 $0 $0

Total $450,000
$10,215,688 $13,468,006
$1,659,963

Project: 621595- Type Work: Passing Lanes

Descp: SR 53 FM E OF CR 36/OLD MILL WHITE RD TO E

OF STEVE TATE RD

Lanes: Exist. 2 Prop. 3

Length: 2.30

Total Project Cost: Total Project Authorizations:

$2,717,091 $0

Phase ROW CST UTL

Fund NHPP NHPP Local

Year 2016 After 2017 After 2017

Federal $935,221
$1,212,852 $0

State $233,805 $303,213
$0

Other $0 $0
$32,000

Total $1,169,027 $1,516,065
$32,000

Project: M003372 Type Work: Miscellaneous Improvements
Descp: SR 136 @ 2 LOC BTWN CR 305 & CR 224 EMERGENCY SLOPE REPAIR Length: 0.80

Total Project Cost: Total Project Authorizations:

$1,310,650 $0

Phase CST

Fund STP

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Project: M004796 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 6 Length: 0.00

Phase CST

Fund State

Total Project Cost: Total Project Authorizations:

$200,000 $0

Year LUMP
Year 2014

Federal $1,048,520
Federal $0

State $262,130

Other $0

Total $1,310,650

State $200,000

Other $0

Total $200,000

Also in Bartow, Carroll, Catoosa, Chattooga, Cherokee, Dade, Fannin, Floyd, Gilmer, Gordon, Haralson, Murray, Paulding, Polk, Walker, Whitfield County

Page 242 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Pickens Totals Summary
County Summary excludes lump sum projects.

Project PI#
0008043 621490621490621595M004796

Year
2015 2014 2015 2016 2014

Phase
ROW PE
ROW ROW CST

Fund NHPP NHPP NHPP NHPP State

Federal
$202,688 $360,000 $8,172,550 $935,221
$0

State
$50,672 $90,000 $2,043,138 $233,805
$8,000

Other
$0 $0 $0 $0 $0

$9,670,459

$2,425,615

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $253,360 $450,000
$10,215,688 $1,169,027 $8,000
$12,096,074

Page 243 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Pierce
Project: 0010595 Type Work: TE-Bike/Ped Facility
Descp: SR 121 @ 1 LOC & CS 624/S CENTRAL AVE @ 1 LOC IN BLACKSHEAR Length: 0.58

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$312,500 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 0012725 Type Work: Pavement Markings
Descp: OFF-SYSTEM SAFETY IMPROVEMENTS @ 15 LOCS IN PIERCE COUNTY Length: 0.00

Phase CST

Fund HSIP

Year LUMP

Total Project Cost: Total Project Authorizations:

$268,000 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 531340- Type Work: Replace Bridge
Descp: CR 305/CR 530 @ BIG SATILLA CREEK & OVERFLOW Length: 0.60

Phase ROW CST UTL

Fund Local STP Local

Year 2014 2016 2016

Total Project Cost: Total Project Authorizations:

$4,186,650 $0

Project: 532320- Type Work: Replace Bridge
Descp: CR 309 @ LITTLE HURRICANE CREEK 3 MI SE OF BACON COUNTY LINE Length: 0.40

Total Project Cost: Total Project Authorizations:

$2,295,943 $125,000

Phase ROW CST UTL

Fund Local STP Local

Year 2013 2015 2015

Federal $250,000
Federal $268,000
Federal $0
$3,159,038 $0
Federal $0
$1,719,154 $0

State $0

Other $62,500

Total $312,500

State $0

Other $0

Total $268,000

State $0 $0 $0

Other $108,120 $789,760 $129,733

Total $108,120
$3,948,798 $129,733

Also in Appling County

State $0 $0 $0

Other $125,000 $429,789
$22,000

Total $125,000
$2,148,943 $22,000

Project: M004795 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 5 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Federal $0

State $200,000

Other $0

Total $200,000

Also in Appling, Bacon, Brantley, Bryan, Bulloch, Camden, Candler, Charlton, Chatham, Effingham, Evans, Glynn, Jeff Davis, Liberty, Long, McIntosh, Montgomery, Tattnall, Telfair, Toombs, Ware, Wayne, Wheeler County

Page 244 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Pierce Totals Summary
County Summary excludes lump sum projects.

Project PI#
531340531340531340532320532320M004795

Year
2014 2016 2016 2015 2015 2014

Phase
ROW CST UTL CST UTL CST

Fund Local STP Local STP Local State

Federal
$0 $1,042,483
$0 $1,719,154
$0 $0

State
$0 $0 $0 $0 $0 $6,000

Other
$35,680 $260,621
$42,812 $429,789
$22,000 $0

$2,761,637

$6,000

$790,901

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $35,680
$1,303,103 $42,812
$2,148,943 $22,000 $6,000
$3,558,537

Page 245 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Pike
Project: 0010621 Type Work: TE-Bike/Ped Facility
Descp: SR 18; CR 250/E JACKSON; CS 559/ADAMS & CS 560/DUNN @ 4 LOCS Length: 0.45

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$500,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 371130- Type Work: Replace Bridge
Descp: CR 5/BUFFINGTON ROAD @ TURNPIKE CREEK 5 MI E OF ZEBULON Length: 0.40

Total Project Cost: Total Project Authorizations:

$633,024 $0

Phase PE
ROW CST UTL

Fund STP Local STP STP

Year LUMP 2016 LUMP LUMP

Uses Lump Sum Bank: LOW IMPACT BRIDGES FOR FY 2014 - FY 2017

Project: M004793 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 3 Length: 0.00

Phase CST

Fund State

Year 2014

Total Project Cost: Total Project Authorizations:

$200,000 $0

Federal $400,000
Federal $81,600 $0
$408,000 $8,160
Federal $0

Pike Totals Summary
County Summary excludes lump sum projects.

State $0

Other $100,000

Total $500,000

State $20,400 $0
$102,000 $2,040

Other $0
$10,824 $0 $0

Total $102,000 $10,824 $510,000 $10,200

State $200,000

Other $0

Total $200,000

Also in Bibb, Butts, Chattahoochee, Coweta, Crawford, Dooly, Fayette, Harris, Heard, Henry, Houston, Jones, Lamar, Macon, Marion, Meriwether, Monroe, Muscogee, Peach, Pulaski, Schley, Spalding, Stewart, Sumter, Talbot, Taylor, Troup, Twiggs, Upson, Webster County

Project PI# M004793

Year 2014

Phase CST

Fund State

Federal $0

State $4,000

Other $0

$0

$4,000

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $4,000 $4,000

Page 246 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Polk
Project: 0010495 Type Work: Signing
Descp: CR 441 @ 1 LOC; CR 442 @ 1 LOC & CR 444 @ 1 LOC Length: 8.03

Phase PE CST

Total Project Cost: Total Project Authorizations:

$83,000 $0

Uses Lump Sum Bank: HIGH RISK RURAL ROADS FOR FY 2014 - FY 2017

Fund Safety Safety

Year LUMP LUMP

Federal $8,000
$75,000

State $0 $0

Other $0 $0

Total $8,000
$75,000

Project: M004796 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 6 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Federal $0

Polk Totals Summary
County Summary excludes lump sum projects.

State $200,000

Other $0

Total $200,000

Also in Bartow, Carroll, Catoosa, Chattooga, Cherokee, Dade, Fannin, Floyd, Gilmer, Gordon, Haralson, Murray, Paulding, Pickens, Walker, Whitfield County

Project PI# M004796

Year 2014

Phase CST

Fund State

Federal $0

State $10,000

Other $0

$0

$10,000

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $10,000 $10,000

Page 247 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Pulaski
Project: 0005533 Type Work: Replace Bridge
Descp: SR 11/US 129 @ BLUFF CREEK 4.7 MILES E OF FINLEYSON Length: 0.49

Total Project Cost: Total Project Authorizations:

$2,385,372 $0

Phase PE
ROW CST

Fund STP STP STP

Year 2016 2016 After 2017

Federal $8,000
$128,367 $1,771,930

State $2,000
$32,092 $442,983

Other $0 $0 $0

Total $10,000
$160,459 $2,214,913

Project: 0007050 Type Work: Replace Bridge Descp: SR 26 @ OCMULGEE RIVER
Length: 0.61

Total Project Cost: Total Project Authorizations:

$9,952,888 $0

Phase ROW CST UTL

Fund NHPP NHPP NHPP

Year 2015 2016 2016

Federal $42,448
$6,664,240 $1,255,621

State $10,612
$1,666,060 $313,905

Other $0 $0 $0

Total $53,060
$8,330,300 $1,569,527

Project: 0007585 Type Work: Sidewalks
Descp: SIDEWALKS & LANDSCAPING IN DOWNTOWN HAWKINSVILLE Length: 0.00

Total Project Cost: Total Project Authorizations:

$449,950 $0

Phase CST

Fund HPP

Year 2015

Federal $359,960

State $0

Other $89,990

Total $449,950

Project: 0009413 Type Work: Multi-use Trail
Descp: OCMULGEE RIVER CORRIDOR - MILE BRANCH RIVER PARK - RIVERWALK Length: 0.00

Total Project Cost: Total Project Authorizations:

$223,650 $0

Phase CST

Fund TCSP

Year 2015

Federal $84,890

State $0

Other $138,760

Total $223,650

Project: 331890- Type Work: Replace Bridge
Descp: CR 198 @ TEN MILE CRK TRIB NW OF FINLEYSON Length: 0.40

Total Project Cost: Total Project Authorizations:

$633,024 $0

Phase PE
ROW CST UTL

Uses Lump Sum Bank: LOW IMPACT BRIDGES FOR FY 2014 - FY 2017

Fund STP Local STP STP

Year LUMP 2016 LUMP LUMP

Federal $81,600 $0
$408,000 $8,160

State $20,400 $0
$102,000 $2,040

Other $0
$10,824 $0 $0

Total $102,000 $10,824 $510,000 $10,200

Page 248 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: M004614 Type Work: Resurface & Maintenance
Descp: SR 27 FROM DOOLY COUNTY LINE TO JUST S OF SR 230 Length: 11.82

Total Project Cost: Total Project Authorizations:

$2,523,845 $0

Phase CST

Fund STP

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Project: M004793 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 3 Length: 0.00

Phase CST

Fund State

Total Project Cost: Total Project Authorizations:

$200,000 $0

Year 2014
Year 2014

Project: M004948 Type Work: Resurface & Maintenance Descp: SR 112 FROM WILCOX COUNTY LINE TO SR 11
Length: 8.30

Phase CST

Fund STP

Total Project Cost: Total Project Authorizations:

$983,799 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Year LUMP

Federal $2,019,076
Federal $0
Federal $787,039

State $504,769

Other $0

Total $2,523,845

State $200,000

Other $0

Total $200,000

State

Also in Bibb, Butts,

Chattahoochee, Coweta,

Crawford, Dooly, Fayette, Harris,

Heard, Henry, Houston, Jones,

Lamar, Macon, Marion,

Meriwether, Monroe, Muscogee,

Peach, Pike, Schley, Spalding,

Stewart, Sumter, Talbot, Taylor,

Troup, Twiggs, Upson, Webster

County

Other

Total

$196,760

$0

$983,799

Pulaski Totals Summary
County Summary excludes lump sum projects.

Project PI#
0005533 0005533 0007050 0007050 0007050 0007585 0009413 M004793

Year
2016 2016 2015 2016 2016 2015 2015 2014

Phase
PE ROW ROW CST UTL CST CST CST

Fund STP STP NHPP NHPP NHPP HPP TCSP State

Federal
$8,000 $128,367
$42,448 $6,664,240 $1,255,621
$359,960 $84,890 $0

State
$2,000 $32,092 $10,612 $1,666,060 $313,905
$0 $0 $4,000

Other
$0 $0 $0 $0 $0 $89,990 $138,760 $0

$8,543,527

$2,028,669

$228,750

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $10,000
$160,459 $53,060
$8,330,300 $1,569,527
$449,950 $223,650
$4,000
$10,800,946

Page 249 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Putnam
Project: 0007430 Type Work: RRX Warning Device Descp: CS 500/MAPLE STREET @ NS #733066A
Length: 0.40

Phase PE CST

Fund HSIP HSIP

Year LUMP LUMP

Total Project Cost: Total Project Authorizations:

$165,204 $0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2014 - FY 2017

Project: 0009896 Type Work: RRX Warning Device Descp: SR 16 @ NS #733043T
Length: 0.40

Phase CST

Fund HSIP

Year LUMP

Total Project Cost: Total Project Authorizations:

$265,302 $0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2014 - FY 2017

Project: 0011702 Type Work: TE-Bike/Ped Facility
Descp: SR 24 FROM SR 16 TO N OF EAST HARRIS ST/WILLIE BAILEY ST Length: 0.10

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$312,500 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 0012728 Type Work: Pavement Markings
Descp: OFF-SYSTEM SAFETY IMPROVEMENTS @ VAR LOCS IN EATONTON Length: 0.00

Phase CST

Fund HSIP

Year LUMP

Total Project Cost: Total Project Authorizations:

$250,000 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: M004792 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 2 Length: 0.00

Phase CST

Fund State

Year 2014

Total Project Cost: Total Project Authorizations:

$200,000 $0

Federal $7,030
$158,174
Federal $265,302
Federal $250,000
Federal $250,000
Federal $0

State $0 $0

Other $0 $0

Total $7,030
$158,174

State $0

Other $0

Total $265,302

State $0

Other $62,500

Total $312,500

State $0

Other $0

Total $250,000

State $200,000

Other $0

Total $200,000

Also in Baldwin, Bleckley, Burke, Columbia, Dodge, Emanuel, Glascock, Greene, Hancock, Jasper, Jefferson, Jenkins, Johnson, Laurens, Lincoln, McDuffie, Morgan, Newton, Oglethorpe, Richmond, Screven, Taliaferro, Treutlen, Warren, Washington, Wilkes, Wilkinson County

Page 250 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Putnam Totals Summary
County Summary excludes lump sum projects.

Project PI# M004792

Year 2014

Phase CST

Fund State

Federal $0

State $6,000

Other $0

$0

$6,000

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $6,000 $6,000

Page 251 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Quitman
Project: M004794 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 4 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Federal $0

Quitman Totals Summary
County Summary excludes lump sum projects.

State $200,000

Other $0

Total $200,000

Also in Atkinson, Baker, Ben Hill, Berrien, Brooks, Calhoun, Clay, Clinch, Coffee, Colquitt, Cook, Crisp, Decatur, Dougherty, Early, Echols, Grady, Irwin, Lanier, Lee, Lowndes, Miller, Mitchell, Randolph, Seminole, Terrell, Thomas, Tift, Turner, Wilcox, Worth County

Project PI# M004794

Year 2014

Phase CST

Fund State

Federal $0

State $2,000

Other $0

$0

$2,000

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $2,000 $2,000

Page 252 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Rabun
Project: 0012849 Type Work: Signing
Descp: OFF-SYSTEM SAFETY IMPROVEMENTS @ 6 LOCS IN RABUN COUNTY Length: 42.59

Phase CST

Fund HSIP

Year LUMP

Federal $257,000

Total Project Cost: Total Project Authorizations:

$257,000 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 122090- Type Work: Widening

Descp: SR 15/US 441 FM NORTH CL/CLAYTON TO

NORTH CAROLINA LINE

Lanes: Exist. 2 Prop. 4

Length: 7.40

Total Project Cost: Total Project Authorizations:

$64,238,205 $0

Phase ROW ROW CST UTL

Fund NHPP HPP NHPP NHPP

Year 2015 2015 After 2017 After 2017

Federal $15,734,107
$1,799,800 $32,570,129
$1,286,528

State $0
State $3,933,527
$449,950 $8,142,532
$321,632

Other $0

Total $257,000

Other $0 $0 $0 $0

Total $19,667,633
$2,249,750 $40,712,662
$1,608,160

Project: 170940- Type Work: Replace Bridge
Descp: CR 86/CAT GAP ROAD @ TALLULAH RIVER 7.1 MI NW OF TIGER Length: 0.20

Total Project Cost: Total Project Authorizations:

$633,024 $0

Phase PE
ROW CST UTL

Fund STP Local STP STP

Year LUMP 2016 LUMP LUMP

Uses Lump Sum Bank: LOW IMPACT BRIDGES FOR FY 2014 - FY 2017

Project: M003640 Type Work: Culvert
Descp: SR 246 FROM CR 7/KELLEYS ROAD TO CR 92/WAYFARER LANE Length: 0.84

Phase

Fund

CST Emergency

Year LUMP

Total Project Cost: Total Project Authorizations:

$16,000 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Project: M003641 Type Work: Shoulder Work
Descp: SR 246 FROM CR 92/WAYFARER LANE TO CS 853/WINDING RIDGE ROAD Length: 1.42

Phase

Fund

CST Emergency

Year LUMP

Total Project Cost: Total Project Authorizations:

$15,000 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Federal $81,600 $0
$408,000 $8,160

State $20,400 $0
$102,000 $2,040

Other $0
$10,824 $0 $0

Federal $12,800

State $3,200

Other $0

Federal $12,000

State $3,000

Other $0

Total $102,000 $10,824 $510,000 $10,200
Total $16,000
Total $15,000

Page 253 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: M003642 Type Work: Shoulder Work
Descp: SR 246 FROM CS 853/WINDING RIDGE ROAD TO NORTH CAROLINA Length: 0.68

Phase

Fund

CST Emergency

Year LUMP

Total Project Cost: Total Project Authorizations:

$14,000 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Federal $11,200

State $2,800

Other $0

Total $14,000

Project: M004791 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 1 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Federal $0

Rabun Totals Summary
County Summary excludes lump sum projects.

State $200,000

Other $0

Total $200,000

Also in Banks, Barrow, Clarke, Dawson, Elbert, Forsyth, Franklin, Gwinnett, Habersham, Hall, Hart, Jackson, Lumpkin, Madison, Oconee, Stephens, Towns, Union, Walton, White County

Project PI# 122090122090M004791

Year 2015 2015 2014

Phase ROW ROW CST

Fund HPP NHPP State

Federal $1,799,800
$15,734,107 $0

State $449,950
$3,933,527 $14,000

Other $0 $0 $0

$17,533,907

$4,397,477

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $2,249,750
$19,667,633 $14,000
$21,931,383

Page 254 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Randolph
Project: 0008362 Type Work: Replace Bridge
Descp: CR 22/ELEVEN BRIDGES RD @ CARTER CREEK 10 MI SE OF CUTHBERT Length: 0.40

Total Project Cost: Total Project Authorizations:

$633,024 $0

Phase PE
ROW CST UTL

Uses Lump Sum Bank: LOW IMPACT BRIDGES FOR FY 2014 - FY 2017

Fund STP Local STP STP

Year LUMP 2016 LUMP LUMP

Federal $81,600 $0
$408,000 $8,160

State $20,400 $0
$102,000 $2,040

Other $0
$10,824 $0 $0

Total $102,000 $10,824 $510,000 $10,200

Project: 0009851 Type Work: Roundabout Descp: SR 1/US 27 @ SR 50/US 82
Length: 0.25

Phase CST

Fund HSIP

Total Project Cost: Total Project Authorizations:

$902,027 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Year LUMP

Federal $902,027

State $0

Other $0

Total $902,027

Project: 0010606 Type Work: TE-Bike/Ped Facility
Descp: SHELLMAN DOWNTOWN STREETSCAPES @ 4 LOCS Length: 0.79

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$375,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Federal $300,000

State $0

Other $75,000

Total $375,000

Project: M004794 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 4 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Federal $0

Randolph Totals Summary
County Summary excludes lump sum projects.

State $200,000

Other $0

Total $200,000

Also in Atkinson, Baker, Ben Hill, Berrien, Brooks, Calhoun, Clay, Clinch, Coffee, Colquitt, Cook, Crisp, Decatur, Dougherty, Early, Echols, Grady, Irwin, Lanier, Lee, Lowndes, Miller, Mitchell, Quitman, Seminole, Terrell, Thomas, Tift, Turner, Wilcox, Worth County

Project PI# M004794

Year 2014

Phase CST

Fund State

Federal $0

State $6,000

Other $0

$0

$6,000

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $6,000 $6,000

Page 255 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Schley
Project: M004793 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 3 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Federal $0

Schley Totals Summary
County Summary excludes lump sum projects.

State $200,000

Other $0

Total $200,000

Also in Bibb, Butts, Chattahoochee, Coweta, Crawford, Dooly, Fayette, Harris, Heard, Henry, Houston, Jones, Lamar, Macon, Marion, Meriwether, Monroe, Muscogee, Peach, Pike, Pulaski, Spalding, Stewart, Sumter, Talbot, Taylor, Troup, Twiggs, Upson, Webster County

Project PI# M004793

Year 2014

Phase CST

Fund State

Federal $0

State $4,000

Other $0

$0

$4,000

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $4,000 $4,000

Page 256 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Screven
Project: 0009918 Type Work: Roundabout
Descp: SR 73 LOOP @ CR 248/BUTTERMILK ROAD/SINGLETON ROAD Length: 0.12

Phase PE CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations:

$1,061,208 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: M004709 Type Work: Resurface & Maintenance
Descp: SR 21 FROM S OF CS 761/HALCYONDALE RD TO S OF SR 73 Length: 1.71

Phase CST

Fund STP

Total Project Cost: Total Project Authorizations:

$798,080 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Project: M004792 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 2 Length: 0.00

Phase CST

Fund State

Total Project Cost: Total Project Authorizations:

$200,000 $0

Year LUMP LUMP
Year LUMP
Year 2014

Federal $159,181 $902,027
Federal $638,464
Federal $0

Screven Totals Summary
County Summary excludes lump sum projects.

State $0 $0

Other $0 $0

Total $159,181 $902,027

State $159,616

Other $0

Total $798,080

State $200,000

Other $0

Total $200,000

Also in Baldwin, Bleckley, Burke, Columbia, Dodge, Emanuel, Glascock, Greene, Hancock, Jasper, Jefferson, Jenkins, Johnson, Laurens, Lincoln, McDuffie, Morgan, Newton, Oglethorpe, Putnam, Richmond, Taliaferro, Treutlen, Warren, Washington, Wilkes, Wilkinson County

Project PI# M004792

Year 2014

Phase CST

Fund State

Federal $0

State $12,000

Other $0

$0

$12,000

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $12,000 $12,000

Page 257 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Seminole
Project: M004794 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 4 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Federal $0

Seminole Totals Summary
County Summary excludes lump sum projects.

