State Transportation Improvement Program 2012-2015 [2012]

FY 12-15 STIP

Please send any comments to:
Marco Trigueros STIP Project Manager Email mtrigueros@dot.ga.gov
Georgia Department of Transportation Office of Planning 600 W Peachtree
Atlanta, Georgia 30308
Phone (404)631-1987

FY 2012-2015 State Transportation Improvement Program

Page
2 5 7
10
24 27 28 29 30


Content
Introduction and Overview
Public Involvement Process
Metropolitan Planning Organization (MPO) Contacts
MPO Map Georgia MPO Contact List
Financial Plan
STIP Amendment Process
Lump Sum Funding
STIP Funds by Category Pie Chart
Understanding STIP Entries
Map of Georgia
Index of Counties
STIP Projects
Appendix A Glossary
Appendix B (Financial Information) Regular AC Projects to be Converted GRVEE Bond AC Projects to be Converted
Appendix C (MPO Financial Information) STIP Fund totals by MPO
Appendix D (Maps) Georgia Rail System Existing Urban and Rural Transit Systems Statewide Bike Route Network Governor's Road Improvement Program (GRIP)

State Transportation Improvement Program
Introduction
We are pleased to present the State Transportation Improvement Program (STIP) for Fiscal Years 2012 through 2015. The STIP lists Federally-funded transportation projects that are located outside Metropolitan Planning Organization (MPO) boundaries.
Each MPO develops its own Transportation Improvement Program (TIP) and questions about projects in those areas of the state may be directed to the individual MPO shown in the MPO Contacts section of this STIP. The TIPs are included in the STIP by reference without modification once approved by the MPO and the Governor, or his designee.
Purpose
In order to receive Federal transportation project funds, the Georgia Department of Transportation (GDOT) produces the STIP annually which lists all highway, public transit, and multimodal projects proposed for funding under Title 23 (highways) and Title 49 (transit) of the U.S. Code. The STIP also includes non-Federally funded regionally significant transportation projects. The STIP includes Highway, Bridge, Bicycle, Pedestrian, Safety, Transportation Enhancement Activities and Public Transportation (transit) projects.
Project-related costs, such as preliminary engineering (PE), right-of-way acquisition (ROW), and construction (CST) are shown for highway projects; capital and operating costs are shown for transit projects. The projects are organized in alphabetical order by county with information on cost, description and fiscal year. Projects that extend into multiple counties are shown in the STIP under each county the project enters. Please see the Understanding STIP Entries Section for detailed information on how to read STIP entries.
Development
Projects listed in this document were identified through GDOT's ongoing planning processes and are vital to the state's transportation program. Projects in the STIP emphasize the maintenance, safety, and improvement of existing transportation facilities and public transportation systems. The projects support GDOT's mission to provide a safe, seamless and sustainable transportation system that supports Georgia's economy and is sensitive to its
2

citizens and environment. The STIP is developed under the framework of the 2010-2030 Statewide Strategic Transportation Plan (SSTP) in an effort to achieve the outlined goals of:
supporting Georgia's economic growth and competitiveness; ensuring safety and security; maximizing the value of Georgia's assets; and minimizing impact on the environment.
This year's STIP makes great strides in the effective movement of freight around the state. Widenings along corridors designated under the Governor's Road Improvement Program (GRIP) see Appendix D and key connections to the interstate will improve the flow of freight throughout the state. There are also numerous congestion relief projects including several state route widenings and bypasses. However, as federal funds become limited in the future, we should expect more and more projects that can be classifies as "asset management". The 2010-2030 SSTP is available online at: www.it3.ga.gov.
This STIP serves as a document to provide all citizens and interested stakeholders with the opportunity to review and comment on the state's transportation priorities for the next four fiscal years. Additionally in the non-MPO areas which the STIP covers projects are identified in direct cooperation with rural (non-MPO) local governments through formal, annual face-to-face meetings with GDOT as well as regular/ongoing informal contact with GDOT throughout the rest of the year. It is also developed with input from stakeholders and the general public.
The STIP was developed under all relevant guidelines provided by the Transportation Equity Act for the 21st Century (TEA-21), passed by Congress in 1998 and continued with the passage of the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU). The STIP is submitted to the Federal Highway Administration and Federal Transit Administration for final approval.
Public Involvement
Through direct contact with local elected officials, as well as stakeholders and the general public, the STIP is presented for consideration and comments throughout its development. In addition to the face-to-face meetings with local elected officials, the Draft STIP is presented at public meetings held around the state by GDOT staff that encourages questions and input. These meetings are held at various locations and are advertised through mailings and press releases. Comments and questions can also be submitted by mail, e-mail and telephone/fax to directly to GDOT staff at any time throughout the year. The STIP is also available on the internet at:
http://www.dot.ga.gov/informationcenter/programs/transportation/Pages/stip.aspx.
3

Funding
The STIP is fiscally balanced and includes only those projects with funding available or having a reasonable expectation to obtain funds. Federal funds for fiscal years 2012, 2013, 2014 and 2015 are program estimates and will not be final until after the Federal budget is implemented on October 1st of each year.
Cost estimates for individual projects are based on the best available engineering estimates. These costs may change as a project progresses from preliminary engineering to the purchase of right of way to construction. If a cost estimate results from a change in the original scope of the project, the STIP will be amended including the necessary public involvement. If an increased cost estimate is based on updated engineering improvements rather than a change in the actual work, no amendment to the STIP is necessary. Greater detail may be found in the Financial Plan Section.
The most current Census data indicates that Georgia's population growth rate from 2000 to 2010 was 18.3%, which is more than double the U. S. average population growth of 9.7% over the same time period. Georgia's economy is also growing, leading to increased demands on the transportation system. The STIP process ensures that maximum benefits are received from available funding and that Georgia's transportation system will continue to support and promote Georgia's growth and economy.
Project List
The STIP is fiscally balanced such that it lists project phases expected for the fiscal year shown. It is worth noting that project schedules are subject to many issues and events between project conception and project conclusion that may impede or accelerate their progress. Project cost estimates are based on latest and best available engineering estimates at the time the STIP is being developed; the final cost for a project phase may be revised over time as the project is refined during its progression to construction.
Conclusion
In conclusion, the Department of Transportation wishes to thank all of the citizens and local officials for taking the time to provide input on the development of this program. Comments and questions may be directed to the persons listed on the inside front cover of the STIP.
4

Public Involvement Process

Background on the State Transportation Improvement Program
Federal legislation requires that each state produce a State Transportation Improvement Program (STIP). The STIP lists federally funded transportation projects for the next four years, and is updated and approved on an annual basis.
A major component of the STIP development process is public involvement. The Office of Planning oversees the STIP public involvement process for the six rural GDOT Districts and distributes the STIP to the Districts for use in their public meetings and meetings with local officials.

Public meetings
Annual public meetings are scheduled to be providing the opportunity for public review and comment. All of the public meetings are held in ADA accessible locations. In 2011, eleven public meetings were scheduled on the following dates:

August 16 - Camilla August 17 - Waycross August 18 - Statesboro August 23 - Cartersville August 23 - Americus August 24 - Carrollton

August 24- Dublin August 25- Helen August 30- Milledgeville August 31- LaGrange September 1 - Jefferson

The Department invited large numbers of customers to these meetings. The Department mailed over 5,600 individual invitations to local officials and the Family of Partners, a group of stakeholders with interest in transportation.
Ads were placed and press releases sent to local newspapers publicly announcing STIP meetings. Radio Advertisements were played over 1,000 times throughout the entire State. Legal ads were placed in all Legal Organs in the state. An informational brochure explaining the STIP process is also published and distributed at the public meetings.

5

Meetings with Local Officials
Every year as part of the STIP development process, the District Planning and Programming Engineers meet with the elected officials from at least each rural county in their area to discuss proposed projects in the STIP to solicit comments and questions. During these meetings, a range of transportation issues are discussed and requests are forwarded to the appropriate DOT office for response. Local officials sign a "Certification of Cooperation with Elected Officials" documenting STIP consultation.
STIP on the Web
The Department makes the Draft STIP available to citizens on the Department's web page. The web address for the Georgia STIP is:
www.georgiastip.com
Contact information is also included on this site for citizen's comments.
Comments
Comments received from the public meetings and the meetings with locals are taken into consideration in the development of the STIP and any comments received are answered or forwarded to the appropriate GDOT office for response. The comments and questions received from the public meetings and the meetings with the local officials ranged from general comments such as the need for more public transit routes to project specific questions, such as when is a particular project scheduled for construction.
Additional Comments can be sent using the contact information below:
Mailing Address: Georgia Department of Transportation Attn: Office of Planning/STIP Project Manager 600 W. Peachtree ST SW Atlanta, Georgia 30308
Email: stipcoordinator@dot.state.ga.us
In the fifteen metropolitan areas of the state, public involvement is the responsibility of the local metropolitan planning organizations (MPOs); for questions about projects located in these areas, please contact the corresponding agency on the pages following the map
6

Georgia Metropolitan Planning Organization (MPO) Contact List
7

Albany (DARTS) Dougherty Area Regional Transportation Study Website: www.albany.ga.us/plan_development.htm Address: Albany-Dougherty Planning/Comm. Dev.
240 Pine Avenue, Suite 300 Albany, Georgia 31702 Contact: David Hamilton, Transportation Planner Phone: (229)438-3907 Email: DHamilton@dougherty.ga.us ------------------------------------------------------------Athens (MACORTS) Madison-Athens-ClarkeOconee Transportation Study Website: www.macorts.org Address: Athens-Clarke Co. Planning Commission 120 W. Dougherty St. Athens, GA 30601 Contact: Sherry F. McDuffie, Transportation Planner Phone: (706) 613-3515 Email: macorts@athensclarkecounty.com --------------------------------------------------------------Atlanta (ARC) Atlanta Regional Commission Website: www.atlantaregional.com Address: 40 Courtland St. NE Atlanta, GA 30303 Contact: Jane Hayse, Chief of Trans. Planning Phone: (404) 463-3100 Email: jhayse@atlantaregional.com ------------------------------------------------------------Augusta (ARTS) Augusta Regional Trans. Study Website: www.augustaga.gov/index.aspx?nid=680 Address: Augusta-Richmond Co. Planning Comm. 525 Telfair St. Augusta, GA 30901-5867 Contact: Paul DeCamp, Planning Director Phone: (706) 821-1796 Email: pdecamp@augustaga.gov --------------------------------------------------------------Brunswick (BATS) Brunswick Area Trans. Study Website: www.glynncounty.org/index.aspx?NID=303 Address: Glynn Co. Community Development 1725 Reynolds St, Ste. 200 Brunswick, GA 31520 Contact: Eric Landon Phone: (912) 554-7436 Email: elandon@glynncounty-ga.gov -------------------------------------------------------------

Chattanooga (CUATS) Chattanooga Urban Area Transportation Study Website: www.chcrpa.org Address: Chattanooga-Hamilton Co. Regional
Planning Agency 1250 Market St., Ste. 2000 Chattanooga, TN 37402-2713 Contact: Karen Rennich, MPO Coordinator Phone: (423) 643-5903 Email: rennich_karen@chattanooga.gov ------------------------------------------------------------Columbus (CPCTS) Columbus-Phenix City Transportation Study Website: www.columbusga.com/mpo/ Address: Columbus Dept. of Engineering Transportation Planning Division 420 10th St. Columbus, GA 31902 Contact: Lynda Temples, Planner Phone: (706) 225-3937 Email: ltemples@columbusga.org ------------------------------------------------------------Dalton Dalton MPO Website: www.whitfieldcountyga.com/engineer/mpo.htm Address: Whitfield County 301 W. Crawford St., P.O. BOX 248 Dalton, Georgia 30722 Contact: Susan Paredes, GDMPO Coordinator Phone: (706) 876-2559 Email: sparedes@whitfieldcountyga.com ------------------------------------------------------------Gainesville (GHTS) Gainesville Hall Trans. Study Website: www.ghmpo.org Address: Hall Co., Department of Planning 440 Prior Street, S.E.,
Gainesville, GA 30501 Contact: Srikanth Yamala, Senior Planner Phone: (770) 531-6809 Email: syamala@hallcounty.org ------------------------------------------------------------Hinesville (HAMPO) Hinesville Area MPO Website: http://thelcpc.org/HAMPO/hampo_index.html Address: Hinesville Area MPO
205 E Court St Hinesville, GA 31313 Contact: Sonny Timmerman, Director Phone: (912) 408-2030 Email: stimmerman@thelcpc.org -------------------------------------------------------------

8

Macon (MATS) Macon Area Trans. Study Website: www.maconbibbpz.org Address: Macon-Bibb Co. Plan. & Zoning Comm.
682 Cherry St., Ste. 1000 Macon, GA 31201 Contact: Don Tussing, Senior Planner Phone: (478) 751-7460 Email: dtussing@mbpz.org ------------------------------------------------------------Rome (FRUTS) Floyd-Rome Urban Trans. Study Website: http://www.romefloyd.com/Infrastructure/PlanningandZo ning/tabid/333/Default.aspx Address: Rome-Floyd Co. Planning Commission PO Box 1433 Rome, GA 30162-1433 Contact: Sue Hiller, Executive Director Phone: (706) 236-5025 Email: shiller@romega.us ------------------------------------------------------------Savannah (CORE MPO) Coastal Region MPO Website: www.thempc.org Address: Metropolitan Planning Commission PO Box 8246 110 E. State St. Savannah, GA 31412-8246 Contact: Mark Wilkes, Dir. of Trans. Planning Phone: (912) 651-1451 Email: wilkesm@thempc.org -------------------------------------------------------------

Valdosta (VLMPO) Valdosta-Lowndes MPO Website: www.sgrc.us/transportation Address: South Georgia Regional Commission
327 West Savannah Ave. Valdosta, GA 31601 Contact: Corey Hull Phone: (229) 333-5277 Email: chull@sgrc.com ------------------------------------------------------------Warner Robins (WRATS) Warner Robins Area Transportation Study Website: http://www.wrga.gov/node/52 Address: Warner Robins Dept. of City Development 700 Watson Blvd. Warner Robins, GA 31093 Contact: Jessica Bird, Transportation Planner Phone: (478) 929-1936 Email: jbird@warnerrobingsga.gov ---------------------------------------------------------------

9

Georgia Department of Transportation STIP Financial Plan
The Georgia Statewide Transportation Improvement Program (STIP) is developed in accordance with 23 Code of Federal Regulations (CFR) Section 450.216 and includes a priority list of highway, passenger rail and transit projects to be implemented (Section 630.106(a)(2)).
The following describes transportation program estimates which financially constrain by year the STIP Financial Plan (SFP) for Fiscal 2012-2015. In order to provide for 23CFR Section 630.110, "Modification of Original Agreements," for project phases authorized (Section 630.106(a)(2)) under a previous STIP, the SFP reserves a portion of the funding for this purpose and allocates the remaining transportation revenues to state and local projects for a four year time period. The financial plan includes projects for which funding can reasonably be expected to be available. Only those projects or project phases (scoping, preliminary engineering, rights-of way, utilities or construction) for highway projects or (capital or operating) for transit projects are included in the STIP.
The Fiscal 2012-2015 SFP was developed on the basis of current state and federal fund balances and projected 2012, 2013, 2014 and 2015 Federal-aid and state funding for each of the four years of the STIP. Also the Transportation Improvement Programs (TIP) and their related funding, developed by Georgia's fifteen Metropolitan Planning Organizations (MPO), are incorporated into the STIP by reference.
The Fiscal 2012-2015 SFP for highways and transit totals $8.86 billion with a FY 2012 annual program of $2.31 billion. Funding for this four-year program includes $5.68 billion in federal funds, $1.52 billion in state funds of which $0.45 billion are State Bonds, and $1.66 billion in local funds. This level of infrastructure investment supports nearly 372,050 jobs in the construction industry as well as a well-maintained transportation system that fosters a healthy economy by providing the infrastructure for efficient movement of goods and people.
The project cost estimates used in developing the STIP are based on the best available engineering estimates at the time. Final cost for the actual project phase authorization may differ, right of way needs or design quantities are finalized through the pre-construction process. If changes due to these revisions alter the STIP description of intent, design, or scope of the project, then appropriate STIP amendment procedures, provided in this section, will be followed. Funds are also reserved for these amendments.
HIGHWAY PROGRAMS funded by extension of SAFETEA-LU (Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users)
Interstate Maintenance (IM) - Funds used for resurfacing, restoration, and rehabilitation of the Interstate Highway System. These funds cannot be used to provide new capacity to the system, nor for construction of new facilities such as rest areas, ports of entry, etc.
National Highway System (NHS) The system of national highways approved by Congress and considered most important to interstate travel, national defense, connectivity with other modes of
10

transportation, and for international commerce. The system includes the current interstate highways and other key state routes identified by the State.
Surface Transportation Program (STP) STP funds may be used for a range of projects from new construction to resurfacing, and may be flexed to transit. STP funds are distributed according to federal guidelines and in compliance with State legislation.
The distribution of STP funds includes 62.5 percent for use in urban and rural areas of the state based on population. Another 27.5 percent can be used in any area of the state at the direction of the State Transportation Board. The remaining ten percent is used for Transportation Enhancement projects.
The Transportation Enhancement Program (TE) is very popular, especially with users of nontraditional transportation. The State Transportation Board established the Transportation Enhancements Advisory Panel to assist in project selection and to represent statewide interests with expertise in multi-modal facilities, historic resources, transportation aesthetics, scenic preservation and other TE-type activities.
There are twelve categories of TE projects. These include "...provisions of facilities for pedestrians and bicycles; provision of safety and educational activities for pedestrians and bicyclists; acquisition of scenic easements...or historic sites; scenic or historic highway programs (including the provision of tourist and welcome center facilities), landscaping and other scenic beautification; historic preservation, rehabilitation and operation of historic transportation buildings, structures, or facilities (including railroad facilities); preservation of abandoned railway corridors (including the conversion and use thereof for pedestrian or bicycle trails); control and removal of outdoor advertising; archaeological planning and research; and environmental mitigation to address water pollution due to highway runoff, or reduce vehicle-caused wildlife mortality (while maintaining habitat connectivity); and, establishment of transportation museums." Source: National Transportation Enhancement Clearinghouse.
Legislation limits eligible recipients to public agencies. However, private groups are encouraged to participate by applying through an appropriate public agency (County and/or City). TE program funds require a 20% match provided by the recipient.
Highway Safety Improvement Program (HSIP) - The Highway Safety Improvement Program is a program to achieve a significant reduction in traffic fatalities and serious injuries on all public roads. Safety projects include Hazard Elimination, Railroad Crossing, and Railroad Protective Devices.
Congestion Mitigation/Air Quality (CMAQ) - These funds are for projects, which can be proven to reduce traffic congestion and/or improve air quality in non-attainment areas. Projects such as park and ride lots, signal coordination, and ride sharing qualify for these funds. Currently, there are twenty eight counties in non-attainment areas: Barrow, Bartow, Bibb, Carroll, Catoosa, Cherokee, Clayton, Cobb, Coweta, DeKalb, Douglas, Fayette, Floyd, Forsyth, Fulton, Gwinnett, Hall, Heard, Henry, Monroe, Murray, Newton, Paulding, Putnam, Rockdale, Spalding, Walker and Walton.
Bridge Replacement (BRG) - These funds are for the replacement or rehabilitation of substandard bridges both on and off the federal system. Bridges must have a span of 20 feet and must be listed on the Federal Register with a sufficiency rating of 80 or less for rehabilitation and 50 or less for replacement.
11

Safe Routes To School Program (SRS) - The program purpose is to enable and encourage children, including those with disabilities, to walk and bicycle to school; to make walking and bicycling to school safe and more appealing; and to facilitate the planning, development and implementation of projects that will improve safety, and reduce traffic, fuel consumption, and air pollution in the vicinity of schools.
Demonstration or High Priority (Demo, HPP) These funds are congressionally authorized and designated for specified projects.
HIGHWAY FUNDING SOURCES
State Funding Sources - The $1.46 billion in State highway funds are available from several sources including motor fuel taxes, special fuel taxes (diesel), State Bonds and 3% state sales tax on gasoline. Eighty-two percent of these funds are used for construction and maintenance of state highways. Another eight percent are programmed for improvements to local roads. The remainder is not associated with a specific route. Revenues from these sources increase about one percent a year. State funds are part of the STIP program development, with about $0.99 billion used for federal match.
Federal Highway Funding Sources Federal highway funds in the STIP are estimated based on the Department's expectations of what Congress will authorize to be spent on the program. The Department expects to get at least $4.99 billion in federal highway funds over the next four years, from the Highway Trust and Other Funds and $1.41 billion from carryover funding from SAFETEALU and previous highway laws. Georgia's yearly share from the Highway Trust Fund alone is anticipated to be about 3.45% of the estimated $47.3 billion or $1.63 billion in FY 2012. The obligation ceiling, or the minimum amount of funds that Georgia will receive, is 92.5% of that amount. Estimates are subject to change based on forthcoming yearly appropriation and obligation levels set by Congress.
Advance Construction (AC) Federal law allows states to borrow against future federal funding. Available state dollars are used to fund these projects until payments are made. These projects are then partially or completely converted to regular federal funds and the Federal Highway Administration billed for the federal portion of these payments. Georgia maintains a "rolling" AC program where projects are AC the first year and converted the next year or so as funds are needed. Projects in the second year become the new AC projects to provide the funding needed to convert the first year projects. The process is repeated each year. This allows the state to advance projects by one or more years. The STIP shows the projects funded AC in previous years in appendix D. Many of these projects will be converted using FY 2012 federal funds. The amount converted, expected to be $300 million, will be balanced with the total amount of FY 2012 projects funded AC. The amount shown in the Summary of Highway Available Funds and Projects table is the net decrease in AC balance projected as this "rolling" AC program is gradually reduced.
There are also four projects in the STIP (PI # 0006372, 0006373, 0006366, 0006367) establishing amounts for conversion for debt service of GARVEE bond projects that were funded federal AC. Appendix B shows a list of projects from which these amounts will be selected based on how much work has been completed and available federal apportionment types at the time of conversion.
12

Local Highway Funding Sources - During the four-year program, an estimated $1.47 billion in local funds will be needed to match federal-aid for local highway projects and for local contributions to matching improvements on the state highway system.

FY 2012-2015 FUNDING OF HIGHWAY PROJECTS

The $7.86 billion highway program for FY 2012-2015 includes $4.93 billion in federal-aid, $1.46 billion in state funds and $1.47 billion in local funds. The following table summarizes program funding for FY 2012-2015:

FY 2012-2015 Highway Projects ($ Millions)

Fund Source
Federal Aid State Funds Local Funds Total Bond Funds * (included in State and Local)

FY 2012 FY 2013 FY 2014 FY 2015

Total

Average Annual

FY 2012-2015

$1,252 $582 $216
$2,050 $328

$1,216 $244 $218
$1,678 $6

$1,193 $373 $887
$2,453 $125

$1,269 $265 $148
$1,682 $0

$4,930 $1,464 $1,469 $7,863
$459

$1,233 $366 $367
$1,966 $115

Selected Program

Distribution

Sidewalks

$12

$10

$2

$3

$27

$7

Bicycle/Pedestrian

$33

$45

$19

$12

$109

$27

Transfer to Transit

$28

$1

$0

$0

$29

$7

HOV

$0

$0

$7

$1

$8

$2

ITS

$25

$23

$23

$19

$90

$23

Design

$130

$47

$43

$57

$277

$69

* Bond Funds Breakdown:

Bond Type

FY 2012

GARVEE Bond State Bond Local Bond Total Bond

$125 $195
$8 $328

FY 2013
$0 $6 $0 $6

FY 2014 FY 2015

Total

FY 2012-2015

$125

$0

$250

$0

$0

$201

$0

$0

$8

$125

$0

$459

13

Local Road Assistance Federal-aid to local governments is primarily from the Surface Transportation Program and the Bridge Replacement and Rehabilitation Program. Local governments also receive federal demonstration funds for specific projects and Congestion Mitigation/Air Quality funds based on project eligibility and selection. Enhancement projects are selected statewide based on the guidance provided through the Georgia Transportation Enhancement Program.

Summary of Highway Available Funds and Projects *
($ Millions)

Description

FY 2012 FY 2013 FY 2014 FY 2015

Total

Total highway projects Reserve - modifications & amendments Reserve for AC conversions

$2,050 $48
$80

$1,678 $86
$80

$2,453 $154
$80

$1,682 $43
$80

$7,863 $331
$320

Total projects & modifications Grand Total funds available

$2,178 $2,178

$1,844 $1,844

$2,687 $2,687

$1,805 $1,805

$8,514 $8,514

* See the Total Highway Funds and Available Spending Authority section in the appendices for details.

Safe, Accountable, Flexible, Efficient Transportation Equity Act (A Legacy for Users) Title 3 programs Transit, passenger rail, aviation, freight rail and ports join highways as significant modes in Georgia's intermodal transportation system. Non-highway modes funded through Title 3 or through moneys flexed from Title 1 are part of the STIP. Because of its importance to the state's transportation program, a comprehensive summary of non-highway modal programs, funded with other than SAFETEA-LU funding and administered by the Georgia Department of Transportation is included in this document.

TRANSIT PROGRAMS
The Georgia Department of Transportation (GDOT) in cooperation with the Federal Transit Administration (FTA) and the state's public transit agencies work together to develop service programs and facility improvements to meet the state's public transportation needs.
One of the missions of GDOT's public transit program is to preserve and enhance the state's facilities and equipment in urban and rural public transit. Public transit projects listed in the STIP are funded with Federal Transit Administration funds (under SAFETEA-LU). These projects have been identified by the MPOs through the transportation planning process and become a part of the Transportation Improvement Programs (TIP) in urban areas. The Department in cooperation with rural transit operators identifies rural needs. Urban transit projects are listed for cities with transit programs in operation - Albany, Athens, Atlanta, Augusta, Columbus, Gainesville, Hinesville, Macon, Rome and Savannah.

14

Typical urban transit projects include urban capital, planning, and operating (Section 5307) and statewide elderly/disabled capital (Section 5310) projects. GDOT is the designated recipient of FTA funds for areas under 200,000 population. The Department receives financing from the State's General Fund budget to match up to one-half of the local share of transit projects in Albany, Athens, Gainesville, Hinesville, Macon and Rome. In addition, the Department coordinates with the Georgia Department of Human Services (GDHS) on elderly and handicapped transportation projects.
Atlanta, Augusta, Savannah and Columbus have populations of over 200,000 and receive transit federal funds directly from FTA. The Department also provides up to one-half the local share of matching funds for capital projects in these areas. The Department has played an important role in providing financial assistance to match projects for Cobb Community Transit (CCT), the Gwinnett County Transit, the Metropolitan Atlanta Regional Transit Authority (MARTA), Clayton County and Douglas County.
Transit Programs include:
Urbanized Area Formula Program FTA Section 5307 provides funding for capital, operating and planning assistance. Funds are distributed nationwide on a formula basis.
Clean Fuels Grant Program FTA Section 5308 supports the use of alternative fuels for clean fuel vehicles and facilities.
Fixed Guideway Modernization Program FTA Section 5309 provides capital funds for modernization of existing rail systems.
Bus and Bus-Related Facilities FTA Section 5309 provides capital assistance for replacement and new buses and related equipment and facilities
Elderly and Individuals with Disabilities Program FTA Section 5310 supports the capital costs of transportation services for older adults and people with disabilities.
Nonurbanized Area Formula Program FTA Section 5311 provides funding to enhance the access of people in non-urbanized areas to healthcare, shopping, education, employment, public services and recreation. Funds are available for capital, operating and administrative expenses. This program also includes the Rural Transit Assistance Program for State DOTs (Section 5411(b)(3) which provides funding for training, technical assistance projects, research and other support services for rural transit operations. The Section 5311 Program also includes a 15% set-aside for capital support for the private intercity bus operators (Section 5311(f)).
Job Access and Reverse Commute Program FTA Section 5316 provides formula funding to States and Designated Recipients to support the transport of welfare recipients and low income recipients to and from jobs and activities related to their employment including reverse commute projects.
New Freedom Program FTA Section 5317 provides funding to support new public transportation services beyond those required by the Americans with Disabilities Act of 1990
15

(ADA) to assist individuals with disabilities with accessing transportation services, including transportation to and from jobs and employment support services.
Alternative Analysis Program FTA Section 5339 provides grants to develop studies as part of the transportation planning process.

TRANSIT FUNDING SOURCES
State Funding Sources The State Legislature provides up to one-half of the required twenty percent match for federal transit funding through the General Fund. Approximately $52 million in General Funds for transit purposes are programmed in the STIP.
Federal Transit Funding Sources The $749 million in federal funds is partially based on estimates of federal revenue available to Georgia through the Transit Trust Fund and from earmarked funds in SAFETEA-LU.
Local Transit Funding Sources During the four-year program, an estimated $195 million in local funds will be needed to match federal funds. These funds are acquired through local sales taxes, special taxing districts, property taxes as well as the general tax digest.

Fund Source
Federal Funds State Funds Local Funds Total

FY 2012-2015 Transit Projects ($ Thousands)

FY 2012
$192,531 $5,638 $61,318
$259,487

FY 2013
$192,008 $5,634 $58,132
$255,774

FY 2014
$182,268 $19,135 $39,699 $241,102

FY 2015
$181,840 $21,530 $36,143 $239,513

Total FY 2012-2015
$748,647 $51,937
$195,292 $995,876

Annual Average
$187,162 $12,984
$48,823 $248,969

16

Estimated Transit Funds by Program - FY 2012-2015 ($ Thousands)

Category
Urbanized Area Formula Program (5307) Capital Urbanized Area Formula Program Operating (5307) Clean Fuels Program (5308) MARTA Capital Investment Program (5309) Elderly & Persons with Disabilities Program (5310) Nonurbanized Area Formula Program (5311) Capital Nonurbanized Area Formula Program (5311) Operating Intercity Bus Program (5311f) Job Access & Reverse Commute Program (5316) Urban Job Access & Reverse Commute Program (5316) Rural New Freedom Program (5317) Urban New Freedom Program (5317) Rural Alternative Analysis Program (5339) MARTA Other Transit Projects
Total Apportionment

FY 2012
$89,800 $17,802 $5,563 $102,531 $6,388 $5,170 $25,530
$2,574 $1,163 $1,444
$573 $795
$0 $154 $259,487

FY 2013
$89,537 $13,937 $5,875 $101,983 $4,521 $7,141 $26,151
$2,574 $1,187 $1,473
$584 $811
$0 $0 $255,774

FY 2014
$87,031 $6,289 $1,250 $102,252 $4,236 $6,433 $26,607 $2,574 $1,210 $1,502
$596 $828
$0 $294 $241,102

FY 2015
$83,263 $6,289 $1,250 $102,752 $3,961 $8,709 $26,285 $2,574 $1,210 $1,502
$596 $828
$0 $294 $239,513

Total FY 2012-2015
$349,631 $44,317 $13,938 $409,518 $19,106 $27,453 $104,573 $10,296 $4,770 $5,921 $2,349 $3,262
$0 $742 $995,876

17

AVIATION PROGRAMS
The mission of GDOT's aviation program is to preserve and enhance the State's air transportation system to meet the demands of users. The program provides financial and technical support to publicly owned, open to the public airports. The Georgia Department of Transportation is authorized to plan and support the establishment, development and maintenance of aviation and aviation facilities. The Georgia Airport Aid Program (GAAP) provides state funding assistance, appropriated by the Georgia General Assembly, for capital, maintenance, approach aid and planning projects. Development, Maintenance, Approach Aid, and Planning projects are funded at 75% state assistance or 50% state assistance for urban area airports lacking federal support. All FAA (Federal Aviation Administration) supported construction projects may be funded at 95% FAA and 2.5% state aid. Airport markings on State development projects are eligible for 100% funding. In addition, the minimum contract level of state funding assistance on all GAAP projects is $1,500. State projects (non-federal) are selected annually based on the GAAP Priority System criteria. Federally funded projects have the highest priority for matching state funds.
RAIL PROGRAMS
The primary mission of GDOT's rail program is to preserve and enhance the State's rail transportation system for future development and expansion of rail freight and rail passenger service. Existing rail corridors in the Department's Freight Rail Plan are identified to be either acquired and rehabilitated, or rehabilitated, in order to maintain and assure strategic rail freight access to Georgia's communities. Since 1992, GDOT has acquired 540 miles of light density railroad lines and since 1981, GDOT has rehabilitated 793 miles of light density railroad lines.
The passenger rail program defined in the document titled: Intermodal Program for Rail Passenger Service in Georgia, guides implementation of intrastate, intercity, and commuter rail passenger service to provide a multi-modal alternative in the State's largest travel market. Seven (7) commute services and six (6) intercity rail lines are identified in the Program to serve and connect together the Atlanta, Athens, Griffin, Macon, Bremen, Canton, Senoia, Albany, Savannah, Augusta, and Columbus metropolitan markets.
PORT PROGRAMS
The mission of GDOT's ports program is to partner with the Corps of Engineers to maintain the navigability of the Atlantic Intracoastal Waterway and Georgia's deepwater ports in Savannah and Brunswick. In order to maintain a navigable channel, the Corps of Engineers dredges the Savannah and Brunswick Harbors annually. The Department's role is to partner with the Corps to provide dredge material containment areas for the Corp's work for the federal navigation projects. The Department is required to cost/share in dike design, construction, and environmental mitigation. GDOT funds 35% of dike construction costs but no maintenance costs of disposal areas. GDOT annually requests funding from the Georgia General Assembly to cover the costs of these activities. GDOT supports the Savannah Harbor Expansion Project an initiative that will improve the port's ability to accommodate larger vessels. Larger ships are expected to call more frequently once the Panama Canal expansion makes transoceanic crossing more convenient, and capital improvements to the Savannah Harbor will help Georgia keep pace with the global freight transportation industry.
18

Total Estimated Highway Funds and Available Spending Authority
($ Millions)

Category Groupings

FY 2012 FY 2013 FY 2014 FY 2015

Total

Apportionment Interstate Maintenance Bridge Replacement & Rehabilitation National Highway System Congestion Mitigation Surface Transportation Program Highway Safety Improvement Safe Routes To School Misc. Categories Total Apportionment
Total Other Funds Unobligated Balance Grand Total

$305 $93
$280 $74 $359
$70 $6
$15 $1,202
$0.3 $1,409 $2,611

$313 $95
$287 $76 $368
$72 $6
$15 $1,232
$0.3
$1,232

$320 $97
$294 $78 $376
$73 $7
$16 $1,261
$0.3
$1,261

$327 $100
$301 $80 $385
$75 $7
$16 $1,291
$0.3
$1,291

$1,265 $385
$1,162 $308
$1,488
$290 $26 $62
$4,986 $1
$1,409 $6,396

Available Federal Spending Authority Formula Obligation Ceiling
Other Obligation Limitation
Special Limitation Equity Bonus Special Limitation High Priority/Earmarks Special Limitation Appalachian Highway Forest Highway/Nat'l Parks
Total Federal Funding Availability AC with State funds
State funds (including state bond) Local funds
Grand Total

$1,144 $4
$135
$89
$3
$5 $1,380
$0 $582
$216 $2,178

$1,172 $5
$138
$56
$5
$6 $1,382
$0 $244
$218 $1,844

$1,199 $5
$141
$45
$37
$0 $1,427
$0 $373
$887 $2,687

$1,227 $5
$145
$10
$5
$0 $1,392
$0 $265
$148 $1,805

$4,742 $19
$559
$200
$50
$11 $5,581
$0 $1,464
$1,469 $8,514

19

Statewide Transportation Improvement Program (STIP) and Transportation Improvement Program (TIP) Amendment Process
April 11, 2011
The Federal Highway Administration (FHWA) and Federal Transit Administration (FTA) issued the Final Rule to revise the Statewide and Metropolitan Transportation Planning regulations incorporating changes from the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users on February 14, 2007 with an effective date of March 16, 2007. The revised regulations clearly define administrative modifications and amendments as actions to update plans and programs. 23 Code of Federal Regulations (CFR) Part 450.104 defines administrative modifications and amendments as follows:
Administrative modification "means a minor revision to a long-range statewide or metropolitan transportation plan, Transportation Improvement Program (TIP), or Statewide Transportation Improvement Program (STIP) that includes minor changes to project/project phase costs, minor changes to funding sources of previously-included projects, and minor changes to project/project phase initiation dates. Administrative Modification is a revision that does not require public review and comment, redemonstration of fiscal constraint, or a conformity determination (in nonattainment and maintenance areas)."
Amendment "means a revision to a long-range statewide or metropolitan transportation plan, TIP, or STIP that involves a major change to a project included in a metropolitan transportation plan, TIP, or STIP, including the addition or deletion of a project or major change in project cost, project/project phase initiation dates, or a major change in design concept or design scope (e.g., changing project termini or the number of through traffic lanes). Changes to projects that are included only for illustrative purposes do not require an amendment. An amendment is a revision that requires public review and comment, redemonstration of fiscal constraint, or a conformity determination (for metropolitan transportation plans and TIPs involving "non-exempt" projects in nonattainment and maintenance areas). In the context of a long-range statewide transportation plan, an amendment is a revision approved by the State in accordance with its public involvement process."
The following procedures have been developed for processing administrative modifications and amendments to the STIP and Metropolitan Planning Organizations (MPOs) TIPs and Long Range Transportation Plans (LRTPs). Processes described below detail procedures that are to be used to update an existing approved STIP or TIP and associated plan, if applicable. A key element of the amendment process is to assure that funding balances are maintained.
20

Administrative Modifications for Initial Authorizations The following actions are eligible as Administrative Modifications to the STIP/TIP/LRTP:
A. Revise a project description without changing the project scope, conflicting with the environmental document or changing the conformity finding in nonattainment and maintenance areas (less than 10% change in project termini). This change would not alter the original project intent.
B. Splitting or combining projects. C. Federal funding category change. D. Minor changes in expenditures for transit projects. E. Roadway project phases may have a cost increase less than $2,000,000 or 20% of the amount
to be authorized. The 20% scenario amount may not exceed $10,000,000. F. Shifting projects within the 4-year STIP as long as the subsequent annual draft STIP was
submitted prior to September 30. G. Projects may be funded from lump sum banks as long as they are consistent with category
definitions. An administrative modification can be processed in accordance with these procedures provided that:
1. It does not affect the air quality conformity determination. 2. It does not impact financial constraint. 3. It does not require public review and comment. The administrative modification process consists of a monthly list of notifications from GDOT to all involved parties, with change summaries sent on a monthly basis to the FHWA and FTA by the GDOT. The GDOT will submit quarterly reports detailing projects drawn from each lump sum bank with remaining balance to the FHWA.
21

Amendments for Initial Authorizations
The following actions are eligible as Amendments to the STIP/TIP/LRTP:
A. Addition or deletion of a project.
B. Addition or deletion of a phase of a project.
C. Roadway project phases that increase in cost over the thresholds described in the Administrative Modification section.
D. Addition of an annual TIP.
E. Major change to scope of work of an existing project. A major change would be any change that alters the original intent i.e. a change in the number of through lanes, a change in termini of more than 10 percent.
F. Shifting projects within the 4-year STIP which require redemonstration of fiscal constraint or when the subsequent annual draft STIP was not submitted prior to September 30. (See Administrative Modification item F.)
Amendments to the STIP/TIP/LRTP will be developed in accordance with the provisions of 23 CFR Part 450. This requires public review and comment and responses to all comments, either individually or in summary form. For amendments in MPO areas, the public review process should be carried out in accordance with the procedures outlined in the Participation Plan. The GDOT will assure that the amendment process and the public involvement procedures have been followed. Cost changes made to the second, third and fourth years of the STIP will be balanced during the STIP yearly update process. All amendments should be approved by FHWA and/or FTA.
Notes:
1. The date a TIP becomes effective is when the Governor or his designee approves it. For nonattainment and maintenance areas, the effective date of the TIP is based on the date of U.S. Department of Transportation's positive finding of conformity.
2. The date the STIP becomes effective is when FHWA and FTA approve it.
3. The STIP is developed on the state fiscal year which is July 1-June 30.
4. Funds for cost increases will come from those set aside in the STIP financial plan by the GDOT for modifications and cost increases. Fiscal Constraint will be maintained in the STIP at all times.
22

Additional Funding Request After the Initial Authorization Additional funding requests for all phases after the receiving initial authorization for those phases shall be a modification and be reported at each month's end except under the following conditions:
A. The Initial Work Authorization for the phase is older than 10 years. B. The additional funding request exceeds the Initial Work Authorization by greater than $10
million.
23

LUMP SUM FUNDING
A portion of the STIP funding is set aside for ten groups of projects that do not affect the capacity of the roadway. The Lump Sum projects program is intended to give the Department and MPO flexibility to address projects of an immediate need while fulfilling the requirements of the STIP. Funds are set up in lump sum banks to undertake projects that are developed after the STIP is approved. These lump sums banks, located in the statewide or "All" county section of the STIP, are listed in a number of funding types for each year for the Department's convenience in managing and accounting for the funding. These Lump Sum Banks are shown in the TIP/STIP with the words "Lump Sum" in the project description and contain an amount of funding for each year. Funds are drawn from these lump sums during the year and individual projects are programmed. The individual projects may include work at one or several locations for letting and accounting purposes. Listed below are these ten groups and information about them. Except for groups for preliminary engineering and rights of way protective buying, the total available funds are shown as construction for easy accounting but preliminary engineering and rights-of-way may be drawn from this amount when needed in that category.
Individual projects are programmed and funds drawn from the Lump Sum Bank at the time these funds are needed for Preliminary Engineering, Rights of Way and Construction. These projects may be funded in the current year or one of the other TIP/STIP years. Funds for these projects are not counted until authorization is requested for the funds. At that time the actual cost is deducted from the balance in the Lump Sum Bank.
To provide the readers of the TIP/STIP with as much information as possible, individual projects to be funded from the Lump Sum Bank in the future may be shown in the TIP/STIP with a program year of 2012 and a preliminary estimated cost. These projects are also denoted with the words "Uses Lump Sum Bank PI # 000xxxx" in the lower left area of the project listing. To avoid double counting, these projects are not included in the county total at the end of the county.
Group: Maintenance
Criteria: existing system maintenance only
This group has six funding/work types: two are for bridge painting/maintenance and the other four are for roadway maintenance. Major types of work undertaken are: resurfacing, pavement rehabilitation, median work, impact attenuators, signing, fencing, pavement markings, landscaping, rest areas, walls, guardrail and shoulder work. Also included is preliminary engineering necessary to prepare plans and rights-of-way needed for work such as landslide repair, sewer hookups and erosion control.
Group: Safety
Criteria: work qualifying for the High Hazard Safety Program and other safety projects
24

This group includes the following work types: signal installation/upgrades, guardrail installation, sign installation, railroad protection devices, operational improvements, railroad crossing hazard elimination, roadway hazard elimination and special safety studies and programs.
Group: Preliminary Engineering
Criteria: planning, studies and management systems This group is a single item
Group: Roadway/Interchange Lighting
Criteria: lighting This group is a single item.
Group: Rights of Way - Protective Buying and Hardship Acquisitions
Criteria: purchase of parcel(s) of rights of way (RW) for future projects that are in jeopardy of development and for hardship acquisition. Qualifying projects are those that have preliminary engineering (PE) underway or have a PE, RW or construction phase in the STIP. For counties that are not in conformance for air quality the only qualifying projects are those that have a RW phase in the STIP. This group is a single item.
Group: Transportation Enhancement
Criteria: projects qualifying for the Transportation Enhancement program (TE) and the Recreational Trails & Scenic Byway programs
TE projects shown in the STIP will be funded on a first come first served basis. When a project is funded it is drawn down from the lump sum. When all funds are gone, no other projects can be funded until the next fiscal year, which begins on July 1.
This group has two funding types.
Group: Livable Centers Initiative (LCI)
Criteria: projects qualifying for the LCI program and selected by the Atlanta Regional Commission (ARC)
LCI implementation projects are selected on a competitive basis and lump sum funding amounts are programmed according to reasonable schedules for engineering, right of way acquisitions and construction for projects comprising the overall program. Funding for individual phases of a project may be shifted between fiscal years as necessary if such shifts do not affect the implementation schedule of other projects or exceed the overall lump sum funding amount.
25

This group is a single item.
Group: Safe Routes to Schools
Criteria: To enable and encourage children, including those with disabilities, to walk and bicycle to school; to make walking and bicycling to school safe and more appealing; and to facilitate the planning, development and implementation of projects that will improve safety, and reduce traffic, fuel consumption, and air pollution in the vicinity of schools.
This group has three items; Infrastructure & non-infrastructure & any project.
Group: High Risk Rural Roads
Criteria: States are required to identify these roadways (and expend the HRRR funds) according to the following definition:
any roadway functionally classified as a rural major or minor collector or a rural local road and
A. on which the accident rate for fatalities and incapacitating injuries exceeds the statewide average for those functional classes of roadway; or
B. that will likely have increases in traffic volume that are likely to create an accident rate for fatalities and incapacitating injuries that exceeds the statewide average for those functional classes of roadway."
Group: Regional Traffic Signal Optimization
Criteria: Applies to maintenance and operation of traffic control devices statewide. Candidate projects include:
A. Regional Traffic Operations Concepts B. Micro-Regional Traffic Operations C. Traffic Control Maintenance Contracts D. Signal Timing E. Identification of minor operational improvement projects to be submitted fir Operational
Projects under another Lump Sum category.
Projects will:
A. Have to support the Regional or Statewide Traffic Signal Concept of Operations B. Focus on operating and maintaining the components of traffic control systems C. Local or quasi-governmental agencies may be contracted with at the project level.
26

Debt Service for GARVEE
$752,568
Intermodal/Transit
$995,877
Other
$880,191
Environmental Improvements
$15,401
Relocation No Added Capacity
$5,072
Bridge Rehab Added Capacity
$49,649

Bridge Replacement Added Capacity
$127,854
$ in Thousands

Major Widening
$1,304,377

STIP Funds by Category for
2012 - 2015 Total Funds $8.86 Billion
Relocation Added Capacity
$67,898
27

Reconstruction No Added Capacity

$46,546

Restoration, Rehab & Resurfacing

$768,796

Minor Widening

$53,628

Bridge Replacement No Added Capacity
$299,140

Bridge Rehab No Added Capacity

$79,889

Safety Improvements
$522,670

Traffic Management/Engineering
$241,214

Construction New Roads
$543,063

Reconstruction Added Capacity
$1,982,322

Construction New Bridges
$122,173

Understanding STIP Entries

This is the PI or Project Identification number used throughout the life of the project for tracking purpose.

Type of work, replacement of an existing bridge. See Glossary of Terms for further definitions.
List the different phases involved in a particular project. Project can consist of Preliminary Engineering, Rights of way and/or Construction.

The status of when work is scheduled to begin, or when the funds were authorized .

Multi County Projects

Total amount previously authorized, i.e. funds spent on the project

Funding Category: May be Bridge, STP, NHS, etc. & refers to specific Category of funds to be used.

Project description

Total cost, authorizations plus funds not yet authorized .

Total cost of funding for each phase of work.
Identify government participation (Federal, State, or Local) in funding each phase of project.

28

29

Index of Counties

County Appling Atkinson Bacon Baker Baldwin Banks Barrow Bartow Ben Hill Berrien Bibb Bleckley Brantley Brooks Bryan Bulloch Burke Butts Calhoun Camden Candler Carroll Catoosa Charlton Chatham Chattahoochee Chattooga Cherokee Clarke Clay Clayton Clinch Cobb Coffee Colquitt Columbia Cook Coweta Crawford Crisp Dade Dawson Decatur Dekalb

Page 56
No Projects 58 59 60 62 64 65 69 70
In an MPO area 73 74 75 76 78 81 82 84 85 87 89 92 93
In an MPO area In an MPO area
95 In an MPO area In an MPO area
96 In an MPO area
97 In an MPO area
98 100 103 105 In an MPO area 106 107 108 109 111 In an MPO area

Dodge Dooly Dougherty Douglas Early Echols Effingham Elbert Emanuel Evans Fannin Fayette Floyd Forsyth Franklin Fulton Gilmer Glascock Glynn Gordon Grady Greene Gwinnett Habersham Hall Hancock Haralson Harris Hart Heard Henry Houston Irwin Jackson Jasper Jeff Davis Jefferson Jenkins Johnson Jones Lamar

30

113 115 In an MPO area In an MPO area 117 No Projects 118 121 122 125 126 In an MPO area In an MPO area In an MPO area 128 In an MPO area 130 132 In an MPO area 133 136 138 In an MPO area 140 In an MPO area 141 142 144 146 147 In an MPO area In an MPO area 148 149 152 154 155 158 160 161 162

County Lanier Laurens Lee Liberty Lincoln Long Lowndes Lumpkin Macon Madison Marion McDuffie McIntosh Meriwether Miller Mitchell Monroe Montgomery Morgan Murray Muscogee Newton Oconee Oglethorpe Paulding Peach Pickens Pierce Pike Polk Pulaski Putnam Quitman Rabun Randolph Richmond Rockdale Schley Screven Seminole Spalding Stephens Stewart Sumter Talbot

Page 163 165 167
In an MPO area 168 170
In an MPO area 171 173 175 177 178 180 182 183 184 185 187 189 192
In an MPO area 193 196 197
In an MPO area 198 200 202 203 204 205 206 207 208 209
In an MPO area In an MPO area
210 211 213 214 216 218 219 220

County Taliaferro Tattnall Taylor Telfair Terrell Thomas Tift Toombs Towns Treutlen Troup Turner Twiggs Union Upson Walker Walton Ware Warren Washington Wayne Webster Wheeler White Whitfield Wilcox Wilkes Wilkinson Worth

31

Page 222 223 225 226 228 229 230 233 235 237 238 240 241 243 245 247 249 251 254 255 256
No Projects 257 259
In an MPO area 261 262 264 265

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

All
Project: 0000694 Type Work: Miscellaneous Improvements
Descp:OPERATE STATE AGENCY WIDE COMMERCIAL VEHICLE PERMIT SYSTEM Length: 0.00

Phase CST

Fund STP

Year 2013

Federal $478,037

State $119,509

Total Project Cost: Total Project Authorizations:

$ 597,546 $0

Other $0

Total $597,546

Project: 0001752 Type Work: Preliminary Engineering
Descp:ENVIRONMENTAL ANALYSIS ON FED-AID PROJECTS BY CONSULTANT Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 2,500,000 $0

Phase PE

Fund Other

Year 2013

Federal $2,000,000

State $500,000

Other $0

Total $2,500,000

Project: 0002911 Type Work: ATMS/ITS
Descp:ATMS: ITS OPERATIONS AND SUPPORT STATEWIDE - 2012 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 7,000,000 $0

Phase CST

Fund NHS

Year 2012

Federal $5,600,000

State $1,400,000

Other $0

Total $7,000,000

Project: 0003830 Type Work: Miscellaneous Improvements
Descp:TASK ORDER CONTRACT-CONSTRUCTION MANAGEMENT FED & BOND-2012 Length: 0.00

Phase CST

Total Project Cost: Total Project Authorizations:

$ 15,000,000 $0

Fund Other

Year 2012

Federal $12,000,000

State $3,000,000

Other $0

Total $15,000,000

Project: 0005821 Type Work: Signing
Descp:SBR 15 CENTRAL RTE SBR 60 SBR70 NORTH CRESCENT BICYCLE SIGNS Length: 0.00

Phase PE CST

Fund Safety Safety

Total Project Cost:

$ 441,359

Total Project Authorizations: $ 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0006120 Type Work: Miscellaneous Improvements
Descp:LUMP SUM FOR TRANSPORTATION ENHANCEMENT (TE) PROJECTS FY 12 Length: 0.00

Phase ALL

Fund STP

Total Project Cost: Total Project Authorizations:

$ 26,000,000 $0

Year 2012 2012
Year 2012

Federal $40,124
$401,236
Federal $20,800,000

State $0 $0

Other $0 $0

Total $40,124
$401,236

State $0

Other $5,200,000

Total $26,000,000

Page 1 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: 0006121 Type Work: Miscellaneous Improvements
Descp:LUMP SUM FOR TRANSPORTATION ENHANCEMENT (TE) PROJECTS FY 13 Length: 0.00

Phase ALL

Fund STP

Year 2013

Federal $20,800,000

State $0

Other $5,200,000

Total Project Cost: Total Project Authorizations:

$ 26,000,000 $0

Total $26,000,000

Project: 0006122 Type Work: Miscellaneous Improvements
Descp:LUMP SUM FOR TRANSPORTATION ENHANCEMENT (TE) PROJECTS FY 14 Length: 0.00

Phase ALL

Total Project Cost: Total Project Authorizations:

$ 26,000,000 $0

Fund STP

Year 2014

Federal $20,800,000

State $0

Other $5,200,000

Total $26,000,000

Project: 0006123 Type Work: Miscellaneous Improvements
Descp:LUMP SUM FOR TRANSPORTATION ENHANCEMENT (TE) PROJECTS FY 15 Length: 0.00

Phase ALL

Total Project Cost: Total Project Authorizations:

$ 26,000,000 $0

Fund STP

Year 2015

Federal $20,800,000

State $0

Other $5,200,000

Total $26,000,000

Project: 0006127 Type Work: Intersection Improvement
Descp:LUMP SUM ROADWAY SAFETY FUNDS FOR FY 2012 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 62,129,964 $0

Phase ALL

Fund Safety

Year 2012

Federal $55,916,968

State $6,212,996

Other $0

Total $62,129,964

Project: 0006128 Type Work: Intersection Improvement
Descp:LUMP SUM ROADWAY SAFETY FUNDS FOR FY 2013 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 63,574,847 $0

Phase ALL

Fund Safety

Year 2013

Federal $57,217,362

State $6,357,485

Other $0

Total $63,574,847

Project: 0006129 Type Work: Intersection Improvement
Descp:LUMP SUM ROADWAY SAFETY FUNDS FOR FY 2014 Length:

Total Project Cost: Total Project Authorizations:

$ 65,019,730 $0

Phase ALL

Fund Safety

Year 2014

Federal $58,517,757

State $6,501,973

Other $0

Total $65,019,730

Page 2 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: 0006130 Type Work: Intersection Improvement
Descp:LUMP SUM ROADWAY SAFETY FUNDS FOR FY 2015 Length: 0.00

Phase ALL

Fund Safety

Year 2015

Federal $59,818,152

State $6,646,461

Total Project Cost: Total Project Authorizations:

$ 66,464,613 $0

Other $0

Total $66,464,613

Project: 0006134 Type Work: Bridges
Descp:LUMP SUM BRIDGE MAINTENANCE/PAINTING FOR FY 2012 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 5,000,000 $0

Phase ALL

Fund STP

Year 2012

Federal $4,000,000

State $1,000,000

Other $0

Total $5,000,000

Project: 0006135 Type Work: Bridges
Descp:LUMP SUM BRIDGE MAINTENANCE/PAINTING FOR FY 2013 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 5,000,000 $0

Phase ALL

Fund STP

Year 2013

Federal $4,000,000

State $1,000,000

Other $0

Total $5,000,000

Project: 0006136 Type Work: Bridges
Descp:LUMP SUM BRIDGE MAINTENANCE/PAINTING FOR FY 2014 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 5,000,000 $0

Phase ALL

Fund STP

Year 2014

Federal $4,000,000

State $1,000,000

Other $0

Total $5,000,000

Project: 0006137 Type Work: Bridges
Descp:LUMP SUM BRIDGE MAINTENANCE/PAINTING FOR FY 2015 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 5,000,000 $0

Phase ALL

Fund STP

Year 2015

Federal $4,000,000

State $1,000,000

Other $0

Total $5,000,000

Project: 0006148 Type Work: Resurface & Maintenance
Descp:LUMP SUM FOR INTERSTATE MAINTENANCE FOR FY 2012 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 10,000,000 $0

Phase ALL

Fund IM

Year 2012

Federal $9,000,000

State $1,000,000

Other $0

Total $10,000,000

Page 3 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: 0006149 Type Work: Resurface & Maintenance
Descp:LUMP SUM FOR INTERSTATE MAINTENANCE FOR FY 2013 Length: 0.00

Phase ALL

Fund IM

Year 2013

Federal $9,000,000

State $1,000,000

Total Project Cost: Total Project Authorizations:

$ 10,000,000 $0

Other $0

Total $10,000,000

Project: 0006150 Type Work: Resurface & Maintenance
Descp:LUMP SUM FOR INTERSTATE MAINTENANCE FOR FY 2014 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 10,000,000 $0

Phase ALL

Fund IM

Year 2014

Federal $9,000,000

State $1,000,000

Other $0

Total $10,000,000

Project: 0006151 Type Work: Resurface & Maintenance
Descp:LUMP SUM FOR INTERSTATE MAINTENANCE FOR FY 2015 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 10,000,000 $0

Phase ALL

Fund IM

Year 2015

Federal $9,000,000

State $1,000,000

Other $0

Total $10,000,000

Project: 0006162 Type Work: Lighting
Descp:LUMP SUM INTERCHANGE/ROADWAY LIGHTING FOR FY 2012 Length: 0.00

Phase ALL

Total Project Cost: Total Project Authorizations:

$ 1,000,000 $0

Fund NHS

Year 2012

Federal $800,000

State $200,000

Other $0

Total $1,000,000

Project: 0006163 Type Work: Lighting
Descp:LUMP SUM INTERCHANGE/ROADWAY LIGHTING FOR FY 2013 Length: 0.00

Phase ALL

Total Project Cost: Total Project Authorizations:

$ 1,000,000 $0

Fund NHS

Year 2013

Federal $800,000

State $200,000

Other $0

Total $1,000,000

Project: 0006164 Type Work: Lighting
Descp:LUMP SUM INTERCHANGE/ROADWAY LIGHTING FOR FY 2014 Length: 0.00

Phase ALL

Total Project Cost: Total Project Authorizations:

$ 1,000,000 $0

Fund NHS

Year 2014

Federal $800,000

State $200,000

Other $0

Total $1,000,000

Page 4 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: 0006165 Type Work: Lighting
Descp:LUMP SUM INTERCHANGE/ROADWAY LIGHTING FOR FY 2015 Length: 0.00

Phase ALL

Fund NHS

Year 2015

Federal $800,000

State $200,000

Total Project Cost: Total Project Authorizations:

$ 1,000,000 $0

Other $0

Total $1,000,000

Project: 0006169 Type Work: Bridges
Descp:LUMP SUM INTERSTATE BRIDGE PAINTING/MAINTENANCE FOR FY 2012 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 10,000,000 $0

Phase ALL

Fund IM

Year 2012

Federal $9,000,000

State $1,000,000

Other $0

Total $10,000,000

Project: 0006170 Type Work: Bridges
Descp:LUMP SUM INTERSTATE BRIDGE PAINTING/MAINTENANCE FOR FY 2013 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 10,000,000 $0

Phase ALL

Fund IM

Year 2013

Federal $9,000,000

State $1,000,000

Other $0

Total $10,000,000

Project: 0006171 Type Work: Bridges
Descp:LUMP SUM INTERSTATE BRIDGE PAINTING/MAINTENANCE FOR FY 2014 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 10,000,000 $0

Phase ALL

Fund IM

Year 2014

Federal $9,000,000

State $1,000,000

Other $0

Total $10,000,000

Project: 0006172 Type Work: Bridges
Descp:LUMP SUM INTERSTATE BRIDGE PAINTING/MAINTENANCE FOR FY 2015 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 10,000,000 $0

Phase ALL

Fund IM

Year 2015

Federal $9,000,000

State $1,000,000

Other $0

Total $10,000,000

Project: 0006176 Type Work: Pavement Rehab
Descp:LUMP SUM MAINTENANCE FOR ANY AREA FY 2012 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 100,000,000 $0

Phase ALL

Fund STP

Year 2012

Federal

State

$80,000,000 $20,000,000

Other

Total

$0 $100,000,000

Page 5 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: 0006177 Type Work: Pavement Rehab
Descp:LUMP SUM MAINTENANCE FOR ANY AREA FY 2013 Length: 0.00

Phase ALL

Fund STP

Year 2013

Federal

State

$80,000,000 $20,000,000

Total Project Cost: Total Project Authorizations:

$ 100,000,000 $0

Other

Total

$0 $100,000,000

Project: 0006178 Type Work: Pavement Rehab
Descp:LUMP SUM MAINTENANCE FOR ANY AREA FY 2014 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 100,000,000 $0

Phase ALL

Fund STP

Year 2014

Federal

State

$80,000,000 $20,000,000

Other

Total

$0 $100,000,000

Project: 0006179 Type Work: Pavement Rehab
Descp:LUMP SUM MAINTENANCE FOR ANY AREA FY 2015 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 100,000,000 $0

Phase ALL

Fund STP

Year 2015

Federal

State

$80,000,000 $20,000,000

Other

Total

$0 $100,000,000

Project: 0006183 Type Work: Pavement Rehab
Descp:LUMP SUM MAINTENANCE FOR ANY AREA GT 200K FY 2012 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 7,500,000 $0

Phase ALL

Fund STP

Year 2012

Federal $6,000,000

State $1,500,000

Other $0

Total $7,500,000

Project: 0006184 Type Work: Pavement Rehab
Descp:LUMP SUM MAINTENANCE FOR ANY AREA GT 200K FY 2013 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 7,500,000 $0

Phase ALL

Fund STP

Year 2013

Federal $6,000,000

State $1,500,000

Other $0

Total $7,500,000

Project: 0006185 Type Work: Pavement Rehab
Descp:LUMP SUM MAINTENANCE FOR ANY AREA GT 200K FY 2014 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 7,500,000 $0

Phase ALL

Fund STP

Year 2014

Federal $6,000,000

State $1,500,000

Other $0

Total $7,500,000

Page 6 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: 0006186 Type Work: Pavement Rehab
Descp:LUMP SUM MAINTENANCE FOR ANY AREA GT 200K FY 2015 Length: 0.00

Phase ALL

Fund STP

Year 2015

Federal $4,000,000

State $0

Other $1,000,000

Total Project Cost: Total Project Authorizations:

$ 5,000,000 $0

Total $5,000,000

Project: 0006190 Type Work: Pavement Rehab
Descp:LUMP SUM MAINTENANCE ON NATIONAL HIGHWAY SYSTEM FOR FY 2012 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 35,000,000 $0

Phase ALL

Fund NHS

Year 2012

Federal $28,000,000

State $7,000,000

Other $0

Total $35,000,000

Project: 0006191 Type Work: Resurface & Maintenance
Descp:LUMP SUM MAINTENANCE ON NATIONAL HIGHWAY SYSTEM FOR FY 2013 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 35,000,000 $0

Phase ALL

Fund NHS

Year 2013

Federal $28,000,000

State $7,000,000

Other $0

Total $35,000,000

Project: 0006192 Type Work: Resurface & Maintenance
Descp:LUMP SUM MAINTENANCE ON NATIONAL HIGHWAY SYSTEM FOR FY 2014 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 35,000,000 $0

Phase ALL

Fund NHS

Year 2014

Federal $28,000,000

State $7,000,000

Other $0

Total $35,000,000

Project: 0006193 Type Work: Resurface & Maintenance
Descp:LUMP SUM MAINTENANCE ON NATIONAL HIGHWAY SYSTEM FOR FY 2015 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 35,000,000 $0

Phase ALL

Fund NHS

Year 2015

Federal $28,000,000

State $7,000,000

Other $0

Total $35,000,000

Project: 0006197 Type Work: Railroad Crossing
Descp:LUMP SUM RAILROAD CROSSING HAZARD ELIMINATION FY 2012 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 4,313,100 $0

Phase ALL

Fund Safety

Year 2012

Federal $4,313,100

State $0

Other $0

Total $4,313,100

Page 7 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: 0006198 Type Work: Railroad Crossing
Descp:LUMP SUM RAILROAD CROSSING HAZARD ELIMINATION FY 2013 Length: 0.00

Phase ALL

Fund Safety

Year 2013

Federal $4,413,405

State $0

Total Project Cost: Total Project Authorizations:

$ 4,413,405 $0

Other $0

Total $4,413,405

Project: 0006199 Type Work: Railroad Crossing
Descp:LUMP SUM RAILROAD CROSSING HAZARD ELIMINATION FY 2014 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 4,513,709 $0

Phase ALL

Fund Safety

Year 2014

Federal $4,513,709

State $0

Other $0

Total $4,513,709

Project: 0006200 Type Work: Railroad Crossing
Descp:LUMP SUM RAILROAD CROSSING HAZARD ELIMINATION FY 2015 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 4,614,014 $0

Phase ALL

Fund Safety

Year 2015

Federal $4,614,014

State $0

Other $0

Total $4,614,014

Project: 0006204 Type Work: Rights-Of-Way
Descp:LUMP SUM RIGHTS OF WAY PROTECTIVE BUYING FOR FY 2012 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 2,500,000 $0

Phase ALL

Fund STP

Year 2012

Federal $2,000,000

State $500,000

Other $0

Total $2,500,000

Project: 0006205 Type Work: Rights-Of-Way
Descp:LUMP SUM RIGHTS OF WAY PROTECTIVE BUYING FOR FY 2013 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 2,500,000 $0

Phase ALL

Fund STP

Year 2013

Federal $2,000,000

State $500,000

Other $0

Total $2,500,000

Project: 0006206 Type Work: Rights-Of-Way
Descp:LUMP SUM RIGHTS OF WAY PROTECTIVE BUYING FOR FY 2014 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 2,500,000 $0

Phase ALL

Fund STP

Year 2014

Federal $2,000,000

State $500,000

Other $0

Total $2,500,000

Page 8 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: 0006207 Type Work: Rights-Of-Way
Descp:LUMP SUM RIGHTS OF WAY PROTECTIVE BUYING FOR FY 2015 Length: 0.00

Phase ALL

Fund STP

Year 2015

Federal $2,000,000

State $500,000

Total Project Cost: Total Project Authorizations:

$ 2,500,000 $0

Other $0

Total $2,500,000

Project: 0006211 Type Work: Railroad Crossing
Descp:LUMP SUM RRX PROTECTION DEVICE FOR FY 2012 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 4,313,100 $0

Phase ALL

Fund Safety

Year 2012

Federal $4,313,100

State $0

Other $0

Total $4,313,100

Project: 0006212 Type Work: Railroad Crossing
Descp:LUMP SUM RRX PROTECTION DEVICE FOR FY 2013 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 4,413,405 $0

Phase ALL

Fund Safety

Year 2013

Federal $4,413,405

State $0

Other $0

Total $4,413,405

Project: 0006213 Type Work: Railroad Crossing
Descp:LUMP SUM RRX PROTECTION DEVICE FOR FY 2014 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 4,513,709 $0

Phase ALL

Fund Safety

Year 2014

Federal $4,513,709

State $0

Other $0

Total $4,513,709

Project: 0006214 Type Work: Railroad Crossing
Descp:LUMP SUM RRX PROTECTION DEVICE FOR FY 2015 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 4,614,014 $0

Phase ALL

Fund Safety

Year 2015

Federal $4,614,014

State $0

Other $0

Total $4,614,014

Project: 0006218 Type Work: Signals
Descp:LUMP SUM TRAF CONTROL DEVICES;UPGRADES & MAINT ANY AREA FY12 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 10,000,000 $0

Phase ALL

Fund STP

Year 2012

Federal $8,000,000

State $2,000,000

Other $0

Total $10,000,000

Page 9 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: 0006219 Type Work: Signals
Descp:LUMP SUM TRAF CONTROL DEVICES;UPGRADES & MAINT ANY AREA FY13 Length: 0.00

Phase ALL

Fund STP

Year 2013

Federal $8,000,000

State $2,000,000

Total Project Cost: Total Project Authorizations:

$ 10,000,000 $0

Other $0

Total $10,000,000

Project: 0006220 Type Work: Signals
Descp:LUMP SUM TRAF CONTROL DEVICES;UPGRADES & MAINT ANY AREA FY14 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 10,000,000 $0

Phase ALL

Fund STP

Year 2014

Federal $8,000,000

State $2,000,000

Other $0

Total $10,000,000

Project: 0006221 Type Work: Signals
Descp:LUMP SUM TRAF CONTROL DEVICES;UPGRADES & MAINT ANY AREA FY15 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 10,000,000 $0

Phase ALL

Fund STP

Year 2015

Federal $8,000,000

State $2,000,000

Other $0

Total $10,000,000

Project: 0006225 Type Work: Special Studies
Descp:LUMP SUM TRAF & REVENUE/DESIGN-BUILD/SPECIAL STUDIES-FY Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 3,000,000 $0

Phase ALL

Fund STP

Year 2012

Federal $2,400,000

State $600,000

Other $0

Total $3,000,000

Project: 0006226 Type Work: Special Studies
Descp:LUMP SUM TRAF & REVENUE/DESIGN-BUILD/SPECIAL STUDIES-FY Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 3,000,000 $0

Phase ALL

Fund STP

Year 2013

Federal $2,400,000

State $600,000

Other $0

Total $3,000,000

Project: 0006227 Type Work: Special Studies
Descp:LUMP SUM TRAF & REVENUE/DESIGN-BUILD/SPECIAL STUDIES-FY Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 3,000,000 $0

Phase ALL

Fund STP

Year 2014

Federal $2,400,000

State $600,000

Other $0

Total $3,000,000

Page 10 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: 0006228 Type Work: Special Studies
Descp:LUMP SUM TRAF & REVENUE/DESIGN-BUILD/SPECIAL STUDIES-FY Length: 0.00

Phase ALL

Fund STP

Year 2015

Federal $2,400,000

State $600,000

Total Project Cost: Total Project Authorizations:

$ 3,000,000 $0

Other $0

Total $3,000,000

Project: 0006294 Type Work: Pedestrian Crossings
Descp:PEDESTRIAN IMPROVEMENTS @ 10 SR LOCATIONS IN DISTRICT 6 Length: 0.00

Phase PE CST

Fund STP Safety

Total Project Cost:

$ 496,736

Total Project Authorizations: $ 80,000

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0006366 Type Work: Miscellaneous Improvements
Descp:DEBT SERVICE FOR GARVEE TO PAY BACK BONDS - FY 2014 Length: 0.00

Phase CST

Fund NHS

Total Project Cost: Total Project Authorizations:

$ 188,141,960 $0

Year 2004 2012

Federal $72,000
$375,063

State $8,000
$41,674

Year

Federal

State

2014 $150,513,568 $37,628,392

Other $0 $0

Total $80,000
$416,736

Other

Total

$0 $188,141,960

Project: 0006367 Type Work: Miscellaneous Improvements
Descp:DEBT SERVICE FOR GARVEE TO PAY BACK BONDS - FY 2015 Length: 0.00

Phase CST

Total Project Cost: Total Project Authorizations:

$ 188,141,960 $0

Fund NHS

Year

Federal

State

2015 $150,513,568 $37,628,392

Other

Total

$0 $188,141,960

Project: 0006372 Type Work: Miscellaneous Improvements
Descp:DEBT SERVICE FOR GARVEE TO PAY BACK BONDS - FY 2012 Length: 0.00

Phase CST

Total Project Cost: Total Project Authorizations:

$ 188,141,960 $0

Fund NHS

Year

Federal

State

2012 $150,513,568 $37,628,392

Other

Total

$0 $188,141,960

Project: 0006373 Type Work: Miscellaneous Improvements
Descp:DEBT SERVICE FOR GARVEE TO PAY BACK BONDS - FY 2013 Length: 0.00

Phase CST

Total Project Cost: Total Project Authorizations:

$ 188,141,960 $0

Fund NHS

Year

Federal

State

2013 $150,513,568 $37,628,392

Other

Total

$0 $188,141,960

Page 11 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: 0006461 Type Work: Pedestrian Crossings
Descp:PEDESTRIAN UPGRADES @ 9 SR INTERSECTIONS IN DISTRICT 6 Length: 0.00

Phase PE CST

Fund STP Safety

Year 2004 2012

Federal $160,650 $341,160

State $17,850 $37,907

Total Project Cost:

$ 557,566

Total Project Authorizations: $ 178,500

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0006463 Type Work: Pedestrian Crossings
Descp:PEDESTRIAN UPGRADES @ 58 INTERSECTIONS IN DISTRICT 2 Length: 0.00

Phase CST

Fund Safety

Year 2013

Federal $2,265,093

State $251,677

Total Project Cost:

$ 2,516,770

Total Project Authorizations: $ 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0006664 Type Work: Signals
Descp:SIGNAL HEAD REPLACEMENT @ VAR LOCATIONS IN SEVERAL DISTRICTS Length: 0.00

Phase PE
ROW CST

Fund STP Safety Safety

Year 2004 2013 2014

Federal $4,500
$269,037 $1,254,225

State $500 $0 $0

Total Project Cost:

$ 1,528,262

Total Project Authorizations: $ 5,000

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0006947 Type Work: Vegetation Removal
Descp:ENHANCED RECOVERY AREA - VEGETATION REMOVAL IN DISTRICT 6 Length: 0.00

Phase PE CST

Fund STP Safety

Year 2005 2013

Federal $0
$465,218

State $0
$51,691

Total Project Cost:

$ 516,909

Total Project Authorizations: $ 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0007496 Type Work: Operational Improvement
Descp:LUMP SUM OPERATIONS FOR ANY AREA - FY 2013 Length: 0.00

Phase ALL

Fund STP

Year 2013

Federal $8,000,000

State $2,000,000

Total Project Cost: Total Project Authorizations:

$ 10,000,000 $0

Other $0 $0

Total $178,500 $379,066

Other $0

Total $2,516,770

Other $0 $0 $0

Total $5,000
$269,037 $1,254,225

Other $0 $0

Total $0
$516,909

Other $0

Total $10,000,000

Project: 0007497 Type Work: Operational Improvement
Descp:LUMP SUM OPERATIONS FOR ANY AREA - FY 2014 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 10,000,000 $0

Phase ALL

Fund STP

Year 2014

Federal $8,000,000

State $2,000,000

Other $0

Total $10,000,000

Page 12 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: 0007498 Type Work: Operational Improvement
Descp:LUMP SUM OPERATIONS FOR ANY AREA - FY 2015 Length: 0.00

Phase ALL

Fund STP

Year 2015

Federal $8,000,000

State $2,000,000

Total Project Cost: Total Project Authorizations:

$ 10,000,000 $0

Other $0

Total $10,000,000

Project: 0007502 Type Work: Operational Improvement
Descp:LUMP SUM OPERATIONS FOR ANY AREA - FY 2012 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 10,000,000 $0

Phase ALL

Fund STP

Year 2012

Federal $8,000,000

State $2,000,000

Other $0

Total $10,000,000

Project: 0007503 Type Work: Bicycle/Ped. Facility
Descp:LUMP SUM RECREATIONAL TRAILS & SCENIC BYWAY PROGRAMS FY 2013 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 1,250,000 $0

Phase ALL

Fund Trails

Year 2013

Federal $1,000,000

State $250,000

Other $0

Total $1,250,000

Project: 0007504 Type Work: Bicycle/Ped. Facility
Descp:LUMP SUM RECREATIONAL TRAILS & SCENIC BYWAY PROGRAMS FY 2014 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 1,250,000 $0

Phase ALL

Fund Trails

Year 2014

Federal $1,000,000

State $250,000

Other $0

Total $1,250,000

Project: 0007505 Type Work: Bicycle/Ped. Facility
Descp:LUMP SUM RECREATIONAL TRAILS & SCENIC BYWAY PROGRAMS FY 2015 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 1,250,000 $0

Phase ALL

Fund Trails

Year 2015

Federal $1,000,000

State $250,000

Other $0

Total $1,250,000

Project: 0007509 Type Work: Bicycle/Ped. Facility
Descp:LUMP SUM RECREATIONAL TRAILS & SCENIC BYWAY PROGRAMS FY 2012 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 1,250,000 $0

Phase ALL

Fund Trails

Year 2012

Federal $1,000,000

State $250,000

Other $0

Total $1,250,000

Page 13 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: 0007552 Type Work: Special Studies
Descp:SOUTHEASTERN ECONOMIC ALLIANCE HIGH SPEED RAIL DEVELOPEMENT Length: 0.00

Phase PE

Fund HPP

Year 2012

Federal $1,799,800

State $449,950

Total Project Cost: Total Project Authorizations:

$ 2,249,750 $0

Other $0

Total $2,249,750

Project: 0007697 Type Work: ATMS/ITS
Descp:ATMS: ITS OPERATIONS AND SUPPORT STATEWIDE - 2013 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 7,000,000 $0

Phase CST

Fund NHS

Year 2013

Federal $5,600,000

State $1,400,000

Other $0

Total $7,000,000

Project: 0007698 Type Work: ATMS/ITS
Descp:ATMS: ITS OPERATIONS AND SUPPORT STATEWIDE - 2014 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 7,000,000 $0

Phase CST

Fund NHS

Year 2014

Federal $5,600,000

State $1,400,000

Other $0

Total $7,000,000

Project: 0007699 Type Work: ATMS/ITS
Descp:ATMS: ITS OPERATIONS AND SUPPORT STATEWIDE - 2015 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 7,000,000 $0

Phase CST

Fund NHS

Year 2015

Federal $5,600,000

State $1,400,000

Other $0

Total $7,000,000

Project: 0008053 Type Work: Coordinator Descp:SAFE ROUTE TO SCHOOL COORDINATOR - 2012

Phase PE

Length: 0.00

Fund Safety

Year 2012

Federal $125,000

Total Project Cost:

$ 125,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: SAFE ROUTES TO SCHOOL INFRASTRUCTURE FOR FY 2012 - FY 2015

Project: 0008058 Type Work: Coordinator Descp:SAFE ROUTE TO SCHOOL COORDINATOR - 2011

Phase PE

Length: 0.00

Fund Safety

Year 2012

Federal $125,000

Total Project Cost:

$ 125,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: SAFE ROUTES TO SCHOOL INFRASTRUCTURE FOR FY 2012 - FY 2015

State $0
State $0

Other $0
Other $0

Total $125,000
Total $125,000

Page 14 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: 0008223 Type Work: Preliminary Engineering
Descp:LUMP SUM SAFE ROUTES TO SCHOOL ANY PROJECTS - FY 2012 Length: 0.00

Phase ALL

Fund Safety

Year 2012

Federal $1,560,000

State $0

Total Project Cost: Total Project Authorizations:

$ 1,560,000 $0

Other $0

Total $1,560,000

Project: 0008323 Type Work: Preliminary Engineering
Descp:LUMP SUM SAFE ROUTES TO SCHOOL INFRASTRUCTURE PROJECTS-2012 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 2,343,000 $0

Phase ALL

Fund Safety

Year 2012

Federal $2,343,000

State $0

Other $0

Total $2,343,000

Project: 0008324 Type Work: Preliminary Engineering
Descp:LUMP SUM SAFE ROUTES TO SCHOOL INFRASTRUCTURE PROJECTS-2013 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 2,343,000 $0

Phase ALL

Fund Safety

Year 2013

Federal $2,343,000

State $0

Other $0

Total $2,343,000

Project: 0008325 Type Work: Preliminary Engineering
Descp:LUMP SUM SAFE ROUTES TO SCHOOL INFRASTRUCTURE PROJECTS-2014 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 2,343,000 $0

Phase ALL

Fund Safety

Year 2014

Federal $2,343,000

State $0

Other $0

Total $2,343,000

Project: 0008326 Type Work: Preliminary Engineering
Descp:LUMP SUM SAFE ROUTES TO SCHOOL INFRASTRUCTURE PROJECTS-2015 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 2,343,000 $0

Phase ALL

Fund Safety

Year 2015

Federal $2,343,000

State $0

Other $0

Total $2,343,000

Project: 0008330 Type Work: Preliminary Engineering
Descp:LUMP SUM SAFE ROUTES TO SCHOOL NON-INFRASTRUCTURE - FY 2012 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 260,000 $0

Phase ALL

Fund Safety

Year 2012

Federal $260,000

State $0

Other $0

Total $260,000

Page 15 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: 0008331 Type Work: Preliminary Engineering
Descp:LUMP SUM SAFE ROUTES TO SCHOOL NON-INFRASTRUCTURE - FY 2013 Length: 0.00

Phase ALL

Fund Safety

Year 2013

Federal $260,000

State $0

Total Project Cost: Total Project Authorizations:

$ 260,000 $0

Other $0

Total $260,000

Project: 0008332 Type Work: Preliminary Engineering
Descp:LUMP SUM SAFE ROUTES TO SCHOOL NON-INFRASTRUCTURE - FY 2014 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 260,000 $0

Phase ALL

Fund Safety

Year 2014

Federal $260,000

State $0

Other $0

Total $260,000

Project: 0008333 Type Work: Preliminary Engineering
Descp:LUMP SUM SAFE ROUTES TO SCHOOL NON-INFRASTRUCTURE - FY 2015 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 260,000 $0

Phase ALL

Fund Safety

Year 2015

Federal $260,000

State $0

Other $0

Total $260,000

Project: 0008380 Type Work: Signing
Descp:SR 23; SR 26; SR 27 & SR 30 @ 202 SR LOCS IN DISTRICT 5 Length: 0.00

Phase PE CST

Fund Safety Safety

Total Project Cost:

$ 286,486

Total Project Authorizations: $ 70,000

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0008557 Type Work: Miscellaneous Improvements
Descp:STATEWIDE CMAQ - MEASUREMENT & NEEDS ASSESSMENT - 2012 Length: 0.00

Phase PE

Fund CMAQ

Total Project Cost: Total Project Authorizations:

$ 1,300,000 $0

Year 2011 2012
Year 2012

Federal $70,000
$216,486

State $0 $0

Federal $1,040,000

State $260,000

Other $0 $0
Other $0

Total $70,000
$216,486
Total $1,300,000

Project: 0008558 Type Work: Miscellaneous Improvements
Descp:STATEWIDE CMAQ - MEASUREMENT & NEEDS ASSESSMENT - 2013 Length: 0.00

Phase PE

Fund CMAQ

Total Project Cost: Total Project Authorizations:

$ 1,400,000 $0

Year 2013

Federal $1,120,000

State $0

Other $280,000

Total $1,400,000

Page 16 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: 0008639 Type Work: Intersection Improvement
Descp:LUMP SUM HIGH RISK RURAL ROADS FOR FY 2015 Length: 0.00

Phase ALL

Fund Safety

Year 2015

Federal $3,622,185

State $402,465

Total Project Cost: Total Project Authorizations:

$ 4,024,650 $0

Other $0

Total $4,024,650

Project: 0008643 Type Work: Intersection Improvement
Descp:LUMP SUM HIGH RISK RURAL ROADS FOR FY 2012 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 3,762,173 $0

Phase ALL

Fund Safety

Year 2012

Federal $3,385,956

State $376,217

Other $0

Total $3,762,173

Project: 0008644 Type Work: Intersection Improvement
Descp:LUMP SUM HIGH RISK RURAL ROADS FOR FY 2013 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 3,849,665 $0

Phase ALL

Fund Safety

Year 2013

Federal $3,464,699

State $384,967

Other $0

Total $3,849,665

Project: 0008645 Type Work: Intersection Improvement
Descp:LUMP SUM HIGH RISK RURAL ROADS FOR FY 2014 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 3,937,158 $0

Phase ALL

Fund Safety

Year 2014

Federal $3,543,442

State $393,716

Other $0

Total $3,937,158

Project: 0008694 Type Work: Transit Projects
Descp:GRTA PURCHASE OF CLEAN FUEL BUSES FOR EXPRESS SERVICE - 2011 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 21,075,000 $0

Phase CST CST

Fund Other Bond

Year 2013 2013

Federal $0 $0

State $0
$4,215,000

Other $16,860,000
$0

Total $16,860,000
$4,215,000

Project: 0009197 Type Work: Miscellaneous Improvements
Descp:EPD GEORGIA DIESEL RETROFIT PROJECT - FY 2012 Length: 0.00

Phase CST

Fund CMAQ

Total Project Cost: Total Project Authorizations:

$ 2,250,000 $0

Year 2012

Federal $1,800,000

State $0

Other $450,000

Total $2,250,000

Page 17 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: 0009201 Type Work: Miscellaneous Improvements Descp:EPD IDLE CONTROL PROJECT - FY 2012

Phase CST

Fund CMAQ

Year 2012

Federal $2,000,000

State $0

Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 2,500,000 $0

Other $500,000

Total $2,500,000

Project: 0009202 Type Work: Miscellaneous Improvements Descp:EPD IDLE CONTROL PROJECT - FY 2013

Phase CST

Fund CMAQ

Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 900,000 $0

Year 2013

Federal $720,000

State $0

Other $180,000

Total $900,000

Project: 0009222 Type Work: Preliminary Engineering
Descp:LUMP SUM SAFE ROUTES TO SCHOOL ANY PROJECTS - FY 2013 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 560,000 $0

Phase ALL

Fund Safety

Year 2013

Federal $560,000

State $0

Other $0

Total $560,000

Project: 0009223 Type Work: Preliminary Engineering
Descp:LUMP SUM SAFE ROUTES TO SCHOOL ANY PROJECTS - FY 2014 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 560,000 $0

Phase ALL

Fund Safety

Year 2014

Federal $560,000

State $0

Other $0

Total $560,000

Project: 0009224 Type Work: Preliminary Engineering
Descp:LUMP SUM SAFE ROUTES TO SCHOOL ANY PROJECTS - FY 2015 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 560,000 $0

Phase ALL

Fund Safety

Year 2015

Federal $560,000

State $0

Other $0

Total $560,000

Project: 0009326 Type Work: Special Studies
Descp:RDC CONTRACT FOR PLANNING /ENVIRONMENT/LOC SERVICES- FY 2012 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 1,500,000 $0

Phase PE

Fund STP

Year 2012

Federal $1,200,000

State $300,000

Other $0

Total $1,500,000

Page 18 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: 0009552 Type Work: Preliminary Engineering
Descp:QUALITY ASSURANCE REVIEW ON EROSION PLANS - FY 2012 Length: 0.00

Phase PE

Fund STP

Year 2012

Federal $280,000

State $70,000

Total Project Cost: Total Project Authorizations:

$ 350,000 $0

Other $0

Total $350,000

Project: 0009553 Type Work: Preliminary Engineering
Descp:QUALITY ASSURANCE REVIEW ON EROSION PLANS - FY 2013 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 350,000 $0

Phase PE

Fund STP

Year 2013

Federal $280,000

State $70,000

Other $0

Total $350,000

Project: 0009554 Type Work: Preliminary Engineering
Descp:QUALITY ASSURANCE REVIEW ON EROSION PLANS - FY 2014 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 350,000 $0

Phase PE

Fund STP

Year 2014

Federal $280,000

State $70,000

Other $0

Total $350,000

Project: 0009555 Type Work: Preliminary Engineering
Descp:QUALITY ASSURANCE REVIEW ON EROSION PLANS - FY 2015 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 350,000 $0

Phase PE

Fund STP

Year 2015

Federal $280,000

State $70,000

Other $0

Total $350,000

Project: 0009570 Type Work: Preliminary Engineering
Descp:STATEWIDE BRIDGE INSPECTION - FY 2012 - PE ONLY Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 8,500,000 $0

Phase PE

Fund Bridge

Year 2012

Federal $6,800,000

State $1,700,000

Other $0

Total $8,500,000

Project: 0009571 Type Work: Preliminary Engineering
Descp:STATEWIDE BRIDGE INSPECTION - FY 2013 - PE ONLY Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 8,500,000 $0

Phase PE

Fund Bridge

Year 2013

Federal $6,800,000

State $1,700,000

Other $0

Total $8,500,000

Page 19 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: 0009572 Type Work: Preliminary Engineering
Descp:STATEWIDE BRIDGE INSPECTION - FY 2014 - PE ONLY Length: 0.00

Phase PE

Fund Bridge

Year 2014

Federal $6,800,000

State $1,700,000

Total Project Cost: Total Project Authorizations:

$ 8,500,000 $0

Other $0

Total $8,500,000

Project: 0009573 Type Work: Preliminary Engineering
Descp:STATEWIDE BRIDGE INSPECTION - FY 2015 - PE ONLY Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 8,500,000 $0

Phase PE

Fund Bridge

Year 2015

Federal $6,800,000

State $1,700,000

Other $0

Total $8,500,000

Project: 0009577 Type Work: Preliminary Engineering
Descp:ENVIRONMENTAL ANALYSIS ON FED-AID PROJS BY CONSULTANT-FY 15 Length: 0.00

Phase PE

Total Project Cost: Total Project Authorizations:

$ 2,500,000 $0

Fund Other

Year 2015

Federal $2,000,000

State $500,000

Other $0

Total $2,500,000

Project: 0009579 Type Work: Miscellaneous Improvements
Descp:TASK ORDER CONTRACT-CONSTRUCTION MANAGEMENT FED & BOND-2013 Length: 0.00

Phase CST

Total Project Cost: Total Project Authorizations:

$ 15,000,000 $0

Fund Other

Year 2013

Federal $12,000,000

State $3,000,000

Other $0

Total $15,000,000

Project: 0009580 Type Work: Miscellaneous Improvements
Descp:TASK ORDER CONTRACT-CONSTRUCTION MANAGEMENT FED & BOND-2014 Length: 0.00

Phase CST

Total Project Cost: Total Project Authorizations:

$ 15,000,000 $0

Fund Other

Year 2014

Federal $12,000,000

State $3,000,000

Other $0

Total $15,000,000

Project: 0009581 Type Work: Miscellaneous Improvements
Descp:TASK ORDER CONTRACT-CONSTRUCTION MANAGEMENT FED & BOND-2015 Length: 0.00

Phase CST

Total Project Cost: Total Project Authorizations:

$ 15,000,000 $0

Fund Other

Year 2015

Federal $12,000,000

State $3,000,000

Other $0

Total $15,000,000

Page 20 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: 0009584 Type Work: Preliminary Engineering Descp:DOT PERSONNEL TRAINING - FY 2012 - PE ONLY

Phase PE

Fund STP

Year 2012

Federal $1,000,000

State $0

Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 1,000,000 $0

Other $0

Total $1,000,000

Project: 0009585 Type Work: Preliminary Engineering Descp:DOT PERSONNEL TRAINING - FY 2013 - PE ONLY

Phase PE

Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 1,000,000 $0

Fund STP

Year 2013

Federal $1,000,000

State $0

Other $0

Total $1,000,000

Project: 0009586 Type Work: Preliminary Engineering Descp:DOT PERSONNEL TRAINING - FY 2014 - PE ONLY

Phase PE

Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 1,000,000 $0

Fund STP

Year 2014

Federal $1,000,000

State $0

Other $0

Total $1,000,000

Project: 0009587 Type Work: Preliminary Engineering Descp:DOT PERSONNEL TRAINING - FY 2015 - PE ONLY

Phase PE

Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 1,000,000 $0

Fund STP

Year 2015

Federal $1,000,000

State $0

Other $0

Total $1,000,000

Project: 0009590 Type Work: Miscellaneous Improvements
Descp:STATEWIDE CMAQ - MEASUREMENT & NEEDS ASSESSMENT - FY 2015 Length: 0.00

Phase CST

Fund CMAQ

Total Project Cost: Total Project Authorizations:

$ 1,200,000 $0

Year 2015

Federal $960,000

State $240,000

Other $0

Total $1,200,000

Project: 0009593 Type Work: Miscellaneous Improvements
Descp:STATEWIDE CMAQ-TDM EMPLOYEE SERVICES & ADVERTISING - FY 2014 Length: 0.00

Phase PE

Fund CMAQ

Total Project Cost: Total Project Authorizations:

$ 8,800,000 $0

Year 2014

Federal $7,040,000

State $0

Other $1,760,000

Total $8,800,000

Page 21 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: 0009594 Type Work: Miscellaneous Improvements
Descp:STATEWIDE CMAQ-TDM EMPLOYEE SERVICES & ADVERTISING - FY 2015 Length: 0.00

Phase PE

Fund CMAQ

Year 2015

Federal $7,040,000

State $0

Other $1,760,000

Total Project Cost: Total Project Authorizations:

$ 8,800,000 $0

Total $8,800,000

Project: 0009982 Type Work: Guardrail
Descp:DISTRICT 1 & 2 @ SEV LOCS - GUARDRAIL ANCHOR REPLACEMENT Length: 0.00

Phase PE CST

Fund Safety Safety

Total Project Cost:

$ 1,070,000

Total Project Authorizations: $ 50,000

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0009983 Type Work: Guardrail
Descp:DISTRICT 3; 6 & 7 @ SEV LOCS - GUARDRAIL ANCHOR REPLACEMENT Length: 0.00

Phase PE CST

Fund Safety Safety

Total Project Cost:

$ 1,330,000

Total Project Authorizations: $ 55,000

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0009984 Type Work: Guardrail
Descp:DISTRICT 4 & 5 @ SEV LOCS - GUARDRAIL ANCHOR REPLACEMENT Length: 0.00

Phase PE CST

Fund Safety Safety

Total Project Cost:

$ 1,070,000

Total Project Authorizations: $ 50,000

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0009993 Type Work: Sharp Curve Treatments
Descp:SHARP CURVE TREATMENTS @ SEV LOCS IN DISTRICT 1 Length: 0.00

Phase PE CST

Fund STP Safety

Total Project Cost:

$ 448,000

Total Project Authorizations: $ 40,000

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0009994 Type Work: Sharp Curve Treatments
Descp:SHARP CURVE TREATMENTS @ SEV LOCS IN DISTRICT 2 Length: 0.00

Phase PE CST

Fund STP Safety

Total Project Cost:

$ 448,000

Total Project Authorizations: $ 40,000

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Year 2010 2012
Year 2010 2012
Year 2010 2012
Year 2010 2012
Year 2010 2012

Federal $50,000
$1,020,000
Federal $55,000
$1,275,000
Federal $50,000
$1,020,000
Federal $36,000
$367,200
Federal $36,000
$367,200

State $0 $0
State $0 $0
State $0 $0
State $4,000
$40,800
State $4,000
$40,800

Other $0 $0
Other $0 $0
Other $0 $0
Other $0 $0
Other $0 $0

Total $50,000
$1,020,000
Total $55,000
$1,275,000
Total $50,000
$1,020,000
Total $40,000
$408,000
Total $40,000
$408,000

Page 22 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: 0009995 Type Work: Sharp Curve Treatments
Descp:SHARP CURVE TREATMENTS @ SEV LOCS IN DISTRICT 3 Length: 0.00

Phase PE CST

Fund STP Safety

Year 2010 2012

Federal $36,000
$367,200

State $4,000
$40,800

Total Project Cost:

$ 448,000

Total Project Authorizations: $ 40,000

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0009996 Type Work: Sharp Curve Treatments
Descp:SHARP CURVE TREATMENTS @ SEV LOCS IN DISTRICT 4 Length: 0.00

Phase PE CST

Fund STP Safety

Year 2010 2012

Federal $36,000
$367,200

State $4,000
$40,800

Total Project Cost:

$ 448,000

Total Project Authorizations: $ 40,000

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0009997 Type Work: Sharp Curve Treatments
Descp:SHARP CURVE TREATMENTS @ SEV LOCS IN DISTRICT 5 Length: 0.00

Phase PE CST

Fund STP Safety

Year 2010 2012

Federal $36,000
$367,200

State $4,000
$40,800

Total Project Cost:

$ 448,000

Total Project Authorizations: $ 40,000

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0009998 Type Work: Sharp Curve Treatments
Descp:SHARP CURVE TREATMENTS @ SEV LOCS IN DISTRICT 6 Length: 0.00

Phase PE CST

Fund STP Safety

Year 2010 2012

Federal $36,000
$367,200

State $4,000
$40,800

Total Project Cost:

$ 448,000

Total Project Authorizations: $ 40,000

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0010148 Type Work: Preliminary Engineering
Descp:STATEWIDE SURPLUS PROPERTY MONITORING & DISPOSAL - FY 2012 Length: 0.00

Phase PE

Fund STP

Year 2012

Federal $280,000

State $70,000

Total Project Cost: Total Project Authorizations:

$ 350,000 $0

Other $0 $0
Other $0 $0
Other $0 $0
Other $0 $0
Other $0

Total $40,000
$408,000
Total $40,000
$408,000
Total $40,000
$408,000
Total $40,000
$408,000
Total $350,000

Project: 0010149 Type Work: Preliminary Engineering
Descp:STATEWIDE SURPLUS PROPERTY MONITORING & DISPOSAL - FY 2013 Length: 0.00

Phase PE

Total Project Cost: Total Project Authorizations:

$ 350,000 $0

Fund STP

Year 2013

Federal $280,000

State $70,000

Other $0

Total $350,000

Page 23 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: 0010150 Type Work: Preliminary Engineering
Descp:STATEWIDE SURPLUS PROPERTY MONITORING & DISPOSAL - FY 2014 Length: 0.00

Phase PE

Fund STP

Year 2014

Federal $280,000

State $70,000

Total Project Cost: Total Project Authorizations:

$ 350,000 $0

Other $0

Total $350,000

Project: 0010151 Type Work: Preliminary Engineering
Descp:STATEWIDE SURPLUS PROPERTY MONITORING & DISPOSAL - FY 2015 Length: 0.00

Phase PE

Total Project Cost: Total Project Authorizations:

$ 350,000 $0

Fund STP

Year 2015

Federal $280,000

State $70,000

Other $0

Total $350,000

Project: 0010166 Type Work: Preliminary Engineering
Descp:OVERSIGHT SERVICES FOR L220/TE PROJECTS - FY 2012 Length: 0.00

Phase PE

Total Project Cost: Total Project Authorizations:

$ 100,000 $0

Fund STP

Year 2012

Federal $80,000

State $20,000

Other $0

Total $100,000

Project: 0010167 Type Work: Preliminary Engineering
Descp:OVERSIGHT SERVICES FOR L220/TE PROJECTS - FY 2013 Length: 0.00

Phase PE

Total Project Cost: Total Project Authorizations:

$ 100,000 $0

Fund STP

Year 2013

Federal $80,000

State $20,000

Other $0

Total $100,000

Project: 0010168 Type Work: Preliminary Engineering
Descp:OVERSIGHT SERVICES FOR L220/TE PROJECTS - FY 2014 Length: 0.00

Phase PE

Total Project Cost: Total Project Authorizations:

$ 100,000 $0

Fund STP

Year 2014

Federal $80,000

State $20,000

Other $0

Total $100,000

Project: 0010169 Type Work: Preliminary Engineering
Descp:OVERSIGHT SERVICES FOR L220/TE PROJECTS - FY 2015 Length: 0.00

Phase PE

Total Project Cost: Total Project Authorizations:

$ 100,000 $0

Fund STP

Year 2015

Federal $80,000

State $20,000

Other $0

Total $100,000

Page 24 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: 0010228 Type Work: RRX Warning Device
Descp:CSX WARNING DEVICE UPGRADES @150 LOC BTWN WAYCROSS & ATLANTA Length: 0.00

Phase PE CST

Fund Safety Safety

Year 2012 2012

Federal $10,000
$900,000

State $0 $0

Total Project Cost:

$ 910,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2012 - FY 2015

Project: 0010376 Type Work: RRX Signing & Marking
Descp:RR CROSSING @ 99 LOC-TRAFFIC SIGNS&PAVEMENT MARKING UPGRADES Length: 0.00

Phase PE CST

Fund STP Safety

Year 2011 2012

Federal $20,000
$350,000

State $0 $0

Total Project Cost:

$ 370,000

Total Project Authorizations: $ 20,000

Uses Lump Sum Bank: RAILROAD CROSSING HAZARD ELIMINATION FOR FY 2012 - FY 2015

Project: 0010383 Type Work: Signals
Descp:ATLANTA REGIONAL TRAFFIC OPERATIONS PROGRAM - FY 2012 Length: 0.00

Phase CST

Fund STP

Year 2012

Federal $7,250,000

State $0

Total Project Cost:

$ 7,250,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: REGIONAL TRAFFIC SIGNAL OPTIMIZATION FOR FY 2012 - FY 2015

Project: 0010447 Type Work: Preliminary Engineering
Descp:PE FOR PROJECT REVIEW/ COST ESTIMATING CONSULTANT SERVICES Length: 0.00

Phase PE

Fund STP

Year 2014

Federal $1,697,933

State $424,483

Total Project Cost: Total Project Authorizations:

$ 2,122,416 $0

Other $0 $0
Other $0 $0
Other $0
Other $0

Total $10,000
$900,000
Total $20,000
$350,000
Total $7,250,000
Total $2,122,416

Project: 0010470 Type Work: Preliminary Engineering
Descp:AASHTO COMMITTEES & SPONSORED EVENTS FY 2012 Length: 0.00

Phase PE

Fund STP

Year 2012

Federal $250,000

State $0

Total Project Cost:

$ 250,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRAF & REVENUE/DESIGN-BUILD/SPECIAL STUDIES FOR FY 2012 - FY 2015

Project: 0010488 Type Work: Signals
Descp:STATEWIDE TRAFFIC SIGNAL MAINTENANCE & UPGRADES - FY 2012 Length: 0.00

Phase CST

Fund STP

Year 2012

Federal $4,000,000

State $1,000,000

Total Project Cost:

$ 5,000,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2012 - FY 2015

Other $0
Other $0

Total $250,000
Total $5,000,000

Page 25 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: 0010489 Type Work: Signals
Descp:STATEWIDE TRAFFIC SIGNAL MAINTENANCE & UPGRADES - FY 2013 Length: 0.00

Phase CST

Fund STP

Year 2013

Federal $3,200,000

State $800,000

Other $0

Total Project Cost:

$ 4,000,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2012 - FY 2015

Project: 0010490 Type Work: Signals
Descp:STATEWIDE TRAFFIC SIGNAL MAINTENANCE & UPGRADES - FY 2014 Length: 0.00

Phase CST

Fund STP

Year 2014

Federal $3,200,000

State $800,000

Other $0

Total Project Cost:

$ 4,000,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2012 - FY 2015

Project: 0010491 Type Work: Signals
Descp:STATEWIDE TRAFFIC SIGNAL MAINTENANCE & UPGRADES - FY 2015 Length: 0.00

Phase CST

Fund STP

Year 2015

Federal $3,200,000

State $800,000

Other $0

Total Project Cost:

$ 4,000,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2012 - FY 2015

Project: 0010501 Type Work: Miscellaneous Improvements
Descp:FREIGHT OPERATIONS & SAFETY PROGRAM FY 2015 Length: 0.00

Phase CST

Fund CMAQ

Year 2015

Federal $10,000,000

State $0

Other $2,500,000

Total Project Cost: Total Project Authorizations:

$ 12,500,000 $0

Total $4,000,000
Total $4,000,000
Total $4,000,000
Total $12,500,000

Project: 0010502 Type Work: Miscellaneous Improvements
Descp:TOWING & RECOVERY INCENTIVE PROGRAM (TRIP) - FY 2015 Length: 0.00

Phase CST

Fund CMAQ

Total Project Cost: Total Project Authorizations:

$ 500,000 $0

Year 2015

Federal $400,000

State $100,000

Other $0

Total $500,000

Project: 0010552 Type Work: Preliminary Engineering Descp:HAZARD INDEX STUDIES - FY 2012

Phase PE

Fund Safety

Year 2012

Federal $200,000

Length: 0.00

Total Project Cost:

$ 200,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: RAILROAD CROSSING HAZARD ELIMINATION FOR FY 2012 - FY 2015

State $0

Other $0

Total $200,000

Page 26 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: 0010556 Type Work: Miscellaneous Improvements
Descp:STATEWIDE SSAP CONSULTANT SERVICES - FY 2012 Length: 0.00

Phase UTL

Fund State

Year 2012

Federal $0

State $1,000,000

Total Project Cost: Total Project Authorizations:

$ 1,000,000 $0

Other $0

Total $1,000,000

Project: 0010557 Type Work: Miscellaneous Improvements
Descp:STATEWIDE SUE CONSULTANT SERVICES - FY 2012 Length: 0.00

Phase UTL

Total Project Cost: Total Project Authorizations:

$ 3,800,000 $0

Fund State

Year 2012

Federal $0

State $3,800,000

Other $0

Total $3,800,000

Project: M001911 Type Work: Preliminary Engineering Descp:LICENSE AND SUPPORT AGREEMENT HMMS
Length: 0.00

Phase PE

Fund STP

Year 2012

Total Project Cost:

$ 172,303

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Project: M003374 Type Work: Miscellaneous Improvements
Descp:FORCE ACCOUNT MAINTENANCE ACTIVITIES FOR FY 2012 Length: 0.00

Phase CST

Fund STP

Year 2012

Total Project Cost: Total Project Authorizations:

$ 15,000,000 $ 15,000,000

Federal $137,842

State $34,461

Federal $12,000,000

State $3,000,000

Other $0

Total $172,303

Other $0

Total $15,000,000

Project: M003375 Type Work: Miscellaneous Improvements
Descp:FORCE ACCOUNT MAINTENANCE ACTIVITIES FOR FY 2013 Length: 0.00

Phase CST

Total Project Cost: Total Project Authorizations:

$ 18,000,000 $0

Fund STP

Year 2013

Federal $14,400,000

State $3,600,000

Other $0

Total $18,000,000

Project: M003376 Type Work: Miscellaneous Improvements
Descp:FORCE ACCOUNT MAINTENANCE ACTIVITIES FOR FY 2014 Length: 0.00

Phase CST

Total Project Cost: Total Project Authorizations:

$ 18,000,000 $0

Fund STP

Year 2014

Federal $14,400,000

State $3,600,000

Other $0

Total $18,000,000

Page 27 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: M003377 Type Work: Miscellaneous Improvements
Descp:FORCE ACCOUNT MAINTENANCE ACTIVITIES FOR FY 2015 Length: 0.00

Phase CST

Fund STP

Year 2015

Federal $14,400,000

State $3,600,000

Total Project Cost: Total Project Authorizations:

$ 18,000,000 $0

Other $0

Total $18,000,000

Project: M003820 Type Work: Weigh Station
Descp:WEIGH STATION UPGRADES @ 6 LOCATIONS PE ONLY - PHASE II Length: 0.00

Phase PE

Fund IM

Year 2012

Total Project Cost:

$ 636,725

Total Project Authorizations: $ 0

Uses Lump Sum Bank: INTERSTATE MAINTENANCE FOR FY 2012 - FY 2015

Project: M004190 Type Work: Signing
Descp:I-16 @ 17 LOCS BETWEEN CANDLER COUNTY & CHATHAM COUNTY Length: 0.00

Phase PE CST

Fund IM IM

Year 2010 2015

Total Project Cost:

$ 3,500,000

Total Project Authorizations: $ 250,000

Uses Lump Sum Bank: INTERSTATE MAINTENANCE FOR FY 2012 - FY 2015

Project: M004191 Type Work: Signing
Descp:I-20 @ 22 LOCS BETWEEN NEWTON COUNTY & RICHMOND COUNTY Length: 0.00

Phase PE CST

Fund IM IM

Year 2010 2015

Total Project Cost:

$ 4,070,000

Total Project Authorizations: $ 250,000

Uses Lump Sum Bank: INTERSTATE MAINTENANCE FOR FY 2012 - FY 2015

Project: M004434 Type Work: Miscellaneous Improvements
Descp:GEORIGA PAVEMENT MANAGEMENT SYSTEM (GPAMS) Length: 0.00

Phase PE

Fund STP

Year 2012

Total Project Cost:

$ 750,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Project: M004435 Type Work: Miscellaneous Improvements
Descp:GEORGIA HIGHWAY MAINTENANCE MANAGEMENT SYSTEM (HMMS) Length: 0.00

Phase PE

Fund STP

Year 2012

Total Project Cost:

$ 2,740,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Federal $573,052

State $63,672

Federal $250,000
$3,250,000

State $0 $0

Federal $250,000
$3,820,000

State $0 $0

Federal $600,000

State $150,000

Federal $2,192,000

State $548,000

Other $0
Other $0 $0
Other $0 $0
Other $0
Other $0

Total $636,725
Total $250,000 $3,250,000
Total $250,000 $3,820,000
Total $750,000
Total $2,740,000

Page 28 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: T003131 Type Work: Transit Projects
Descp:FY 2012 SECTION 5311 CAPITAL FOR DOT DISTRICT 1 Length: 0.00

Phase CST

Fund Transit

Year 2012

Federal $224,160

State $28,020

Total Project Cost: Total Project Authorizations:

$ 280,200 $0

Other $28,020

Total $280,200

Project: T003138 Type Work: Transit Projects
Descp:FY 2013 SECTION 5311 CAPITAL FOR DOT DISTRICT 1 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 71,260 $0

Phase CST

Fund Transit

Year 2013

Federal $22,800

State $24,230

Other $24,230

Total $71,260

Project: T003153 Type Work: Transit Projects
Descp:FY 2012 SECTION 5311 OPERATING FOR DOT DISTRICT 4 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 7,634,538 $0

Phase CST

Fund Transit

Year 2012

Federal $3,817,269

State $0

Other $3,817,269

Total $7,634,538

Project: T003160 Type Work: Transit Projects
Descp:FY 2013 SECTION 5311 OPERATING FOR DOT DISTRICT 1 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 2,266,976 $0

Phase CST

Fund Transit

Year 2013

Federal $1,133,488

State $0

Other $1,133,488

Total $2,266,976

Project: T003170 Type Work: Transit Projects
Descp:FY 2012 SECTION 5311 DISCRETIONARY CAPITAL Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 300,000 $0

Phase CST

Fund Transit

Year 2012

Federal $240,000

State $30,000

Other $30,000

Total $300,000

Project: T003171 Type Work: Transit Projects
Descp:FY 2013 SECTION 5311 DISCRETIONARY CAPITAL Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 300,000 $0

Phase CST

Fund Transit

Year 2013

Federal $240,000

State $30,000

Other $30,000

Total $300,000

Page 29 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: T003172 Type Work: Transit Projects
Descp:FY 2012 SECTION 5311 DISCRETIONARY OPERATING Length: 0.00

Phase CST

Fund Transit

Year 2012

Federal $300,000

State $0

Total Project Cost: Total Project Authorizations:

$ 600,000 $0

Other $300,000

Total $600,000

Project: T003173 Type Work: Transit Projects
Descp:FY 2013 SECTION 5311 DISCRETIONARY OPERATING Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 600,000 $0

Phase CST

Fund Transit

Year 2013

Federal $300,000

State $0

Other $300,000

Total $600,000

Project: T003185 Type Work: Transit Projects
Descp:FY 2012 SECTION 5311F INTERCITY BUS PROGRAM Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 2,573,843 $0

Phase CST

Fund Transit

Year 2012

Federal $2,059,074

State $0

Other $514,769

Total $2,573,843

Project: T003186 Type Work: Transit Projects
Descp:FY 2013 SECTION 5311F INTERCITY BUS PROGRAM Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 2,573,843 $0

Phase CST

Fund Transit

Year 2013

Federal $2,059,074

State $0

Other $514,769

Total $2,573,843

Project: T003189 Type Work: Transit Projects
Descp:FY 2012 SECTION 5316/JARC RURAL (Apportionment) Length:

Total Project Cost: Total Project Authorizations:

$ 1,444,042 $0

Phase CST

Fund Transit

Year 2012

Federal $1,444,042

State $0

Other $0

Total $1,444,042

Project: T003190 Type Work: Transit Projects
Descp:FY 2013 SECTION 5316/JARC RURAL (Apportionment) Length:

Total Project Cost: Total Project Authorizations:

$ 1,472,923 $0

Phase CST

Fund Transit

Year 2013

Federal $1,472,923

State $0

Other $0

Total $1,472,923

Page 30 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: T003197 Type Work: Transit Projects Descp:FY 2012 SECTION 5317/NF RURAL (Apportionment)

Phase CST

Fund Transit

Year 2012

Federal $795,373

State $0

Length:

Total Project Cost: Total Project Authorizations:

$ 795,373 $0

Other $0

Total $795,373

Project: T003202 Type Work: Transit Projects Descp:FY 2013 SECTION 5317/NF RURAL (Apportionment)

Phase CST

Length:

Fund Transit

Total Project Cost: Total Project Authorizations:

$ 811,281 $0

Year 2013

Federal $811,281

State $0

Other $0

Total $811,281

Project: T003451 Type Work: Transit Projects
Descp:FY 2014 SECTION 5311 DISCRETIONARY CAPITAL Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 300,000 $0

Phase CST

Fund Transit

Year 2014

Federal $240,000

State $30,000

Other $30,000

Total $300,000

Project: T003452 Type Work: Transit Projects
Descp:FY 2014 SECTION 5311F INTERCITY BUS PROGRAM Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 2,573,843 $0

Phase CST

Fund Transit

Year 2014

Federal $2,059,074

State $257,384

Other $257,384

Total $2,573,843

Project: T003453 Type Work: Transit Projects
Descp:FY 2014 SECTION 5311 DISCRETIONARY OPERATING Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 300,000 $0

Phase CST

Fund Transit

Year 2014

Federal $240,000

State $30,000

Other $30,000

Total $300,000

Project: T003652 Type Work: Transit Projects
Descp:FY 2014 SECTION 5316/JARC RURAL (Apportionment) Length:

Total Project Cost: Total Project Authorizations:

$ 1,502,381 $0

Phase CST

Fund Transit

Year 2014

Federal $1,502,381

State $0

Other $0

Total $1,502,381

Page 31 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: T003668 Type Work: Transit Projects Descp:FY 2014 SECTION 5317/NF RURAL (Apportionment)

Phase CST

Fund Transit

Year 2014

Federal $827,506

State $0

Length:

Total Project Cost: Total Project Authorizations:

$ 827,506 $0

Other $0

Total $827,506

Project: T003743 Type Work: Transit Projects
Descp:FY 2012 SECTION 5310 CAPITAL FOR DHS DISTRICT 1 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 319,924 $0

Phase CST

Fund Transit

Year 2012

Federal $255,939

State $63,985

Other $0

Total $319,924

Project: T003744 Type Work: Transit Projects
Descp:FY 2012 SECTION 5310 CAPITAL FOR DHS DISTRICT 2 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 154,128 $0

Phase CST

Fund Transit

Year 2012

Federal $123,302

State $30,826

Other $0

Total $154,128

Project: T003745 Type Work: Transit Projects
Descp:FY 2012 SECTION 5310 CAPITAL FOR DHS DISTRICT 3 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 578,686 $0

Phase CST

Fund Transit

Year 2012

Federal $462,949

State $115,737

Other $0

Total $578,686

Project: T003746 Type Work: Transit Projects
Descp:FY 2012 SECTION 5310 CAPITAL FOR DHS DISTRICT 4 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 249,353 $0

Phase CST

Fund Transit

Year 2012

Federal $199,482

State $49,871

Other $0

Total $249,353

Project: T003747 Type Work: Transit Projects
Descp:FY 2012 SECTION 5310 CAPITAL FOR DHS DISTRICT 5 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 174,076 $0

Phase CST

Fund Transit

Year 2012

Federal $139,261

State $34,815

Other $0

Total $174,076

Page 32 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: T003748 Type Work: Transit Projects
Descp:FY 2012 SECTION 5310 CAPITAL FOR DHS DISTRICT 6 Length: 0.00

Phase CST

Fund Transit

Year 2012

Federal $94,095

State $23,524

Total Project Cost: Total Project Authorizations:

$ 117,619 $0

Other $0

Total $117,619

Project: T003749 Type Work: Transit Projects
Descp:FY 2012 SECTION 5310 CAPITAL FOR DHS DISTRICT 7 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 103,505 $0

Phase CST

Fund Transit

Year 2012

Federal $82,804

State $20,701

Other $0

Total $103,505

Project: T003750 Type Work: Transit Projects
Descp:FY 2012 SECTION 5310 CAPITAL FOR DHS DISTRICT 8 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 169,372 $0

Phase CST

Fund Transit

Year 2012

Federal $135,498

State $33,874

Other $0

Total $169,372

Project: T003751 Type Work: Transit Projects
Descp:FY 2012 SECTION 5310 CAPITAL FOR DHS DISTRICT 9 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 174,076 $0

Phase CST

Fund Transit

Year 2012

Federal $139,261

State $34,815

Other $0

Total $174,076

Project: T003752 Type Work: Transit Projects
Descp:FY 2012 SECTION 5310 CAPITAL FOR DHS DISTRICT 10 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 84,686 $0

Phase CST

Fund Transit

Year 2012

Federal $67,749

State $16,937

Other $0

Total $84,686

Project: T003753 Type Work: Transit Projects
Descp:FY 2012 SECTION 5310 CAPITAL FOR DHS DISTRICT 11 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 61,162 $0

Phase CST

Fund Transit

Year 2012

Federal $48,930

State $12,232

Other $0

Total $61,162

Page 33 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: T003754 Type Work: Transit Projects
Descp:FY 2012 SECTION 5310 CAPITAL FOR DHS DISTRICT 12 Length: 0.00

Phase CST

Fund Transit

Year 2012

Federal $609,738

State $152,434

Total Project Cost: Total Project Authorizations:

$ 762,172 $0

Other $0

Total $762,172

Project: T003755 Type Work: Transit Projects
Descp:FY 2013 SECTION 5310 CAPITAL FOR DHS DISTRICT 1 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 321,524 $0

Phase CST

Fund Transit

Year 2013

Federal $257,219

State $64,305

Other $0

Total $321,524

Project: T003756 Type Work: Transit Projects
Descp:FY 2013 SECTION 5310 CAPITAL FOR DHS DISTRICT 2 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 154,899 $0

Phase CST

Fund Transit

Year 2013

Federal $123,919

State $30,980

Other $0

Total $154,899

Project: T003757 Type Work: Transit Projects
Descp:FY 2013 SECTION 5310 CAPITAL FOR DHS DISTRICT 3 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 581,580 $0

Phase CST

Fund Transit

Year 2013

Federal $465,264

State $116,316

Other $0

Total $581,580

Project: T003758 Type Work: Transit Projects
Descp:FY 2013 SECTION 5310 CAPITAL FOR DHS DISTRICT 4 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 250,599 $0

Phase CST

Fund Transit

Year 2013

Federal $200,479

State $50,120

Other $0

Total $250,599

Project: T003759 Type Work: Transit Projects
Descp:FY 2013 SECTION 5310 CAPITAL FOR DHS DISTRICT 5 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 174,947 $0

Phase CST

Fund Transit

Year 2013

Federal $139,958

State $34,989

Other $0

Total $174,947

Page 34 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: T003760 Type Work: Transit Projects
Descp:FY 2013 SECTION 5310 CAPITAL FOR DHS DISTRICT 6 Length: 0.00

Phase CST

Fund Transit

Year 2013

Federal $94,566

State $23,641

Total Project Cost: Total Project Authorizations:

$ 118,207 $0

Other $0

Total $118,207

Project: T003761 Type Work: Transit Projects
Descp:FY 2013 SECTION 5310 CAPITAL FOR DHS DISTRICT 7 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 104,022 $0

Phase CST

Fund Transit

Year 2013

Federal $83,218

State $20,804

Other $0

Total $104,022

Project: T003762 Type Work: Transit Projects
Descp:FY 2013 SECTION 5310 CAPITAL FOR DHS DISTRICT 8 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 170,218 $0

Phase CST

Fund Transit

Year 2013

Federal $136,174

State $34,044

Other $0

Total $170,218

Project: T003763 Type Work: Transit Projects
Descp:FY 2013 SECTION 5310 CAPITAL FOR DHS DISTRICT 9 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 174,947 $0

Phase CST

Fund Transit

Year 2013

Federal $139,958

State $34,989

Other $0

Total $174,947

Project: T003764 Type Work: Transit Projects
Descp:FY 2013 SECTION 5310 CAPITAL FOR DHS DISTRICT 10 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 85,109 $0

Phase CST

Fund Transit

Year 2013

Federal $68,087

State $17,022

Other $0

Total $85,109

Project: T003765 Type Work: Transit Projects
Descp:FY 2013 SECTION 5310 CAPITAL FOR DHS DISTRICT 11 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 61,468 $0

Phase CST

Fund Transit

Year 2013

Federal $49,174

State $12,294

Other $0

Total $61,468

Page 35 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: T003766 Type Work: Transit Projects
Descp:FY 2013 SECTION 5310 CAPITAL FOR DHS DISTRICT 12 Length: 0.00

Phase CST

Fund Transit

Year 2013

Federal $612,786

State $153,197

Total Project Cost: Total Project Authorizations:

$ 765,983 $0

Other $0

Total $765,983

Project: T003767 Type Work: Transit Projects
Descp:FY 2014 SECTION 5310 CAPITAL FOR DHS DISTRICT 1 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 337,600 $0

Phase CST

Fund Transit

Year 2014

Federal $270,080

State $67,520

Other $0

Total $337,600

Project: T003768 Type Work: Transit Projects
Descp:FY 2014 SECTION 5310 CAPITAL FOR DHS DISTRICT 2 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 162,644 $0

Phase CST

Fund Transit

Year 2014

Federal $130,115

State $32,529

Other $0

Total $162,644

Project: T003769 Type Work: Transit Projects
Descp:FY 2014 SECTION 5310 CAPITAL FOR DHS DISTRICT 3 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 610,659 $0

Phase CST

Fund Transit

Year 2014

Federal $488,527

State $122,132

Other $0

Total $610,659

Project: T003770 Type Work: Transit Projects
Descp:FY 2014 SECTION 5310 CAPITAL FOR DHS DISTRICT 4 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 263,129 $0

Phase CST

Fund Transit

Year 2014

Federal $210,503

State $52,626

Other $0

Total $263,129

Project: T003771 Type Work: Transit Projects
Descp:FY 2014 SECTION 5310 CAPITAL FOR DHS DISTRICT 5 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 183,694 $0

Phase CST

Fund Transit

Year 2014

Federal $146,955

State $36,739

Other $0

Total $183,694

Page 36 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: T003772 Type Work: Transit Projects
Descp:FY 2014 SECTION 5310 CAPITAL FOR DHS DISTRICT 6 Length: 0.00

Phase CST

Fund Transit

Year 2014

Federal $99,294

State $24,824

Total Project Cost: Total Project Authorizations:

$ 124,118 $0

Other $0

Total $124,118

Project: T003773 Type Work: Transit Projects
Descp:FY 2014 SECTION 5310 CAPITAL FOR DHS DISTRICT 7 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 109,224 $0

Phase CST

Fund Transit

Year 2014

Federal $87,379

State $21,845

Other $0

Total $109,224

Project: T003774 Type Work: Transit Projects
Descp:FY 2014 SECTION 5310 CAPITAL FOR DHS DISTRICT 8 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 178,729 $0

Phase CST

Fund Transit

Year 2014

Federal $142,983

State $35,746

Other $0

Total $178,729

Project: T003775 Type Work: Transit Projects
Descp:FY 2014 SECTION 5310 CAPITAL FOR DHS DISTRICT 9 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 183,694 $0

Phase CST

Fund Transit

Year 2014

Federal $146,955

State $36,739

Other $0

Total $183,694

Project: T003776 Type Work: Transit Projects
Descp:FY 2014 SECTION 5310 CAPITAL FOR DHS DISTRICT 10 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 89,365 $0

Phase CST

Fund Transit

Year 2014

Federal $71,492

State $17,873

Other $0

Total $89,365

Project: T003777 Type Work: Transit Projects
Descp:FY 2014 SECTION 5310 CAPITAL FOR DHS DISTRICT 11 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 64,541 $0

Phase CST

Fund Transit

Year 2014

Federal $51,633

State $12,908

Other $0

Total $64,541

Page 37 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: T003778 Type Work: Transit Projects
Descp:FY 2014 SECTION 5310 CAPITAL FOR DHS DISTRICT 12 Length: 0.00

Phase CST

Fund Transit

Year 2014

Federal $643,426

State $160,856

Total Project Cost: Total Project Authorizations:

$ 804,282 $0

Other $0

Total $804,282

Project: T003956 Type Work: Transit Projects
Descp:FY 2012 SECTION 5311 CAPITAL FOR DOT DISTRICT 3 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 694,080 $0

Phase CST

Fund Transit

Year 2012

Federal $555,264

State $69,408

Other $69,408

Total $694,080

Project: T003957 Type Work: Transit Projects
Descp:FY 2013 SECTION 5311 CAPITAL FOR DOT DISTRICT 3 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 616,500 $0

Phase CST

Fund Transit

Year 2013

Federal $493,200

State $61,650

Other $61,650

Total $616,500

Project: T003958 Type Work: Transit Projects
Descp:FY 2014 SECTION 5311 CAPITAL FOR DOT DISTRICT 3 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 551,500 $0

Phase CST

Fund Transit

Year 2014

Federal $441,200

State $55,150

Other $55,150

Total $551,500

Project: T003959 Type Work: Transit Projects
Descp:FY 2015 SECTION 5311 CAPITAL FOR DOT DISTRICT 3 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 947,800 $0

Phase CST

Fund Transit

Year 2015

Federal $758,240

State $94,780

Other $94,780

Total $947,800

Project: T003960 Type Work: Transit Projects
Descp:FY 2012 SECTION 5311 OPERATING FOR DOT DISTRICT 3 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 2,682,236 $0

Phase CST

Fund Transit

Year 2012

Federal $1,341,118

State $0

Other $1,341,118

Total $2,682,236

Page 38 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: T003961 Type Work: Transit Projects
Descp:FY 2013 SECTION 5311 OPERATING FOR DOT DISTRICT 3 Length: 0.00

Phase CST

Fund Transit

Year 2013

Federal $1,419,603

State $0

Other $1,419,603

Total Project Cost: Total Project Authorizations:

$ 2,839,206 $0

Total $2,839,206

Project: T003962 Type Work: Transit Projects
Descp:FY 2014 SECTION 5311 OPERATING FOR DOT DISTRICT 3 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 2,981,166 $0

Phase CST

Fund Transit

Year 2014

Federal $1,490,583

State $0

Other $1,490,583

Total $2,981,166

Project: T003963 Type Work: Transit Projects
Descp:FY 2015 SECTION 5311 OPERATING FOR DOT DISTRICT 3 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 3,031,750 $0

Phase CST

Fund Transit

Year 2015

Federal $1,515,875

State $0

Other $1,515,875

Total $3,031,750

Project: T003964 Type Work: Transit Projects
Descp:FY 2012 SECTION 5311 OPERATING FOR DOT DISTRICT 5 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 5,632,966 $0

Phase CST

Fund Transit

Year 2012

Federal $2,816,483

State $0

Other $2,816,483

Total $5,632,966

Project: T003965 Type Work: Transit Projects
Descp:FY 2013 SECTION 5311 OPERATING FOR DOT DISTRICT 5 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 5,792,042 $0

Phase CST

Fund Transit

Year 2013

Federal $2,896,021

State $0

Other $2,896,021

Total $5,792,042

Project: T003966 Type Work: Transit Projects
Descp:FY 2014 SECTION 5311 OPERATING FOR DOT DISTRICT 5 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 6,266,602 $0

Phase CST

Fund Transit

Year 2014

Federal $3,133,301

State $0

Other $3,133,301

Total $6,266,602

Page 39 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: T003967 Type Work: Transit Projects
Descp:FY 2015 SECTION 5311 OPERATING FOR DOT DISTRICT 5 Length: 0.00

Phase CST

Fund Transit

Year 2015

Federal $3,140,501

State $0

Other $3,140,501

Total Project Cost: Total Project Authorizations:

$ 6,281,002 $0

Total $6,281,002

Project: T003968 Type Work: Transit Projects
Descp:FY 2012 SECTION 5311 CAPITAL FOR DOT DISTRICT 5 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 960,900 $0

Phase CST

Fund Transit

Year 2012

Federal $766,520

State $97,190

Other $97,190

Total $960,900

Project: T003969 Type Work: Transit Projects
Descp:FY 2013 SECTION 5311 CAPITAL FOR DOT DISTRICT 5 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 1,587,647 $0

Phase CST

Fund Transit

Year 2013

Federal $1,270,118

State $158,765

Other $158,765

Total $1,587,647

Project: T003970 Type Work: Transit Projects
Descp:FY 2014 SECTION 5311 CAPITAL FOR DOT DISTRICT 5 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 815,700 $0

Phase CST

Fund Transit

Year 2014

Federal $652,560

State $81,570

Other $81,570

Total $815,700

Project: T003971 Type Work: Transit Projects
Descp:FY 2015 SECTION 5311 CAPITAL FOR DOT DISTRICT 5 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 2,929,500 $0

Phase CST

Fund Transit

Year 2015

Federal $2,343,600

State $292,950

Other $292,950

Total $2,929,500

Project: T003972 Type Work: Transit Projects
Descp:FY 2012 SECTION 5310 CAPITAL FOR DHS DISTRICT 1 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 283,821 $0

Phase CST

Fund Transit

Year 2012

Federal $227,057

State $56,764

Other $0

Total $283,821

Page 40 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: T003973 Type Work: Transit Projects
Descp:FY 2012 SECTION 5310 CAPITAL FOR DHS DISTRICT 2 Length: 0.00

Phase CST

Fund Transit

Year 2012

Federal $107,243

State $26,811

Total Project Cost: Total Project Authorizations:

$ 134,054 $0

Other $0

Total $134,054

Project: T003974 Type Work: Transit Projects
Descp:FY 2012 SECTION 5310 CAPITAL FOR DHS DISTRICT 4 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 216,876 $0

Phase CST

Fund Transit

Year 2012

Federal $173,501

State $43,375

Other $0

Total $216,876

Project: T003975 Type Work: Transit Projects
Descp:FY 2012 SECTION 5310 CAPITAL FOR DHS DISTRICT 5 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 151,404 $0

Phase CST

Fund Transit

Year 2012

Federal $121,123

State $30,281

Other $0

Total $151,404

Project: T003976 Type Work: Transit Projects
Descp:FY 2012 SECTION 5310 CAPITAL FOR DHS DISTRICT 6 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 102,300 $0

Phase CST

Fund Transit

Year 2012

Federal $81,840

State $20,460

Other $0

Total $102,300

Project: T003977 Type Work: Transit Projects
Descp:FY 2012 SECTION 5310 CAPITAL FOR DHS DISTRICT 7 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 90,024 $0

Phase CST

Fund Transit

Year 2012

Federal $72,019

State $18,005

Other $0

Total $90,024

Project: T003978 Type Work: Transit Projects
Descp:FY 2012 SECTION 5310 CAPITAL FOR DHS DISTRICT 8 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 147,312 $0

Phase CST

Fund Transit

Year 2012

Federal $117,850

State $29,462

Other $0

Total $147,312

Page 41 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: T003979 Type Work: Transit Projects
Descp:FY 2012 SECTION 5310 CAPITAL FOR DHS DISTRICT 9 Length: 0.00

Phase CST

Fund Transit

Year 2012

Federal $121,123

State $30,281

Total Project Cost: Total Project Authorizations:

$ 151,404 $0

Other $0

Total $151,404

Project: T003980 Type Work: Transit Projects
Descp:FY 2012 SECTION 5310 CAPITAL FOR DHS DISTRICT 10 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 73,656 $0

Phase CST

Fund Transit

Year 2012

Federal $58,925

State $14,731

Other $0

Total $73,656

Project: T003981 Type Work: Transit Projects
Descp:FY 2012 SECTION 5310 CAPITAL FOR DHS DISTRICT 11 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 53,196 $0

Phase CST

Fund Transit

Year 2012

Federal $42,557

State $10,639

Other $0

Total $53,196

Project: T003982 Type Work: Transit Projects
Descp:FY 2012 SECTION 5310 CAPITAL FOR DHS DISTRICT 12 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 662,905 $0

Phase CST

Fund Transit

Year 2012

Federal $530,324

State $132,581

Other $0

Total $662,905

Project: T003983 Type Work: Transit Projects
Descp:FY 2012 SECTION 5311 OPERATING FOR DOT DISTRICT 2 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 2,753,844 $0

Phase CST

Fund Transit

Year 2012

Federal $1,376,922

State $0

Other $1,376,922

Total $2,753,844

Project: T003984 Type Work: Transit Projects
Descp:FY 2013 SECTION 5311 OPERATING FOR DOT DISTRICT 2 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 2,836,467 $0

Phase CST

Fund Transit

Year 2013

Federal $1,418,234

State $0

Other $1,418,234

Total $2,836,467

Page 42 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: T003985 Type Work: Transit Projects
Descp:FY 2014 SECTION 5311 OPERATING FOR DOT DISTRICT 2 Length: 0.00

Phase CST

Fund Transit

Year 2014

Federal $1,460,786

State $0

Other $1,460,775

Total Project Cost: Total Project Authorizations:

$ 2,921,561 $0

Total $2,921,561

Project: T003986 Type Work: Transit Projects
Descp:FY 2015 SECTION 5311 OPERATING FOR DOT DISTRICT 2 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 3,009,210 $0

Phase CST

Fund Transit

Year 2015

Federal $1,504,600

State $0

Other $1,504,610

Total $3,009,210

Project: T003987 Type Work: Transit Projects
Descp:FY 2012 SECTION 5311 CAPITAL FOR DOT DISTRICT 2 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 247,376 $0

Phase CST

Fund Transit

Year 2012

Federal $197,901

State $24,738

Other $24,737

Total $247,376

Project: T003988 Type Work: Transit Projects
Descp:FY 2013 SECTION 5311 CAPITAL FOR DOT DISTRICT 2 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 524,100 $0

Phase CST

Fund Transit

Year 2013

Federal $419,280

State $52,410

Other $52,410

Total $524,100

Project: T003989 Type Work: Transit Projects
Descp:FY 2014 SECTION 5311 CAPITAL FOR DOT DISTRICT 2 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 471,200 $0

Phase CST

Fund Transit

Year 2014

Federal $376,960

State $47,120

Other $47,120

Total $471,200

Project: T003990 Type Work: Transit Projects
Descp:FY 2015 SECTION 5311 CAPITAL FOR DOT DISTRICT 2 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 1,154,950 $0

Phase CST

Fund Transit

Year 2015

Federal $923,960

State $115,495

Other $115,495

Total $1,154,950

Page 43 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: T003992 Type Work: Transit Projects
Descp:FY 2013 SECTION 5311 OPERATING FOR DOT DISTRICT 4 Length: 0.00

Phase CST

Fund Transit

Year 2013

Federal $3,891,301

State $0

Other $3,891,301

Total Project Cost: Total Project Authorizations:

$ 7,782,602 $0

Total $7,782,602

Project: T003993 Type Work: Transit Projects
Descp:FY 2014 SECTION 5311 OPERATING FOR DOT DISTRICT 4 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 7,782,602 $0

Phase CST

Fund Transit

Year 2014

Federal $3,891,301

State $0

Other $3,891,301

Total $7,782,602

Project: T003994 Type Work: Transit Projects
Descp:FY 2015 SECTION 5311 OPERATING FOR DOT DISTRICT 4 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 7,782,602 $0

Phase CST

Fund Transit

Year 2015

Federal $3,891,301

State $0

Other $3,891,301

Total $7,782,602

Project: T003995 Type Work: Transit Projects
Descp:FY 2012 SECTION 5311 OPERATING FOR DOT DISTRICT 6 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 3,989,036 $0

Phase CST

Fund Transit

Year 2012

Federal $1,994,518

State $0

Other $1,994,518

Total $3,989,036

Project: T003996 Type Work: Transit Projects
Descp:FY 2013 SECTION 5311 OPERATING FOR DOT DISTRICT 6 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 3,913,830 $0