State $200,000

Other $0

Total $200,000

Also in Atkinson, Baker, Ben Hill, Berrien, Brooks, Calhoun, Clay, Clinch, Coffee, Colquitt, Cook, Crisp, Decatur, Dougherty, Early, Echols, Grady, Irwin, Lanier, Lee, Lowndes, Miller, Mitchell, Quitman, Randolph, Terrell, Thomas, Tift, Turner, Wilcox, Worth County

Project PI# M004794

Year 2014

Phase CST

Fund State

Federal $0

State $4,000

Other $0

$0

$4,000

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $4,000 $4,000

Page 258 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Spalding
Project: 0000409 Type Work: Roundabout
Descp: SR 16 @ CR 496/OLD 85 CONNECTOR & CR 688/HOLLONVILLE RD Length: 0.55

Total Project Cost: Total Project Authorizations:

$1,618,403 $795,000

Phase PE
ROW CST UTL

Fund HSIP HSIP HSIP HSIP

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 0000410 Type Work: Intersection Improvement
Descp: SR 362 @ CR 507/ROVER ZETELLA ROAD/MORELAND ROAD Length: 0.48

Phase ROW CST UTL

Fund HSIP HSIP HSIP

Total Project Cost: Total Project Authorizations:

$2,938,294 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 331690- Type Work: Replace Bridge Descp: CR 496 @ UNNAMED CREEK S OF SR 16

Length: 0.20

Total Project Cost: Total Project Authorizations:

$633,024 $0

Phase PE
ROW CST UTL

Fund STP Local STP STP

Uses Lump Sum Bank: LOW IMPACT BRIDGES FOR FY 2014 - FY 2017

Project: M004793 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 3 Length: 0.00

Phase CST

Fund State

Total Project Cost: Total Project Authorizations:

$200,000 $0

Year 2014 2013 LUMP LUMP
Year 2014 LUMP LUMP
Year LUMP 2016 LUMP LUMP
Year 2014

Project: T003642 Type Work: Transit Projects
Descp: FY 2014 FTA SECTION 5307/5340 FORMULA FUNDS FOR SPALDING Length: 0.00

Total Project Cost: Total Project Authorizations:

$227,585 $0

Phase CST

Fund Transit

Year 2014

Federal $40,500
$675,000 $570,063 $171,000
Federal $828,000
$1,761,722 $54,743
Federal $81,600 $0
$408,000 $8,160
Federal $0
Federal $182,068

State $4,500
$75,000 $63,340 $19,000

Other $0 $0 $0 $0

Total $45,000
$750,000 $633,403 $190,000

State $92,000
$195,747 $6,083

Other $0 $0 $0

Total $920,000
$1,957,469 $60,825

State $20,400 $0
$102,000 $2,040

Other $0
$10,824 $0 $0

Total $102,000 $10,824 $510,000 $10,200

State $200,000

Other $0

Total $200,000

State

Also in Bibb, Butts,

Chattahoochee, Coweta,

Crawford, Dooly, Fayette, Harris,

Heard, Henry, Houston, Jones,

Lamar, Macon, Marion,

Meriwether, Monroe, Muscogee,

Peach, Pike, Pulaski, Schley,

Stewart, Sumter, Talbot, Taylor,

Troup, Twiggs, Upson, Webster

County

Other

Total

$0

$45,517

$227,585

Page 259 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: T004090 Type Work: Transit Projects
Descp: FY 2015 FTA SECTION 5307/5340 FORMULA FUNDS FOR SPALDING Length: 0.00

Total Project Cost: Total Project Authorizations:

$227,585 $0

Phase CST

Fund Transit

Year 2015

Federal $182,068

State $22,759

Other $22,759

Total $227,585

Project PI# M004793 T003642 T004090

Year 2014 2014 2015

Spalding Totals Summary

County Summary excludes lump sum projects.

This County is also located in a MPO area. Additional Projects may be listed in the MPO TIP.

Phase

Fund

Federal

State

Other

CST

State

CST

Transit

CST

Transit

$0 $182,068 $182,068

$4,000 $0
$22,759

$0 $45,517 $22,759

$364,136

$26,758

$68,276

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $4,000
$227,585 $227,585
$459,170

Page 260 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Stephens
Project: 0010416 Type Work: Replace Bridge Descp: SR 184 @ TOCCOA CREEK 3.5 MI NE OF TOCCOA
Length: 0.40

Total Project Cost: Total Project Authorizations:

$693,406 $0

Phase ROW CST UTL

Fund STP STP STP

Year 2015 2016 2016

Federal $86,595
$423,967 $44,163

State $21,649
$105,992 $11,041

Other $0 $0 $0

Total $108,243 $529,959 $55,204

Project: 0010689 Type Work: TE-Bike/Ped Facility
Descp: CS 510/FOREACRE STREET & CR 780/SOUTH PARK LANE @ 2 LOCS Length: 0.22

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$406,250 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: M003644 Type Work: Shoulder Work
Descp: SR 17 ALT FM CR 171/BLACK MOUNTAIN RD TO CR 174/PHILLIPS RD Length: 2.00

Phase

Fund

CST Emergency

Year LUMP

Total Project Cost: Total Project Authorizations:

$25,000 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Project: M003645 Type Work: Drainage Improvements Descp: SR 17 FROM I-985 TO HABERSHAM COUNTY LINE
Length: 3.98

Phase

Fund

CST Emergency

Year LUMP

Total Project Cost: Total Project Authorizations:

$65,000 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Project: M004791 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 1 Length: 0.00

Phase CST

Fund State

Year 2014

Total Project Cost: Total Project Authorizations:

$200,000 $0

Federal $325,000
Federal $20,000
Federal $52,000
Federal $0

State $0

Other $81,250

Total $406,250

State $5,000

Other $0

Total $25,000

State $13,000

Other $0

Total $65,000

State $200,000

Other $0

Total $200,000

Also in Banks, Barrow, Clarke, Dawson, Elbert, Forsyth, Franklin, Gwinnett, Habersham, Hall, Hart, Jackson, Lumpkin, Madison, Oconee, Rabun, Towns, Union, Walton, White County

Page 261 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Stephens Totals Summary
County Summary excludes lump sum projects.

Project PI#
0010416 0010416 0010416 M004791

Year
2015 2016 2016 2014

Phase
ROW CST UTL CST

Fund STP STP STP State

Federal
$86,595 $423,967
$44,163 $0

State
$21,649 $105,992
$11,041 $6,000

Other
$0 $0 $0 $0

$554,725

$144,681

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $108,243 $529,959 $55,204 $6,000
$699,406

Page 262 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Stewart
Project: 0007887 Type Work: Replace Bridge Descp: CR 33/2ND AVE @ HANNAHATCHEE CREEK
Length: 0.40

Total Project Cost: Total Project Authorizations:

$1,546,319 $0

Phase PE
ROW CST UTL

Fund STP Local STP STP

Year 2015 2016 2017 2017

Federal $84,897 $0
$1,033,165 $34,097

State $21,224 $0
$258,291 $8,524

Other $0
$106,121 $0 $0

Total $106,121 $106,121
$1,291,457 $42,621

Project: 0010305 Type Work: TE-Historic Preservation
Descp: HISTORIC BEDINGFIELD STAGECOACH INN RESTORATION Length: 0.00

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$177,500 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 0011687 Type Work: Replace Bridge
Descp: SR 39 @ HANNAHATCHEE CREEK TRIBUTARY 4.5 MI E OF OMAHA Length: 0.40

Total Project Cost: Total Project Authorizations:

$963,304 $200,000

Phase PE
ROW CST UTL

Fund Bridge STP STP STP

Year 2013 2015 After 2017 After 2017

Federal $142,000
Federal $160,000 $124,848 $441,632 $44,163

State $0
State $40,000 $31,212
$110,408 $11,041

Other $35,500
Other $0 $0 $0 $0

Total $177,500
Total $200,000 $156,060 $552,040 $55,204

Project: M004575 Type Work: Bridges
Descp: SR 39 @ HANNAHATCHEE CREEK TRIB CULVERT REHAB Length: 0.40

Phase PE CST

Fund STP STP

Total Project Cost: Total Project Authorizations:

$250,000 $0

Uses Lump Sum Bank: BRIDGE MAINTENANCE/PAINTING FOR FY 2014 - FY 2017

Project: M004793 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 3 Length: 0.00

Phase CST

Fund State

Total Project Cost: Total Project Authorizations:

$200,000 $0

Year LUMP LUMP
Year 2014

Federal $40,000
$160,000
Federal $0

State $10,000 $40,000

Other $0 $0

Total $50,000
$200,000

State $200,000

Other $0

Total $200,000

Also in Bibb, Butts, Chattahoochee, Coweta, Crawford, Dooly, Fayette, Harris, Heard, Henry, Houston, Jones, Lamar, Macon, Marion, Meriwether, Monroe, Muscogee, Peach, Pike, Pulaski, Schley, Spalding, Sumter, Talbot, Taylor, Troup, Twiggs, Upson, Webster County

Page 263 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Stewart Totals Summary
County Summary excludes lump sum projects.

Project PI#
0007887 0007887 0007887 0007887 0011687 M004793

Year
2015 2016 2017 2017 2015 2014

Phase
PE ROW CST UTL ROW CST

Fund STP Local STP STP STP State

Federal
$84,897 $0
$1,033,165 $34,097
$124,848 $0

State
$21,224 $0
$258,291 $8,524
$31,212 $10,000

Other
$0 $106,121
$0 $0 $0 $0

$1,277,007

$329,252

$106,121

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $106,121 $106,121
$1,291,457 $42,621
$156,060 $10,000
$1,712,379

Page 264 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Sumter
Project: 0010213 Type Work: TE-Landscape/Beautify
Descp: GEORGIA SOUTHWESTERN STATE UNIVERSITY ENTRACEWAY Length: 0.00

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$1,600,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Federal $1,280,000

State $0

Other $320,000

Total $1,600,000

Project: 0010607 Type Work: TE-Rehab Hist Trans Bldg Descp: ANDERSONVILLE HISTORICAL TRAIN DEPOT
Length: 0.04

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$250,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Federal $200,000

State $0

Other $50,000

Total $250,000

Project: M004613 Type Work: Resurface & Maintenance
Descp: SR 377 FROM LEE COUNTY LINE TO SR 27/US 280 Length: 11.15

Phase CST

Fund STP

Total Project Cost: Total Project Authorizations:

$2,437,229 $2,437,229

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Year 2014

Federal $1,949,783

State $487,446

Other $0

Total $2,437,229

Project: M004793 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 3 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Federal $0

Sumter Totals Summary
County Summary excludes lump sum projects.

State $200,000

Other $0

Total $200,000

Also in Bibb, Butts, Chattahoochee, Coweta, Crawford, Dooly, Fayette, Harris, Heard, Henry, Houston, Jones, Lamar, Macon, Marion, Meriwether, Monroe, Muscogee, Peach, Pike, Pulaski, Schley, Spalding, Stewart, Talbot, Taylor, Troup, Twiggs, Upson, Webster County

Project PI# M004793

Year 2014

Phase CST

Fund State

Federal $0

State $10,000

Other $0

$0

$10,000

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $10,000 $10,000

Page 265 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Talbot

Project: 0002869 Type Work: Passing Lanes

Descp: SR 90 PASSING LANES @ TWO LOCATIONS

BETWEEN SR 96 TO SR 208

Lanes: Exist. 2 Prop. 3

Length: 2.76

Total Project Cost: Total Project Authorizations:

$7,546,019 $0

Phase PE
ROW CST UTL

Fund STP STP STP STP

Year 2015 After 2017 After 2017 After 2017

Federal $302,619 $391,003
$4,094,554 $1,248,640

State $75,655 $97,751
$1,023,638 $312,160

Other $0 $0 $0 $0

Total $378,273 $488,753
$5,118,192 $1,560,800

Project: 0005941 Type Work: Passing Lanes

Descp: SR 41 PASSING LANES BETWEEN TALBOTTON

AND MERIWITHER CO LINE

Lanes: Exist. 2 Prop. 3

Length: 2.37

Total Project Cost: Total Project Authorizations:

$8,469,069 $0

Phase PE
ROW CST UTL

Fund STP STP STP STP

Year 2015 After 2017 After 2017 After 2017

Federal $271,649
$1,730,840 $3,675,524 $1,097,241

State $67,912
$432,710 $918,881 $274,310

Other $0 $0 $0 $0

Total $339,562
$2,163,551 $4,594,405 $1,371,552

Project: 0007051 Type Work: Replace Bridge
Descp: SR 22 @ POTTERS CREEK 10.1 MI E OF TALBOTTON Length: 0.21

Total Project Cost: Total Project Authorizations:

$1,062,774 $90,000

Phase PE
ROW CST UTL

Fund STP Bridge STP Local

Year 2015 2013 2015 LOCL

Federal $8,000
$72,000 $765,420
$0

State $2,000
$18,000 $191,355
$0

Other $0 $0 $0
$6,000

Total $10,000 $90,000
$956,774 $6,000

Project: 333210- Type Work: Replace Bridge Descp: SR 36 @ FLINT RIVER 9.6 MI E OF WOODLAND
Length: 0.97

Total Project Cost: Total Project Authorizations:

$5,787,900 $1,600,000

Phase ROW CST UTL

Fund STP STP STP

Year 2013 2014 2014

Project: M004612 Type Work: Resurface & Maintenance
Descp: SR 90 FROM TAYLOR COUNTY LINE TO SR 22/SR 41 Length: 11.14

Phase CST

Fund STP

Total Project Cost: Total Project Authorizations:

$1,851,013 $1,851,013

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Year 2014

Federal $1,280,000 $3,254,493
$95,828

State $320,000 $813,623
$23,957

Other $0 $0 $0

Total $1,600,000 $4,068,116
$119,784

Federal $1,480,810

Also in Upson County

State $370,203

Other $0

Total $1,851,013

Page 266 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: M004793 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 3 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Federal $0

Talbot Totals Summary
County Summary excludes lump sum projects.

State $200,000

Other $0

Total $200,000

Also in Bibb, Butts, Chattahoochee, Coweta, Crawford, Dooly, Fayette, Harris, Heard, Henry, Houston, Jones, Lamar, Macon, Marion, Meriwether, Monroe, Muscogee, Peach, Pike, Pulaski, Schley, Spalding, Stewart, Sumter, Taylor, Troup, Twiggs, Upson, Webster County

Project PI#
0002869 0005941 0007051 0007051 333210333210M004793

Year
2015 2015 2015 2015 2014 2014 2014

Phase
PE PE PE CST CST UTL CST

Fund STP STP STP STP STP STP State

Federal
$302,619 $271,649
$8,000 $765,420 $1,887,606
$55,580 $0

State
$75,655 $67,912
$2,000 $191,355 $471,901
$13,895 $8,000

Other
$0 $0 $0 $0 $0 $0 $0

$3,290,873

$830,718

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $378,273 $339,562 $10,000 $956,774
$2,359,507 $69,475 $8,000
$4,121,592

Page 267 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Taliaferro
Project: 0012727 Type Work: Pavement Markings
Descp: OFF-SYSTEM SAFETY IMPROVEMENTS @VAR LOC IN TALIAFERRO COUNTY Length: 0.00

Phase CST

Fund HSIP

Total Project Cost: Total Project Authorizations:

$350,000 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: M004792 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 2 Length: 0.00

Phase CST

Fund State

Total Project Cost: Total Project Authorizations:

$200,000 $0

Year LUMP
Year 2014

Federal $350,000
Federal $0

Taliaferro Totals Summary
County Summary excludes lump sum projects.

State $0

Other $0

Total $350,000

State $200,000

Other $0

Total $200,000

Also in Baldwin, Bleckley, Burke, Columbia, Dodge, Emanuel, Glascock, Greene, Hancock, Jasper, Jefferson, Jenkins, Johnson, Laurens, Lincoln, McDuffie, Morgan, Newton, Oglethorpe, Putnam, Richmond, Screven, Treutlen, Warren, Washington, Wilkes, Wilkinson County

Project PI# M004792

Year 2014

Phase CST

Fund State

Federal $0

State $4,000

Other $0

$0

$4,000

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $4,000 $4,000

Page 268 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Tattnall
Project: 0009880 Type Work: Roundabout Descp: SR 23/US 25/US 301 @ SR 196
Length: 0.50

Phase PE CST

Fund Safety HSIP

Total Project Cost: Total Project Authorizations:

$1,055,027 $153,000

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 0012840 Type Work: RRX Warning Device Descp: CR 468/BURKHALTER ROAD @ GCR #636011W
Length: 0.40

Phase CST

Fund HSIP

Total Project Cost: Total Project Authorizations:

$220,000 $0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2014 - FY 2017

Project: M004795 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 5 Length: 0.00

Phase CST

Fund State

Total Project Cost: Total Project Authorizations:

$200,000 $0

Year 2013 LUMP
Year LUMP
Year 2014

Federal $153,000 $902,027
Federal $220,000
Federal $0

Tattnall Totals Summary
County Summary excludes lump sum projects.

State $0 $0

Other $0 $0

Total $153,000 $902,027

State $0

Other $0

Total $220,000

State $200,000

Other $0

Total $200,000

Also in Appling, Bacon, Brantley, Bryan, Bulloch, Camden, Candler, Charlton, Chatham, Effingham, Evans, Glynn, Jeff Davis, Liberty, Long, McIntosh, Montgomery, Pierce, Telfair, Toombs, Ware, Wayne, Wheeler County

Project PI# M004795

Year 2014

Phase CST

Fund State

Federal $0

State $8,000

Other $0

$0

$8,000

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $8,000 $8,000

Page 269 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Taylor
Project: 0007606 Type Work: Landscaping
Descp: SR 96/FALL LINE FREEWAY FM CR 138 TO CR 269 IN REYNOLDS Length: 3.70

Total Project Cost: Total Project Authorizations:

$341,000 $0

Phase CST

Fund HPP

Year 2015

Federal $272,800

State $0

Other $68,200

Total $341,000

Project: 0010608 Type Work: TE-Bike/Ped Facility Descp: SR 3; SR 137 & SR 137WE @ 4 LOCS IN BUTLER
Length: 0.97

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$312,500 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 370892- Type Work: Replace Bridge Descp: CR 247 @ HORSE CREEK SE OF BUTLER

Length: 0.40

Total Project Cost: Total Project Authorizations:

$633,024 $0

Phase PE
ROW CST UTL

Fund STP Local STP STP

Year LUMP 2016 LUMP LUMP

Uses Lump Sum Bank: LOW IMPACT BRIDGES FOR FY 2014 - FY 2017

Project: M004793 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 3 Length: 0.00

Phase CST

Fund State

Year 2014

Total Project Cost: Total Project Authorizations:

$200,000 $0

Federal $250,000
Federal $81,600 $0
$408,000 $8,160
Federal $0

State $0

Other $62,500

Total $312,500

State $20,400 $0
$102,000 $2,040

Other $0
$10,824 $0 $0

Total $102,000 $10,824 $510,000 $10,200

State $200,000

Other $0

Total $200,000

Also in Bibb, Butts, Chattahoochee, Coweta, Crawford, Dooly, Fayette, Harris, Heard, Henry, Houston, Jones, Lamar, Macon, Marion, Meriwether, Monroe, Muscogee, Peach, Pike, Pulaski, Schley, Spalding, Stewart, Sumter, Talbot, Troup, Twiggs, Upson, Webster County

Page 270 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Taylor Totals Summary
County Summary excludes lump sum projects.

Project PI# 0007606 M004793

Year 2015 2014

Phase CST CST

Fund HPP State

Federal $272,800 $0

State $0
$8,000

Other $68,200 $0

$272,800

$8,000

$68,200

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $341,000 $8,000
$349,000

Page 271 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Telfair
Project: 0002425 Type Work: Replace Bridge
Descp: SR 31/US 319/US 441 @ TURNPIKE CREEK 5.3 MI S OF MCRAE Length: 0.20

Total Project Cost: Total Project Authorizations:

$3,168,219 $0

Phase ROW CST UTL

Fund NHPP NHPP NHPP

Year 2015 2016 2016

Federal $298,803
$2,149,815 $85,958

State $74,701
$537,454 $21,489

Other $0 $0 $0

Total $373,504
$2,687,268 $107,447

Project: 0012847 Type Work: Sidewalks Descp: SIDEWALK & CROSSWALK IN MCRAE

Lanes: Exist.

Prop.

Length: 0.00

Total Project Cost: Total Project Authorizations:

$260,900 $0

Phase CST

Fund HPP

Year 2015

Federal $208,720

State $0

Other $52,180

Total $260,900

Project: M004553 Type Work: Resurface & Maintenance
Descp: SR 149 CO FM N OF CR 150/TURNPIKE CEMETERY RD TO S OF SR 31 Length: 3.13

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$459,666 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Project: M004555 Type Work: Resurface & Maintenance
Descp: SR 31/US 319 FROM COFFEE COUNTY LINE TO 0.01 MI S OF SR 132 Length: 18.32

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations:

$3,904,854 $0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Project: M004556 Type Work: Resurface & Maintenance
Descp: SR 149 FROM 0.01 MI N OF SR 117 TO WHEELER COUNTY LINE Length: 18.51

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$2,882,726 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Federal $367,733
Federal $3,123,883
Federal $2,306,181

State $91,933

Other $0

State $780,971

Other $0

State $576,545

Other $0

Total $459,666
Total $3,904,854
Total $2,882,726

Page 272 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: M004557 Type Work: Resurface & Maintenance
Descp: SR 165 FROM 0.01 MI S OF CR 3/CRAVEY FARM ROAD TO SR 30 Length: 1.86

Total Project Cost: Total Project Authorizations:

$332,259 $0

Phase CST

Fund STP

Year LUMP

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Project: M004558 Type Work: Resurface & Maintenance
Descp: SR 30/US 280 FROM DODGE COUNTY LINE TO SR 31 Length: 9.61

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations:

$1,938,122 $0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Project: M004795 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 5 Length: 0.00

Phase CST

Fund State

Year 2014

Total Project Cost: Total Project Authorizations:

$200,000 $0

Federal $265,807
Federal $1,550,498
Federal $0

Telfair Totals Summary
County Summary excludes lump sum projects.

State $66,452

Other $0

Total $332,259

State $387,624

Other $0

Total $1,938,122

State $200,000

Other $0

Total $200,000

Also in Appling, Bacon, Brantley, Bryan, Bulloch, Camden, Candler, Charlton, Chatham, Effingham, Evans, Glynn, Jeff Davis, Liberty, Long, McIntosh, Montgomery, Pierce, Tattnall, Toombs, Ware, Wayne, Wheeler County

Project PI#
0002425 0002425 0002425 0012847 M004795

Year
2015 2016 2016 2015 2014

Phase
ROW CST UTL CST CST

Fund NHPP NHPP NHPP HPP State

Federal
$298,803 $2,149,815
$85,958 $208,720
$0

State
$74,701 $537,454
$21,489 $0
$8,000

Other
$0 $0 $0 $52,180 $0

$2,743,295

$641,644

$52,180

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $373,504
$2,687,268 $107,447 $260,900 $8,000
$3,437,119

Page 273 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Terrell
Project: 0007597 Type Work: Streetscapes Descp: STREETSCAPE IN DAWSON
Length: 0.00

Total Project Cost: Total Project Authorizations:

$247,923 $0

Phase PE CST

Fund HPP HPP

Year 2014 After 2017

Federal $38,339
$105,645

State $0 $0

Other $9,585
$94,355

Total $47,923
$200,000

Project: M004794 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 4 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Project: M004800 Type Work: Resurface & Maintenance
Descp: SR 55 FROM CALHOUN COUNTY LINE TO SR 520/US 82 Length: 10.80

Phase CST

Fund STP

Total Project Cost: Total Project Authorizations:

$1,100,000 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Year LUMP

Federal $0
Federal $880,000

State $200,000

Other $0

Total $200,000

State

Also in Atkinson, Baker, Ben Hill,

Berrien, Brooks, Calhoun, Clay,

Clinch, Coffee, Colquitt, Cook,

Crisp, Decatur, Dougherty, Early,

Echols, Grady, Irwin, Lanier, Lee,

Lowndes, Miller, Mitchell,

Quitman, Randolph, Seminole,

Thomas, Tift, Turner, Wilcox,

Worth County

Other

Total

$220,000

$0

$1,100,000

Terrell Totals Summary
County Summary excludes lump sum projects.

Project PI# 0007597 M004794

Year 2014 2014

Phase PE CST

Fund HPP State

Federal $38,339 $0

State $0
$6,000

Other $9,585 $0

$38,339

$6,000

$9,585

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $47,923 $6,000
$53,923

Page 274 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Thomas
Project: 0007126 Type Work: Median Crossovers
Descp: SR 3/US 19 FM N OF FLORIDA STATE LN TO S OF CR 219 - 20 LOCS Length: 9.49

Phase PE CST UTL

Fund HSIP HSIP HSIP

Total Project Cost: Total Project Authorizations:

$9,630,566 $604,128

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 0007607 Type Work: Streetscapes Descp: STREETSCAPE IN THOMASVILLE
Length: 0.00

Phase CST

Fund HPP

Total Project Cost: Total Project Authorizations:

$300,000 $0

Year 2013 LUMP LUMP
Year 2015

Federal $543,715
$8,117,886 $5,909

State $60,413
$901,987 $657

Other $0 $0 $0

Federal $215,977

State $0

Other $84,023

Total $604,128
$9,019,873 $6,565
Total $300,000

Project: 0008717 Type Work: Operational Improvement
Descp: SR 35/US 319 @ SR 35 CONN N OF THOMASVILLE Length: 0.34

Phase CST UTL

Fund STP STP

Year LUMP LUMP

Total Project Cost: Total Project Authorizations:

$553,183 $0

Uses Lump Sum Bank: OPERATIONS FOR ANY AREA FOR FY 2014 - FY 2017

Project: 0010609 Type Work: TE-Bike/Ped Facility
Descp: CR 384/METCALF ROAD FM BROAD STREET TO METCALF-BEACHTON ROAD Length: 0.12

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$187,500 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: M004794 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 4 Length: 0.00

Phase CST

Fund State

Year 2014

Total Project Cost: Total Project Authorizations:

$200,000 $0

Federal $168,946 $273,600
Federal $150,000
Federal $0

State $42,237 $68,400

Other $0 $0

Total $211,183 $342,000

State $0

Other $37,500

Total $187,500

State $200,000

Other $0

Total $200,000

Also in Atkinson, Baker, Ben Hill, Berrien, Brooks, Calhoun, Clay, Clinch, Coffee, Colquitt, Cook, Crisp, Decatur, Dougherty, Early, Echols, Grady, Irwin, Lanier, Lee, Lowndes, Miller, Mitchell, Quitman, Randolph, Seminole, Terrell, Tift, Turner, Wilcox, Worth County

Page 275 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Thomas Totals Summary
County Summary excludes lump sum projects.

Project PI# 0007607 M004794

Year 2015 2014

Phase CST CST

Fund HPP State

Federal $215,977 $0

State $0
$8,000

Other $84,023 $0

$215,977

$8,000

$84,023

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $300,000 $8,000
$308,000

Page 276 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Tift

Project: 0001340 Type Work: New Construction

Descp: SOUTH TIFTON BYP FM SR 520/US 82 WEST TO

SR 35/US 319 EAST

Lanes: Exist. 0 Prop. 2

Length: 7.50

Total Project Cost: Total Project Authorizations:

$52,124,237 $0

Phase ROW CST UTL

Fund HPP STP STP

Year 2016 After 2017 After 2017

Federal $4,049,550 $35,233,614 $2,416,225

State $1,012,387 $8,808,404
$604,056

Other $0 $0 $0

Total $5,061,937 $44,042,018 $3,020,281

Project: 0003430 Type Work: Widening

Descp: CR 75/CARPENTER RD IN TIFTON FM SR 520/US

82 TO DAVIS RD

Lanes: Exist. 2 Prop. 5

Length: 2.50

Total Project Cost: Total Project Authorizations:

$9,573,545 $90,000

Phase PE
ROW CST

Fund STP Local STP

Year 2013 LOCL 2014

Federal $40,000 $0
$7,586,836

State $10,000 $0
$1,896,709

Other $0
$40,000 $0

Total $50,000 $40,000
$9,483,545

Project: 0007273 Type Work: Realignment
Descp: CR 299/OLD OMEGA ROAD FROM SR 35/US 319 TO I-75 Length: 0.30

Total Project Cost: Total Project Authorizations:

$1,511,844 $0

Phase ROW CST UTL

Fund STP STP STP

Year 2014 2015 2015

Federal $232,560 $971,089 $5,826

State $58,140
$242,772 $1,457

Other $0 $0 $0

Total $290,700
$1,213,862 $7,283

Project: 0007578 Type Work: Sidewalks
Descp: SIDEWALKS; LIGHTING & LANDSCAPING IN TIFTON Length: 0.00

Total Project Cost: Total Project Authorizations:

$714,363 $0

Phase CST

Fund HPP

Year 2014

Federal $554,925

State $0

Other $159,438

Total $714,363

Project: 0008723 Type Work: Operational Improvement Descp: SR 520/US 82 @ SR 35/US 319
Length: 0.06

Phase ROW CST UTL

Fund NHPP NHPP NHPP

Total Project Cost: Total Project Authorizations:

$549,863 $150,000

Uses Lump Sum Bank: OPERATIONS FOR ANY AREA FOR FY 2014 - FY 2017

Year 2013 LUMP LUMP

Federal $120,000 $227,890 $92,000

State $30,000 $56,973 $23,000

Other $0 $0 $0

Total $150,000 $284,863 $115,000

Page 277 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0009854 Type Work: Roundabout Descp: SR 125 @ CR 410/BRIGHTON ROAD

Length: 0.25

Total Project Cost: Total Project Authorizations:

$1,094,027 $0

Phase ROW CST

Fund HSIP HSIP

Year LUMP LUMP

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 0010674 Type Work: TE-Bike/Ped Facility
Descp: SR 7 FROM 4TH ST TO 1ST ST & FROM SR 520 TO POPLAR ST Length: 0.49

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$625,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: M004794 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 4 Length: 0.00

Phase CST

Fund State

Year 2014

Total Project Cost: Total Project Authorizations:

$200,000 $0

Project: M004807 Type Work: Resurface & Maintenance
Descp: I-75 FM S OF CR 204/SOUTHWELL RD/TIFT TO S OF SR 32/TURNER Length: 19.00

Phase PE

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations:

$50,000 $0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Federal $192,000 $902,027
Federal $500,000
Federal $0
Federal $45,000

State $0 $0

Other $0 $0

Total $192,000 $902,027

State $0

Other $125,000

Total $625,000

State $200,000

Other $0

Total $200,000

State

Also in Atkinson, Baker, Ben Hill,

Berrien, Brooks, Calhoun, Clay,

Clinch, Coffee, Colquitt, Cook,

Crisp, Decatur, Dougherty, Early,

Echols, Grady, Irwin, Lanier, Lee,

Lowndes, Miller, Mitchell,

Quitman, Randolph, Seminole,

Terrell, Thomas, Turner, Wilcox,

Worth County

Other

Total

$5,000

$0

$50,000

Also in Turner County

Page 278 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Tift Totals Summary
County Summary excludes lump sum projects.

Project PI#
0001340 0003430 0007273 0007273 0007273 0007578 M004794

Year
2016 2014 2014 2015 2015 2014 2014

Phase
ROW CST ROW CST UTL CST CST

Fund HPP STP STP STP STP HPP State

Federal
$4,049,550 $7,586,836
$232,560 $971,089
$5,826 $554,925
$0

State
$1,012,387 $1,896,709
$58,140 $242,772
$1,457 $0
$4,000

Other
$0 $0 $0 $0 $0 $159,438 $0

$13,400,787

$3,215,465

$159,438

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $5,061,937 $9,483,545 $290,700 $1,213,862 $7,283 $714,363 $4,000
$16,775,690

Page 279 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Toombs
Project: 0001216 Type Work: Replace Bridge
Descp: SR 4/US 1 @ ALTAMAHA RIVER; OVERFLOW & WILLIAMS CREEK - TIA Length: 1.56

Total Project Cost: Total Project Authorizations:

$24,572,708 $0

Project: 0007587 Type Work: Sidewalks Descp: SIDEWALKS & LIGHTING IN DOWNTOWN VIDALIA
Length: 0.00

Total Project Cost: Total Project Authorizations:

$1,250,175 $0

Phase CST CST UTL

Fund State NHPP NHPP

Year 2014 2014 2014

Federal $0
$15,337,827 $344,515

State $0
$3,834,457 $86,129

Other $4,969,781
$0 $0

Total $4,969,781 $19,172,283
$430,644

Phase CST CST

Fund HPP HPP

Year 2014 2014

Federal $291,522 $68,438

Also in Appling County

State $0 $0

Other $873,106
$17,110

Total $1,164,628
$85,548

Project: 0009135 Type Work: TE-Bike/Ped Facility
Descp: SR 4/US 1 FROM VICTORY DRIVE TO RAILROAD CORRIDOR @ US 280 Length: 0.99

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$375,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 0009883 Type Work: Roundabout Descp: SR 56 @ CR 332/CR 333/JOHNSON CORNER
Length: 0.50

Phase PE CST

Fund HSIP HSIP

Year LUMP LUMP

Total Project Cost: Total Project Authorizations:

$1,061,208 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 522180- Type Work: Widening

Descp: SR 4/US 1 FM SR 56 TO SR 29; INC CLVT @ OPEN

CREEK -TIA

Lanes: Exist. 2 Prop. 4

Length: 4.34

Total Project Cost: Total Project Authorizations:

$23,515,848 $0

Phase PE
ROW CST UTL

Fund NHPP NHPP State State

Year 2014 2017 After 2017 After 2017

Federal $300,000
Federal $159,181 $902,027
Federal $320,000
$4,442,302 $0 $0

State $0

Other $75,000

State $0 $0

Other $0 $0

State $80,000
$1,110,575 $0 $0

Other $0 $0
$16,604,085 $958,886

Total $375,000
Total $159,181 $902,027
Total $400,000
$5,552,877 $16,604,085
$958,886

Page 280 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 522190- Type Work: Widening

Descp: SR 4 FM SR 29 TO CR 386/GREEN OAK RD; INC

CLVT@ROCKY CRK-TIA

Lanes: Exist. 2 Prop. 5

Length: 3.60

Total Project Cost: Total Project Authorizations:

$22,320,418 $0

Phase ROW CST CST UTL

Fund State State NHPP State

Year 2017 After 2017 After 2017 After 2017

Federal $0 $0
$8,214,290 $0

State $0 $0
$2,053,572 $0

Other $3,025,181 $8,423,474
$0 $603,900

Total $3,025,181 $8,423,474 $10,267,862
$603,900

Project: 522200- Type Work: Widening

Descp: SR 4 FM CR 386/GREEN OAK RD TO SR

130/FISHER BAREFOOT HWY

Lanes: Exist. 2 Prop. 4

Length: 7.30

Total Project Cost: Total Project Authorizations:

$60,930,350 $750,000

Phase PE
ROW CST UTL

Fund NHPP NHPP NHPP NHPP

Year 2013 2015 2017 2017

Federal $600,000
$7,632,208 $38,490,677
$2,021,395

State $150,000 $1,908,052 $9,622,669 $505,349

Other $0 $0 $0 $0

Total $750,000
$9,540,260 $48,113,346
$2,526,744

Project: 522220- Type Work: Widening

Descp: SR 4/US 1 FROM N OF WILLIAMS CREEK TO SR

56 - TIA

Lanes: Exist. 2 Prop. 4

Length: 6.52

Total Project Cost: Total Project Authorizations:

$54,020,160 $0

Phase PE
ROW CST CST UTL

Fund NHPP State State NHPP State

Year 2014 2017 After 2017 After 2017 After 2017

Federal $320,000 $0 $0
$19,547,728 $0

State $80,000 $0 $0
$4,886,932 $0

Other $0
$3,895,000 $25,175,500
$0 $115,000

Total $400,000
$3,895,000 $25,175,500 $24,434,660
$115,000

Project: M004795 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 5 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Federal $0

State $200,000

Other $0

Total $200,000

Also in Appling, Bacon, Brantley, Bryan, Bulloch, Camden, Candler, Charlton, Chatham, Effingham, Evans, Glynn, Jeff Davis, Liberty, Long, McIntosh, Montgomery, Pierce, Tattnall, Telfair, Ware, Wayne, Wheeler County

Page 281 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Toombs Totals Summary
County Summary excludes lump sum projects.

Project PI#
0001216 0001216 0001216 0007587 0007587 522180522180522190522200522200522200522220522220M004795

Year
2014 2014 2014 2014 2014 2014 2017 2017 2015 2017 2017 2014 2017 2014

Phase
CST CST UTL CST CST PE ROW ROW ROW CST UTL PE ROW CST

Fund NHPP State NHPP HPP HPP NHPP NHPP State NHPP NHPP NHPP NHPP State State

Federal
$13,343,909 $0
$299,728 $68,438
$291,522 $320,000 $4,442,302
$0 $7,632,208 $38,490,677 $2,021,395
$320,000 $0 $0

State
$3,335,977 $0
$74,932 $0 $0
$80,000 $1,110,575
$0 $1,908,052 $9,622,669
$505,349 $80,000 $0 $6,000

Other
$0 $4,323,709
$0 $17,110 $873,106
$0 $0 $3,025,181 $0 $0 $0 $0 $3,895,000 $0

$67,230,179

$16,723,555

$12,134,106

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total
$16,679,887 $4,323,709 $374,660 $85,548 $1,164,628 $400,000 $5,552,877 $3,025,181 $9,540,260
$48,113,346 $2,526,744 $400,000 $3,895,000 $6,000
$96,087,840

Page 282 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Towns
Project: 0000301 Type Work: Replace Bridge
Descp: SR 17- SR 75 @ HIAWASSEE RIVER 6.5 MI S OF HIAWASSEE Length: 0.22

Total Project Cost: Total Project Authorizations:

$2,097,255 $30,000

Phase PE CST UTL

Fund Bridge STP STP

Year 2013 2014 2014

Federal $24,000
$1,462,454 $191,350

State $6,000
$365,614 $47,838

Other $0 $0 $0

Total $30,000
$1,828,067 $239,188

Project: 0000302 Type Work: Replace Bridge
Descp: SR 17- SR 75 @ HIAWASSEE RIVER 3.6 MI S OF HIAWASSEE Length: 0.22

Total Project Cost: Total Project Authorizations:

$2,141,687 $30,000

Phase PE CST UTL

Fund Bridge STP STP

Year 2013 2014 2014

Federal $24,000
$1,554,855 $134,495

State $6,000
$388,714 $33,624

Other $0 $0 $0

Total $30,000
$1,943,569 $168,118

Project: 0000303 Type Work: Replace Bridge
Descp: SR 2 @ HIGHTOWER CREEK 6.1 MI E OF HIAWASSEE Length: 0.57

Total Project Cost: Total Project Authorizations:

$2,881,219 $550,000

Phase PE
ROW CST UTL

Fund Bridge NHS NHPP NHPP

Year 2013 2013 2015 2015

Federal $24,000
$416,000 $1,819,980
$44,995

State $6,000
$104,000 $454,995
$11,249

Other $0 $0 $0 $0

Total $30,000
$520,000 $2,274,975
$56,244

Project: 0000304 Type Work: Replace Bridge
Descp: SR 66 @ BRASSTOWN CREEK .5 MI NW OF YOUNG HARRIS Length: 0.76

Total Project Cost: Total Project Authorizations:

$3,467,961 $30,000

Phase PE
ROW CST UTL

Fund Bridge STP STP STP

Year 2013 2015 2016 2016

Federal $24,000
$692,757 $2,042,025
$15,587

State $6,000
$173,189 $510,506
$3,897

Other $0 $0 $0 $0

Total $30,000
$865,946 $2,552,531
$19,484

Project: 0000305 Type Work: Replace Bridge
Descp: SR 66 @ CROOKED CREEK 3.2 MI NW OF YOUNG HARRIS Length: 0.66

Total Project Cost: Total Project Authorizations:

$3,866,877 $30,000

Phase PE
ROW CST

Fund Bridge STP STP

Year 2013 2015 2016

Federal $24,000
$884,823 $2,184,678

State $6,000
$221,206 $546,170

Other $0 $0 $0

Total $30,000
$1,106,029 $2,730,848

Page 283 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0007495 Type Work: Pedestrian Crossings
Descp: PEDESTRIAN UPGRADES @ 20 SR LOCATIONS IN DISTRICT 1 Length: 0.00

Total Project Cost: Total Project Authorizations:

$3,146,613 $560,000

Phase CST

Fund HSIP

Year LUMP

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 0010688 Type Work: TE-Bike/Ped Facility
Descp: SR 2/SR 515 FM CS 352/SCHOOL ST TO CR 33/BRASSTOWN CREEK Length: 0.33

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$343,750 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: M004791 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 1 Length: 0.00

Phase CST

Fund State

Year 2014

Total Project Cost: Total Project Authorizations:

$200,000 $0

Federal $2,327,952
Federal $275,000
Federal $0

Towns Totals Summary
County Summary excludes lump sum projects.

State $258,661

Other $0

Total $2,586,613

State

Also in Lumpkin, Union, White

County

Other

Total

$0

$68,750

$343,750

State $200,000

Other $0

Total $200,000

Also in Banks, Barrow, Clarke, Dawson, Elbert, Forsyth, Franklin, Gwinnett, Habersham, Hall, Hart, Jackson, Lumpkin, Madison, Oconee, Rabun, Stephens, Union, Walton, White County

Project PI#
0000301 0000301 0000302 0000302 0000303 0000303 0000304 0000304 0000304 0000305 0000305 M004791

Year
2014 2014 2014 2014 2015 2015 2015 2016 2016 2015 2016 2014

Phase
CST UTL CST UTL CST UTL ROW CST UTL ROW CST CST

Fund STP STP STP STP NHPP NHPP STP STP STP STP STP State

Federal
$1,462,454 $191,350
$1,554,855 $134,495
$1,819,980 $44,995
$692,757 $2,042,025
$15,587 $884,823 $2,184,678
$0

State
$365,614 $47,838
$388,714 $33,624
$454,995 $11,249
$173,189 $510,506
$3,897 $221,206 $546,170
$6,000

Other
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

$11,028,000

$2,763,000

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total
$1,828,067 $239,188
$1,943,569 $168,118
$2,274,975 $56,244
$865,946 $2,552,531
$19,484 $1,106,029 $2,730,848
$6,000
$13,791,000

Page 284 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Treutlen
Project: M004189 Type Work: Signing
Descp: I-16 @ 12 LOCS BETWEEN BLECKLEY COUNTY & EMANUEL COUNTY Length: 4.80

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations:

$1,700,000 $0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Project: M004702 Type Work: Resurface & Maintenance
Descp: SR 56 FROM MONTGOMERY COUNTY LINE TO SR 15 Length: 4.05

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$980,960 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Federal $1,700,000
Federal $784,768

State $0

Other $0

Total $1,700,000

State

Also in Bleckley, Emanuel,

Laurens County

Other

Total

$196,192

$0

$980,960

Project: M004703 Type Work: Resurface & Maintenance Descp: SR 227 FROM SR 46 TO SR 56
Length: 2.18

Phase CST

Fund STP

Total Project Cost: Total Project Authorizations:

$278,852 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Year LUMP

Federal $223,082

State $55,770

Other $0

Total $278,852

Project: M004792 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 2 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Federal $0

Treutlen Totals Summary
County Summary excludes lump sum projects.