Phase CST

Fund Transit

Year 2013

Federal $1,956,915

State $0

Other $1,956,915

Total $3,913,830

Project: T003997 Type Work: Transit Projects
Descp:FY 2014 SECTION 5311 OPERATING FOR DOT DISTRICT 6 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 3,844,016 $0

Phase CST

Fund Transit

Year 2014

Federal $1,922,008

State $0

Other $1,922,008

Total $3,844,016

Page 44 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: T003998 Type Work: Transit Projects
Descp:FY 2015 SECTION 5311 OPERATING FOR DOT DISTRICT 6 Length: 0.00

Phase CST

Fund Transit

Year 2015

Federal $1,792,436

State $0

Other $1,792,436

Total Project Cost: Total Project Authorizations:

$ 3,584,872 $0

Total $3,584,872

Project: T003999 Type Work: Transit Projects
Descp:FY 2012 SECTION 5311 CAPITAL FOR DOT DISTRICT 4 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 1,932,900 $0

Phase CST

Fund Transit

Year 2012

Federal $1,546,320

State $193,290

Other $193,290

Total $1,932,900

Project: T004000 Type Work: Transit Projects
Descp:FY 2013 SECTION 5311 CAPITAL FOR DOT DISTRICT 4 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 2,508,700 $0

Phase CST

Fund Transit

Year 2013

Federal $2,009,520

State $249,590

Other $249,590

Total $2,508,700

Project: T004001 Type Work: Transit Projects
Descp:FY 2014 SECTION 5311 CAPITAL FOR DOT DISTRICT 4 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 1,993,100 $0

Phase CST

Fund Transit

Year 2014

Federal $1,594,480

State $199,310

Other $199,310

Total $1,993,100

Project: T004002 Type Work: Transit Projects
Descp:FY 2015 SECTION 5311 CAPITAL FOR DOT DISTRICT 4 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 2,070,200 $0

Phase CST

Fund Transit

Year 2015

Federal $1,656,160

State $207,020

Other $207,020

Total $2,070,200

Project: T004003 Type Work: Transit Projects
Descp:FY 2012 SECTION 5311 CAPITAL FOR DOT DISTRICT 6 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 704,000 $0

Phase CST

Fund Transit

Year 2012

Federal $563,200

State $70,400

Other $70,400

Total $704,000

Page 45 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: T004004 Type Work: Transit Projects
Descp:FY 2013 SECTION 5311 CAPITAL FOR DOT DISTRICT 6 Length: 0.00

Phase CST

Fund Transit

Year 2013

Federal $1,149,600

State $143,700

Total Project Cost: Total Project Authorizations:

$ 1,437,000 $0

Other $143,700

Total $1,437,000

Project: T004005 Type Work: Transit Projects
Descp:FY 2014 SECTION 5311 CAPITAL FOR DOT DISTRICT 6 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 292,900 $0

Phase CST

Fund Transit

Year 2014

Federal $234,320

State $29,290

Other $29,290

Total $292,900

Project: T004006 Type Work: Transit Projects
Descp:FY 2015 SECTION 5311 CAPITAL FOR DOT DISTRICT 6 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 734,400 $0

Phase CST

Fund Transit

Year 2015

Federal $587,520

State $73,440

Other $73,440

Total $734,400

Project: T004007 Type Work: Transit Projects
Descp:FY 2012 SECTION 5311 OPERATING FOR DOT DISTRICT 1 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 2,117,044 $0

Phase CST

Fund Transit

Year 2012

Federal $1,058,522

State $0

Other $1,058,522

Total $2,117,044

Project: T004009 Type Work: Transit Projects
Descp:FY 2014 SECTION 5311 OPERATING FOR DOT DISTRICT 1 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 2,390,744 $0

Phase CST

Fund Transit

Year 2014

Federal $1,195,372

State $0

Other $1,195,372

Total $2,390,744

Project: T004010 Type Work: Transit Projects
Descp:FY 2012 SECTION 5310 CAPITAL FOR DHS DISTRICT 1 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 280,200 $0

Phase CST

Fund Transit

Year 2012

Federal $224,160

State $56,040

Other $0

Total $280,200

Page 46 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: T004011 Type Work: Transit Projects
Descp:FY 2013 SECTION 5310 CAPITAL FOR DHS DISTRICT 1 Length: 0.00

Phase CST

Fund Transit

Year 2013

Federal $228,800

State $57,200

Total Project Cost: Total Project Authorizations:

$ 286,000 $0

Other $0

Total $286,000

Project: T004013 Type Work: Transit Projects
Descp:FY 2014 SECTION 5310 CAPITAL FOR DHS DISTRICT 1 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 290,500 $0

Phase CST

Fund Transit

Year 2014

Federal $232,400

State $58,100

Other $0

Total $290,500

Project: T004016 Type Work: Transit Projects
Descp:FY 2015 SECTION 5311 CAPITAL FOR DOT DISTRICT 1 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 527,900 $0

Phase CST

Fund Transit

Year 2015

Federal $422,320

State $52,790

Other $52,790

Total $527,900

Project: T004017 Type Work: Transit Projects
Descp:FY 2015 SECTION 5311 OPERATING FOR DOT DISTRICT 1 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 2,174,882 $0

Phase CST

Fund Transit

Year 2015

Federal $1,087,441

State $0

Other $1,087,441

Total $2,174,882

Project: T004061 Type Work: Transit Projects
Descp:FY 2015 SECTION 5311 DISCRETIONARY CAPITAL Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 300,000 $0

Phase CST

Fund Transit

Year 2015

Federal $240,000

State $30,000

Other $30,000

Total $300,000

Project: T004062 Type Work: Transit Projects
Descp:FY 2015 SECTION 5311F INTERCITY BUS PROGRAM Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 2,573,843 $0

Phase CST

Fund Transit

Year 2015

Federal $2,059,074

State $257,384

Other $257,384

Total $2,573,843

Page 47 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: T004063 Type Work: Transit Projects
Descp:FY 2015 SECTION 5311 DISCRETIONARY OPERATING Length: 0.00

Phase CST

Fund Transit

Year 2015

Federal $240,000

State $30,000

Total Project Cost: Total Project Authorizations:

$ 300,000 $0

Other $30,000

Total $300,000

Project: T004114 Type Work: Transit Projects
Descp:FY 2015 SECTION 5310 CAPITAL FOR DHS DISTRICT 1 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 337,600 $0

Phase CST

Fund Transit

Year 2015

Federal $270,080

State $67,520

Other $0

Total $337,600

Project: T004115 Type Work: Transit Projects
Descp:FY 2015 SECTION 5310 CAPITAL FOR DHS DISTRICT 2 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 162,644 $0

Phase CST

Fund Transit

Year 2015

Federal $130,115

State $32,529

Other $0

Total $162,644

Project: T004116 Type Work: Transit Projects
Descp:FY 2015 SECTION 5310 CAPITAL FOR DHS DISTRICT 3 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 610,659 $0

Phase CST

Fund Transit

Year 2015

Federal $488,527

State $122,132

Other $0

Total $610,659

Project: T004117 Type Work: Transit Projects
Descp:FY 2015 SECTION 5310 CAPITAL FOR DHS DISTRICT 4 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 263,129 $0

Phase CST

Fund Transit

Year 2015

Federal $210,503

State $52,626

Other $0

Total $263,129

Project: T004118 Type Work: Transit Projects
Descp:FY 2015 SECTION 5310 CAPITAL FOR DHS DISTRICT 5 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 183,694 $0

Phase CST

Fund Transit

Year 2015

Federal $146,955

State $36,739

Other $0

Total $183,694

Page 48 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: T004119 Type Work: Transit Projects
Descp:FY 2015 SECTION 5310 CAPITAL FOR DHS DISTRICT 6 Length: 0.00

Phase CST

Fund Transit

Year 2015

Federal $99,294

State $24,824

Total Project Cost: Total Project Authorizations:

$ 124,118 $0

Other $0

Total $124,118

Project: T004120 Type Work: Transit Projects
Descp:FY 2015 SECTION 5310 CAPITAL FOR DHS DISTRICT 7 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 109,224 $0

Phase CST

Fund Transit

Year 2015

Federal $87,379

State $21,845

Other $0

Total $109,224

Project: T004121 Type Work: Transit Projects
Descp:FY 2015 SECTION 5310 CAPITAL FOR DHS DISTRICT 8 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 178,729 $0

Phase CST

Fund Transit

Year 2015

Federal $142,983

State $35,746

Other $0

Total $178,729

Project: T004122 Type Work: Transit Projects
Descp:FY 2015 SECTION 5310 CAPITAL FOR DHS DISTRICT 9 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 183,694 $0

Phase CST

Fund Transit

Year 2015

Federal $146,955

State $36,739

Other $0

Total $183,694

Project: T004123 Type Work: Transit Projects
Descp:FY 2015 SECTION 5310 CAPITAL FOR DHS DISTRICT 10 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 89,365 $0

Phase CST

Fund Transit

Year 2015

Federal $71,492

State $17,873

Other $0

Total $89,365

Project: T004124 Type Work: Transit Projects
Descp:FY 2015 SECTION 5310 CAPITAL FOR DHS DISTRICT 11 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 64,541 $0

Phase CST

Fund Transit

Year 2015

Federal $51,633

State $12,908

Other $0

Total $64,541

Page 49 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: T004125 Type Work: Transit Projects
Descp:FY 2015 SECTION 5310 CAPITAL FOR DHS DISTRICT 12 Length: 0.00

Phase CST

Fund Transit

Year 2015

Federal $643,426

State $160,856

Total Project Cost: Total Project Authorizations:

$ 804,282 $0

Other $0

Total $804,282

Project: T004130 Type Work: Transit Projects
Descp:FY 2015 SECTION 5316/JARC RURAL (Apportionment) Length:

Total Project Cost: Total Project Authorizations:

$ 1,502,381 $0

Phase CST

Fund Transit

Year 2015

Federal $1,201,905

State $300,476

Other $0

Total $1,502,381

Project: T004133 Type Work: Transit Projects Descp:FY 2015 SECTION 5317/NF RURAL (Apportionment)

Phase CST

Length:

Fund Transit

Total Project Cost: Total Project Authorizations:

$ 827,506 $0

Year 2015

Federal $662,005

State $165,501

Other $0

Total $827,506

Project: T004166 Type Work: Transit Projects
Descp:FY 2014 SECTION 5311 CAPITAL FOR DOT DISTRICT 1 Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 1,963,780 $0

Phase CST

Fund Transit

Year 2014

Federal $1,905,680

State $29,050

Other $29,050

Total $1,963,780

Page 50 of 283

Project PI#
0000694 0001752 0002911 0003830 0006120 0006121 0006122 0006123 0006127 0006128 0006129 0006130 0006134 0006135 0006136 0006137 0006148 0006149 0006150 0006151 0006162 0006163 0006164 0006165 0006169 0006170 0006171 0006172 0006176 0006177 0006178 0006179 0006183 0006184 0006185 0006186 0006190 0006191 0006192 0006193 0006197 0006198 0006199 0006200 0006204 0006205 0006206 0006207 0006211 0006212 0006213

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/4/2011
All Totals Summary
County Summary excludes lump sum projects.

Year
2013 2013 2012 2012 2012 2013 2014 2015 2012 2013 2014 2015 2012 2013 2014 2015 2012 2013 2014 2015 2012 2013 2014 2015 2012 2013 2014 2015 2012 2013 2014 2015 2012 2013 2014 2015 2012 2013 2014 2015 2012 2013 2014 2015 2012 2013 2014 2015 2012 2013 2014

Phase
CST PE CST CST ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL

Fund
STP Other NHS Other STP STP STP STP Safety Safety Safety Safety STP STP STP STP
IM IM IM IM NHS NHS NHS NHS IM IM IM IM STP STP STP STP STP STP STP STP NHS NHS NHS NHS Safety Safety Safety Safety STP STP STP STP Safety Safety Safety

Federal
$478,037 $2,000,000 $5,600,000 $12,000,000 $20,800,000 $20,800,000 $20,800,000 $20,800,000 $55,916,968 $57,217,362 $58,517,757 $59,818,152 $4,000,000 $4,000,000 $4,000,000 $4,000,000 $9,000,000 $9,000,000 $9,000,000 $9,000,000
$800,000 $800,000 $800,000 $800,000 $9,000,000 $9,000,000 $9,000,000 $9,000,000 $80,000,000 $80,000,000 $80,000,000 $80,000,000 $6,000,000 $6,000,000 $6,000,000 $4,000,000 $28,000,000 $28,000,000 $28,000,000 $28,000,000 $4,313,100 $4,413,405 $4,513,709 $4,614,014 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $4,313,100 $4,413,405 $4,513,709

State
$119,509 $500,000 $1,400,000 $3,000,000
$0 $0 $0 $0 $6,212,996 $6,357,485 $6,501,973 $6,646,461 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $200,000 $200,000 $200,000 $200,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $20,000,000 $20,000,000 $20,000,000 $20,000,000 $1,500,000 $1,500,000 $1,500,000 $0 $7,000,000 $7,000,000 $7,000,000 $7,000,000 $0 $0 $0 $0 $500,000 $500,000 $500,000 $500,000 $0 $0 $0

Other
$0 $0 $0 $0 $5,200,000 $5,200,000 $5,200,000 $5,200,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

Total
$597,546 $2,500,000 $7,000,000 $15,000,000 $26,000,000 $26,000,000 $26,000,000 $26,000,000 $62,129,964 $63,574,847 $65,019,730 $66,464,613 $5,000,000 $5,000,000 $5,000,000 $5,000,000 $10,000,000 $10,000,000 $10,000,000 $10,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $10,000,000 $10,000,000 $10,000,000 $10,000,000 $100,000,000 $100,000,000 $100,000,000 $100,000,000 $7,500,000 $7,500,000 $7,500,000 $5,000,000 $35,000,000 $35,000,000 $35,000,000 $35,000,000 $4,313,100 $4,413,405 $4,513,709 $4,614,014 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $4,313,100 $4,413,405 $4,513,709
Page 51 of 283

0006214 0006218 0006219 0006220 0006221 0006225 0006226 0006227 0006228 0006366 0006367 0006372 0006373 0007496 0007497 0007498 0007502 0007503 0007504 0007505 0007509 0007552 0007697 0007698 0007699 0008223 0008323 0008324 0008325 0008326 0008330 0008331 0008332 0008333 0008557 0008558 0008639 0008643 0008644 0008645 0008694 0008694 0009197 0009201 0009202 0009222 0009223 0009224 0009326 0009552 0009553 0009554 0009555 0009570 0009571

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

2015

ALL

2012

ALL

2013

ALL

2014

ALL

2015

ALL

2012

ALL

2013

ALL

2014

ALL

2015

ALL

2014

CST

2015

CST

2012

CST

2013

CST

2013

ALL

2014

ALL

2015

ALL

2012

ALL

2013

ALL

2014

ALL

2015

ALL

2012

ALL

2012

PE

2013

CST

2014

CST

2015

CST

2012

ALL

2012

ALL

2013

ALL

2014

ALL

2015

ALL

2012

ALL

2013

ALL

2014

ALL

2015

ALL

2012

PE

2013

PE

2015

ALL

2012

ALL

2013

ALL

2014

ALL

2013

CST

2013

CST

2012

CST

2012

CST

2013

CST

2013

ALL

2014

ALL

2015

ALL

2012

PE

2012

PE

2013

PE

2014

PE

2015

PE

2012

PE

2013

PE

Safety STP STP STP STP STP STP STP STP NHS NHS NHS NHS STP STP STP STP Trails Trails Trails Trails HPP NHS NHS NHS Safety Safety Safety Safety Safety Safety Safety Safety Safety CMAQ CMAQ Safety Safety Safety Safety Bond Other CMAQ CMAQ CMAQ Safety Safety Safety STP STP STP STP STP Bridge Bridge

$4,614,014 $8,000,000 $8,000,000 $8,000,000 $8,000,000 $2,400,000 $2,400,000 $2,400,000 $2,400,000 $150,513,568 $150,513,568 $150,513,568 $150,513,568 $8,000,000 $8,000,000 $8,000,000 $8,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,799,800 $5,600,000 $5,600,000 $5,600,000 $1,560,000 $2,343,000 $2,343,000 $2,343,000 $2,343,000
$260,000 $260,000 $260,000 $260,000 $1,040,000 $1,120,000 $3,622,185 $3,385,956 $3,464,699 $3,543,442
$0 $0 $1,800,000 $2,000,000 $720,000 $560,000 $560,000 $560,000 $1,200,000 $280,000 $280,000 $280,000 $280,000 $6,800,000 $6,800,000

$0 $2,000,000 $2,000,000 $2,000,000 $2,000,000
$600,000 $600,000 $600,000 $600,000 $37,628,392 $37,628,392 $37,628,392 $37,628,392 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $250,000 $250,000 $250,000 $250,000 $449,950 $1,400,000 $1,400,000 $1,400,000
$0 $0 $0 $0 $0 $0 $0 $0 $0 $260,000 $0 $402,465 $376,217 $384,967 $393,716 $4,215,000 $0 $0 $0 $0 $0 $0 $0 $300,000 $70,000 $70,000 $70,000 $70,000 $1,700,000 $1,700,000

$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $280,000 $0 $0 $0 $0 $0 $16,860,000 $450,000 $500,000 $180,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

$4,614,014 $10,000,000 $10,000,000 $10,000,000 $10,000,000
$3,000,000 $3,000,000 $3,000,000 $3,000,000 $188,141,960 $188,141,960 $188,141,960 $188,141,960 $10,000,000 $10,000,000 $10,000,000 $10,000,000 $1,250,000 $1,250,000 $1,250,000 $1,250,000 $2,249,750 $7,000,000 $7,000,000 $7,000,000 $1,560,000 $2,343,000 $2,343,000 $2,343,000 $2,343,000
$260,000 $260,000 $260,000 $260,000 $1,300,000 $1,400,000 $4,024,650 $3,762,173 $3,849,665 $3,937,158 $4,215,000 $16,860,000 $2,250,000 $2,500,000 $900,000 $560,000 $560,000 $560,000 $1,500,000 $350,000 $350,000 $350,000 $350,000 $8,500,000 $8,500,000
Page 52 of 283

0009572 0009573 0009577 0009579 0009580 0009581 0009584 0009585 0009586 0009587 0009590 0009593 0009594 0010148 0010149 0010150 0010151 0010166 0010167 0010168 0010169 0010447 0010501 0010502 0010556 0010557 M003374 M003375 M003376 M003377 T003131 T003138 T003153 T003160 T003170 T003171 T003172 T003173 T003185 T003186 T003189 T003190 T003197 T003202 T003451 T003452 T003453 T003652 T003668 T003743 T003744 T003745 T003746 T003747 T003748

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

2014

PE

2015

PE

2015

PE

2013

CST

2014

CST

2015

CST

2012

PE

2013

PE

2014

PE

2015

PE

2015

CST

2014

PE

2015

PE

2012

PE

2013

PE

2014

PE

2015

PE

2012

PE

2013

PE

2014

PE

2015

PE

2014

PE

2015

CST

2015

CST

2012

UTL

2012

UTL

2012

CST

2013

CST

2014

CST

2015

CST

2012

CST

2013

CST

2012

CST

2013

CST

2012

CST

2013

CST

2012

CST

2013

CST

2012

CST

2013

CST

2012

CST

2013

CST

2012

CST

2013

CST

2014

CST

2014

CST

2014

CST

2014

CST

2014

CST

2012

CST

2012

CST

2012

CST

2012

CST

2012

CST

2012

CST

Bridge Bridge Other Other Other Other
STP STP STP STP CMAQ CMAQ CMAQ STP STP STP STP STP STP STP STP STP CMAQ CMAQ State State STP STP STP STP Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit

$6,800,000 $6,800,000 $2,000,000 $12,000,000 $12,000,000 $12,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000
$960,000 $7,040,000 $7,040,000
$280,000 $280,000 $280,000 $280,000
$80,000 $80,000 $80,000 $80,000 $1,697,933 $10,000,000 $400,000
$0 $0 $12,000,000 $14,400,000 $14,400,000 $14,400,000 $224,160 $22,800 $3,817,269 $1,133,488 $240,000 $240,000 $300,000 $300,000 $2,059,074 $2,059,074 $1,444,042 $1,472,923 $795,373 $811,281 $240,000 $2,059,074 $240,000 $1,502,381 $827,506 $255,939 $123,302 $462,949 $199,482 $139,261 $94,095

$1,700,000 $1,700,000
$500,000 $3,000,000 $3,000,000 $3,000,000
$0 $0 $0 $0 $240,000 $0 $0 $70,000 $70,000 $70,000 $70,000 $20,000 $20,000 $20,000 $20,000 $424,483 $0 $100,000 $1,000,000 $3,800,000 $3,000,000 $3,600,000 $3,600,000 $3,600,000 $28,020 $24,230 $0 $0 $30,000 $30,000 $0 $0 $0 $0 $0 $0 $0 $0 $30,000 $257,384 $30,000 $0 $0 $63,985 $30,826 $115,737 $49,871 $34,815 $23,524

$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,760,000 $1,760,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,500,000 $0 $0 $0 $0 $0 $0 $0 $28,020 $24,230 $3,817,269 $1,133,488 $30,000 $30,000 $300,000 $300,000 $514,769 $514,769 $0 $0 $0 $0 $30,000 $257,384 $30,000 $0 $0 $0 $0 $0 $0 $0 $0

$8,500,000 $8,500,000 $2,500,000 $15,000,000 $15,000,000 $15,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,200,000 $8,800,000 $8,800,000
$350,000 $350,000 $350,000 $350,000 $100,000 $100,000 $100,000 $100,000 $2,122,416 $12,500,000 $500,000 $1,000,000 $3,800,000 $15,000,000 $18,000,000 $18,000,000 $18,000,000 $280,200
$71,260 $7,634,538 $2,266,976
$300,000 $300,000 $600,000 $600,000 $2,573,843 $2,573,843 $1,444,042 $1,472,923 $795,373 $811,281 $300,000 $2,573,843 $300,000 $1,502,381 $827,506 $319,924 $154,128 $578,686 $249,353 $174,076 $117,619
Page 53 of 283

T003749 T003750 T003751 T003752 T003753 T003754 T003755 T003756 T003757 T003758 T003759 T003760 T003761 T003762 T003763 T003764 T003765 T003766 T003767 T003768 T003769 T003770 T003771 T003772 T003773 T003774 T003775 T003776 T003777 T003778 T003956 T003957 T003958 T003959 T003960 T003961 T003962 T003963 T003964 T003965 T003966 T003967 T003968 T003969 T003970 T003971 T003972 T003973 T003974 T003975 T003976 T003977 T003978 T003979 T003980

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

2012

CST

2012

CST

2012

CST

2012

CST

2012

CST

2012

CST

2013

CST

2013

CST

2013

CST

2013

CST

2013

CST

2013

CST

2013

CST

2013

CST

2013

CST

2013

CST

2013

CST

2013

CST

2014

CST

2014

CST

2014

CST

2014

CST

2014

CST

2014

CST

2014

CST

2014

CST

2014

CST

2014

CST

2014

CST

2014

CST

2012

CST

2013

CST

2014

CST

2015

CST

2012

CST

2013

CST

2014

CST

2015

CST

2012

CST

2013

CST

2014

CST

2015

CST

2012

CST

2013

CST

2014

CST

2015

CST

2012

CST

2012

CST

2012

CST

2012

CST

2012

CST

2012

CST

2012

CST

2012

CST

2012

CST

Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit

$82,804 $135,498 $139,261
$67,749 $48,930 $609,738 $257,219 $123,919 $465,264 $200,479 $139,958 $94,566 $83,218 $136,174 $139,958 $68,087 $49,174 $612,786 $270,080 $130,115 $488,527 $210,503 $146,955 $99,294 $87,379 $142,983 $146,955 $71,492 $51,633 $643,426 $555,264 $493,200 $441,200 $758,240 $1,341,118 $1,419,603 $1,490,583 $1,515,875 $2,816,483 $2,896,021 $3,133,301 $3,140,501 $766,520 $1,270,118 $652,560 $2,343,600 $227,057 $107,243 $173,501 $121,123 $81,840 $72,019 $117,850 $121,123 $58,925

$20,701 $33,874 $34,815 $16,937 $12,232 $152,434 $64,305 $30,980 $116,316 $50,120 $34,989 $23,641 $20,804 $34,044 $34,989 $17,022 $12,294 $153,197 $67,520 $32,529 $122,132 $52,626 $36,739 $24,824 $21,845 $35,746 $36,739 $17,873 $12,908 $160,856 $69,408 $61,650 $55,150 $94,780
$0 $0 $0 $0 $0 $0 $0 $0 $97,190 $158,765 $81,570 $292,950 $56,764 $26,811 $43,375 $30,281 $20,460 $18,005 $29,462 $30,281 $14,731

$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $69,408 $61,650 $55,150 $94,780 $1,341,118 $1,419,603 $1,490,583 $1,515,875 $2,816,483 $2,896,021 $3,133,301 $3,140,501 $97,190 $158,765 $81,570 $292,950 $0 $0 $0 $0 $0 $0 $0 $0 $0

$103,505 $169,372 $174,076
$84,686 $61,162 $762,172 $321,524 $154,899 $581,580 $250,599 $174,947 $118,207 $104,022 $170,218 $174,947 $85,109 $61,468 $765,983 $337,600 $162,644 $610,659 $263,129 $183,694 $124,118 $109,224 $178,729 $183,694 $89,365 $64,541 $804,282 $694,080 $616,500 $551,500 $947,800 $2,682,236 $2,839,206 $2,981,166 $3,031,750 $5,632,966 $5,792,042 $6,266,602 $6,281,002 $960,900 $1,587,647 $815,700 $2,929,500 $283,821 $134,054 $216,876 $151,404 $102,300 $90,024 $147,312 $151,404 $73,656
Page 54 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

T003981 T003982 T003983 T003984 T003985 T003986 T003987 T003988 T003989 T003990 T003992 T003993 T003994 T003995 T003996 T003997 T003998 T003999 T004000 T004001 T004002 T004003 T004004 T004005 T004006 T004007 T004009 T004010 T004011 T004013 T004016 T004017 T004061 T004062 T004063 T004114 T004115 T004116 T004117 T004118 T004119 T004120 T004121 T004122 T004123 T004124 T004125 T004130 T004133 T004166

2012

CST

2012

CST

2012

CST

2013

CST

2014

CST

2015

CST

2012

CST

2013

CST

2014

CST

2015

CST

2013

CST

2014

CST

2015

CST

2012

CST

2013

CST

2014

CST

2015

CST

2012

CST

2013

CST

2014

CST

2015

CST

2012

CST

2013

CST

2014

CST

2015

CST

2012

CST

2014

CST

2012

CST

2013

CST

2014

CST

2015

CST

2015

CST

2015

CST

2015

CST

2015

CST

2015

CST

2015

CST

2015

CST

2015

CST

2015

CST

2015

CST

2015

CST

2015

CST

2015

CST

2015

CST

2015

CST

2015

CST

2015

CST

2015

CST

2014

CST

Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit

$42,557 $530,324 $1,376,922 $1,418,234 $1,460,786 $1,504,600 $197,901 $419,280 $376,960 $923,960 $3,891,301 $3,891,301 $3,891,301 $1,994,518 $1,956,915 $1,922,008 $1,792,436 $1,546,320 $2,009,520 $1,594,480 $1,656,160 $563,200 $1,149,600 $234,320 $587,520 $1,058,522 $1,195,372 $224,160 $228,800 $232,400 $422,320 $1,087,441 $240,000 $2,059,074 $240,000 $270,080 $130,115 $488,527 $210,503 $146,955
$99,294 $87,379 $142,983 $146,955 $71,492 $51,633 $643,426 $1,201,905 $662,005 $1,905,680

$10,639 $132,581
$0 $0 $0 $0 $24,738 $52,410 $47,120 $115,495 $0 $0 $0 $0 $0 $0 $0 $193,290 $249,590 $199,310 $207,020 $70,400 $143,700 $29,290 $73,440 $0 $0 $56,040 $57,200 $58,100 $52,790 $0 $30,000 $257,384 $30,000 $67,520 $32,529 $122,132 $52,626 $36,739 $24,824 $21,845 $35,746 $36,739 $17,873 $12,908 $160,856 $300,476 $165,501 $29,050

$0 $0 $1,376,922 $1,418,234 $1,460,775 $1,504,610 $24,737 $52,410 $47,120 $115,495 $3,891,301 $3,891,301 $3,891,301 $1,994,518 $1,956,915 $1,922,008 $1,792,436 $193,290 $249,590 $199,310 $207,020 $70,400 $143,700 $29,290 $73,440 $1,058,522 $1,195,372 $0 $0 $0 $52,790 $1,087,441 $30,000 $257,384 $30,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $29,050

$53,196 $662,905 $2,753,844 $2,836,467 $2,921,561 $3,009,210 $247,376 $524,100 $471,200 $1,154,950 $7,782,602 $7,782,602 $7,782,602 $3,989,036 $3,913,830 $3,844,016 $3,584,872 $1,932,900 $2,508,700 $1,993,100 $2,070,200 $704,000 $1,437,000 $292,900 $734,400 $2,117,044 $2,390,744 $280,200 $286,000 $290,500 $527,900 $2,174,882 $300,000 $2,573,843 $300,000 $337,600 $162,644 $610,659 $263,129 $183,694 $124,118 $109,224 $178,729 $183,694
$89,365 $64,541 $804,282 $1,502,381 $827,506 $1,963,780

$1,914,858,931

$381,862,747

$102,011,558

$2,398,733,235

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 55 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Appling
Project: 0001216 Type Work: Replace Bridge
Descp:SR 4/US 1 @ ALTAMAHA RIVER; OVERFLOW & WILLIAMS CREEK Length: 1.56

Total Project Cost: Total Project Authorizations:

$ 27,430,980 $ 1,429,835

Phase PE
ROW CST UTL

Fund NHS Bridge Bridge Local

Year 2002 2011 2015 2015

Federal $999,868 $144,000
$20,536,916 $0

State $249,967
$36,000 $5,134,229
$0

Other $0 $0 $0
$330,000

Total $1,249,835
$180,000 $25,671,145
$330,000

Also in Toombs County

Project: 0005963 Type Work: Replace Bridge Descp:CR 575 ZOAR ROAD @ BIG SATILLA CREEK

Length: 0.30

Total Project Cost: Total Project Authorizations:

$ 2,108,773 $ 593,999

Phase PE
ROW CST UTL

Fund Bridge Local Bridge Local

Year 2004 2012 2014 2014

Federal $475,199 $0
$1,113,464 $0

State $118,800
$0 $278,366
$0

Other $0
$36,720 $0
$86,223

Total $593,999
$36,720 $1,391,831
$86,223

Also in Jeff Davis County

Project: 0008063 Type Work: TE-Landscape/Beautify
Descp:BAXLEY DOWNTOWN STREETSCAPE & WELCOME CENTER - PHASE II Length: 1.23

Phase CST

Fund STP

Year 2012

Federal $250,400

State $0

Other $62,600

Total $313,000

Total Project Cost:

$ 313,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 0008976 Type Work: TE-Landscape/Beautify
Descp:ALTAMAHA TECHNICAL COLLEGE LANDSCAPE IMPROVEMENTS Length: 0.00

Phase CST

Fund STP

Year 2015

Federal $85,000

State $0

Other $21,250

Total $106,250

Total Project Cost:

$ 106,250

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 0009866 Type Work: Roundabout Descp:SR 15 @ SR 203
Length: 0.50

Phase PE CST

Fund Safety Safety

Year 2012 2013

Federal $153,000 $867,000

State $0 $0

Other $0 $0

Total $153,000 $867,000

Total Project Cost:

$ 1,020,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0010426 Type Work: Guardrail
Descp:CR 537/TEN MILE ROAD @ 3 LOCS IN APPLING COUNTY Length: 1.04

Phase PE CST

Fund Safety Safety

Year 2012 2013

Federal $40,000
$118,000

State $0 $0

Other $0 $0

Total $40,000
$118,000

Total Project Cost:

$ 158,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: HIGH RISK RURAL ROADS FOR FY 2012 - FY 2015

Page 56 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: 0010427 Type Work: Shoulder Work
Descp:CR 591/BEN CARTER RD FM S OF DUNNS LAKE RD TO TEN MILE CREEK Length: 1.83

Phase PE CST

Fund Safety Safety

Year 2012 2013

Federal $36,000
$333,000

State $4,000
$37,000

Other $0 $0

Total $40,000
$370,000

Total Project Cost:

$ 410,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: HIGH RISK RURAL ROADS FOR FY 2012 - FY 2015

Project: 531340- Type Work: Replace Bridge
Descp:CR 305 @ BIG SATILLA CREEK @ APPLING-PIERCE COUNTY LINE Length: 0.40

Phase PE
ROW CST

Fund Bridge Local Bridge

Year 2011 2014 After 2015

Federal $311,423 $0
$2,899,840

State $77,856
$0 $724,960

Other $0
$31,200 $0

Total $389,279
$31,200 $3,624,799

Total Project Cost: Total Project Authorizations:

$ 4,045,278 $ 389,279

Also in Pierce County

Project: M004226 Type Work: Resurface & Maintenance
Descp:SR 4 FM CR 1/NAILS FERRY RD/APPLING TO ALTAMAHA RIVER/TOOMBS Length: 10.91

Phase CST

Fund NHS

Year 2012

Federal $3,771,642

State $942,911

Other $0

Total $4,714,553

Total Project Cost:

$ 4,714,553

Total Project Authorizations: $ 4,714,553

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2012 - FY 2015

Also in Toombs County

Project: M004283 Type Work: Resurface & Maintenance
Descp:SR 27 FROM JEFF DAVIS CO LINE TO S OF CR 30/MOODY ALTMAN RD Length: 8.57

Phase CST

Fund NHS

Year 2012

Federal $3,502,960

State $875,740

Other $0

Total $4,378,700

Total Project Cost:

$ 4,378,700

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2012 - FY 2015

Appling Totals Summary
County Summary excludes lump sum projects.

Project PI#

Year

Phase

Fund

Federal

State

Other

Total

0001216 0001216 0005963 0005963 0005963 531340-

2015 2015 2012 2014 2014 2014

CST UTL ROW CST UTL ROW

Bridge Local Local Bridge Local Local

$2,669,799 $0 $0
$634,675 $0 $0

$667,450 $0 $0
$158,669 $0 $0

$0 $42,900 $20,930
$0 $49,147 $15,600

$3,337,249 $42,900 $20,930
$793,343 $49,147 $15,600

$3,304,474

$826,118

$128,577

$4,259,170

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 57 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Bacon
Project: M004225 Type Work: Resurface & Maintenance
Descp:SR 19 FROM SR 4/US 1 TO APPLING COUNTY LINE Length: 6.79

Phase CST

Fund STP

Year 2012

Federal $968,214

State $242,053

Total Project Cost:

$ 1,210,267

Total Project Authorizations: $ 1,210,267

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Project: M004391 Type Work: Resurface & Maintenance
Descp:SR 32 FROM COFFEE COUNTY LINE TO CR 316/3RD STREET Length: 4.63

Phase CST

Fund STP

Year 2012

Federal $920,000

State $230,000

Total Project Cost:

$ 1,150,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Other $0
Other $0

Total $1,210,267
Total $1,150,000

Page 58 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Baker
Project: 0007153 Type Work: Replace Bridge Descp:SR 200 @ ICHAWAYNOCHAWAY CREEK

Length: 0.40

Total Project Cost: Total Project Authorizations:

$ 6,036,697 $0

Phase PE
ROW CST UTL

Fund Bridge Bridge Bridge Bridge

Year 2012 2014 After 2015 After 2015

Federal $309,653 $26,233
$4,273,518 $219,953

State $77,413
$6,558 $1,068,380
$54,988

Other $0 $0 $0 $0

Total $387,066
$32,791 $5,341,898
$274,942

Project: 0007154 Type Work: Replace Bridge Descp:SR 216 @ ICHAWAYNOCHAWAY CREEK

Length: 0.40

Total Project Cost: Total Project Authorizations:

$ 4,911,972 $ 244,728

Phase PE
ROW CST

Fund Bridge Bridge Bridge

Year 2007 2013 2015

Federal $195,782 $58,679
$3,675,117

State $48,946 $14,670 $918,779

Other $0 $0 $0

Total $244,728
$73,348 $4,593,896

Project: 0010012 Type Work: Sidewalks
Descp:BAKER COUNTY SCHOOL SYSTEM - BEARS WAY - SRTS Length: 0.00

Phase PE CST

Fund Safety Safety

Year 2010 2013

Federal $140,000 $94,350

Total Project Cost:

$ 234,350

Total Project Authorizations: $ 140,000

Uses Lump Sum Bank: SAFE ROUTES TO SCHOOL INFRASTRUCTURE FOR FY 2012 - FY 2015

State $0 $0

Other $0 $0

Total $140,000
$94,350

Baker Totals Summary
County Summary excludes lump sum projects.

Project PI#
0007153 0007153 0007154 0007154

Year
2012 2014 2013 2015

Phase
PE ROW ROW CST

Fund
Bridge Bridge Bridge Bridge

Federal
$309,653 $26,233 $58,679
$3,675,117

State
$77,413 $6,558
$14,670 $918,779

Other
$0 $0 $0 $0

Total
$387,066 $32,791 $73,348
$4,593,896

$4,069,681

$1,017,420

$0

$5,087,101

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 59 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Baldwin
Project: 0004527 Type Work: Intersection Improvement
Descp:SR 243/US 441 @ CR 466/SWINT & CS 670/CARAKER/MILLEDGEVILLE Length: 0.20

Phase CST

Fund Safety

Year 2013

Federal $138,943

State $15,438

Total Project Cost:

$ 154,381

Total Project Authorizations: $ 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0007362 Type Work: Signals
Descp:SR 22;SR 29;SR 49;SR 243;CS 546&CS 578 @16 LOC IN BALDWIN CO Length: 0.00

Phase PE
ROW CST

Fund STP STP STP

Year 2006 2012 After 2015

Federal $44,000 $87,000
$1,355,568

State $11,000
$0 $0

Total Project Cost:

$ 1,497,568

Total Project Authorizations: $ 55,000

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2012 - FY 2015

Project: 0007531 Type Work: New Construction
Descp:EAST GREENE STREET EXTENSION IN MILLEDGEVILLE
Lanes: Exist. 0 Prop. 2 Length: 0.28

Phase PE PE CST

Fund HPP HPP HPP

Year 2008 2008 2012

Federal $11,562 $68,438
$279,960

State $0 $0 $0

Total Project Cost: Total Project Authorizations:

$ 515,313 $ 100,000

Other $0
Other $0 $0 $0
Other $2,891
$17,110 $135,353

Total $154,381
Total $55,000 $87,000
$1,355,568
Total $14,453 $85,548
$415,313

Project: 0008978 Type Work: TE-Bike/Ped Facility
Descp:HISTORIC DOWNTOWN MILLEDGEVILLE STREETSCAPE - PHASE III Length: 0.00

Phase CST

Fund STP

Year 2013

Federal $300,000

State $0

Total Project Cost:

$ 375,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 0010455 Type Work: Bicycle/Ped. Facility
Descp:BALDWIN COUNTY SCHOOL SYSTEM @ 5 SCHOOLS - SRTS Length: 0.00

Phase PE CST

Fund Safety Safety

Year 2015 After 2015

Federal $160,000 $499,977

State $0 $0

Total Project Cost:

$ 659,977

Total Project Authorizations: $ 0

Uses Lump Sum Bank: SAFE ROUTES TO SCHOOL INFRASTRUCTURE FOR FY 2012 - FY 2015

Project: 231450- Type Work: Widening
Descp:SR 49 FM JUST W. OF FELTON RD TO EAST OF MILLEDGEVILLE BYP
Lanes: Exist. 2 Prop. 4 Length: 2.80

Phase PE
ROW CST

Fund NHS NHS NHS

Year 1998 2013 After 2015

Federal $598,040
$2,963,059 $7,639,681

State $149,510 $740,765 $1,909,920

Total Project Cost: Total Project Authorizations:

$ 14,000,976 $ 747,550

Other $75,000
Other $0 $0
Other $0 $0 $0

Total $375,000
Total $160,000 $499,977
Total $747,550 $3,703,824 $9,549,602

Page 60 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/4/2011
Baldwin Totals Summary
County Summary excludes lump sum projects.

Project PI#

Year

Phase

Fund

Federal

State

Other

Total

0007531 231450-

2012 2013

CST ROW

HPP NHS

$279,960 $2,963,059

$0 $740,765

$135,353 $0

$415,313 $3,703,824

$3,243,019

$740,765

$135,353

$4,119,137

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 61 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Banks
Project: 0007155 Type Work: Replace Bridge Descp:SR 98 @ GROVE CREEK

Length: 0.40

Total Project Cost: Total Project Authorizations:

$ 5,079,945 $0

Phase PE
ROW CST UTL

Fund Bridge Bridge Bridge Bridge

Year 2012 2014 After 2015 After 2015

Federal $257,709 $41,973
$3,486,902 $277,373

State $64,427 $10,493 $871,725 $69,343

Other $0 $0 $0 $0

Total $322,136
$52,466 $4,358,627
$346,716

Project: 0007156 Type Work: Replace Bridge Descp:SR 98 @ HICKORY LEVEL CREEK

Length: 0.40

Total Project Cost: Total Project Authorizations:

$ 4,903,210 $0

Phase PE
ROW CST UTL

Fund Bridge Bridge Bridge Bridge

Year 2012 2014 After 2015 After 2015

Federal $257,709 $18,888
$3,486,902 $159,070

State $64,427
$4,722 $871,725
$39,768

Other $0 $0 $0 $0

Total $322,136
$23,610 $4,358,627
$198,837

Project: 0007157 Type Work: Replace Bridge
Descp:SR 323 @ GROVE CREEK 6.5 MI WEST OF HOMER Length: 0.40

Total Project Cost: Total Project Authorizations:

$ 4,185,815 $0

Phase PE
ROW CST UTL

Fund Bridge Bridge Bridge Bridge

Year 2012 2014 After 2015 After 2015

Federal $216,415 $46,563
$2,928,188 $157,485

State $54,104 $11,641 $732,047 $39,371

Other $0 $0 $0 $0

Total $270,519
$58,204 $3,660,235
$196,856

Project: 0007158 Type Work: Replace Bridge Descp:SR 63 @ MIDDLE FORK BROAD RIVER

Length: 0.40

Total Project Cost: Total Project Authorizations:

$ 6,357,863 $0

Phase PE
ROW CST UTL

Fund Bridge Bridge Bridge Bridge

Year 2012 2014 After 2015 After 2015

Federal $334,396 $24,265
$4,524,512 $203,117

State $83,599
$6,066 $1,131,128
$50,779

Other $0 $0 $0 $0

Total $417,995
$30,331 $5,655,640
$253,897

Project: 0009893 Type Work: RRX Warning Device Descp:CR 141/WYNN SHOALS ROAD @ NS #717635M
Length: 0.40

Phase CST

Fund Safety

Total Project Cost:

$ 204,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2012 - FY 2015

Project: 0009930 Type Work: Roundabout Descp:SR 51 @ SR 63
Length: 0.26

Phase PE CST

Fund Safety Safety

Total Project Cost:

$ 1,020,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Year 2012
Year 2012 2012

Federal $204,000

State $0

Other $0

Federal $153,000 $867,000

State $0 $0

Other $0 $0

Total $204,000
Total $153,000 $867,000

Page 62 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/4/2011
Banks Totals Summary
County Summary excludes lump sum projects.

Project PI#
0007155 0007155 0007156 0007156 0007157 0007157 0007158 0007158

Year
2012 2014 2012 2014 2012 2014 2012 2014

Phase
PE ROW
PE ROW
PE ROW
PE ROW

Fund
Bridge Bridge Bridge Bridge Bridge Bridge Bridge Bridge

Federal
$257,709 $41,973
$257,709 $18,888
$216,415 $46,563
$334,396 $24,265

State
$64,427 $10,493 $64,427
$4,722 $54,104 $11,641 $83,599
$6,066

Other
$0 $0 $0 $0 $0 $0 $0 $0

Total
$322,136 $52,466
$322,136 $23,610
$270,519 $58,204
$417,995 $30,331

$1,197,917

$299,479

$0

$1,497,397

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 63 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Barrow
Project: T002953 Type Work: Transit Projects
Descp:FY 2012 FTA SECTION 5307/5340 FORMULA FUNDS FOR BARROW Length: 0.00

Phase CST

Fund Transit

Year 2012

Federal $36,323

State $0

Total Project Cost: Total Project Authorizations:

$ 45,404 $0

Other $9,081

Total $45,404

Project: T002954 Type Work: Transit Projects
Descp:FY 2013 FTA SECTION 5307/5340 FORMULA FUNDS FOR BARROW Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 46,312 $0

Phase CST

Fund Transit

Year 2013

Federal $37,050

State $0

Other $9,262

Total $46,312

Project: T003624 Type Work: Transit Projects
Descp:FY 2014 FTA SECTION 5307/5340 FORMULA FUNDS FOR BARROW Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 46,312 $0

Phase CST

Fund Transit

Year 2014

Federal $37,050

State $0

Other $9,262

Total $46,312

Project: T004075 Type Work: Transit Projects
Descp:FY 2015 FTA SECTION 5307/5340 FORMULA FUNDS FOR BARROW Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 46,312 $0

Phase CST

Fund Transit

Year 2015

Federal $37,050

State $4,631

Other $4,631

Total $46,312

Project PI#

Year

Barrow Totals Summary

County Summary excludes lump sum projects.

This County is also located in a MPO area. Additional Projects may be listed in the MPO TIP.

Phase

Fund

Federal

State

Other

Total

T002953 T002954 T003624 T004075

2012

CST

2013

CST

2014

CST

2015

CST

Transit Transit Transit Transit

$36,323 $37,050 $37,050 $37,050

$0 $0 $0 $4,631

$9,081 $9,262 $9,262 $4,631

$45,404 $46,312 $46,312 $46,312

$147,472

$4,631

$32,236

$184,340

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 64 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Bartow
Project: 0007456 Type Work: Pedestrian Crossings
Descp:SR 2 @ 1 LOC; SR 3 @13 LOCS; SR 5 @ 1 LOC IN BARTOW & FANNIN Length: 0.00

Phase PE
ROW CST

Fund Safety Safety Safety

Year 2006 2012 2012

Federal $0
$152,032 $354,741

State $0
$16,892 $39,416

Other $0 $0 $0

Total $0
$168,924 $394,157

Total Project Cost:

$ 563,081

Total Project Authorizations: $ 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Also in Fannin County

Project: 0007494 Type Work: Widening
Descp:CR 343/DOUTHIT FERRY RD FM OLD ALABAMA RD TO SR 61/SR 113
Lanes: Exist. 2 Prop. 4 Length: 2.43

Total Project Cost: Total Project Authorizations:

$ 16,441,048 $0

Phase PE PE
ROW CST

Fund Local STP Local STP

Year

Federal

2012

$0

2012

$45,047

2015

$0

After 2015 $11,406,862

State $0
$11,262 $0
$2,851,716

Other $1,126,162
$0 $1,000,000
$0

Total $1,126,162
$56,308 $1,000,000 $14,258,578

Project: 0008067 Type Work: TE-Bike/Ped Facility Descp:LEAKE MOUNDS-ETOWAH RIVERWALK LINK
Length: 1.85

Phase CST

Fund STP

Year 2013

Federal $750,400

Total Project Cost:

$ 938,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 0009838 Type Work: Roundabout Descp:SR 293 @ CR 155/GRASSDALE ROAD
Length: 0.40

Phase PE CST

Fund Safety Safety

Year 2012 2012

Federal $153,000 $867,000

Total Project Cost:

$ 1,020,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0009840 Type Work: Roundabout Descp:SR 293 @ CR 134/HAMILTON CROSSING ROAD
Length: 0.40

Phase PE CST

Fund Safety Safety

Year 2012 2012

Federal $153,000 $867,000

Total Project Cost:

$ 1,020,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0009860 Type Work: Replace Bridge Descp:SR 3/US 41 @ CR 122/OLD HWY 41
Length: 0.40

Phase PE
ROW CST

Fund Bridge Bridge Bridge

Year 2011 2015 After 2015

Federal $40,000 $44,163
$459,474

Total Project Cost: Total Project Authorizations:

$ 679,547 $ 50,000

State $0
State $0 $0
State $0 $0
State $10,000 $11,041 $114,869

Other $187,600
Other $0 $0
Other $0 $0
Other $0 $0 $0

Total $938,000
Total $153,000 $867,000
Total $153,000 $867,000
Total $50,000 $55,204
$574,343

Page 65 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: 0010189 Type Work: Pavement Markings
Descp:OFF-SYSTEM SAFETY IMPROVEMENTS @ 21 CS LOC IN BARTOW COUNTY Length: 0.00

Phase CST

Fund Safety

Year 2012

Federal $61,723

State $0

Total Project Cost:

$ 61,723

Total Project Authorizations: $ 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 621350- Type Work: Widening
Descp:SR 20 FM I-75 TO SR 61/US 411 PART RELOCATION
Lanes: Exist. 2 Prop. 4 Length: 2.20

Total Project Cost: Total Project Authorizations:

$ 30,534,792 $ 15,254,000

Phase PE
ROW ROW CST

Fund STP STP STP STP

Year 1992 2000 2011 2013

Federal $71,200
$900,000 $11,232,000 $12,224,634

State $17,800 $225,000 $2,808,000 $3,056,158

Other $0

Total $61,723

Other $0 $0 $0 $0

Total $89,000
$1,125,000 $14,040,000 $15,280,792

Project: 621440- Type Work: Widening
Descp:SR 113 FM CR 31 TO RICHLAND CREEK @ OLD ALA RD RELOC -PH III
Lanes: Exist. 2 Prop. 4 Length: 2.90

Total Project Cost: Total Project Authorizations:

$ 20,285,079 $ 4,370,493

Phase PE
ROW CST

Fund STP STP STP

Year 1998 2008 2013

Federal $1,256,394 $2,240,000 $12,731,669

State $314,099 $560,000 $3,182,917

Other $0 $0 $0

Total $1,570,493 $2,800,000 $15,914,587

Project: 621445- Type Work: Bridge Rehab Descp:SR 113 @ RACCOON CREEK

Lanes: Exist. 2 Prop. 4 Length: 0.05

Total Project Cost: Total Project Authorizations:

$ 947,969 $ 119,626

Phase PE CST

Fund Bridge Bridge

Year 1993 2013

Federal $95,700
$662,675

State $23,925 $165,669

Other $0 $0

Total $119,626 $828,343

Project: 641870- Type Work: Intersection Improvement Descp:SR 293 @ CR 155/GRASSDALE RD

Length: 0.26

Total Project Cost: Total Project Authorizations:

$ 1,085,728 $0

Phase PE
ROW CST

Fund STP STP STP

Year 2012 2015 After 2015

Federal $81,600
$497,350 $289,633

State $20,400 $124,337 $72,408

Other $0 $0 $0

Total $102,000 $621,687 $362,041

Page 66 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: 661950- Type Work: New Construction
Descp:US 411 RELOC FM SR 3/US 41 TO I-75; INCL I-75 INTERCHANGE
Lanes: Exist. 0 Prop. 4 Length: 20.37

Total Project Cost: Total Project Authorizations:

$ 228,161,793 $ 24,949,504

Phase PE PE
ROW ROW ROW ROW ROW ROW ROW CST UTL

Fund State NHS State NHS HPP HPP HPP HPP NHS NHS NHS

Year

Federal

1993

$0

2004 $17,177,857

1990

$0

2008

$1,203,507

2012

$3,644,028

2012 $12,243,936

2012

$855,472

2012

$2,874,388

2015

$6,256,261

After 2015 $130,715,287

After 2015 $5,922,973

State $42,000 $4,294,464 $1,930,798 $300,877 $911,007 $3,060,984 $213,868
$0 $1,564,065 $32,678,822 $1,480,743

Other $0 $0 $0 $0 $0 $0 $0
$790,457 $0 $0 $0

Total $42,000
$21,472,322 $1,930,798 $1,504,384 $4,555,035
$15,304,920 $1,069,340 $3,664,845 $7,820,326
$163,394,109 $7,403,716

Project: M004324 Type Work: Resurface & Maintenance Descp:I-75 FROM SR 61/BARTOW TO SR 156/GORDON

Length: 21.70

Total Project Cost: Total Project Authorizations:

$ 33,785,536 $0

Phase CST

Fund IM

Year 2012

Project: M004450 Type Work: Resurface & Maintenance
Descp:SR 61 FM 0.04 MI W OF CS 830/LEAKE ST TO 0.07 MI N OF SR 20 Length: 3.19

Phase CST

Fund STP

Year 2012

Total Project Cost:

$ 1,074,730

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Project: T003061 Type Work: Transit Projects
Descp:FY 2012 FTA SECTION 5307/5340 FORMULA FUNDS FOR BARTOW Length: 0.00

Phase CST

Fund Transit

Year 2012

Total Project Cost: Total Project Authorizations:

$ 40,010 $0

Federal $30,406,982

State $3,378,554

Other $0

Total $33,785,536

Federal $859,784

Also in Gordon County

State $214,946

Other $0

Total $1,074,730

Federal $32,008

State $0

Other $8,002

Total $40,010

Project: T003062 Type Work: Transit Projects
Descp:FY 2013 FTA SECTION 5307/5340 FORMULA FUNDS FOR BARTOW Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 40,810 $0

Phase CST

Fund Transit

Year 2013

Federal $32,648

State $0

Other $8,162

Total $40,810

Page 67 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: T003625 Type Work: Transit Projects
Descp:FY 2014 FTA SECTION 5307/5340 FORMULA FUNDS FOR BARTOW Length: 0.00

Phase CST

Fund Transit

Year 2014

Federal $32,648

State $0

Total Project Cost: Total Project Authorizations:

$ 40,810 $0

Other $8,162

Total $40,810

Project: T004076 Type Work: Transit Projects
Descp:FY 2015 FTA SECTION 5307/5340 FORMULA FUNDS FOR BARTOW Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 40,810 $0

Phase CST

Fund Transit

Year 2015

Federal $32,648

State $4,081

Other $4,081

Total $40,810

Project PI#

Year

Bartow Totals Summary

County Summary excludes lump sum projects.

This County is also located in a MPO area. Additional Projects may be listed in the MPO TIP.

Phase

Fund

Federal

State

Other

Total

0007494 0007494 0007494 0009860 621350621440621445641870641870661950661950661950661950661950T003061 T003062 T003625 T004076

2012 2012 2015 2015 2013 2013 2013 2012 2015 2012 2012 2015 2012 2012 2012 2013 2014 2015

PE PE ROW ROW CST CST CST PE ROW ROW ROW ROW ROW ROW CST CST CST CST

STP Local Local Bridge STP STP Bridge STP STP HPP HPP NHS HPP HPP Transit Transit Transit Transit

$45,047 $0 $0
$44,163 $12,224,634 $12,731,669
$662,675 $81,600
$497,350 $2,874,388
$855,472 $6,256,261 $12,243,936 $3,644,028
$32,008 $32,648 $32,648 $32,648

$11,262 $0 $0
$11,041 $3,056,158 $3,182,917
$165,669 $20,400
$124,337 $0
$213,868 $1,564,065 $3,060,984
$911,007 $0 $0 $0
$4,081

$0 $1,126,162 $1,000,000
$0 $0 $0 $0 $0 $0 $790,457 $0 $0 $0 $0 $8,002 $8,162 $8,162 $4,081

$56,308 $1,126,162 $1,000,000
$55,204 $15,280,792 $15,914,587
$828,343 $102,000 $621,687 $3,664,845 $1,069,340 $7,820,326 $15,304,920 $4,555,035
$40,010 $40,810 $40,810 $40,810

$52,291,174

$12,325,789

$2,945,026

$67,561,989

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 68 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Ben Hill
Project: 0006529 Type Work: TE-Bike/Ped Facility Descp:JEFFERSON DAVIS HERITAGE TRAIL

Phase CST

Fund STP

Year 2012

Federal $333,000

State $0

Length: 0.00

Total Project Cost:

$ 416,250

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 0007627 Type Work: Historic Preservation
Descp:PRESERVATION OF 1906 AB&A RAILROAD BUILDING IN FITZGERALD Length: 0.00

Phase CST

Fund HPP

Year 2014

Federal $449,951

State $0

Total Project Cost: Total Project Authorizations:

$ 562,439 $0

Other $83,250
Other $112,488

Total $416,250
Total $562,439

Project: 0008982 Type Work: TE-Bike/Ped Facility
Descp:FITZGERALD STREETSCAPE REVITALIZATION PHASE III Length: 0.00

Phase CST

Fund STP

Year 2014

Total Project Cost:

$ 625,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Federal $500,000

State $0

Other $125,000

Total $625,000

Ben Hill Totals Summary
County Summary excludes lump sum projects.

Project PI# 0007627

Year 2014

Phase CST

Fund HPP

Federal $449,951

State $0

Other $112,488

Total $562,439

$449,951

$0

$112,488

$562,439

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 69 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Berrien
Project: 0008983 Type Work: TE-Bike/Ped Facility Descp:BERRIEN COUNTY PEDESTRIAN FACILITIES

Phase CST

Fund STP

Year 2012

Federal $200,000

State $0

Length: 0.00

Total Project Cost:

$ 250,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 0008985 Type Work: TE-Bike/Ped Facility
Descp:RAY CITY DOWNTOWN PEDESTRIAN IMPROVEMENTS Length: 0.00

Phase CST

Fund STP

Year 2012

Federal $100,000

State $0

Total Project Cost:

$ 125,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 0010117 Type Work: Signals
Descp:SR 11 @ SR 125; @ SR 168 & @ CS 798 - SIGNAL UPGRADES Length: 1.20

Phase PE
ROW CST

Fund STP STP STP

Year 2011 2012 2013

Federal $150,000 $81,600 $357,000

State $0 $0 $0

Total Project Cost:

$ 588,600

Total Project Authorizations: $ 150,000

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2012 - FY 2015

Project: T003208 Type Work: Transit Projects Descp:FY 2012 SECTION 5311 OPERATING BERRIEN
Length: 0.00

Phase CST

Fund Transit

Year 2012

Federal $60,133

State $0

Total Project Cost: Total Project Authorizations:

$ 120,265 $0

Other $50,000
Other $25,000
Other $0 $0 $0
Other $60,133

Total $250,000
Total $125,000
Total $150,000
$81,600 $357,000
Total $120,265

Project: T003209 Type Work: Transit Projects Descp:FY 2013 SECTION 5311 OPERATING BERRIEN
Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 120,265 $0

Phase CST

Fund Transit

Year 2013

Federal $60,133

State $0

Other $60,133

Total $120,265

Project: T003211 Type Work: Transit Projects Descp:FY 2012 SECTION 5311 CAPITAL BERRIEN

Length: 0.00

Total Project Cost:

$0

Total Project Authorizations: $ 0

Phase CST

Fund Transit

Year 2012

Federal $0

State $0

Other $0

Total $0

Page 70 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: T003212 Type Work: Transit Projects Descp:FY 2013 SECTION 5311 CAPITAL BERRIEN

Phase CST

Fund Transit

Year 2013

Federal $35,680

State $4,460

Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 44,600 $0

Other $4,460

Total $44,600

Project: T003698 Type Work: Transit Projects Descp:FY 2014 SECTION 5311 OPERATING BERRIEN

Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 120,266 $0

Phase CST

Fund Transit

Year 2014

Federal $60,133

State $0

Other $60,133

Total $120,266

Project: T003699 Type Work: Transit Projects Descp:FY 2014 SECTION 5311 CAPITAL BERRIEN

Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 44,600 $0

Phase CST

Fund Transit

Year 2014

Federal $35,680

State $4,460

Other $4,460

Total $44,600

Project: T004110 Type Work: Transit Projects Descp:FY 2015 SECTION 5311 OPERATING BERRIEN

Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 120,266 $0

Phase CST

Fund Transit

Year 2015

Federal $60,133

State $0

Other $60,133

Total $120,266

Project: T004111 Type Work: Transit Projects Descp:FY 2015 SECTION 5311 CAPITAL BERRIEN

Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 44,600 $0

Phase CST

Fund Transit

Year 2015

Federal $35,680

State $4,460

Other $4,460

Total $44,600

Page 71 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/4/2011
Berrien Totals Summary
County Summary excludes lump sum projects.

Project PI#
T003208 T003209 T003211 T003212 T003698 T003699 T004110 T004111

Year
2012 2013 2012 2013 2014 2014 2015 2015

Phase
CST CST CST CST CST CST CST CST

Fund
Transit Transit Transit Transit Transit Transit Transit Transit

Federal
$60,133 $60,133
$0 $35,680 $60,133 $35,680 $60,133 $35,680

State
$0 $0 $0 $4,460 $0 $4,460 $0 $4,460

Other
$60,133 $60,133
$0 $4,460 $60,133 $4,460 $60,133 $4,460

Total
$120,265 $120,265
$0 $44,600 $120,266 $44,600 $120,266 $44,600

$347,571

$13,380

$253,911

$614,862

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 72 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Bleckley
Project: 0003625 Type Work: Widening
Descp:SR 87 FM 0.2 MI N OF CR 141/FOSKEY RD TO CR 166/DYKES CIRCLE
Lanes: Exist. 2 Prop. 4 Length: 4.40

Phase PE
ROW CST

Fund STP STP STP

Year

Federal

2004

$509,849

2013

$1,706,256

After 2015 $13,465,960

State $127,462 $426,564 $3,366,490

Total Project Cost: Total Project Authorizations:

$ 19,602,582 $ 637,311

Other $0 $0 $0

Total $637,311 $2,132,820 $16,832,450

Project: M004189 Type Work: Signing
Descp:I-16 @ 12 LOCS BETWEEN BLECKLEY COUNTY & EMANUEL COUNTY Length: 4.80

Phase PE CST

Fund IM IM

Total Project Cost:

$ 1,900,000

Total Project Authorizations: $ 200,000

Uses Lump Sum Bank: INTERSTATE MAINTENANCE FOR FY 2012 - FY 2015

Year 2010 2015

Federal $200,000
$1,700,000

Bleckley Totals Summary
County Summary excludes lump sum projects.

State $0 $0

Other $0 $0

Total $200,000 $1,700,000

Also in Emanuel, Laurens, Treutlen County

Project PI# 0003625

Year 2013

Phase ROW

Fund STP

Federal $1,706,256

State $426,564

Other $0

Total $2,132,820

$1,706,256

$426,564

$0

$2,132,820

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 73 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Brantley
Project: 0007161 Type Work: Replace Bridge Descp:SR 32 @ LITTLE SATILLA RIVER OVERFLOW
Length: 0.40

Phase PE
ROW CST

Fund Bridge Bridge Bridge

Year 2008 2014 After 2015

Federal $120,000 $58,018
$1,125,945

State $30,000 $14,505 $281,486

Total Project Cost: Total Project Authorizations:

$ 1,629,955 $ 150,000

Other $0 $0 $0

Total $150,000
$72,523 $1,407,432

Project: M004264 Type Work: Resurface & Maintenance
Descp:SR 110 FROM SR 25/CAMDEN TO SR 520/US 82/BRANTLEY Length: 13.54

Phase CST

Fund STP

Year 2012

Total Project Cost:

$ 2,115,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Project: M004285 Type Work: Resurface & Maintenance
Descp:SR 15 FROM N OF SR 4/US 1/CHARLTON TO SATILLA RIVER/BRANTLEY Length: 15.67

Phase CST

Fund STP

Year 2013

Total Project Cost:

$ 4,233,525

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Federal $1,692,000
Federal $3,386,820

State $423,000

Other $0

Total $2,115,000

Also in Camden County

State $846,705

Other $0

Total $4,233,525

Also in Charlton County

Brantley Totals Summary
County Summary excludes lump sum projects.

Project PI# 0007161

Year 2014

Phase ROW

Fund Bridge

Federal $58,018

State $14,505

Other $0

Total $72,523

$58,018

$14,505

$0

$72,523

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 74 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Brooks
Project: 0000543 Type Work: Widening
Descp:SR 133 FM CR 276/TROUPEVILLE RD TO CR 10/PAULINE CHURCH RD
Lanes: Exist. 2 Prop. 4 Length: 6.67

Total Project Cost: Total Project Authorizations:

$ 28,918,897 $ 3,284,981

Phase PE
ROW ROW CST UTL

Fund STP HPP NHS NHS NHS

Year 2003 2012 2012 2014 2014

Federal $2,627,985
$990,000 $870,465 $18,681,379 $163,289

State $656,996
$0 $217,616 $4,670,345
$40,822

Other $0 $0 $0 $0 $0

Total $3,284,981
$990,000 $1,088,081 $23,351,724
$204,111

Project: 0000544 Type Work: Widening
Descp:SR 133 FM CR 10/PAULINE CH RD TO CR 1/OLD QUITMAN ADEL RD
Lanes: Exist. 2 Prop. 4 Length: 5.43

Total Project Cost: Total Project Authorizations:

$ 42,835,739 $ 4,877,469

Phase PE PE PE
ROW CST UTL

Fund STP HPP HPP NHS NHS NHS

Year

Federal

2003

$2,102,176

2003

$1,457,611

2003

$342,189

2012

$934,475

After 2015 $28,085,982

After 2015 $1,346,159

State $525,544 $364,403
$85,547 $233,619 $7,021,495 $336,540

Other $0 $0 $0 $0 $0 $0

Total $2,627,720 $1,822,014
$427,736 $1,168,094 $35,107,477 $1,682,698

Project: 0000545 Type Work: Widening
Descp:SR 133 FM CR 1/OLD QUITMAN ADEL RD/BROOKS TO CR 256/COLQUITT
Lanes: Exist. 2 Prop. 4 Length: 9.63

Total Project Cost: Total Project Authorizations:

$ 59,497,744 $ 5,876,933

Phase PE PE
ROW CST UTL

Fund Year

STP

2003

Corr Plan 2003

NHS

2012

NHS After 2015

Local After 2015

Federal $939,872
$3,761,674 $1,700,314 $36,737,907
$0

State $234,968 $940,419 $425,078 $9,184,477
$0

Other $0 $0 $0 $0
$5,573,035

Total $1,174,840 $4,702,093 $2,125,392 $45,922,383 $5,573,035

Also in Colquitt County

Brooks Totals Summary
County Summary excludes lump sum projects.