State $200,000

Other $0

Total $200,000

Also in Baldwin, Bleckley, Burke, Columbia, Dodge, Emanuel, Glascock, Greene, Hancock, Jasper, Jefferson, Jenkins, Johnson, Laurens, Lincoln, McDuffie, Morgan, Newton, Oglethorpe, Putnam, Richmond, Screven, Taliaferro, Warren, Washington, Wilkes, Wilkinson County

Project PI# M004792

Year 2014

Phase CST

Fund State

Federal $0

State $4,000

Other $0

$0

$4,000

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $4,000 $4,000

Page 285 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Troup
Project: 0009975 Type Work: Roundabout Descp: I-85 @ SR 18
Length: 0.30

Phase CST

Fund HSIP

Year LUMP

Federal $902,027

State $0

Total Project Cost: Total Project Authorizations:

$902,027 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 0010623 Type Work: TE-Bike/Ped Facility
Descp: SR 14; CS 659/CS 687/9TH ST & CS 661/8TH ST @ 3 LOC - PH III Length: 0.30

Phase CST

Fund STP

Year LUMP

Federal $500,000

State $0

Total Project Cost: Total Project Authorizations:

$625,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 310730- Type Work: Interchange
Descp: I-185 CONN @ I-85 & I-185; INTERCHANGE CONSTRUCTION Length: 4.69

Phase PE
ROW CST

Fund NHPP NHPP NHPP

Year 2014 After 2017 After 2017

Federal $320,000
$1,941,738 $68,524,937

State $80,000
$485,435 $17,131,234

Total Project Cost: Total Project Authorizations:

$88,483,344 $0

Other $0

Total $902,027

Other $125,000

Total $625,000

Other $0 $0 $0

Total $400,000
$2,427,173 $85,656,171

Project: 321715- Type Work: Widening

Descp: SR 14/US 29 FM CR 403/UPPER GLASS BRIDGE

TO OLD VERNON RD

Lanes: Exist. 2 Prop. 4

Length: 3.05

Total Project Cost: Total Project Authorizations:

$24,710,929 $0

Phase PE
ROW CST UTL

Fund STP STP STP STP

Year 2014 2017 After 2017 After 2017

Federal $96,000
$9,917,862 $9,126,855
$628,026

State $24,000
$2,479,466 $2,281,714
$157,006

Other $0 $0 $0 $0

Total $120,000
$12,397,328 $11,408,569
$785,032

Project: 322250- Type Work: Widening

Descp: SR 1/US 27/LAGRANGE FM AUBURN ST TO SR

219/MORGAN ST

Lanes: Exist. 2 Prop. 4

Length: 1.42

Total Project Cost: Total Project Authorizations:

$31,031,625 $2,000,000

Phase PE
ROW CST UTL

Fund NHPP NHPP NHPP Local

Year 2013 2016 2017 2017

Federal $1,600,000 $15,292,432 $6,932,701
$0

State $400,000 $3,823,108 $1,733,175
$0

Other $0 $0 $0
$1,250,209

Total $2,000,000 $19,115,540 $8,665,876 $1,250,209

Page 286 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 342870- Type Work: Replace Bridge
Descp: CR 296/HAMMETT ROAD @ WEST POINT LAKE TRIB. N OF LAGRANGE Length: 0.40

Total Project Cost: Total Project Authorizations:

$633,024 $0

Phase PE
ROW CST UTL

Uses Lump Sum Bank: LOW IMPACT BRIDGES FOR FY 2014 - FY 2017

Project: 343455- Type Work: Replace Bridge
Descp: CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE Length: 0.20

Phase PE
ROW CST

Total Project Cost: Total Project Authorizations:

$3,347,544 $100,000

Fund STP Local STP STP
Fund STP Local STP

Year LUMP 2016 LUMP LUMP
Year 2013 LOCL 2016

Federal $81,600 $0
$408,000 $8,160

State $20,400 $0
$102,000 $2,040

Other $0
$10,824 $0 $0

Federal $80,000 $0
$2,348,435

State $20,000 $0
$587,109

Other $0
$312,000 $0

Total $102,000 $10,824 $510,000 $10,200
Total $100,000 $312,000
$2,935,544

Project: 362910- Type Work: New Construction

Descp: I-185 CONN FM I-185 @ I-85 TO SR 1/US 27 S OF

BEECH CREEK

Lanes: Exist. 0 Prop. 4

Length: 5.53

Total Project Cost: Total Project Authorizations:

$90,227,037 $0

Phase PE
ROW CST UTL

Fund NHPP NHPP NHPP Local

Year 2014 After 2017 After 2017 After 2017

Federal $320,000
$4,937,510 $65,195,014
$0

State $80,000
$1,234,378 $16,298,753
$0

Other $0 $0 $0
$2,161,382

Total $400,000
$6,171,888 $81,493,767
$2,161,382

Project: M004517 Type Work: Signing Descp: I-185 @ 16 LOCS - SIGN UPGRADES

Length: 0.00

Total Project Cost: Total Project Authorizations:

$6,943,886 $0

Phase PE CST

Fund NHPP NHPP

Year LUMP LUMP

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Project: M004521 Type Work: Signing Descp: I-85 @ 12 LOCS - SIGN UPGRADES
Length: 4.80

Phase PE CST

Fund NHPP NHPP

Year LUMP LUMP

Total Project Cost: Total Project Authorizations:

$3,831,907 $0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Federal $80,000
$6,863,886
Federal $80,000
$3,751,907

State $0 $0

Other $0 $0

Total $80,000
$6,863,886

Also in Harris, Muscogee County

State $0 $0

Other $0 $0

Total $80,000
$3,751,907

Also in Coweta County

Page 287 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: M004793 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 3 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Project: M004891 Type Work: Resurface & Maintenance
Descp: SR 219 FROM SR 14 CONN TO CS 718/SOUTH CHILTON AVE Length: 1.68

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$272,880 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Project: M004921 Type Work: Resurface & Maintenance Descp: I-85 FROM ALABAMA STATE LINE TO SR 219

Length: 13.00

Total Project Cost: Total Project Authorizations:

$20,000 $0

Phase PE

Fund NHPP

Year LUMP

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Project: M004945 Type Work: Resurface & Maintenance Descp: SR 14 FROM ALABAMA STATE LINE TO SR 18
Length: 0.87

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$426,771 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Project: M004953 Type Work: Resurface & Maintenance
Descp: SR 14 FROM SR 18 TO N OF CS 1187/MEDICAL PKWY Length: 14.33

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$3,208,344 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Federal $0
Federal $218,304
Federal $18,000
Federal $341,417
Federal $2,566,675

State $200,000

Other $0

Total $200,000

State

Also in Bibb, Butts,

Chattahoochee, Coweta,

Crawford, Dooly, Fayette, Harris,

Heard, Henry, Houston, Jones,

Lamar, Macon, Marion,

Meriwether, Monroe, Muscogee,

Peach, Pike, Pulaski, Schley,

Spalding, Stewart, Sumter, Talbot,

Taylor, Twiggs, Upson, Webster

County

Other

Total

$54,576

$0

$272,880

State $2,000

Other $0

Total $20,000

Also in Harris County

State $85,354

Other $0

Total $426,771

State $641,669

Other $0

Total $3,208,344

Page 288 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: M004954 Type Work: Resurface & Maintenance
Descp: SR 109 FROM SR 1 TO MERIWETHER COUNTY LINE Length: 9.79

Phase CST

Fund STP

Total Project Cost: Total Project Authorizations:

$1,830,813 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Year LUMP

Federal $1,464,650

State $366,163

Other $0

Total $1,830,813

Troup Totals Summary
County Summary excludes lump sum projects.

Project PI#
310730321715321715322250322250322250343455362910M004793

Year
2014 2014 2017 2016 2017 2017 2016 2014 2014

Phase
PE PE ROW ROW CST UTL CST PE CST

Fund NHPP STP STP NHPP NHPP Local STP NHPP State

Federal
$320,000 $96,000
$9,917,862 $15,292,432
$6,932,701 $0
$2,348,435 $320,000 $0

State
$80,000 $24,000 $2,479,466 $3,823,108 $1,733,175
$0 $587,109
$80,000 $8,000

Other
$0 $0 $0 $0 $0 $1,250,209 $0 $0 $0

$35,227,430

$8,814,857

$1,250,209

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $400,000 $120,000
$12,397,328 $19,115,540
$8,665,876 $1,250,209 $2,935,544
$400,000 $8,000
$45,292,497

Page 289 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Turner

Project: 0000311 Type Work: Widening

Descp: SR 107/SR 112 FROM CR 250 TO I-75 IN

ASHBURN

Lanes: Exist. 2 Prop. 4

Length: 7.90

Total Project Cost: Total Project Authorizations:

$28,757,034 $85,000

Phase PE PE
ROW CST UTL

Fund STP STP STP STP STP

Year 2013 2014 After 2017 After 2017 After 2017

Federal $68,000 $40,000
$3,153,255 $19,111,676
$632,696

State $17,000 $10,000
$788,314 $4,777,919
$158,174

Other $0 $0 $0 $0 $0

Total $85,000 $50,000
$3,941,568 $23,889,596
$790,870

Project: 0007579 Type Work: Sidewalks
Descp: CS 500/CARLOS AVE FM TOOMBS ST TO JEFFERSON ST IN ASHBURN Length: 0.16

Total Project Cost: Total Project Authorizations:

$534,578 $0

Phase CST

Fund HPP

Year 2014

Federal $401,950

State $0

Other $132,628

Total $534,578

Project: 0007596 Type Work: Streetscapes
Descp: SR 7 & SR 112 FM GORDON ST TO EAST COLLEGE ST IN ASHBURN Length: 0.15

Total Project Cost: Total Project Authorizations:

$196,070 $0

Phase CST

Fund HPP

Year 2015

Federal $155,980

State $0

Other $40,090

Total $196,070

Project: 0010675 Type Work: TE-Bike/Ped Facility
Descp: SR 112 FROM SR 7/US 41 TO CS 503/JOHNSON STREET Length: 0.19

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$625,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 0011646 Type Work: RRX Consolidation
Descp: CS 618/WILLIS STREET @ CSX #723712Y & #925521X Length: 0.09

Phase CST

Fund HSIP

Year LUMP

Total Project Cost: Total Project Authorizations:

$15,000 $0

Uses Lump Sum Bank: RAILROAD CROSSING HAZARD ELIMINATION FOR FY 2014 - FY 2017

Federal $500,000
Federal $15,000

State $0

Other $125,000

State $0

Other $0

Total $625,000
Total $15,000

Page 290 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: M004723 Type Work: Bridges Descp: I-75 @ HAT CREEK - SCOUR REHAB

Length: 0.20

Total Project Cost: Total Project Authorizations:

$400,000 $100,000

Phase PE CST

Fund NHPP NHPP

Year 2013 LUMP

Uses Lump Sum Bank: INTERSTATE BRIDGE PAINTING/MAINTENANCE FOR FY 2014 - FY 2017

Project: M004794 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 4 Length: 0.00

Phase CST

Fund State

Year 2014

Total Project Cost: Total Project Authorizations:

$200,000 $0

Project: M004805 Type Work: Resurface & Maintenance
Descp: I-75 FROM SR 159/TURNER TO N OF CR 355/OLD HATLEY RD/CRISP Length: 14.37

Total Project Cost: Total Project Authorizations:

$50,000 $0

Phase PE

Fund NHPP

Year LUMP

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Project: M004807 Type Work: Resurface & Maintenance
Descp: I-75 FM S OF CR 204/SOUTHWELL RD/TIFT TO S OF SR 32/TURNER Length: 19.00

Phase PE

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations:

$50,000 $0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Federal $90,000
$270,000
Federal $0
Federal $45,000
Federal $45,000

State $10,000 $30,000

Other $0 $0

Total $100,000 $300,000

State $200,000

Other $0

Total $200,000

State

Also in Atkinson, Baker, Ben Hill,

Berrien, Brooks, Calhoun, Clay,

Clinch, Coffee, Colquitt, Cook,

Crisp, Decatur, Dougherty, Early,

Echols, Grady, Irwin, Lanier, Lee,

Lowndes, Miller, Mitchell,

Quitman, Randolph, Seminole,

Terrell, Thomas, Tift, Wilcox,

Worth County

Other

Total

$5,000

$0

$50,000

Also in Crisp County

State $5,000

Other $0

Total $50,000

Also in Tift County

Page 291 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Turner Totals Summary
County Summary excludes lump sum projects.

Project PI#
0000311 0007579 0007596 M004794

Year
2014 2014 2015 2014

Phase
PE CST CST CST

Fund STP HPP HPP State

Federal
$40,000 $401,950 $155,980
$0

State
$10,000 $0 $0
$4,000

Other
$0 $132,628
$40,090 $0

$597,930

$14,000

$172,718

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $50,000
$534,578 $196,070
$4,000
$784,648

Page 292 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Twiggs
Project: 0007054 Type Work: Replace Bridge Descp: SR 19 @ CSX RR 2.8 MI SE OF DRY BRANCH
Length: 0.56

Total Project Cost: Total Project Authorizations:

$3,553,384 $150,000

Phase ROW CST UTL

Fund STP STP STP

Year 2013 2015 2015

Federal $120,000
$2,481,542 $241,165

State $30,000
$620,386 $60,291

Other $0 $0 $0

Total $150,000
$3,101,928 $301,456

Project: 0007251 Type Work: Interchange Descp: SR 96 @ I-16

Lanes: Exist. 2 Prop. 4

Length: 1.40

Total Project Cost: Total Project Authorizations:

$14,684,877 $0

Phase CST UTL

Fund NHPP NHPP

Year 2014 2014

Federal $11,303,286
$444,615

State $2,825,822
$111,154

Other $0 $0

Total $14,129,108
$555,769

Project: 0008416 Type Work: Replace Bridge Descp: CR 189/BULLARD @ FLAT CREEK

Length: 0.40

Total Project Cost: Total Project Authorizations:

$633,024 $0

Phase PE
ROW CST UTL

Fund STP Local STP STP

Year LUMP 2016 LUMP LUMP

Federal $81,600 $0
$408,000 $8,160

State $20,400 $0
$102,000 $2,040

Other $0
$10,824 $0 $0

Total $102,000 $10,824 $510,000 $10,200

Uses Lump Sum Bank: LOW IMPACT BRIDGES FOR FY 2014 - FY 2017

Project: 322460- Type Work: Widening

Descp: SR 96 FROM E OF CR 540/OLD HAWKINSVILLE

ROAD TO W OF SR 87

Lanes: Exist. 2 Prop. 4

Length: 7.84

Total Project Cost: Total Project Authorizations:

$76,802,001 $0

Phase PE CST UTL

Fund NHPP NHPP NHPP

Year 2014 After 2017 After 2017

Federal $400,000
$59,023,036 $2,018,565

State $100,000 $14,755,759 $504,641

Other $0 $0 $0

Total $500,000
$73,778,795 $2,523,206

Also in Houston County

Project: 322470- Type Work: Widening

Descp: SR 96 FM 0.48 W OF SR 87 TO S OF I-16

Lanes: Exist. 2 Prop. 4

Length: 7.64

Total Project Cost: Total Project Authorizations:

$41,503,446 $0

Phase ROW CST UTL

Fund NHPP NHPP NHPP

Year 2014 After 2017 After 2017

Federal $6,453,744 $25,804,493
$944,520

State $1,613,436 $6,451,123
$236,130

Other $0 $0 $0

Total $8,067,180 $32,255,616 $1,180,650

Page 293 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: M004188 Type Work: Signing Descp: I-16 @ 5 LOCS & I-75 @ 4 LOCS
Length: 3.60

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations:

$1,300,000 $0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Federal $1,300,000

State $0

Other $0

Total $1,300,000

Also in Bibb County

Project: M004793 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 3 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Federal $0

Twiggs Totals Summary
County Summary excludes lump sum projects.

State $200,000

Other $0

Total $200,000

Also in Bibb, Butts, Chattahoochee, Coweta, Crawford, Dooly, Fayette, Harris, Heard, Henry, Houston, Jones, Lamar, Macon, Marion, Meriwether, Monroe, Muscogee, Peach, Pike, Pulaski, Schley, Spalding, Stewart, Sumter, Talbot, Taylor, Troup, Upson, Webster County

Project PI#
0007054 0007054 0007251 0007251 322460322470M004793

Year
2015 2015 2014 2014 2014 2014 2014

Phase
CST UTL CST UTL PE ROW CST

Fund STP STP NHPP NHPP NHPP NHPP State

Federal
$2,481,542 $241,165
$11,303,286 $444,615 $296,000
$6,453,744 $0

State
$620,386 $60,291
$2,825,822 $111,154 $74,000
$1,613,436 $8,000

Other
$0 $0 $0 $0 $0 $0 $0

$21,220,353

$5,313,088

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $3,101,928 $301,456
$14,129,108 $555,769 $370,000
$8,067,180 $8,000
$26,533,441

Page 294 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Union
Project: 0007055 Type Work: Replace Bridge Descp: SR 180 @ SLAUGHTER CREEK
Length: 0.40

Total Project Cost: Total Project Authorizations:

$6,615,655 $0

Phase PE
ROW CST UTL

Fund STP STP STP STP

Year 2014 2015 After 2017 After 2017

Federal $346,552 $38,732
$4,688,990 $218,250

State $86,638 $9,683
$1,172,247 $54,563

Other $0 $0 $0 $0

Total $433,190 $48,415
$5,861,237 $272,813

Project: 0007495 Type Work: Pedestrian Crossings
Descp: PEDESTRIAN UPGRADES @ 20 SR LOCATIONS IN DISTRICT 1 Length: 0.00

Phase CST

Fund HSIP

Total Project Cost: Total Project Authorizations:

$3,146,613 $560,000

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 122900- Type Work: Widening

Descp: SR 515/2/US 76 FM E BLAIRSVILLE TO YOUNG

HARRIS BP@CL/CORR A

Lanes: Exist. 2 Prop. 4

Length: 5.87

Total Project Cost: Total Project Authorizations:

$49,936,000 $0

Phase PE
ROW CST

Fund App Dev App Dev App Dev

Year LUMP
Year 2014 2016 2017

Federal $2,327,952
Federal $500,000
$32,275,000 $17,161,000

State $258,661

Other $0

Total $2,586,613

State

Also in Lumpkin, Towns, White

County

Other

Total

$0

$0

$500,000

$0

$0

$32,275,000

$0

$0

$17,161,000

Project: M004791 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 1 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Federal $0

State $200,000

Other $0

Total $200,000

Also in Banks, Barrow, Clarke, Dawson, Elbert, Forsyth, Franklin, Gwinnett, Habersham, Hall, Hart, Jackson, Lumpkin, Madison, Oconee, Rabun, Stephens, Towns, Walton, White County

Page 295 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Union Totals Summary
County Summary excludes lump sum projects.

Project PI#
0007055 0007055 122900122900122900M004791

Year
2014 2015 2014 2016 2017 2014

Phase
PE ROW
PE ROW CST CST

Fund STP STP
App Dev App Dev App Dev
State

Federal
$346,552 $38,732
$500,000 $32,275,000 $17,161,000
$0

State
$86,638 $9,683 $0 $0 $0
$12,000

Other
$0 $0 $0 $0 $0 $0

$50,321,284

$108,321

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $433,190 $48,415 $500,000
$32,275,000 $17,161,000
$12,000
$50,429,605

Page 296 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Upson
Project: 0000297 Type Work: Roadway Project
Descp: SR 3/US 19 FM CR 73/EAST-WEST COUNTY RD TO CR 8/ATWATER RD Length: 2.00

Total Project Cost: Total Project Authorizations:

$20,900,104 $0

Phase ROW CST UTL

Fund NHPP NHPP NHPP

Year 2014 2017 2017

Federal $9,799,344 $6,362,237
$558,503

State $2,449,836 $1,590,559
$139,626

Other $0 $0 $0

Total $12,249,180
$7,952,796 $698,129

Project: 0006967 Type Work: New Construction Descp: SR 74 EAST ONE-WAY PAIR IN THOMASTON

Lanes: Exist. 0 Prop. 2

Length: 0.15

Total Project Cost: Total Project Authorizations:

$1,595,445 $0

Phase PE
ROW CST

Fund STP STP STP

Year 2014 After 2017 After 2017

Federal $100,388 $733,229 $442,739

State $25,097
$183,307 $110,685

Other $0 $0 $0

Total $125,485 $916,536 $553,423

Project: 0010624 Type Work: TE-Bike/Ped Facility
Descp: SR 3 FROM CS 602/R STREET TO CS 609/PARK DRIVE Length: 0.43

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$650,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 333210- Type Work: Replace Bridge Descp: SR 36 @ FLINT RIVER 9.6 MI E OF WOODLAND
Length: 0.97

Phase ROW CST UTL

Fund STP STP STP

Year 2013 2014 2014

Total Project Cost: Total Project Authorizations:

$5,787,900 $1,600,000

Project: M004793 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 3 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Federal $520,000
Federal $1,280,000 $3,254,493
$95,828
Federal $0

State $0

Other $130,000

Total $650,000

State $320,000 $813,623
$23,957

Other $0 $0 $0

Total $1,600,000 $4,068,116
$119,784

Also in Talbot County

State $200,000

Other $0

Total $200,000

Also in Bibb, Butts, Chattahoochee, Coweta, Crawford, Dooly, Fayette, Harris, Heard, Henry, Houston, Jones, Lamar, Macon, Marion, Meriwether, Monroe, Muscogee, Peach, Pike, Pulaski, Schley, Spalding, Stewart, Sumter, Talbot, Taylor, Troup, Twiggs, Webster County

Page 297 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Upson Totals Summary
County Summary excludes lump sum projects.

Project PI#
0000297 0000297 0000297 0006967 333210333210M004793

Year
2014 2017 2017 2014 2014 2014 2014

Phase
ROW CST UTL PE CST UTL CST

Fund NHPP NHPP NHPP STP STP STP State

Federal
$9,799,344 $6,362,237
$558,503 $100,388 $1,366,887
$40,248 $0

State
$2,449,836 $1,590,559
$139,626 $25,097
$341,722 $10,062 $6,000

Other
$0 $0 $0 $0 $0 $0 $0

$18,227,606

$4,562,901

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $12,249,180
$7,952,796 $698,129 $125,485
$1,708,609 $50,309 $6,000
$22,790,507

Page 298 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Walker
Project: 0007543 Type Work: Miscellaneous Improvements
Descp: TRANSPORTATION IMPROVEMENTS IN WALKER COUNTY Length: 0.00

Total Project Cost: Total Project Authorizations:

$2,069,184 $0

Phase CST

Fund HPP

Year 2015

Federal $1,655,347

State $0

Other $413,837

Total $2,069,184

Project: 0010448 Type Work: Signals
Descp: SR 1 @ 3 LOC; SR 2 @ 5 LOC; SR 136 @ 3 LOC &SR 146 @ 2 LOC Length: 0.00

Phase ROW CST

Fund STP STP

Year LUMP LUMP

Federal $520,200
$1,014,390

State $0 $0

Other $0 $0

Total $520,200
$1,014,390

Total Project Cost: Total Project Authorizations:

$1,534,590 $0

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2014 - FY 2017

Also in Catoosa, Dade County

Project: 0010683 Type Work: TE-Rehab Hist Trans Bldg
Descp: WELCOME CENTER @ MCLEMORES COVE IN WALKER COUNTY Length: 0.00

Phase CST

Fund STP

Year LUMP

Federal $225,000

State $0

Other $56,250

Total $281,250

Total Project Cost: Total Project Authorizations:

$281,250 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: M004796 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 6 Length: 0.00

Phase CST

Fund State

Year 2014

Federal $0

State $200,000

Other $0

Total $200,000

Total Project Cost: Total Project Authorizations:

$200,000 $0

Also in Bartow, Carroll, Catoosa, Chattooga, Cherokee, Dade, Fannin, Floyd, Gilmer, Gordon, Haralson, Murray, Paulding, Pickens, Polk, Whitfield County

Project PI# 0007543 M004796

Year 2015 2014

Walker Totals Summary

County Summary excludes lump sum projects.

This County is also located in a MPO area. Additional Projects may be listed in the MPO TIP.