Project PI#

Year

Phase

Fund

Federal

State

Other

Total

0000543 0000543 0000543 0000543 0000544 0000545

2012 2012 2014 2014 2012 2012

ROW ROW CST UTL ROW ROW

NHS HPP NHS NHS NHS NHS

$870,465 $990,000 $18,681,379 $163,289 $934,475 $1,309,242

$217,616 $0
$4,670,345 $40,822
$233,619 $327,310

$0

$1,088,081

$0

$990,000

$0

$23,351,724

$0

$204,111

$0

$1,168,094

$0

$1,636,552

$22,948,849

$5,489,712

$0

$28,438,561

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 75 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Bryan
Project: 0008442 Type Work: Operational Improvement Descp:SR 25/US 17 @ SOMMERS BLVD
Length: 0.26

Phase PE
ROW CST

Fund STP Local STP

Year 2007 LOCL 2012

Federal $48,000 $0
$345,843

State $12,000
$0 $86,461

Total Project Cost:

$ 503,253

Total Project Authorizations: $ 70,949

Uses Lump Sum Bank: OPERATIONS FOR ANY AREA FOR FY 2012 - FY 2015

Project: 0008988 Type Work: TE-Bike/Ped Facility
Descp:PEMBROKE DOWNTOWN REDEVELOPMENT PHASE III Length: 0.00

Phase CST

Fund STP

Year 2012

Federal $200,000

State $0

Total Project Cost:

$ 250,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 532370- Type Work: Widening Descp:SR 144 EB FROM S OF CR 100 TO S OF CR 154

Lanes: Exist. 2 Prop. 4 Length: 4.60

Total Project Cost: Total Project Authorizations:

$ 34,222,793 $ 784,012

Phase PE
ROW ROW CST UTL

Fund STP STP STP STP STP

Year

Federal

2000

$627,210

2012

$3,264,000

2013

$4,929,831

After 2015 $18,186,222

After 2015 $370,971

State $156,802 $816,000 $1,232,458 $4,546,556
$92,743

Other $0
$10,949 $0

Total $60,000 $10,949
$432,304

Other $50,000

Total $250,000

Other $0 $0 $0 $0 $0

Total $784,012 $4,080,000 $6,162,289 $22,732,778 $463,714

Project: 533145- Type Work: Replace Bridge
Descp:SR 26/US 80 @ OGEECHEE RIVER & OVERFLOW 9 MI S OF GUYTON Length: 0.63

Total Project Cost: Total Project Authorizations:

$ 10,435,574 $ 246,300

Phase PE
ROW CST CST

Fund Bridge Bridge HPP Bridge

Year 2000 2013 2015 2015

Project: M003511 Type Work: Weigh Scales
Descp:I-16 WB & I-95 SB @ TRUCK WEIGH STATIONS PHASE I Length: 0.80

Phase CST

Fund IM

Total Project Cost:

$ 1,766,529

Total Project Authorizations: $ 0

Uses Lump Sum Bank: INTERSTATE MAINTENANCE FOR FY 2012 - FY 2015

Project: M003514 Type Work: Weigh Scales
Descp:I-16 @ EB TRUCK WEIGH STATION IN BRYAN PHASE II Length: 0.40

Phase CST

Fund IM

Total Project Cost:

$ 883,265

Total Project Authorizations: $ 0

Uses Lump Sum Bank: INTERSTATE MAINTENANCE FOR FY 2012 - FY 2015

Year 2015
Year 2014

Federal $197,040 $219,524 $792,000
$7,298,295

State $49,260 $54,881
$0 $1,824,574

Other $0 $0 $0 $0

Total $246,300 $274,406 $792,000 $9,122,868

Federal $1,589,876

Also in Effingham County

State $176,653

Other $0

Total $1,766,529

Federal $794,938

Also in Chatham County

State $88,326

Other $0

Total $883,265

Page 76 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: M004401 Type Work: Resurface & Maintenance Descp:SR 119 FROM LIBERTY COUNTY LINE TO SR 30

Phase CST

Fund NHS

Year 2013

Federal $1,152,000

State $288,000

Length: 5.76

Total Project Cost:

$ 1,440,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2012 - FY 2015

Other $0

Total $1,440,000

Bryan Totals Summary
County Summary excludes lump sum projects.

Project PI#
532370532370533145533145533145-

Year
2013 2012 2013 2015 2015

Phase
ROW ROW ROW CST CST

Fund
STP STP Bridge Bridge HPP

Federal
$4,929,831 $3,264,000
$54,881 $1,824,574
$198,000

State
$1,232,458 $816,000 $13,720 $456,143 $0

Other
$0 $0 $0 $0 $0

Total
$6,162,289 $4,080,000
$68,601 $2,280,717
$198,000

$10,271,286

$2,518,322

$0

$12,789,608

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 77 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Bulloch
Project: 0008076 Type Work: TE-Bike/Ped Facility
Descp:CAMPUS GREENWAY MULTI-USE TRAIL - PHASE I Length: 0.00

Phase CST

Fund STP

Year 2012

Federal $250,400

State $0

Total Project Cost:

$ 313,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 0008078 Type Work: TE-Landscape/Beautify
Descp:CR 576 FM SR 67/N MAIN ST TO CS 619/COLLEGE ST - PHASE II Length: 0.14

Phase CST

Fund STP

Year 2013

Federal $300,000

State $0

Total Project Cost:

$ 375,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 0008397 Type Work: Operational Improvement
Descp:SR 26/US 80 @ CR 340/BEASLEY ROAD/CAWANA ROAD Length: 0.38

Phase PE
ROW CST

Fund STP Local STP

Total Project Cost:

$ 637,755

UTL Local

Total Project Authorizations: $ 222,550

Uses Lump Sum Bank: OPERATIONS FOR ANY AREA FOR FY 2012 - FY 2015

Year 2007 LOCL 2012 2012

Federal $68,000 $0
$174,708 $0

State $17,000
$0 $43,677
$0

Project: 0008424 Type Work: Signals Descp:SR 73/US 301 @ SR 46
Length: 0.37

Phase PE CST

Fund Safety Safety

Year 2008 2012

Federal $207,000 $203,239

State $23,000
$0

Total Project Cost:

$ 433,239

Total Project Authorizations: $ 433,239

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0008618 Type Work: Intersection Improvement Descp:SR 67 BYPASS @ CR 142/PULASKI ROAD
Length: 0.25

Phase PE
ROW CST

Fund Safety Safety Safety

Year 2008 2013 2014

Federal $292,243 $55,590
$1,218,722

State $32,471
$6,177 $135,414

Total Project Cost:

$ 1,740,616

Total Project Authorizations: $ 324,714

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0010364 Type Work: Intersection Improvement Descp:SR 26 @ CR 585/BURKHALTER ROAD
Length: 0.40

Phase PE
ROW CST

Fund Safety Safety Safety

Year 2011 2012 2012

Federal $315,000 $180,000
$1,080,000

State $35,000 $20,000 $120,000

Total Project Cost:

$ 1,750,000

Total Project Authorizations: $ 350,000

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Other $62,600
Other $75,000
Other $0
$137,550 $0
$196,820
Other $0 $0
Other $0 $0 $0
Other $0 $0 $0

Total $313,000
Total $375,000
Total $85,000
$137,550 $218,385 $196,820
Total $230,000 $203,239
Total $324,714
$61,766 $1,354,136
Total $350,000 $200,000 $1,200,000

Page 78 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: 0010428 Type Work: Intersection Improvement
Descp:CR 248/LANGSTON CHAPEL ROAD @ CR 585/HARVILLE ROAD Length: 0.20

Phase PE CST

Fund Safety Safety

Year 2012 2013

Federal $90,000
$675,000

State $10,000 $75,000

Total Project Cost:

$ 850,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: HIGH RISK RURAL ROADS FOR FY 2012 - FY 2015

Project: 0010429 Type Work: Intersection Improvement
Descp:CR 576/WESTSIDE ROAD @ CR 127/NESMITH ROAD Length: 0.40

Phase PE CST

Fund Safety Safety

Year 2012 2013

Federal $90,000
$675,000

State $10,000 $75,000

Total Project Cost:

$ 850,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: HIGH RISK RURAL ROADS FOR FY 2012 - FY 2015

Project: 0010430 Type Work: Intersection Improvement
Descp:CR 153/CYPRESS ROAD @ CR 146/COUNTRY CLUB ROAD Length: 0.20

Phase PE CST

Fund Safety Safety

Year 2012 2012

Federal $90,000
$675,000

State $10,000 $75,000

Total Project Cost:

$ 850,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: HIGH RISK RURAL ROADS FOR FY 2012 - FY 2015

Project: 522460- Type Work: Widening Descp:SR 67 FM I-16 TO STATESBORO BYPASS

Lanes: Exist. 2 Prop. 4 Length: 10.85

Total Project Cost: Total Project Authorizations:

$ 49,384,566 $ 2,000,000

Phase PE
ROW ROW CST

Fund STP TCSP STP STP

Year

Federal

2002

$1,600,000

2013

$452,760

2013

$8,613,656

After 2015 $28,841,237

State $400,000 $113,190 $2,153,414 $7,210,309

Other $0 $0

Total $100,000 $750,000

Other $0 $0

Total $100,000 $750,000

Other $0 $0

Total $100,000 $750,000

Other $0 $0 $0 $0

Total $2,000,000
$565,950 $10,767,069 $36,051,547

Project: M004261 Type Work: Resurface & Maintenance
Descp:SR 26 FM E OF CR 348/STILES ST TO E OF CR 402/ARCOLA RD Length: 10.52

Phase CST

Fund STP

Year 2012

Total Project Cost:

$ 2,735,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Project: M004263 Type Work: Resurface & Maintenance
Descp:SR 73 FROM S OF LOTTS CREEK TO S OF CS 797/TILLMAN STREET Length: 6.49

Phase CST

Fund STP

Year 2012

Total Project Cost:

$ 3,665,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Federal $2,188,000

State $547,000

Federal $2,932,000

State $733,000

Other $0
Other $0

Total $2,735,000
Total $3,665,000

Page 79 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: M004405 Type Work: Resurface & Maintenance Descp:SR 67 FROM SR 46 TO CS 804/WILDWOOD DRIVE

Phase CST

Fund STP

Year 2014

Federal $3,440,000

State $860,000

Length: 10.64

Total Project Cost:

$ 4,300,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Project: M004457 Type Work: Resurface & Maintenance
Descp:SR 73 FROM S OF CS 797/TILLMAN STREET TO SR 26/US 80 Length: 1.45

Phase CST

Fund STP

Year 2012

Federal $487,200

State $121,800

Total Project Cost:

$ 609,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Project: T002559 Type Work: Airport Descp:STATESBORO - SECURITY FENCING
Length: 0.00

Phase CST

Fund Airport

Year 2012

Federal $146,490

State $3,065

Total Project Cost: Total Project Authorizations:

$ 154,200 $0

Other $0
Other $0
Other $4,645

Total $4,300,000
Total $609,000
Total $154,200

Bulloch Totals Summary
County Summary excludes lump sum projects.

Project PI#
522460522460T002559

Year
2013 2013 2012

Phase
ROW ROW CST

Fund
STP TCSP Airport

Federal
$8,613,656 $452,760 $146,490

State
$2,153,414 $113,190 $3,065

Other
$0 $0 $4,645

Total
$10,767,069 $565,950 $154,200

$9,212,906

$2,269,669

$4,645

$11,487,219

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 80 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Burke

Project: 0007361 Type Work: Signals
Descp:SR 4; SR 23; SR 24; SR 56; SR 121 - TRAFFIC SIGNAL UPGRADES Length: 3.20

Phase PE
ROW CST

Fund STP STP STP

Year 2006 2011 2015

Federal $226,400 $70,000
$1,215,931

Total Project Cost:

$ 1,619,931

UTL

STP

2015

$51,000

Total Project Authorizations: $ 353,000

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2012 - FY 2015

State $56,600
$0 $0 $0

Other $0 $0 $0 $0

Total $283,000
$70,000 $1,215,931
$51,000

Also in Jefferson County

Project: 0008079 Type Work: TE-Historic Preservation
Descp:SARDIS HISTORIC TRANSPORTATION RESTORATION AND EDUCATION Length: 0.71

Phase CST

Fund STP

Year 2013

Federal $218,400

State $0

Other $54,600

Total $273,000

Total Project Cost:

$ 273,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: M004328 Type Work: Resurface & Maintenance
Descp:SR 24 FM SCREVEN CO LINE TO 0.43 MI N OF CR 196/NEELY CIRCLE Length: 18.77

Phase CST

Fund STP

Year 2013

Federal $3,757,192

State $939,298

Other $0

Total $4,696,490

Total Project Cost:

$ 4,696,490

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Page 81 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Butts
Project: 0007580 Type Work: Sidewalks
Descp:ROAD IMPROVEMENTS & UTILITY RELOCATIONS IN JACKSON Length: 0.00

Phase PE
ROW CST

Fund Local Local HPP

Year 2013 2014 After 2015

Federal $0 $0
$449,950

State $0 $0 $0

Total Project Cost: Total Project Authorizations:

$ 674,438 $0

Other $62,000 $50,000 $112,488

Total $62,000 $50,000
$562,438

Project: 0009964 Type Work: Roundabout
Descp:SR 36 @ CR 295/OLD BETHEL ROAD/FOUR POINTS ROAD Length: 0.30

Phase PE CST

Fund Safety Safety

Total Project Cost:

$ 1,020,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0009966 Type Work: Roundabout Descp:SR 42 @ SR 87
Length: 0.30

Phase PE CST

Fund Safety Safety

Total Project Cost:

$ 1,020,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 322440- Type Work: Widening
Descp:SR 36 FROM CR 296/BROWNLEE ROAD TO N OF CR 289/STARK ROAD
Lanes: Exist. 2 Prop. 4 Length: 1.49

Total Project Cost: Total Project Authorizations:

$ 33,469,205 $ 1,543,366

Phase PE
ROW CST UTL

Fund STP STP STP STP

Year 2012 2012

Federal $153,000 $867,000

State $0 $0

Year 2012 2012

Federal $153,000 $867,000

State $0 $0

Year 1992 2014 2015 2015

Federal $1,234,693 $6,614,959 $18,578,588
$347,123

State $308,673 $1,653,740 $4,644,647
$86,781

Other $0 $0

Total $153,000 $867,000

Other $0 $0

Total $153,000 $867,000

Other $0 $0 $0 $0

Total $1,543,366 $8,268,699 $23,223,236
$433,904

Project: 333170- Type Work: Replace Bridge
Descp:SR 36 @ TOWALIGA RIVER 7.5 MI SW OF JACKSON Length: 0.27

Total Project Cost: Total Project Authorizations:

$ 3,232,008 $ 780,341

Phase PE
ROW CST UTL

Fund Bridge Bridge Bridge Bridge

Year 2001 2010 2012 2012

Federal $384,273 $240,000
$1,918,886 $42,448

State $96,068 $60,000 $479,721 $10,612

Other $0 $0 $0 $0

Total $480,341 $300,000 $2,398,607
$53,060

Project: 333171- Type Work: Replace Bridge
Descp:SR 36 @ YELLOW WATER CREEK 1 MI N OF JCT SR 42 Length: 0.50

Total Project Cost: Total Project Authorizations:

$ 4,551,185 $ 189,200

Phase PE
ROW CST UTL

Fund Bridge Bridge Bridge Local

Year 2000 2014 2015 2015

Federal $151,360 $53,689
$3,345,806 $0

State $37,840 $13,422 $836,452
$0

Other $0 $0 $0
$112,616

Total $189,200
$67,111 $4,182,258
$112,616

Page 82 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: 333172- Type Work: Replace Bridge
Descp:SR 36 @ SOUTH RIVER @ BUTTS-NEWTON COUNTY LINE Length: 0.76

Total Project Cost: Total Project Authorizations:

$ 9,228,268 $ 342,429

Phase PE
ROW ROW CST CST

Fund Bridge Bridge STP STP Bridge

Year 2000 2012 2014 After 2015 After 2015

Federal $273,943
$1,298,419 $1,350,875 $2,997,146 $1,462,231

State $68,486 $324,605 $337,719 $749,286 $365,558

Other $0 $0 $0 $0 $0

Total $342,429 $1,623,024 $1,688,594 $3,746,432 $1,827,789

Also in Newton County

Project: M004354 Type Work: Resurface & Maintenance Descp:SR 36 FROM 0.09 MI E OF I-75 TO SR 16
Length: 8.37

Phase CST

Fund STP

Year 2012

Federal $1,276,846

State $319,211

Other $0

Total $1,596,057

Total Project Cost:

$ 1,596,057

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Project: M004362 Type Work: Resurface & Maintenance Descp:SR 42 FROM SR 16/BUTTS TO SR 155/HENRY
Length: 15.91

Phase CST

Fund STP

Year 2013

Federal $2,522,923

State $630,731

Other $0

Total $3,153,654

Total Project Cost:

$ 3,153,654

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Also in Henry County

Butts Totals Summary
County Summary excludes lump sum projects.

Project PI#
0007580 0007580 322440322440322440333170333170333171333171333171333172333172-

Year
2013 2014 2014 2015 2015 2012 2012 2014 2015 2015 2012 2014

Phase
PE ROW ROW CST UTL CST UTL ROW CST UTL ROW ROW

Fund
Local Local STP STP STP Bridge Bridge Bridge Bridge Local Bridge STP

Federal
$0 $0 $6,614,959 $18,578,588 $347,123 $1,918,886 $42,448 $53,689 $3,345,806 $0 $649,210 $675,438

State
$0 $0 $1,653,740 $4,644,647 $86,781 $479,721 $10,612 $13,422 $836,452 $0 $162,302 $168,859

Other
$62,000 $50,000
$0 $0 $0 $0 $0 $0 $0 $112,616 $0 $0

Total
$62,000 $50,000 $8,268,699 $23,223,236 $433,904 $2,398,607 $53,060 $67,111 $4,182,258 $112,616 $811,512 $844,297

$32,226,147

$8,056,537

$224,616

$40,507,300

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 83 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Calhoun
Project: 0008990 Type Work: TE-Rehab Hist Trans Bldg Descp:ARLINGTON DEPOT REHABILITATION

Phase CST

Fund STP

Year 2012

Federal $80,128

State $0

Length: 0.00

Total Project Cost:

$ 100,160

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 0009862 Type Work: Replace Bridge
Descp:SR 45 @ CORDRAYS POND DRAIN AND OVERFLOW Length: 0.40

Phase PE
ROW CST

Fund Bridge Bridge Bridge

Year 2011 2015 After 2015

Federal $40,000 $44,163
$293,604

State $10,000 $11,041 $73,401

Total Project Cost: Total Project Authorizations:

$ 472,209 $ 50,000

Other $20,032
Other $0 $0 $0

Total $100,160
Total $50,000 $55,204
$367,005

Project: 0010456 Type Work: Pavement Markings
Descp:OFF-SYSTEM SAFETY IMPROVEMENTS @ 11 CR LOC IN CALHOUN COUNTY Length: 35.56

Phase CST

Fund Safety

Year 2012

Federal $101,085

State $0

Other $0

Total $101,085

Total Project Cost:

$ 101,085

Total Project Authorizations: $ 0

Uses Lump Sum Bank: HIGH RISK RURAL ROADS FOR FY 2012 - FY 2015

Project: 442951- Type Work: Replace Bridge
Descp:SR 234 @ CHICKASAWHATCHEE CREEK 8 MI NE OF LEARY Length: 1.54

Total Project Cost: Total Project Authorizations:

$ 12,531,565 $ 173,145

Phase PE
ROW CST CST

Fund Bridge Bridge STP Bridge

Year 2000 2014 After 2015 After 2015

Federal $138,516 $129,892
$4,293,011 $5,463,833

State $34,629 $32,473 $1,073,253 $1,365,958

Other $0 $0 $0 $0

Total $173,145 $162,365 $5,366,264 $6,829,791

Also in Dougherty County

Project: M004383 Type Work: Resurface & Maintenance Descp:SR 45 ALT FROM SR 45 TO SR 45 IN ARLINGTON
Length: 0.37

Phase CST

Fund STP

Year 2012

Federal $94,633

State $23,658

Other $0

Total $118,291

Total Project Cost:

$ 118,291

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Calhoun Totals Summary
County Summary excludes lump sum projects.

Project PI#
0009862 442951-

Year
2015 2014

Phase
ROW ROW

Fund
Bridge Bridge

Federal
$44,163 $64,946

State
$11,041 $16,236

Other
$0 $0

Total
$55,204 $81,182

$109,109

$27,277

$0

$136,386

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 84 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Camden
Project: 0000820 Type Work: Widening
Descp:SR 40 FM EAST OF ST MARYS CUTOFF/MP 5.0/CHARLTON TO CR 61
Lanes: Exist. 2 Prop. 4 Length: 11.14

Total Project Cost: Total Project Authorizations:

$ 44,166,978 $ 2,867,738

Phase PE PE PE
ROW ROW ROW CST

Fund STP HPP HPP HPP HPP STP STP

Year

Federal

2003

$1,574,270

2003

$583,045

2003

$136,876

2014

$1,812,278

2014

$719,921

2014

$177,519

After 2015 $30,329,674

State

Other

Total

$393,567

$0

$1,967,837

$145,761

$0

$728,806

$34,219

$0

$171,095

$453,069

$0

$2,265,347

$179,980

$0

$899,901

$44,380

$0

$221,899

$7,582,418

$0 $37,912,092

Also in Charlton County

Project: 0002861 Type Work: Turn Lanes
Descp:SR 40 FM W OF CS 481/GROVE BLVD TO E OF PR 718/TRUSS PLANT Length: 1.44

Total Project Cost: Total Project Authorizations:

$ 13,866,788 $ 461,047

Phase PE
ROW ROW CST UTL

Fund NHS NHS NHS NHS NHS

Year 2006 2013 2014 After 2015 After 2015

Federal $368,837
$1,873,669 $3,463,783 $4,361,449 $1,025,693

State $92,209 $468,417 $865,946 $1,090,362 $256,423

Other $0 $0 $0 $0 $0

Total $461,047 $2,342,086 $4,329,729 $5,451,811 $1,282,116

Project: 0006701 Type Work: Pavement Rehab Descp:ST MARYS ROAD PAVING PROJECT

Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 100,000 $0

Phase CST

Fund HPP

Year 2014

Federal $100,000

State $0

Other $0

Total $100,000

Project: 0007414 Type Work: Widening
Descp:CR 90/COLERAIN ROAD FM I-95 TO KINGS BAY ROAD
Lanes: Exist. 2 Prop. 4 Length: 4.90

Total Project Cost: Total Project Authorizations:

$ 35,318,415 $ 1,110,000

Phase PE PE PE
ROW CST

Fund HPP STP HPP Local STP

Year 2007 2007 2007 2012 2014

Federal $583,045 $168,079 $136,876 $0
$22,988,729

State $145,761
$42,020 $34,219
$0 $5,747,182

Other $0 $0 $0
$5,472,504 $0

Total $728,806 $210,099 $171,095 $5,472,504 $28,735,911

Project: 0008666 Type Work: Widening Descp:KINGSLAND BYPASS FROM CR 61 TO I-95

Lanes: Exist. 2 Prop. 4 Length: 5.30

Total Project Cost: Total Project Authorizations:

$ 23,537,108 $ 1,816,653

Phase PE PE PE
ROW CST CST CST

Fund HPP STP HPP HPP HPP HPP STP

Year

Federal

2011

$308,906

2011

$973,322

2011

$171,094

2014

$3,200,000

After 2015 $424,556

After 2015 $419,900

After 2015 $13,331,908

State $77,226 $243,331 $42,774 $800,000 $106,139 $104,975 $3,332,977

Other $0 $0 $0 $0 $0 $0 $0

Total $386,132 $1,216,653 $213,868 $4,000,000 $530,695 $524,875 $16,664,885

Page 85 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0009436 Type Work: RRX Warning Device Descp:SR 40 SPUR @ SMR #861077N IN ST MARYS

10/4/2011

Phase CST

Fund Safety

Year 2012

Federal $153,000

State $0

Length: 0.40

Other $0

Total $153,000

Total Project Cost:

$ 153,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2012 - FY 2015

Project: M003293 Type Work: Shoulder Work
Descp:CAMDEN SR 40 TATNALL SR 147 SHOULDER PAVING VARIOUS LOC Length: 5.10

Phase CST

Fund State

Year 2012

Federal $0

State $306,517

Other $0

Total $306,517

Total Project Cost: Total Project Authorizations:

$ 306,517 $0

Also in Tattnall County

Project: M004264 Type Work: Resurface & Maintenance
Descp:SR 110 FROM SR 25/CAMDEN TO SR 520/US 82/BRANTLEY Length: 13.54

Phase CST

Fund STP

Year 2012

Federal $1,692,000

State $423,000

Other $0

Total $2,115,000

Total Project Cost:

$ 2,115,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Also in Brantley County

Project: M004265 Type Work: Resurface & Maintenance Descp:SR 110 FROM SR 40 TO SR 25
Length: 14.40

Phase CST

Fund STP

Year 2012

Federal $1,840,000

State $460,000

Other $0

Total $2,300,000

Total Project Cost:

$ 2,300,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Camden Totals Summary
County Summary excludes lump sum projects.

Project PI#
0000820 0000820 0000820 0002861 0002861 0006701 0007414 0007414 0008666 M003293

Year
2014 2014 2014 2014 2013 2014 2012 2014 2014 2012

Phase
ROW ROW ROW ROW ROW CST ROW CST ROW CST

Fund
STP HPP HPP NHS NHS HPP Local STP HPP State

Federal
$152,666 $619,132 $1,558,559 $3,463,783 $1,873,669 $100,000
$0 $22,988,729
$3,200,000 $0

State
$38,167 $154,783 $389,640 $865,946 $468,417
$0 $0 $5,747,182 $800,000 $110,346

Other
$0 $0 $0 $0 $0 $0 $5,472,504 $0 $0 $0

Total
$190,833 $773,915 $1,948,199 $4,329,729 $2,342,086 $100,000 $5,472,504 $28,735,911 $4,000,000 $110,346

$33,956,538

$8,574,481

$5,472,504

$48,003,523

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 86 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Candler
Project: 0006495 Type Work: RRX Warning Device Descp:CS 587/MLK JR BLVD @ OGE RR #620236D

Phase CST

Fund Safety

Year 2012

Federal $172,303

State $0

Length: 0.13

Total Project Cost:

$ 172,303

Total Project Authorizations: $ 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2012 - FY 2015

Project: 0007221 Type Work: Drainage Improvements
Descp:CS 559/VERTIA FM CS 577/KENNEDY ST TO CS 558/S TRAPNELL ST Length: 0.40

Phase PE
ROW CST

Fund STP STP STP

Year 2006 2010 2012

Federal $220,533 $176,000 $689,220

State $55,133 $44,000 $172,305

Total Project Cost: Total Project Authorizations:

$ 1,357,191 $ 495,667

Other $0
Other $0 $0 $0

Total $172,303
Total $275,667 $220,000 $861,525

Project: 0008992 Type Work: TE-Landscape/Beautify Descp:METTER DOWNTOWN STREETSCAPE - PHASE II
Length: 0.00

Phase CST

Fund STP

Year 2012

Total Project Cost:

$ 375,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: M004224 Type Work: Resurface & Maintenance
Descp:SR 57 FROM EMANUEL COUNTY LINE TO 0.06 MI N OF SR 23/SR 121 Length: 10.07

Phase CST

Fund STP

Year 2012

Total Project Cost:

$ 1,170,139

Total Project Authorizations: $ 1,170,139

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Project: M004227 Type Work: Resurface & Maintenance Descp:SR 46 FROM EMANUEL COUNTY LINE TO SR 121

Phase CST

Length: 9.50

Fund STP

Year 2012

Total Project Cost:

$ 1,423,543

Total Project Authorizations: $ 1,423,543

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Project: M004286 Type Work: Resurface & Maintenance Descp:SR 23 FROM SR 46 TO EMANUEL COUNTY LINE
Length: 10.03

Phase CST

Fund STP

Year 2013

Total Project Cost:

$ 2,387,140

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Federal $300,000
Federal $936,111
Federal $1,138,834
Federal $1,909,712

State $0

Other $75,000

Total $375,000

State $234,028

Other $0

Total $1,170,139

Also in Tattnall County

State $284,709

Other $0

Total $1,423,543

State $477,428

Other $0

Total $2,387,140

Page 87 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: M004406 Type Work: Resurface & Maintenance Descp:SR 121 FROM SR 46 TO EMANUEL COUNTY LINE

Phase CST

Fund STP

Year 2013

Federal $2,136,000

State $534,000

Length: 10.71

Total Project Cost:

$ 2,670,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Other $0

Total $2,670,000

Candler Totals Summary
County Summary excludes lump sum projects.

Project PI# 0007221

Year 2012

Phase CST

Fund STP

Federal $689,220

State $172,305

Other $0

Total $861,525

$689,220

$172,305

$0

$861,525

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 88 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Carroll
Project: 0000312 Type Work: Widening
Descp:SR 1/US 27 FROM CR 526/CENTRAL RD NORTH TO DIXIE ST
Lanes: Exist. 4 Prop. 6 Length: 0.70

Total Project Cost: Total Project Authorizations:

$ 18,111,630 $0

Phase SCP PE ROW CST UTL

Fund STP STP STP STP STP

Year

Federal

2012

$480,000

2015

$206,796

After 2015 $2,838,392

After 2015 $10,111,995

After 2015 $852,121

State $120,000
$51,699 $709,598 $2,527,999 $213,030

Other $0 $0 $0 $0 $0

Total $600,000 $258,495 $3,547,991 $12,639,993 $1,065,151

Project: 0005827 Type Work: Intersection Improvement Descp:SR 166 @ HAYS MILL ROAD IN CARROLLTON

Length: 0.15

Total Project Cost: Total Project Authorizations:

$ 458,119 $0

Phase PE CST

Fund STP STP

Year 2012 2015

Federal $33,744
$332,751

State $8,436
$83,188

Other $0 $0

Total $42,180
$415,939

Project: 0006026 Type Work: Intersection Improvement Descp:SR 5 @ SR 16/US 27 ALT

Phase PE PE

Fund STP Safety

Length: 0.40

ROW Safety

Total Project Cost: Total Project Authorizations:

$ 1,785,462 $ 231,000

CST UTL

Safety Safety

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0007640 Type Work: Multi-use Trail
Descp:CHATTAHOOCHEE HILLS REGIONAL GREENWAY TRAIL - CARROLL Length: 0.00

Phase CST

Fund HPP

Total Project Cost: Total Project Authorizations:

$ 562,437 $0

Year 2005 2005 2013 2014 2014
Year 2012

Federal $77,400
$130,500 $355,349 $700,397 $343,270

State $8,600
$14,500 $39,483 $77,822 $38,141

Other $0 $0 $0 $0 $0

Federal $449,950

State $0

Other $112,487

Total $86,000
$145,000 $394,832 $778,219 $381,411
Total $562,437

Project: 0008083 Type Work: TE-Bike/Ped Facility
Descp:CARROLLTON GREENBELT FM HAYS MILL RD TO SR 1/US 27 - PHASE I Length: 1.50

Phase CST CST

Total Project Cost: Total Project Authorizations:

$ 1,475,445 $0

Fund HPP STP

Year 2012 After 2015

Federal $251,972 $928,384

State $0 $0

Other $62,993 $232,096

Total $314,965 $1,160,480

Project: 0008459 Type Work: Intersection Improvement Descp:SR 61 @ CS 841/SOUTH CARROLL ROAD
Length: 0.27

Phase PE CST

Fund Safety Safety

Total Project Cost:

$ 708,881

Total Project Authorizations: $ 230,000

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Year 2008 2012

Federal $207,000 $430,993

State $23,000 $47,888

Other $0 $0

Total $230,000 $478,881

Page 89 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: 0009818 Type Work: Barriers
Descp:I-20 FROM ALABAMA STATE LINE TO W OF SR 5 CABLE BARRIERS Length: 34.03

Phase PE CST

Fund Safety Safety

Year 2010 2012

Federal $27,000
$5,136,210

State $3,000
$570,690

Other $0 $0

Total $30,000
$5,706,900

Total Project Cost:

$ 5,736,900

Total Project Authorizations: $ 30,000

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Also in Douglas, Haralson County

Project: 0010188 Type Work: Signing
Descp:OFF-SYSTEM SAFETY IMPROVEMENTS @ 27 CS LOC IN CARROLL COUNTY Length: 0.00

Phase CST

Fund Safety

Year 2012

Federal $148,297

State $0

Other $0

Total $148,297

Total Project Cost:

$ 148,297

Total Project Authorizations: $ 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0010493 Type Work: Signing
Descp:CR 392 FROM SR 61 TO CR 384 & CR 824 FROM SR 113 TO CR 753 Length: 2.82

Phase PE CST

Fund Safety Safety

Year 2012 2012

Federal $10,000 $35,000

State $0 $0

Other $0 $0

Total $10,000 $35,000

Total Project Cost:

$ 45,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: HIGH RISK RURAL ROADS FOR FY 2012 - FY 2015

Project: 621990- Type Work: Interchange Descp:SR 1/US 27 @ SR 166 IN CARROLLTON
Length: 0.20

Phase PE CST

Fund NHS NHS

Year 2000 2014

Federal $943,112
$4,840,637

State $235,778 $1,210,159

Other $0 $0

Total $1,178,890 $6,050,796

Total Project Cost: Total Project Authorizations:

$ 7,229,686 $ 1,178,890

Project: 631490- Type Work: New Construction
Descp:VILLA RICA BYP EXTEND W FM PROPOSED SR 61 BYPASS TO SR 101
Lanes: Exist. 0 Prop. 2 Length: 2.42

Total Project Cost: Total Project Authorizations:

$ 6,426,653 $ 37,000

Phase PE
ROW CST

Fund STP STP STP

Year 2000 2013 After 2015

Federal $29,600
$1,100,035 $4,011,687

State $7,400
$275,009 $1,002,922

Other $0 $0 $0

Total $37,000
$1,375,044 $5,014,608

Project: 662540- Type Work: New Construction
Descp:SR 61 CONN FM SR 61 TO S OF SHORELINE PKWY
Lanes: Exist. 0 Prop. 2 Length: 1.10

Total Project Cost: Total Project Authorizations:

$ 6,327,746 $ 20,000

Phase PE
ROW CST

Fund Other STP STP

Year 2001 2013 After 2015

Federal $0
$1,807,265 $3,238,931

State $20,000 $451,816 $809,733

Other $0 $0 $0

Total $20,000
$2,259,082 $4,048,664

Page 90 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: M003516 Type Work: Weigh Scales
Descp:I-20 @ WB TRUCK WEIGH STATION IN CARROLL PHASE II Length: 0.40

Phase CST

Fund IM

Year 2014

Federal $794,938

State $88,326

Total Project Cost:

$ 883,265

Total Project Authorizations: $ 0

Uses Lump Sum Bank: INTERSTATE MAINTENANCE FOR FY 2012 - FY 2015

Project: M003688 Type Work: Weigh Station
Descp:I-20 FM PLEASANT RIDGE RD TO LEVANS RD NEW WEIGH STATION Length: 1.72

Phase PE
ROW CST

Fund IM IM IM

Year

Federal

2012

$1,193,381

2013

$243,547

After 2015 $15,907,877

State $132,598
$27,061 $1,767,542

Total Project Cost:

$ 19,272,007

Total Project Authorizations: $ 0

Uses Lump Sum Bank: INTERSTATE MAINTENANCE FOR FY 2012 - FY 2015

Project: M004439 Type Work: Resurface & Maintenance
Descp:SR 1/US 27 FM HEARD COUNTY LINE TO N OF CR 561/SPRINGDALE RD Length: 9.69

Phase CST

Fund NHS

Year 2012

Federal $3,146,455

State $786,614

Total Project Cost:

$ 3,933,069

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2012 - FY 2015

Project: M004449 Type Work: Resurface & Maintenance
Descp:SR 16 FROM 0.08 MI W OF CS 1120/COLUMBIA DRIVE TO SR 1/US 27 Length: 1.45

Phase CST

Fund STP

Year 2012

Federal $411,184

State $102,796

Total Project Cost:

$ 513,980

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Other $0

Total $883,265

Other $0 $0 $0

Total $1,325,979
$270,608 $17,675,419

Other $0

Total $3,933,069

Other $0

Total $513,980

Carroll Totals Summary
County Summary excludes lump sum projects.

Project PI#
0000312 0000312 0005827 0005827 0007640 0008083 621990631490662540-

Year
2012 2015 2012 2015 2012 2012 2014 2013 2013

Phase
SCP PE PE CST CST CST CST ROW ROW

Fund
STP STP STP STP HPP HPP NHS STP STP

Federal
$480,000 $206,796
$33,744 $332,751 $449,950 $251,972 $4,840,637 $1,100,035 $1,807,265

State
$120,000 $51,699 $8,436 $83,188 $0 $0
$1,210,159 $275,009 $451,816

Other
$0 $0 $0 $0 $112,487 $62,993 $0 $0 $0

Total
$600,000 $258,495
$42,180 $415,939 $562,437 $314,965 $6,050,796 $1,375,044 $2,259,082

$9,503,150

$2,200,307

$175,480

$11,878,938

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 91 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Catoosa
Project: 0010448 Type Work: Signals
Descp:SR 1 @ 3 LOC; SR 2 @ 5 LOC; SR 136 @ 3 LOC &SR 146 @ 2 LOC Length: 0.00

Phase PE
ROW CST

Fund STP STP STP

Year 2011 2013 2014

Federal $400,000 $500,000 $975,000

State $0 $0 $0

Other $0 $0 $0

Total $400,000 $500,000 $975,000

Total Project Cost:

$ 1,875,000

Total Project Authorizations: $ 400,000

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2012 - FY 2015

Also in Dade, Walker County

Page 92 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Charlton
Project: 0000820 Type Work: Widening
Descp:SR 40 FM EAST OF ST MARYS CUTOFF/MP 5.0/CHARLTON TO CR 61
Lanes: Exist. 2 Prop. 4 Length: 11.14

Total Project Cost: Total Project Authorizations:

$ 44,166,978 $ 2,867,738

Phase PE PE PE
ROW ROW ROW CST

Fund STP HPP HPP HPP HPP STP STP

Year

Federal

2003

$1,574,270

2003

$583,045

2003

$136,876

2014

$1,812,278

2014

$719,921

2014

$177,519

After 2015 $30,329,674

State

Other

Total

$393,567

$0

$1,967,837

$145,761

$0

$728,806

$34,219

$0

$171,095

$453,069

$0

$2,265,347

$179,980

$0

$899,901

$44,380

$0

$221,899

$7,582,418

$0 $37,912,092

Also in Camden County

Project: 0000821 Type Work: Widening
Descp:SR 40 FM SR 40 CONN TO 0.36 MI EAST OF CR 82/MAY BLUFF ROAD
Lanes: Exist. 2 Prop. 4 Length: 1.65

Total Project Cost: Total Project Authorizations:

$ 15,031,002 $ 2,222,670

Phase PE
ROW CST UTL

Fund STP STP STP STP

Year 2003 2015 After 2015 After 2015

Federal $1,778,136
$973,654 $8,947,148
$325,864

State $444,534 $243,413 $2,236,787
$81,466

Other $0 $0 $0 $0

Total $2,222,670 $1,217,067 $11,183,936
$407,329

Project: 0007162 Type Work: Replace Bridge
Descp:SR 185 @ JOAQUIN CREEK 2.5 MI SOUTH OF JCT SR 94 Length: 0.34

Total Project Cost: Total Project Authorizations:

$ 2,532,750 $ 638,423

Phase PE
ROW CST CST UTL

Fund Bridge Bridge STP Bridge Bridge

Year 2007 2014 After 2015 After 2015 After 2015

Federal $510,739 $90,093 $855,461 $546,934 $22,974

State $127,685
$22,523 $213,865 $136,733
$5,743

Other $0 $0 $0 $0 $0

Total $638,423 $112,616 $1,069,326 $683,667
$28,717

Project: 0007163 Type Work: Replace Bridge
Descp:SR 252 @ SATILLA RIVER OVERFLOWS 10 MI NORTHEAST OF FOLKSON Length: 0.80

Total Project Cost: Total Project Authorizations:

$ 5,348,132 $ 150,000

Phase PE
ROW CST

Fund Bridge Bridge Bridge

Year 2008 2014 After 2015

Federal $120,000 $275,371
$3,883,135

State $30,000 $68,843 $970,784

Other $0 $0 $0

Total $150,000 $344,213 $4,853,919

Project: 0007666 Type Work: Drainage Improvements
Descp:SR 4/US 301 @ CS 462/MAIN ST & SR 23 @ MAIN ST IN FOLKSTON Length: 0.70

Total Project Cost: Total Project Authorizations:

$ 1,990,855 $0

Phase PE
ROW CST

Fund STP STP STP

Year 2012 2014 2015

Federal $135,139 $23,433
$1,434,111

State $33,785
$5,858 $358,528

Other $0 $0 $0

Total $168,924
$29,291 $1,792,639

Project: 0009869 Type Work: Roundabout Descp:SR 40 CONN @ SR 252
Length: 0.50

Phase PE CST

Fund Safety Safety

Total Project Cost:

$ 1,020,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Year 2012 2012

Federal $153,000 $867,000

State $0 $0

Other $0 $0

Total $153,000 $867,000

Page 93 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: 0009912 Type Work: Miscellaneous Improvements Descp:OKF ROAD 33 & PERIMETER ROAD

Phase Fund CST Natl Wildlife

Year 2012

Federal $35,000

State $0

Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 35,000 $0

Other $0

Total $35,000

Project: 0010450 Type Work: Pavement Markings
Descp:OFF-SYSTEM SAFETY IMPROVEMENTS @ 7 CR LOC IN CHARLTON COUNTY Length: 25.78

Phase CST

Fund Safety

Year 2012

Total Project Cost:

$ 181,395

Total Project Authorizations: $ 0

Uses Lump Sum Bank: HIGH RISK RURAL ROADS FOR FY 2012 - FY 2015

Project: M004285 Type Work: Resurface & Maintenance
Descp:SR 15 FROM N OF SR 4/US 1/CHARLTON TO SATILLA RIVER/BRANTLEY Length: 15.67

Phase CST

Fund STP

Year 2013

Total Project Cost:

$ 4,233,525

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Project: M004392 Type Work: Resurface & Maintenance Descp:SR 40 FROM SR 4 TO CAMDEN COUNTY LINE
Length: 6.58

Phase CST

Fund NHS

Year 2013

Total Project Cost:

$ 1,463,750

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2012 - FY 2015

Federal $163,256
Federal $3,386,820
Federal $1,171,000

State $18,140

Other $0

Total $181,395

State $846,705

Other $0

Total $4,233,525

Also in Brantley County

State $292,750

Other $0

Total $1,463,750

Charlton Totals Summary
County Summary excludes lump sum projects.

Project PI#
0000820 0000820 0000820 0000821 0007162 0007163 0007666 0007666 0007666 0009912

Year
2014 2014 2014 2015 2014 2014 2012 2014 2015 2012

Phase
ROW ROW ROW ROW ROW ROW
PE ROW CST CST

Fund
STP HPP HPP STP Bridge Bridge STP STP STP Natl Wildlife

Federal
$24,853 $100,789 $253,719 $973,654
$90,093 $275,371 $135,139
$23,433 $1,434,111
$35,000

State
$6,213 $25,197 $63,430 $243,413 $22,523 $68,843 $33,785
$5,858 $358,528
$0

Other
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0

Total
$31,066 $125,986 $317,149 $1,217,067 $112,616 $344,213 $168,924
$29,291 $1,792,639
$35,000

$3,346,162

$827,790

$0

$4,173,952

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 94 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Chattooga
Project: 0003081 Type Work: Replace Bridge
Descp:CR 321/TALIAFERRO SPRINGS @ CHATTOOGA RIVER 1 MI S OF LYERLY Length: 0.19

Total Project Cost: Total Project Authorizations:

$ 4,051,628 $ 446,546

Phase PE
ROW CST UTL

Fund Bridge Local Bridge Local

Year 2002 2012 After 2015 After 2015

Federal $357,237 $0
$2,676,175 $0

State $89,309
$0 $669,044
$0

Other $0
$224,726 $0
$35,136

Total $446,546 $224,726 $3,345,219
$35,136

Project: 0005530 Type Work: Replace Bridge
Descp:SR 48 @ EAST FORK LITTLE RIVER 3.7 MI NE OF MENLO Length: 0.41

Total Project Cost: Total Project Authorizations:

$ 3,972,752 $ 574,802

Phase PE
ROW CST UTL

Fund Bridge Bridge Bridge Bridge

Year 2005 2012 2013 2013

Federal $459,841 $180,336
$2,388,606 $149,418

State $114,960
$45,084 $597,152
$37,355

Other $0 $0 $0 $0

Total $574,802 $225,420 $2,985,758 $186,773

Project: 0010335 Type Work: Pavement Markings
Descp:OFF-SYSTEM SAFETY IMPROVEMENTS @ 70 LOCS IN CHATTOOGA COUNTY Length: 0.00

Phase CST

Fund Safety

Year 2012

Federal $157,506

State $0

Total Project Cost:

$ 157,506

Total Project Authorizations: $ 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 621082- Type Work: Widening
Descp:SR 1/US27/SUMMERV'LE BYP FM CR 329 TO N OF CR325 @ SR 1/US27
Lanes: Exist. 2 Prop. 4 Length: 8.00

Total Project Cost: Total Project Authorizations:

$ 101,948,157 $ 720,768

Phase PE
ROW CST UTL

Fund State STP STP STP

Year 1993 2015 After 2015 After 2015

Federal $0
$11,526,007 $61,040,126
$8,415,778

State $720,768 $2,881,502 $15,260,031 $2,103,945

Other $0

Total $157,506

Other $0 $0 $0 $0

Total $720,768 $14,407,509 $76,300,157 $10,519,723

Chattooga Totals Summary
County Summary excludes lump sum projects.

Project PI#

Year

Phase

Fund

Federal

State

Other

Total

0003081 0005530 0005530 0005530 621082-

2012 2012 2013 2013 2015

ROW ROW CST UTL ROW

Local Bridge Bridge Bridge
STP

$0 $180,336 $2,388,606 $149,418 $11,526,007

$0 $45,084 $597,152 $37,355 $2,881,502

$224,726 $0 $0 $0 $0

$224,726 $225,420 $2,985,758 $186,773 $14,407,509

$14,244,368

$3,561,092

$224,726

$18,030,186

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 95 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Clay
Project: 0008097 Type Work: TE-Bike/Ped Facility Descp:PHENOMENON TRAIL - PHASE I

Phase CST

Fund STP

Year 2012

Federal $400,000

State $0

Length: 0.00

Total Project Cost:

$ 500,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: M004384 Type Work: Resurface & Maintenance Descp:SR 37 FROM CHATTAHOOCHEE RIVER TO SR 1
Length: 12.87

Phase CST

Fund STP

Year 2012

Federal $2,687,662

State $671,915

Total Project Cost:

$ 3,359,577

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Other $100,000
Other $0

Total $500,000
Total $3,359,577

Page 96 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Clinch
Project: 0010358 Type Work: RRX Warning Device Descp:CR 262/MULCH PLANT ROAD @ CSX #637404H
Length: 0.24

Phase PE CST

Fund Safety Safety

Year 2012 2012

Federal $30,000
$150,000

State $0 $0

Other $0 $0

Total $30,000
$150,000

Total Project Cost:

$ 180,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2012 - FY 2015

Project: 0010375 Type Work: RRX Signing & Marking
Descp:RR CROSSING @ 80 LOC-TRAFFIC SIGNS&PAVEMENT MARKING UPGRADES Length: 0.00

Phase PE CST

Fund STP Safety

Year 2011 2012

Federal $20,000
$300,000

State $0 $0

Other $0 $0

Total $20,000
$300,000

Total Project Cost:

$ 320,000

Total Project Authorizations: $ 20,000

Uses Lump Sum Bank: RAILROAD CROSSING HAZARD ELIMINATION FOR FY 2012 - FY 2015

Project: 422120- Type Work: Widening
Descp:SR 38/US84 FM W OF WOODYARD CK/CLINCH TO W OF GREASY CK/WARE
Lanes: Exist. 2 Prop. 4 Length: 11.60

Total Project Cost: Total Project Authorizations:

$ 74,473,957 $ 4,972,749

Phase PE PE
ROW CST UTL

Fund State NHS NHS NHS NHS

Year 1995 2010 2012 2015 2015

Federal $0
$423,369 $5,644,680 $48,737,035 $1,219,252

State

Also in Lanier, Lowndes, Ware

County

Other

Total

$4,443,538

$0

$4,443,538

$105,842

$0

$529,211

$1,411,170

$0

$7,055,850

$12,184,259

$0 $60,921,293

$304,813

$0

$1,524,064

Also in Ware County

Clinch Totals Summary
County Summary excludes lump sum projects.

Project PI#
422120422120422120-

Year
2012 2015 2015

Phase
ROW CST UTL

Fund
NHS NHS NHS

Federal
$3,669,042 $31,679,072
$792,514

State
$917,261 $7,919,768
$198,128

Other
$0 $0 $0

Total
$4,586,303 $39,598,841
$990,642

$36,140,628

$9,035,157

$0

$45,175,785

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 97 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Coffee
Project: 0007164 Type Work: Replace Bridge Descp:SR 64 @ 17 MILE RIVER 12 MI NE OF PEARSON

Length: 0.40

Total Project Cost: Total Project Authorizations:

$ 3,451,406 $ 210,000

Phase PE
ROW CST UTL

Fund STP Bridge Bridge Bridge

Year 2008 2013 After 2015 After 2015

Federal $168,000 $51,604
$2,535,338 $6,183

State $42,000 $12,901 $633,834
$1,546

Other $0 $0 $0 $0

Total $210,000
$64,505 $3,169,172
$7,729

Project: 0007165 Type Work: Replace Bridge
Descp:SR 158 @ SATILLA RIVER 12 MI WEST OF DOUGLAS Length: 0.40

Total Project Cost: Total Project Authorizations:

$ 5,503,374 $0

Phase PE
ROW CST UTL

Fund Bridge Bridge Bridge Bridge

Year 2012 2015 After 2015 After 2015

Federal $285,916 $48,431
$3,868,563 $199,789

State $71,479 $12,108 $967,141 $49,947

Other $0 $0 $0 $0

Total $357,395
$60,539 $4,835,704
$249,736

Project: 0007166 Type Work: Replace Bridge
Descp:SR 158 @ 17 MILE RIVER 3.5 MI E OF DOUGLAS CITY Length: 0.52

Total Project Cost: Total Project Authorizations:

$ 7,777,774 $ 270,751

Phase PE
ROW CST

Fund Bridge Bridge Bridge

Year 2007 2012 2014

Federal $216,601 $61,433
$5,944,186

State $54,150 $15,358 $1,486,046

Other $0 $0 $0

Total $270,751
$76,791 $7,430,232

Project: 0009017 Type Work: TE-Bike/Ped Facility
Descp:DOUGLAS GREENWAY TRAIL - PHASE II SECTION B Length: 0.00

Phase CST

Fund STP

Year 2012

Federal $300,000

Total Project Cost:

$ 375,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 0010407 Type Work: Replace Bridge
Descp:SR 32 @ BEAR CREEK APPROX 4 MI SE OF AMBROSE Length: 0.40

Total Project Cost: Total Project Authorizations:

$ 1,040,000 $0

Phase PE
ROW CST UTL

Fund Bridge Bridge Bridge Bridge

Year 2012 2014 After 2015 After 2015

Federal $200,000 $80,000 $512,000 $40,000

State $0
State $50,000 $20,000 $128,000 $10,000

Other $75,000
Other $0 $0 $0 $0

Total $375,000
Total $250,000 $100,000 $640,000
$50,000

Project: 0010408 Type Work: Replace Bridge
Descp:SR 32 @ HURRICANE CREEK APPROX 0.4 MI W OF NICHOLS Length: 0.40

Total Project Cost: Total Project Authorizations:

$ 1,200,000 $0

Phase PE
ROW CST UTL

Fund Bridge Bridge Bridge Bridge

Year 2012 2014 After 2015 After 2015

Federal $200,000 $80,000 $640,000 $40,000

State $50,000 $20,000 $160,000 $10,000

Other $0 $0 $0 $0

Total $250,000 $100,000 $800,000
$50,000

Page 98 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: 421345- Type Work: Widening
Descp:SR 32 FM W OF CR 296 EAST TO WEST CITY LIMITS OF DOUGLAS
Lanes: Exist. 2 Prop. 4 Length: 4.20

Total Project Cost: Total Project Authorizations:

$ 26,077,831 $ 1,603,992

Phase PE
ROW ROW CST UTL

Fund STP STP STP STP STP

Year

Federal

1992

$925,600

1997

$357,594

2012

$2,501,544

After 2015 $15,900,563

After 2015 $1,176,963

State $231,400
$89,398 $625,386 $3,975,141 $294,241

Other $0 $0 $0 $0 $0

Total $1,157,000
$446,992 $3,126,930 $19,875,704 $1,471,204

Project: 431830- Type Work: Widening
Descp:SR 135 FM SR 31/US 441 EAST TO SR 32 INCLUDING RR SEPARATION
Lanes: Exist. 2 Prop. 4 Length: 2.72

Total Project Cost: Total Project Authorizations:

$ 34,242,473 $ 3,770,575

Phase PE PE
ROW CST UTL

Fund STP STP STP STP STP

Year

Federal

2003

$2,746,280

2003

$270,180

2013

$3,767,447

After 2015 $20,489,348

After 2015 $120,725

State $686,570
$67,545 $941,862 $5,122,337
$30,181

Other $0 $0 $0 $0 $0

Total $3,432,850
$337,725 $4,709,308 $25,611,685
$150,906

Project: M004380 Type Work: Resurface & Maintenance Descp:SR 158 FROM IRWIN COUNTY LINE TO SR 206

Phase CST

Fund STP

Year 2012

Length: 17.49

Total Project Cost:

$ 4,015,667

Total Project Authorizations: $ 4,015,667

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Federal $3,212,534

State $803,133

Other $0

Total $4,015,667

Coffee Totals Summary
County Summary excludes lump sum projects.

Project PI#
0007164 0007165 0007165 0007166 0007166 0010407 0010407 0010408 0010408 421345431830-

Year
2013 2012 2015 2012 2014 2012 2014 2012 2014 2012 2013

Phase
ROW PE
ROW ROW CST
PE ROW
PE ROW ROW ROW

Fund
Bridge Bridge Bridge Bridge Bridge Bridge Bridge Bridge Bridge
STP STP

Federal
$51,604 $285,916
$48,431 $61,433 $5,944,186 $200,000 $80,000 $200,000 $80,000 $2,501,544 $3,767,447

State
$12,901 $71,479 $12,108 $15,358 $1,486,046 $50,000 $20,000 $50,000 $20,000 $625,386 $941,862

Other
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

Total
$64,505 $357,395
$60,539 $76,791 $7,430,232 $250,000 $100,000 $250,000 $100,000 $3,126,930 $4,709,308

$13,220,561

$3,305,140

$0

$16,525,701

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 99 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Colquitt
Project: 0000520 Type Work: Widening
Descp:SR 133 FM S OF SR 35/US 319 TO N OF COLQUITT COUNTY LINE
Lanes: Exist. 2 Prop. 4 Length: 13.87

Total Project Cost: Total Project Authorizations:

$ 76,092,905 $ 4,874,616

Phase PE PE
ROW CST UTL

Fund STP HPP STP STP STP

Year 2003 2003 2014 After 2015 After 2015

Federal $2,899,693 $1,250,000 $10,704,593 $45,364,472
$905,566

State $724,923
$0 $2,676,148 $11,341,118
$226,392

Other $0 $0 $0 $0 $0

Total $3,624,616 $1,250,000 $13,380,742 $56,705,590 $1,131,958

Also in Worth County

Project: 0000545 Type Work: Widening
Descp:SR 133 FM CR 1/OLD QUITMAN ADEL RD/BROOKS TO CR 256/COLQUITT
Lanes: Exist. 2 Prop. 4 Length: 9.63

Total Project Cost: Total Project Authorizations:

$ 59,497,744 $ 5,876,933

Phase PE PE
ROW CST UTL

Fund Year

STP

2003

Corr Plan 2003

NHS

2012

NHS After 2015

Local After 2015

Federal $939,872
$3,761,674 $1,700,314 $36,737,907
$0

State $234,968 $940,419 $425,078 $9,184,477
$0

Other $0 $0 $0 $0
$5,573,035

Total $1,174,840 $4,702,093 $2,125,392 $45,922,383 $5,573,035

Also in Brooks County

Project: 0000546 Type Work: Widening
Descp:SR 133 FROM CR 256/OLD BERLIN ROAD TO CR 388/HAWTHORNE DRIVE
Lanes: Exist. 2 Prop. 4 Length: 7.86

Total Project Cost: Total Project Authorizations:

$ 47,309,715 $ 3,467,199

Phase PE
ROW CST UTL

Fund STP NHS NHS NHS

Year

Federal

2003

$2,773,759

2012

$1,527,071

After 2015 $32,135,104

After 2015 $1,411,839

State $693,440 $381,768 $8,033,776 $352,960

Other $0 $0 $0 $0

Total $3,467,199 $1,908,838 $40,168,880 $1,764,798

Project: 0006691 Type Work: Streetscapes Descp:MOULTRIE STREETSCAPE INITIATIVE - PHASE II

Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 460,064 $0

Phase CST

Fund TCSP

Year 2013

Federal $460,064

State $0

Other $0

Total $460,064

Project: 0007183 Type Work: Miscellaneous Improvements
Descp:SR 35/US 319 FM CR 89/INDIAN LAKE DR/COLQUITT TO SR 520/TIFT Length: 22.31

Phase PE
ROW CST

Fund Safety Safety Safety

Total Project Cost:

$ 22,040,223

Total Project Authorizations: $ 4,880,000

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0007477 Type Work: Realignment
Descp:SR 133 @ CR 238/INDUSTRIAL DR & SE 5TH AVE & @ OLD ADEL RD Length: 0.48

Phase PE
ROW CST

Fund Safety Safety Safety

Total Project Cost:

$ 6,471,192

Total Project Authorizations: $ 2,980,000

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Year 2006 2010 2012

Federal $1,017,000 $3,375,000 $15,444,201

State $113,000 $375,000 $1,716,022

Other $0 $0 $0

Total $1,130,000 $3,750,000 $17,160,223

Year 2006 2010 2012

Federal $225,000
$2,457,000 $3,142,073

Also in Tift County

State $25,000 $273,000 $349,119

Other $0 $0 $0

Total $250,000 $2,730,000 $3,491,192

Page 100 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: 0007479 Type Work: RRX Warning Device
Descp:CR 494/FUNSTON-DOERUN ROAD @ GFRR #723300L Length: 0.02

Phase PE CST

Fund Safety Safety

Year 2012 2012

Federal $6,757
$157,663

State $0 $0

Total Project Cost:

$ 164,420

Total Project Authorizations: $ 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2012 - FY 2015

Project: 0007616 Type Work: Streetscapes Descp:STREETSCAPE IN MOULTRIE - PHASE III
Length: 0.00

Phase CST

Fund HPP

Year 2013

Federal $674,925

State $0

Total Project Cost: Total Project Authorizations:

$ 915,677 $0

Other $0 $0
Other $240,752

Total $6,757
$157,663
Total $915,677

Project: 0008398 Type Work: RRX Warning Device Descp:SR 111/WEST BYPASS DR @ NS #723442C
Length: 0.40

Phase PE CST

Fund Safety Safety

Total Project Cost:

$ 227,311

Total Project Authorizations: $ 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2012 - FY 2015

Project: 0009846 Type Work: Roundabout Descp:SR 33/US 319 @ SR 33 SO
Length: 0.25

Phase PE CST

Fund Safety Safety

Total Project Cost:

$ 1,117,000

Total Project Authorizations: $ 250,000

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0009855 Type Work: Roundabout
Descp:SR 37 @ CR 238/INDUSTRIAL DRIVE/CR 477/COOL SPRINGS ROAD Length: 0.25

Phase PE CST

Fund Safety Safety

Total Project Cost:

$ 1,020,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 431100- Type Work: Replace Bridge
Descp:SR 256 @ WARRIOR CREEK 2 MI N OF NORMAN PARK Length: 0.32

Total Project Cost: Total Project Authorizations:

$ 4,510,786 $ 339,397

Phase PE
ROW CST UTL

Fund Bridge Bridge Bridge Local

Year 2012 2012
Year 2011 2014
Year 2013 2014
Year 2004 2010 2012 2012

Federal $10,824
$216,486

State $0 $0

Federal $250,000 $867,000

State $0 $0

Federal $153,000 $867,000

State $0 $0

Federal $245,518 $26,000
$3,327,942 $0

State $61,379
$6,500 $831,986
$0

Other $0 $0
Other $0 $0
Other $0 $0
Other $0 $0 $0
$11,461

Total $10,824
$216,486
Total $250,000 $867,000
Total $153,000 $867,000
Total $306,897
$32,500 $4,159,928
$11,461

Page 101 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: 431780- Type Work: Widening
Descp:SR 133 FM CR 388/SPENCE FIELD TO SR 35/E MOULTRIE BYPASS
Lanes: Exist. 4 Prop. 5 Length: 4.55

Total Project Cost: Total Project Authorizations:

$ 31,300,285 $ 4,285,841

Phase PE PE PE PE
ROW CST

Fund STP HPP HPP HPP STP STP

Year 2002 2002 2002 2011 2012 2014

Federal $1,988,831
$583,045 $273,752 $583,045 $1,627,241 $19,984,314

State $497,208 $145,761
$68,438 $145,761 $406,810 $4,996,079

Other $0 $0 $0 $0 $0 $0

Total $2,486,038
$728,806 $342,190 $728,806 $2,034,051 $24,980,393

Project: M004257 Type Work: Resurface & Maintenance Descp:SR 37WE FROM SR 37 TO SR 37 IN MOULTRIE

Phase CST

Fund STP

Year 2014

Length: 0.82

Total Project Cost:

$ 203,532

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Federal $162,826

State $40,706

Other $0

Total $203,532

Colquitt Totals Summary
County Summary excludes lump sum projects.

Project PI#
0000520 0000545 0000546 0006691 0007616 431100431100431780431780-

Year
2014 2012 2012 2013 2013 2012 2012 2012 2014

Phase
ROW ROW ROW CST CST CST UTL ROW CST

Fund
STP NHS NHS TCSP HPP Bridge Local STP STP

Federal
$10,383,456 $391,072
$1,527,071 $460,064 $674,925
$3,327,942 $0
$1,627,241 $19,984,314

State
$2,595,864 $97,768
$381,768 $0 $0
$831,986 $0
$406,810 $4,996,079

Other
$0 $0 $0 $0 $240,752 $0 $11,461 $0 $0

Total
$12,979,319 $488,840
$1,908,838 $460,064 $915,677
$4,159,928 $11,461
$2,034,051 $24,980,393

$38,376,085

$9,310,274

$252,213

$47,938,572

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 102 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Columbia
Project: 0004732 Type Work: Roundabout Descp:SR 47 @ SR 223
Length: 0.36

Phase PE
ROW CST

Fund STP Safety Safety

Year 2003 2013 2014

Federal $370,800 $62,000 $808,838

State $41,200
$0 $0

Total Project Cost:

$ 1,282,838

Total Project Authorizations: $ 412,000

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0007168 Type Work: Replace Bridge
Descp:SR 47/US 221 @ GREENBRIER CREEK 2.5 MI NE OF APPLING CITY Length: 0.40

Total Project Cost: Total Project Authorizations:

$ 2,552,817 $ 350,000

Phase PE
ROW CST CST

Fund Bridge Bridge STP Bridge

Year 2007 2013 2015 2015

Federal $280,000 $188,810 $298,954
$1,274,489

State $70,000 $47,203 $74,739 $318,622

Other $0 $0 $0
Other $0 $0 $0 $0

Total $412,000
$62,000 $808,838
Total $350,000 $236,013 $373,693 $1,593,111

Project: 0008345 Type Work: Widening Descp:I-20 FROM MCDUFFIE COUNTY LINE TO SR 383

Lanes: Exist. 4 Prop. 6 Length: 15.95

Total Project Cost: Total Project Authorizations:

$ 179,075,395 $0

Phase SCP PE ROW CST

Fund NHS NHS NHS NHS

Year

Federal

2014

$5,600,000

After 2015 $2,812,880

After 2015 $14,356,829

After 2015 $120,490,607

State $1,400,000
$703,220 $3,589,207 $30,122,652

Other $0 $0 $0 $0

Total $7,000,000 $3,516,100 $17,946,036 $150,613,259

Project: 231350- Type Work: Passing Lanes
Descp:SR 47 SB FRM MP 2.45 NEAR KEG CREEK SOUTH TO MP 3.88
Lanes: Exist. 2 Prop. 3 Length: 1.43

Phase PE
ROW CST

Total Project Cost: Total Project Authorizations:

$ 4,701,140 $ 267,800

Fund STP STP STP

Year 1995 2012 After 2015

Federal $214,240 $311,875
$3,234,797

State $53,560 $77,969 $808,699

Other $0 $0 $0

Total $267,800 $389,844 $4,043,496

Project: 232305- Type Work: Replace Bridge Descp:SR 47 @ KEG CREEK 6.9 MI N OF APPLING
Length: 0.24

Total Project Cost: Total Project Authorizations:

$ 4,202,002 $ 207,209

Phase PE
ROW CST CST

Fund Bridge Bridge STP Bridge

Year 2000 2012 After 2015 After 2015

Federal $165,768 $92,453
$1,551,691 $1,551,691

State $41,442 $23,113 $387,923 $387,923

Other $0 $0 $0 $0

Total $207,209 $115,566 $1,939,613 $1,939,613

Project: 232310- Type Work: Replace Bridge
Descp:SR 47 @ LITTLE RIVER 10.5 MI SE OF LINCOLNTON Length: 0.40

Total Project Cost: Total Project Authorizations:

$ 21,724,098 $ 910,627

Phase PE
ROW CST

Fund Bridge Bridge Bridge

Year 2000 2012 2014

Federal $728,502 $47,328
$16,603,448

State $182,125
$11,832 $4,150,862

Other $0 $0 $0

Total $910,627
$59,160 $20,754,311

Also in Lincoln County

Page 103 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: M003510 Type Work: Weigh Scales
Descp:I-20 @ WB TRUCK WEIGH STATION IN COLUMBIA - PHASE I Length: 0.40

Phase CST

Fund IM

Year 2014

Federal $794,938

State $88,326

Total Project Cost:

$ 883,265

Total Project Authorizations: $ 0

Uses Lump Sum Bank: INTERSTATE MAINTENANCE FOR FY 2012 - FY 2015

Project: M003517 Type Work: Weigh Scales
Descp:I-20 @ EB TRUCK WEIGH STATION IN COLUMBIA - PHASE II Length: 0.40

Phase CST

Fund IM

Year 2014

Federal $794,938

State $88,326

Total Project Cost:

$ 883,265

Total Project Authorizations: $ 0

Uses Lump Sum Bank: INTERSTATE MAINTENANCE FOR FY 2012 - FY 2015

Other $0
Other $0

Total $883,265
Total $883,265

Project PI#

Year

Columbia Totals Summary

County Summary excludes lump sum projects.

This County is also located in a MPO area. Additional Projects may be listed in the MPO TIP.

Phase

Fund

Federal

State

Other

Total

0007168 0007168 0007168 0008345 231350232305232310232310-

2013 2015 2015 2014 2012 2012 2012 2014

ROW CST CST SCP ROW ROW ROW CST

Bridge Bridge
STP NHS STP Bridge Bridge Bridge

$188,810 $1,274,489
$298,954 $5,600,000
$311,875 $92,453 $23,664
$8,301,724

$47,203 $318,622
$74,739 $1,400,000
$77,969 $23,113
$5,916 $2,075,431

$0

$236,013

$0

$1,593,111

$0

$373,693

$0

$7,000,000

$0

$389,844

$0

$115,566

$0

$29,580

$0

$10,377,155

$16,091,970

$4,022,992

$0

$20,114,962

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 104 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Cook
Project: 0008922 Type Work: RRX Consolidation Descp:CS707/2ND STREET @ NS #723345T & #723346A

Phase CST

Fund Safety

Year 2012

Federal $15,918

State $0

Length: 0.40

Total Project Cost:

$ 15,918

Total Project Authorizations: $ 0

Uses Lump Sum Bank: RAILROAD CROSSING HAZARD ELIMINATION FOR FY 2012 - FY 2015

Project: 0008923 Type Work: RRX Warning Device Descp:SR 37/4TH STREET @ NS #723341R
Length: 0.40

Phase CST

Fund Safety

Year 2012

Federal $159,181

State $0

Total Project Cost:

$ 159,181

Total Project Authorizations: $ 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2012 - FY 2015

Project: M004110 Type Work: Bridges
Descp:CR 246/JUDGE LOTT RD @ NEW RIVER -EMERGENCY REPAIR- SITE 13 Length: 0.20

Phase Fund Year CST Emergency 2012

Federal $218,739

State $0

Total Project Cost: Total Project Authorizations:

$ 273,424 $0

Other $0
Other $0
Other $54,685

Total $15,918
Total $159,181
Total $273,424

Cook Totals Summary
County Summary excludes lump sum projects.