Phase

Fund

Federal

State

Other

CST

HPP

CST

State

$1,655,347 $0

$0 $14,000

$413,837 $0

Total $2,069,184 $14,000

$1,655,347

$14,000

$413,837

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

$2,083,184

Page 299 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Walton
Project: 0010199 Type Work: TE-Bike/Ped Facility
Descp: SR 11 FROM BLUE WILLOW INN TO HIGHTOWER TRAIL Length: 0.23

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$500,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 0012674 Type Work: Signals
Descp: SR 10; SR 10BU; SR 11; SR 20; SR 81; SR 138@15 LOC IN WALTON Length: 0.00

Phase PE
ROW CST

Fund CMAQ CMAQ CMAQ

Year 2013 LUMP LUMP

Total Project Cost: Total Project Authorizations:

$2,600,000 $500,000

Federal $400,000

State $0

Other $100,000

Federal $400,000 $600,000
$1,080,000

State $100,000 $150,000 $270,000

Other $0 $0 $0

Total $500,000
Total $500,000 $750,000
$1,350,000

Project: 132980- Type Work: Replace Bridge
Descp: SR 11 @ CSX RAILROAD IN SOUTH SOCIAL CIRCLE Length: 0.23

Total Project Cost: Total Project Authorizations:

$2,430,341 $0

Phase PE
ROW CST

Fund STP STP STP

Year 2015 2014 2016

Federal $16,000
$408,000 $1,520,273

State $4,000
$102,000 $380,068

Other $0 $0 $0

Total $20,000
$510,000 $1,900,341

Project: 132981- Type Work: Replace Bridge
Descp: SR 11 @ APALACHEE RIVER 7.5 MILES NORTH OF MONROE Length: 0.57

Total Project Cost: Total Project Authorizations:

$2,592,500 $85,000

Phase PE
ROW CST UTL

Fund STP STP STP STP

Year 2013 2015 2017 2017

Federal $68,000
$170,000 $1,800,000
$36,000

State $17,000 $42,500
$450,000 $9,000

Other $0 $0 $0 $0

Total $85,000
$212,500 $2,250,000
$45,000

Project: M004658 Type Work: Resurface & Maintenance
Descp: SR 11 FROM NEWTON CO LINE TO N OF SOCIAL CIRCLE FAIRPLAY RD Length: 3.30

Phase CST

Fund STP

Total Project Cost: Total Project Authorizations:

$1,086,335 $1,086,335

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Year 2014

Federal $869,068

State $217,267

Other $0

Total $1,086,335

Page 300 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: M004660 Type Work: Resurface & Maintenance
Descp: SR 10 FM E OF CS 804/CHERRY HILL ROAD TO OCONEE COUNTY LINE Length: 7.35

Total Project Cost: Total Project Authorizations:

$4,200,000 $0

Phase CST

Fund STP

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Project: M004791 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 1 Length: 0.00

Phase CST

Fund State

Total Project Cost: Total Project Authorizations:

$200,000 $0

Year LUMP
Year 2014

Project: M004883 Type Work: Resurface & Maintenance
Descp: SR 10 FROM OCONEE COUNTY LINE TO CS 804/CHERRY HILL ROAD Length: 7.55

Phase CST

Fund STP

Total Project Cost: Total Project Authorizations:

$1,883,004 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Project: T003643 Type Work: Transit Projects
Descp: FY 2014 FTA SECTION 5307/5340 FORMULA FUNDS FOR WALTON Length: 0.00

Phase CST

Fund Transit

Total Project Cost: Total Project Authorizations:

$43,346 $0

Year LUMP
Year 2014

Federal $3,360,000
Federal $0
Federal $1,506,403
Federal $34,677

State $840,000

Other $0

Total $4,200,000

State $200,000

Other $0

Total $200,000

State

Also in Banks, Barrow, Clarke,

Dawson, Elbert, Forsyth,

Franklin, Gwinnett, Habersham,

Hall, Hart, Jackson, Lumpkin,

Madison, Oconee, Rabun,

Stephens, Towns, Union, White

County

Other

Total

$376,601

$0

$1,883,004

State $0

Other $8,669

Total $43,346

Project: T004091 Type Work: Transit Projects
Descp: FY 2015 FTA SECTION 5307/5340 FORMULA FUNDS FOR WALTON Length: 0.00

Total Project Cost: Total Project Authorizations:

$43,346 $0

Phase CST

Fund Transit

Year 2015

Federal $34,677

State $4,335

Other $4,335

Total $43,346

Page 301 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: T004410 Type Work: Transit Projects
Descp: FY 2016 FTA SECTION 5307/5340 FORMULA FUNDS FOR WALTON Length: 0.00

Total Project Cost: Total Project Authorizations:

$45,000 $0

Phase CST

Fund Transit

Year 2016

Federal $36,000

State $0

Other $9,000

Total $45,000

Project: T004843 Type Work: Transit Projects
Descp: FY 2017 FTA SECTION 5307/5340 FORMULA FUNDS FOR WALTON Length: 0.00

Total Project Cost: Total Project Authorizations:

$54,000 $0

Phase CST

Fund Transit

Year 2017

Federal $43,200

State $0

Other $10,800

Total $54,000

Project PI#
132980132980132980132981132981132981M004791 T003643 T004091 T004410 T004843

Year
2015 2014 2016 2015 2017 2017 2014 2014 2015 2016 2017

Walton Totals Summary

County Summary excludes lump sum projects.

This County is also located in a MPO area. Additional Projects may be listed in the MPO TIP.

Phase

Fund

Federal

State

Other

PE ROW CST ROW CST UTL CST CST CST CST CST

STP STP STP STP STP STP State Transit Transit Transit Transit

$16,000 $408,000 $1,520,273 $170,000 $1,800,000
$36,000 $0
$34,677 $34,677 $36,000 $43,200

$4,000 $102,000 $380,068
$42,500 $450,000
$9,000 $12,000
$0 $4,335
$0 $0

$0 $0 $0 $0 $0 $0 $0 $8,669 $4,335 $9,000 $10,800

$4,098,827

$1,003,903

$32,804

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total
$20,000 $510,000 $1,900,341 $212,500 $2,250,000
$45,000 $12,000 $43,346 $43,346 $45,000 $54,000
$5,135,533

Page 302 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Ware

Project: 0007664 Type Work: Widening

Descp: CR 392/HATCHER POINT MALL ROAD FM SR 4/US

1 TO SR 520/US 82

Lanes: Exist. 2 Prop. 5

Length: 0.40

Total Project Cost: Total Project Authorizations:

$3,567,020 $0

Phase CST UTL UTL

Fund STP STP State

Year 2016 2016 2016

Federal $1,778,796
$496,000 $0

State $444,699 $124,000 $723,525

Other $0 $0 $0

Total $2,223,496
$620,000 $723,525

Project: 0010293 Type Work: Realignment
Descp: SR 122 FM W OF CR 39/CORBITT RD TO E OF CR 68/PINE VALLEY RD Length: 0.90

Phase ROW CST

Fund HSIP HSIP

Year LUMP LUMP

Total Project Cost: Total Project Authorizations:

$2,654,256 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 0010596 Type Work: TE-Bike/Ped Facility
Descp: CR 465/JAMESTOWN ROAD FROM CR 252/TERNEST ROAD TO SR 4 Length: 10.79

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$249,999 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 0011688 Type Work: Replace Bridge
Descp: SR 158 @ SATILLA RIVER 9 MI NW OF WAYCROSS Length: 0.40

Total Project Cost: Total Project Authorizations:

$4,355,694 $0

Phase PE
ROW CST UTL

Fund STP STP STP STP

Year 2014 2015 2017 2017

Federal $861,300
$1,527,530
Federal $199,999
Federal $285,600 $124,848
$3,030,810 $43,297

State $95,700
$169,726

Other $0 $0

State $0

Other $50,000

State $71,400 $31,212
$757,703 $10,824

Other $0 $0 $0 $0

Total $957,000
$1,697,256
Total $249,999
Total $357,000 $156,060
$3,788,513 $54,122

Project: 422120- Type Work: Widening

Descp: SR 38 FM W OF WOODYARD CK/CLINCH TO W OF

GREASY BRANCH/WARE

Lanes: Exist. 2 Prop. 4

Length: 11.60

Total Project Cost: Total Project Authorizations:

$56,470,835 $0

Phase CST UTL

Fund NHPP NHPP

Year 2015 2015

Federal $44,391,370
$785,298

State $11,097,843
$196,325

Other $0 $0

Total $55,489,213
$981,623

Also in Clinch County

Page 303 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 422125- Type Work: Replace Bridge

Descp: SR 38/US 84 @ SUWANNEE CRK

Lanes: Exist. 2 Prop. 4

Length: 0.10

Total Project Cost: Total Project Authorizations:

$1,742,670 $0

Phase CST

Fund NHPP

Year 2015

Federal $1,394,136

State $348,534

Other $0

Total $1,742,670

Project: 522770- Type Work: Widening

Descp: SR 38/US 84 FM W OF GREASY BRANCH CK TO

W OF CR 88/RUSKIN RD

Lanes: Exist. 2 Prop. 4

Length: 7.60

Total Project Cost: Total Project Authorizations:

$23,288,136 $0

Phase CST

Fund NHPP

Year 2015

Federal $18,630,509

State $4,657,627

Other $0

Total $23,288,136

Project: 522775- Type Work: Replace Bridge

Descp: SR 38/US 84 @ GREASY BRANCH; LITTLE & BIG

ALLIGATOR CREEK

Lanes: Exist. 2 Prop. 4

Length: 0.10

Total Project Cost: Total Project Authorizations:

$13,532,648 $0

Phase PE CST

Fund NHPP NHPP

Year 2015 2015

Federal $40,000
$10,786,118

State $10,000
$2,696,530

Other $0 $0

Total $50,000
$13,482,648

Project: 522780- Type Work: Widening

Descp: SR 38/US 84 FM W OF CR 88/RUSKIN RD TO E OF

CR 294/WADLEY RD

Lanes: Exist. 2 Prop. 4

Length: 6.06

Total Project Cost: Total Project Authorizations:

$20,495,822 $0

Phase CST UTL

Fund NHPP Local

Year 2016 2016

Federal $16,311,761
$0

State $4,077,940
$0

Other $0
$106,121

Total $20,389,701
$106,121

Project: M004592 Type Work: Resurface & Maintenance
Descp: SR 4BU/US 1BU FM CS 911/CARSWELL AVE TO CR 358/WARING STREET Length: 2.17

Phase CST

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations:

$808,333 $0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Federal $646,666

State $161,667

Other $0

Total $808,333

Page 304 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: M004795 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 5 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Federal $0

Ware Totals Summary
County Summary excludes lump sum projects.

State $200,000

Other $0

Total $200,000

Also in Appling, Bacon, Brantley, Bryan, Bulloch, Camden, Candler, Charlton, Chatham, Effingham, Evans, Glynn, Jeff Davis, Liberty, Long, McIntosh, Montgomery, Pierce, Tattnall, Telfair, Toombs, Wayne, Wheeler County

Project PI#
0007664 0007664 0007664 0011688 0011688 0011688 0011688 422120422120422125522770522775522775522780522780M004795

Year
2016 2016 2016 2014 2015 2017 2017 2015 2015 2015 2015 2015 2015 2016 2016 2014

Phase
CST UTL UTL PE ROW CST UTL CST UTL CST CST PE CST CST UTL CST

Fund STP State STP STP STP STP STP NHPP NHPP NHPP NHPP NHPP NHPP NHPP Local State

Federal
$1,778,796 $0
$496,000 $285,600 $124,848 $3,030,810
$43,297 $15,536,980
$274,854 $1,394,136 $18,630,509
$40,000 $10,786,118 $16,311,761
$0 $0

State
$444,699 $723,525 $124,000
$71,400 $31,212 $757,703 $10,824 $3,884,245 $68,714 $348,534 $4,657,627 $10,000 $2,696,530 $4,077,940
$0 $16,000

Other
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $106,121 $0

$68,733,709

$17,922,952

$106,121

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total
$2,223,496 $723,525 $620,000 $357,000 $156,060
$3,788,513 $54,122
$19,421,224 $343,568
$1,742,670 $23,288,136
$50,000 $13,482,648 $20,389,701
$106,121 $16,000
$86,762,782

Page 305 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Warren

Project: 0008680 Type Work: Frontage Roads

Descp: I-20 FRONTAGE RD FM CR 187/RIDGE RD TO SR

80 -PHASE II - TIA

Lanes: Exist. 0 Prop. 2

Length: 3.39

Total Project Cost: Total Project Authorizations:

$13,262,000 $0

Phase PE
ROW CST CST

Fund HPP Local State Local

Year 2015 2017 After 2017 After 2017

Federal $1,398,400
$0 $0 $0

State $0 $0 $0 $0

Other $349,600 $984,000 $2,500,000 $8,030,000

Total $1,748,000
$984,000 $2,500,000 $8,030,000

Project: 0010714 Type Work: TE-Bike/Ped Facility
Descp: CS 614/NORWOOD ST FM CS 615/ACADEMY ST TO CS 616/COURT SQ Length: 0.10

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$395,579 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 0010844 Type Work: Frontage Roads

Descp: I-20 FRONTAGE RD FM CADLEY ROAD TO RIDGE

ROAD - PH I - TIA

Lanes: Exist. 0 Prop. 2

Length: 2.68

Total Project Cost: Total Project Authorizations:

$12,602,311 $0

Phase ROW CST CST CST

Fund Local State HPP HPP

Year LOCL 2017 2017 2017

Federal $316,463

State $0

Other $79,116

Federal $0 $0
$3,599,601 $3,012,648

State $0 $0 $0 $0

Other $1,837,000 $2,500,000
$899,900 $753,162

Total $395,579
Total $1,837,000 $2,500,000 $4,499,501 $3,765,809

Project: 0012747 Type Work: Preliminary Engineering Descp: CS 562/BAKER STREET @ CSX #279522W
Length: 0.20

Phase PE CST

Fund HSIP HSIP

Total Project Cost: Total Project Authorizations:

$165,000 $0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2014 - FY 2017

Project: M004792 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 2 Length: 0.00

Phase CST

Fund State

Total Project Cost: Total Project Authorizations:

$200,000 $0

Year LUMP LUMP
Year 2014

Federal $25,000
$140,000
Federal $0

State $0 $0

Other $0 $0

Total $25,000
$140,000

State $200,000

Other $0

Total $200,000

Also in Baldwin, Bleckley, Burke, Columbia, Dodge, Emanuel, Glascock, Greene, Hancock, Jasper, Jefferson, Jenkins, Johnson, Laurens, Lincoln, McDuffie, Morgan, Newton, Oglethorpe, Putnam, Richmond, Screven, Taliaferro, Treutlen, Washington, Wilkes, Wilkinson County

Page 306 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: M004920 Type Work: Resurface & Maintenance Descp: I-20 FROM SR 12/WARREN TO SR 17/MCDUFFIE
Length: 17.78

Phase PE

Fund NHPP

Year LUMP

Total Project Cost: Total Project Authorizations:

$20,000 $0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Federal $18,000

State $2,000

Other $0

Total $20,000

Also in McDuffie County

Warren Totals Summary
County Summary excludes lump sum projects.

Project PI#
0008680 0008680 0010844 0010844 0010844 M004792

Year
2015 2017 2017 2017 2017 2014

Phase
PE ROW CST CST CST CST

Fund HPP Local HPP HPP State State

Federal
$1,398,400 $0
$3,012,648 $3,599,601
$0 $0

State
$0 $0 $0 $0 $0 $4,000

Other
$349,600 $984,000 $753,162 $899,900 $2,500,000
$0

$8,010,649

$4,000

$5,486,662

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $1,748,000 $984,000 $3,765,809 $4,499,501 $2,500,000 $4,000
$13,501,311

Page 307 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Washington
Project: 0010715 Type Work: TE-Rehab Hist Trans Bldg
Descp: TENNILLE FREIGHT DEPOT REHAB & STREETSCAPE @ 4 LOCS - PH II Length: 0.21

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$625,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 222190- Type Work: Passing Lanes

Descp: SR 15 @ 2 LOCS BTWN WRIGHTSVILLE &

TENNILLE

Lanes: Exist. 2 Prop. 3

Length: 2.56

Total Project Cost: Total Project Authorizations:

$4,611,290 $59,000

Phase PE CST

Fund STP NHPP

Year 2013 2014

Federal $500,000
Federal $47,200
$3,641,832

Project: 231170- Type Work: Replace Bridge
Descp: CR 376/HAMBURG RD N JCT W OF SR 102 @ COWPEN CRK Length: 0.20

Total Project Cost: Total Project Authorizations:

$633,024 $0

Phase PE
ROW CST UTL

Uses Lump Sum Bank: LOW IMPACT BRIDGES FOR FY 2014 - FY 2017

Project: 245080- Type Work: New Construction

Descp: SR 15 BYP FROM SR 15 TO SR 242 E OF

TENNILLE

Lanes: Exist. 0 Prop. 4

Length: 3.70

Phase ROW CST UTL

Total Project Cost: Total Project Authorizations:

$24,815,401 $0

Fund STP Local STP STP

Year LUMP 2016 LUMP LUMP

Federal $81,600 $0
$408,000 $8,160

Fund STP STP STP

Year 2017 After 2017 After 2017

Federal $3,258,565 $16,490,650
$103,106

State $0

Other $125,000

Total $625,000

State $11,800
$910,458

Other $0 $0

Total $59,000
$4,552,290

Also in Johnson County

State $20,400 $0
$102,000 $2,040

Other $0
$10,824 $0 $0

Total $102,000 $10,824 $510,000 $10,200

State $814,641 $4,122,662
$25,777

Other $0 $0 $0

Total $4,073,207 $20,613,312
$128,883

Project: M004792 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 2 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Federal $0

State $200,000

Other $0

Total $200,000

Also in Baldwin, Bleckley, Burke, Columbia, Dodge, Emanuel, Glascock, Greene, Hancock, Jasper, Jefferson, Jenkins, Johnson, Laurens, Lincoln, McDuffie, Morgan, Newton, Oglethorpe, Putnam, Richmond, Screven, Taliaferro, Treutlen, Warren, Wilkes, Wilkinson County
Page 308 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Washington Totals Summary
County Summary excludes lump sum projects.

Project PI# 222190245080M004792

Year 2014 2017 2014

Phase CST ROW CST

Fund NHPP STP State

Federal $983,295
$3,258,565 $0

State $245,824 $814,641 $12,000

Other $0 $0 $0

$4,241,860

$1,072,465

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $1,229,118 $4,073,207 $12,000
$5,314,325

Page 309 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Wayne
Project: 0012839 Type Work: RRX Warning Device Descp: CS 723/RAILROAD AVE @ NS #729092H IN JESUP
Length: 0.16

Phase CST

Total Project Cost: Total Project Authorizations:

$250,000 $0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2014 - FY 2017

Fund HSIP

Year LUMP

Federal $250,000

State $0

Other $0

Total $250,000

Project: M004795 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 5 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Federal $0

Wayne Totals Summary
County Summary excludes lump sum projects.

State $200,000

Other $0

Total $200,000

Also in Appling, Bacon, Brantley, Bryan, Bulloch, Camden, Candler, Charlton, Chatham, Effingham, Evans, Glynn, Jeff Davis, Liberty, Long, McIntosh, Montgomery, Pierce, Tattnall, Telfair, Toombs, Ware, Wheeler County

Project PI# M004795

Year 2014

Phase CST

Fund State

Federal $0

State $12,000

Other $0

$0

$12,000

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $12,000 $12,000

Page 310 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Webster
Project: M004793 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 3 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Federal $0

Webster Totals Summary
County Summary excludes lump sum projects.

State $200,000

Other $0

Total $200,000

Also in Bibb, Butts, Chattahoochee, Coweta, Crawford, Dooly, Fayette, Harris, Heard, Henry, Houston, Jones, Lamar, Macon, Marion, Meriwether, Monroe, Muscogee, Peach, Pike, Pulaski, Schley, Spalding, Stewart, Sumter, Talbot, Taylor, Troup, Twiggs, Upson County

Project PI# M004793

Year 2014

Phase CST

Fund State

Federal $0

State $4,000

Other $0

$0

$4,000

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $4,000 $4,000

Page 311 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Wheeler
Project: 0008417 Type Work: Replace Bridge Descp: CR 178/SNOWHILL ROAD @ OCHWALKEE CREEK
Length: 0.40

Total Project Cost: Total Project Authorizations:

$2,810,229 $0

Phase PE
ROW CST UTL

Fund STP Local STP Local

Year 2015 2016 After 2017 After 2017

Federal $176,653 $0
$1,726,285 $0

State $44,163 $0
$431,571 $0

Other $0
$34,116 $0
$397,441

Total $220,816 $34,116
$2,157,856 $397,441

Project: 532342- Type Work: Replace Bridge Descp: CR 197 @ ALLIGATOR CREEK S OF GLENWOOD
Length: 0.20

Total Project Cost: Total Project Authorizations:

$633,024 $0

Phase PE
ROW CST UTL

Uses Lump Sum Bank: LOW IMPACT BRIDGES FOR FY 2014 - FY 2017

Project: M004795 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 5 Length: 0.00

Phase CST

Total Project Cost: Total Project Authorizations:

$200,000 $0

Fund STP Local STP STP
Fund State

Year LUMP 2016 LUMP LUMP
Year 2014

Federal $81,600 $0
$408,000 $8,160
Federal $0

Wheeler Totals Summary
County Summary excludes lump sum projects.

State $20,400 $0
$102,000 $2,040

Other $0
$10,824 $0 $0

Total $102,000 $10,824 $510,000 $10,200

State $200,000

Other $0

Total $200,000

Also in Appling, Bacon, Brantley, Bryan, Bulloch, Camden, Candler, Charlton, Chatham, Effingham, Evans, Glynn, Jeff Davis, Liberty, Long, McIntosh, Montgomery, Pierce, Tattnall, Telfair, Toombs, Ware, Wayne County

Project PI# 0008417 0008417 M004795

Year 2015 2016 2014

Phase PE
ROW CST

Fund STP Local State

Federal $176,653 $0 $0

State $44,163 $0 $6,000

Other $0
$34,116 $0

$176,653

$50,163

$34,116

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $220,816 $34,116 $6,000
$260,932

Page 312 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

White
Project: 0001935 Type Work: TE-Scenic Hwy/Welcome Ctr
Descp: HARDMAN FARM VISITOR CENTER - PARKING LOTS&PEDESTRIAN TRAIL Length: 0.00

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$721,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 0007495 Type Work: Pedestrian Crossings
Descp: PEDESTRIAN UPGRADES @ 20 SR LOCATIONS IN DISTRICT 1 Length: 0.00

Phase CST

Fund HSIP

Year LUMP

Total Project Cost: Total Project Authorizations:

$3,146,613 $560,000

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 0010194 Type Work: New Construction

Descp: WEST CLEVELAND BYP FROM N OF SR 115 TO E

OF SR 11 - PH II

Lanes: Exist. 0 Prop. 4

Length: 1.73

Total Project Cost: Total Project Authorizations:

$19,515,402 $0

Phase CST UTL

Fund STP STP

Year 2015 2015

Federal $576,800

State $0

Other $144,200

Total $721,000

Federal $2,327,952

State $258,661

Other $0

Total $2,586,613

Federal $14,576,915
$1,035,406

State

Also in Lumpkin, Towns, Union

County

Other

Total

$3,644,229

$0

$18,221,144

$258,852

$0

$1,294,258

Project: 0010684 Type Work: TE-Bike/Ped Facility
Descp: SR 17/SR 75 @ CHATTAHOOCHEE RIVER IN HELEN Length: 0.20

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$375,000 $0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: M004775 Type Work: Resurface & Maintenance Descp: SR 75 ALT FROM SR 11 TO SR 75
Length: 8.10

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$1,200,000 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Federal $300,000
Federal $960,000

State $0

Other $75,000

State $240,000

Other $0

Total $375,000
Total $1,200,000

Page 313 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: M004791 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 1 Length: 0.00

Total Project Cost: Total Project Authorizations:

$200,000 $0

Phase CST

Fund State

Year 2014

Federal $0

White Totals Summary
County Summary excludes lump sum projects.