Project PI# M004110

Year 2012

Phase CST

Fund Emergency

Federal $218,739

State $0

Other $54,685

Total $273,424

$218,739

$0

$54,685

$273,424

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 105 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Crawford
Project: 0010452 Type Work: Sidewalks
Descp:CRAWFORD COUNTY ELEMENTARY; MIDDLE & THE EAGLES NEST - SRTS Length: 0.00

Phase PE CST

Fund Safety Safety

Year 2012 2014

Federal $140,000 $358,530

State $0 $0

Other $0 $0

Total $140,000 $358,530

Total Project Cost:

$ 498,530

Total Project Authorizations: $ 0

Uses Lump Sum Bank: SAFE ROUTES TO SCHOOL INFRASTRUCTURE FOR FY 2012 - FY 2015

Project: 333205- Type Work: Replace Bridge Descp:SR 128 @ FLINT RIVER 8 MI N OF REYNOLDS
Length: 0.94

Phase PE
ROW CST

Fund Bridge Bridge Bridge

Year 2000 2010 2012

Federal $273,384 $856,000
$3,969,568

State $68,346 $214,000 $992,392

Other $0 $0 $0

Total $341,730 $1,070,000 $4,961,960

Total Project Cost: Total Project Authorizations:

$ 6,373,690 $ 1,411,730

Also in Taylor County

Crawford Totals Summary
County Summary excludes lump sum projects.

Project PI# 333205-

Year 2012

Phase CST

Fund Bridge

Federal $1,984,784

State $496,196

Other $0

Total $2,480,980

$1,984,784

$496,196

$0

$2,480,980

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 106 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Crisp
Project: 0000481 Type Work: Widening
Descp:SR 30/SR 90 FROM 4 LN @ I-75 TO MIDWAY RD IN CORDELE
Lanes: Exist. 3 Prop. 5 Length: 0.25

Total Project Cost: Total Project Authorizations:

$ 5,117,317 $ 286,773

Phase PE
ROW CST UTL

Fund STP STP STP STP

Year 2011 2015 After 2015 After 2015

Federal $229,419 $401,362
$3,106,513 $356,559

State $57,355 $100,341 $776,628 $89,140

Other $0 $0 $0 $0

Total $286,773 $501,703 $3,883,142 $445,699

Project: 0007145 Type Work: RRX Warning Device Descp:SR 30/US 280 @ HOG #723159S
Length: 0.01

Phase PE CST

Fund Safety Safety

Year 2012 2012

Federal $11,262
$197,078

Total Project Cost:

$ 208,340

Total Project Authorizations: $ 0

Uses Lump Sum Bank: RAILROAD CROSSING HAZARD ELIMINATION FOR FY 2012 - FY 2015

Project: M004259 Type Work: Resurface & Maintenance
Descp:SR 257 FROM 0.45 MI N OF I-75 TO DOOLY COUNTY LINE Length: 4.50

Phase CST

Fund STP

Year 2013

Federal $773,500

Total Project Cost:

$ 966,875

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Project: M004260 Type Work: Resurface & Maintenance Descp:SR 300 CONN FROM SR 300 TO SR 30
Length: 3.30

Phase CST

Fund STP

Year 2013

Federal $405,200

Total Project Cost:

$ 506,500

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

State $0 $0
State $193,375
State $101,300

Other $0 $0
Other $0
Other $0

Total $11,262
$197,078
Total $966,875
Total $506,500

Crisp Totals Summary
County Summary excludes lump sum projects.

Project PI#

Year

Phase

Fund

Federal

State

Other

Total

0000481

2015

ROW

STP

$401,362

$100,341

$0

$501,703

$401,362

$100,341

$0

$501,703

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 107 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Dade
Project: 0009021 Type Work: TE-Bike/Ped Facility Descp:TRENTON DOWNTOWN STREETSCAPING

Phase CST

Fund STP

Year 2014

Federal $288,400

State $0

Length: 0.00

Other $72,100

Total $360,500

Total Project Cost:

$ 360,500

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 0010114 Type Work: Lighting Descp:I-59 @ SR 136 INTERCHANGE - LIGHTING
Length: 0.40

Phase CST

Fund NHS

Year 2012

Federal $477,375

State $119,344

Other $0

Total $596,718

Total Project Cost:

$ 596,718

Total Project Authorizations: $ 0

Uses Lump Sum Bank: INTERCHANGE/ROADWAY LIGHTING FOR FY 2012 - FY 2015

Project: 0010448 Type Work: Signals
Descp:SR 1 @ 3 LOC; SR 2 @ 5 LOC; SR 136 @ 3 LOC &SR 146 @ 2 LOC Length: 0.00

Phase PE
ROW CST

Fund STP STP STP

Year 2011 2013 2014

Federal $400,000 $500,000 $975,000

State $0 $0 $0

Other $0 $0 $0

Total $400,000 $500,000 $975,000

Total Project Cost:

$ 1,875,000

Total Project Authorizations: $ 400,000

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2012 - FY 2015

Also in Catoosa, Walker County

Project: M004276 Type Work: Resurface & Maintenance
Descp:I-59 FROM ALABAMA STATE LINE TO 0.06 MI W OF SR 136 Length: 11.60

Phase CST

Fund IM

Year 2013

Federal $8,190,000

State $910,000

Other $0

Total $9,100,000

Total Project Cost:

$ 9,100,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: INTERSTATE MAINTENANCE FOR FY 2012 - FY 2015

Project: M004453 Type Work: Resurface & Maintenance
Descp:SR 157 FM E OF CR 393/MT OLIVE RD TO N OF CR 161/MARTIN LANE Length: 18.71

Phase CST

Fund STP

Year 2012

Federal $389,240

State $97,310

Other $0

Total $486,550

Total Project Cost:

$ 486,550

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Also in Walker County

Page 108 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Dawson
Project: 0000296 Type Work: Passing Lanes
Descp:SR 52: TWO WB PASSING LANES BT GILMER AND LUMPKIN COUNTIES
Lanes: Exist. 2 Prop. 3 Length: 3.20

Total Project Cost: Total Project Authorizations:

$ 46,416,198 $0

Phase PE
ROW CST UTL

Fund STP STP STP STP

Year

Federal

2015

$1,706,927

After 2015 $5,966,417

After 2015 $23,095,411

After 2015 $6,364,204

State $426,732 $1,491,604 $5,773,853 $1,591,051

Other $0 $0 $0 $0

Total $2,133,659 $7,458,021 $28,869,263 $7,955,255

Project: 0000315 Type Work: Intersection Improvement
Descp:SR 52 RELOCATION @ SR 183 EXTENSION / MP 3.7 TO 5.3
Lanes: Exist. 0 Prop. 4 Length: 1.60

Total Project Cost: Total Project Authorizations:

$ 5,634,071 $0

Phase PE
ROW CST

Fund STP STP STP

Year 2015 After 2015 After 2015

Federal $391,912 $269,174
$3,846,171

State $97,978 $67,293 $961,543

Other $0 $0 $0

Total $489,889 $336,467 $4,807,714

Project: 0001769 Type Work: Intersection Improvement
Descp:SR 53 @ THOMPSON ROAD/ETOWAH RIVER ROAD Length: 0.50

Total Project Cost: Total Project Authorizations:

$ 4,940,600 $ 2,123,595

Phase PE PE
ROW CST UTL

Fund STP STP STP STP Local

Year 2003 2006 2010 2013 2013

Federal $4,000
$662,876 $1,032,000 $2,099,109
$0

State $1,000
$165,719 $258,000 $524,777
$0

Other $0 $0 $0 $0
$193,118

Total $5,000
$828,595 $1,290,000 $2,623,887
$193,118

Project: 0007030 Type Work: Replace Bridge Descp:SR 9 @ ETOWAH RIVER

Length: 0.40

Total Project Cost: Total Project Authorizations:

$ 866,184 $ 467,000

Phase PE
ROW CST

Fund Bridge Bridge Bridge

Year 2007 2013 2014

Federal $373,600 $46,866 $272,481

State $93,400 $11,717 $68,120

Other $0 $0 $0

Total $467,000
$58,583 $340,601

Project: 0007169 Type Work: Replace Bridge
Descp:SR 136 @ ETOWAH RIVER 5.7 MI EAST OF DAWSONVILLE Length: 0.40

Total Project Cost: Total Project Authorizations:

$ 3,542,383 $ 266,200

Phase PE
ROW CST

Fund Bridge Bridge Bridge

Year 2007 2013 2015

Federal $212,960 $214,655
$2,406,291

State $53,240 $53,664 $601,573

Other $0 $0 $0

Total $266,200 $268,319 $3,007,864

Project: 0009022 Type Work: TE-Bike/Ped Facility
Descp:DAWSON COUNTY COMMUNITY CULTURAL TRAILWAY - PHASE I Length: 0.00

Phase CST

Fund STP

Year 2014

Total Project Cost:

$ 169,741

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Federal $135,793

State $0

Other $33,948

Total $169,741

Page 109 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: 0009822 Type Work: Barriers
Descp:SR 400 FM FORSYTH CO LINE TO S OF CR 145 CABLE BARRIER Length: 10.30

Phase PE CST

Fund Safety Safety

Year 2010 2012

Federal $27,000
$1,285,200

State $3,000
$142,800

Other $0 $0

Total $30,000
$1,428,000

Total Project Cost:

$ 1,458,000

Total Project Authorizations: $ 30,000

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Also in Lumpkin County

Project: 0009938 Type Work: Roundabout Descp:SR 53 @ SR 183
Length: 0.26

Phase PE CST

Fund Safety Safety

Year 2011 2013

Federal $450,000 $867,000

State $0 $0

Other $0 $0

Total $450,000 $867,000

Total Project Cost:

$ 1,317,000

Total Project Authorizations: $ 450,000

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 132790- Type Work: Intersection Improvement Descp:SR 400 @ SR 53/CORR A1

Length: 2.67

Total Project Cost: Total Project Authorizations:

$ 11,743,374 $ 2,415,374

Phase PE
ROW CST UTL

Fund App Dev App Dev App Dev
Local

Year 1999 2013 2015 2015

Federal $1,932,299 $1,904,000 $5,173,600
$0

State $483,075 $476,000 $1,293,400
$0

Other $0 $0 $0
$481,000

Total $2,415,374 $2,380,000 $6,467,000
$481,000

Dawson Totals Summary
County Summary excludes lump sum projects.

Project PI#
0000296 0000315 0001769 0001769 0007030 0007030 0007169 0007169 132790132790132790-

Year
2015 2015 2013 2013 2013 2014 2013 2015 2013 2015 2015

Phase
PE PE CST UTL ROW CST ROW CST ROW CST UTL

Fund
STP STP STP Local Bridge Bridge Bridge Bridge App Dev App Dev Local

Federal
$1,706,927 $391,912
$2,099,109 $0
$46,866 $272,481 $214,655 $2,406,291 $1,904,000 $5,173,600
$0

State
$426,732 $97,978
$524,777 $0
$11,717 $68,120 $53,664 $601,573 $476,000 $1,293,400
$0

Other
$0 $0 $0 $193,118 $0 $0 $0 $0 $0 $0 $481,000

Total
$2,133,659 $489,889
$2,623,887 $193,118 $58,583 $340,601 $268,319
$3,007,864 $2,380,000 $6,467,000
$481,000

$14,215,842

$3,553,961

$674,118

$18,443,921

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 110 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Decatur
Project: 0007171 Type Work: Replace Bridge
Descp:SR 97 @ BIG SLOUGH 3.2 MI NORTHEAST OF BAINBRIDGE Length: 0.40

Total Project Cost: Total Project Authorizations:

$ 4,974,425 $ 596,379

Phase PE
ROW CST UTL

Fund Bridge Bridge Bridge Bridge

Year 2011 2013 2015 2015

Federal $477,103 $39,607
$3,298,642 $164,188

State $119,276
$9,902 $824,661
$41,047

Other $0 $0 $0 $0

Total $596,379
$49,508 $4,123,303
$205,235

Project: 0007608 Type Work: Streetscapes
Descp:DOWNTOWN STREETSCAPE IN BAINBRIDGE PHASE III Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 224,975 $0

Phase CST

Fund HPP

Year 2015

Federal $179,980

State $0

Other $44,995

Total $224,975

Project: M004379 Type Work: Resurface & Maintenance
Descp:SR 253 FROM SEMINOLE COUNTY LINE TO SR 1BU Length: 11.86

Phase CST

Fund STP

Year 2012

Total Project Cost:

$ 2,752,530

Total Project Authorizations: $ 2,752,530

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Project: M004387 Type Work: Resurface & Maintenance
Descp:SR 253 FROM SR 1 BU TO BAINBRIDGE CITY LIMITS Length: 1.64

Phase CST

Fund STP

Year 2014

Total Project Cost:

$ 816,403

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Project: M004388 Type Work: Resurface & Maintenance Descp:SR 38BU FROM SR 1 TO SR 1BU IN BAINBRIDGE
Length: 0.85

Phase CST

Fund STP

Year 2014

Total Project Cost:

$ 215,809

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Project: M004389 Type Work: Resurface & Maintenance Descp:SR 1BU FROM SR 38BU TO SR 97
Length: 0.82

Phase CST

Fund STP

Year 2014

Total Project Cost:

$ 138,605

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Federal $2,202,024

State $550,506

Federal $653,122

State $163,281

Federal $172,647

State $43,162

Federal $110,884

State $27,721

Other $0
Other $0
Other $0
Other $0

Total $2,752,530
Total $816,403
Total $215,809
Total $138,605

Page 111 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/4/2011
Decatur Totals Summary
County Summary excludes lump sum projects.

Project PI#

Year

Phase

Fund

Federal

State

Other

Total

0007171 0007171 0007171 0007608

2013 2015 2015 2015

ROW CST UTL CST

Bridge Bridge Bridge HPP

$39,607 $3,298,642
$164,188 $179,980

$9,902 $824,661
$41,047 $0

$0 $0 $0 $44,995

$49,508 $4,123,303
$205,235 $224,975

$3,682,417

$875,609

$44,995

$4,603,021

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 112 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Dodge
Project: 0006476 Type Work: Guardrail
Descp:SR 117 FM EASTMAN CITY TO SR 29/US 441 S OF DUBLIN @ 8 LOCS Length: 0.58

Phase PE
ROW CST

Fund STP Safety Safety

Year 2004 2012 2013

Federal $284,582 $390,000
$2,565,694

State $0 $0 $0

Other $0 $0 $0

Total $284,582 $390,000 $2,565,694

Total Project Cost:

$ 3,240,276

Total Project Authorizations: $ 284,582

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Also in Laurens County

Project: 0007359 Type Work: Signals Descp:SR 17; SR 21; SR 21BU; SR 30; & SR 73 @ 8 LOCS
Length: 3.00

Phase PE
ROW CST

Fund STP STP STP

Year 2006 2011 2014

Federal $153,040 $304,000
$1,204,601

State $38,260 $76,000
$0

Other $0 $0 $0

Total $191,300 $380,000 $1,204,601

Total Project Cost:

$ 1,775,901

Total Project Authorizations: $ 571,300

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2012 - FY 2015

Also in Jenkins, Screven County

Project: 0007584 Type Work: Sidewalks
Descp:MAIN &WEST MAIN ST FM 2ND AVE TO 3RD AVE IN DOWNTOWN EASTMAN Length: 0.16

Phase PE CST

Fund HPP HPP

Year 2009 2012

Federal $40,000
$319,960

State $0 $0

Other $10,000 $201,339

Total $50,000
$521,299

Total Project Cost: Total Project Authorizations:

$ 571,299 $ 50,000

Project: 0007626 Type Work: Historic Preservation
Descp:CITY BUS STATION PRESERVATION IN DOWNTOWN EASTMAN Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 193,755 $0

Phase PE CST

Fund Local HPP

Year 2012 2012

Federal $0
$143,984

State $0 $0

Other $13,775 $35,996

Total $13,775
$179,980

Project: 0008953 Type Work: RRX Warning Device
Descp:CR 228/CARRISON ROAD @ NS #729365A IN CHAUNCEY Length: 0.20

Phase CST

Fund Safety

Total Project Cost:

$ 182,070

Total Project Authorizations: $ 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2012 - FY 2015

Year 2013

Federal $182,070

State $0

Other $0

Total $182,070

Page 113 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/4/2011
Dodge Totals Summary
County Summary excludes lump sum projects.

Project PI#

Year

Phase

Fund

Federal

State

Other

Total

0007584 0007626 0007626

2012

CST

2012

PE

2012

CST

HPP Local HPP

$319,960 $0
$143,984

$0

$201,339

$0

$13,775

$0

$35,996

$521,299 $13,775
$179,980

$463,944

$0

$251,110

$715,054

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 114 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Dooly
Project: 0005320 Type Work: Interchange Descp:I-75 @ SR 215

Length: 0.90

Total Project Cost: Total Project Authorizations:

$ 38,396,504 $ 2,012,700

Phase PE PE
ROW CST UTL

Fund NHS NHS NHS NHS NHS

Year 2004 2007 2013 2015 2015

Federal $320,000
$1,290,160 $10,322,073 $17,913,771
$871,199

State $80,000 $322,540 $2,580,518 $4,478,443 $217,800

Other $0 $0 $0 $0 $0

Total $400,000 $1,612,700 $12,902,591 $22,392,214 $1,088,999

Project: 0007172 Type Work: Replace Bridge
Descp:SR 230 @ TURKEY CREEK 9.5 MI WEST OF VIENNA Length: 0.40

Total Project Cost: Total Project Authorizations:

$ 2,271,967 $ 150,000

Phase PE
ROW CST CST

Fund Bridge Bridge STP Bridge

Year 2007 2014 After 2015 After 2015

Federal $120,000 $90,994
$1,179,158 $427,421

State $30,000 $22,748 $294,790 $106,855

Other $0 $0 $0 $0

Total $150,000 $113,742 $1,473,948 $534,277

Project: 0007173 Type Work: Replace Bridge
Descp:SR 230 @ TURKEY CREEK 5.5 MI NORTHEAST OF BYROMVILLE Length: 0.40

Total Project Cost: Total Project Authorizations:

$ 1,603,969 $ 300,000

Phase PE
ROW CST CST UTL

Fund Bridge Bridge STP Bridge Bridge

Year 2007 2013 After 2015 After 2015 After 2015

Federal $240,000 $85,677 $713,320 $225,259 $18,920

State $60,000 $21,419 $178,330 $56,315
$4,730

Other $0 $0 $0 $0 $0

Total $300,000 $107,096 $891,650 $281,574
$23,649

Project: 0007574 Type Work: Sidewalks
Descp:SR 27 FM 2ND ST TO FORD ST - LANDSCAPING &SIDEWALK IN VIENNA Length: 0.94

Total Project Cost: Total Project Authorizations:

$ 562,000 $0

Phase CST

Fund HPP

Year 2013

Federal $449,600

State $0

Other $112,400

Total $562,000

Project: 0009034 Type Work: TE-Bike/Ped Facility
Descp:UNADILLA STREETSCAPE IMPROVEMENTS PHASE II Length: 0.00

Phase CST

Fund STP

Year 2012

Total Project Cost:

$ 425,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 311665- Type Work: Replace Bridge Descp:I-75 @ SR 27 - WIDEN BRIDGE & RAMPS

Length: 0.70

Total Project Cost: Total Project Authorizations:

$ 27,408,954 $ 3,853,107

Phase PE
ROW CST UTL

Fund IM
NHS NHS NHS

Year 1992 2007 2012 2012

Federal $340,000

State $0

Federal $1,114,296 $2,092,000 $18,584,385
$260,293

State $123,811 $523,000 $4,646,096
$65,073

Other $85,000

Total $425,000

Other $0 $0 $0 $0

Total $1,238,107 $2,615,000 $23,230,481
$325,366

Page 115 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: M004347 Type Work: Resurface & Maintenance
Descp:SR 230 FROM SW OF CR 122/LESTER STREET TO W OF I-75 Length: 10.73

Phase CST

Fund STP

Year 2012

Federal $2,272,197

State $568,049

Other $0

Total $2,840,247

Total Project Cost:

$ 2,840,247

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Project: M004351 Type Work: Resurface & Maintenance Descp:SR 90 FROM SR 27/DOOLY TO SR 26/MACON
Length: 19.06

Phase CST

Fund STP

Year 2012

Federal $2,927,514

State $731,879

Other $0

Total $3,659,393

Total Project Cost:

$ 3,659,393

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Also in Macon County

Project: M004356 Type Work: Resurface & Maintenance Descp:SR 230 FROM I-75 TO SR 7 IN UNADILLA
Length: 0.75

Phase CST

Fund STP

Year 2012

Federal $116,916

State $29,229

Other $0

Total $146,145

Total Project Cost:

$ 146,145

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Project: M004419 Type Work: Miscellaneous Improvements
Descp:I-75 @ 3 LOCS & I-285 @ 2 LOCS-UPGRADE CANTILEVER STRUCTURES Length: 2.00

Phase CST

Fund IM

Year 2012

Federal $558,900

State $62,100

Other $0

Total $621,000

Total Project Cost:

$ 621,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: INTERSTATE MAINTENANCE FOR FY 2012 - FY 2015

Also in Dekalb, Monroe County

Dooly Totals Summary
County Summary excludes lump sum projects.

Project PI#
0005320 0005320 0005320 0007172 0007173 0007574 311665311665-

Year
2013 2015 2015 2014 2013 2013 2012 2012

Phase
ROW CST UTL ROW ROW CST CST UTL

Fund
NHS NHS NHS Bridge Bridge HPP NHS NHS

Federal
$10,322,073 $17,913,771
$871,199 $90,994 $85,677
$449,600 $18,584,385
$260,293

State
$2,580,518 $4,478,443
$217,800 $22,748 $21,419 $0
$4,646,096 $65,073

Other
$0 $0 $0 $0 $0 $112,400 $0 $0

Total
$12,902,591 $22,392,214
$1,088,999 $113,742 $107,096 $562,000
$23,230,481 $325,366

$48,577,992

$12,032,098

$112,400

$60,722,490

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 116 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Early
Project: 0006112 Type Work: RRX Warning Device Descp:CS 630/ARLINGTON AVE @ NS #733632H

Phase CST

Fund Safety

Year 2012

Federal $178,046

State $0

Length: 0.40

Other $0

Total $178,046

Total Project Cost:

$ 178,046

Total Project Authorizations: $ 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2012 - FY 2015

Project: 0009036 Type Work: TE-Bike/Ped Facility Descp:BLAKELY GATEWAY PROJECT
Length: 0.00

Phase CST

Fund STP

Year 2014

Federal $500,000

State $0

Other $125,000

Total $625,000

Total Project Cost:

$ 625,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: M004365 Type Work: Resurface & Maintenance
Descp:SR 38 FROM SR 370/EARLY TO E OF CS 574/7TH STREET/SEMINOLE Length: 9.91

Phase CST

Fund NHS

Year 2012

Federal $2,975,552

State $743,888

Other $0

Total $3,719,439

Total Project Cost:

$ 3,719,439

Total Project Authorizations: $ 3,719,439

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2012 - FY 2015

Also in Seminole County

Page 117 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Effingham
Project: 0007277 Type Work: RRX Warning Device Descp:CR 91/MARION AVE @ CSX #635139N
Length: 0.18

Phase PE CST

Fund Safety Safety

Year 2012 2013

Federal $6,757
$157,663

State $0 $0

Total Project Cost:

$ 164,420

Total Project Authorizations: $ 0

Uses Lump Sum Bank: RAILROAD CROSSING HAZARD ELIMINATION FOR FY 2012 - FY 2015

Project: 0008215 Type Work: Intersection Improvement Descp:SR 21 @ CR 156/9TH STREET
Length: 0.22

Phase PE
ROW CST

Fund Safety STP Safety

Year 2006 2011 2012

Federal $180,000 $162,000 $558,726

State $20,000 $18,000 $62,081

Total Project Cost:

$ 1,000,807

Total Project Authorizations: $ 380,000

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0009437 Type Work: RRX Surface Rehab/Recst Descp:CR 115/INDIGO ROAD @ CSX #635134E
Length: 0.40

Phase CST

Fund Safety

Year 2012

Federal $76,500

State $0

Total Project Cost:

$ 76,500

Total Project Authorizations: $ 0

Uses Lump Sum Bank: RAILROAD CROSSING HAZARD ELIMINATION FOR FY 2012 - FY 2015

Project: 0009870 Type Work: Roundabout Descp:SR 17 @ SR 119
Length: 0.50

Phase PE CST

Fund Safety Safety

Year 2011 2014

Federal $250,000 $867,000

State $0 $0

Total Project Cost:

$ 1,117,000

Total Project Authorizations: $ 250,000

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0009872 Type Work: Roundabout Descp:SR 275 @ CR 307/RINCON-STILL ROAD
Length: 0.40

Phase PE CST

Fund Safety Safety

Year 2013 2014

Federal $153,000 $867,000

State $0 $0

Total Project Cost:

$ 1,020,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0009892 Type Work: Sharp Curve Treatments
Descp:CR 176; CR 188; & CR 265 - SHARP CURVE TREATMENTS Length: 0.00

Phase PE CST

Fund Safety Safety

Year 2012 2013

Federal $36,720
$137,700

State $4,080
$15,300

Total Project Cost:

$ 193,800

Total Project Authorizations: $ 0

Uses Lump Sum Bank: HIGH RISK RURAL ROADS FOR FY 2012 - FY 2015

Other $0 $0
Other $0 $0 $0
Other $0
Other $0 $0
Other $0 $0
Other $0 $0

Total $6,757
$157,663
Total $200,000 $180,000 $620,807
Total $76,500
Total $250,000 $867,000
Total $153,000 $867,000
Total $40,800
$153,000

Page 118 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: 0009913 Type Work: Miscellaneous Improvements Descp:WILDLIFE DRIVE - REPAIR & PACK

Phase Fund CST Natl Wildlife

Year 2012

Federal $75,000

State $0

Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 75,000 $0

Other $0

Total $75,000

Project: 0010365 Type Work: Shoulder Work
Descp:CR 311 FM SR 26 TO CR 221 & CR 140 FM CHATHAM CO TO CR 156 Length: 11.11

Phase PE CST

Fund Safety Safety

Total Project Cost:

$ 775,000

Total Project Authorizations: $ 175,000

Uses Lump Sum Bank: HIGH RISK RURAL ROADS FOR FY 2012 - FY 2015

Project: 0010434 Type Work: Intersection Improvement
Descp:CR 156/BLUE JAY RD/BLANFORD RD @ CR 143/CR 176/MCCALL RD Length: 0.40

Phase PE CST

Fund Safety Safety

Total Project Cost:

$ 905,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: HIGH RISK RURAL ROADS FOR FY 2012 - FY 2015

Project: 533145- Type Work: Replace Bridge
Descp:SR 26/US 80 @ OGEECHEE RIVER & OVERFLOW 9 MI S OF GUYTON Length: 0.63

Total Project Cost: Total Project Authorizations:

$ 10,435,574 $ 246,300

Phase PE
ROW CST CST

Fund Bridge Bridge HPP Bridge

Year 2011 2012
Year 2012 2012
Year 2000 2013 2015 2015

Project: M004397 Type Work: Resurface & Maintenance
Descp:SR 119 FROM BULLOCH COUNTY LINE TO SR 21BU Length: 9.69

Phase CST

Fund STP

Year 2013

Total Project Cost:

$ 2,425,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Project: M004398 Type Work: Resurface & Maintenance Descp:SR 30 FROM SR 17 TO CHATHAM COUNTY LINE
Length: 7.21

Phase CST

Fund STP

Year 2013

Total Project Cost:

$ 1,775,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Federal $157,500 $540,000

State $17,500 $60,000

Other $0 $0

Total $175,000 $600,000

Federal $225,000 $589,500

State $25,000 $65,500

Other $0 $0

Total $250,000 $655,000

Federal $197,040 $219,524 $792,000
$7,298,295

State $49,260 $54,881
$0 $1,824,574

Other $0 $0 $0 $0

Total $246,300 $274,406 $792,000 $9,122,868

Federal $1,940,000

Also in Bryan County

State $485,000

Other $0

Total $2,425,000

Federal $1,420,000

State $355,000

Other $0

Total $1,775,000

Page 119 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/4/2011
Effingham Totals Summary
County Summary excludes lump sum projects.

Project PI#

Year

Phase

Fund

Federal

State

Other

Total

0009913 533145533145533145-

2012 2013 2015 2015

CST ROW CST CST

Natl Wildlife Bridge Bridge HPP

$75,000 $164,643 $5,473,721 $594,000

$0 $41,161 $1,368,430
$0

$0

$75,000

$0

$205,804

$0

$6,842,151

$0

$594,000

$6,307,364

$1,409,591

$0

$7,716,955

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 120 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Elbert
Project: 0006660 Type Work: Replace Bridge
Descp:CR 183/PLANTATION RD @ COLDWATER CREEK 8.3 MI N OF ELBERTON Length: 0.09

Phase PE
ROW CST

Fund Bridge Local Bridge

Year 2006 2012 After 2015

Federal $532,169 $0 $968,625

State $133,042
$0 $242,156

Total Project Cost: Total Project Authorizations:

$ 2,625,992 $ 665,211

Other $0
$750,000 $0

Total $665,211 $750,000 $1,210,781

Project: 0009863 Type Work: Replace Bridge Descp:SR 368 @ PICKENS CREEK

Length: 0.40

Total Project Cost: Total Project Authorizations:

$ 1,328,069 $ 726,744

Phase PE
ROW CST

Fund Bridge Bridge Bridge

Year 2011 2013 2015

Federal $581,395 $42,448 $438,612

State $145,349
$10,612 $109,653

Other $0 $0 $0

Total $726,744
$53,060 $548,264

Project: 0010421 Type Work: Pavement Markings
Descp:OFF-SYSTEM SAFETY IMPROVEMENTS @ 25 CR LOCS IN ELBERT COUNTY Length: 0.00

Phase CST

Fund Safety

Year 2012

Federal $250,000

State $0

Other $0

Total $250,000

Total Project Cost:

$ 250,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: HIGH RISK RURAL ROADS FOR FY 2012 - FY 2015

Project: 122650- Type Work: Widening
Descp:SR 72 FM WEST CITY LIMITS OF COMER TO E OF BROAD RVR/ELBERT
Lanes: Exist. 2 Prop. 4 Length: 9.33

Total Project Cost: Total Project Authorizations:

$ 47,938,810 $ 9,502,367

Phase PE PE
ROW ROW ROW CST

Fund State NHS State NHS NHS NHS

Year

Federal

1994

$0

2002

$1,554,294

2001

$0

2007

$4,197,600

2012

$1,746,648

After 2015 $29,002,506

State

Other

Total

$1,500,000

$0

$1,500,000

$388,573

$0

$1,942,867

$812,500

$0

$812,500

$1,049,400

$0

$5,247,000

$436,662

$0

$2,183,310

$7,250,627

$0 $36,253,133

Also in Madison County

Elbert Totals Summary
County Summary excludes lump sum projects.

Project PI#
0006660 0009863 0009863 122650-

Year
2012 2013 2015 2012

Phase
ROW ROW CST ROW

Fund
Local Bridge Bridge NHS

Federal
$0 $42,448 $438,612 $1,187,721

State
$0 $10,612 $109,653 $296,930

Other
$750,000 $0 $0 $0

Total
$750,000 $53,060
$548,264 $1,484,651

$1,668,781

$417,195

$750,000

$2,835,976

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 121 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Emanuel
Project: 0006109 Type Work: RRX Warning Device Descp:CS 818/COLEMAN STREET @ OGE #732673J

Phase CST

Fund Safety

Year 2012

Federal $155,073

State $0

Length: 0.20

Total Project Cost:

$ 155,073

Total Project Authorizations: $ 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2012 - FY 2015

Project: 0006516 Type Work: RRX Warning Device Descp:CS 893/GREENE STREET @ G&F #732671V
Length: 0.40

Phase CST

Fund Safety

Year 2015

Federal $183,790

State $0

Total Project Cost:

$ 183,790

Total Project Authorizations: $ 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2012 - FY 2015

Project: 0006517 Type Work: RRX Warning Device Descp:CS 814/PINE STREET @ NS/OGE #732680U
Length: 0.40

Phase CST

Fund Safety

Year 2012

Federal $172,303

State $0

Total Project Cost:

$ 172,303

Total Project Authorizations: $ 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2012 - FY 2015

Project: 0009040 Type Work: TE-Landscape/Beautify Descp:BYPASS SIGNAGE FOR SWAINSBORO
Length: 0.00

Phase CST

Fund STP

Year 2012

Federal $90,360

State $0

Total Project Cost:

$ 112,950

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 0009917 Type Work: Roundabout Descp:SR 4/US 1 @ SR 57
Length: 0.12

Phase PE CST

Fund Safety Safety

Year 2012 2012

Federal $153,000 $867,000

State $0 $0

Total Project Cost:

$ 1,020,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 221900- Type Work: Widening
Descp:SR 4/US 1 FM SOUTH TO NORTH CTY LMTS IN OAK PARK/NEW LOC
Lanes: Exist. 2 Prop. 4 Length: 2.30

Total Project Cost: Total Project Authorizations:

$ 12,782,999 $ 2,151,535

Phase PE PE PE
ROW CST UTL

Fund State NHS State STP NHS Local

Year 1994 2002 2002 2010 2012 2012

Federal $0
$45 $0
$1,268,800 $8,467,301
$0

State $370,000
$11 $195,479 $317,200 $2,116,825
$0

Other $0

Total $155,073

Other $0

Total $183,790

Other $0

Total $172,303

Other $22,590

Total $112,950

Other $0 $0

Total $153,000 $867,000

Other $0 $0 $0 $0 $0
$47,338

Total $370,000
$56 $195,479 $1,586,000 $10,584,126
$47,338

Page 122 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: 221910- Type Work: Widening
Descp:SR 4/US 1 FROM NORTH CITY LIMITS OAK PARK TO I-16
Lanes: Exist. 2 Prop. 4 Length: 1.80

Total Project Cost: Total Project Authorizations:

$ 16,268,092 $ 16,268,092

Phase PE PE
ROW CST

Fund State NHS STP NHS

Year 1994 2011 2010 2012

Federal $0
$132,800 $132,800 $12,380,624

State $460,312
$33,200 $33,200 $3,095,156

Other $0 $0 $0 $0

Total $460,312 $166,000 $166,000 $15,475,779

Project: M004189 Type Work: Signing
Descp:I-16 @ 12 LOCS BETWEEN BLECKLEY COUNTY & EMANUEL COUNTY Length: 4.80

Phase PE CST

Fund IM IM

Year 2010 2015

Total Project Cost:

$ 1,900,000

Total Project Authorizations: $ 200,000

Uses Lump Sum Bank: INTERSTATE MAINTENANCE FOR FY 2012 - FY 2015

Project: M004318 Type Work: Resurface & Maintenance
Descp:SR 26 FM W OF SR 57 TO CS 811/COLEMAN ST IN SWAINSBORO Length: 2.11

Phase CST

Fund STP

Year 2013

Total Project Cost:

$ 307,944

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Project: M004319 Type Work: Resurface & Maintenance
Descp:SR 4BU FROM CR 382/INJUNCTION ROAD TO SR 4 Length: 5.91

Phase CST

Fund NHS

Year 2013

Total Project Cost:

$ 2,009,064

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2012 - FY 2015

Project: M004334 Type Work: Resurface & Maintenance Descp:SR 192 FROM SR 57 TO SR 26
Length: 11.14

Phase CST

Fund STP

Year 2013

Total Project Cost:

$ 2,216,162

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Project: M004336 Type Work: Resurface & Maintenance
Descp:SR 23 FROM CANDLER COUNTY LINE TO JENKINS COUNTY LINE Length: 12.56

Phase CST

Fund STP

Year 2012

Total Project Cost:

$ 2,364,879

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Federal $200,000
$1,700,000
Federal $246,355
Federal $1,607,251
Federal $1,772,930
Federal $1,891,903

State $0 $0

Other $0 $0

Total $200,000 $1,700,000

State

Also in Bleckley, Laurens,

Treutlen County

Other

Total

$61,589

$0

$307,944

State $401,813

Other $0

Total $2,009,064

State $443,232

Other $0

Total $2,216,162

State $472,976

Other $0

Total $2,364,879

Page 123 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/4/2011
Emanuel Totals Summary
County Summary excludes lump sum projects.

Project PI#

Year

Phase

Fund

Federal

State

Other

Total

221900221900221910-

2012

CST

2012

UTL

2012

CST

NHS Local NHS

$8,467,301 $0
$12,380,624

$2,116,825 $0
$3,095,156

$0 $47,338
$0

$10,584,126 $47,338
$15,475,779

$20,847,924

$5,211,981

$47,338

$26,107,244

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 124 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Evans
Project: 0007590 Type Work: Sidewalks
Descp:SR 30 FROM CS 637/BROAD ST TO CS 602/PETERS ST IN CLAXTON Length: 0.38

Phase CST

Fund HPP

Year 2012

Federal $359,960

State $0

Total Project Cost: Total Project Authorizations:

$ 449,950 $0

Other $89,990

Total $449,950

Project: 0009041 Type Work: TE-Landscape/Beautify
Descp:CLAXTON STREETSCAPE IMPROVEMENTS PHASE II Length: 0.00

Phase CST

Fund STP

Year 2012

Total Project Cost:

$ 375,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: M004400 Type Work: Resurface & Maintenance Descp:SR 129 FROM SR 30 TO CANDLER COUNTY LINE
Length: 11.00

Phase CST

Fund STP

Year 2013

Total Project Cost:

$ 2,762,500

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Project: M004403 Type Work: Resurface & Maintenance
Descp:SR 30 FM CR 445/HICKRY HAMMCK RANCH/TATTNALL TO SR 169/EVANS Length: 14.67

Phase CST

Fund NHS

Year 2015

Total Project Cost:

$ 3,745,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2012 - FY 2015

Federal $300,000
Federal $2,210,000
Federal $2,996,000

State $0

Other $75,000

Total $375,000

State $552,500

Other $0

Total $2,762,500

Also in Tattnall County

State $749,000

Other $0

Total $3,745,000

Also in Tattnall County

Evans Totals Summary
County Summary excludes lump sum projects.

Project PI#

Year

Phase

Fund

Federal

State

Other

Total

0007590

2012

CST

HPP

$359,960

$0

$89,990

$449,950

$359,960

$0

$89,990

$449,950

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 125 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Fannin
Project: 0007456 Type Work: Pedestrian Crossings
Descp:SR 2 @ 1 LOC; SR 3 @13 LOCS; SR 5 @ 1 LOC IN BARTOW & FANNIN Length: 0.00

Phase PE
ROW CST

Fund Safety Safety Safety

Year 2006 2012 2012

Federal $0
$152,032 $354,741

State $0
$16,892 $39,416

Other $0 $0 $0

Total $0
$168,924 $394,157

Total Project Cost:

$ 563,081

Total Project Authorizations: $ 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Also in Bartow County

Project: 0008125 Type Work: TE-Landscape/Beautify
Descp:CS 562/WEST MAIN ST FM CHURCH ST TO MOUNTAIN ST - PHASE II Length: 0.35

Phase CST

Fund STP

Year 2015

Federal $300,000

State $0

Other $75,000

Total $375,000

Total Project Cost:

$ 375,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 0009042 Type Work: TE-Historic Preservation Descp:BLUE RIDGE DEPOT
Length: 0.00

Phase CST

Fund STP

Year 2012

Federal $250,000

State $0

Other $62,500

Total $312,500

Total Project Cost:

$ 312,500

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 620490- Type Work: New Construction
Descp:SR 771 FM SR 5 NEAR CR 18 S/MCCAYSVILLE TO TENN STATE LINE
Lanes: Exist. 0 Prop. 5 Length: 2.05

Phase PE
ROW CST

Fund NHS App Dev App Dev

Year 1998 2014 After 2015

Federal $34,603
$396,800 $5,554,400

State $8,651
$99,200 $1,388,600

Other $0 $0 $0

Total $43,253
$496,000 $6,943,000

Total Project Cost: Total Project Authorizations:

$ 7,482,253 $ 43,253

Project: 621340- Type Work: Widening
Descp:SR 5 FM SR 2/BLUE RIDGE N TO PROP MCCAYSVILLE BYP NR CR 138
Lanes: Exist. 2 Prop. 5 Length: 8.00

Total Project Cost: Total Project Authorizations:

$ 42,497,575 $ 533,575

Phase PE
ROW CST

Fund NHS App Dev App Dev

Year 1993 2014 After 2015

Federal $426,860
$10,661,600 $22,909,600

State $106,715 $2,665,400 $5,727,400

Other $0 $0 $0

Total $533,575 $13,327,000 $28,637,000

Project: M003371 Type Work: Miscellaneous Improvements
Descp:SR 60 @ 2 LOCS BTWN CR 5 & CR 244 EMERGENCY SLOPE REPAIR Length: 0.80

Phase PE
ROW CST

Fund STP STP STP

Year 2006 2012 2012

Total Project Cost:

$ 251,630

Total Project Authorizations: $ 50,000

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Federal $40,000 $29,714
$131,590

State $10,000
$7,428 $32,897

Other $0 $0 $0

Total $50,000 $37,142
$164,487

Page 126 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/4/2011
Fannin Totals Summary
County Summary excludes lump sum projects.

Project PI#

Year

Phase

Fund

Federal

State

Other

Total

620490621340-

2014 2014

ROW ROW

App Dev App Dev

$396,800 $10,661,600

$99,200 $2,665,400

$0

$496,000

$0

$13,327,000

$11,058,400

$2,764,600

$0

$13,823,000

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 127 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Franklin
Project: 0007457 Type Work: Pedestrian Crossings
Descp:I-85; SR 8; SR 17 & SR 72 IN FRANKLIN; HART & MADISON CO Length: 3.60

Phase PE
ROW CST

Fund Safety Safety Safety

Year 2006 2012 2012

Federal $399,775 $313,200
$1,571,510

State $44,419 $34,800 $174,612

Other $0 $0 $0

Total $444,194 $348,000 $1,746,122

Total Project Cost:

$ 2,538,317

Total Project Authorizations: $ 444,194

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Also in Hart, Madison County

Project: 122110- Type Work: Widening
Descp:SR 17 FM S OF FRANKLIN COUNTY LINE TO N OF CR 24/SCOTT ROAD
Lanes: Exist. 2 Prop. 4 Length: 6.30

Total Project Cost: Total Project Authorizations:

$ 73,493,879 $ 11,527,801

Phase PE PE
ROW CST UTL

Fund State State STP STP Local

Year 1994 2002 2007 2013 2013

Federal $0 $0
$6,370,400 $49,052,913
$0

State $1,140,000 $2,424,801 $1,592,600 $12,263,228
$0

Other $0 $0 $0 $0
$649,938

Total $1,140,000 $2,424,801 $7,963,000 $61,316,141
$649,938

Also in Stephens County

Project: M003512 Type Work: Weigh Scales
Descp:I-85 @ SB TRUCK WEIGH STATION IN FRANKLIN PHASE I Length: 0.40

Phase CST

Fund IM

Year 2012

Federal $794,938

State $88,326

Other $0

Total $883,265

Total Project Cost:

$ 883,265

Total Project Authorizations: $ 0

Uses Lump Sum Bank: INTERSTATE MAINTENANCE FOR FY 2012 - FY 2015

Project: M003518 Type Work: Weigh Scales
Descp:I-85 @ NB TRUCK WEIGH STATION IN FRANKLIN PHASE II Length: 0.40

Phase CST

Fund IM

Year 2014

Federal $794,938

State $88,326

Other $0

Total $883,265

Total Project Cost:

$ 883,265

Total Project Authorizations: $ 0

Uses Lump Sum Bank: INTERSTATE MAINTENANCE FOR FY 2012 - FY 2015

Project: M004300 Type Work: Resurface & Maintenance
Descp:SR 59 FROM CR 91/WRIGHT BRIDGE RD/FRANKLIN TO SR 77/HART Length: 3.09

Phase CST

Fund STP

Year 2013

Federal $1,163,250

State $290,812

Other $0

Total $1,454,062

Total Project Cost:

$ 1,454,062

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Also in Hart County

Project: M004302 Type Work: Resurface & Maintenance
Descp:SR 281 FROM SR 8/MADISON TO SR 17BU/FRANKLIN Length: 11.97

Phase CST

Fund STP

Year 2012

Federal $1,107,410

State $276,852

Other $0

Total $1,384,262

Total Project Cost:

$ 1,384,262

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Also in Hart, Madison County

Page 128 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: M004306 Type Work: Resurface & Maintenance Descp:SR 174 FROM SR 8 TO SR 51

Phase CST

Fund STP

Year 2013

Federal $382,127

State $95,532

Length: 4.52

Total Project Cost:

$ 477,658

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Other $0

Total $477,658

Franklin Totals Summary
County Summary excludes lump sum projects.

Project PI#
122110122110-

Year
2013 2013

Phase
CST UTL

Fund
STP Local

Federal
$6,376,879 $0

State
$1,594,220 $0

Other
$0 $84,492

Total
$7,971,098 $84,492

$6,376,879

$1,594,220

$84,492

$8,055,590

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 129 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Gilmer
Project: 0006612 Type Work: TE-Bike/Ped Facility
Descp:ELLIJAY STREETSCAPE FM SR 282 TO SPRING STREET - PHASE III Length: 0.00

Phase CST

Fund STP

Year 2012

Federal $300,000

State $0

Total Project Cost:

$ 375,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 0008142 Type Work: TE-Bike/Ped Facility
Descp:ELLIJAY STREETSCAPE IN GILMER COUNTY PHASE IV Length: 0.00

Phase CST

Fund STP

Year 2012

Federal $360,000

State $0

Total Project Cost:

$ 450,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 0008537 Type Work: Pavement Markings
Descp:OFF-SYSTEM SAFETY IMPROVEMENTS @ 6 LOCS IN GILMER COUNTY Length: 29.71

Phase CST

Fund Safety

Year 2012

Federal $185,191

State $0

Total Project Cost:

$ 185,191

Total Project Authorizations: $ 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0009061 Type Work: TE-Bike/Ped Facility Descp:ELLIJAY STREETSCAPE - PHASE V
Length: 0.00

Phase CST

Fund STP

Year 2012

Federal $300,000

State $0

Total Project Cost:

$ 375,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 631260- Type Work: New Construction
Descp:SR 382 EXT FM CR 239 TO SR 5/SR 515 NEW APD CORRIDOR
Lanes: Exist. 0 Prop. 2 Length: 0.60

Total Project Cost: Total Project Authorizations:

$ 9,525,067 $ 562,210

Phase PE
ROW CST UTL

Fund STP STP STP STP

Year 1992 2013 2014 2014

Federal $449,768
$3,037,968 $3,493,301
$639,017

State $112,442 $759,492 $873,325 $159,754

Other $75,000
Other $90,000
Other $0
Other $75,000
Other $0 $0 $0 $0

Total $375,000
Total $450,000
Total $185,191
Total $375,000
Total $562,210 $3,797,460 $4,366,626 $798,771

Project: M003370 Type Work: Miscellaneous Improvements
Descp:SR 282 @ CS 502/SCHOOL ST - EMERGENCY SLOPE REPAIR Length: 0.04

Phase PE
ROW CST

Fund STP STP STP

Year 2006 2012 2012

Total Project Cost:

$ 1,134,937

Total Project Authorizations: $ 59,828

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Federal $47,862 $6,183
$853,905

State $11,966
$1,546 $213,476

Other $0 $0 $0

Total $59,828 $7,729
$1,067,381

Page 130 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: M003646 Type Work: Shoulder Work
Descp:SR 282 FROM COURIER STREET TO CR 239/MAIN STREET Length: 0.22

Phase Fund CST Emergency

Year 2012

Federal $5,600

State $1,400

Total Project Cost:

$ 7,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2012 - FY 2015

Other $0

Total $7,000

Gilmer Totals Summary
County Summary excludes lump sum projects.

Project PI#
631260631260631260-

Year
2013 2014 2014

Phase
ROW CST UTL

Fund
STP STP STP

Federal
$3,037,968 $3,493,301
$639,017

State
$759,492 $873,325 $159,754

Other
$0 $0 $0

Total
$3,797,460 $4,366,626
$798,771

$7,170,286

$1,792,572

$0

$8,962,858

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 131 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Glascock
Project: M004326 Type Work: Resurface & Maintenance Descp:SR 80 FROM SR 296 TO WARREN COUNTY LINE

Phase CST

Fund STP

Year 2013

Federal $1,384,902

State $346,226

Other $0

Total $1,731,128

Length: 8.76

Total Project Cost:

$ 1,731,128

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Also in Jefferson County

Page 132 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Gordon
Project: 0005316 Type Work: Intersection Improvement Descp:SR 53 @ CASH ROAD/FOLSOM ROAD
Length: 0.32

Phase PE
ROW CST

Fund STP STP STP

Year 2006 2011 2013

Federal $160,400 $504,000 $463,979

State $40,100 $126,000 $115,995

Total Project Cost: Total Project Authorizations:

$ 1,410,474 $ 830,500

Other $0 $0 $0

Total $200,500 $630,000 $579,974

Project: 0006416 Type Work: Realignment
Descp:SR 53 FM E OF CR 269/RYO MOUNTAIN RD TO W OF CR 178/DAVIS RD Length: 1.50

Phase PE
ROW CST

Fund STP Safety Safety

Total Project Cost:

$ 14,708,335

UTL Safety

Total Project Authorizations: $ 2,349,117

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Year 2004 2013 2014 2014

Federal $2,114,205 $2,249,100 $8,324,529
$549,667

Project: 0009065 Type Work: TE-Bike/Ped Facility
Descp:SR 3/WALL ST FM CS 742/TRAMMELL ST TO CS 746/HICKS ST-PH III Length: 0.27

Phase CST

Fund STP

Year 2012

Federal $200,000

Total Project Cost:

$ 250,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 0009066 Type Work: TE-Bike/Ped Facility Descp:FAIRMOUNT STREETSCAPE PHASE 1
Length: 4.78

Phase CST

Fund STP

Year 2013

Federal $200,000

Total Project Cost:

$ 250,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 0009067 Type Work: TE-Historic Preservation
Descp:SR 136 FROM CSX RAILROAD TO CR 462/TAYLOR RIDGE ROAD Length: 0.34

Phase CST

Fund STP

Year 2012

Federal $200,000

Total Project Cost:

$ 250,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 0009730 Type Work: RRX Warning Device Descp:CR 148/MIDWAY ROAD @ NS #719727G
Length: 0.40

Phase CST

Fund Safety

Year 2012

Federal $306,000

Total Project Cost:

$ 306,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: RAILROAD CROSSING HAZARD ELIMINATION FOR FY 2012 - FY 2015

State $234,912 $249,900 $924,948
$61,074

Other $0 $0 $0 $0

Total $2,349,117 $2,499,000 $9,249,477
$610,741

Also in Pickens County

State $0

Other $50,000

Total $250,000

State $0

Other $50,000

Total $250,000

State $0

Other $50,000

Total $250,000

State $0

Other $0

Total $306,000

Page 133 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: 0010409 Type Work: Replace Bridge Descp:SR 3 @ LYNN CREEK 5 MI S OF CALHOUN

Length: 0.30

Total Project Cost: Total Project Authorizations:

$ 1,040,000 $0

Phase PE
ROW CST UTL

Fund Bridge Bridge Bridge Bridge

Year 2012 2014 After 2015 After 2015

Federal $200,000 $80,000 $512,000 $40,000

State $50,000 $20,000 $128,000 $10,000

Other $0 $0 $0 $0

Total $250,000 $100,000 $640,000
$50,000

Project: 0010410 Type Work: Replace Bridge Descp:SR 156 @ CSX #340683F 2 MI N OF RANGER

Length: 0.40

Total Project Cost: Total Project Authorizations:

$ 1,360,000 $0

Phase PE
ROW CST UTL

Fund Bridge Bridge Bridge Bridge

Year 2012 2014 After 2015 After 2015

Federal $200,000 $80,000 $768,000 $40,000

State $50,000 $20,000 $192,000 $10,000

Other $0 $0 $0 $0

Total $250,000 $100,000 $960,000
$50,000

Project: 610870- Type Work: Interchange
Descp:I-75 @ CR 65/UNION GROVE RD & FM CS 825 TO W OF CR 68 RELOC Length: 3.80

Total Project Cost: Total Project Authorizations:

$ 27,610,099 $ 10,755,388

Phase Fund Year

PE

STP

1998

PE Other Funds 1998

ROW TCSP

2010

ROW HPP

2010

ROW STP

2011

CST

STP

2012

UTL

STP

2012

Federal $1,464,561
$438,515 $141,308 $983,928 $5,743,550 $11,849,300 $1,634,468

State $366,140 $146,172
$35,327 $0
$1,435,887 $2,962,325
$408,617

Other $0 $0 $0 $0 $0 $0 $0

Total $1,830,702
$584,686 $176,635 $983,928 $7,179,437 $14,811,625 $2,043,086

Project: 610930- Type Work: Interchange
Descp:I-75 INTERCHANGE @ SR 136 & SR 136 FM CAMP CRK TO SR 3/US 41 Length: 1.10

Total Project Cost: Total Project Authorizations:

$ 22,833,670 $ 3,826,070

Phase PE
ROW CST CST UTL

Fund Other STP STP
IM STP

Year 1996 2010 2015 2015 2015

Federal $1,332,856 $1,728,000 $9,369,678 $6,460,544
$93,697

State $333,214 $432,000 $2,342,419 $717,838
$23,424

Other $0 $0 $0 $0 $0

Total $1,666,070 $2,160,000 $11,712,097 $7,178,382
$117,121

Project: 631570- Type Work: Replace Bridge
Descp:SR 225 @ NEW TOWN CREEK & COOSAWATTEE RIVER NE OF CALHOUN Length: 1.00

Total Project Cost: Total Project Authorizations:

$ 12,305,187 $ 1,960,858

Phase PE
ROW CST CST UTL

Fund Bridge Bridge STP Bridge STP

Year 1998 2011 2013 2013 2013

Federal $1,568,686 $1,784,000
$727,108 $3,817,319 $1,947,037

State $392,172 $446,000 $181,777 $954,330 $486,759

Other $0 $0 $0 $0 $0

Total $1,960,858 $2,230,000
$908,885 $4,771,649 $2,433,796

Project: 632670- Type Work: Widening
Descp:SR 3 FROM SR 136/GORDON TO SR 3 CONN/WHITFIELD
Lanes: Exist. 2 Prop. 4 Length: 8.57

Total Project Cost: Total Project Authorizations:

$ 74,312,350 $0

Phase SCP PE ROW CST UTL

Fund STP STP STP STP STP

Year 2014 After 2015 After 2015 After 2015 After 2015

Federal $2,000,000 $1,034,807 $9,251,711 $43,409,951 $3,753,411

State $500,000 $258,702 $2,312,928 $10,852,488 $938,353

Other $0 $0 $0 $0 $0

Total $2,500,000 $1,293,509 $11,564,639 $54,262,438 $4,691,763

Also in Whitfield County

Page 134 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: M004324 Type Work: Resurface & Maintenance Descp:I-75 FROM SR 61/BARTOW TO SR 156/GORDON

Phase CST

Fund IM

Year 2012

Federal $30,406,982

State $3,378,554

Other $0

Total $33,785,536

Length: 21.70

Total Project Cost: Total Project Authorizations:

$ 33,785,536 $0

Also in Bartow County

Gordon Totals Summary
County Summary excludes lump sum projects.

Project PI#
0005316 0010409 0010409 0010410 0010410 610870610870610930610930610930631570631570631570632670-

Year
2013 2012 2014 2012 2014 2012 2012 2015 2015 2015 2013 2013 2013 2014

Phase
CST PE ROW PE ROW CST UTL CST CST UTL CST CST UTL SCP

Fund
STP Bridge Bridge Bridge Bridge
STP STP IM STP STP Bridge STP STP STP

Federal
$463,979 $200,000
$80,000 $200,000
$80,000 $11,849,300
$1,634,468 $6,460,544 $9,369,678
$93,697 $3,817,319
$727,108 $1,947,037
$620,000

State
$115,995 $50,000 $20,000 $50,000 $20,000
$2,962,325 $408,617 $717,838
$2,342,419 $23,424
$954,330 $181,777 $486,759 $155,000

Other
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

Total
$579,974 $250,000 $100,000 $250,000 $100,000 $14,811,625 $2,043,086 $7,178,382 $11,712,097 $117,121 $4,771,649 $908,885 $2,433,796 $775,000

$37,543,130

$8,488,485

$0

$46,031,614

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 135 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Grady
Project: 0000535 Type Work: Intersection Improvement Descp:SR 38/US 84 @ SR 112 AND 17TH AVE

Length: 0.36

Total Project Cost: Total Project Authorizations:

$ 3,838,046 $ 743,000

Phase PE
ROW CST UTL

Fund NHS NHS NHS NHS

Year 2006 2011 2012 2012

Federal $154,400 $440,000
$2,105,547 $370,490

State $38,600 $110,000 $526,387 $92,623

Other $0 $0 $0 $0

Total $193,000 $550,000 $2,631,934 $463,113

Project: 0006435 Type Work: Turn Lanes Descp:SR 93 @ CR 85/JOYNER ROAD

Length: 0.40

Total Project Cost: Total Project Authorizations:

$ 807,763 $ 123,040

Phase PE
ROW CST

Fund STP STP STP

Year 2007 2012 2014

Federal $98,432 $66,912
$480,866

State $24,608 $16,728 $120,217

Other $0 $0 $0

Total $123,040
$83,640 $601,083

Project: 0007008 Type Work: RRX Warning Device Descp:SR 93/BROAD STREET @ CSX #636831U
Length: 0.40

Phase CST

Fund Safety

Total Project Cost:

$ 28,154

Total Project Authorizations: $ 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2012 - FY 2015

Project: 0007247 Type Work: Replace Bridge
Descp:CR 169/STAGE COACH RD @ BARNETTS CREEK 9.4 MI NE OF CAIRO Length: 0.23

Phase PE
ROW CST

Fund Bridge Local Bridge

Total Project Cost: Total Project Authorizations:

$ 1,328,484 $ 192,451

Year 2012
Year 2006 2012 2013

Federal $28,154

State $0

Other $0

Total $28,154

Federal $153,961 $0 $808,199

State $38,490
$0 $202,050

Other $0
$125,785 $0

Total $192,451 $125,785 $1,010,248

Project: M004432 Type Work: Bridge Painting
Descp:SR 93 @ LITTLE TIRED CREEK TRIB & SR 195 @ MUCKALEE CREEK Length: 0.80

Phase PE CST

Fund STP STP

Year 2012 2012

Total Project Cost:

$ 204,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: BRIDGE MAINTENANCE/PAINTING FOR FY 2012 - FY 2015

Federal $3,200
$160,000

State $800
$40,000

Other $0 $0

Total $4,000
$200,000

Also in Lee County

Page 136 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/4/2011
Grady Totals Summary
County Summary excludes lump sum projects.

Project PI#

Year

Phase

Fund

Federal

State

Other

Total

0000535 0000535 0006435 0006435 0007247 0007247

2012 2012 2012 2014 2012 2013

CST UTL ROW CST ROW CST

NHS NHS STP STP Local Bridge

$2,105,547 $370,490 $66,912 $480,866 $0 $808,199

$526,387 $92,623 $16,728
$120,217 $0
$202,050

$0 $0 $0 $0 $125,785 $0

$2,631,934 $463,113 $83,640 $601,083 $125,785
$1,010,248

$3,832,014

$958,003

$125,785

$4,915,802

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 137 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Greene
Project: 0006253 Type Work: Widening
Descp:SR 44 FM CR 54/LINGER LONGER ROAD TO EAST GREENSBORO BYPASS
Lanes: Exist. 2 Prop. 4 Length: 7.94

Total Project Cost: Total Project Authorizations:

$ 78,241,091 $ 4,427,839

Phase PE
ROW CST UTL

Fund STP STP STP STP

Year

Federal

2005

$3,542,271

2014 $22,384,035

After 2015 $34,543,127

After 2015 $2,123,440

State $885,568 $5,596,009 $8,635,782 $530,860

Other $0 $0 $0 $0

Total $4,427,839 $27,980,043 $43,178,908 $2,654,301

Project: 0006605 Type Work: TE-Bike/Ped Facility Descp:GREENSBORO STREETSCAPE PLAN - PHASE III
Length: 0.00

Phase CST

Fund STP

Year 2013

Total Project Cost:

$ 750,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 0006944 Type Work: Realignment
Descp:SR 44 @ CR 39/OLD EATONTON RD N OF I-20 INTERSECTION RELOC Length: 0.26

Phase PE
ROW CST

Fund STP STP STP

Year 2005 2011 2012

Total Project Cost: Total Project Authorizations:

$ 2,033,775 $ 1,239,915

Federal $600,000

State $0

Other $150,000

Federal $156,800 $835,132 $635,088

State $39,200 $208,783 $158,772

Other $0 $0 $0

Total $750,000
Total $196,000 $1,043,915 $793,860

Project: 0007528 Type Work: Interchange Descp:I-20 @ CR 178/CAREY STATION ROAD

Length: 0.40

Total Project Cost: Total Project Authorizations:

$ 42,601,192 $0

Phase PE PE PE PE PE
ROW CST

Fund HPP HPP HPP HPP HPP Local Local

Year 2006 2006 2012 2012 2012 2015 After 2015

Federal $0 $0
$198,000 $719,920 $2,303,744
$0 $0

State $0 $0 $0
$179,980 $575,936
$0 $0

Other $0 $0 $0 $0 $0
$6,820,000 $31,803,612

Total $0 $0
$198,000 $899,900 $2,879,680 $6,820,000 $31,803,612

Project: 0009068 Type Work: TE-Scenic Hwy/Welcome Ctr Descp:UNION POINT GAS STATION WELCOME CENTER

Phase CST

Length: 0.00

Fund STP

Year 2013

Total Project Cost:

$ 298,600

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: M004314 Type Work: Resurface & Maintenance
Descp:SR 77 FROM SR 44/GREENE TO SR 10/OGLETHORPE Length: 22.14

Phase CST

Fund STP

Year 2012

Total Project Cost:

$ 4,005,248

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Federal $238,880
Federal $3,204,198

State $0

Other $59,720

Total $298,600

State $801,050

Other $0

Total $4,005,248

Also in Oglethorpe County

Page 138 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: M004329 Type Work: Resurface & Maintenance
Descp:SR 44 FROM SR 77 TO TALIAFERRO COUNTY LINE Length: 11.02

Phase CST

Fund STP

Year 2013

Federal $1,984,027

State $496,007

Other $0

Total $2,480,034

Total Project Cost:

$ 2,480,034

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Also in Taliaferro County

Greene Totals Summary
County Summary excludes lump sum projects.

Project PI#
0006253 0006944 0007528 0007528 0007528 0007528

Year
2014 2012 2012 2012 2012 2015

Phase
ROW CST PE PE PE ROW

Fund
STP STP HPP HPP HPP Local

Federal
$22,384,035 $635,088
$2,303,744 $719,920 $198,000 $0

State
$5,596,009 $158,772 $575,936 $179,980 $0 $0

Other
$0 $0 $0 $0 $0 $6,820,000

Total
$27,980,043 $793,860
$2,879,680 $899,900 $198,000
$6,820,000

$26,240,786

$6,510,697

$6,820,000

$39,571,483

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 139 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Habersham
Project: 0009080 Type Work: TE-Bike/Ped Facility
Descp:DEMOREST STREETSCAPE & SIDEWALK IMPROVEMENTS Length: 0.00

Phase CST

Fund STP

Year 2012

Federal $500,000

State $0

Other $125,000

Total $625,000

Total Project Cost:

$ 625,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 0009945 Type Work: Roundabout Descp:SR 384 @ CR 382/PEA RIDGE ROAD
Length: 0.26

Phase PE CST

Fund Safety Safety

Year 2012 2012

Federal $153,000 $867,000

State $0 $0

Other $0 $0

Total $153,000 $867,000

Total Project Cost:

$ 1,020,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0010334 Type Work: Signals
Descp:SR 15 @ 2 LOCS; SR 17 @ 1 LOC & SR 105 @ 4 LOCS Length: 2.80

Phase PE
ROW CST

Fund STP STP STP

Year 2011 2015 After 2015

Federal $225,000 $90,000 $588,000

State $0 $0 $0

Other $0 $0 $0

Total $225,000
$90,000 $588,000

Total Project Cost:

$ 903,000

Total Project Authorizations: $ 225,000

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2012 - FY 2015

Project: M003643 Type Work: Drainage Improvements
Descp:SR 15/US 441 FROM CR 123/JOHN WOOD RD TO CR 125/TOM BORN RD Length: 2.02

Phase Fund Year CST Emergency 2012

Federal $34,400

State $8,600

Other $0

Total $43,000

Total Project Cost:

$ 43,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2012 - FY 2015

Project: M004303 Type Work: Resurface & Maintenance
Descp:SR 255 FROM SR 115/WHITE TO SR 17/HABERSHAM Length: 5.90

Phase CST

Fund STP

Year 2012

Federal $434,211

State $108,553

Other $0

Total $542,764

Total Project Cost:

$ 542,764

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Also in White County

Page 140 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Hancock
Project: 0007033 Type Work: Replace Bridge Descp:SR 16 @ TWO MILE CREEK 1.8 MI E OF SPARTA
Length: 0.60

Phase PE
ROW CST

Fund Bridge Bridge Bridge

Year 2007 2011 2014

Federal $240,000 $304,000
$1,326,497

State $60,000 $76,000 $331,624

Total Project Cost: Total Project Authorizations:

$ 2,338,121 $ 680,000

Other $0 $0 $0

Total $300,000 $380,000 $1,658,121

Project: 0007034 Type Work: Replace Bridge
Descp:SR 16 @ LITTLE OGEECHEE RIVER 3.4 MI E OF SPARTA Length: 0.60

Total Project Cost: Total Project Authorizations:

$ 1,905,333 $ 400,000

Phase PE
ROW CST

Fund Bridge Bridge Bridge

Year 2007 2011 2014

Federal $240,000 $80,000
$1,204,266

State $60,000 $20,000 $301,067

Other $0 $0 $0

Total $300,000 $100,000 $1,505,333

Project: 0009087 Type Work: TE-Landscape/Beautify
Descp:SR 15 FROM SR 16/JONES STREET TO CS 500/ELM STREET Length: 0.35

Phase CST

Fund STP

Year 2012

Federal $300,000

Total Project Cost:

$ 375,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 0010411 Type Work: Replace Bridge
Descp:SR 16 @ LITTLE SHOULDERBONE CREEK 8.6 MI NW OF SPARTA Length: 0.40

Total Project Cost: Total Project Authorizations:

$ 1,040,000 $0

Phase PE
ROW CST UTL

Fund Bridge Bridge Bridge Bridge

Year 2012 2014 After 2015 After 2015

Federal $200,000 $80,000 $512,000 $40,000

State $0
State $50,000 $20,000 $128,000 $10,000

Other $75,000
Other $0 $0 $0 $0

Total $375,000
Total $250,000 $100,000 $640,000
$50,000

Hancock Totals Summary
County Summary excludes lump sum projects.

Project PI#

Year

Phase

Fund

Federal

State

Other

Total

0007033 0007034 0010411 0010411

2014 2014 2012 2014

CST CST PE ROW

Bridge Bridge Bridge Bridge

$1,326,497 $1,204,266
$200,000 $80,000

$331,624 $301,067
$50,000 $20,000

$0

$1,658,121

$0

$1,505,333

$0

$250,000

$0

$100,000

$2,810,763

$702,691

$0

$3,513,454

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 141 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Haralson
Project: 0000761 Type Work: Intersection Improvement
Descp:SR 100 FM SR 8 TO SR 120 IN TALLAPOOSA&DRAINAGE IMPROVEMENTS Length: 0.85

Phase PE
ROW CST

Fund STP STP STP

Year 2011 2014 After 2015

Federal $117,625 $29,256
$1,149,587

State $29,406
$7,314 $287,397

Total Project Cost: Total Project Authorizations:

$ 1,620,585 $ 147,032

Other $0 $0 $0

Total $147,032
$36,570 $1,436,983

Project: 0008426 Type Work: Widening
Descp:CR 324/MCBRAYER ROAD BUSINESS PARK LOCAL ACCESS ROAD Length: 0.85

Total Project Cost: Total Project Authorizations:

$ 532,000 $0

Phase PE CST

Fund Local App Dev

Year 2012 2013

Federal $0
$392,000

State $0
$98,000

Other $42,000
$0

Total $42,000
$490,000

Project: 0009089 Type Work: TE-Bike/Ped Facility Descp:TALLAPOOSA STREETSCAPE - PHASE III
Length: 0.00

Phase CST

Fund STP

Year 2013

Federal $425,000

Total Project Cost:

$ 531,250

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 0009448 Type Work: Sidewalks Descp:H A JONES ELEMENTARY SCHOOL - SRTS
Length: 0.00

Phase PE CST

Fund Safety Safety

Year 2010 2012

Federal $55,000
$510,000

Total Project Cost:

$ 565,000

Total Project Authorizations: $ 55,000

Uses Lump Sum Bank: SAFE ROUTES TO SCHOOL INFRASTRUCTURE FOR FY 2012 - FY 2015

Project: 0009818 Type Work: Barriers
Descp:I-20 FROM ALABAMA STATE LINE TO W OF SR 5 CABLE BARRIERS Length: 34.03

Phase PE CST

Fund Safety Safety

Year 2010 2012

Federal $27,000
$5,136,210

Total Project Cost:

$ 5,736,900

Total Project Authorizations: $ 30,000

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0009864 Type Work: Replace Bridge Descp:SR 120 @ BEACH CREEK
Length: 0.40

Phase PE
ROW CST

Fund Bridge Bridge Bridge

Year 2011 2015 After 2015

Federal $40,000 $44,163
$424,554

Total Project Cost: Total Project Authorizations:

$ 635,897 $ 50,000

State $0

Other $106,250

Total $531,250

State $0 $0

Other $0 $0

Total $55,000
$510,000

State $3,000
$570,690

Other $0 $0

Total $30,000
$5,706,900

Also in Carroll, Douglas County

State $10,000 $11,041 $106,139

Other $0 $0 $0

Total $50,000 $55,204
$530,693

Page 142 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: 0009901 Type Work: Roundabout Descp:I-20 @ SR 348/WACO ROAD - EB & WB RAMPS
Length: 0.43

Phase PE CST

Fund Safety Safety

Year 2012 2012

Federal $204,000
$1,530,000

State $0 $0

Total Project Cost:

$ 1,734,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: M004441 Type Work: Resurface & Maintenance
Descp:SR 1BU FROM W OF SR 1/US 27 TO W OF SR 1/US 27 Length: 2.29

Phase CST

Fund STP

Year 2012

Federal $454,660

State $113,665

Total Project Cost:

$ 568,325

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Other $0 $0
Other $0

Total $204,000 $1,530,000
Total $568,325

Haralson Totals Summary
County Summary excludes lump sum projects.

Project PI#

Year

Phase

Fund

Federal

State

Other

Total

0000761 0008426 0008426 0009864

2014 2012 2013 2015

ROW PE CST
ROW

STP Local App Dev Bridge

$29,256 $0
$392,000 $44,163

$7,314 $0
$98,000 $11,041

$0 $42,000
$0 $0

$36,570 $42,000 $490,000 $55,204

$465,419

$116,355

$42,000

$623,774

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 143 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Harris
Project: 0008600 Type Work: Replace Bridge
Descp:CR 386/FORTSON ROAD @ STANDING BOY CREEK Length: 0.40

Phase PE
ROW CST

Fund Bridge Local Bridge

Year 2014 2015 After 2015

Federal $45,947 $0
$248,675

State $11,487
$0 $62,169

Total Project Cost: Total Project Authorizations:

$ 418,278 $0

Other $0
$50,000 $0

Total $57,434 $50,000
$310,844

Project: 0009090 Type Work: TE-Bike/Ped Facility
Descp:HAMILTON/PALMETTO CREEK - WALKING TRAIL AMENITIES Length: 0.00

Phase CST

Fund STP

Year 2013

Total Project Cost:

$ 200,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 0009091 Type Work: TE-Bike/Ped Facility
Descp:PINE MOUNTAIN DOWNTOWN STREETSCAPE PHASE IV Length: 0.00

Phase CST

Fund STP

Year 2012

Total Project Cost:

$ 275,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 333156- Type Work: Replace Bridge
Descp:SR 103 @ FLAT SHOALS CREEK 11.2 MI W OF SR 116 Length: 0.63

Phase PE
ROW CST

Fund Bridge Bridge Bridge

Year 2000 2012 2013

Total Project Cost: Total Project Authorizations:

$ 2,821,078 $ 346,809

Federal $160,000

State $0

Federal $220,000

State $0

Federal $277,447 $98,328
$1,881,088

State $69,362 $24,582 $470,272

Other $40,000
Other $55,000
Other $0 $0 $0

Total $200,000
Total $275,000
Total $346,809 $122,910 $2,351,360

Project: M004355 Type Work: Resurface & Maintenance Descp:SR 208 FROM SR 1 TO TALBOT COUNTY LINE
Length: 9.67

Phase CST

Fund STP

Year 2013

Total Project Cost:

$ 1,859,502

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Federal $1,487,602

State $371,900

Other $0

Total $1,859,502

Page 144 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/4/2011
Harris Totals Summary
County Summary excludes lump sum projects.

Project PI#

Year

Phase

Fund

Federal

State

Other

Total

0008600 0008600 333156333156-

2014 2015 2012 2013

PE ROW ROW CST

Bridge Local Bridge Bridge

$45,947 $0
$98,328 $1,881,088

$11,487 $0
$24,582 $470,272

$0 $50,000
$0 $0

$57,434 $50,000 $122,910 $2,351,360

$2,025,363

$506,341

$50,000

$2,581,704

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 145 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Hart
Project: 0007457 Type Work: Pedestrian Crossings
Descp:I-85; SR 8; SR 17 & SR 72 IN FRANKLIN; HART & MADISON CO Length: 3.60

Phase PE
ROW CST

Fund Safety Safety Safety

Year 2006 2012 2012

Federal $399,775 $313,200
$1,571,510

State $44,419 $34,800 $174,612

Other $0 $0 $0

Total $444,194 $348,000 $1,746,122

Total Project Cost:

$ 2,538,317

Total Project Authorizations: $ 444,194

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Also in Franklin, Madison County

Project: 0009324 Type Work: Acceleration / Decel Lane
Descp:CR 594/KNOX BRIDGE XING RD FM SR 77 TO CR 245/SHOAL CREEK RD
Lanes: Exist. 2 Prop. 3 Length: 0.81

Phase PE PE CST

Fund STP Local App Dev

Year 2011 2012 2013

Federal $40,000 $0
$493,485

State $10,000
$0 $0

Other $0
$54,335 $274,326

Total $50,000 $54,335
$767,811

Total Project Cost: Total Project Authorizations:

$ 872,146 $ 50,000

Project: M004300 Type Work: Resurface & Maintenance
Descp:SR 59 FROM CR 91/WRIGHT BRIDGE RD/FRANKLIN TO SR 77/HART Length: 3.09

Phase CST

Fund STP

Year 2013

Total Project Cost:

$ 1,454,062

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Project: M004302 Type Work: Resurface & Maintenance
Descp:SR 281 FROM SR 8/MADISON TO SR 17BU/FRANKLIN Length: 11.97

Phase CST

Fund STP

Year 2012

Total Project Cost:

$ 1,384,262

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Federal $1,163,250
Federal $1,107,410

State $290,812

Other $0

Total $1,454,062

Also in Franklin County

State $276,852

Other $0

Total $1,384,262

Also in Franklin, Madison County

Hart Totals Summary
County Summary excludes lump sum projects.

Project PI#

Year

Phase

Fund

Federal

State

Other

Total

0009324 0009324

2012

PE

Local

2013

CST

App Dev

$0 $493,485

$0

$54,335

$0

$274,326

$54,335 $767,811

$493,485

$0

$328,661

$822,146

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 146 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Heard
Project: 343420- Type Work: Replace Bridge
Descp:SR 100 @ NEW RIVER & @ CLEAR CREEK; INCL RESURF BTWN BRIDGES Length: 2.20

Phase PE
ROW CST

Fund Bridge Bridge Bridge

Year 2002 2008 2012

Federal $277,600 $133,600
$3,949,265

State $69,400 $33,400 $987,316

Total Project Cost: Total Project Authorizations:

$ 5,450,581 $ 514,000

Other $0 $0 $0

Total $347,000 $167,000 $4,936,581

Project: M004345 Type Work: Resurface & Maintenance
Descp:SR 219 FM 0.08 MI N OF CS 720/MALIBU DR/TROUP TO SR 34/HEARD Length: 16.31

Phase CST

Fund STP

Year 2012

Total Project Cost:

$ 4,376,730

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Federal $3,501,384

State $875,346

Other $0

Total $4,376,730

Also in Troup County

Heard Totals Summary
County Summary excludes lump sum projects.

Project PI# 343420-

Year 2012

Phase CST

Fund Bridge

Federal $3,949,265

State $987,316

Other $0

Total $4,936,581

$3,949,265

$987,316

$0

$4,936,581

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 147 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Irwin
Project: 0007591 Type Work: Sidewalks
Descp:SIDEWALKS; LIGHTING & LANDSCAPING IN OCILLA Length: 0.36

Phase PE CST

Fund HPP HPP

Year 2009 2014

Federal $39,680
$384,246

State $0 $0

Total Project Cost: Total Project Authorizations:

$ 529,908 $ 49,600

Other $9,920
$96,062

Total $49,600
$480,308

Project: 0007959 Type Work: Replace Bridge Descp:CR 252/FRANK ROAD @ WILLACOOCHEE RIVER

Length: 0.26

Total Project Cost: Total Project Authorizations:

$ 2,307,142 $ 187,587

Phase PE
ROW CST

Fund Bridge Local Bridge

Year 2007 2013 After 2015

Federal $150,069 $0
$1,574,958

State $37,517
$0 $393,739

Other $0
$150,858 $0

Total $187,587 $150,858 $1,968,697

Project: 0007960 Type Work: Replace Bridge
Descp:CR 252/FRANK ROAD @ WILLACOOCHEE RIVER OVERFLOW Length: 0.18

Total Project Cost: Total Project Authorizations:

$ 1,128,622 $ 50,000

Phase PE
ROW CST

Fund Bridge Local Bridge

Year 2007 2013 After 2015

Federal $40,000 $0
$779,666

State $10,000
$0 $194,916

Other $0
$104,040 $0

Total $50,000
$104,040 $974,582

Irwin Totals Summary
County Summary excludes lump sum projects.

Project PI#
0007591 0007959 0007960

Year
2014 2013 2013

Phase
CST ROW ROW

Fund
HPP Local Local

Federal
$384,246 $0 $0

State
$0 $0 $0

Other
$96,062 $150,858 $104,040

Total
$480,308 $150,858 $104,040

$384,246

$0

$350,960

$735,206

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 148 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Jackson
Project: 0007291 Type Work: RRX Warning Device Descp:SR 98 @ NS #717696D
Length: 0.22

Phase PE CST

Fund Safety Safety

Year 2012 2013

Federal $67,570
$739,734

State $0 $0

Total Project Cost:

$ 807,304

Total Project Authorizations: $ 0

Uses Lump Sum Bank: RAILROAD CROSSING HAZARD ELIMINATION FOR FY 2012 - FY 2015

Project: 0007350 Type Work: Signals Descp:SR 15 @ 3 LOCS & SR 11BU @ 1 LOC

Phase PE PE

Fund STP STP

Year 2005 2005

Federal $40,000
$316,807

Length: 1.60

CST

STP

2014

$324,799

Total Project Cost:

$ 742,606

UTL

STP

2014

$51,000

Total Project Authorizations: $ 366,807

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2012 - FY 2015

State $10,000
$0 $0 $0

Project: 0008396 Type Work: Replace Bridge
Descp:CR 146/GALILEE CHURCH ROAD @ MIDDLE OCONEE RIVER Length: 0.23

Total Project Cost: Total Project Authorizations:

$ 2,512,495 $ 40,000

Phase PE
ROW CST UTL

Fund Bridge Local Bridge Local

Year 2010 2012 2013 2013

Federal $32,000 $0
$1,715,761 $0

State $8,000 $0
$428,940 $0

Other $0 $0
Other $0 $0 $0 $0
Other $0
$41,918 $0
$285,876

Total $67,570
$739,734
Total $50,000
$316,807 $324,799
$51,000
Total $40,000 $41,918
$2,144,701 $285,876

Project: 0008434 Type Work: Widening Descp:SR 53 FROM I-85 TO CR 167/TAPP WOOD ROAD

Lanes: Exist. 2 Prop. 4 Length: 5.56

Total Project Cost: Total Project Authorizations:

$ 45,834,047 $0

Phase PE
ROW CST

Fund STP STP STP

Year

Federal

2014

$2,264,289

After 2015 $10,374,130

After 2015 $24,028,818

State $566,072 $2,593,533 $6,007,205

Other $0 $0 $0

Total $2,830,361 $12,967,663 $30,036,023

Project: 0008565 Type Work: Widening
Descp:JACKSON COUNTY INDUSTRIAL PARK - LOCAL ACCESS ROAD Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 3,101,358 $ 484,000

Phase PE PE
ROW CST

Fund STP Local Local App Dev

Year 2011 LOCL LOCL 2012

Federal $40,000 $0 $0
$1,100,000

State $10,000
$0 $0 $0

Other $0
$196,000 $238,000 $1,517,358

Total $50,000
$196,000 $238,000 $2,617,358

Project: 0009097 Type Work: TE-Bike/Ped Facility
Descp:SR 53 FROM BRASELTON-HOSCHTON CITY LIMIT TO SR 124 - PHASE I Length: 0.25

Phase CST

Fund STP

Year 2013

Total Project Cost:

$ 625,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Federal $500,000

State $0

Other $125,000

Total $625,000

Page 149 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: 0009947 Type Work: Roundabout Descp:SR 11 @ SR 124
Length: 0.26

Phase PE CST

Fund Safety Safety

Year 2012 2012

Federal $153,000 $867,000

State $0 $0

Total Project Cost:

$ 1,020,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0010022 Type Work: Sidewalks Descp:JEFFERSON CITY SCHOOL SYSTEM - SRTS
Length: 0.00

Phase PE CST

Fund Safety Safety

Year 2010 2014

Federal $140,000 $714,000

State $0 $0

Total Project Cost:

$ 854,000

Total Project Authorizations: $ 140,000

Uses Lump Sum Bank: SAFE ROUTES TO SCHOOL INFRASTRUCTURE FOR FY 2012 - FY 2015

Project: 0010231 Type Work: New Construction
Descp:CITY OF BRASELTON INDUSTRIAL PARKWAY EXTENSION - PHASE I
Lanes: Exist. 0 Prop. 2 Length: 0.25

Phase PE
ROW CST

Fund App Dev App Dev App Dev

Year 2011 2012 2013

Federal $59,200
$1,471,200 $958,844

State $0 $0 $0

Total Project Cost: Total Project Authorizations:

$ 3,111,555 $ 74,000

Other $0 $0
Other $0 $0
Other $14,800 $367,800 $239,711

Total $153,000 $867,000
Total $140,000 $714,000
Total $74,000
$1,839,000 $1,198,555

Project: 121340- Type Work: Replace Bridge Descp:SR 11/ US 129/ @ ALLEN CREEK N OF TALMO

Length: 0.40

Total Project Cost: Total Project Authorizations:

$ 3,061,983 $ 21,344

Phase PE CST

Fund Bridge Bridge

Year 1987 2015

Federal $17,076
$2,432,511

State $4,269
$608,128

Other $0 $0

Total $21,344
$3,040,639

Project: 122150- Type Work: Widening
Descp:SR 11/US 129 FM SR 332 @ TALMO/JACKSON TO SR 323/HALL
Lanes: Exist. 2 Prop. 4 Length: 6.72

Total Project Cost: Total Project Authorizations:

$ 65,186,743 $ 25,406,413

Phase PE
ROW ROW CST UTL

Fund NHS NHS State NHS NHS

Project: 122510- Type Work: Bridge Rehab
Descp:SR 15 ALT FM STOREY ST TO SR 82; INCL NEW BRIDGES@ CURRY CRK
Lanes: Exist. 2 Prop. 3 Length: 0.70

Total Project Cost: Total Project Authorizations:

$ 9,770,902 $ 4,876,357

Phase PE
ROW CST CST UTL

Fund Bridge Bridge STP Bridge Bridge

Year 1992 2002 2011 2015 2015
Year 1993 2011 2014 2014 2014

Federal $2,148,331 $1,200,800
$0 $31,075,510
$748,754

State $537,083 $300,200 $21,220,000 $7,768,877 $187,188

Other $0 $0 $0 $0 $0

Total $2,685,413 $1,501,000 $21,220,000 $38,844,387
$935,942

Also in Hall County

Federal $981,086
$2,920,000 $2,515,737 $1,295,986
$103,913

State $245,271 $730,000 $628,934 $323,996
$25,978

Other $0 $0 $0 $0 $0

Total $1,226,357 $3,650,000 $3,144,671 $1,619,982
$129,892

Page 150 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/4/2011
Jackson Totals Summary
County Summary excludes lump sum projects.

Project PI#
0008396 0008396 0008396 0008434 0008565 0010231 0010231 121340122150122150122510122510122510-

Year
2012 2013 2013 2014 2012 2012 2013 2015 2015 2015 2014 2014 2014

Phase
ROW CST UTL PE CST ROW CST CST CST UTL CST CST UTL

Fund
Local Bridge Local
STP App Dev App Dev App Dev Bridge
NHS NHS Bridge STP Bridge

Federal
$0 $1,715,761
$0 $2,264,289 $1,100,000 $1,471,200
$958,844 $2,432,511 $9,633,408
$232,114 $1,295,986 $2,515,737
$103,913

State
$0 $428,940
$0 $566,072
$0 $0 $0 $608,128 $2,408,352 $58,028 $323,996 $628,934 $25,978

Other
$41,918 $0
$285,876 $0
$1,517,358 $367,800 $239,711 $0 $0 $0 $0 $0 $0

Total
$41,918 $2,144,701
$285,876 $2,830,361 $2,617,358 $1,839,000 $1,198,555 $3,040,639 $12,041,760
$290,142 $1,619,982 $3,144,671
$129,892

$23,723,763

$5,048,430

$2,452,662

$31,224,855

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 151 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Jasper
Project: 0001939 Type Work: New Construction Descp:MONTICELLO NE BYPASS FM SR 16 TO SR 83 Lanes: Exist. 0 Prop. 2 Length: 3.28

Phase PE
ROW CST

Fund STP STP STP

Year

Federal

2004

$702,400

2013

$1,214,771

After 2015 $12,472,841

State $175,600 $303,693 $3,118,210

Total Project Cost: Total Project Authorizations:

$ 17,987,515 $ 878,000

Other $0 $0 $0

Total $878,000 $1,518,464 $15,591,051

Project: 0002337 Type Work: TE-Landscape/Beautify
Descp:MONTICELLO DOWNTOWN STREETSCAPE AND SCENIC BYWAY BIKEWAY Length: 0.00

Phase CST

Fund STP

Year 2013

Total Project Cost:

$ 500,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 0004444 Type Work: Guardrail
Descp:SR 212 @ LAKE JACKSON GUARDRAIL @ APPROACHES Length: 0.40

Phase PE
ROW CST

Fund STP Safety Safety

Year 2004 2012 2012

Total Project Cost:

$ 321,632

Total Project Authorizations: $ 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0007593 Type Work: Sidewalks
Descp:SIDEWALKS; LIGHTING & LANDSCAPING IN MONTICELLO Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 1,274,164 $ 150,000

Phase PE PE CST CST

Fund HPP HPP HPP HPP

Year 2009 2009 2012 2012

Federal $400,000
Federal $0
$165,411 $156,221
Federal $34,453 $85,547
$495,000 $329,950

State $0

Other $100,000

Total $500,000

State $0 $0 $0

Other $0 $0 $0

Total $0
$165,411 $156,221

Also in Newton County

State $0 $0 $0 $0

Other $8,613
$21,387 $0
$299,214

Total $43,066
$106,934 $495,000 $629,164

Project: 0009922 Type Work: Roundabout Descp:SR 16 @ SR 380
Length: 0.12

Phase PE CST

Fund Safety Safety

Year 2012 2012

Federal $153,000 $867,000

State $0 $0

Total Project Cost:

$ 1,020,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 231730- Type Work: Passing Lanes
Descp:SR 83: 2 PASSING LANES BETWEEN OCMULGEE RIVER AND SHADYDALE
Lanes: Exist. 2 Prop. 3 Length: 2.73

Phase PE
ROW CST

Fund STP STP STP

Year 2001 2013 After 2015

Federal $310,400 $357,721
$5,862,598

State $77,600 $89,430 $1,465,650

Total Project Cost: Total Project Authorizations:

$ 8,163,399 $ 388,000

Other $0 $0
Other $0 $0 $0

Total $153,000 $867,000
Total $388,000 $447,151 $7,328,248

Page 152 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/4/2011
Jasper Totals Summary
County Summary excludes lump sum projects.

Project PI#

Year

Phase

Fund

Federal

State

Other

Total

0001939

2013

ROW

STP

0007593

2012

CST

HPP

0007593

2012

CST

HPP

231730-

2013

ROW

STP

$1,214,771 $329,950 $495,000 $357,721

$303,693 $0 $0
$89,430

$0 $299,214
$0 $0

$1,518,464 $629,164 $495,000 $447,151

$2,397,442

$393,123

$299,214

$3,089,779

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 153 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Jeff Davis
Project: 0005963 Type Work: Replace Bridge Descp:CR 575 ZOAR ROAD @ BIG SATILLA CREEK

Length: 0.30

Total Project Cost: Total Project Authorizations:

$ 2,108,773 $ 593,999

Phase PE
ROW CST UTL

Fund Bridge Local Bridge Local

Year 2004 2012 2014 2014

Federal $475,199 $0
$1,113,464 $0

State $118,800
$0 $278,366
$0

Other $0
$36,720 $0
$86,223

Total $593,999
$36,720 $1,391,831
$86,223

Also in Appling County

Project: 0009875 Type Work: Roundabout Descp:SR 19/US 23 @ SR 135 CONN
Length: 0.50

Phase PE CST

Fund Safety Safety

Year 2011 2012

Federal $250,000 $867,000

State $0 $0

Other $0 $0

Total $250,000 $867,000

Total Project Cost:

$ 1,117,000

Total Project Authorizations: $ 250,000

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0009876 Type Work: Roundabout Descp:SR 107 @ SR 268
Length: 1.00

Phase PE CST

Fund Safety Safety

Year 2012 2012

Federal $153,000 $867,000

State $0 $0

Other $0 $0

Total $153,000 $867,000

Total Project Cost:

$ 1,020,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: M004262 Type Work: Resurface & Maintenance
Descp:SR 19/US 23 FM 0.02 MI N OF SR 135 CONN TO OCMULGEE RIVER Length: 7.84

Phase CST

Fund NHS

Year 2012

Federal $4,482,400

State $1,120,600

Other $0

Total $5,603,000

Total Project Cost:

$ 5,603,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2012 - FY 2015

Jeff Davis Totals Summary
County Summary excludes lump sum projects.

Project PI#

Year

Phase

Fund

Federal

State

Other

Total

0005963 0005963 0005963

2012 2014 2014

ROW CST UTL

Local Bridge Local

$0 $478,790
$0

$0 $119,697
$0

$15,790 $0
$37,076

$15,790 $598,487
$37,076

$478,790

$119,697

$52,866

$651,353

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 154 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Jefferson
Project: 0007041 Type Work: Replace Bridge Descp:SR 47 @ BIG BRIER CREEK
Length: 0.40

Phase PE
ROW CST

Fund Bridge Bridge Bridge

Year 2008 2013 2014

Federal $418,449 $46,866
$1,227,599

State $104,612
$11,717 $306,900

Other $0 $0 $0

Total $523,061
$58,583 $1,534,499

Total Project Cost: Total Project Authorizations:

$ 2,116,142 $ 523,061

Also in McDuffie County

Project: 0007361 Type Work: Signals
Descp:SR 4; SR 23; SR 24; SR 56; SR 121 - TRAFFIC SIGNAL UPGRADES Length: 3.20

Phase PE
ROW CST

Fund STP STP STP

Year 2006 2011 2015

Federal $226,400 $70,000
$1,215,931

Total Project Cost:

$ 1,619,931

UTL

STP

2015

$51,000

Total Project Authorizations: $ 353,000

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2012 - FY 2015

State $56,600
$0 $0 $0

Other $0 $0 $0 $0

Total $283,000
$70,000 $1,215,931
$51,000

Also in Burke County

Project: 0009098 Type Work: TE-Bike/Ped Facility Descp:SR 4/US 1 FROM SR 4BU TO SR 4BU - PHASE II
Length: 2.38

Phase CST

Fund STP

Year 2012

Federal $283,320

State $0

Other $70,830

Total $354,150

Total Project Cost:

$ 354,150

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 0009099 Type Work: TE-Bike/Ped Facility Descp:WADLEY DOWNTOWN STREETSCAPE
Length: 0.00

Phase CST

Fund STP

Year 2012

Federal $283,320

State $0

Other $70,830

Total $354,150

Total Project Cost:

$ 354,150

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 0009449 Type Work: Sidewalks Descp:LOUISVILLE ACADEMY - SRTS
Length: 0.00

Phase PE CST

Fund Safety Safety

Year 2010 2012

Federal $55,000
$502,363

State $0 $0

Other $0 $0

Total $55,000
$502,363

Total Project Cost:

$ 557,363

Total Project Authorizations: $ 55,000

Uses Lump Sum Bank: SAFE ROUTES TO SCHOOL INFRASTRUCTURE FOR FY 2012 - FY 2015

Project: 222150- Type Work: Widening
Descp:SR 4/US 1/LOUISVILLE BYP FM SR 4 BU/US 1BU TO CR 325
Lanes: Exist. 2 Prop. 4 Length: 2.54

Total Project Cost: Total Project Authorizations:

$ 25,303,654 $ 1,103,597

Phase PE PE PE
ROW CST

Fund State NHS State STP NHS

Year

Federal

1994

$0

2002

$186,529

2002

$0

2015

$888,460

After 2015 $18,471,585

State $91,000 $46,632 $779,436 $222,115 $4,617,896

Other $0 $0 $0 $0 $0

Total $91,000
$233,162 $779,436 $1,110,575 $23,089,481

Page 155 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: 231230- Type Work: Passing Lanes
Descp:SR 24/US 221 EB MP 12.6-13.8;WB 10.0-11.3;EB 3.2-4.3
Lanes: Exist. 2 Prop. 3 Length: 3.60

Phase PE
ROW CST

Fund STP STP STP

Year 1998 2010 2013

Federal $246,400 $615,920
$4,729,706

State $61,600 $153,980 $1,182,426

Total Project Cost: Total Project Authorizations:

$ 6,990,032 $ 1,077,900

Other $0 $0 $0

Total $308,000 $769,900 $5,912,132

Project: M004279 Type Work: Resurface & Maintenance
Descp:SR 17 FROM SR 4/US 1 TO WARREN COUNTY LINE Length: 5.50

Phase CST

Fund NHS

Year 2013

Total Project Cost:

$ 1,510,456

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2012 - FY 2015

Project: M004311 Type Work: Resurface & Maintenance
Descp:SR 4 FROM CR 183/WYNDER SMITH ROAD TO SR 4BU Length: 8.81

Phase CST

Fund NHS

Year 2012

Total Project Cost:

$ 2,377,907

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2012 - FY 2015

Project: M004326 Type Work: Resurface & Maintenance Descp:SR 80 FROM SR 296 TO WARREN COUNTY LINE
Length: 8.76

Phase CST

Fund STP

Year 2013

Total Project Cost:

$ 1,731,128

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Project: M004327 Type Work: Resurface & Maintenance Descp:SR 80 FROM SR 4 TO SR 17 IN WRENS
Length: 0.23

Phase CST

Fund STP

Year 2013

Total Project Cost:

$ 68,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Project: M004330 Type Work: Resurface & Maintenance
Descp:SR 102 FROM GLASCOCK COUNTY LINE TO SR 17 Length: 10.02

Phase CST

Fund STP

Year 2012

Total Project Cost:

$ 2,240,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Federal $1,208,365
Federal $1,902,326
Federal $1,384,902
Federal $54,400
Federal $1,792,000

State $302,091

Other $0

Total $1,510,456

State $475,582

Other $0

Total $2,377,907

State $346,226

Other $0

Total $1,731,128

Also in Glascock County

State $13,600

Other $0

Total $68,000

State $448,000

Other $0

Total $2,240,000

Page 156 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: M004332 Type Work: Resurface & Maintenance
Descp:SR 296 FROM SR 88 TO GLASCOCK COUNTY LINE Length: 8.92

Phase CST

Fund STP

Year 2013

Federal $1,295,123

State $323,781

Total Project Cost:

$ 1,618,904

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Other $0

Total $1,618,904

Jefferson Totals Summary
County Summary excludes lump sum projects.

Project PI#
0007041 0007041 222150231230-

Year
2013 2014 2015 2013

Phase
ROW CST ROW CST

Fund
Bridge Bridge
STP STP

Federal
$23,433 $613,800 $888,460 $4,729,706

State
$5,858 $153,450 $222,115 $1,182,426

Other
$0 $0 $0 $0

Total
$29,291 $767,249 $1,110,575 $5,912,132

$6,255,399

$1,563,850

$0

$7,819,248

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 157 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Jenkins
Project: 0006319 Type Work: Replace Bridge
Descp:CR 200/OLD SAVANNAH ROAD @ SCULLS CREEK 5.3 MI S OF MILLEN Length: 0.47

Phase PE
ROW CST

Fund Bridge Local Bridge

Year 2005 2012 After 2015

Federal $566,507 $0 $897,421

State $141,627
$0 $224,355

Total Project Cost: Total Project Authorizations:

$ 1,980,462 $ 708,134

Other $0
$150,552 $0

Total $708,134 $150,552 $1,121,776

Project: 0007359 Type Work: Signals Descp:SR 17; SR 21; SR 21BU; SR 30; & SR 73 @ 8 LOCS
Length: 3.00

Phase PE
ROW CST

Fund STP STP STP

Year 2006 2011 2014

Federal $153,040 $304,000
$1,204,601

State $38,260 $76,000
$0

Other $0 $0 $0

Total $191,300 $380,000 $1,204,601

Total Project Cost:

$ 1,775,901

Total Project Authorizations: $ 571,300

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2012 - FY 2015

Also in Dodge, Screven County

Project: 231150- Type Work: Replace Bridge
Descp:CR 191 @ OGEECHEE RIVER OVERFLOW N OF EMANUEL COUNTY LINE Length: 0.30

Phase PE
ROW CST

Fund Bridge Local Bridge

Year 2006 2012 2014

Federal $505,424 $0
$1,049,900

State $126,356
$0 $262,475

Other $0
$69,276 $0

Total $631,780
$69,276 $1,312,375

Total Project Cost: Total Project Authorizations:

$ 2,013,430 $ 631,780

Project: 231152- Type Work: Replace Bridge
Descp:CR 191 @ OGEECHEE RIVER NORTH OF EMANUEL COUNTY LINE Length: 0.50

Total Project Cost: Total Project Authorizations:

$ 5,347,182 $ 794,829

Phase PE
ROW CST

Fund Bridge Local Bridge

Year 2006 2012 2014

Federal $635,863 $0
$3,473,023

State $158,966
$0 $868,256

Other $0
$211,074 $0

Total $794,829 $211,074 $4,341,279

Project: M004438 Type Work: Resurface & Maintenance
Descp:SR 17 FROM SR 73/SCREVEN TO 0.09 MI S OF SR 121/JENKINS Length: 21.66

Phase CST

Fund STP

Year 2012

Total Project Cost:

$ 2,474,760

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Federal $1,979,808

State $494,952

Other $0

Total $2,474,760

Also in Screven County

Page 158 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/4/2011
Jenkins Totals Summary
County Summary excludes lump sum projects.

Project PI#

Year

Phase

Fund

Federal

State

Other

Total

0006319 231150231150231152231152-

2012 2012 2014 2012 2014

ROW ROW CST ROW CST

Local Local Bridge Local Bridge

$0 $0 $1,049,900 $0 $3,473,023

$0 $0 $262,475 $0 $868,256

$150,552 $69,276 $0
$211,074 $0

$150,552 $69,276
$1,312,375 $211,074
$4,341,279

$4,522,923

$1,130,731

$430,902

$6,084,556

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 159 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Johnson
Project: 0007178 Type Work: Replace Bridge Descp:SR 171 @ HOLTON CREEK 0.6 MI S OF KITE

Length: 0.40

Total Project Cost: Total Project Authorizations:

$ 4,583,525 $0

Phase PE
ROW CST UTL

Fund Bridge Bridge Bridge Bridge

Year 2012 2014 After 2015 After 2015

Federal $227,449 $35,415
$3,139,032 $264,924

State $56,862
$8,854 $784,758
$66,231

Other $0 $0 $0 $0

Total $284,312
$44,268 $3,923,790
$331,155

Project: 0007180 Type Work: Replace Bridge
Descp:SR 171 @ LITTLE OHOOPEE RIVER 2.7 MI NORTH KITE Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 7,386,799 $0

Phase PE
ROW CST UTL

Fund Bridge Bridge Bridge Bridge

Year 2012 2014 After 2015 After 2015

Federal $392,619 $29,381
$5,418,545 $68,894

State $98,155
$7,345 $1,354,636
$17,223

Other $0 $0 $0 $0

Total $490,774
$36,726 $6,773,181
$86,117

Project: 0009100 Type Work: TE-Rehab Hist Trans Bldg Descp:JOHNSON COUNTY TRAIN DEPOT RENOVATION

Phase CST

Fund STP

Year 2014

Length: 0.00

Total Project Cost:

$ 211,250

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Federal $169,000

State $0

Other $42,250

Total $211,250

Johnson Totals Summary
County Summary excludes lump sum projects.

Project PI#
0007178 0007178 0007180 0007180

Year
2012 2014 2012 2014

Phase
PE ROW
PE ROW

Fund
Bridge Bridge Bridge Bridge

Federal
$227,449 $35,415
$392,619 $29,381

State
$56,862 $8,854
$98,155 $7,345

Other
$0 $0 $0 $0

Total
$284,312 $44,268
$490,774 $36,726

$684,864

$171,216

$0

$856,080

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 160 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Jones
Project: 0009914 Type Work: Miscellaneous Improvements Descp:LITTLE ROCK WILDLIFE DRIVE

Phase Fund CST Natl Wildlife

Year 2013

Federal $50,000

State $0

Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 50,000 $0

Other $0

Total $50,000

Project: 322540- Type Work: New Construction
Descp:SR 899/GRAY NORTH BYPASS FM SR 18 NE TO SR 22
Lanes: Exist. 0 Prop. 4 Length: 6.00

Total Project Cost: Total Project Authorizations:

$ 67,843,498 $ 12,455,952

Phase PE
ROW ROW CST UTL

Fund STP STP STP STP STP

Year 1999 2008 2010 2014 2014

Federal $1,308,762 $2,902,400 $5,753,600 $37,139,546 $7,170,490

State $327,190 $725,600 $1,438,400 $9,284,887 $1,792,623

Other $0 $0 $0 $0 $0

Total $1,635,952 $3,628,000 $7,192,000 $46,424,433 $8,963,113

Project PI#
0009914 322540322540-

Year
2013 2014 2014

Jones Totals Summary

County Summary excludes lump sum projects.

This County is also located in a MPO area. Additional Projects may be listed in the MPO TIP.

Phase

Fund

Federal

State

Other

CST

Natl Wildlife

$50,000

$0

$0

CST

STP

$37,139,546

$9,284,887

$0

UTL

STP

$7,170,490

$1,792,623

$0

Total
$50,000 $46,424,433
$8,963,113

$44,360,037

$11,077,509

$0

$55,437,546

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 161 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Lamar
Project: M004361 Type Work: Resurface & Maintenance Descp:SR 36 FROM BUTTS COUNTY LINE TO SR 7

Phase CST

Fund STP

Year 2014

Federal $1,862,964

State $465,741

Length: 12.07

Total Project Cost:

$ 2,328,705

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Other $0

Total $2,328,705

Page 162 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Lanier
Project: 0007181 Type Work: Replace Bridge
Descp:SR 64 @ TEN MILE CREEK 6.5 MI NORTHWEST OF LAKELAND Length: 0.40

Total Project Cost: Total Project Authorizations:

$ 2,271,215 $0

Phase PE
ROW CST UTL

Fund Bridge Bridge Bridge Bridge

Year 2012 2014 After 2015 After 2015

Federal $103,233 $21,249
$1,424,719 $267,771

State $25,808
$5,312 $356,180
$66,943

Other $0 $0 $0 $0

Total $129,041
$26,561 $1,780,899
$334,714

Project: 0007182 Type Work: Replace Bridge
Descp:SR 64 @ FIVE MILE CREEK 5 MI NORTH OF LAKELAND Length: 0.40

Total Project Cost: Total Project Authorizations:

$ 11,716,858 $0

Phase PE
ROW CST UTL

Fund Bridge Bridge Bridge Bridge

Year 2012 2014 After 2015 After 2015

Federal $598,751 $61,617
$8,263,371 $449,748

State $149,688
$15,404 $2,065,843
$112,437

Other $0 $0 $0 $0

Total $748,439
$77,021 $10,329,213
$562,186

Project: 0010370 Type Work: Pavement Markings
Descp:OFF-SYSTEM SAFETY IMPROVEMENTS @ 10 CR LOCS IN LANIER COUNTY Length: 25.67

Phase CST

Fund Safety

Year 2012

Federal $61,459

Total Project Cost:

$ 61,459

Total Project Authorizations: $ 0

Uses Lump Sum Bank: HIGH RISK RURAL ROADS FOR FY 2012 - FY 2015

Project: 0010375 Type Work: RRX Signing & Marking
Descp:RR CROSSING @ 80 LOC-TRAFFIC SIGNS&PAVEMENT MARKING UPGRADES Length: 0.00

Phase PE CST

Fund STP Safety

Year 2011 2012

Federal $20,000
$300,000

Total Project Cost:

$ 320,000

Total Project Authorizations: $ 20,000

Uses Lump Sum Bank: RAILROAD CROSSING HAZARD ELIMINATION FOR FY 2012 - FY 2015

Project: 0010451 Type Work: Sidewalks
Descp:LANIER COUNTY PRIMARY; ELEMENTARY & MIDDLE SCHOOLS - SRTS Length: 0.00

Phase PE CST

Fund Safety Safety

Year 2013 2014

Federal $110,000 $196,878

Total Project Cost:

$ 306,878

Total Project Authorizations: $ 0

Uses Lump Sum Bank: SAFE ROUTES TO SCHOOL INFRASTRUCTURE FOR FY 2012 - FY 2015

Project: M004368 Type Work: Resurface & Maintenance Descp:SR 135 BYPASS FROM SR 135 TO SR 135
Length: 1.57

Phase CST

Fund STP

Year 2012

Federal $241,044

Total Project Cost:

$ 301,304

Total Project Authorizations: $ 301,304

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

State $0

Other $0

Total $61,459

State $0 $0

Other $0 $0

Total $20,000
$300,000

State

Also in Clinch, Lowndes, Ware

County

Other

Total

$0

$0

$110,000

$0

$0

$196,878

State $60,261

Other $0

Total $301,304

Page 163 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: M004369 Type Work: Resurface & Maintenance
Descp:SR 11 CONN FROM SR 122 TO SR 11 IN LAKELAND Length: 0.06

Phase CST

Fund STP

Year 2012

Federal $26,304

State $6,576

Total Project Cost:

$ 32,880

Total Project Authorizations: $ 32,880

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Project: M004370 Type Work: Resurface & Maintenance
Descp:SR 11 BYPASS FROM SR 11 TO SR 135 BYPASS IN LAKELAND Length: 0.24

Phase CST

Fund STP

Year 2012

Federal $85,616

State $21,404

Total Project Cost:

$ 107,020

Total Project Authorizations: $ 107,020

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Other $0
Other $0

Total $32,880
Total $107,020

Project PI#

Year

Lanier Totals Summary

County Summary excludes lump sum projects.

This County is also located in a MPO area. Additional Projects may be listed in the MPO TIP.

Phase

Fund

Federal

State

Other

Total

0007181 0007181 0007182 0007182

2012 2014 2012 2014

PE ROW
PE ROW

Bridge Bridge Bridge Bridge

$103,233 $21,249
$598,751 $61,617

$25,808 $5,312
$149,688 $15,404

$0

$129,041

$0

$26,561

$0

$748,439

$0

$77,021

$784,849

$196,212

$0

$981,062

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 164 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Laurens
Project: 0000833 Type Work: Bridges
Descp:NEW OCONEE RVR X'ING FM COUNTRY CLUB TO BLACKSHEAR & FERRY
Lanes: Exist. 0 Prop. 2 Length: 2.60

Phase PE
ROW CST

Fund STP Local STP

Year

Federal

2003

$740,000

2012

$0

After 2015 $14,420,658

State $185,000
$0 $3,605,164

Total Project Cost: Total Project Authorizations:

$ 19,222,142 $ 925,000

Other $0
$271,320 $0

Total $925,000 $271,320 $18,025,822

Project: 0006476 Type Work: Guardrail
Descp:SR 117 FM EASTMAN CITY TO SR 29/US 441 S OF DUBLIN @ 8 LOCS Length: 0.58

Phase PE
ROW CST

Fund STP Safety Safety

Year 2004 2012 2013

Federal $284,582 $390,000
$2,565,694

State $0 $0 $0

Other $0 $0 $0

Total $284,582 $390,000 $2,565,694

Total Project Cost:

$ 3,240,276

Total Project Authorizations: $ 284,582

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Also in Dodge County

Project: 0009102 Type Work: TE-Landscape/Beautify Descp:CENTRAL DRIVE REVITALIZATION
Length: 0.00

Phase CST

Fund STP

Year 2012

Federal $150,000

State $0

Other $37,500

Total $187,500

Total Project Cost:

$ 187,500

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 0010398 Type Work: Sidewalks
Descp:SUSIE DASHER & SAXON HEIGHTS ELEMENTARY SCHOOLS - SRTS Length: 0.00

Phase PE CST

Fund Safety Safety

Year 2012 After 2015

Federal $140,000 $328,000

State $0 $0

Other $0 $0

Total $140,000 $328,000

Total Project Cost:

$ 468,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: SAFE ROUTES TO SCHOOL INFRASTRUCTURE FOR FY 2012 - FY 2015

Project: 262027- Type Work: Widening
Descp:SR 31/US 441 FM N OF CR 272 TO JUST S OF I-16 @ CR 354
Lanes: Exist. 2 Prop. 4 Length: 7.93

Total Project Cost: Total Project Authorizations:

$ 46,199,377 $ 1,136,801

Phase PE
ROW ROW CST

Fund State STP STP STP

Year

Federal

1993

$0

2014

$1,697,933

After 2015 $6,864,291

After 2015 $27,487,837

State $1,136,801
$424,483 $1,716,073 $6,871,959

Other $0 $0 $0 $0

Total $1,136,801 $2,122,416 $8,580,364 $34,359,796

Project: M004189 Type Work: Signing
Descp:I-16 @ 12 LOCS BETWEEN BLECKLEY COUNTY & EMANUEL COUNTY Length: 4.80

Phase PE CST

Fund IM IM

Total Project Cost:

$ 1,900,000

Total Project Authorizations: $ 200,000

Uses Lump Sum Bank: INTERSTATE MAINTENANCE FOR FY 2012 - FY 2015

Year 2010 2015

Federal $200,000
$1,700,000

State $0 $0

Other $0 $0

Total $200,000 $1,700,000

Also in Bleckley, Emanuel, Treutlen County

Page 165 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: M004333 Type Work: Resurface & Maintenance Descp:SR 26 FROM SR 29 TO JOHNSON COUNTY LINE

Phase CST

Fund STP

Year 2013

Federal $1,929,209

State $482,302

Length: 12.23

Total Project Cost:

$ 2,411,511

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Other $0

Total $2,411,511

Laurens Totals Summary
County Summary excludes lump sum projects.

Project PI#
0000833 262027-

Year
2012 2014

Phase
ROW ROW

Fund
Local STP

Federal
$0 $1,697,933

State
$0 $424,483

Other
$271,320 $0

Total
$271,320 $2,122,416

$1,697,933

$424,483

$271,320

$2,393,736

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 166 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Lee
Project: 0009264 Type Work: Miscellaneous Improvements
Descp:LEESBURG TRAIN DEPOT - RENOVATION & RECONSTRUCTION Length: 0.00

Phase Fund PE Other Funds CST Other Funds

Year 2011 2014

Federal $57,600
$233,116

State $0 $0

Total Project Cost: Total Project Authorizations:

$ 363,395 $ 72,000

Other $14,400 $58,279

Total $72,000
$291,395

Project: 0009865 Type Work: Replace Bridge Descp:SR 118 @ MUCKALOOCHEE CREEK

Length: 0.40

Total Project Cost: Total Project Authorizations:

$ 879,547 $ 250,000

Phase PE
ROW CST

Fund Bridge Bridge Bridge

Year 2011 2015 After 2015

Federal $200,000 $44,163 $459,474

State $50,000 $11,041 $114,869

Other $0 $0 $0

Total $250,000
$55,204 $574,343

Project: 432092- Type Work: Replace Bridge
Descp:SR 32 @ FLINT RIVER & OVERFLOW @ LEE/WORTH COUNTY LINE Length: 1.17

Total Project Cost: Total Project Authorizations:

$ 11,901,590 $ 460,000

Phase PE
ROW CST

Fund Bridge Bridge Bridge

Year 2001 2012 2013

Project: M004432 Type Work: Bridge Painting
Descp:SR 93 @ LITTLE TIRED CREEK TRIB & SR 195 @ MUCKALEE CREEK Length: 0.80

Phase PE CST

Fund STP STP

Year 2012 2012

Total Project Cost:

$ 204,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: BRIDGE MAINTENANCE/PAINTING FOR FY 2012 - FY 2015

Federal $368,000 $303,960
$8,849,312

State $92,000 $75,990 $2,212,328

Other $0 $0 $0

Total $460,000 $379,950 $11,061,640

Federal $3,200
$160,000

Also in Worth County

State $800
$40,000

Other $0 $0

Total $4,000
$200,000

Also in Grady County

Project PI#

Year

Lee Totals Summary

County Summary excludes lump sum projects.

This County is also located in a MPO area. Additional Projects may be listed in the MPO TIP.

Phase

Fund

Federal

State

Other

Total

0009264 0009865 432092432092-

2014 2015 2012 2013

CST ROW ROW CST

Other Funds Bridge Bridge Bridge

$233,116 $44,163
$224,930 $6,548,491

$0 $11,041 $56,233 $1,637,123

$58,279 $0 $0 $0

$291,395 $55,204
$281,163 $8,185,614

$7,050,700

$1,704,396

$58,279

$8,813,375

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 167 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Lincoln
Project: 0000759 Type Work: Realignment
Descp:SR 79 RELOCATION USING CR 278 FM SR 43 TO SR 79 Length: 1.66

Phase PE
ROW CST

Fund STP STP STP

Year 2003 2011 2014

Federal $329,600
$1,048,000 $3,354,419

State $82,400 $262,000 $838,605

Total Project Cost: Total Project Authorizations:

$ 5,915,024 $ 1,722,000

Other $0 $0 $0

Total $412,000 $1,310,000 $4,193,024

Project: 0007040 Type Work: Replace Bridge Descp:SR 43 @ LITTLE RIVER

Length: 0.40

Total Project Cost: Total Project Authorizations:

$ 6,038,836 $ 382,272

Phase PE
ROW CST UTL

Fund Bridge Bridge Bridge Bridge

Year 2010 2013 After 2015 After 2015

Federal $305,817 $25,719
$4,182,000 $317,533

State $76,454
$6,430 $1,045,500
$79,383

Other $0 $0 $0 $0

Total $382,272
$32,148 $5,227,499
$396,917

Also in McDuffie County

Project: 0007358 Type Work: Signals
Descp:SR 10 @ 1 LOC; SR 17 @ 4 LOCS & SR 43 @ 1 LOC Length: 2.40

Phase PE
ROW CST

Fund STP STP STP

Year 2006 2012 2013

Federal $171,209 $41,048
$1,057,858

State $42,802
$0 $0

Other $0 $0 $0

Total $214,011
$41,048 $1,057,858

Total Project Cost:

$ 1,312,917

Total Project Authorizations: $ 214,011

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2012 - FY 2015

Also in McDuffie County

Project: 0008169 Type Work: TE-Bike/Ped Facility
Descp:LINCOLNTON DOWNTOWN STREETSCAPE PHASE II Length: 0.00

Phase CST

Fund STP

Year 2014

Federal $412,000

State $0

Other $103,000

Total $515,000

Total Project Cost:

$ 515,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 0010413 Type Work: Replace Bridge Descp:SR 43 @ SOAP CREEK 4 MI NE OF LINCOLNTON
Length: 0.40

Total Project Cost: Total Project Authorizations:

$ 1,520,000 $0

Phase PE
ROW CST UTL

Fund Bridge Bridge Bridge Bridge

Year 2012 2014 After 2015 After 2015

Federal $200,000 $80,000 $896,000 $40,000

State $50,000 $20,000 $224,000 $10,000

Other $0 $0 $0 $0

Total $250,000 $100,000 $1,120,000
$50,000

Project: 231360- Type Work: Passing Lanes
Descp:SR 47 FM SR 43 CONN TO .5 NW OF CR 80 - TWO PASSING LANES
Lanes: Exist. 2 Prop. 3 Length: 1.52

Phase PE
ROW CST

Total Project Cost: Total Project Authorizations:

$ 5,863,234 $ 1,343,900

Fund STP STP STP

Year 1998 2006 2015

Federal $282,320 $792,800
$3,615,467

State $70,580 $198,200 $903,867

Other $0 $0 $0

Total $352,900 $991,000 $4,519,334

Page 168 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: 231920- Type Work: Widening
Descp:SR 43/47 TRAFFIC IMPROVEMENTS IN LINCOLNTON
Lanes: Exist. 2 Prop. 3 Length: 1.70

Phase PE
ROW CST

Fund STP STP STP

Year 2001 2013 After 2015

Federal $169,600 $854,804
$3,081,350

State $42,400 $213,701 $770,337

Total Project Cost: Total Project Authorizations:

$ 5,132,192 $ 212,000

Other $0 $0 $0

Total $212,000 $1,068,505 $3,851,687

Project: 232310- Type Work: Replace Bridge
Descp:SR 47 @ LITTLE RIVER 10.5 MI SE OF LINCOLNTON Length: 0.40

Total Project Cost: Total Project Authorizations:

$ 21,724,098 $ 910,627

Phase PE
ROW CST

Fund Bridge Bridge Bridge

Year 2000 2012 2014

Federal $728,502 $47,328
$16,603,448

State $182,125
$11,832 $4,150,862

Other $0 $0 $0

Total $910,627
$59,160 $20,754,311

Also in Columbia County

Lincoln Totals Summary
County Summary excludes lump sum projects.

Project PI#
0000759 0007040 0010413 0010413 231360231920232310232310-

Year
2014 2013 2012 2014 2015 2013 2012 2014

Phase
CST ROW
PE ROW CST ROW ROW CST

Fund
STP Bridge Bridge Bridge
STP STP Bridge Bridge

Federal
$3,354,419 $12,859
$200,000 $80,000
$3,615,467 $854,804 $23,664
$8,301,724

State
$838,605 $3,215
$50,000 $20,000 $903,867 $213,701
$5,916 $2,075,431

Other
$0 $0 $0 $0 $0 $0 $0 $0

Total
$4,193,024 $16,074
$250,000 $100,000 $4,519,334 $1,068,505
$29,580 $10,377,155

$16,442,937

$4,110,734

$0

$20,553,672

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 169 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Long
Project: M004407 Type Work: Resurface & Maintenance Descp:SR 57 FROM SR 38 TO MCINTOSH COUNTY LINE

Phase CST

Fund STP

Year 2014

Federal $2,848,000

State $712,000

Length: 14.31

Total Project Cost:

$ 3,560,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Other $0

Total $3,560,000

Page 170 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Lumpkin

Project: 0007495 Type Work: Pedestrian Crossings
Descp:PEDESTRIAN UPGRADES @ 20 SR LOCATIONS IN DISTRICT 1 Length: 0.00

Phase PE PE
ROW

Fund STP Safety Safety

Total Project Cost:

$ 4,064,053

CST Safety

Total Project Authorizations: $ 669,490

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0008912 Type Work: Streetscapes
Descp:DOWNTOWN DEVELOPMENT AUTHORITY DIST STREETSCAPE IN DAHLONEGA Length: 0.00

Phase PE CST CST

Fund Other Other TCSP

Year 2007 2007 2012 2012
Year 2010 2012 2012

Federal $99,000
$503,541 $747,900 $2,307,207
Federal $50,000 $40,553
$686,294

State $11,000 $55,949 $83,100 $256,356

Other $0 $0 $0 $0

Total $110,000 $559,490 $831,000 $2,563,563

State

Also in Towns, Union, White

County

Other

Total

$0

$0

$50,000

$0

$0

$40,553

$0

$171,574

$857,868

Total Project Cost: Total Project Authorizations:

$ 948,421 $ 50,000

Project: 0009104 Type Work: TE-Bike/Ped Facility
Descp:DOWNTOWN DAHLONEGA PEDESTRIAN & LANDSCAPE IMPROVEMENTS Length: 0.00

Phase CST

Fund STP

Year 2015

Total Project Cost:

$ 126,250

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 0009822 Type Work: Barriers
Descp:SR 400 FM FORSYTH CO LINE TO S OF CR 145 CABLE BARRIER Length: 10.30

Phase PE CST

Fund Safety Safety

Year 2010 2012

Total Project Cost:

$ 1,458,000

Total Project Authorizations: $ 30,000

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0009948 Type Work: Roundabout Descp:SR 52 @ SR 115/CR 41/COPPER MINE ROAD
Length: 0.26

Phase PE CST

Fund Safety Safety

Year 2012 2012

Total Project Cost:

$ 1,020,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0009949 Type Work: Roundabout Descp:SR 9 @ SR 52
Length: 0.26

Phase PE CST

Fund Safety Safety

Year 2012 2012

Total Project Cost:

$ 1,020,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Federal $101,000
Federal $27,000
$1,285,200
Federal $153,000 $867,000
Federal $153,000 $867,000

State $0

Other $25,250

Total $126,250

State $3,000
$142,800

Other $0 $0

Total $30,000
$1,428,000

Also in Dawson County

State $0 $0

Other $0 $0

Total $153,000 $867,000

State $0 $0

Other $0 $0

Total $153,000 $867,000

Page 171 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: 0009950 Type Work: Roundabout Descp:SR 9 @ SR 60
Length: 0.26

Phase PE CST

Fund Safety Safety

Year 2012 2012

Federal $153,000 $867,000

State $0 $0

Total Project Cost:

$ 1,020,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Other $0 $0

Total $153,000 $867,000

Lumpkin Totals Summary
County Summary excludes lump sum projects.

Project PI#
0008912 0008912

Year
2012 2012

Phase
CST CST

Fund
TCSP Other

Federal
$686,294 $40,553

State
$0 $0

Other
$171,574 $0

Total
$857,868 $40,553

$726,847

$0

$171,574

$898,421

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 172 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Macon
Project: 0007594 Type Work: Sidewalks
Descp:SIDEWALKS; LIGHTING & LANDSCAPING IN MONTEZUMA Length: 0.00

Phase CST

Fund HPP

Year 2013

Federal $178,000

State $0

Total Project Cost: Total Project Authorizations:

$ 222,500 $0

Other $44,500

Total $222,500

Project: 0009106 Type Work: TE-Bike/Ped Facility Descp:MARSHALLVILLE DOWNTOWN STREETSCAPE
Length: 0.00

Phase CST

Fund STP

Year 2012

Total Project Cost:

$ 500,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 0009107 Type Work: TE-Bike/Ped Facility Descp:OGLETHORPE DOWNTOWN STREETSCAPE
Length: 0.00

Phase CST

Fund STP

Year 2013

Total Project Cost:

$ 375,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 0009230 Type Work: New Construction Descp:ACCESS ROAD IN MONTEZUMA
Length: 0.00

Phase CST

Fund HPP

Year 2012

Total Project Cost: Total Project Authorizations:

$ 200,000 $0

Federal $400,000
Federal $300,000
Federal $160,000

State $0

Other $100,000

State $0

Other $75,000

State $0

Other $40,000

Total $500,000
Total $375,000
Total $200,000

Project: 322285- Type Work: Replace Bridge Descp:SR 90 @ CSX RR SOUTH OF IDEAL NEAR CR 57

Length: 0.90

Total Project Cost: Total Project Authorizations:

$ 5,267,858 $ 328,775

Phase PE
ROW CST UTL

Fund Bridge Bridge Bridge Bridge

Year 2011 2006 2013 2013

Federal $120,000 $143,020
$3,917,308 $33,959

State $30,000 $35,755 $979,327
$8,490

Other $0 $0 $0 $0

Total $150,000 $178,775 $4,896,634
$42,448

Project: M004348 Type Work: Resurface & Maintenance Descp:SR 128 BYPASS FROM SR 49 TO SR 90

Phase CST

Fund STP

Year 2013

Length: 1.85

Total Project Cost:

$ 489,242

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Federal $391,393

State $97,848

Other $0

Total $489,242

Page 173 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: M004351 Type Work: Resurface & Maintenance Descp:SR 90 FROM SR 27/DOOLY TO SR 26/MACON

Phase CST

Fund STP

Year 2012

Federal $2,927,514

State $731,879

Other $0

Total $3,659,393

Length: 19.06

Total Project Cost:

$ 3,659,393

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Also in Dooly County

Macon Totals Summary
County Summary excludes lump sum projects.

Project PI#
0007594 0009230 322285322285-

Year
2013 2012 2013 2013

Phase
CST CST CST UTL

Fund
HPP HPP Bridge Bridge

Federal
$178,000 $160,000 $3,917,308
$33,959

State
$0 $0 $979,327 $8,490

Other
$44,500 $40,000
$0 $0

Total
$222,500 $200,000 $4,896,634
$42,448

$4,289,266

$987,817

$84,500

$5,361,583

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 174 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Madison
Project: 0007457 Type Work: Pedestrian Crossings
Descp:I-85; SR 8; SR 17 & SR 72 IN FRANKLIN; HART & MADISON CO Length: 3.60

Phase PE
ROW CST

Fund Safety Safety Safety

Year 2006 2012 2012

Federal $399,775 $313,200
$1,571,510

State $44,419 $34,800 $174,612

Other $0 $0 $0

Total $444,194 $348,000 $1,746,122

Total Project Cost:

$ 2,538,317

Total Project Authorizations: $ 444,194

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Also in Franklin, Hart County

Project: 0010190 Type Work: RRX Warning Device Descp:CR 280/SIMS KIDD ROAD @ CSX #638801J
Length: 0.20

Phase PE CST

Fund STP Safety

Year 2011 2012

Federal $15,809
$204,000

State $0 $0

Other $0 $0

Total $15,809
$204,000

Total Project Cost:

$ 219,809

Total Project Authorizations: $ 15,809

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2012 - FY 2015

Project: 122100- Type Work: Widening
Descp:SR 72 FM EAST OF SR 172 TO THE WEST CITY LIMITS OF COMER
Lanes: Exist. 2 Prop. 4 Length: 2.67

Total Project Cost: Total Project Authorizations:

$ 18,407,338 $ 5,515,031

Phase PE PE PE PE
ROW CST

Fund State NHS STP State STP NHS

Year 1994 2002 2002 2002 2007 2015

Federal $0
$87,804 $451,183
$0 $2,880,000 $10,313,846

State $565,000
$21,951 $112,796 $676,297 $720,000 $2,578,461

Other $0 $0 $0 $0 $0 $0

Total $565,000 $109,755 $563,978 $676,297 $3,600,000 $12,892,307

Project: 122650- Type Work: Widening
Descp:SR 72 FM WEST CITY LIMITS OF COMER TO E OF BROAD RVR/ELBERT
Lanes: Exist. 2 Prop. 4 Length: 9.33

Total Project Cost: Total Project Authorizations:

$ 47,938,810 $ 9,502,367

Phase PE PE
ROW ROW ROW CST

Fund State NHS State NHS NHS NHS

Year

Federal

1994

$0

2002

$1,554,294

2001

$0

2007

$4,197,600

2012

$1,746,648

After 2015 $29,002,506

State

Other

Total

$1,500,000

$0

$1,500,000

$388,573

$0

$1,942,867

$812,500

$0

$812,500

$1,049,400

$0

$5,247,000

$436,662

$0

$2,183,310

$7,250,627

$0 $36,253,133

Also in Elbert County

Project: M003887 Type Work: Resurface & Maintenance
Descp:SR 72 FROM W OF COMER CITY LIMIT TO W OF CR 287/RIVER ROAD Length: 9.44

Phase CST

Fund NHS

Year 2012

Federal $1,627,186

State $406,796

Other $0

Total $2,033,982

Total Project Cost:

$ 2,033,982

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2012 - FY 2015

Project: M004302 Type Work: Resurface & Maintenance
Descp:SR 281 FROM SR 8/MADISON TO SR 17BU/FRANKLIN Length: 11.97

Phase CST

Fund STP

Year 2012

Federal $1,107,410

State $276,852

Other $0

Total $1,384,262

Total Project Cost:

$ 1,384,262

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Also in Franklin, Hart County

Page 175 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: M004304 Type Work: Resurface & Maintenance Descp:SR 191 FROM SR 98 TO SR 8

Phase CST

Fund STP

Year 2012

Federal $531,132

State $132,783

Length: 6.67

Total Project Cost:

$ 663,915

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Other $0

Total $663,915

Project PI#
122100122650-

Year
2015 2012

Madison Totals Summary

County Summary excludes lump sum projects.

This County is also located in a MPO area. Additional Projects may be listed in the MPO TIP.

Phase

Fund

Federal

State

Other

CST

NHS

$10,313,846

$2,578,461

$0

ROW

NHS

$558,927

$139,732

$0

Total
$12,892,307 $698,659

$10,872,773

$2,718,193

$0

$13,590,967

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 176 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Marion
Project: 0008175 Type Work: TE-Bike/Ped Facility
Descp:BUENA VISTA SIDEWALK PROJECT IN MARION COUNTY Length: 0.00

Phase CST

Fund STP

Year 2015

Federal $223,200

State $0

Other $55,800

Total $279,000

Total Project Cost:

$ 279,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: M004342 Type Work: Resurface & Maintenance
Descp:SR 30 FROM SR 3/US 19/SUMTER TO SR 41/MARION Length: 19.13

Phase CST

Fund STP

Year 2012

Federal $2,784,539

State $696,135

Other $0

Total $3,480,674

Total Project Cost:

$ 3,480,674

Total Project Authorizations: $ 3,480,674

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Also in Sumter County

Page 177 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

McDuffie
Project: 0007040 Type Work: Replace Bridge Descp:SR 43 @ LITTLE RIVER

Length: 0.40

Total Project Cost: Total Project Authorizations:

$ 6,038,836 $ 382,272

Phase PE
ROW CST UTL

Fund Bridge Bridge Bridge Bridge

Year 2010 2013 After 2015 After 2015

Federal $305,817 $25,719
$4,182,000 $317,533

State $76,454
$6,430 $1,045,500
$79,383

Other $0 $0 $0 $0

Total $382,272
$32,148 $5,227,499
$396,917

Also in Lincoln County

Project: 0007041 Type Work: Replace Bridge Descp:SR 47 @ BIG BRIER CREEK
Length: 0.40

Phase PE
ROW CST

Fund Bridge Bridge Bridge

Year 2008 2013 2014

Federal $418,449 $46,866
$1,227,599

State $104,612
$11,717 $306,900

Other $0 $0 $0

Total $523,061
$58,583 $1,534,499

Total Project Cost: Total Project Authorizations:

$ 2,116,142 $ 523,061

Also in Jefferson County

Project: 0007358 Type Work: Signals
Descp:SR 10 @ 1 LOC; SR 17 @ 4 LOCS & SR 43 @ 1 LOC Length: 2.40

Phase PE
ROW CST

Fund STP STP STP

Year 2006 2012 2013

Federal $171,209 $41,048
$1,057,858

State $42,802
$0 $0

Other $0 $0 $0

Total $214,011
$41,048 $1,057,858

Total Project Cost:

$ 1,312,917

Total Project Authorizations: $ 214,011

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2012 - FY 2015

Also in Lincoln County

Project: 0008176 Type Work: TE-Bike/Ped Facility
Descp:THOMSON-MCDUFFIE DOWNTOWN WALKWAY REVITALIZATION- PHASE II Length: 0.00

Phase CST

Fund STP

Year 2012

Federal $800,000

State $0

Other $200,000

Total $1,000,000

Total Project Cost:

$ 1,000,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 222250- Type Work: Widening
Descp:SR 10/SR 17/US 78 FROM SR 43 TO CR 6/SMITH MILL ROAD
Lanes: Exist. 2 Prop. 5 Length: 5.74

Total Project Cost: Total Project Authorizations:

$ 34,149,573 $ 1,965,523

Phase PE PE PE
ROW ROW CST UTL

Fund State NHS State STP NHS NHS NHS

Year

Federal

1995

$0

2002

$444,883

2002

$0

2012

$2,569,543

2012

$873,977

After 2015 $22,155,331

After 2015 $148,388

State $402,006 $111,221 $1,007,415 $642,386 $218,494 $5,538,833
$37,097

Other $0 $0 $0 $0 $0 $0 $0

Total $402,006 $556,103 $1,007,415 $3,211,929 $1,092,471 $27,694,164 $185,486

Project: 222255- Type Work: Widening
Descp:SR 10/SR 17 FM CR 6/SMITH MILL RD TO WASHINGTON BYP/WILKES
Lanes: Exist. 2 Prop. 4 Length: 12.00

Total Project Cost: Total Project Authorizations:

$ 50,626,810 $ 2,244,589

Phase PE PE
ROW CST UTL

Fund NHS State NHS NHS NHS

Year

Federal

2002

$301,722

2002

$0

2013

$3,504,067

After 2015 $35,154,843

After 2015

$46,866

State $75,431 $1,867,437 $876,017 $8,788,711 $11,717

Other $0 $0 $0 $0 $0

Total $377,152 $1,867,437 $4,380,084 $43,943,554
$58,583

Also in Wilkes County

Page 178 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: M004280 Type Work: Resurface & Maintenance
Descp:SR 10 FROM WILKES COUNTY LINE TO NW OF CS 734/WALNUT STREET Length: 14.08

Phase CST

Fund STP

Year 2013

Federal $2,434,071

State $608,518

Total Project Cost:

$ 3,042,588

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Other $0

Total $3,042,588

McDuffie Totals Summary
County Summary excludes lump sum projects.