State $200,000

Other $0

Total $200,000

Also in Banks, Barrow, Clarke, Dawson, Elbert, Forsyth, Franklin, Gwinnett, Habersham, Hall, Hart, Jackson, Lumpkin, Madison, Oconee, Rabun, Stephens, Towns, Union, Walton County

Project PI# 0010194 0010194 M004791

Year 2015 2015 2014

Phase CST UTL CST

Fund STP STP State

Federal $14,576,915 $1,035,406 $0

State $3,644,229
$258,852 $8,000

Other $0 $0 $0

$15,612,321

$3,911,080

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $18,221,144
$1,294,258 $8,000
$19,523,402

Page 314 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Wilcox
Project: 0012797 Type Work: RRX Signing & Marking
Descp: SIGNING & MARKING @ 47 RR LOCS IN CRISP; DODGE & WILCOX Length: 0.00

Phase PE CST

Fund HSIP HSIP

Year LUMP LUMP

Total Project Cost: Total Project Authorizations:

$275,000 $0

Uses Lump Sum Bank: RAILROAD CROSSING HAZARD ELIMINATION FOR FY 2014 - FY 2017

Project: M004794 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 4 Length: 0.00

Phase CST

Fund State

Year 2014

Total Project Cost: Total Project Authorizations:

$200,000 $0

Federal $25,000
$250,000
Federal $0

Wilcox Totals Summary
County Summary excludes lump sum projects.

State $0 $0

Other $0 $0

Total $25,000
$250,000

Also in Crisp, Dodge County

State $200,000

Other $0

Total $200,000

Also in Atkinson, Baker, Ben Hill, Berrien, Brooks, Calhoun, Clay, Clinch, Coffee, Colquitt, Cook, Crisp, Decatur, Dougherty, Early, Echols, Grady, Irwin, Lanier, Lee, Lowndes, Miller, Mitchell, Quitman, Randolph, Seminole, Terrell, Thomas, Tift, Turner, Worth County

Project PI# M004794

Year 2014

Phase CST

Fund State

Federal $0

State $6,000

Other $0

$0

$6,000

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $6,000 $6,000

Page 315 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Wilkes
Project: 0012731 Type Work: Pavement Markings
Descp: OFF-SYSTEM SAFETY IMPROVEMENTS @ VAR LOCS IN WASHINGTON CITY Length: 0.00

Phase CST

Fund HSIP

Total Project Cost: Total Project Authorizations:

$225,000 $0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2014 - FY 2017

Project: 222255- Type Work: Widening

Descp: SR 10/SR 17 FM SMITH MILL RD TO

WASHINGTON BYP/WILKES - TIA

Lanes: Exist. 2 Prop. 4

Length: 12.00

Total Project Cost: Total Project Authorizations:

$43,406,018 $4,210,000

Phase PE
ROW CST CST UTL

Fund NHPP NHS State NHPP NHPP

Year LUMP
Year 2014 2013 2016 2016 2016

Federal $225,000
Federal $100,000
$3,368,000 $0
$26,374,231 $1,682,583

Project: 222460- Type Work: Passing Lanes

Descp: SR 10:OGLETHORPE 13.7-15;15.3-16.2 &WILKES

0-1.5;5.5-7.0-TIA

Lanes: Exist. 2 Prop. 3

Length: 5.32

Total Project Cost: Total Project Authorizations:

$8,058,287 $100,866

Phase PE PE CST

Fund STP State NHPP

Year 2013 2014 After 2017

Federal $80,693 $0
$6,205,937

Project: M004701 Type Work: Resurface & Maintenance Descp: SR 44 FROM SR 17/WILKES TO SR 79/LINCOLN
Length: 15.21

Phase CST

Fund STP

Total Project Cost: Total Project Authorizations:

$2,447,110 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Project: M004792 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 2 Length: 0.00

Phase CST

Fund State

Total Project Cost: Total Project Authorizations:

$200,000 $0

Year LUMP
Year 2014

Federal $1,957,688
Federal $0

State $0

Other $0

Total $225,000

State $25,000
$842,000 $0
$6,593,558 $420,646

Other $0 $0
$4,000,000 $0 $0

Total $125,000
$4,210,000 $4,000,000 $32,967,789 $2,103,229

Also in McDuffie County

State $20,173 $0
$1,551,484

Other $0
$200,000 $0

Total $100,866 $200,000
$7,757,421

Also in Oglethorpe County

State $489,422

Other $0

Total $2,447,110

Also in Lincoln County

State $200,000

Other $0

Total $200,000

Also in Baldwin, Bleckley, Burke, Columbia, Dodge, Emanuel, Glascock, Greene, Hancock, Jasper, Jefferson, Jenkins, Johnson, Laurens, Lincoln, McDuffie, Morgan, Newton, Oglethorpe, Putnam, Richmond, Screven, Taliaferro, Treutlen, Warren, Washington, Wilkinson County

Page 316 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: M004933 Type Work: Resurface & Maintenance Descp: SR 17 FROM SR 47 TO 0.60 MI N OF SR 44

Length: 3.30

Total Project Cost: Total Project Authorizations:

$1,618,815 $0

Phase CST

Fund NHPP

Year LUMP

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2014 - FY 2017

Project: M004946 Type Work: Resurface & Maintenance Descp: SR 17BU FROM SR 17 TO SR 10
Length: 2.75

Phase CST

Fund STP

Year LUMP

Total Project Cost: Total Project Authorizations:

$265,153 $0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2014 - FY 2017

Federal $1,295,052
Federal $212,122

State $323,763

Other $0

State $53,031

Other $0

Total $1,618,815
Total $265,153

Wilkes Totals Summary
County Summary excludes lump sum projects.

Project PI#
222255222255222255222255222460M004792

Year
2014 2016 2016 2016 2014 2014

Phase
PE CST CST UTL PE CST

Fund NHPP NHPP State NHPP State State

Federal
$74,000 $19,516,931
$0 $1,245,112
$0 $0

State
$18,500 $4,879,233
$0 $311,278
$0 $8,000

Other
$0 $0 $2,960,000 $0 $116,000 $0

$20,836,043

$5,217,011

$3,076,000

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $92,500
$24,396,164 $2,960,000 $1,556,390 $116,000 $8,000
$29,129,053

Page 317 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Wilkinson
Project: 0011762 Type Work: RRX Warning Device
Descp: CR 188/MACON ROAD @ NS #732725Y IN MCINTYRE Length: 0.40

Phase CST

Fund HSIP

Total Project Cost: Total Project Authorizations:

$275,000 $0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2014 - FY 2017

Project: M004792 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 2 Length: 0.00

Phase CST

Fund State

Total Project Cost: Total Project Authorizations:

$200,000 $0

Year LUMP
Year 2014

Federal $275,000
Federal $0

Wilkinson Totals Summary
County Summary excludes lump sum projects.

State $0

Other $0

Total $275,000

State $200,000

Other $0

Total $200,000

Also in Baldwin, Bleckley, Burke, Columbia, Dodge, Emanuel, Glascock, Greene, Hancock, Jasper, Jefferson, Jenkins, Johnson, Laurens, Lincoln, McDuffie, Morgan, Newton, Oglethorpe, Putnam, Richmond, Screven, Taliaferro, Treutlen, Warren, Washington, Wilkes County

Project PI# M004792

Year 2014

Phase CST

Fund State

Federal $0

State $8,000

Other $0

$0

$8,000

$0

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $8,000 $8,000

Page 318 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Worth

Project: 0000475 Type Work: Widening

Descp: SR 133 FM N OF SR 112 TO N OF CR 459/COUNTY

LINE ROAD

Lanes: Exist. 2 Prop. 4

Length: 3.40

Total Project Cost: Total Project Authorizations:

$20,441,096 $0

Project: 0000519 Type Work: Widening

Descp: SR 133 FM N OF COLQUITT COUNTY LINE TO N

OF SR 112

Lanes: Exist. 2 Prop. 4

Length: 6.49

Total Project Cost: Total Project Authorizations:

$33,072,503 $0

Phase PE
ROW CST UTL

Fund NHPP NHPP NHPP NHPP

Year 2014 2016 After 2017 After 2017

Federal $128,800
$3,144,572 $12,640,014
$439,491

State $32,200
$786,143 $3,160,003
$109,873

Other $0 $0 $0 $0

Total $161,000
$3,930,714 $15,800,017
$549,364

Phase PE
ROW CST UTL

Fund NHPP NHPP NHPP NHPP

Year 2014 2016 After 2017 After 2017

Federal $271,680
$5,139,643 $20,558,866
$487,814

Also in Dougherty County

State $67,920
$1,284,911 $5,139,716
$121,953

Other $0 $0 $0 $0

Total $339,600
$6,424,553 $25,698,582
$609,767

Project: 0000520 Type Work: Widening

Descp: SR 133 FM S OF SR 35/US 319 TO N OF

COLQUITT COUNTY LINE

Lanes: Exist. 2 Prop. 4

Length: 13.87

Total Project Cost: Total Project Authorizations:

$64,902,793 $0

Project: 0007622 Type Work: Bicycle/Ped. Facility
Descp: CR 328/ISABELLA ST FM NORTH ST TO KING ST IN SYLVESTER Length: 0.44

Total Project Cost: Total Project Authorizations:

$646,116 $0

Phase PE
ROW CST UTL

Fund NHPP NHPP NHPP NHPP

Year 2014 2016 After 2017 After 2017

Federal $128,800
$11,544,269 $38,919,218
$1,329,947

State $32,200
$2,886,067 $9,729,805
$332,487

Other $0 $0 $0 $0

Total $161,000
$14,430,336 $48,649,023
$1,662,434

Phase CST

Fund HPP

Year 2015

Federal $311,960

Also in Colquitt County

State $0

Other $334,156

Total $646,116

Project: 0007914 Type Work: Streetscapes
Descp: SR 112 @ 1 LOC & CS 728/KELLY STREET @ 1 LOC IN SYLVESTER Length: 0.28

Total Project Cost: Total Project Authorizations:

$676,200 $0

Phase CST

Fund Local

Year 2015

Federal $0

State $0

Other $676,200

Total $676,200

Page 319 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Project: 0010610 Type Work: TE-Bike/Ped Facility
Descp: CS 726/FRONT STREET FROM SR 33 TO SR 112 IN SYLVESTER Length: 0.12

Total Project Cost: Total Project Authorizations:

$375,000 $0

Phase CST

Fund STP

Year LUMP

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2014 - FY 2017

Project: 431120- Type Work: Replace Bridge
Descp: CR 160 @ OCHLOCKONEE RIVER NE OF DOERUN Length: 0.50

Total Project Cost: Total Project Authorizations:

$633,024 $0

Phase PE
ROW CST UTL

Fund STP Local STP STP

Year LUMP 2016 LUMP LUMP

Uses Lump Sum Bank: LOW IMPACT BRIDGES FOR FY 2014 - FY 2017

Project: M004794 Type Work: Vegetation Removal
Descp: DISTRICTWIDE ROW TREE CUTTING - DISTRICT 4 Length: 0.00

Phase CST

Fund State

Year 2014

Total Project Cost: Total Project Authorizations:

$200,000 $0

Federal $300,000
Federal $81,600 $0
$408,000 $8,160
Federal $0

Worth Totals Summary
County Summary excludes lump sum projects.

State $0

Other $75,000

Total $375,000

State $20,400 $0
$102,000 $2,040

Other $0
$10,824 $0 $0

Total $102,000 $10,824 $510,000 $10,200

State $200,000

Other $0

Total $200,000

Also in Atkinson, Baker, Ben Hill, Berrien, Brooks, Calhoun, Clay, Clinch, Coffee, Colquitt, Cook, Crisp, Decatur, Dougherty, Early, Echols, Grady, Irwin, Lanier, Lee, Lowndes, Miller, Mitchell, Quitman, Randolph, Seminole, Terrell, Thomas, Tift, Turner, Wilcox County

Project PI#
0000475 0000475 0000519 0000519 0000520 0000520 0007622 0007914 M004794

Year
2014 2016 2014 2016 2014 2016 2015 2015 2014

Phase
PE ROW
PE ROW
PE ROW CST CST CST

Fund NHPP NHPP NHPP NHPP NHPP NHPP HPP Local State

Federal
$124,936 $3,050,234
$271,680 $5,139,643
$3,864 $346,328 $311,960
$0 $0

State
$31,234 $762,559
$67,920 $1,284,911
$966 $86,582
$0 $0 $10,000

Other
$0 $0 $0 $0 $0 $0 $334,156 $676,200 $0

$9,248,645

$2,244,171

$1,010,356

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Total $156,170
$3,812,793 $339,600
$6,424,553 $4,830
$432,910 $646,116 $676,200
$10,000
$12,503,172

Page 320 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

FY 2014 Total: FY 2015 Total: FY 2016 Total: FY 2017 Total: All Counties STIP Totals:
FY 2014 Total: FY 2016 Total: Appling STIP Totals:
FY 2014 Total: Atkinson STIP Totals:
FY 2014 Total: Bacon STIP Totals:
FY 2014 Total: FY 2015 Total: Baker STIP Totals:
FY 2014 Total: Baldwin STIP Totals:

STIP Counties Summary

Federal $

State $

All Counties

$454,096,585 $471,536,761 $464,028,803 $456,556,461 $1,846,218,610

$97,259,864 $96,051,247 $94,548,209 $92,486,575 $380,345,895

Appling

$2,038,704 $2,116,556 $4,155,260

$517,676 $0
$517,676

Atkinson

$0

$6,000

$0

$6,000

Bacon

$0

$4,000

$0

$4,000

Baker

$0 $1,825,828 $1,825,828

$6,000 $456,457 $462,457

Baldwin

$3,089,766 $3,089,766

$776,442 $776,442

Other $

Total $

$39,542,214 $18,125,205 $19,094,029 $22,130,835 $98,892,282

$590,898,663 $585,713,212 $577,671,041 $571,173,871 $2,325,456,787

$718,512 $616,060 $1,334,572

$3,274,892 $2,732,615 $6,007,508

$0

$6,000

$0

$6,000

$0

$4,000

$0

$4,000

$0

$6,000

$0

$2,282,285

$0

$2,288,285

$0

$3,866,208

$0

$3,866,208

Page 321 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

FY 2014 Total: FY 2015 Total: FY 2016 Total: FY 2017 Total: Banks STIP Totals:
FY 2014 Total: FY 2015 Total: FY 2016 Total: FY 2017 Total: Barrow STIP Totals:
FY 2014 Total: FY 2015 Total: FY 2016 Total: FY 2017 Total: Bartow STIP Totals:
FY 2014 Total: FY 2015 Total: FY 2017 Total: Ben Hill STIP Totals:
FY 2014 Total: FY 2015 Total: Berrien STIP Totals:

Federal $

State $

Banks

$80,000 $331,529 $3,198,870 $2,725,705 $6,336,104

$28,000 $82,882 $799,718 $681,426 $1,592,026

Barrow

$37,050 $37,050 $2,498,420 $48,000 $2,620,520

$6,000 $4,631 $614,605
$0 $625,236

Bartow

$20,796,062 $32,648
$32,753,366 $65,984,983 $119,567,059

$5,206,853 $4,081
$8,179,591 $15,767,149 $29,157,675

Ben Hill

$0 $574,799 $1,602,000 $2,176,799

$4,000 $31,212 $400,500 $435,712

Berrien

$95,813 $95,813 $191,626

$12,460 $4,460
$16,920

Other $
$0 $0 $0 $178,601 $178,601
$9,262 $4,631 $10,000 $12,000 $35,893
$8,162 $8,975,450
$941,698 $2,750,521 $12,675,832
$0 $112,488
$0 $112,488
$64,593 $64,593 $129,186

Total $
$108,000 $414,412 $3,998,588 $3,585,732 $8,106,731
$52,312 $46,312 $3,123,025 $60,000 $3,281,649
$26,011,077 $9,012,179
$41,874,656 $84,502,653 $161,400,566
$4,000 $718,499 $2,002,500 $2,724,998
$172,866 $164,866 $337,732

Page 322 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

FY 2014 Total: FY 2017 Total: Bleckley STIP Totals:
FY 2014 Total: FY 2015 Total: FY 2016 Total: Brantley STIP Totals:
FY 2014 Total: FY 2017 Total: Brooks STIP Totals:
FY 2014 Total: FY 2016 Total: FY 2017 Total: Bryan STIP Totals:
FY 2014 Total: FY 2016 Total: Bulloch STIP Totals:
FY 2014 Total: Burke STIP Totals:

Federal $

State $

Bleckley

$2,937,460 $2,960,306 $5,897,765

$738,365 $740,076 $1,478,441

Brantley

$0 $41,616 $1,001,750 $1,043,366

$8,000 $10,404 $250,437 $268,841

Brooks

$17,813,174 $19,383,657 $37,196,831

$4,461,293 $4,845,914 $9,307,208

Bryan

$7,053,786 $0
$12,972,780 $20,026,566

$1,771,447 $0
$3,243,195 $5,014,642

Bulloch

$120,000 $7,081,229 $7,201,229

$42,000 $1,770,307 $1,812,307

Burke

$0

$14,000

$0

$14,000

Other $
$0 $1,310,999 $1,310,999
$0 $0 $0 $0
$0 $0 $0
$1,894,000 $1,500,000
$0 $3,394,000
$0 $0 $0
$0 $0

Total $
$3,675,825 $5,011,381 $8,687,206
$8,000 $52,020 $1,252,187 $1,312,207
$22,274,467 $24,229,571 $46,504,038
$10,719,233 $1,500,000
$16,215,975 $28,435,208
$162,000 $8,851,536 $9,013,536
$14,000 $14,000

Page 323 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

FY 2014 Total: FY 2016 Total: Butts STIP Totals:
FY 2014 Total: FY 2016 Total: FY 2017 Total: Calhoun STIP Totals:
FY 2014 Total: FY 2015 Total: FY 2016 Total: FY 2017 Total: Camden STIP Totals:
FY 2014 Total: Candler STIP Totals:
FY 2014 Total: FY 2016 Total: FY 2017 Total: Carroll STIP Totals:
FY 2014 Total: Catoosa STIP Totals:

Federal $

State $

Butts

$545,431 $4,000
$549,431

$140,358 $1,000
$141,358

Calhoun

$227,664 $1,678,614 $3,167,126 $5,073,404

$60,916 $419,653 $791,781 $1,272,351

Camden

$0 $2,203,013 $2,127,200 $22,130,836 $26,461,050

$14,000 $550,753 $531,800 $5,532,709 $6,629,262

Candler

$0

$4,000

$0

$4,000

Carroll

$202,741 $4,823,645 $33,741,593 $38,767,978

$66,685 $1,093,424 $4,295,095 $5,455,204

Catoosa

$0

$6,000

$0

$6,000

Other $
$50,000 $0
$50,000
$0 $0 $0 $0
$89,000 $0 $0 $0
$89,000
$0 $0
$0 $112,487
$0 $112,487
$0 $0

Total $
$735,789 $5,000
$740,789
$288,580 $2,098,267 $3,958,907 $6,345,755
$103,000 $2,753,766 $2,659,000 $27,663,546 $33,179,312
$4,000 $4,000
$269,426 $6,029,556 $38,036,688 $44,335,670
$6,000 $6,000

Page 324 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

FY 2014 Total: FY 2015 Total: FY 2016 Total: Charlton STIP Totals:
FY 2014 Total: FY 2015 Total: FY 2017 Total: Chattooga STIP Totals:
FY 2014 Total: Clay STIP Totals:
FY 2014 Total: FY 2015 Total: Clinch STIP Totals:
FY 2014 Total: FY 2015 Total: FY 2016 Total: FY 2017 Total: Coffee STIP Totals:
FY 2014 Total: FY 2016 Total: Colquitt STIP Totals:

Federal $

State $

Charlton

$234,665 $555,860 $8,788,620 $9,579,146

$72,666 $138,965 $2,197,155 $2,408,786

Chattooga

$80,000 $15,237,512 $74,736,078 $90,053,589

$30,000 $3,809,378 $18,684,019 $22,523,397

Clay

$0

$4,000

$0

$4,000

Clinch

$0 $29,364,834 $29,364,834

$12,000 $7,341,209 $7,353,209

Coffee

$3,520,279 $3,989,808 $23,715,158 $4,373,026 $35,598,272

$890,070 $997,452 $5,928,790 $1,093,256 $8,909,568

Colquitt

$12,505,771 $11,197,941 $23,703,712

$3,134,443 $2,799,485 $5,933,928

Other $
$0 $0 $0 $0
$220,320 $52,020 $0
$272,340
$0 $0
$0 $0 $0
$0 $0 $0 $0 $0
$0 $0 $0

Total $
$307,332 $694,825 $10,985,776 $11,987,932
$330,320 $19,098,910 $93,420,097 $112,849,327
$4,000 $4,000
$12,000 $36,706,043 $36,718,043
$4,410,349 $4,987,260 $29,643,948 $5,466,282 $44,507,840
$15,640,214 $13,997,426 $29,637,640
Page 325 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

FY 2014 Total: FY 2015 Total: Columbia STIP Totals:
FY 2014 Total: Cook STIP Totals:
FY 2014 Total: FY 2015 Total: FY 2017 Total: Crawford STIP Totals:
FY 2014 Total: FY 2015 Total: FY 2016 Total: Crisp STIP Totals:
FY 2014 Total: Dade STIP Totals:
FY 2014 Total: FY 2015 Total: FY 2017 Total: Dawson STIP Totals:

Federal $

State $

Columbia

$9,641,475 $8,000
$9,649,475

$2,416,369 $2,000
$2,418,369

Cook

$0

$4,000

$0

$4,000

Crawford

$0 $124,848 $476,270 $601,118

$6,000 $31,212 $119,068 $156,280

Crisp

$0 $401,362 $3,395,169 $3,796,532

$4,000 $100,341 $848,792 $953,133

Dade

$0

$6,000

$0

$6,000

Dawson

$134,640 $11,181,097
$1,878,207 $13,193,944

$41,660 $694,432 $469,552 $1,205,644

Other $
$0 $0 $0
$0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0
$0 $481,000
$0 $481,000

Total $
$12,057,844 $10,000
$12,067,844
$4,000 $4,000
$6,000 $156,060 $595,338 $757,398
$4,000 $501,703 $4,243,962 $4,749,665
$6,000 $6,000
$176,300 $12,356,529
$2,347,759 $14,880,588

Page 326 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

FY 2014 Total: FY 2015 Total: FY 2017 Total: Decatur STIP Totals:
FY 2014 Total: FY 2017 Total: Dodge STIP Totals:
FY 2014 Total: FY 2015 Total: FY 2016 Total: Dooly STIP Totals:
FY 2014 Total: Early STIP Totals:
FY 2014 Total: Echols STIP Totals:
FY 2014 Total: FY 2015 Total: Effingham STIP Totals:

Federal $

State $

Decatur

$327,676 $1,771,601 $1,602,000 $3,701,276

$46,924 $442,900 $400,500 $890,324

Dodge

$5,323,240 $15,541,604 $20,864,844

$1,338,810 $3,885,401 $5,224,211

Dooly

$4,727,979 $26,470,385
$913,436 $32,111,801

$1,189,995 $6,617,596
$228,359 $8,035,950

Early

$0

$8,000

$0

$8,000

Echols

$0

$6,000

$0

$6,000

Effingham

$0 $394,520 $394,520

$8,000 $98,630 $106,630

Other $
$44,995 $0 $0
$44,995
$1,703,125 $6,882,745 $8,585,870
$0 $0 $0 $0
$0 $0
$0 $0
$0 $22,771,984 $22,771,984

Total $
$419,595 $2,214,501 $2,002,500 $4,636,595
$8,365,175 $26,309,750 $34,674,925
$5,917,973 $33,087,982
$1,141,796 $40,147,751
$8,000 $8,000
$6,000 $6,000
$8,000 $23,265,133 $23,273,133

Page 327 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

FY 2014 Total: FY 2015 Total: Elbert STIP Totals:
FY 2014 Total: Emanuel STIP Totals:
FY 2014 Total: Evans STIP Totals:
FY 2014 Total: FY 2015 Total: FY 2017 Total: Fannin STIP Totals:
FY 2014 Total: Franklin STIP Totals:
FY 2014 Total: FY 2016 Total: FY 2017 Total: Gilmer STIP Totals:
FY 2014 Total: Glascock STIP Totals:

Federal $

State $

Elbert

$133,008 $33,172,313 $33,305,321

$45,252 $8,293,078 $8,338,330

Emanuel

$4,799,278 $4,799,278

$1,211,820 $1,211,820

Evans

$0

$4,000

$0

$4,000

Fannin

$13,327,000 $396,800
$28,637,000 $42,360,800

$14,000 $99,200
$0 $113,200

Franklin

$0

$10,000

$0

$10,000

Gilmer

$0 $2,671,697 $4,544,344 $7,216,041

$14,000 $667,924 $1,136,086 $1,818,010

Glascock

$0

$2,000

$0

$2,000

Other $
$0 $0 $0
$0 $0
$0 $0
$0 $0 $0 $0
$0 $0
$0 $0 $0 $0
$0 $0

Total $
$178,260 $41,465,392 $41,643,652
$6,011,098 $6,011,098
$4,000 $4,000
$13,341,000 $496,000
$28,637,000 $42,474,000
$10,000 $10,000
$14,000 $3,339,622 $5,680,429 $9,034,051
$2,000 $2,000

Page 328 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

FY 2014 Total: FY 2015 Total: FY 2016 Total: FY 2017 Total: Gordon STIP Totals:
FY 2014 Total: Grady STIP Totals:
FY 2014 Total: Greene STIP Totals:
FY 2014 Total: Habersham STIP Totals:
FY 2014 Total: FY 2015 Total: FY 2016 Total: Hancock STIP Totals:
FY 2014 Total: FY 2015 Total: FY 2016 Total: Haralson STIP Totals:

Federal $

State $

Gordon

$5,661,011 $86,595
$27,236,278 $1,531,581
$34,515,465

$1,427,253 $21,649
$6,809,069 $382,895
$8,640,866

Grady

$0

$8,000

$0

$8,000

Greene

$0

$8,000

$0

$8,000

Habersham

$0

$10,000

$0

$10,000

Hancock

$0 $86,595 $609,453 $696,047

$8,000 $21,649 $152,363 $182,012

Haralson

$0 $600,576 $3,206,299 $3,806,875

$10,000 $27,644 $801,575 $839,219

Other $
$0 $0 $0 $0 $0
$0 $0
$0 $0
$0 $0
$0 $0 $0 $0
$0 $0 $0 $0

Total $
$7,088,264 $108,243
$34,045,347 $1,914,476
$43,156,331
$8,000 $8,000
$8,000 $8,000
$10,000 $10,000
$8,000 $108,243 $761,816 $878,059
$10,000 $628,220 $4,007,874 $4,646,094

Page 329 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

FY 2014 Total: FY 2016 Total: Harris STIP Totals:
FY 2014 Total: Hart STIP Totals:
FY 2014 Total: Heard STIP Totals:
FY 2014 Total: FY 2015 Total: FY 2017 Total: Irwin STIP Totals:
FY 2014 Total: FY 2015 Total: FY 2016 Total: FY 2017 Total: Jackson STIP Totals:
FY 2014 Total: FY 2015 Total: Jasper STIP Totals:

Federal $

State $

Harris

$0 $54,586 $54,586

$10,000 $13,646 $23,646

Hart

$0

$8,000

$0

$8,000

Heard

$0

$6,000

$0

$6,000

Irwin

$1,783,912 $410,271 $16,000
$2,210,183

$451,978 $0
$4,000 $455,978

Jackson

$5,596,694 $2,168,381 $11,529,944
$476,270 $19,771,289

$1,411,173 $542,095
$2,274,975 $119,068
$4,347,311

Jasper

$120,000 $4,452,549 $4,572,549

$36,000 $1,030,650 $1,066,650

Other $
$0 $0 $0
$0 $0
$0 $0
$269,000 $102,568
$0 $371,568
$0 $0 $607,511 $0 $607,511
$0 $433,173 $433,173

Total $
$10,000 $68,232 $78,232
$8,000 $8,000
$6,000 $6,000
$2,504,890 $512,839 $20,000
$3,037,729
$7,007,867 $2,710,476 $14,412,430
$595,338 $24,726,111
$156,000 $5,916,371 $6,072,371

Page 330 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

FY 2014 Total: FY 2015 Total: FY 2017 Total: Jeff Davis STIP Totals:
FY 2014 Total: FY 2015 Total: FY 2017 Total: Jefferson STIP Totals:
FY 2014 Total: FY 2015 Total: FY 2016 Total: Jenkins STIP Totals:
FY 2014 Total: FY 2017 Total: Johnson STIP Totals:
FY 2014 Total: Jones STIP Totals:
FY 2014 Total: Lamar STIP Totals:

Federal $

State $

Jeff Davis

$142,800 $3,239,591 $2,322,485 $5,704,876

$41,700 $809,898 $580,621 $1,432,219

Jefferson

$1,571,780 $888,460
$13,691,215 $16,151,455

$402,945 $222,115 $3,422,804 $4,047,864

Jenkins

$4,532,408 $884,640 $675,744
$6,092,792

$1,139,102 $221,160 $2,000
$1,362,262

Johnson

$2,848,665 $2,427,256 $5,275,921

$718,166 $606,814 $1,324,980

Jones

$0

$8,000

$0

$8,000

Lamar

$0

$4,000

$0

$4,000

Other $
$0 $0 $0 $0
$0 $0 $5,975,463 $5,975,463
$161,160 $0
$166,936 $328,096
$0 $0 $0
$0 $0
$0 $0

Total $
$184,500 $4,049,489 $2,903,106 $7,137,095
$1,974,724 $1,110,575 $23,089,481 $26,174,781
$5,832,670 $1,105,800
$844,680 $7,783,150
$3,566,832 $3,034,070 $6,600,902
$8,000 $8,000
$4,000 $4,000

Page 331 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

FY 2014 Total: FY 2015 Total: FY 2017 Total: Lanier STIP Totals:
FY 2014 Total: FY 2015 Total: FY 2016 Total: Laurens STIP Totals:
FY 2014 Total: FY 2015 Total: Lee STIP Totals:
FY 2014 Total: FY 2015 Total: FY 2016 Total: Lincoln STIP Totals:
FY 2014 Total: Long STIP Totals:
FY 2014 Total: Lumpkin STIP Totals:

Federal $

State $

Lanier

$0 $84,523 $4,278,904 $4,363,426

$4,000 $21,131 $1,069,726 $1,094,857

Laurens

$4,225,500 $0
$13,930,408 $18,155,908

$1,070,375 $0
$3,482,602 $4,552,977

Lee

$84,064 $1,015,725 $1,099,789

$27,016 $253,931 $280,947

Lincoln

$8,558,651 $2,756,073 $1,070,547 $12,385,270

$2,143,663 $689,018 $267,637
$3,100,318

Long

$0

$6,000

$0

$6,000

Lumpkin

$410,294 $410,294

$10,000 $10,000

Other $
$0 $0 $0 $0
$9,930,495 $9,078,000
$0 $19,008,495
$0 $0 $0
$0 $0 $0 $0
$0 $0
$762,776 $762,776

Total $
$4,000 $105,653 $5,348,629 $5,458,283
$15,226,370 $9,078,000
$17,413,010 $41,717,380
$111,080 $1,269,656 $1,380,736
$10,702,314 $3,445,091 $1,338,183
$15,485,588
$6,000 $6,000
$1,183,070 $1,183,070

Page 332 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

FY 2014 Total: FY 2016 Total: FY 2017 Total: Macon STIP Totals:
FY 2014 Total: FY 2015 Total: Madison STIP Totals:
FY 2014 Total: Marion STIP Totals:
FY 2014 Total: FY 2015 Total: FY 2016 Total: FY 2017 Total: McDuffie STIP Totals:
FY 2014 Total: McIntosh STIP Totals:
FY 2014 Total: FY 2015 Total: FY 2016 Total: Meriwether STIP Totals:

Federal $

State $

Macon

$0 $136,463 $2,600,393 $2,736,856

$8,000 $34,116 $650,098 $692,214

Madison

$14,270,080 $15,069,696 $29,339,775

$3,577,520 $3,767,424 $7,344,944

Marion

$0

$8,000

$0

$8,000

McDuffie

$1,689,780 $19,838,881
$7,294,772 $2,341,651 $31,165,083

$426,445 $4,959,720 $1,823,693
$585,413 $7,795,271

McIntosh

$0

$10,000

$0

$10,000

Meriwether

$1,648,401 $174,787
$2,162,966 $3,986,154

$422,100 $43,697
$540,742 $1,006,539

Other $
$500,000 $0
$2,000,000 $2,500,000
$69,850 $0
$69,850
$0 $0
$0 $4,244,832 $1,040,000
$0 $5,284,832
$0 $0
$0 $0 $0 $0

Total $
$508,000 $170,579 $5,250,491 $5,929,070
$17,917,449 $18,837,120 $36,754,569
$8,000 $8,000
$2,116,224 $29,043,433 $10,158,465
$2,927,064 $44,245,186
$10,000 $10,000
$2,070,501 $218,484
$2,703,708 $4,992,693

Page 333 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

FY 2014 Total: FY 2015 Total: Miller STIP Totals:
FY 2014 Total: FY 2017 Total: Mitchell STIP Totals:
FY 2014 Total: FY 2016 Total: Monroe STIP Totals:
FY 2014 Total: FY 2017 Total: Montgomery STIP Totals:
FY 2014 Total: FY 2016 Total: Morgan STIP Totals:
FY 2014 Total: FY 2015 Total: FY 2016 Total: FY 2017 Total: Murray STIP Totals:

Federal $

State $

Miller

$279,888 $560,912 $840,800

$73,972 $140,228 $214,200

Mitchell

$0 $52,719 $52,719

$8,000 $13,180 $21,180

Monroe

$0 $81,878 $81,878

$8,000 $20,470 $28,470

Montgomery

$0 $29,365 $29,365

$4,000 $7,341 $11,341

Morgan

$0 $6,029,359 $6,029,359

$6,000 $1,507,340 $1,513,340

Murray

$0 $369,745 $8,545,696 $1,652,729 $10,568,170

$12,000 $92,436 $2,136,424 $413,182 $2,654,042

Other $
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0 $0 $0

Total $
$353,860 $701,139 $1,054,999
$8,000 $65,899 $73,899
$8,000 $102,348 $110,348
$4,000 $36,706 $40,706
$6,000 $7,536,699 $7,542,699
$12,000 $462,181 $10,682,120 $2,065,912 $13,222,212

Page 334 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

FY 2014 Total: FY 2015 Total: FY 2016 Total: FY 2017 Total: Newton STIP Totals:
FY 2014 Total: Oconee STIP Totals:
FY 2014 Total: Oglethorpe STIP Totals:
FY 2014 Total: FY 2017 Total: Peach STIP Totals:
FY 2014 Total: FY 2015 Total: FY 2016 Total: Pickens STIP Totals:
FY 2014 Total: FY 2015 Total: FY 2016 Total: Pierce STIP Totals:

Federal $

State $

Newton

$4,241,271 $159,811
$23,066,087 $192,000
$27,659,169

$893,134 $19,976
$5,726,522 $0
$6,639,632

Oconee

$0

$6,000

$0

$6,000

Oglethorpe

$0

$8,000

$0

$8,000

Peach

$220,791 $2,478,749 $2,699,541

$59,198 $619,687 $678,885

Pickens

$360,000 $8,375,238
$935,221 $9,670,459

$98,000 $2,093,809
$233,805 $2,425,615

Pierce

$0 $1,719,154 $1,042,483 $2,761,637

$6,000 $0 $0
$6,000

Other $
$424,028 $19,976 $40,000 $48,000
$532,004
$0 $0
$84,000 $84,000
$0 $0 $0
$0 $0 $0 $0
$35,680 $451,789 $303,432 $790,901

Total $
$5,558,433 $199,764
$28,832,609 $240,000
$34,830,805
$6,000 $6,000
$92,000 $92,000
$279,989 $3,098,437 $3,378,426
$458,000 $10,469,047
$1,169,027 $12,096,074
$41,680 $2,170,943 $1,345,915 $3,558,537

Page 335 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

FY 2014 Total: Pike STIP Totals:
FY 2014 Total: Polk STIP Totals:
FY 2014 Total: FY 2015 Total: FY 2016 Total: Pulaski STIP Totals:
FY 2014 Total: Putnam STIP Totals:
FY 2014 Total: Quitman STIP Totals:
FY 2014 Total: FY 2015 Total: Rabun STIP Totals:
FY 2014 Total: Randolph STIP Totals:
FY 2014 Total: Schley STIP Totals:

Federal $
Pike

State $

$0

$4,000

$0

$4,000

Polk

$0

$10,000

$0

$10,000

Pulaski

$0 $487,298 $8,056,229 $8,543,527

$4,000 $10,612 $2,014,057 $2,028,669

Putnam

$0

$6,000

$0

$6,000

Quitman

$0

$2,000

$0

$2,000

Rabun

$0 $17,533,907 $17,533,907

$14,000 $4,383,477 $4,397,477

Randolph

$0

$6,000

$0

$6,000

Schley

$0

$4,000

$0

$4,000

Other $
$0 $0
$0 $0
$0 $228,750
$0 $228,750
$0 $0
$0 $0
$0 $0 $0
$0 $0
$0 $0

Total $
$4,000 $4,000
$10,000 $10,000
$4,000 $726,660 $10,070,286 $10,800,946
$6,000 $6,000
$2,000 $2,000
$14,000 $21,917,383 $21,931,383
$6,000 $6,000
$4,000 $4,000
Page 336 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

FY 2014 Total: Screven STIP Totals:
FY 2014 Total: Seminole STIP Totals:
FY 2014 Total: FY 2015 Total: Spalding STIP Totals:
FY 2014 Total: FY 2015 Total: FY 2016 Total: Stephens STIP Totals:
FY 2014 Total: FY 2015 Total: FY 2016 Total: FY 2017 Total: Stewart STIP Totals:
FY 2014 Total: Sumter STIP Totals:

Federal $

State $

Screven

$0

$12,000

$0

$12,000

Seminole

$0

$4,000

$0

$4,000

Spalding

$182,068 $182,068 $364,136

$4,000 $22,759 $26,758

Stephens

$0 $86,595 $468,130 $554,725

$6,000 $21,649 $117,033 $144,681

Stewart

$0 $209,745
$0 $1,067,262 $1,277,007

$10,000 $52,436
$0 $266,815 $329,252

Sumter

$0

$10,000

$0

$10,000

Other $
$0 $0
$0 $0
$45,517 $22,759 $68,276
$0 $0 $0 $0
$0 $0 $106,121 $0 $106,121
$0 $0

Total $
$12,000 $12,000
$4,000 $4,000
$231,585 $227,585 $459,170
$6,000 $108,243 $585,163 $699,406
$10,000 $262,181 $106,121 $1,334,077 $1,712,379
$10,000 $10,000

Page 337 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

FY 2014 Total: FY 2015 Total: Talbot STIP Totals:
FY 2014 Total: Taliaferro STIP Totals:
FY 2014 Total: Tattnall STIP Totals:
FY 2014 Total: FY 2015 Total: Taylor STIP Totals:
FY 2014 Total: FY 2015 Total: FY 2016 Total: Telfair STIP Totals:
FY 2014 Total: Terrell STIP Totals:
FY 2014 Total: FY 2015 Total: Thomas STIP Totals:

Federal $

State $

Talbot

$1,943,186 $1,347,688 $3,290,873

$493,796 $336,922 $830,718

Taliaferro

$0

$4,000

$0

$4,000

Tattnall

$0

$8,000

$0

$8,000

Taylor

$0 $272,800 $272,800

$8,000 $0
$8,000

Telfair

$0 $507,523 $2,235,773 $2,743,295

$8,000 $74,701 $558,943 $641,644

Terrell

$38,339 $38,339

$6,000 $6,000

Thomas

$0 $215,977 $215,977

$8,000 $0
$8,000

Other $
$0 $0 $0
$0 $0
$0 $0
$0 $68,200 $68,200
$0 $52,180
$0 $52,180
$9,585 $9,585
$0 $84,023 $84,023

Total $
$2,436,982 $1,684,610 $4,121,592
$4,000 $4,000
$8,000 $8,000
$8,000 $341,000 $349,000
$8,000 $634,403 $2,794,716 $3,437,119
$53,923 $53,923
$8,000 $300,000 $308,000

Page 338 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

FY 2014 Total: FY 2015 Total: FY 2016 Total: Tift STIP Totals:
FY 2014 Total: FY 2015 Total: FY 2017 Total: Toombs STIP Totals:
FY 2014 Total: FY 2015 Total: FY 2016 Total: Towns STIP Totals:
FY 2014 Total: Treutlen STIP Totals:
FY 2014 Total: FY 2016 Total: FY 2017 Total: Troup STIP Totals:
FY 2014 Total: FY 2015 Total: Turner STIP Totals:

Federal $
Tift

State $

$8,374,321 $976,916
$4,049,550 $13,400,787

$1,958,849 $244,229
$1,012,387 $3,215,465

Toombs

$14,643,597 $7,632,208
$44,954,374 $67,230,179

$3,576,909 $1,908,052 $11,238,594 $16,723,555

Towns

$3,343,154 $3,442,555 $4,242,290 $11,028,000

$841,789 $860,639 $1,060,573 $2,763,000

Treutlen

$0

$4,000

$0

$4,000

Troup

$736,000 $17,640,867 $16,850,563 $35,227,430

$192,000 $4,410,217 $4,212,641 $8,814,857

Turner

$441,950 $155,980 $597,930

$14,000 $0
$14,000

Other $
$159,438 $0 $0
$159,438
$5,213,925 $0
$6,920,181 $12,134,106
$0 $0 $0 $0
$0 $0
$0 $0 $1,250,209 $1,250,209
$132,628 $40,090
$172,718

Total $
$10,492,608 $1,221,144 $5,061,937
$16,775,690
$23,434,431 $9,540,260
$63,113,149 $96,087,840
$4,184,943 $4,303,194 $5,302,863 $13,791,000
$4,000 $4,000
$928,000 $22,051,084 $22,313,413 $45,292,497
$588,578 $196,070 $784,648
Page 339 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

FY 2014 Total: FY 2015 Total: Twiggs STIP Totals:
FY 2014 Total: FY 2015 Total: FY 2016 Total: FY 2017 Total: Union STIP Totals:
FY 2014 Total: FY 2017 Total: Upson STIP Totals:
FY 2014 Total: FY 2015 Total: Walker STIP Totals:
FY 2014 Total: FY 2015 Total: FY 2016 Total: FY 2017 Total: Walton STIP Totals:

Federal $

State $

Twiggs

$18,497,646 $2,722,707
$21,220,353

$4,632,411 $680,677
$5,313,088

Union

$846,552 $38,732
$32,275,000 $17,161,000 $50,321,284

$98,638 $9,683 $0 $0
$108,321

Upson

$11,306,866 $6,920,740
$18,227,606

$2,832,717 $1,730,185 $4,562,901

Walker

$0 $1,655,347 $1,655,347

$14,000 $0
$14,000

Walton

$442,677 $220,677 $1,556,273 $1,879,200 $4,098,827

$114,000 $50,835
$380,068 $459,000 $1,003,903

Other $
$0 $0 $0
$0 $0 $0 $0 $0
$0 $0 $0
$0 $413,837 $413,837
$8,669 $4,335 $9,000 $10,800 $32,804

Total $
$23,130,057 $3,403,384
$26,533,441
$945,190 $48,415
$32,275,000 $17,161,000 $50,429,605
$14,139,583 $8,650,924
$22,790,507
$14,000 $2,069,184 $2,083,184
$565,346 $275,846 $1,945,341 $2,349,000 $5,135,533