Project PI#
0007040 0007041 0007041 222250222250222255-

Year
2013 2013 2014 2012 2012 2013

Phase
ROW ROW CST ROW ROW ROW

Fund
Bridge Bridge Bridge NHS
STP NHS

Federal
$12,859 $23,433 $613,800 $873,977 $2,569,543 $911,057

State
$3,215 $5,858 $153,450 $218,494 $642,386 $227,764

Other
$0 $0 $0 $0 $0 $0

Total
$16,074 $29,291 $767,249 $1,092,471 $3,211,929 $1,138,822

$5,004,670

$1,251,167

$0

$6,255,837

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 179 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

McIntosh
Project: 0006540 Type Work: TE-Bike/Ped Facility Descp:DARIEN PEDESTRIAN CORRIDOR - PHASE III

Phase CST

Fund STP

Year 2012

Federal $500,000

State $0

Length: 0.00

Total Project Cost:

$ 625,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 0007421 Type Work: Interchange Descp:I-95 @ SR 251/BRIARDAM ROAD

Length: 0.40

Total Project Cost: Total Project Authorizations:

$ 27,182,150 $ 896,656

Phase PE
ROW CST UTL

Fund NHS NHS NHS NHS

Year

Federal

2010

$717,325

2014

$3,256,635

After 2015 $16,418,260

After 2015 $1,353,501

State $179,331 $814,159 $4,104,565 $338,375

Other $125,000

Total $625,000

Other $0 $0 $0 $0

Total $896,656 $4,070,794 $20,522,824 $1,691,876

Project: 0007635 Type Work: Multi-use Trail
Descp:SR 99 MCINTOSH PATH FM MCINTOSH BLVD/PINE ST TO BOND RD Length: 0.30

Total Project Cost: Total Project Authorizations:

$ 384,770 $0

Phase CST

Fund HPP

Year 2012

Federal $143,984

State $0

Other $240,786

Total $384,770

Project: 0008177 Type Work: TE-Bike/Ped Facility
Descp:MCINTOSH COUNTY HIGHLANDER TRAIL PHASE I Length: 0.00

Phase CST

Fund STP

Year 2013

Total Project Cost:

$ 875,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: M003507 Type Work: Weigh Scales
Descp:I-95 @ NB TRUCK WEIGH STATION IN MCINTOSH - PHASE I Length: 0.40

Phase CST

Fund IM

Year 2015

Total Project Cost:

$ 883,265

Total Project Authorizations: $ 0

Uses Lump Sum Bank: INTERSTATE MAINTENANCE FOR FY 2012 - FY 2015

Project: M003513 Type Work: Weigh Scales
Descp:I-95 @ SB TRUCK WEIGH STATION IN MCINTOSH - PHASE II Length: 0.40

Phase CST

Fund IM

Year 2014

Total Project Cost:

$ 883,265

Total Project Authorizations: $ 0

Uses Lump Sum Bank: INTERSTATE MAINTENANCE FOR FY 2012 - FY 2015

Federal $700,000
Federal $794,938
Federal $794,938

State $0

Other $175,000

State $88,326

Other $0

State $88,326

Other $0

Total $875,000
Total $883,265
Total $883,265

Page 180 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: M004393 Type Work: Resurface & Maintenance
Descp:SR 99 FROM SR 25 TO 0.29 MI N OF CR 286/EULONIA LAKES ESTATE Length: 16.61

Phase CST

Fund STP

Year 2013

Federal $3,450,000

State $862,500

Total Project Cost:

$ 4,312,500

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Other $0

Total $4,312,500

McIntosh Totals Summary
County Summary excludes lump sum projects.

Project PI#
0007421 0007635

Year
2014 2012

Phase
ROW CST

Fund
NHS HPP

Federal
$3,256,635 $143,984

State
$814,159 $0

Other
$0 $240,786

Total
$4,070,794 $384,770

$3,400,619

$814,159

$240,786

$4,455,564

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 181 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Meriwether
Project: 0005532 Type Work: Replace Bridge
Descp:SR 85 IN MANCHESTER LOCATED @ CSX #638677F Length: 0.14

Phase ROW CST UTL

Fund Bridge Bridge Bridge

Year 2012 2015 2015

Federal $197,260
$2,639,573 $71,809

State $49,315 $659,893 $17,952

Total Project Cost: Total Project Authorizations:

$ 3,635,802 $0

Other $0 $0 $0

Total $246,575 $3,299,466
$89,762

Project: 0010414 Type Work: Replace Bridge Descp:SR 109 SPUR @ RED OAK CREEK 2 MI W OF GAY

Length: 0.40

Total Project Cost: Total Project Authorizations:

$ 1,360,000 $0

Phase PE
ROW CST UTL

Fund Bridge Bridge Bridge Bridge

Year 2012 2014 After 2015 After 2015

Federal $200,000 $80,000 $768,000 $40,000

State $50,000 $20,000 $192,000 $10,000

Other $0 $0 $0 $0

Total $250,000 $100,000 $960,000
$50,000

Project: 321880- Type Work: Bridge Rehab
Descp:SR 41 @ CSX RAILROAD W OF WARM SPRINGS; INC DETOUR
Lanes: Exist. 2 Prop. 5 Length: 0.53

Total Project Cost: Total Project Authorizations:

$ 11,661,958 $ 2,862,788

Phase PE
ROW CST UTL

Fund STP STP STP STP

Year 1992 2012 After 2015 After 2015

Federal $2,290,230
$492,864 $6,445,052
$101,420

State $572,558 $123,216 $1,611,263
$25,355

Other $0 $0 $0 $0

Total $2,862,788
$616,080 $8,056,315
$126,775

Meriwether Totals Summary
County Summary excludes lump sum projects.

Project PI#
0005532 0005532 0005532 0010414 0010414 321880-

Year
2012 2015 2015 2012 2014 2012

Phase
ROW CST UTL PE ROW ROW

Fund
Bridge Bridge Bridge Bridge Bridge
STP

Federal
$197,260 $2,639,573
$71,809 $200,000
$80,000 $492,864

State
$49,315 $659,893
$17,952 $50,000 $20,000 $123,216

Other
$0 $0 $0 $0 $0 $0

Total
$246,575 $3,299,466
$89,762 $250,000 $100,000 $616,080

$3,681,506

$920,376

$0

$4,601,882

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 182 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Miller
Project: 0008667 Type Work: Drainage Improvements
Descp:SR 1/US 27 FM CS 500/CUTHBERT STREET TO SR 45/COLLEGE STREET Length: 0.09

Phase PE
ROW CST

Fund NHS NHS NHS

Year 2012 2014 2015

Federal $43,297 $18,019
$367,579

State $10,824
$4,505 $91,895

Total Project Cost: Total Project Authorizations:

$ 536,119 $0

Other $0 $0 $0

Total $54,122 $22,523
$459,474

Project: 0009111 Type Work: TE-Bike/Ped Facility
Descp:MILFORD STREET/PHILLIPSBURG ROAD SIDEWALKS/WALKING LANE Length: 0.00

Phase CST

Fund STP

Year 2013

Total Project Cost:

$ 500,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Federal $400,000

State $0

Other $100,000

Total $500,000

Miller Totals Summary
County Summary excludes lump sum projects.

Project PI#
0008667 0008667 0008667

Year
2012 2014 2015

Phase
PE ROW CST

Fund
NHS NHS NHS

Federal
$43,297 $18,019 $367,579

State
$10,824 $4,505
$91,895

Other
$0 $0 $0

Total
$54,122 $22,523 $459,474

$428,895

$107,224

$0

$536,119

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 183 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Mitchell
Project: 0005873 Type Work: Replace Bridge
Descp:CR 307/OLD HIGHWAY 3 @ RACCOON CREEK OVERFLOW Length: 0.17

Phase PE
ROW CST

Fund Bridge Local Bridge

Year 2004 2011 2014

Federal $24,000 $0
$667,848

State $6,000 $0
$166,962

Total Project Cost: Total Project Authorizations:

$ 909,110 $ 74,300

Other $0
$44,300 $0

Total $30,000 $44,300
$834,810

Project: 0005876 Type Work: Replace Bridge
Descp:CR 307/OLD HIGHWAY 3 @ WETHINGTON SLOUGH Length: 0.25

Total Project Cost: Total Project Authorizations:

$ 1,314,810 $ 132,000

Phase PE
ROW CST

Fund Bridge Local Bridge

Year 2004 2011 2014

Federal $27,200 $0
$946,248

State $6,800 $0
$236,562

Other $0
$98,000 $0

Total $34,000 $98,000
$1,182,810

Project: 0005877 Type Work: Replace Bridge Descp:CR 307/OLD HIGHWAY 3 @ RACCOON CREEK

Length: 0.20

Total Project Cost: Total Project Authorizations:

$ 1,529,749 $ 130,000

Phase PE
ROW CST

Fund Bridge Local Bridge

Year 2004 2011 2014

Federal $51,600 $0
$1,119,799

State $12,900
$0 $279,950

Other $0
$65,500 $0

Total $64,500 $65,500
$1,399,749

Project: M004382 Type Work: Resurface & Maintenance Descp:SR 97 FROM DECATUR COUNTY LINE TO SR 37

Phase CST

Fund STP

Year 2012

Length: 18.73

Total Project Cost:

$ 4,480,067

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Federal $3,584,054

State $896,013

Other $0

Total $4,480,067

Mitchell Totals Summary
County Summary excludes lump sum projects.

Project PI#

Year

Phase

Fund

Federal

State

Other

Total

0005873 0005876 0005877

2014

CST

2014

CST

2014

CST

Bridge Bridge Bridge

$667,848 $946,248 $1,119,799

$166,962 $236,562 $279,950

$0

$834,810

$0

$1,182,810

$0

$1,399,749

$2,733,895

$683,474

$0

$3,417,368

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 184 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Monroe

Project: 0007140 Type Work: Roundabout Descp:SR 74 @ SR 42 - 1 MILE S OF RUSSELLVILLE

Phase PE
ROW

Fund STP Safety

Length: 1.06

CST Safety

Total Project Cost:

$ 3,928,516

UTL Safety

Total Project Authorizations: $ 168,720

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Year 2005 2013 2014 2014

Federal $151,848
$1,171,574 $2,516,823
$71,400

State $16,872
$0 $0 $0

Project: 0008884 Type Work: Roundabout Descp:SR 18 @ SR 87

Phase PE
ROW

Fund Safety Safety

Length: 0.40

CST Safety

Total Project Cost:

$ 2,081,775

UTL Safety

Total Project Authorizations: $ 250,000

Uses Lump Sum Bank: HIGH RISK RURAL ROADS FOR FY 2012 - FY 2015

Year 2009 2012 2012 2012

Federal $225,000 $73,440
$1,478,335 $280,000

State $25,000
$0 $0 $0

Project: 0009336 Type Work: RRX Consolidation
Descp:INDIAN SPRINGS RD CROSSOVER @NS #718327K &RR AVE@NS #718328S Length: 0.04

Phase CST

Fund Safety

Year 2012

Federal $15,606

State $0

Total Project Cost:

$ 15,606

Total Project Authorizations: $ 0

Uses Lump Sum Bank: RAILROAD CROSSING HAZARD ELIMINATION FOR FY 2012 - FY 2015

Project: 0009973 Type Work: Roundabout Descp:SR 87 @ CR 271/CR 276/JULIETTE ROAD
Length: 0.30

Phase PE CST

Fund Safety Safety

Year 2012 2012

Federal $153,000 $867,000

State $0 $0

Total Project Cost:

$ 1,020,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0009974 Type Work: Roundabout Descp:SR 87 @ SR 83
Length: 0.30

Phase PE CST

Fund Safety Safety

Year 2012 2012

Federal $153,000 $867,000

State $0 $0

Total Project Cost:

$ 1,020,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: M003502 Type Work: Weigh Scales
Descp:I-75 SB & NB @ TRUCK WEIGH STATIONS IN MONROE - PHASE I Length: 0.40

Phase CST

Fund IM

Year 2012

Federal $1,646,012

State $182,890

Total Project Cost:

$ 1,828,903

Total Project Authorizations: $ 0

Uses Lump Sum Bank: INTERSTATE MAINTENANCE FOR FY 2012 - FY 2015

Other $0 $0 $0 $0
Other $0 $0 $0 $0
Other $0
Other $0 $0
Other $0 $0
Other $0

Total $168,720 $1,171,574 $2,516,823
$71,400
Total $250,000
$73,440 $1,478,335
$280,000
Total $15,606
Total $153,000 $867,000
Total $153,000 $867,000
Total $1,828,903

Page 185 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M004357 Type Work: Resurface & Maintenance Descp:SR 83 FROM SR 7 TO SR 18

10/4/2011

Phase CST

Fund STP

Year 2013

Federal $1,846,042

State $461,510

Length: 12.05

Other $0

Total $2,307,552

Total Project Cost:

$ 2,307,552

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Project: M004358 Type Work: Resurface & Maintenance
Descp:SR 87 FROM CR 27/TAYLOR ROAD TO BUTTS COUNTY LINE Length: 15.03

Phase CST

Fund STP

Year 2013

Federal $2,366,010

State $591,502

Other $0

Total $2,957,512

Total Project Cost:

$ 2,957,512

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Project: M004419 Type Work: Miscellaneous Improvements
Descp:I-75 @ 3 LOCS & I-285 @ 2 LOCS-UPGRADE CANTILEVER STRUCTURES Length: 2.00

Phase CST

Fund IM

Year 2012

Federal $558,900

State $62,100

Other $0

Total $621,000

Total Project Cost:

$ 621,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: INTERSTATE MAINTENANCE FOR FY 2012 - FY 2015

Also in Dekalb, Dooly County

Page 186 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Montgomery
Project: 0001366 Type Work: Replace Bridge Descp:SR 30/US 280 @ OCONEE RIVER & OVERFLOWS

Length: 1.30

Total Project Cost: Total Project Authorizations:

$ 20,884,197 $ 780,915

Phase PE
ROW CST UTL

Fund Bridge Bridge Bridge Local

Year 2002 2011 2012 2012

Federal $464,732 $160,000
$15,926,417 $0

State $116,183
$40,000 $3,981,604
$0

Other $0 $0 $0
$195,260

Total $580,915 $200,000 $19,908,022 $195,260

Also in Wheeler County

Project: 0007409 Type Work: Signals
Descp:SR 27 WEST @ 2 LOCS; SR 30 @ 2 LOCS & SR 31 @ 1 LOC Length: 1.40

Phase PE
ROW CST

Fund STP STP STP

Year 2006 2011 2013

Federal $112,923 $250,000 $987,988

State $28,231
$0 $0

Other $0 $0 $0

Total $141,154 $250,000 $987,988

Total Project Cost:

$ 1,379,142

Total Project Authorizations: $ 391,154

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2012 - FY 2015

Also in Telfair, Wheeler County

Project: 0008180 Type Work: TE-Bike/Ped Facility
Descp:MT VERNON DOWNTOWN STREETSCAPE IMPROVEMENTS IN MONTGOMERY Length: 0.00

Phase CST

Fund STP

Year 2012

Federal $100,000

State $0

Other $25,000

Total $125,000

Total Project Cost:

$ 125,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 550610- Type Work: Turn Lanes
Descp:SR 292/VIDALIA FM MORN'SIDE - LOWERY WITH RIGHT ON WILSON Length: 1.32

Total Project Cost: Total Project Authorizations:

$ 8,309,069 $ 2,543,667

Phase PE
ROW CST UTL

Fund Safety STP STP Local

Year 1995 2006 2015 2015

Federal $489,300
$1,600,000 $4,579,395
$0

State $54,367 $400,000 $1,144,849
$0

Other $0 $0 $0
$41,159

Total $543,667 $2,000,000 $5,724,243
$41,159

Also in Toombs County

Project: M004394 Type Work: Resurface & Maintenance
Descp:SR 135 FROM CR 181/WEST BROAD STREET TO SR 15/SR 30 Length: 9.18

Phase CST

Fund STP

Year 2013

Federal $1,352,720

State $338,180

Other $0

Total $1,690,900

Total Project Cost:

$ 1,690,900

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Project: M004396 Type Work: Resurface & Maintenance
Descp:SR 30/US 280 FROM CR 134/BROAD STREET TO SR 15/SR 135 Length: 8.66

Phase CST

Fund NHS

Year 2015

Federal $1,736,000

State $434,000

Other $0

Total $2,170,000

Total Project Cost:

$ 2,170,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2012 - FY 2015

Page 187 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/4/2011
Montgomery Totals Summary
County Summary excludes lump sum projects.

Project PI#

Year

Phase

Fund

Federal

State

Other

Total

0001366 0001366 550610550610-

2012

CST

2012

UTL

2015

CST

2015

UTL

Bridge Local STP Local

$7,963,209 $0
$2,335,491 $0

$1,990,802 $0
$583,873 $0

$0 $97,630
$0 $20,991

$9,954,011 $97,630
$2,919,364 $20,991

$10,298,700

$2,574,675

$118,621

$12,991,996

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 188 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Morgan
Project: 0006432 Type Work: Replace Bridge
Descp:CR 251/SEVEN ISLANDS RD @ BIG INDIAN CREEK & OVERFLOW Length: 0.68

Phase PE
ROW CST

Fund Bridge Local Bridge

Year 2005 2012 2012

Federal $641,114 $0
$1,572,937

State $160,279
$0 $393,234

Total Project Cost: Total Project Authorizations:

$ 3,022,564 $ 801,393

Other $0
$255,000 $0

Total $801,393 $255,000 $1,966,171

Project: 0007392 Type Work: Replace Bridge
Descp:CR 154/OLD BUCKHEAD ROAD @ NORTH SUGAR CREEK Length: 0.30

Phase PE
ROW CST

Total Project Cost: Total Project Authorizations:

$ 1,673,708 $ 650,000

Fund Bridge Local Bridge

Year 2007 2011 2012

Federal $480,000 $0 $818,966

State $120,000
$0 $204,742

Other $0
$50,000 $0

Total $600,000
$50,000 $1,023,708

Project: 0007393 Type Work: Replace Bridge
Descp:CR 133/KINGSTON RD @ LITTLE SUGAR CREEK 5.3 MI S OF BUCKHEAD Length: 0.32

Total Project Cost: Total Project Authorizations:

$ 1,563,432 $ 650,000

Phase PE
ROW CST

Fund Bridge Local Bridge

Year 2007 LOCL 2012

Federal $480,000 $0 $730,745

State $120,000
$0 $182,686

Other $0
$50,000 $0

Total $600,000
$50,000 $913,432

Project: 0007394 Type Work: Replace Bridge
Descp:CR 246/BROWNWOOD RD @ BIG INDIAN CREEK 4.5 MI SW OF MADISON Length: 0.32

Total Project Cost: Total Project Authorizations:

$ 2,006,376 $ 650,000

Phase PE
ROW CST

Fund Bridge Local Bridge

Year 2007 LOCL 2012

Federal $480,000 $0
$1,085,101

State $120,000
$0 $271,275

Other $0
$50,000 $0

Total $600,000
$50,000 $1,356,376

Project: 0007395 Type Work: Replace Bridge
Descp:CR 23/DAVIS ACADEMY RD @ BIG INDIAN CREEK 5 MI W OF MADISON Length: 0.37

Phase PE
ROW CST

Fund Bridge Local Bridge

Total Project Cost: Total Project Authorizations:

$ 1,778,547 $ 650,000

Year 2007 LOCL 2012

Federal $480,000 $0 $902,837

State $120,000
$0 $225,709

Other $0
$50,000 $0

Total $600,000
$50,000 $1,128,547

Project: 0009435 Type Work: RRX Warning Device
Descp:CS 603/LIONS CLUB ROAD @ SQS #733144E IN MADISON Length: 0.40

Phase CST

Fund Safety

Total Project Cost:

$ 153,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2012 - FY 2015

Year 2013

Federal $153,000

State $0

Other $0

Total $153,000

Page 189 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: 0009735 Type Work: RRX Warning Device Descp:CS 510/JEFFERSON STREET @ CSX #279605K

10/4/2011

Phase CST

Fund Safety

Year 2012

Federal $255,000

State $0

Length: 0.40

Total Project Cost:

$ 255,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2012 - FY 2015

Project: 0009832 Type Work: Roundabout Descp:SR 24 BYPASS @ CR 252/BETHANY ROAD
Length: 0.40

Phase PE CST

Fund Safety Safety

Year 2012 2013

Federal $61,200
$204,000

State $0 $0

Total Project Cost:

$ 265,200

Total Project Authorizations: $ 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 222570- Type Work: Widening
Descp:SR 24/US 441 FM THE PUTNAM CL TO N OF CR 121PIERCE DAIRY RD
Lanes: Exist. 2 Prop. 4 Length: 8.05

Total Project Cost: Total Project Authorizations:

$ 44,604,673 $ 1,687,962

Phase PE PE PE
ROW CST

Fund State NHS State NHS NHS

Year

Federal

1995

$0

2002

$383,620

2002

$0

2014

$9,797,884

After 2015 $24,535,485

State $200,000
$95,905 $1,008,438 $2,449,471 $6,133,871

Other $0

Total $255,000

Other $0 $0

Total $61,200
$204,000

Other $0 $0 $0 $0 $0

Total $200,000 $479,524 $1,008,438 $12,247,356 $30,669,356

Project: M004308 Type Work: Resurface & Maintenance Descp:SR 24/US 129 FROM I-20 TO SR 24 BYPASS
Length: 2.48

Phase CST

Fund NHS

Year 2012

Total Project Cost:

$ 1,395,879

Total Project Authorizations: $ 1,395,879

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2012 - FY 2015

Project: M004309 Type Work: Resurface & Maintenance Descp:SR 24 BYP FROM SR 24 TO SR 12
Length: 4.23

Phase CST

Fund NHS

Year 2012

Total Project Cost:

$ 2,142,714

Total Project Authorizations: $ 2,142,714

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2012 - FY 2015

Federal $1,116,703

State $279,176

Federal $1,714,171

State $428,543

Other $0
Other $0

Total $1,395,879
Total $2,142,714

Page 190 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/4/2011
Morgan Totals Summary
County Summary excludes lump sum projects.

Project PI#
0006432 0006432 0007392 0007393 0007394 0007395 222570-

Year
2012 2012 2012 2012 2012 2012 2014

Phase
ROW CST CST CST CST CST ROW

Fund
Local Bridge Bridge Bridge Bridge Bridge NHS

Federal
$0 $1,572,937
$818,966 $730,745 $1,085,101 $902,837 $9,797,884

State
$0 $393,234 $204,742 $182,686 $271,275 $225,709 $2,449,471

Other
$255,000 $0 $0 $0 $0 $0 $0

Total
$255,000 $1,966,171 $1,023,708
$913,432 $1,356,376 $1,128,547 $12,247,356

$14,908,471

$3,727,118

$255,000

$18,890,589

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 191 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Murray
Project: 0006064 Type Work: Turn Lanes
Descp:SR 286 @ COBB ROAD AND @ TOM GREGORY ROAD Length: 0.80

Total Project Cost: Total Project Authorizations:

$ 1,439,445 $0

Phase PE
ROW CST UTL

Fund STP STP STP STP

Year 2015 After 2015 After 2015 After 2015

Federal $16,656
$334,063 $220,941 $579,897

State $4,164
$83,516 $55,235 $144,974

Other $0 $0 $0 $0

Total $20,820
$417,578 $276,176 $724,871

Project: 0009620 Type Work: Roundabout
Descp:SR 225 @ CR 132/MT CARMEL ROAD/MITCHELL BRIDGE ROAD Length: 0.75

Phase PE
ROW CST

Fund Safety Safety Safety

Year 2012 2013 2014

Federal $408,000 $76,500
$1,275,000

State $0 $0 $0

Total Project Cost:

$ 1,759,500

Total Project Authorizations: $ 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0010494 Type Work: Signing
Descp:CR 34 FM CS 621 TO SR 52 & CR 106/109 FM SR 225 TO WHITFIELD Length: 3.68

Phase PE CST

Fund Safety Safety

Year 2012 2012

Federal $10,000 $25,000

State $0 $0

Total Project Cost:

$ 35,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: HIGH RISK RURAL ROADS FOR FY 2012 - FY 2015

Project: 631550- Type Work: New Construction
Descp:SR 225/SPRING PL BYP FM NEW HOPE RD TO SR 52/US 76 -PHASE I
Lanes: Exist. 0 Prop. 2 Length: 3.72

Phase PE
ROW CST

Fund STP STP STP

Year

Federal

1996

$369,360

2014 $10,187,597

After 2015 $13,844,851

State $92,340 $2,546,899 $3,461,213

Total Project Cost: Total Project Authorizations:

$ 30,502,260 $ 461,700

Other $0 $0 $0

Total $408,000
$76,500 $1,275,000

Other $0 $0

Total $10,000 $25,000

Other $0 $0 $0

Total $461,700 $12,734,496 $17,306,064

Project: M004452 Type Work: Resurface & Maintenance
Descp:SR 225 FROM 0.03 MI N OF SR 52 TO TENNESSEE STATE LINE Length: 14.92

Phase CST

Fund STP

Year 2012

Total Project Cost:

$ 2,265,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Federal $1,812,000

State $453,000

Other $0

Total $2,265,000

Murray Totals Summary
County Summary excludes lump sum projects.

Project PI#
0006064 631550-

Year
2015 2014

Phase
PE ROW

Fund
STP STP

Federal
$16,656 $10,187,597

State
$4,164 $2,546,899

Other
$0 $0

Total
$20,820 $12,734,496

$10,204,253

$2,551,063

$0

$12,755,316

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 192 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Newton
Project: 0004444 Type Work: Guardrail
Descp:SR 212 @ LAKE JACKSON GUARDRAIL @ APPROACHES Length: 0.40

Phase PE
ROW CST

Fund STP Safety Safety

Year 2004 2012 2012

Federal $0
$165,411 $156,221

State $0 $0 $0

Other $0 $0 $0

Total $0
$165,411 $156,221

Total Project Cost:

$ 321,632

Total Project Authorizations: $ 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Also in Jasper County

Project: 0004709 Type Work: TE-Bike/Ped Facility
Descp:YELLOW RIVER/BROWN'S BRIDGE ROAD MULTI-USE TRAIL Length: 5.00

Phase CST

Fund STP

Year 2012

Federal $350,000

State $0

Other $87,500

Total $437,500

Total Project Cost:

$ 437,500

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 0006022 Type Work: New Construction
Descp:SR 11/I-20 RELOCATE CLOSE FRONTAGE RD RIVER RD EXTENSION
Lanes: Exist. 0 Prop. 2 Length: 0.20

Phase PE
ROW CST

Fund STP STP STP

Year 2012 2015 After 2015

Federal $46,866 $23,902
$146,279

State $11,717
$5,975 $36,570

Other $0 $0 $0

Total $58,583 $29,877
$182,849

Total Project Cost: Total Project Authorizations:

$ 271,309 $0

Project: 0007049 Type Work: Replace Bridge Descp:SR 36 @ YELLOW RIVER 10 MI S OF COVINGTON

Length: 0.40

Total Project Cost: Total Project Authorizations:

$ 7,553,899 $ 449,474

Phase PE
ROW CST UTL

Fund Bridge Bridge Bridge Bridge

Year 2011 2014 After 2015 After 2015

Federal $359,579 $151,495
$5,163,042 $369,004

State $89,895 $37,874 $1,290,760 $92,251

Other $0 $0 $0 $0

Total $449,474 $189,369 $6,453,802 $461,255

Project: 0007217 Type Work: New Construction
Descp:SOCIAL CIRCLE BYPASS FROM EAST HIGHTOWER TRAIL TO SR 11
Lanes: Exist. 0 Prop. 2 Length: 2.80

Total Project Cost: Total Project Authorizations:

$ 21,064,316 $ 5,486,901

Project: 0007592 Type Work: Sidewalks
Descp:YELLOW RIVER MULTI-USE TRAIL IN NEWTON COUNTY Length: 2.36

Total Project Cost: Total Project Authorizations:

$ 1,002,750 $ 93,750

Phase PE
ROW ROW CST UTL

Fund STP HPP HPP STP STP

Phase PE CST

Fund HPP HPP

Year 2005 2010 2010 2013 2013
Year 2008 2012

Federal $2,373,521 $1,605,373
$410,627 $12,133,008
$328,924

State $593,380 $401,343 $102,657 $3,033,252
$82,231

Other $0 $0 $0 $0 $0

Total $2,966,901 $2,006,716
$513,284 $15,166,259
$411,155

Also in Walton County

Federal $75,000
$524,925

State $0 $0

Other $18,750 $384,075

Total $93,750
$909,000

Page 193 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: 0009928 Type Work: Roundabout Descp:SR 11 @ SR 142
Length: 0.12

Phase PE CST

Fund Safety Safety

Year 2012 2012

Federal $153,000 $867,000

State $0 $0

Other $0 $0

Total $153,000 $867,000

Total Project Cost:

$ 1,020,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 333172- Type Work: Replace Bridge
Descp:SR 36 @ SOUTH RIVER @ BUTTS-NEWTON COUNTY LINE Length: 0.76

Total Project Cost: Total Project Authorizations:

$ 9,228,268 $ 342,429

Phase PE
ROW ROW CST CST

Fund Bridge Bridge STP STP Bridge

Year 2000 2012 2014 After 2015 After 2015

Federal $273,943
$1,298,419 $1,350,875 $2,997,146 $1,462,231

State $68,486 $324,605 $337,719 $749,286 $365,558

Other $0 $0 $0 $0 $0

Total $342,429 $1,623,024 $1,688,594 $3,746,432 $1,827,789

Also in Butts County

Project: T003010 Type Work: Transit Projects
Descp:FY 2012 FTA SECTION 5307/5340 FORMULA FUNDS FOR NEWTON Length: 0.00

Phase CST

Fund Transit

Year 2012

Federal $156,678

State $0

Other $39,169

Total $195,847

Total Project Cost: Total Project Authorizations:

$ 195,847 $0

Project: T003011 Type Work: Transit Projects
Descp:FY 2013 FTA SECTION 5307/5340 FORMULA FUNDS FOR NEWTON Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 199,764 $0

Phase CST

Fund Transit

Year 2013

Federal $159,811

State $0

Other $39,953

Total $199,764

Project: T003636 Type Work: Transit Projects
Descp:FY 2014 FTA SECTION 5307/5340 FORMULA FUNDS FOR NEWTON Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 199,764 $0

Phase CST

Fund Transit

Year 2014

Federal $159,811

State $0

Other $39,953

Total $199,764

Project: T004087 Type Work: Transit Projects
Descp:FY 2015 FTA SECTION 5307/5340 FORMULA FUNDS FOR NEWTON Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 199,764 $0

Phase CST

Fund Transit

Year 2015

Federal $159,811

State $19,976

Other $19,976

Total $199,764

Page 194 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/4/2011

Project PI#
0006022 0006022 0007049 0007217 0007217 0007592 333172333172T003010 T003011 T003636 T004087

Year
2012 2015 2014 2013 2013 2012 2012 2014 2012 2013 2014 2015

Newton Totals Summary

County Summary excludes lump sum projects.

This County is also located in a MPO area. Additional Projects may be listed in the MPO TIP.

Phase

Fund

Federal

State

Other

PE ROW ROW CST UTL CST ROW ROW CST CST CST CST

STP STP Bridge STP STP HPP Bridge STP Transit Transit Transit Transit

$46,866 $23,902 $151,495 $121,330
$3,289 $524,925 $649,210 $675,438 $156,678 $159,811 $159,811 $159,811

$11,717 $5,975
$37,874 $30,333
$822 $0
$162,302 $168,859
$0 $0 $0 $19,976

$0 $0 $0 $0 $0 $384,075 $0 $0 $39,169 $39,953 $39,953 $19,976

Total
$58,583 $29,877 $189,369 $151,663
$4,112 $909,000 $811,512 $844,297 $195,847 $199,764 $199,764 $199,764

$2,832,566

$437,859

$523,127

$3,793,551

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 195 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Oconee
Project: M004291 Type Work: Resurface & Maintenance
Descp:SR 24 FROM CR 109/THOMAS FARM ROAD TO SR 15 Length: 3.03

Phase CST

Fund NHS

Year 2013

Federal $729,005

State $182,251

Total Project Cost:

$ 911,256

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2012 - FY 2015

Other $0

Total $911,256

Page 196 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Oglethorpe
Project: 222460- Type Work: Passing Lanes
Descp:SR 10: OGLETHORPE MP13.7-15;15.3-16.2& WILKES: 0-1.5;5.5-7.0
Lanes: Exist. 2 Prop. 3 Length: 5.32

Phase PE
ROW CST

Fund STP STP STP

Year 1998 2012 After 2015

Federal $478,320
$1,126,080 $5,507,518

State $119,580 $281,520 $1,376,880

Other $0 $0 $0

Total $597,900 $1,407,600 $6,884,398

Total Project Cost: Total Project Authorizations:

$ 8,889,898 $ 597,900

Also in Wilkes County

Project: M004314 Type Work: Resurface & Maintenance
Descp:SR 77 FROM SR 44/GREENE TO SR 10/OGLETHORPE Length: 22.14

Phase CST

Fund STP

Year 2012

Federal $3,204,198

State $801,050

Other $0

Total $4,005,248

Total Project Cost:

$ 4,005,248

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Also in Greene County

Oglethorpe Totals Summary
County Summary excludes lump sum projects.

Project PI# 222460-

Year 2012

Phase ROW

Fund STP

Federal $472,954

State $118,238

Other $0

Total $591,192

$472,954

$118,238

$0

$591,192

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 197 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Peach
Project: 0003623 Type Work: Miscellaneous Improvements
Descp:SR 49 FM S OF CS 629 TO SR 7 & SR 7 FM SR 49 TO S OF CS 740 Length: 0.72

Total Project Cost: Total Project Authorizations:

$ 10,258,878 $ 3,662,264

Phase PE
ROW CST UTL

Fund STP STP STP STP

Year 2003 2010 2012 2012

Federal $1,025,811 $1,904,000 $2,866,958 $2,410,334

State $256,453 $476,000 $716,739 $602,583

Other $0 $0 $0 $0

Total $1,282,264 $2,380,000 $3,583,697 $3,012,917

Project: 0007623 Type Work: Replace Bridge
Descp:CR 183/MOSLEY RD @ MULE CREEK IN PEACH COUNTY Length: 0.40

Total Project Cost: Total Project Authorizations:

$ 602,195 $ 50,000

Phase PE
ROW CST

Fund HPP Local HPP

Year 2007 2013 2014

Federal $40,000 $0
$364,956

State $10,000
$0 $91,239

Other $0
$96,000 $0

Total $50,000 $96,000
$456,195

Project: 0008189 Type Work: TE-Historic Preservation
Descp:FORT VALLEY FREIGHT DEPOT REHABILITATION IN PEACH COUNTY Length: 0.00

Phase CST

Fund STP

Year 2012

Federal $856,212

Total Project Cost:

$ 1,070,265

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 0008534 Type Work: Intersection Improvement
Descp:SR 247 CONN @ CR 189/JOHN E SULLIVAN ROAD/WALKER ROAD Length: 0.29

Phase PE
ROW CST

Fund Safety Safety Safety

Year 2008 2011 2012

Federal $341,228 $702,000 $662,500

Total Project Cost:

$ 1,895,254

Total Project Authorizations: $ 1,159,142

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0009731 Type Work: RRX Warning Device Descp:CS 622/EAST MAIN STREET @ NS #733427C
Length: 0.16

Phase CST

Fund Safety

Year 2012

Federal $306,000

Total Project Cost:

$ 306,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: RAILROAD CROSSING HAZARD ELIMINATION FOR FY 2012 - FY 2015

State $0

Other $214,053

State $37,914 $78,000 $73,611

Other $0 $0 $0

State $0

Other $0

Total $1,070,265
Total $379,142 $780,000 $736,112
Total $306,000

Page 198 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/4/2011

Project PI#
0003623 0003623 0007623 0007623

Year
2012 2012 2013 2014

Peach Totals Summary

County Summary excludes lump sum projects.

This County is also located in a MPO area. Additional Projects may be listed in the MPO TIP.

Phase

Fund

Federal

State

Other

CST UTL ROW CST

STP STP Local HPP

$2,866,958 $2,410,334
$0 $364,956

$716,739 $602,583
$0 $91,239

$0 $0 $96,000 $0

Total
$3,583,697 $3,012,917
$96,000 $456,195

$5,642,248

$1,410,562

$96,000

$7,148,810

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 199 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Pickens

Project: 0006416 Type Work: Realignment
Descp:SR 53 FM E OF CR 269/RYO MOUNTAIN RD TO W OF CR 178/DAVIS RD Length: 1.50

Phase PE
ROW CST

Fund STP Safety Safety

Total Project Cost:

$ 14,708,335

UTL Safety

Total Project Authorizations: $ 2,349,117

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Year 2004 2013 2014 2014

Federal $2,114,205 $2,249,100 $8,324,529
$549,667

State $234,912 $249,900 $924,948
$61,074

Other $0 $0 $0 $0

Total $2,349,117 $2,499,000 $9,249,477
$610,741

Also in Gordon County

Project: 0007665 Type Work: Widening
Descp:SR 53 FM 0.25 MI S OF CR 305/BURNT MTN RD TO CR 75/CAMP RD
Lanes: Exist. 2 Prop. 4 Length: 1.94

Total Project Cost: Total Project Authorizations:

$ 8,132,417 $ 131,400

Phase PE PE
ROW CST

Fund STP STP STP STP

Year 2008 2012 After 2015 After 2015

Federal $105,120 $276,585
$1,852,872 $4,271,356

State $26,280 $69,146 $463,218 $1,067,839

Other $0 $0 $0 $0

Total $131,400 $345,732 $2,316,089 $5,339,196

Project: 0008043 Type Work: Acceleration / Decel Lane
Descp:SR 515/US 76 @ CR 250/ANTIOCH CHURCH ROAD Length: 1.10

Total Project Cost: Total Project Authorizations:

$ 1,293,262 $ 85,000

Phase PE
ROW CST

Fund NHS NHS NHS

Year 2007 2015 After 2015

Federal $68,000
$202,688 $763,922

State $17,000 $50,672 $190,980

Other $0 $0 $0

Total $85,000
$253,360 $954,902

Project: 0008190 Type Work: TE-Scenic Hwy/Welcome Ctr Descp:SR 53 @ TATE DEPOT IN PICKENS COUNTY

Phase CST

Length: 0.40

Fund STP

Year 2012

Total Project Cost:

$ 1,000,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 0008314 Type Work: Realignment Descp:SR 136 FROM SR 136 CONN TO SR 515
Length: 2.68

Phase PE
ROW CST

Fund Safety Safety Safety

Year 2006 2013 2014

Total Project Cost:

$ 9,528,137

Total Project Authorizations: $ 703,523

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0009889 Type Work: Roundabout Descp:SR 53 @ SR 53BU
Length: 0.25

Phase PE CST

Fund Safety Safety

Year 2012 2012

Total Project Cost:

$ 1,020,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Federal $800,000

State $0

Federal $633,171
$1,709,316 $6,232,836

State $70,352 $189,924 $692,537

Federal $153,000 $867,000

State $0 $0

Other $200,000
Other $0 $0 $0
Other $0 $0

Total $1,000,000
Total $703,523 $1,899,240 $6,925,374
Total $153,000 $867,000

Page 200 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: 621490- Type Work: Widening
Descp:SR 53BU FM SR 515/APD TO CR 243/INDUSTRIAL BLVD
Lanes: Exist. 2 Prop. 4 Length: 2.60

Phase PE
ROW CST

Fund STP STP STP

Year

Federal

1992

$1,925,134

2014 $17,828,294

After 2015 $10,986,473

State $481,284 $4,457,074 $2,746,618

Total Project Cost: Total Project Authorizations:

$ 38,424,877 $ 2,406,418

Other $0 $0 $0

Total $2,406,418 $22,285,368 $13,733,091

Project: 621595- Type Work: Passing Lanes
Descp:SR 53 FM E OF CR 36/OLD MILL WHITE RD TO E OF STEVE TATE RD
Lanes: Exist. 2 Prop. 3 Length: 2.30

Total Project Cost: Total Project Authorizations:

$ 15,578,808 $ 414,804

Phase PE
ROW CST UTL

Fund STP STP STP Local

Year 2000 2013 After 2015 After 2015

Federal $331,843 $832,320
$9,299,732 $0

State $82,961 $208,080 $2,324,933
$0

Other $0 $0 $0
$2,498,939

Total $414,804 $1,040,400 $11,624,665 $2,498,939

Project: M003372 Type Work: Miscellaneous Improvements
Descp:SR 136 @ 2 LOC BTWN CR 305 & CR 224 EMERGENCY SLOPE REPAIR Length: 0.80

Phase PE CST

Fund STP STP

Year 2006 2012

Total Project Cost:

$ 1,309,756

Total Project Authorizations: $ 50,000

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Federal $40,000
$1,007,805

State $10,000 $251,951

Other $0 $0

Total $50,000
$1,259,756

Pickens Totals Summary
County Summary excludes lump sum projects.

Project PI#
0007665 0008043 621490621595-

Year
2012 2015 2014 2013

Phase
PE ROW ROW ROW

Fund
STP NHS STP STP

Federal
$276,585 $202,688 $17,828,294 $832,320

State
$69,146 $50,672 $4,457,074 $208,080

Other
$0 $0 $0 $0

Total
$345,732 $253,360 $22,285,368 $1,040,400

$19,139,888

$4,784,972

$0

$23,924,859

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 201 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Pierce
Project: 531340- Type Work: Replace Bridge
Descp:CR 305 @ BIG SATILLA CREEK @ APPLING-PIERCE COUNTY LINE Length: 0.40

Phase PE
ROW CST

Fund Bridge Local Bridge

Year 2011 2014 After 2015

Federal $311,423 $0
$2,899,840

State $77,856
$0 $724,960

Other $0
$31,200 $0

Total $389,279
$31,200 $3,624,799

Total Project Cost: Total Project Authorizations:

$ 4,045,278 $ 389,279

Also in Appling County

Project: 532312- Type Work: Replace Bridge Descp:CR 305 @ BIG SATILLA CREEK OVERFLOW
Length: 0.40

Phase PE
ROW CST

Fund Bridge Local Bridge

Year 2011 2014 After 2015

Federal $312,288 $0
$2,155,283

State $78,072
$0 $538,821

Other $0
$59,905 $0

Total $390,360
$59,905 $2,694,103

Total Project Cost: Total Project Authorizations:

$ 3,144,369 $ 390,360

Project: 532320- Type Work: Replace Bridge
Descp:CR 309 @ LITTLE HURRICANE CREEK 3 MI SE OF BACON COUNTY LINE Length: 0.40

Total Project Cost: Total Project Authorizations:

$ 4,528,994 $ 727,337

Phase PE
ROW CST UTL

Fund Bridge Local Bridge Local

Year 2010 2013 2015 2015

Federal $581,870 $0
$2,826,447 $0

State $145,468
$0 $706,612
$0

Other $0
$31,344 $0
$237,254

Total $727,337
$31,344 $3,533,059
$237,254

Project: M004228 Type Work: Resurface & Maintenance
Descp:SR 32 FM 0.17 MI E OF BACON CO LINE TO BRANTLEY CO LINE Length: 18.73

Phase CST

Fund NHS

Year 2012

Total Project Cost:

$ 3,498,906

Total Project Authorizations: $ 3,498,906

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2012 - FY 2015

Federal $2,799,125

State $699,781

Other $0

Total $3,498,906

Pierce Totals Summary
County Summary excludes lump sum projects.

Project PI#

Year

Phase

Fund

Federal

State

Other

Total

531340532312532320532320532320-

2014 2014 2013 2015 2015

ROW ROW ROW CST UTL

Local Local Local Bridge Local

$0 $0 $0 $2,826,447 $0

$0 $0 $0 $706,612 $0

$15,600 $59,905 $31,344
$0 $237,254

$15,600 $59,905 $31,344 $3,533,059 $237,254

$2,826,447

$706,612

$344,103

$3,877,162

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 202 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Pike
Project: 0009122 Type Work: TE-Bike/Ped Facility Descp:ZEBULON DOWNTOWN DISTRICT - PHASE II

Phase CST

Fund STP

Year 2013

Federal $400,000

State $0

Length: 0.00

Total Project Cost:

$ 500,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Other $100,000

Total $500,000

Page 203 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Polk
Project: 0010310 Type Work: RRX Warning Device Descp:CR 344/LAKE CREEK ROAD @ NS #719481L

Phase CST

Fund Safety

Year 2012

Federal $175,000

State $0

Length: 0.40

Total Project Cost:

$ 175,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2012 - FY 2015

Project: 0010492 Type Work: Pavement Markings
Descp:OFF-SYSTEM SAFETY IMPROVEMENTS @ 23 CR LOCS IN POLK COUNTY Length: 0.00

Phase CST

Fund Safety

Year 2012

Federal $280,044

State $0

Total Project Cost:

$ 280,044

Total Project Authorizations: $ 0

Uses Lump Sum Bank: HIGH RISK RURAL ROADS FOR FY 2012 - FY 2015

Project: 0010495 Type Work: Signing
Descp:CR 441 @ 1 LOC; CR 442 @ 1 LOC & CR 444 @ 1 LOC Length: 8.03

Phase PE CST

Fund Safety Safety

Year 2012 2012

Federal $8,000
$75,000

State $0 $0

Total Project Cost:

$ 83,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: HIGH RISK RURAL ROADS FOR FY 2012 - FY 2015

Project: M004459 Type Work: Turn Lanes Descp:SR 101 @ SR 6/US 278
Length: 0.40

Phase CST

Fund State

Year 2012

Federal $0

State $48,332

Total Project Cost: Total Project Authorizations:

$ 48,332 $0

Other $0
Other $0
Other $0 $0
Other $0

Total $175,000
Total $280,044
Total $8,000
$75,000
Total $48,332

Polk Totals Summary
County Summary excludes lump sum projects.

Project PI#

Year

Phase

Fund

Federal

State

Other

Total

M004459

2012

CST

State

$0

$48,332

$0

$48,332

$0

$48,332

$0

$48,332

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 204 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Pulaski
Project: 0007050 Type Work: Replace Bridge Descp:SR 26 @ OCMULGEE RIVER

Length: 0.40

Total Project Cost: Total Project Authorizations:

$ 20,301,579 $ 1,237,649

Phase PE
ROW CST UTL

Fund Bridge Bridge Bridge Bridge

Year

Federal

2010

$990,119

2013

$514,370

After 2015 $14,216,695

After 2015 $520,079

State $247,530 $128,593 $3,554,174 $130,020

Other $0 $0 $0 $0

Total $1,237,649
$642,963 $17,770,869
$650,099

Project: 0007585 Type Work: Sidewalks
Descp:SIDEWALKS & LANDSCAPING IN DOWNTOWN HAWKINSVILLE Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 449,950 $0

Phase CST

Fund HPP

Year 2013

Federal $359,960

State $0

Other $89,990

Total $449,950

Project: 0009413 Type Work: Multi-use Trail
Descp:OCMULGEE RIVER CORRIDOR - MILE BRANCH RIVER PARK - RIVERWALK Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 223,650 $0

Phase CST

Fund TCSP

Year 2013

Federal $173,809

State $0

Other $49,841

Total $223,650

Project: 0010415 Type Work: Replace Bridge Descp:SR 26WE @ OCMULGEE RIVER

Length: 0.40

Total Project Cost: Total Project Authorizations:

$ 5,200,000 $0

Phase PE
ROW CST UTL

Fund Bridge Bridge Bridge Bridge

Year 2012 2014 After 2015 After 2015

Federal $200,000 $80,000
$3,840,000 $40,000

State $50,000 $20,000 $960,000 $10,000

Other $0 $0 $0 $0

Total $250,000 $100,000 $4,800,000
$50,000

Pulaski Totals Summary
County Summary excludes lump sum projects.

Project PI#

Year

Phase

Fund

Federal

State

Other

Total

0007050 0007585 0009413 0010415 0010415

2013 2013 2013 2012 2014

ROW CST CST PE ROW

Bridge HPP TCSP Bridge Bridge

$514,370 $359,960 $173,809 $200,000
$80,000

$128,593 $0 $0
$50,000 $20,000

$0 $89,990 $49,841
$0 $0

$642,963 $449,950 $223,650 $250,000 $100,000

$1,328,139

$198,593

$139,831

$1,666,563

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 205 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Putnam
Project: 0007430 Type Work: RRX Warning Device Descp:CS 500/MAPLE STREET @ NS #733066A
Length: 0.40

Phase PE CST

Fund Safety Safety

Year 2012 2012

Federal $6,757
$152,032

State $0 $0

Total Project Cost:

$ 158,789

Total Project Authorizations: $ 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2012 - FY 2015

Project: 0009896 Type Work: RRX Warning Device Descp:SR 16 @ NS #733043T
Length: 0.40

Phase CST

Fund Safety

Year 2012

Federal $255,000

State $0

Total Project Cost:

$ 255,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2012 - FY 2015

Project: 222580- Type Work: Widening
Descp:SR 24/US 441 FM EATONTON BP @ S OF SHERWOOD AVE TO MORGAN CL
Lanes: Exist. 2 Prop. 4 Length: 9.19

Total Project Cost: Total Project Authorizations:

$ 50,763,023 $ 2,069,434

Phase PE PE PE
ROW ROW CST

Fund State NHS State NHS NHS NHS

Year

Federal

1995

$0

2002

$553,088

2002

$0

2006

$119,200

2015 $10,800,402

After 2015 $28,154,469

State $200,000 $138,272 $1,029,075
$29,800 $2,700,101 $7,038,617

Other $0 $0

Total $6,757
$152,032

Other $0

Total $255,000

Other $0 $0 $0 $0 $0 $0

Total $200,000 $691,359 $1,029,075 $149,000 $13,500,503 $35,193,086

Putnam Totals Summary
County Summary excludes lump sum projects.

Project PI# 222580-

Year 2015

Phase ROW

Fund NHS

Federal $10,800,402

State $2,700,101

Other $0

Total $13,500,503

$10,800,402

$2,700,101

$0

$13,500,503

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 206 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Quitman
Project: 0007521 Type Work: Replace Bridge Descp:CR 1/UPPER MORRIS ROAD @ HOLANNA CREEK
Length: 0.30

Phase PE
ROW CST

Fund Bridge Local Bridge

Year 2007 2013 After 2015

Federal $187,137 $0
$1,119,440

State $46,784
$0 $279,860

Total Project Cost: Total Project Authorizations:

$ 1,760,150 $ 233,921

Other $0
$126,929 $0

Total $233,921 $126,929 $1,399,300

Project: M004373 Type Work: Resurface & Maintenance
Descp:SR 50 FROM SR 27 TO CR 84/UNION CHURCH ROAD Length: 11.12

Phase CST

Fund STP

Year 2012

Total Project Cost:

$ 2,730,780

Total Project Authorizations: $ 2,730,780

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Federal $2,184,624

State $546,156

Other $0

Total $2,730,780

Quitman Totals Summary
County Summary excludes lump sum projects.

Project PI# 0007521

Year 2013

Phase ROW

Fund Local

Federal $0

State $0

Other $126,929

Total $126,929

$0

$0

$126,929

$126,929

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 207 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Rabun
Project: 122090- Type Work: Widening
Descp:SR 15/US 441 FM NORTH CL/CLAYTON TO NORTH CAROLINA LINE
Lanes: Exist. 2 Prop. 4 Length: 7.40

Total Project Cost: Total Project Authorizations:

$ 75,956,503 $ 6,858,125

Phase PE PE PE
ROW ROW CST UTL

Fund State NHS State HPP NHS NHS NHS

Year

Federal

1993

$0

2002

$4,031,259

2002

$0

2013

$1,799,800

2013 $15,478,863

After 2015 $36,980,752

After 2015 $1,019,287

State $316,000 $1,007,815 $1,503,051 $449,950 $3,869,716 $9,245,188 $254,822

Other $0 $0 $0 $0 $0 $0 $0

Total $316,000 $5,039,073 $1,503,051 $2,249,750 $19,348,579 $46,225,940 $1,274,109

Project: M003640 Type Work: Culvert
Descp:SR 246 FROM CR 7/KELLEYS ROAD TO CR 92/WAYFARER LANE Length: 0.84

Phase Fund Year CST Emergency 2012

Total Project Cost:

$ 16,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Project: M003641 Type Work: Shoulder Work
Descp:SR 246 FROM CR 92/WAYFARER LANE TO CS 853/WINDING RIDGE ROAD Length: 1.42

Phase Fund Year CST Emergency 2012

Total Project Cost:

$ 15,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Project: M003642 Type Work: Shoulder Work
Descp:SR 246 FROM CS 853/WINDING RIDGE ROAD TO NORTH CAROLINA Length: 0.68

Phase Fund Year CST Emergency 2012

Total Project Cost:

$ 14,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Federal $12,800

State $3,200

Other $0

Federal $12,000

State $3,000

Other $0

Federal $11,200

State $2,800

Other $0

Total $16,000
Total $15,000
Total $14,000

Rabun Totals Summary
County Summary excludes lump sum projects.

Project PI#

Year

Phase

Fund

Federal

State

Other

Total

122090122090-

2013 2013

ROW ROW

NHS HPP

$15,478,863 $1,799,800

$3,869,716 $449,950

$0

$19,348,579

$0

$2,249,750

$17,278,663

$4,319,666

$0

$21,598,329

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 208 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Randolph
Project: 0009851 Type Work: Roundabout Descp:SR 1/US 27 @ SR 50/US 82
Length: 0.25

Phase PE CST

Fund Safety Safety

Year 2011 2012

Federal $250,000 $867,000

State $0 $0

Total Project Cost:

$ 1,117,000

Total Project Authorizations: $ 250,000

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0010313 Type Work: TE-Historic Preservation Descp:RANDOLPH COUNTY WELCOME CENTER
Length: 0.00

Phase CST

Fund STP

Year 2013

Federal $480,000

State $0

Total Project Cost:

$ 600,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: M004374 Type Work: Resurface & Maintenance Descp:SR 1BU FROM SR 1 TO SR 1
Length: 3.31

Phase CST

Fund STP

Year 2012

Federal $779,072

State $194,768

Total Project Cost:

$ 973,840

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Other $0 $0
Other $120,000
Other $0

Total $250,000 $867,000
Total $600,000
Total $973,840

Page 209 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Schley
Project: 0007595 Type Work: Streetscapes
Descp:STREESTSCAPE & PEDESTRIAN IMPROVEMENTS IN ELLAVILLE Length: 0.33

Phase CST

Fund HPP

Year 2013

Federal $224,975

State $0

Total Project Cost: Total Project Authorizations:

$ 281,219 $0

Other $56,244

Total $281,219

Project: 0009129 Type Work: TE-Bike/Ped Facility Descp:ELLAVILLE DOWNTOWN STREETSCAPE

Phase CST

Fund STP

Year 2013

Length: 0.00

Total Project Cost:

$ 312,500

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Federal $250,000

State $0

Other $62,500

Total $312,500

Schley Totals Summary
County Summary excludes lump sum projects.

Project PI# 0007595

Year 2013

Phase CST

Fund HPP

Federal $224,975

State $0

Other $56,244

Total $281,219

$224,975

$0

$56,244

$281,219

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 210 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Screven
Project: 0007359 Type Work: Signals Descp:SR 17; SR 21; SR 21BU; SR 30; & SR 73 @ 8 LOCS
Length: 3.00

Phase PE
ROW CST

Fund STP STP STP

Year 2006 2011 2014

Federal $153,040 $304,000
$1,204,601

State $38,260 $76,000
$0

Other $0 $0 $0

Total $191,300 $380,000 $1,204,601

Total Project Cost:

$ 1,775,901

Total Project Authorizations: $ 571,300

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2012 - FY 2015

Also in Dodge, Jenkins County

Project: 0007693 Type Work: Operational Improvement
Descp:SR 21BU @ SR 73/US 301/WEST OGEECHEE ROAD IN SYLVANIA Length: 0.53

Phase PE
ROW CST

Fund STP STP STP

Year 2006 2011 2013

Federal $76,688
$280,000 $690,504

State $19,172 $70,000 $172,626

Other $0 $0 $0

Total $95,860
$350,000 $863,131

Total Project Cost:

$ 1,308,991

Total Project Authorizations: $ 445,860

Uses Lump Sum Bank: OPERATIONS FOR ANY AREA FOR FY 2012 - FY 2015

Project: 0009918 Type Work: Roundabout
Descp:SR 73 LOOP @ CR 248/BUTTERMILK ROAD/SINGLETON ROAD Length: 0.12

Phase PE CST

Fund Safety Safety

Year 2012 2012

Federal $153,000 $867,000

State $0 $0

Other $0 $0

Total $153,000 $867,000

Total Project Cost:

$ 1,020,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 231670- Type Work: Replace Bridge
Descp:SR 73/US 301 @ OGEECHEE RIVER OVERFLOW 11 MI NW OF OLIVER
Lanes: Exist. 2 Prop. 4 Length: 0.25

Total Project Cost: Total Project Authorizations:

$ 5,004,457 $ 1,221,004

Phase PE
ROW CST UTL

Fund Bridge Bridge Bridge Bridge

Year 2002 2011 2013 2013

Federal $976,803 $80,000
$2,781,214 $165,548

State $244,201
$20,000 $695,303
$41,387

Other $0 $0 $0 $0

Total $1,221,004
$100,000 $3,476,517
$206,936

Project: 231680- Type Work: Replace Bridge
Descp:SR 73/US 301 @ NORFOLK SOUTHERN RR (620143J) SOUTH OF SR 17
Lanes: Exist. 2 Prop. 4 Length: 0.22

Total Project Cost: Total Project Authorizations:

$ 3,065,361 $ 783,680

Phase PE
ROW CST UTL

Fund Bridge Bridge Bridge Bridge

Year 2004 2011 2013 2013

Federal $626,944 $96,000
$1,674,162 $55,183

State $156,736
$24,000 $418,540
$13,796

Other $0 $0 $0 $0

Total $783,680 $120,000 $2,092,702
$68,979

Project: M004321 Type Work: Resurface & Maintenance Descp:SR 21/SR 73 LOOP FROM SR 73 TO SR 73

Phase CST

Fund NHS

Year 2013

Length: 3.06

Total Project Cost:

$ 1,522,100

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2012 - FY 2015

Federal $1,217,680

State $304,420

Other $0

Total $1,522,100

Page 211 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: M004322 Type Work: Resurface & Maintenance
Descp:SR 73 FROM CR 232/WATER STATION RD TO CR 233/SOUTH ACCESS RD Length: 3.38

Phase CST

Fund NHS

Year 2013

Federal $347,260

State $86,815

Other $0

Total $434,075

Total Project Cost:

$ 434,075

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2012 - FY 2015

Project: M004323 Type Work: Resurface & Maintenance Descp:SR 24 FROM BULLOCH COUNTY LINE TO SR 17
Length: 2.39

Phase CST

Fund STP

Year 2013

Federal $327,289

State $81,822

Other $0

Total $409,111

Total Project Cost:

$ 409,111

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Project: M004438 Type Work: Resurface & Maintenance
Descp:SR 17 FROM SR 73/SCREVEN TO 0.09 MI S OF SR 121/JENKINS Length: 21.66

Phase CST

Fund STP

Year 2012

Federal $1,979,808

State $494,952

Other $0

Total $2,474,760

Total Project Cost:

$ 2,474,760

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Also in Jenkins County

Screven Totals Summary
County Summary excludes lump sum projects.

Project PI#
231670231670231680231680-

Year
2013 2013 2013 2013

Phase
CST UTL CST UTL

Fund
Bridge Bridge Bridge Bridge

Federal
$2,781,214 $165,548
$1,674,162 $55,183

State
$695,303 $41,387
$418,540 $13,796

Other
$0 $0 $0 $0

Total
$3,476,517 $206,936
$2,092,702 $68,979

$4,676,107

$1,169,027

$0

$5,845,134

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 212 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Seminole
Project: 0003767 Type Work: Roadway Project
Descp:SR 39 FM N OF CR 99/SPORTSMAN RD TO S OF CR 71/DRAKE FARM RD Length: 0.50

Phase PE
ROW CST

Fund STP STP STP

Year 2007 2012 2013

Federal $195,134 $61,200 $731,812

State $48,783 $15,300 $182,953

Total Project Cost: Total Project Authorizations:

$ 1,235,182 $ 243,917

Other $0 $0 $0

Total $243,917
$76,500 $914,766

Project: 0007248 Type Work: Replace Bridge
Descp:CR 226/BURKE ROAD @ FISH POND DRAIN 11.5 MI S OF IRON CITY Length: 0.25

Total Project Cost: Total Project Authorizations:

$ 2,408,421 $ 389,701

Phase PE
ROW CST

Fund Bridge Local Bridge

Year 2006 2011 2012

Federal $276,560 $0
$1,614,977

State $69,140
$0 $403,744

Other $0
$44,000 $0

Total $345,701
$44,000 $2,018,721

Project: M004365 Type Work: Resurface & Maintenance
Descp:SR 38 FROM SR 370/EARLY TO E OF CS 574/7TH STREET/SEMINOLE Length: 9.91

Phase CST

Fund NHS

Year 2012

Total Project Cost:

$ 3,719,439

Total Project Authorizations: $ 3,719,439

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2012 - FY 2015

Federal $2,975,552

State $743,888

Other $0

Total $3,719,439

Also in Early County

Seminole Totals Summary
County Summary excludes lump sum projects.

Project PI#
0003767 0003767 0007248

Year
2012 2013 2012

Phase
ROW CST CST

Fund
STP STP Bridge

Federal
$61,200 $731,812 $1,614,977

State
$15,300 $182,953 $403,744

Other
$0 $0 $0

Total
$76,500 $914,766 $2,018,721

$2,407,989

$601,997

$0

$3,009,986

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 213 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Spalding
Project: 0000408 Type Work: Intersection Improvement
Descp:SR 16 @ CR 35/VAUGHN RD & CR 507/ROVER RD - TURN LANES Length: 0.45

Phase ROW CST UTL

Fund Safety Safety Local

Year 2011 2012 2012

Federal $1,899,000 $1,387,384
$0

State $211,000 $154,154
$0

Total Project Cost:

$ 4,432,388

Total Project Authorizations: $ 2,110,000

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0000409 Type Work: Turn Lanes
Descp:SR 16 @ CR 496/688/OLD 85 CONNECTOR/HOLLONVILLE RD Length: 0.40

Phase PE
ROW CST

Fund STP Safety Safety

Year 2003 2013 2014

Federal $302,233 $746,984
$1,202,286

State $33,581 $82,998 $133,587

Total Project Cost:

$ 2,501,670

Total Project Authorizations: $ 335,814

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0000410 Type Work: Intersection Improvement
Descp:SR 362 @ CR 507/ROVER-WILLIAMSON ROADS-TURN LANES
Lanes: Exist. 2 Prop. 3 Length: 0.48

Phase PE
ROW ROW

Fund STP Safety Local

Total Project Cost:

$ 3,007,889

CST Safety

Total Project Authorizations: $ 12,468

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Year 2004 2012 2012 2013

Federal $11,221
$374,544 $0
$1,947,325

State $1,247
$41,616 $0
$216,369

Project: T003022 Type Work: Transit Projects
Descp:FY 2012 FTA SECTION 5307/5340 FORMULA FUNDS FOR SPALDING Length: 0.00

Phase CST

Fund Transit

Year 2012

Federal $178,498

State $22,312

Total Project Cost: Total Project Authorizations:

$ 223,122 $0

Other $0 $0
$780,850
Other $0 $0 $0
Other $0 $0
$415,567 $0
Other $22,312

Total $2,110,000 $1,541,538
$780,850
Total $335,814 $829,982 $1,335,874
Total $12,468
$416,160 $415,567 $2,163,695
Total $223,122

Project: T003023 Type Work: Transit Projects
Descp:FY 2013 FTA SECTION 5307/5340 FORMULA FUNDS FOR SPALDING Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 227,585 $0

Phase CST

Fund Transit

Year 2013

Federal $182,068

State $0

Other $45,517

Total $227,585

Project: T003642 Type Work: Transit Projects
Descp:FY 2014 FTA SECTION 5307/5340 FORMULA FUNDS FOR SPALDING Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 227,585 $0

Phase CST

Fund Transit

Year 2014

Federal $182,068

State $0

Other $45,517

Total $227,585

Page 214 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: T004090 Type Work: Transit Projects
Descp:FY 2015 FTA SECTION 5307/5340 FORMULA FUNDS FOR SPALDING Length: 0.00

Phase CST

Fund Transit

Year 2015

Federal $182,068

State $22,759

Total Project Cost: Total Project Authorizations:

$ 227,585 $0

Other $22,759

Total $227,585

Project PI#
T003022 T003023 T003642 T004090

Year
2012 2013 2014 2015

Spalding Totals Summary

County Summary excludes lump sum projects.

This County is also located in a MPO area. Additional Projects may be listed in the MPO TIP.

Phase

Fund

Federal

State

Other

CST

Transit

CST

Transit

CST

Transit

CST

Transit

$178,498 $182,068 $182,068 $182,068

$22,312 $0 $0
$22,759

$22,312 $45,517 $45,517 $22,759

Total
$223,122 $227,585 $227,585 $227,585

$724,702

$45,071

$136,105

$905,877

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 215 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Stephens
Project: 0010125 Type Work: Pavement Markings
Descp:OFF-SYSTEM SAFETY IMPROVEMENTS @38 CR LOC IN STEPHENS COUNTY Length: 0.00

Phase CST

Fund Safety

Year 2012

Federal $153,000

State $0

Total Project Cost:

$ 153,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: HIGH RISK RURAL ROADS FOR FY 2012 - FY 2015

Project: 0010416 Type Work: Replace Bridge Descp:SR 184 @ TOCCOA CREEK 3.5 MI NE OF TOCCOA

Length: 0.40

Total Project Cost: Total Project Authorizations:

$ 880,000 $0

Phase PE
ROW CST UTL

Fund Bridge Bridge Bridge Bridge

Year 2012 2014 After 2015 After 2015

Federal $200,000 $80,000 $384,000 $40,000

State $50,000 $20,000 $96,000 $10,000

Other $0
Other $0 $0 $0 $0

Total $153,000
Total $250,000 $100,000 $480,000
$50,000

Project: 122110- Type Work: Widening
Descp:SR 17 FM S OF FRANKLIN COUNTY LINE TO N OF CR 24/SCOTT ROAD
Lanes: Exist. 2 Prop. 4 Length: 6.30

Total Project Cost: Total Project Authorizations:

$ 73,493,879 $ 11,527,801

Phase PE PE
ROW CST UTL

Fund State State STP STP Local

Year 1994 2002 2007 2013 2013

Project: M003644 Type Work: Shoulder Work
Descp:SR 17 ALT FM CR 171/BLACK MOUNTAIN RD TO CR 174/PHILLIPS RD Length: 2.00

Phase Fund Year CST Emergency 2012

Total Project Cost:

$ 25,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Project: M003645 Type Work: Drainage Improvements Descp:SR 17 FROM I-985 TO HABERSHAM COUNTY LINE

Phase Fund CST Emergency

Year 2012

Length: 3.98

Total Project Cost:

$ 65,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Federal $0 $0
$6,370,400 $49,052,913
$0

State $1,140,000 $2,424,801 $1,592,600 $12,263,228
$0

Other $0 $0 $0 $0
$649,938

Total $1,140,000 $2,424,801 $7,963,000 $61,316,141
$649,938

Also in Franklin County

Federal $20,000

State $5,000

Other $0

Total $25,000

Federal $52,000

State $13,000

Other $0

Total $65,000

Page 216 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/4/2011
Stephens Totals Summary
County Summary excludes lump sum projects.