Page 340 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

FY 2014 Total: FY 2015 Total: FY 2016 Total: FY 2017 Total: Ware STIP Totals:
FY 2014 Total: FY 2015 Total: FY 2017 Total: Warren STIP Totals:
FY 2014 Total: FY 2017 Total: Washington STIP Totals:
FY 2014 Total: Wayne STIP Totals:
FY 2014 Total: Webster STIP Totals:
FY 2014 Total: FY 2015 Total: FY 2016 Total: Wheeler STIP Totals:

Federal $

State $

Ware

$285,600 $46,787,445 $18,586,558
$3,074,107 $68,733,709

$87,400 $11,696,861
$5,370,164 $768,527
$17,922,952

Warren

$0 $1,398,400 $6,612,249 $8,010,649

$4,000 $0 $0
$4,000

Washington

$983,295 $3,258,565 $4,241,860

$257,824 $814,641 $1,072,465

Wayne

$0

$12,000

$0

$12,000

Webster

$0

$4,000

$0

$4,000

Wheeler

$0 $176,653
$0 $176,653

$6,000 $44,163
$0 $50,163

Other $
$0 $0 $106,121 $0 $106,121
$0 $349,600 $5,137,062 $5,486,662
$0 $0 $0
$0 $0
$0 $0
$0 $0 $34,116 $34,116

Total $
$373,000 $58,484,306 $24,062,843
$3,842,634 $86,762,782
$4,000 $1,748,000 $11,749,311 $13,501,311
$1,241,118 $4,073,207 $5,314,325
$12,000 $12,000
$4,000 $4,000
$6,000 $220,816
$34,116 $260,932

Page 341 of 342

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/24/2013

Federal $

State $

White

Other $

Total $

FY 2014 Total: FY 2015 Total: White STIP Totals:

$0 $15,612,321 $15,612,321

$8,000 $3,903,080 $3,911,080

$0

$8,000

$0

$19,515,402

$0

$19,523,402

Wilcox

FY 2014 Total: Wilcox STIP Totals:

$0

$6,000

$0

$6,000

$0

$6,000

$0

$6,000

Wilkes

FY 2014 Total: FY 2016 Total: Wilkes STIP Totals:

$74,000 $20,762,043 $20,836,043

$26,500 $5,190,511 $5,217,011

$116,000 $2,960,000 $3,076,000

$216,500 $28,912,553 $29,129,053

Wilkinson

FY 2014 Total: Wilkinson STIP Totals:

$0

$8,000

$0

$8,000

$0

$8,000

$0

$8,000

Worth

FY 2014 Total: FY 2015 Total: FY 2016 Total: Worth STIP Totals:

$400,480 $311,960 $8,536,205 $9,248,645

$110,120 $0
$2,134,051 $2,244,171

$0 $1,010,356
$0 $1,010,356

$510,600 $1,322,316 $10,670,256 $12,503,172

STIP Grand Totals:

$3,136,283,591

$668,352,352

$211,713,697

$4,016,349,641

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 342 of 342

Appendix A Glossary

GLOSSARY OF TERMS
ATMS Advanced Transportation Management System; a computerized system that integrates video, voice, and data management functions to collect information about the transportation infrastructure and performance analysis as well as support traffic management decisions based on real-time information.
CMAQ Congestion Mitigation and Air Quality Improvement Program; directs funds primarily to areas that have failed to reach certain air quality standards. Projects allowed under this program include mass transit improvements and high-occupancy vehicle facilities.
CST Construction; phase of a project that includes the actual construction of the project.
DONOR STATE BONUS Donor states are states that contribute more to the Highway Trust Fund than they receive back in federalaid highway programs. These states receive a predetermined amount based on a comparison of a projection of all payments into the Highway Trust Fund and the amount received in federal-aid apportionments. Starting with the state with the lowest return, states are brought up to the level of return for states with the next higher level of return until available funds are depleted.
FED Share Federal Share; portion of funding to be paid for with federal money.
GARVEE Grant Anticipation Revenue Vehicle; bonds against anticipated federal funds for the purpose of accelerating the construction of the "Governor's Road Improvement Program".
GA Share Georgia Share; portion of funding to be paid for with state money.
GRVA GARVEE Advance; advance funding to pay for "Governor's Road Improvement Program" projects with GARVEE bond before converting to regular federal aid funding.
GRVC GARVEE Converted; funding to pay back the GARVEE bond.
HPP High Priority Project; list of 1,850 high priority projects specified by Congress in TEA-21. Funding for these projects totals $9.4 billion over the six years of TEA-21. Georgia will receive $283.87 million for 40 projects.
HIGHWAY TRUST FUND Federal account established by law to hold receipts collected by the government, earmarked for highway programs and a portion of the mass transit program; supported by the federal gasoline tax and other user taxes.

INTERMODAL SURFACE TRANSPORTATION EFFICIENCY ACT of 1991 (ISTEA) Transportation bill approved by Congress in 1991.
METROPOLITAN PLANNING ORGANIZATION (MPO) Required by federal regulations in urbanized areas to develop transportation plans and programs; responsible for developing the Transportation Improvement Program (TIP).
NEPA National Environmental Policy Act of 1969; requires federal government to use all practical means and measures to protect environmental values; makes environmental protection a part of the mandate of every federal agency and department.
NHS National Highway System; consists primarily of the Interstates and other major routes. Includes all urban and rural principal arterials.
NON-ATTAINMENT Areas that do not meet the national ambient air quality standards set by USEPA.
OBLIGATION CEILING The maximum amount that a state is expected to receive from the Highway Trust Fund .
OTH Share Other Share; portion of funding to be paid for with money other than federal or state funds; generally provided by local governments.
PE Preliminary Engineering; phase of a project that includes the development of the concept, survey, environmental documentation and design plans.
ROW Right of Way; phase of a project that includes the acquisition of any necessary property for the construction of the project.
SAFETEA-LU Safe, Accountable, Flexible, Efficient Transportation Equity Act- A Legacy for Users. Most recent transportation bill, approved by Congress in 2005.
STATE AID LET Projects that are funded with state money.
STATE HIGHWAY SYSTEM Network of roads maintained by the state including road and bridge construction, maintenance, rehabilitation and restoration. There are approximately 17, 947 miles of state highways in Georgia which make up 16% of the total public road system in the state.

STP Surface Transportation Program; federal funding category that provides funding for projects on any federal-aid highway, including the NHS, bridge projects on any public road, transit capital projects, and public bus terminals and facilities.
TRANSPORTATION EQUITY ACT FOR THE 21ST CENTURY (TEA-21) Six year transportation bill approved by Congress in 1998.
TRANSPORTATION IMPROVEMENT PROGRAM (TIP) In metropolitan areas over 50,000 in population, a program of federally funded transportation projects proposed to be carried out in the first three years of adoption by the MPO. There are 15 urbanized areas in Georgia Chattanooga, Dalton, Rome, Athens, Gainesville, Augusta, Savannah, Hinesville, Brunswick, Macon, Columbus, Albany, Valdosta, Atlanta, and Warner Robins. The TIPs are incorporated into the STIP as adopted by the respective governments and approved by the Governor, with no changes.
TYPE WORK category of project and source of funding ATM/ITS - Advanced Transportation Management/Intelligent Transportation System; work relating to computerized transportation system that supports traffic management decisions; commonly known as the NAVIGATOR System. Bicycle/Ped. Facility - generally bike/pedestrian path/lane funded through a Transportation Enhancement Activity (TEA) project. Bridges - lump sum funding identified for bridge maintenance or bridge painting. Bridge Painting - lump sum for bridge painting. Bridge Rehab - bridge rehabilitation work that will improve and/or widen an existing bridge. Capital - funding identified for the purchase of transit related items. Historic Preservation - restoration or rehabilitation of historic structures that have a direct linkage to the transportation system; funded as part of a Transportation Enhancement Activities (TEA) project. Interchange - work at an interchange. Intersection Improvement - work that will improve an existing intersection. Landscaping - purchase/installation of shrubbery, plants, trees, etc. Lighting - lump sum funding for purchase/installation of lighting along a National Highway System road. Miscellaneous Improvements - identified for various projects that are not necessarily covered by a standard category. New Construction - new roadway construction on new location. Operating: funding identified for the operation of transit systems. Passing Lanes -- passing lanes added along an existing roadway. Preliminary Engineering - the design phase of a project. Ramp - construction work on a ramp at an interchange. Realignment - improvements to the geometry of a roadway. Replace Bridge - construction of a new bridge to replace an existing bridge. Rest Area - construction of rest areas along state routes (Interstates). Resurface and Maintenance - re-paving of a roadway and minor improvements. RR Xing - improvements to a road/rail crossing, such as the installation of gates, bells, lights, or improvements to the crossing itself. Safety - work that is designed to reduce accidents. Shoulder Work - improving and/or widening shoulders on a roadway.

Sidewalks - installation of sidewalk. Signals - installation and/or improvement of signals. Signing - fabrication/installation of roadway signs. Special Studies - lump sum funding for planning and management studies. Turn Lanes - addition of turn lanes at intersections. Water Pollution Mitig. - lump sum funding for wetland mitigation site that were taken by roadway construction. Weigh Station - construction and/or rehabilitation of truck weigh stations. Widening - adding additional travel lanes to a roadway.

Appendix B Maps
Georgia Rail System Existing Urban and Transit Systems
Statewide Bike Route Network Governor's Road Improvement Program (GRIP)

Operating

Inactive Shortline Railroad Name

Chattanooga

NS CCKY

Hedges

Dalton

McCaysville

Mineral Bluff

Blue Ridge Chatsworth White Path

CSX Norfolk Southern
Shortlines GDOT Owned

ABR

Athens Branch
Chattahoochee & Gulf Chattahoochee Industrial Chattooga & Chickamauga First Coast Fulton County Georgia Central

CCKY

LaFayette

Ellijay

GNRR

Toccoa

Completed GDOT Rehab Projects

Georgia Dept of Transportation CaterParrott Railnet Georgia Southern

Summerville Calhoun Lyerly

Jasper Tate

Rome

Canton Cartersville

Gainesville

HRT

Lula

Bowersville HRT

Commerce

Hartwell Goss HRT

Last 10 years Prior to 2000
Current Projects Underway
Acquisition Rehabilitation
Potential Abandonments

Georgia Northeastern Georgia Southwestern GWRC Georgia Woodlands GRWR Great Walton GITM* Golden Isle Terminal* HOG Heart of Georgia HRT Hartwell LW Louisville & Wadley

Cedartown

Rockmart

Marietta

Edna Atlanta

Austell

Winder

Center

Athens
Monroe Bishop

Elberton

Known Trails

RSOR Riceboro Southern SAN Sandersville SAPT**Savannah Port Terminal** SM St. Mary's
St. Mary's West

FCR GRWR SCS GWRC

VR Valdosta

Bremen Carrollton

Union City

Social Circle Covington

Madison

Washington

SCS Squaw Creek Southern * GITM aka CISD Colonel's Island

Wansley Newnan

Jonesboro

NS McDonough

Senoia

Griffin

Machen Eatonton
Monticello

Barnett Camak Warrenton
Sparta

Hephzibah

** SAPT aka SSDK Savannah State Docks
Augusta

Rover

LW
SCS GS

LaGrange

Barnesville

Wayside

Milledgeville

Wrens

Waynesboro

West Point

Durand

Thomaston

Manchester

Macon

Junction City

Roberta

Fort Valley

Warner Robins

Mogul GCR

Gordon

SANSandersville Tennille

Louisville Wadley Midville

HOG

Wrightsville Swainsboro

Millen Dover

Sylvania ORC

Mahrt

Columbus

GSWR

GSWR

Cusseta

GS Perry Montezuma

Cochran

Dublin
GCR

HOG

Kirby
Statesboro
Metter

Ardmore

Omaha HOG Georgetown
White GSWR House
Cuthbert
GSWR Hilton
Saffold

GSWR

Richland Preston

Americus

Vienna

HOG

Cordele
HOG

Smithville Dawson GSWR

Cedar Creek

Rochelle

GSWR Sasser
Arlington GSWR

Albany
Sylvester GFRR

Tifton

Fitzgerald

HOG Helena Hazlehurst
Douglas

GDOT

Vidalia
GCR
Hester

Claxton

Pembroke

Savannah

Richmond Hill

SAPT GITM

RSOR

Surrency Jesup

Riceboro

GFRR

Camilla Colquitt

GFRR GFRR

Moultrie

Sparks GFRR

Willacoochee CPR
Adel

Pearson SMWR
Waresboro

Nahunta
Waycross

Everett

GITM

Brunswick

GSWR CIRR

Lynn

Coolidge

CPR

Bainbridge

Thomasville Metcalf

GFRR

Quitman Clyattville

VR

Dupont
Valdosta

Fargo

FCRD

Folkston

Seals Kings Bay

Kingsland

SM St. Mary's

N

Moniac

St. George

Last Updated: September 13, 2012 Visit us at: WWW.DOT.GA.US Or Search for us online, enter: "GDOT RAIL"

State of Georgia
Urban and Rural Public Transit Programs 2013

Dade

Catoosa

Fannin

WhitfieldMurray

Towns Rabun Union

Walker

Gilmer

WhiteHabersham

Chattooga

Lumpkin

Stephens

Gordon

Pickens Dawson

Hall Banks Franklin Hart

Floyd Bartow Cherokee Forsyth

Urban Transit Program
No Transit Service Rural Transit Program
Regional Urban Transit Program (May not include entire county) City Programs

Jackson Madison Elbert

Polk Paulding Cobb
Haralson

Gwinnett Barrow Clarke

DeKalb

Oglethorpe

Oconee

Walton

Wilkes

Lincoln

Douglas Fulton

Rockdale

Carroll

Clayton

Morgan Newton

GreeneTaliaferro

Columbia

Henry

McDuffie

Fayette

Coweta Heard

Spalding Butts Jasper Putnam

Warren Hancock Glascock

Richmond

Troup

Meriwether

Pike

Lamar Monroe

Baldwin Jones

Jefferson Washington

Burke

Upson

Harris

Talbot

Bibb

Wilkinson

Crawford

Twiggs

Johnson

Jenkins Screven

Muscogee ChattahoocheeMarion

Taylor

Peach

Houston Bleckley

Macon

Emanuel

Laurens Treutlen

Candler Bulloch Effingham

Schley
Stewart Webster Sumter
Quitman Terrell Lee
Randolph

Dooly Crisp

Pulaski Wilcox

Dodge

Montgomery Wheeler Toombs

Evans

Tattnall

Telfair

Bryan

Turner

Ben Hill

Jeff Davis Appling

Liberty Long

Chatham

/

Clay Calhoun Dougherty Worth

Irwin

Tift

Coffee

Early

Baker

Miller

Mitchell

Colquitt

Berrien Atkinson Cook

Seminole Decatur Grady Thomas Brooks

Lanier Lowndes

Clinch

Bacon

Wayne

McIntosh

Pierce

Brantley

Glynn

Ware

Charlton

Camden

Echols

6

1

7

2 3

5 4



Georgia Department of
Transportation State Bicycle System

LEGEND
STATE BIKE ROUTES SCENIC BYWAYS STATE ROUTES COUNTY BOUNDARY
GDOT DISTRICTS District Number
1 2 3 4 5 6 7

0 15 30

60

90

120

Miles

The data used was provided "as is" and represents the information available and updated within GDOT at the date of issue. Every effort is made to provide accurate and reliable information, but it is still possible
that errors exist or the information has changed.

Georgia Department of Transportation
Fact Sheet
The Governor's Road Improvement Program (GRIP)

Definition

The Governor's Road Improvement Program, commonly referred to as GRIP, is a system of proposed economic developmental highways in Georgia. GRIP was originally adopted in 1989 by the Georgia General Assembly. Georgia law defines the following corridors as the GRIP:

Appalachian Developmental Highway South Georgia Parkway/US 82 US 319 Golden Isles Parkway Fall Line Freeway SR 72 Savannah River Parkway US 19 US 1/SR 17 US 27

US 441 US 84 Sunbelt Parkway/SR 133 Power Alley/US 280 East-West Highway SR 40 SR 32 SR 125 SR 15

GRIP was initiated in 1989 and originally consisted of 12 corridors with 2,845 miles of roadway, including 113 miles of truck access routes. During the 2001 and 2005 Legislative sessions, the General Assembly added new routes, including three truck access routes. The current length of the GRIP system has grown to 3,273 miles. The total length will continue to vary as alignments, including bypasses and shifts, are determined through the engineering process.

Purpose
Economic development highways traditionally receive strong support in Georgia. The purpose of the GRIP system explains why :
Connectivity in Rural Georgia: GRIP will connect 95% of Georgia cities with a population of 2,500 or more to the Interstate System and ensure that 98% of all areas in the state will be within 20 miles of a four-lane road.
Provide opportunities for growth: Several studies have provided evidence that GRIP fosters economic development.
Provide effective and efficient transportation for the growing statewide population
Safer travel in rural areas: Accidents occur three times more often on 2-lane highways than on multi-lane divided highways.

Visit www.dot.ga.gov for updates to this fact sheet.

GDOT GRIP System Fact Sheet, updated September 2012, Page 1

Current GRIP Corridor Statistics

GRIP CORRIDOR Appalachian Developmental
Highw ay South Georgia Parkw ay/US 82
US 319
Golden Isles Parkw ay
Fall Line Freew ay
SR 72
Savannah River Parkw ay
US 19
US 1/SR 17
US 27
US 441
US 84 Sunbelt Parkw ay/SR 133
Pow er Alley/US 280
SR 32 SR 40 East-West Highw ay SR 15 SR 125

COM PLETE OR

TOTAL

UNDER

LENGTH CONSTRUCTION

(m iles)

(m iles)

60

58

262

262

72

72

168

168

215

205

45

20

156

156

194

194

331

170

352

320

371

196

259

235

66

0

238

4

149

13

29

13

169

0

149

0

22

4

COM PLETE OR UNDER
CONSTRUCTION (pe r ce ntage ) 97% 100% 100%
100%
95%
44%
100%
100%
51%
91%
53%
91% 0% 2%
9% 45% 0% 0% 18%

CORRIDOR STATUS No Activity on Final 2
Miles Complete
Complete Engineering Active Construction Complete Engineering Active Construction Active Engineering and
Construction Active Engineering and
Construction Active Engineering and
Construction Active Engineering and
Construction Active Engineering and
Construction Active Engineering and
Construction Active Engineering and
Construction Active Engineering and
Construction
Active Engineering
Active Engineering on 27 miles only
Active Engineering on 44 miles only
Active Engineering No Activity No Activity No Activity

REM AINING COST TO
COM PLETE (m illions)
$16.2 $0.0 $0.0
$0.0
$81.5
$173.4
$0.0
$0.0
$1,099.8
$408.8
$964.0
$132.8 $272.2 $1,821.4
$1,517.9 $39.5
$656.7 $1,120.6
$207.5

Subtotals for Original 1989 GRIP Cor r idor s :
Subtotals for Active & Com plete GRIP Corridors: Grand Totals for all GRIP
Cor r idor s :

2485 2967 3307

2056 2073 2090

83% 70% 63%

$2,876.5 $6,130.2 $8,512.3

Meeting the Challenge
GDOT is striving to complete the construction of the GRIP System. A strategy is in place that recognizes the complexity of each of the three phases of project development:
Engineering (including environmental studies) Right of way acquisition Construction These phases are not generally scheduled for completion in the same year, and in most cases a phase takes several years to complete. Another consideration in scheduling each phase is the availability of funds. A multiple-year funding program to accomplish the planning, design, right of way and construction of the GRIP System is based on these considerations and the past funding history for GRIP projects.
Contact: Office of Program Control 404-631-1523

Visit www.dot.ga.gov for updates to this fact sheet.

GDOT GRIP System Fact Sheet, updated September 2012, Page 2

Governor's Road

Improvement Program

DADE
59

CATOOSA

East West WALKER Highway 27

WHITFIELD MURRAY

GILMERFAANpNpINalachiLaUnMHPUiDKgNIeINhOvwNealoypWTmHOITWeEnNStaHl ABERRASBHU4ANM41

CHATTOOGA

75 GORDON

PICKENS 575

DAWSON
400

STEPHENS

HALL

BANKS

HART

FLOYD

FRANKLIN

BARTOW

CHEROKEE

FORSYTH

85

MADISON

POLK

JACKSON
72

ELBERT

COBB PAULDING

BARROW CLARKE
17

HARALSON

2D0OUGLAS

GWINNETT

FULTON

DEKALB

WALTON

OCONEE
441

OGLETHORPE

WILKES

CARROLL

CLAYTON

ROCKDALE NEWTON

MORGAN

GREENE

TALIAFERRO 20

(GRIP) CURRENT STATUS SEPTEMBER 2012
LINCOLN COLUMBIA

27
HEARD

COWETA
85

FAYETTE

HENRY

SPALDING

BUTTS

JASPER

PUTNAM

TROUP

MERIWETHER

PIKE

LAMAR

MONROE

BALDWIN
JONES Line

WARREN MCDUFFIE

HANCOCK

y GLASCOCK
FreewaJEFFERSON

15

1

WASHINGTON

RICHMOND BURKE

UPSON

Savannah River Parkway

HARRIS

TALBOT

BIBB
Fall CRAWFORD

WILKINSON TWIGGS

JOHNSON

JENKINS EMANUEL

SCREVEN

MUSCOGEE

TAYLOR

CHATTAHOOCHEE

19 MARION
SCHLEY

PEACH MACON

HOUSTON

BLECKLEY
Golden

LAURENS

16 TREUTLEN

CANDLER

BULLOCH

EFFINGHAM

STEWART
QUITMAN 82 RANDOLPH

WEBSTER

SUMTER

DOOLY
280
CRISP

TERRELL

LEE

32

PULASKI

WILCOX

TURNER

BEN HILL IRWIN

DODGE

MONTGOMERY

WHEELER

TOOMBS

280 EVANS

TATTNALL

BRYAN

TELFAIR
441

Isles

LIBERTY

JEFF DAVIS

APPLING

P34a1rkway LONG

84

CHATHAM CHATHAM

CLAY

South

125

CALHOUN

DOUGHERTY

WORTH

COFFEE

32

WAYNE

MCINTO9SH5

TIFT

Georgia

BACON

MCINTOSH

27 EARLY

BAKER

MITCHELL

75

BERRIEN

Parkway
ATKINSON

PIERCE BRANTLEY

GLYNN

GLYNN

MILLER

COOK

SEMINOLE

DECATUR

84

GRADY

COLQUITT 319

133

THOMAS

BROOKS

LANIER

WARE

LOWNDES

CLINCH

441

1
CHARLTON

CAMDEN
40

ECHOLS

Open Under Construction Right of Way Preliminary Engineering No Activities