Project PI#

Year

Phase

Fund

Federal

State

Other

Total

0010416 0010416 122110122110-

2012 2014 2013 2013

PE ROW CST UTL

Bridge Bridge
STP Local

$200,000 $80,000
$42,676,034 $0

$50,000 $20,000 $10,669,009
$0

$0 $0 $0 $565,446

$250,000 $100,000 $53,345,043 $565,446

$42,956,034

$10,739,009

$565,446

$54,260,489

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 217 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Stewart
Project: 0007611 Type Work: Streetscapes Descp:STREETSCAPE IN RICHLAND

Phase CST

Fund HPP

Year 2012

Federal $143,984

State $0

Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 179,980 $0

Other $35,996

Total $179,980

Stewart Totals Summary
County Summary excludes lump sum projects.

Project PI# 0007611

Year 2012

Phase CST

Fund HPP

Federal $143,984

State $0

Other $35,996

Total $179,980

$143,984

$0

$35,996

$179,980

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 218 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Sumter
Project: 0005939 Type Work: Intersection Improvement
Descp:SOUTHERFIELD ROAD @ SR 49 & DISTRICT LINE ROAD EXT Length: 5.68

Phase PE
ROW CST

Fund STP STP STP

Year 2005 2013 2015

Federal $1,279,480
$114,028 $970,542

State $319,870
$28,507 $242,636

Total Project Cost: Total Project Authorizations:

$ 2,955,062 $ 1,599,350

Other $0 $0 $0

Total $1,599,350
$142,535 $1,213,178

Project: 0010213 Type Work: TE-Landscape/Beautify
Descp:GEORGIA SOUTHWESTERN STATE UNIVERSITY ENTRACEWAY Length: 0.00

Phase CST

Fund STP

Year 2014

Total Project Cost:

$ 600,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: M004342 Type Work: Resurface & Maintenance
Descp:SR 30 FROM SR 3/US 19/SUMTER TO SR 41/MARION Length: 19.13

Phase CST

Fund STP

Year 2012

Total Project Cost:

$ 3,480,674

Total Project Authorizations: $ 3,480,674

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Federal $480,000
Federal $2,784,539

State $0

Other $120,000

Total $600,000

State $696,135

Other $0

Total $3,480,674

Also in Marion County

Sumter Totals Summary
County Summary excludes lump sum projects.

Project PI#
0005939 0005939

Year
2013 2015

Phase
ROW CST

Fund
STP STP

Federal
$114,028 $970,542

State
$28,507 $242,636

Other
$0 $0

Total
$142,535 $1,213,178

$1,084,570

$271,143

$0

$1,355,713

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 219 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Talbot
Project: 0007051 Type Work: Replace Bridge Descp:SR 22 @ POTTERS CREEK
Length: 0.40

Phase PE
ROW CST

Fund Bridge Bridge Bridge

Year 2007 2013 2015

Federal $431,908 $357,065 $271,104

State $107,977
$89,266 $67,776

Total Project Cost: Total Project Authorizations:

$ 1,325,097 $ 539,885

Other $0 $0 $0

Total $539,885 $446,332 $338,880

Project: 333210- Type Work: Replace Bridge Descp:SR 36 @ FLINT RIVER 9.6 MI E OF WOODLAND

Length: 0.97

Total Project Cost: Total Project Authorizations:

$ 5,173,054 $ 429,214

Phase PE
ROW CST

Fund Bridge Bridge Bridge

Year 2000 2013 After 2015

Federal $343,371 $423,651
$3,371,421

Project: 343110- Type Work: Replace Bridge
Descp:CR 172/POBIDDY ROAD@ FLINT RIVER N OF JCT SR 22/UPSON/TALBOT Length: 0.66

Phase PE
ROW CST

Total Project Cost: Total Project Authorizations:

$ 4,012,814 $ 220,171

Fund Bridge Bridge Bridge

Year 1998 2011 2012

Federal $176,137 $128,000
$2,906,114

Project: M004343 Type Work: Resurface & Maintenance
Descp:SR 36 FROM SR 41/TALBOT TO POTATO CREEK/UPSON Length: 14.83

Phase CST

Fund STP

Year 2012

Total Project Cost:

$ 2,593,736

Total Project Authorizations: $ 2,593,736

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Project: M004346 Type Work: Resurface & Maintenance Descp:SR 41 FROM SR 22/US 80 TO 0.05 MI N OF SR 85
Length: 13.25

Phase CST

Fund STP

Year 2012

Total Project Cost:

$ 3,416,758

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Federal $2,074,989
Federal $2,733,407

State $85,843 $105,913 $842,855

Other $0 $0 $0

Total $429,214 $529,564 $4,214,276

Also in Upson County

State $44,034 $32,000 $726,528

Other $0 $0 $0

Total $220,171 $160,000 $3,632,642

Also in Upson County

State $518,747

Other $0

Total $2,593,736

Also in Upson County

State $683,352

Other $0

Total $3,416,758

Page 220 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/4/2011
Talbot Totals Summary
County Summary excludes lump sum projects.

Project PI#

Year

Phase

Fund

Federal

State

Other

Total

0007051 0007051 333210343110-

2013 2015 2013 2012

ROW CST ROW CST

Bridge Bridge Bridge Bridge

$357,065 $271,104 $245,718 $1,453,057

$89,266 $67,776 $61,429 $363,264

$0

$446,332

$0

$338,880

$0

$307,147

$0

$1,816,321

$2,326,944

$581,736

$0

$2,908,680

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 221 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Taliaferro
Project: M004329 Type Work: Resurface & Maintenance
Descp:SR 44 FROM SR 77 TO TALIAFERRO COUNTY LINE Length: 11.02

Phase CST

Fund STP

Year 2013

Federal $1,984,027

State $496,007

Other $0

Total $2,480,034

Total Project Cost:

$ 2,480,034

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Also in Greene County

Project: M004437 Type Work: Resurface & Maintenance Descp:SR 47 FROM SR 12 TO WILKES COUNTY LINE
Length: 10.91

Phase CST

Fund STP

Year 2012

Federal $690,685

State $172,671

Other $0

Total $863,356

Total Project Cost:

$ 863,356

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Page 222 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Tattnall
Project: 0007396 Type Work: Replace Bridge
Descp:CR 472/KENNEDY BRIDGE ROAD @ CEDAR CREEK 1 MI N OF MANASSAS Length: 0.40

Phase PE
ROW CST

Fund Bridge Local Bridge

Year 2007 2011 2012

Federal $144,502 $0
$1,343,928

State $36,126
$0 $335,982

Total Project Cost: Total Project Authorizations:

$ 1,905,238 $ 225,328

Other $0
$44,700 $0

Total $180,628
$44,700 $1,679,910

Project: 0009131 Type Work: TE-Landscape/Beautify
Descp:SR 144/E BARNARD STREET FM CASWELL STREET TO TILLMAN STREET Length: 0.10

Phase CST

Fund STP

Year 2012

Total Project Cost:

$ 375,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 0009880 Type Work: Roundabout Descp:SR 23/US 25/US 301 @ SR 196
Length: 0.50

Phase PE CST

Fund Safety Safety

Year 2012 2012

Total Project Cost:

$ 1,020,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0010551 Type Work: RRX Warning Device
Descp:SR 23/SR 27/SR 121 @ GCR #636015Y IN COLLINS Length: 0.40

Phase CST

Fund Safety

Year 2012

Total Project Cost:

$ 200,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2012 - FY 2015

Project: M003293 Type Work: Shoulder Work
Descp:CAMDEN SR 40 TATNALL SR 147 SHOULDER PAVING VARIOUS LOC Length: 5.10

Phase CST

Fund State

Year 2012

Total Project Cost: Total Project Authorizations:

$ 306,517 $0

Project: M004224 Type Work: Resurface & Maintenance
Descp:SR 57 FROM EMANUEL COUNTY LINE TO 0.06 MI N OF SR 23/SR 121 Length: 10.07

Phase CST

Fund STP

Year 2012

Total Project Cost:

$ 1,170,139

Total Project Authorizations: $ 1,170,139

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Federal $300,000

State $0

Other $75,000

Total $375,000

Federal $153,000 $867,000

State $0 $0

Other $0 $0

Total $153,000 $867,000

Federal $200,000

State $0

Other $0

Total $200,000

Federal $0

State $306,517

Other $0

Total $306,517

Federal $936,111

Also in Camden County

State $234,028

Other $0

Total $1,170,139

Also in Candler County

Page 223 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Project: M004400 Type Work: Resurface & Maintenance Descp:SR 129 FROM SR 30 TO CANDLER COUNTY LINE

10/4/2011

Phase CST

Fund STP

Year 2013

Federal $2,210,000

State $552,500

Length: 11.00

Other $0

Total $2,762,500

Total Project Cost:

$ 2,762,500

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Also in Evans County

Project: M004403 Type Work: Resurface & Maintenance
Descp:SR 30 FM CR 445/HICKRY HAMMCK RANCH/TATTNALL TO SR 169/EVANS Length: 14.67

Phase CST

Fund NHS

Year 2015

Federal $2,996,000

State $749,000

Other $0

Total $3,745,000

Total Project Cost:

$ 3,745,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2012 - FY 2015

Also in Evans County

Project: M004409 Type Work: Resurface & Maintenance Descp:SR 169 FROM SR 121 TO CR 238/BACON CIRCLE
Length: 12.12

Phase CST

Fund STP

Year 2014

Federal $2,424,000

State $606,000

Other $0

Total $3,030,000

Total Project Cost:

$ 3,030,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Tattnall Totals Summary
County Summary excludes lump sum projects.

Project PI#
0007396 M003293

Year
2012 2012

Phase
CST CST

Fund
Bridge State

Federal
$1,343,928 $0

State
$335,982 $196,171

Other
$0 $0

Total
$1,679,910 $196,171

$1,343,928

$532,153

$0

$1,876,081

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 224 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Taylor
Project: 0007606 Type Work: Landscaping
Descp:SR 96/FALL LINE FREEWAY FM CR 138 TO CR 269 IN REYNOLDS Length: 3.70

Phase PE CST

Fund HPP HPP

Year 2010 2012

Federal $31,200
$272,800

State $0 $0

Total Project Cost: Total Project Authorizations:

$ 380,000 $ 39,000

Other $7,800
$68,200

Total $39,000
$341,000

Project: 333205- Type Work: Replace Bridge Descp:SR 128 @ FLINT RIVER 8 MI N OF REYNOLDS

Length: 0.94

Total Project Cost: Total Project Authorizations:

$ 6,373,690 $ 1,411,730

Phase PE
ROW CST

Fund Bridge Bridge Bridge

Year 2000 2010 2012

Federal $273,384 $856,000
$3,969,568

State $68,346 $214,000 $992,392

Other $0 $0 $0

Total $341,730 $1,070,000 $4,961,960

Also in Crawford County

Taylor Totals Summary
County Summary excludes lump sum projects.

Project PI#
0007606 333205-

Year
2012 2012

Phase
CST CST

Fund
HPP Bridge

Federal
$272,800 $1,984,784

State
$0 $496,196

Other
$68,200 $0

Total
$341,000 $2,480,980

$2,257,584

$496,196

$68,200

$2,821,980

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 225 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Telfair
Project: 0002425 Type Work: Replace Bridge
Descp:SR 31/US 319 /441 @ TURNPIKE CREEK 5.3 MI S OF MCRAE
Lanes: Exist. 2 Prop. 4 Length: 0.40

Phase PE
ROW CST

Fund Bridge Bridge Bridge

Year 2012 2014 After 2015

Federal $81,600 $80,000
$785,893

State $20,400 $20,000 $196,473

Total Project Cost: Total Project Authorizations:

$ 1,184,366 $0

Other $0 $0 $0

Total $102,000 $100,000 $982,366

Project: 0007409 Type Work: Signals
Descp:SR 27 WEST @ 2 LOCS; SR 30 @ 2 LOCS & SR 31 @ 1 LOC Length: 1.40

Phase PE
ROW CST

Fund STP STP STP

Year 2006 2011 2013

Federal $112,923 $250,000 $987,988

State $28,231
$0 $0

Other $0 $0 $0

Total $141,154 $250,000 $987,988

Total Project Cost:

$ 1,379,142

Total Project Authorizations: $ 391,154

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2012 - FY 2015

Project: 0007576 Type Work: Sidewalks
Descp:SR 27 FM SR 30 TO 2ND AVE - SIDEWALK & CROSSWALK IN MCRAE Length: 0.90

Phase CST

Fund HPP

Year 2012

Federal $359,960

State

Also in Montgomery, Wheeler

County

Other

Total

$0

$89,990

$449,950

Total Project Cost: Total Project Authorizations:

$ 449,950 $0

Project: M004399 Type Work: Resurface & Maintenance
Descp:SR 27 FROM CR 230 TO CS 743 & SR 31 FROM SR 132 TO SR 27 Length: 2.72

Phase CST

Fund STP

Year 2013

Total Project Cost:

$ 950,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Project: M004404 Type Work: Resurface & Maintenance
Descp:SR 27 FROM E OF CR 267/WALKER RD TO E OF CS 568/RIVER ST Length: 1.87

Phase CST

Fund NHS

Year 2013

Total Project Cost:

$ 959,600

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2012 - FY 2015

Federal $760,000

State $190,000

Other $0

Federal $767,680

State $191,920

Other $0

Total $950,000
Total $959,600

Page 226 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/4/2011
Telfair Totals Summary
County Summary excludes lump sum projects.

Project PI#

Year

Phase

Fund

Federal

State

Other

Total

0002425 0002425 0007576

2012 2014 2012

PE ROW CST

Bridge Bridge HPP

$81,600 $80,000 $359,960

$20,400 $20,000
$0

$0 $0 $89,990

$102,000 $100,000 $449,950

$521,560

$40,400

$89,990

$651,950

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 227 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Terrell
Project: M004390 Type Work: Resurface & Maintenance
Descp:SR 520 FM 0.23 MI E OF SR 45 TO 0.96 MI E OF CS 509/PECAN ST Length: 6.75

Phase CST

Fund NHS

Year 2014

Federal $1,464,779

State $366,195

Total Project Cost:

$ 1,830,974

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2012 - FY 2015

Other $0

Total $1,830,974

Page 228 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Thomas
Project: 0007126 Type Work: Median Crossovers
Descp:SR 3/US 19 FM N OF FLORIDA STATE LN TO S OF CR 219 - 19 LOCS Length: 9.49

Phase PE CST

Fund Safety Safety

Year 2006 2014

Federal $234,000
$7,094,823

State $26,000 $788,314

Total Project Cost:

$ 8,143,137

Total Project Authorizations: $ 260,000

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0007607 Type Work: Streetscapes Descp:STREETSCAPE IN THOMASVILLE
Length: 0.00

Phase CST

Fund HPP

Year 2015

Federal $215,977

State $0

Total Project Cost: Total Project Authorizations:

$ 300,000 $0

Other $0 $0
Other $84,023

Total $260,000 $7,883,137
Total $300,000

Project: 0008717 Type Work: Operational Improvement Descp:SR 35/US 319 @ SR 35 CONN
Length: 0.34

Phase PE
ROW CST

Fund STP STP STP

Total Project Cost:

$ 392,004

Total Project Authorizations: $ 130,493

Uses Lump Sum Bank: OPERATIONS FOR ANY AREA FOR FY 2012 - FY 2015

Project: 0010417 Type Work: Pavement Markings
Descp:OFF-SYSTEM SAFETY IMPROVEMENTS @ 6 CR LOCS IN THOMAS COUNTY Length: 33.56

Phase CST

Fund Safety

Total Project Cost:

$ 89,832

Total Project Authorizations: $ 0

Uses Lump Sum Bank: HIGH RISK RURAL ROADS FOR FY 2012 - FY 2015

Year 2009 2012 2014
Year 2012

Federal $104,395 $14,560 $194,649

State $26,099
$3,640 $48,662

Other $0 $0 $0

Federal $89,832

State $0

Other $0

Total $130,493
$18,200 $243,311
Total $89,832

Thomas Totals Summary
County Summary excludes lump sum projects.

Project PI#

Year

Phase

Fund

Federal

State

Other

Total

0007607

2015

CST

HPP

$215,977

$0

$84,023

$300,000

$215,977

$0

$84,023

$300,000

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 229 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Tift
Project: 0000803 Type Work: Interchange Descp:I-75 @ CR 410/BRIGHTON ROAD - PHASE II

Lanes: Exist. 4 Prop. 6 Length: 0.40

Total Project Cost: Total Project Authorizations:

$ 27,032,737 $ 5,866,451

Phase PE PE PE
ROW CST CST UTL

Fund NHS HPP HPP HPP HPP NHS NHS

Year 2005 2005 2005 2011 2015 2015 2015

Federal $2,125,240
$583,045 $136,876 $1,848,000 $1,776,476 $14,209,815 $946,738

State $531,310 $145,761
$34,219 $462,000 $444,119 $3,552,454 $236,685

Other $0 $0

Total $2,656,550
$728,806

$0

$2,310,000

$0

$2,220,595

$0 $17,762,268

$0

$1,183,423

Project: 0001340 Type Work: New Construction
Descp:SOUTH TIFTON BYP FM SR 520/US 82 WEST TO SR 35/US 319 EAST
Lanes: Exist. 0 Prop. 2 Length: 7.50

Total Project Cost: Total Project Authorizations:

$ 81,791,427 $ 4,150,309

Phase PE PE PE
ROW ROW CST

Fund HPP STP HPP HPP STP STP

Year 2007 2007 2007 2015 2015 After 2015

Federal $291,522
$2,960,287 $68,438
$4,049,550 $4,416,323 $53,647,022

State $72,881 $740,072 $17,110 $1,012,387 $1,104,081 $13,411,755

Other $0 $0 $0 $0 $0 $0

Total $364,403 $3,700,359
$85,548 $5,061,937 $5,520,404 $67,058,777

Project: 0003430 Type Work: Widening
Descp:CR 75/CARPENTER RD IN TIFTON FM SR 520/US 82 TO DAVIS RD
Lanes: Exist. 2 Prop. 5 Length: 2.50

Phase PE
ROW CST

Total Project Cost: Total Project Authorizations:

$ 9,237,823 $ 30,000

Fund STP Local STP

Year 2003 2012 2013

Federal $24,000 $0
$7,334,258

State $6,000 $0
$1,833,565

Other $0
$40,000 $0

Total $30,000 $40,000
$9,167,823

Project: 0007183 Type Work: Miscellaneous Improvements
Descp:SR 35/US 319 FM CR 89/INDIAN LAKE DR/COLQUITT TO SR 520/TIFT Length: 22.31

Phase PE
ROW CST

Fund Safety Safety Safety

Year 2006 2010 2012

Federal $1,017,000 $3,375,000 $15,444,201

State $113,000 $375,000 $1,716,022

Other $0 $0 $0

Total $1,130,000 $3,750,000 $17,160,223

Total Project Cost:

$ 22,040,223

Total Project Authorizations: $ 4,880,000

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Also in Colquitt County

Project: 0007273 Type Work: Realignment
Descp:CR 299/OMEGA ROAD FROM SR 35/US 319 TO I-75 Length: 0.30

Total Project Cost: Total Project Authorizations:

$ 5,671,670 $0

Phase PE
ROW CST UTL

Fund STP Local STP Local

Year 2012 After 2015 After 2015 After 2015

Federal $67,973 $0
$938,092 $0

State $16,993
$0 $234,523
$0

Other $0
$3,786,735 $0
$627,353

Total $84,966
$3,786,735 $1,172,616
$627,353

Project: 0007578 Type Work: Sidewalks
Descp:SIDEWALKS; LIGHTING & LANDSCAPING IN TIFTON Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 843,656 $ 150,000

Phase PE CST

Fund HPP HPP

Year 2009 2014

Federal $120,000 $554,925

State $30,000
$0

Other $0
$138,731

Total $150,000 $693,656

Page 230 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: 0008723 Type Work: Operational Improvement Descp:SR 520/US 82 @ SR 35/US 319
Length: 0.40

Phase PE CST

Fund STP STP

Year 2010 2015

Federal $108,842 $218,863

State $27,210 $54,716

Total Project Cost:

$ 409,631

Total Project Authorizations: $ 136,052

Uses Lump Sum Bank: OPERATIONS FOR ANY AREA FOR FY 2012 - FY 2015

Project: 0008767 Type Work: Operational Improvement Descp:SR 7 @ CR 413/20TH STREET
Length: 0.20

Phase PE
ROW CST

Fund STP STP STP

Year 2011 2012 2013

Federal $160,000 $80,000 $480,000

State $40,000 $20,000 $120,000

Total Project Cost:

$ 900,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: OPERATIONS FOR ANY AREA FOR FY 2012 - FY 2015

Project: 0009133 Type Work: TE-Bike/Ped Facility
Descp:SR 35 FROM OAK STREET TO CEMETERY ROAD - PHASE III Length: 0.65

Phase CST

Fund STP

Year 2012

Federal $450,000

State $0

Total Project Cost:

$ 562,500

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 0009134 Type Work: TE-Bike/Ped Facility
Descp:TIFTON MULTI-PHASED DOWNTOWN STREETSCAPE & BEAUTIFICATION Length: 0.00

Phase CST

Fund STP

Year 2013

Federal $650,000

State $0

Total Project Cost:

$ 812,500

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 0009854 Type Work: Roundabout Descp:SR 125 @ CR 410/BRIGHTON ROAD
Length: 0.25

Phase PE CST

Fund Safety Safety

Year 2013 2014

Federal $153,000 $867,000

State $0 $0

Total Project Cost:

$ 1,020,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0010018 Type Work: Sidewalks Descp:G O BAILEY SCHOOL IN TIFTON - SRTS
Length: 0.00

Phase PE CST

Fund Safety Safety

Year 2010 2014

Federal $140,000 $381,480

State $0 $0

Total Project Cost:

$ 521,480

Total Project Authorizations: $ 140,000

Uses Lump Sum Bank: SAFE ROUTES TO SCHOOL INFRASTRUCTURE FOR FY 2012 - FY 2015

Other $0 $0
Other $0 $0 $0
Other $112,500
Other $162,500
Other $0 $0
Other $0 $0

Total $136,052 $273,579
Total $200,000 $100,000 $600,000
Total $562,500
Total $812,500
Total $153,000 $867,000
Total $140,000 $381,480

Page 231 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: M004376 Type Work: Resurface & Maintenance
Descp:SR 35 FM COLQUITT CO LN TO CR 45/OLD ISABELLA NASHVILLE RD Length: 5.86

Phase CST

Fund NHS

Year 2012

Federal $1,744,000

State $436,000

Total Project Cost:

$ 2,180,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2012 - FY 2015

Project: M004385 Type Work: Resurface & Maintenance
Descp:SR 7 FROM COOK COUNTY LINE TO CS 842/RURAL DEVELOPMENT ROAD Length: 11.75

Phase CST

Fund STP

Year 2012

Federal $5,513,056

State $1,378,264

Total Project Cost:

$ 6,891,320

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Other $0
Other $0

Total $2,180,000
Total $6,891,320

Tift Totals Summary
County Summary excludes lump sum projects.

Project PI#
0000803 0000803 0000803 0001340 0001340 0003430 0003430 0007273 0007578

Year
2015 2015 2015 2015 2015 2012 2013 2012 2014

Phase
CST CST UTL ROW ROW ROW CST PE CST

Fund
NHS HPP NHS STP HPP Local STP STP HPP

Federal
$14,209,815 $1,776,476 $946,738 $4,416,323 $4,049,550 $0 $7,334,258 $67,973 $554,925

State
$3,552,454 $444,119 $236,685
$1,104,081 $1,012,387
$0 $1,833,565
$16,993 $0

Other
$0 $0 $0 $0 $0 $40,000 $0 $0 $138,731

Total
$17,762,268 $2,220,595 $1,183,423 $5,520,404 $5,061,937 $40,000 $9,167,823 $84,966 $693,656

$33,356,058

$8,200,283

$178,731

$41,735,073

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 232 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Toombs
Project: 0001216 Type Work: Replace Bridge
Descp:SR 4/US 1 @ ALTAMAHA RIVER; OVERFLOW & WILLIAMS CREEK Length: 1.56

Total Project Cost: Total Project Authorizations:

$ 27,430,980 $ 1,429,835

Phase PE
ROW CST UTL

Fund NHS Bridge Bridge Local

Year 2002 2011 2015 2015

Federal $999,868 $144,000
$20,536,916 $0

State $249,967
$36,000 $5,134,229
$0

Other $0 $0 $0
$330,000

Total $1,249,835
$180,000 $25,671,145
$330,000

Also in Appling County

Project: 0007587 Type Work: Sidewalks Descp:SIDEWALKS & LIGHTING IN DOWNTOWN VIDALIA

Phase CST

Length: 0.00

Fund HPP

Year 2012

Federal $359,960

State $0

Other $889,040

Total $1,249,000

Total Project Cost: Total Project Authorizations:

$ 1,249,000 $0

Project: 0009135 Type Work: TE-Bike/Ped Facility
Descp:SR 4/US 1 FROM VICTORY DRIVE TO RAILROAD CORRIDOR @ US 280 Length: 0.99

Phase CST

Fund STP

Year 2014

Total Project Cost:

$ 375,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 0009882 Type Work: Roundabout Descp:SR 56 @ SR 178
Length: 0.50

Phase PE CST

Fund Safety Safety

Year 2012 2012

Total Project Cost:

$ 1,020,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0009883 Type Work: Roundabout Descp:SR 56 @ CR 332/CR 333/JOHNSON CORNER
Length: 0.50

Phase PE CST

Fund Safety Safety

Year 2012 2012

Total Project Cost:

$ 1,020,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 550610- Type Work: Turn Lanes
Descp:SR 292/VIDALIA FM MORN'SIDE - LOWERY WITH RIGHT ON WILSON Length: 1.32

Total Project Cost: Total Project Authorizations:

$ 8,309,069 $ 2,543,667

Phase PE
ROW CST UTL

Fund Safety STP STP Local

Year 1995 2006 2015 2015

Federal $300,000

State $0

Other $75,000

Total $375,000

Federal $153,000 $867,000

State $0 $0

Other $0 $0

Total $153,000 $867,000

Federal $153,000 $867,000

State $0 $0

Other $0 $0

Total $153,000 $867,000

Federal $489,300
$1,600,000 $4,579,395
$0

State $54,367 $400,000 $1,144,849
$0

Other $0 $0 $0
$41,159

Total $543,667 $2,000,000 $5,724,243
$41,159

Also in Montgomery County

Page 233 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: M004226 Type Work: Resurface & Maintenance
Descp:SR 4 FM CR 1/NAILS FERRY RD/APPLING TO ALTAMAHA RIVER/TOOMBS Length: 10.91

Phase CST

Fund NHS

Year 2012

Federal $3,771,642

State $942,911

Other $0

Total $4,714,553

Total Project Cost:

$ 4,714,553

Total Project Authorizations: $ 4,714,553

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2012 - FY 2015

Also in Appling County

Project: M004395 Type Work: Resurface & Maintenance
Descp:SR 292 FROM SR 4/US 1 TO MONTGOMERY COUNTY LINE Length: 7.56

Phase CST

Fund STP

Year 2013

Federal $1,514,000

State $378,500

Other $0

Total $1,892,500

Total Project Cost:

$ 1,892,500

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Project: M004408 Type Work: Resurface & Maintenance Descp:SR 147 FROM SR 4 TO SR 178
Length: 8.55

Phase CST

Fund STP

Year 2014

Federal $1,722,000

State $430,500

Other $0

Total $2,152,500

Total Project Cost:

$ 2,152,500

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Toombs Totals Summary
County Summary excludes lump sum projects.

Project PI#

Year

Phase

Fund

Federal

State

Other

Total

0001216 0001216 0007587 550610550610-

2015

CST

2015

UTL

2012

CST

2015

CST

2015

UTL

Bridge Local HPP STP Local

$17,867,117 $0
$359,960 $2,243,903
$0

$4,466,779 $0 $0
$560,976 $0

$0 $287,100 $889,040
$0 $20,168

$22,333,896 $287,100
$1,249,000 $2,804,879
$20,168

$20,470,980

$5,027,755

$1,196,308

$26,695,043

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 234 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Towns
Project: 0000302 Type Work: Replace Bridge
Descp:SR 17- SR 75 @ HIAWASSEE RIVER 3.6 MI S OF HIAWASSEE Length: 0.22

Total Project Cost: Total Project Authorizations:

$ 3,289,183 $ 492,453

Phase PE
ROW CST CST

Fund Bridge Bridge STP Bridge

Year 2001 2012 After 2015 After 2015

Federal $393,962 $692,161 $772,612 $772,612

State $98,491 $173,040 $193,153 $193,153

Other $0 $0 $0 $0

Total $492,453 $865,202 $965,764 $965,764

Project: 0000303 Type Work: Replace Bridge
Descp:SR 2/US 76 @ HIGHTOWER CREEK 6.1 MI E OF HIAWASSEE Length: 0.57

Total Project Cost: Total Project Authorizations:

$ 3,288,752 $ 616,872

Phase PE
ROW CST CST

Fund Bridge Bridge STP Bridge

Year 2001 2013 2015 2015

Federal $493,497 $265,502
$1,141,921 $730,081

State $123,374
$66,375 $285,480 $182,520

Other $0 $0 $0 $0

Total $616,872 $331,877 $1,427,402 $912,601

Project: 0000304 Type Work: Replace Bridge
Descp:SR 66 @ BRASSTOWN CREEK .5 MI NW OF YOUNG HARRIS Length: 0.76

Total Project Cost: Total Project Authorizations:

$ 5,123,403 $ 753,012

Phase PE
ROW CST CST

Fund Bridge Bridge STP Bridge

Year 2001 2014 After 2015 After 2015

Federal $602,409 $490,066
$1,713,561 $1,292,686

State $150,602 $122,516 $428,390 $323,172

Other $0 $0 $0 $0

Total $753,012 $612,582 $2,141,951 $1,615,858

Project: 0000305 Type Work: Replace Bridge
Descp:SR 66 @ CROOKED CREEK 3.2 MI NW OF YOUNG HARRIS Length: 0.66

Total Project Cost: Total Project Authorizations:

$ 4,555,079 $ 739,889

Phase PE
ROW CST CST

Fund Bridge Bridge STP Bridge

Year 2001 2014 After 2015 After 2015

Federal $591,911 $867,474
$1,529,275 $655,403

State $147,978 $216,868 $382,319 $163,851

Other $0 $0 $0 $0

Total $739,889 $1,084,342 $1,911,593 $819,254

Project: 0007495 Type Work: Pedestrian Crossings
Descp:PEDESTRIAN UPGRADES @ 20 SR LOCATIONS IN DISTRICT 1 Length: 0.00

Phase PE PE
ROW

Fund STP Safety Safety

Total Project Cost:

$ 4,064,053

CST Safety

Total Project Authorizations: $ 669,490

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Year 2007 2007 2012 2012

Project: 0009907 Type Work: Replace Bridge Descp:CR 177/TALLULAH RIVER ROAD @ TATE BRANCH

Phase Fund CST Forest Hwy

Year 2012

Length: 0.40

Total Project Cost: Total Project Authorizations:

$ 600,000 $0

Federal $99,000
$503,541 $747,900 $2,307,207
Federal $600,000

State $11,000 $55,949 $83,100 $256,356

Other $0 $0 $0 $0

Total $110,000 $559,490 $831,000 $2,563,563

State

Also in Lumpkin, Union, White

County

Other

Total

$0

$0

$600,000

Page 235 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/4/2011
Towns Totals Summary
County Summary excludes lump sum projects.

Project PI#
0000302 0000303 0000303 0000303 0000304 0000305 0009907

Year
2012 2013 2015 2015 2014 2014 2012

Phase
ROW ROW CST CST ROW ROW CST

Fund
Bridge Bridge Bridge
STP Bridge Bridge Forest Hwy

Federal
$692,161 $265,502 $730,081 $1,141,921 $490,066 $867,474 $600,000

State
$173,040 $66,375
$182,520 $285,480 $122,516 $216,868
$0

Other
$0 $0 $0 $0 $0 $0 $0

Total
$865,202 $331,877 $912,601 $1,427,402 $612,582 $1,084,342 $600,000

$4,787,205

$1,046,801

$0

$5,834,007

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 236 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Treutlen
Project: 0007586 Type Work: Sidewalks
Descp:SIDEWALKS; LIGHTING & LANDSCAPING IN SOPERTON Length: 0.00

Phase PE CST

Fund HPP HPP

Year 2013 After 2015

Federal $40,000
$319,960

State $0 $0

Total Project Cost: Total Project Authorizations:

$ 449,950 $0

Other $10,000 $79,990

Total $50,000
$399,950

Project: M004189 Type Work: Signing
Descp:I-16 @ 12 LOCS BETWEEN BLECKLEY COUNTY & EMANUEL COUNTY Length: 4.80

Phase PE CST

Fund IM IM

Year 2010 2015

Total Project Cost:

$ 1,900,000

Total Project Authorizations: $ 200,000

Uses Lump Sum Bank: INTERSTATE MAINTENANCE FOR FY 2012 - FY 2015

Project: M004338 Type Work: Resurface & Maintenance
Descp:SR 56 FROM CS 506/RAILROAD AVE TO EMANUEL COUNTY LINE Length: 11.64

Phase CST

Fund STP

Year 2013

Total Project Cost:

$ 2,676,800

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Federal $200,000
$1,700,000
Federal $2,141,440

State $0 $0

Other $0 $0

Total $200,000 $1,700,000

State

Also in Bleckley, Emanuel,

Laurens County

Other

Total

$535,360

$0

$2,676,800

Treutlen Totals Summary
County Summary excludes lump sum projects.

Project PI# 0007586

Year 2013

Phase PE

Fund HPP

Federal $40,000

State $0

Other $10,000

Total $50,000

$40,000

$0

$10,000

$50,000

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 237 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Troup
Project: 0008206 Type Work: TE-Bike/Ped Facility
Descp:HOGANSVILLE STREETSCAPE IN TROUP COUNTY - PHASE III Length: 2.46

Phase CST

Fund STP

Year 2012

Federal $200,000

State $0

Total Project Cost:

$ 250,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 0009136 Type Work: TE-Bike/Ped Facility Descp:WEST POINT STREETSCAPE - PHASE II
Length: 0.00

Phase CST

Fund STP

Year 2012

Federal $350,000

State $0

Total Project Cost:

$ 437,500

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 0009975 Type Work: Roundabout Descp:I-85 @ SR 18
Length: 0.30

Phase PE CST

Fund Safety Safety

Year 2012 2013

Federal $153,000 $867,000

State $0 $0

Total Project Cost:

$ 1,020,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 322250- Type Work: Widening
Descp:SR 1/US 27/LAGRANGE FM AUBURN ST TO SR 219/MORGAN ST
Lanes: Exist. 2 Prop. 4 Length: 1.42

Total Project Cost: Total Project Authorizations:

$ 35,665,818 $ 1,840,800

Phase PE
ROW CST UTL

Fund NHS NHS NHS Local

Year

Federal

1992

$1,472,640

2014 $19,666,307

After 2015 $7,303,615

After 2015

$0

State $368,160 $4,916,577 $1,825,904
$0

Other $50,000

Total $250,000

Other $87,500

Total $437,500

Other $0 $0

Total $153,000 $867,000

Other $0 $0 $0
$112,616

Total $1,840,800 $24,582,883 $9,129,519
$112,616

Project: M003509 Type Work: Weigh Scales
Descp:I-85 @ NB TRUCK WEIGH STATION IN TROUP PHASE I Length: 20.40

Phase CST

Fund IM

Total Project Cost:

$ 883,265

Total Project Authorizations: $ 0

Uses Lump Sum Bank: INTERSTATE MAINTENANCE FOR FY 2012 - FY 2015

Project: M003515 Type Work: Weigh Scales
Descp:I-85 @ SB TRUCK WEIGH STATION IN TROUP PHASE II Length: 0.40

Phase CST

Fund IM

Total Project Cost:

$ 883,265

Total Project Authorizations: $ 0

Uses Lump Sum Bank: INTERSTATE MAINTENANCE FOR FY 2012 - FY 2015

Year 2014
Year 2014

Federal $794,938

State $88,326

Other $0

Federal $794,938

State $88,326

Other $0

Total $883,265
Total $883,265

Page 238 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: M004345 Type Work: Resurface & Maintenance
Descp:SR 219 FM 0.08 MI N OF CS 720/MALIBU DR/TROUP TO SR 34/HEARD Length: 16.31

Phase CST

Fund STP

Year 2012

Federal $3,501,384

State $875,346

Other $0

Total $4,376,730

Total Project Cost:

$ 4,376,730

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Also in Heard County

Project: M004359 Type Work: Resurface & Maintenance
Descp:SR 14 FROM CS 760/FERRELL DR TO CS 987/NEWNAN ST IN LAGRANGE Length: 3.67

Phase CST

Fund STP

Year 2012

Federal $1,284,371

State $321,093

Other $0

Total $1,605,463

Total Project Cost:

$ 1,605,463

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Troup Totals Summary
County Summary excludes lump sum projects.

Project PI#

Year

Phase

Fund

Federal

State

Other

Total

322250-

2014

ROW

NHS

$19,666,307

$4,916,577

$0

$24,582,883

$19,666,307

$4,916,577

$0

$24,582,883

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 239 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Turner
Project: 0000311 Type Work: Widening Descp:SR 107/112 FROM CR 250 TO I-75 IN ASHBURN

Lanes: Exist. 2 Prop. 4 Length: 7.90

Total Project Cost: Total Project Authorizations:

$ 49,601,114 $ 1,582,709

Phase PE
ROW ROW CST UTL

Fund STP STP STP STP STP

Year

Federal

2003

$1,266,167

2014

$865,946

2015

$4,434,872

After 2015 $32,411,848

After 2015 $702,058

State $316,542 $216,486 $1,108,718 $8,102,962 $175,515

Other $0 $0 $0 $0 $0

Total $1,582,709 $1,082,432 $5,543,590 $40,514,810
$877,573

Project: 0007579 Type Work: Sidewalks
Descp:SIDEWALKS ALONG WHEELER AVE & CARLOS AVE IN ASHBURN Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 562,438 $ 60,000

Phase PE CST

Fund HPP HPP

Year 2009 2014

Federal $48,000
$401,950

State $0 $0

Other $12,000 $100,488

Total $60,000
$502,438

Project: 0007596 Type Work: Streetscapes Descp:STREETSCAPE IN ASHBURN

Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 224,975 $ 30,000

Phase PE CST

Fund HPP HPP

Year 2009 2014

Federal $24,000
$155,980

State $0 $0

Other $6,000
$38,995

Total $30,000
$194,975

Turner Totals Summary
County Summary excludes lump sum projects.

Project PI#
0000311 0000311 0007579 0007596

Year
2014 2015 2014 2014

Phase
ROW ROW CST CST

Fund
STP STP HPP HPP

Federal
$865,946 $4,434,872
$401,950 $155,980

State
$216,486 $1,108,718
$0 $0

Other
$0 $0 $100,488 $38,995

Total
$1,082,432 $5,543,590
$502,438 $194,975

$5,858,748

$1,325,204

$139,483

$7,323,434

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 240 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Twiggs
Project: 0007054 Type Work: Replace Bridge Descp:SR 19 @ CSX RR 2.8 MI SE OF DRY BRANCH

Length: 0.40

Total Project Cost: Total Project Authorizations:

$ 3,597,041 $ 953,452

Phase PE
ROW CST UTL

Fund Bridge Bridge Bridge Bridge

Year 2011 2013 2015 2015

Federal $762,761 $185,173
$1,589,876 $339,822

State $190,690
$46,293 $397,469
$84,955

Other $0 $0 $0 $0

Total $953,452 $231,466 $1,987,345 $424,777

Project: 0007251 Type Work: Interchange Descp:SR 96 @ I-16

Lanes: Exist. 4 Prop. 6 Length: 1.50

Total Project Cost: Total Project Authorizations:

$ 16,036,163 $ 3,710,000

Phase PE
ROW CST UTL

Fund NHS STP STP STP

Year 2007 2011 2015 2015

Federal $1,600,000 $1,368,000 $9,420,380
$440,550

State $400,000 $342,000 $2,355,095 $110,137

Other $0 $0 $0 $0

Total $2,000,000 $1,710,000 $11,775,475
$550,687

Project: 0009909 Type Work: Miscellaneous Improvements
Descp:BEAVER SWAMP LOOP TRAIL & ROUTE 102; 103; & 903 Length: 0.00

Phase Fund CST Natl Wildlife

Year 2012

Total Project Cost: Total Project Authorizations:

$ 810,000 $0

Federal $810,000

State $0

Other $0

Total $810,000

Project: 322470- Type Work: Widening Descp:SR 96 FM 0.48 W OF SR 87 TO S OF I-16

Lanes: Exist. 2 Prop. 4 Length: 7.64

Total Project Cost: Total Project Authorizations:

$ 49,882,980 $ 1,311,578

Phase PE
ROW CST UTL

Fund STP STP STP STP

Year

Federal

2003

$1,049,263

2015

$7,594,344

After 2015 $30,406,070

After 2015 $856,707

State $262,316 $1,898,586 $7,601,518 $214,177

Other $0 $0 $0 $0

Total $1,311,578 $9,492,930 $38,007,588 $1,070,884

Project: M004188 Type Work: Signing Descp:I-16 @ 5 LOCS & I-75 @ 4 LOCS
Length: 3.60

Phase PE CST

Fund IM IM

Year 2010 2014

Total Project Cost:

$ 1,400,000

Total Project Authorizations: $ 100,000

Uses Lump Sum Bank: INTERSTATE MAINTENANCE FOR FY 2012 - FY 2015

Project: M004349 Type Work: Resurface & Maintenance Descp:SR 19 FROM SR 18 TO WILKINSON COUNTY LINE

Phase CST

Length: 9.99

Fund STP

Year 2012

Total Project Cost:

$ 1,912,934

Total Project Authorizations: $ 1,912,934

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Federal $100,000
$1,300,000
Federal $1,530,347

State $0 $0

Other $0 $0

Total $100,000 $1,300,000

Also in Bibb County

State $382,587

Other $0

Total $1,912,934

Page 241 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: M004353 Type Work: Resurface & Maintenance
Descp:SR 96 FROM HOUSTON COUNTY LINE TO CR 176/HILL & DALE ROAD Length: 11.55

Phase CST

Fund STP

Year 2012

Federal $1,784,507

State $446,127

Total Project Cost:

$ 2,230,634

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Other $0

Total $2,230,634

Twiggs Totals Summary
County Summary excludes lump sum projects.

Project PI#
0007054 0007054 0007054 0007251 0007251 0009909 322470-

Year
2013 2015 2015 2015 2015 2012 2015

Phase
ROW CST UTL CST UTL CST ROW

Fund
Bridge Bridge Bridge
STP STP Natl Wildlife STP

Federal
$185,173 $1,589,876
$339,822 $9,420,380
$440,550 $810,000 $7,594,344

State
$46,293 $397,469
$84,955 $2,355,095
$110,137 $0
$1,898,586

Other
$0 $0 $0 $0 $0 $0 $0

Total
$231,466 $1,987,345
$424,777 $11,775,475
$550,687 $810,000 $9,492,930

$20,380,145

$4,892,536

$0

$25,272,682

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 242 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Union
Project: 0007055 Type Work: Replace Bridge Descp:SR 180 @ SLAUGHTER CREEK

Length: 0.40

Total Project Cost: Total Project Authorizations:

$ 6,733,833 $0

Phase PE
ROW CST UTL

Fund Bridge Bridge Bridge Bridge

Year 2013 After 2015 After 2015 After 2015

Federal $339,757 $41,925
$4,782,769 $222,615

State $84,939 $10,481 $1,195,692 $55,654

Other $0 $0 $0 $0

Total $424,696
$52,406 $5,978,462
$278,269

Project: 0007495 Type Work: Pedestrian Crossings
Descp:PEDESTRIAN UPGRADES @ 20 SR LOCATIONS IN DISTRICT 1 Length: 0.00

Phase PE PE
ROW

Fund STP Safety Safety

Total Project Cost:

$ 4,064,053

CST Safety

Total Project Authorizations: $ 669,490

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Year 2007 2007 2012 2012

Project: 0009137 Type Work: TE-Bike/Ped Facility Descp:BLAIRSVILLE DOWNTOWN STREETSCAPE
Length: 0.00

Phase CST

Fund STP

Year 2012

Total Project Cost:

$ 312,500

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 0009729 Type Work: Pavement Markings
Descp:OFF-SYSTEM SAFETY IMPROVEMENTS @ 22 CR LOCS IN UNION COUNTY Length: 0.00

Phase CST

Fund Safety

Year 2012

Total Project Cost:

$ 102,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: HIGH RISK RURAL ROADS FOR FY 2012 - FY 2015

Project: 121385- Type Work: Replace Bridge
Descp:SR 11/US 19 @ IVY LOG CREEK 6 MI N OF BLAIRSVILLE Length: 0.72

Total Project Cost: Total Project Authorizations:

$ 5,796,631 $ 159,500

Phase PE
ROW CST UTL

Fund Bridge Bridge Bridge Bridge

Year 2007 2012 2013 2013

Federal $99,000
$503,541 $747,900 $2,307,207
Federal $250,000
Federal $102,000
Federal $127,600 $652,800
$3,640,335 $216,570

State $11,000 $55,949 $83,100 $256,356

Other $0 $0 $0 $0

Total $110,000 $559,490 $831,000 $2,563,563

State

Also in Lumpkin, Towns, White

County

Other

Total

$0

$62,500

$312,500

State $0

Other $0

Total $102,000

State $31,900 $163,200 $910,084 $54,142

Other $0 $0 $0 $0

Total $159,500 $816,000 $4,550,419 $270,712

Project: 122900- Type Work: Widening
Descp:SR 515/2/US 76 FM E BLAIRSVILLE TO YOUNG HARRIS BP@CL/CORR A
Lanes: Exist. 2 Prop. 4 Length: 5.87

Total Project Cost: Total Project Authorizations:

$ 53,417,588 $ 3,981,588

Phase PE
ROW CST

Fund App Dev App Dev App Dev

Year 1999 2014 After 2015

Federal $3,185,271 $25,820,000 $13,728,800

State $796,318 $6,455,000 $3,432,200

Other $0 $0 $0

Total $3,981,588 $32,275,000 $17,161,000

Page 243 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/4/2011
Union Totals Summary
County Summary excludes lump sum projects.

Project PI#

Year

Phase

Fund

Federal

State

Other

Total

0007055 121385121385121385122900-

2013 2012 2013 2013 2014

PE ROW CST UTL ROW

Bridge Bridge Bridge Bridge App Dev

$339,757 $652,800 $3,640,335 $216,570 $25,820,000

$84,939 $163,200 $910,084
$54,142 $6,455,000

$0

$424,696

$0

$816,000

$0

$4,550,419

$0

$270,712

$0

$32,275,000

$30,669,462

$7,667,366

$0

$38,336,828

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 244 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Upson
Project: 0000297 Type Work: Widening
Descp:SR 3/US 19 FM CR 73/EAST-WEST COUNTY RD TO CR 8/ATWATER RD Length: 2.00

Total Project Cost: Total Project Authorizations:

$ 27,133,101 $ 3,365,543

Phase PE
ROW CST UTL

Fund NHS NHS NHS NHS

Year

Federal

2006

$2,692,435

2014 $11,059,253

After 2015 $7,255,933

After 2015 $698,860

State $673,109 $2,764,813 $1,813,983 $174,715

Other $0 $0 $0 $0

Total $3,365,543 $13,824,066 $9,069,916
$873,575

Project: 0006967 Type Work: New Construction Descp:SR 74 EAST ONE-WAY PAIR IN THOMASTON

Lanes: Exist. 0 Prop. 2 Length: 0.15

Total Project Cost: Total Project Authorizations:

$ 1,640,445 $ 45,000

Phase PE PE
ROW CST

Fund STP STP STP STP

Year 2008 2014 After 2015 After 2015

Federal $36,000
$100,388 $733,229 $442,739

State $9,000
$25,097 $183,307 $110,685

Other $0 $0 $0 $0

Total $45,000
$125,485 $916,536 $553,423

Project: 0006969 Type Work: New Construction
Descp:SR 36 FROM CHEROKEE ROAD TO TRIUNE MILL ROAD
Lanes: Exist. 0 Prop. 2 Length: 2.70

Phase PE
ROW CST

Total Project Cost: Total Project Authorizations:

$ 14,864,298 $0

Fund STP STP STP

Year 2014 After 2015 After 2015

Federal $833,697
$2,552,087 $8,505,655

State $208,424 $638,022 $2,126,414

Other $0 $0 $0

Total $1,042,121 $3,190,108 $10,632,069

Project: 333210- Type Work: Replace Bridge Descp:SR 36 @ FLINT RIVER 9.6 MI E OF WOODLAND

Length: 0.97

Total Project Cost: Total Project Authorizations:

$ 5,173,054 $ 429,214

Phase PE
ROW CST

Fund Bridge Bridge Bridge

Year 2000 2013 After 2015

Federal $343,371 $423,651
$3,371,421

Project: 343110- Type Work: Replace Bridge
Descp:CR 172/POBIDDY ROAD@ FLINT RIVER N OF JCT SR 22/UPSON/TALBOT Length: 0.66

Phase PE
ROW CST

Fund Bridge Bridge Bridge

Total Project Cost: Total Project Authorizations:

$ 4,012,814 $ 220,171

Year 1998 2011 2012

Federal $176,137 $128,000
$2,906,114

Project: M004343 Type Work: Resurface & Maintenance
Descp:SR 36 FROM SR 41/TALBOT TO POTATO CREEK/UPSON Length: 14.83

Phase CST

Fund STP

Year 2012

Total Project Cost:

$ 2,593,736

Total Project Authorizations: $ 2,593,736

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Federal $2,074,989

State $85,843 $105,913 $842,855

Other $0 $0 $0

Total $429,214 $529,564 $4,214,276

Also in Talbot County

State $44,034 $32,000 $726,528

Other $0 $0 $0

Total $220,171 $160,000 $3,632,642

Also in Talbot County

State $518,747

Other $0

Total $2,593,736

Also in Talbot County

Page 245 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/4/2011
Upson Totals Summary
County Summary excludes lump sum projects.

Project PI#

Year

Phase

Fund

Federal

State

Other

Total

0000297 0006967 0006969 333210343110-

2014 2014 2014 2013 2012

ROW PE PE
ROW CST

NHS STP STP Bridge Bridge

$11,059,253 $100,388 $833,697 $177,933
$1,453,057

$2,764,813 $25,097
$208,424 $44,483
$363,264

$0

$13,824,066

$0

$125,485

$0

$1,042,121

$0

$222,417

$0

$1,816,321

$13,624,327

$3,406,082

$0

$17,030,409

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 246 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Walker
Project: 0005571 Type Work: Replace Bridge
Descp:SR 136 @ WEST CHICKAMAUGA CREEK 5.7 M NW OF LAFAYETTE Length: 0.31

Phase PE CST UTL

Fund Bridge Bridge STP

Year 2005 2012 2011

Federal $410,882
$1,856,500 $1,404,171

State $102,720 $464,125 $351,043

Total Project Cost: Total Project Authorizations:

$ 4,589,441 $ 4,589,441

Other $0 $0 $0

Total $513,602 $2,320,625 $1,755,213

Project: 0007371 Type Work: Signals
Descp:SR 1 @ 2 LOCS; SR 1BU @ 5 LOCS & SR 193 @ 2 LOCS Length: 3.60

Phase PE
ROW CST

Fund STP STP STP

Year 2006 2011 2012

Federal $156,624 $260,000
$1,260,146

State $39,156
$0 $0

Total Project Cost:

$ 1,715,926

Total Project Authorizations: $ 455,780

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2012 - FY 2015

Project: 0007543 Type Work: Miscellaneous Improvements
Descp:TRANSPORTATION IMPROVEMENTS IN WALKER COUNTY Length: 0.00

Phase CST

Fund HPP

Year 2013

Federal $1,055,347

State $0

Total Project Cost: Total Project Authorizations:

$ 1,319,184 $0

Other $0 $0 $0
Other $263,837

Total $195,780 $260,000 $1,260,146
Total $1,319,184

Project: 0010092 Type Work: Bridges
Descp:SR 193 @ MILE POST 1.15 - EMERGENCY PROJECT - WALKER-1 Length: 0.40

Total Project Cost: Total Project Authorizations:

$ 16,000 $0

Phase Fund Year CST Emergency 2012

Federal $16,000

State $0

Other $0

Total $16,000

Project: 0010448 Type Work: Signals
Descp:SR 1 @ 3 LOC; SR 2 @ 5 LOC; SR 136 @ 3 LOC &SR 146 @ 2 LOC Length: 0.00

Phase PE
ROW CST

Fund STP STP STP

Year 2011 2013 2014

Federal $400,000 $500,000 $975,000

State $0 $0 $0

Other $0 $0 $0

Total $400,000 $500,000 $975,000

Total Project Cost:

$ 1,875,000

Total Project Authorizations: $ 400,000

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2012 - FY 2015

Also in Catoosa, Dade County

Project: M004453 Type Work: Resurface & Maintenance
Descp:SR 157 FM E OF CR 393/MT OLIVE RD TO N OF CR 161/MARTIN LANE Length: 18.71

Phase CST

Fund STP

Year 2012

Federal $389,240

State $97,310

Other $0

Total $486,550

Total Project Cost:

$ 486,550

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Also in Dade County

Page 247 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/4/2011

Project PI#
0005571 0007543 0010092

Year
2012 2013 2012

Walker Totals Summary

County Summary excludes lump sum projects.

This County is also located in a MPO area. Additional Projects may be listed in the MPO TIP.

Phase

Fund

Federal

State

Other

CST

Bridge

CST

HPP

CST

Emergency

$1,856,500 $1,055,347
$16,000

$464,125 $0 $0

$0 $263,837
$0

Total
$2,320,625 $1,319,184
$16,000

$2,927,847

$464,125

$263,837

$3,655,809

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 248 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Walton
Project: 0000411 Type Work: New Construction
Descp:SR 11/MONROE E BYP FM SO. CITY LIMITS NORTH TO US78 TO SR 11
Lanes: Exist. 0 Prop. 4 Length: 12.00

Total Project Cost: Total Project Authorizations:

$ 25,318,708 $ 55,000

Phase PE PE
ROW ROW CST UTL

Fund STP Local STP STP STP Local

Year

Federal

2003

$44,000

2012

$0

2013

$848,966

2014

$5,261,336

After 2015 $13,607,246

After 2015

$0

State $11,000
$0 $212,242 $1,315,334 $3,401,811
$0

Other $0
$110,000 $0 $0 $0
$506,773

Total $55,000
$110,000 $1,061,208 $6,576,669 $17,009,057
$506,773

Project: 0007217 Type Work: New Construction
Descp:SOCIAL CIRCLE BYPASS FROM EAST HIGHTOWER TRAIL TO SR 11
Lanes: Exist. 0 Prop. 2 Length: 2.80

Total Project Cost: Total Project Authorizations:

$ 21,064,316 $ 5,486,901

Phase PE
ROW ROW CST UTL

Fund STP HPP HPP STP STP

Year 2005 2010 2010 2013 2013

Federal $2,373,521 $1,605,373
$410,627 $12,133,008
$328,924

State $593,380 $401,343 $102,657 $3,033,252
$82,231

Other $0 $0 $0 $0 $0

Total $2,966,901 $2,006,716
$513,284 $15,166,259
$411,155

Also in Newton County

Project: 0010199 Type Work: TE-Bike/Ped Facility
Descp:SR 11 FROM BLUE WILLOW INN TO HIGHTOWER TRAIL Length: 0.23

Phase CST

Fund STP

Year 2015

Federal $400,000

State $0

Other $100,000

Total $500,000

Total Project Cost:

$ 500,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 132980- Type Work: Replace Bridge
Descp:SR 11 @ CSX RAILROAD IN SOUTH SOCIAL CIRCLE Length: 0.23

Total Project Cost: Total Project Authorizations:

$ 2,267,569 $ 182,278

Phase PE
ROW CST CST

Fund Bridge Bridge STP Bridge

Year 2000 2013 After 2015 After 2015

Federal $145,822 $46,610 $827,028 $794,595

State $36,456 $11,652 $206,757 $198,649

Other $0 $0 $0 $0

Total $182,278
$58,262 $1,033,785
$993,244

Project: 132982- Type Work: Replace Bridge
Descp:SR 10/US 78 WBL @ APALACHEE RIVER 4 MI E OF GRATIS Length: 0.28

Total Project Cost: Total Project Authorizations:

$ 6,137,848 $ 1,101,119

Phase PE
ROW CST

Fund Bridge Bridge Bridge

Year 2000 2012 2014

Federal $880,895 $52,224
$3,977,159

State $220,224
$13,056 $994,290

Other $0 $0 $0

Total $1,101,119
$65,280 $4,971,449

Project: T003027 Type Work: Transit Projects
Descp:FY 2012 FTA SECTION 5307/5340 FORMULA FUNDS FOR WALTON Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 42,496 $0

Phase CST

Fund Transit

Year 2012

Federal $33,997

State $0

Other $8,499

Total $42,496

Page 249 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: T003028 Type Work: Transit Projects
Descp:FY 2013 FTA SECTION 5307/5340 FORMULA FUNDS FOR WALTON Length: 0.00

Phase CST

Fund Transit

Year 2013

Federal $34,677

State $0

Total Project Cost: Total Project Authorizations:

$ 43,346 $0

Other $8,669

Total $43,346

Project: T003643 Type Work: Transit Projects
Descp:FY 2014 FTA SECTION 5307/5340 FORMULA FUNDS FOR WALTON Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 43,346 $0

Phase CST

Fund Transit

Year 2014

Federal $34,677

State $0

Other $8,669

Total $43,346

Project: T004091 Type Work: Transit Projects
Descp:FY 2015 FTA SECTION 5307/5340 FORMULA FUNDS FOR WALTON Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 43,346 $0

Phase CST

Fund Transit

Year 2015

Federal $34,677

State $4,335

Other $4,335

Total $43,346

Project PI#
0000411 0000411 0000411 0007217 0007217 132980132982132982T003027 T003028 T003643 T004091

Year
2012 2013 2014 2013 2013 2013 2012 2014 2012 2013 2014 2015

Walton Totals Summary

County Summary excludes lump sum projects.

This County is also located in a MPO area. Additional Projects may be listed in the MPO TIP.

Phase

Fund

Federal

State

Other

PE ROW ROW CST UTL ROW ROW CST CST CST CST CST

Local STP STP STP STP Bridge Bridge Bridge Transit Transit Transit Transit

$0 $848,966 $5,261,336 $12,011,677 $325,634
$46,610 $52,224 $3,977,159 $33,997 $34,677 $34,677 $34,677

$0 $212,242 $1,315,334 $3,002,919
$81,409 $11,652 $13,056 $994,290
$0 $0 $0 $4,335

$110,000 $0 $0 $0 $0 $0 $0 $0
$8,499 $8,669 $8,669 $4,335

Total
$110,000 $1,061,208 $6,576,669 $15,014,597
$407,043 $58,262 $65,280
$4,971,449 $42,496 $43,346 $43,346 $43,346

$22,661,635

$5,635,236

$140,172

$28,437,043

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 250 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Ware
Project: 0007406 Type Work: Signals
Descp:SR 4BU @ 6 LOCS; SR 38 @ 2 LOCS & SR 520 @3 LOCS IN WARE Length: 0.00

Phase PE
ROW CST

Fund STP STP STP

Year 2006 2012 2013

Federal $195,327 $199,779
$1,522,913

State $48,832
$0 $0

Total Project Cost:

$ 1,966,850

Total Project Authorizations: $ 244,159

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2012 - FY 2015

Project: 0007664 Type Work: Widening
Descp:CR 392/HATCHER POINT MALL ROAD FM SR 4/US 1 TO SR 520/US 82
Lanes: Exist. 2 Prop. 5 Length: 0.40

Phase PE CST

Fund STP STP

Year 2008 2014

Federal $120,000
$1,849,218

State $30,000 $462,304

Total Project Cost: Total Project Authorizations:

$ 2,461,522 $ 150,000

Other $0 $0 $0
Other $0 $0

Total $244,159 $199,779 $1,522,913
Total $150,000 $2,311,522

Project: 0008886 Type Work: RRX Consolidation
Descp:RAILROAD GRADE CROSSING CLOSURES @ 6 LOCS IN WARE COUNTY Length: 2.00

Phase CST

Fund Safety

Year 2012

Federal $47,754

Total Project Cost:

$ 47,754

Total Project Authorizations: $ 0

Uses Lump Sum Bank: RAILROAD CROSSING HAZARD ELIMINATION FOR FY 2012 - FY 2015

Project: 0009140 Type Work: TE-Bike/Ped Facility Descp:WAYCROSS MULTI-USE TRAIL & TRAILHEAD
Length: 0.00

Phase CST

Fund STP

Year 2013

Federal $300,000

Total Project Cost:

$ 375,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 0010293 Type Work: Realignment
Descp:SR 122 FROM CR 39/CORBITT ROAD TO CR 68/PINE VALLEY ROAD Length: 0.83

Phase PE
ROW CST

Fund Safety Safety Safety

Year 2011 2012 2012

Federal $315,000 $504,000
$2,301,154

Total Project Cost:

$ 3,466,838

Total Project Authorizations: $ 350,000

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0010375 Type Work: RRX Signing & Marking
Descp:RR CROSSING @ 80 LOC-TRAFFIC SIGNS&PAVEMENT MARKING UPGRADES Length: 0.00

Phase PE CST

Fund STP Safety

Year 2011 2012

Federal $20,000
$300,000

Total Project Cost:

$ 320,000

Total Project Authorizations: $ 20,000

Uses Lump Sum Bank: RAILROAD CROSSING HAZARD ELIMINATION FOR FY 2012 - FY 2015

State $0

Other $0

Total $47,754

State $0

Other $75,000

Total $375,000

State $35,000 $56,000 $255,684

Other $0 $0 $0

Total $350,000 $560,000 $2,556,838

State $0 $0

Other $0 $0

Total $20,000
$300,000

Also in Clinch, Lanier, Lowndes County

Page 251 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: 0010471 Type Work: RRX Warning Device Descp:CR 591/ALBANY AVE @ CSX #637894C
Length: 0.40

Phase PE CST

Fund Safety Safety

Year 2012 2012

Federal $20,000
$300,000

State $0 $0

Other $0 $0

Total $20,000
$300,000

Total Project Cost:

$ 320,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: RRX PROTECTION DEVICE FOR FY 2012 - FY 2015

Project: 422120- Type Work: Widening
Descp:SR 38/US84 FM W OF WOODYARD CK/CLINCH TO W OF GREASY CK/WARE
Lanes: Exist. 2 Prop. 4 Length: 11.60

Total Project Cost: Total Project Authorizations:

$ 74,473,957 $ 4,972,749

Phase PE PE
ROW CST UTL

Fund State NHS NHS NHS NHS

Year 1995 2010 2012 2015 2015

Federal $0
$423,369 $5,644,680 $48,737,035 $1,219,252

State $4,443,538
$105,842 $1,411,170 $12,184,259
$304,813

Other $0 $0 $0 $0 $0

Total $4,443,538
$529,211 $7,055,850 $60,921,293 $1,524,064

Also in Clinch County

Project: 422125- Type Work: Replace Bridge Descp:SR 38/US 84 @ SUWANNEE CRK Lanes: Exist. 2 Prop. 4 Length: 0.10

Phase PE CST CST

Fund Bridge STP Bridge

Year 1995 2015 2015

Federal $153,200 $741,458 $741,458

State $38,300 $185,365 $185,365

Other $0 $0 $0

Total $191,500 $926,823 $926,823

Total Project Cost: Total Project Authorizations:

$ 2,045,146 $ 191,500

Project: 522770- Type Work: Widening
Descp:SR 38/US 84 FM W OF GREASY BRANCH CK TO W OF CR 88/RUSKIN RD
Lanes: Exist. 2 Prop. 4 Length: 7.40

Total Project Cost: Total Project Authorizations:

$ 29,681,746 $ 2,546,332

Phase PE PE PE
ROW CST

Fund State NHS State NHS NHS

Year 1995 2003 2003 2012 2015

Federal $0
$1,034,804 $0
$1,846,608 $19,861,723

State $372,000 $258,701 $880,828 $461,652 $4,965,431

Other $0 $0 $0 $0 $0

Total $372,000 $1,293,505 $880,828 $2,308,260 $24,827,153

Project: 522775- Type Work: Replace Bridge
Descp:SR 38/US 84 OVER GREASY BRANCH- LITTLE & BIG ALLIGATOR CREEK
Lanes: Exist. 2 Prop. 4 Length: 0.10

Total Project Cost: Total Project Authorizations:

$ 14,713,340 $ 356,039

Phase PE CST CST

Fund Bridge STP Bridge

Year 1995 2015 2015

Federal $284,831
$5,742,920 $5,742,920

State $71,208 $1,435,730 $1,435,730

Other $0 $0 $0

Total $356,039 $7,178,651 $7,178,651

Project: 522780- Type Work: Widening
Descp:SR 38/US 84 FM W OF CR 88/RUSKIN RD TO E OF CR 294/WADLEY RD
Lanes: Exist. 2 Prop. 4 Length: 5.60

Total Project Cost: Total Project Authorizations:

$ 29,898,580 $ 2,130,633

Phase PE PE
ROW ROW CST

Fund State HPP HPP STP NHS

Year

Federal

1995

$0

2011

$420,000

2012

$3,680,397

2012

$1,430,614

After 2015 $16,519,330

State $1,605,633
$0 $0 $357,654 $4,129,833

Other $0
$105,000 $1,650,119
$0 $0

Total $1,605,633
$525,000 $5,330,516 $1,788,268 $20,649,163

Page 252 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/4/2011
Ware Totals Summary
County Summary excludes lump sum projects.

Project PI#
0007664 422120422120422120422125422125522770522770522775522775522780522780-

Year
2014 2012 2015 2015 2015 2015 2012 2015 2015 2015 2012 2012

Phase
CST ROW CST UTL CST CST ROW CST CST CST ROW ROW

Fund
STP NHS NHS NHS Bridge STP NHS NHS Bridge STP STP HPP

Federal
$1,849,218 $1,975,638 $17,057,962
$426,738 $741,458 $741,458 $1,846,608 $19,861,723 $5,742,920 $5,742,920 $1,430,614 $3,680,397

State
$462,304 $493,910 $4,264,491 $106,685 $185,365 $185,365 $461,652 $4,965,431 $1,435,730 $1,435,730 $357,654
$0

Other
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,650,119

Total
$2,311,522 $2,469,548 $21,322,453
$533,423 $926,823 $926,823 $2,308,260 $24,827,153 $7,178,651 $7,178,651 $1,788,268 $5,330,516

$61,097,655

$14,354,315

$1,650,119

$77,102,089

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 253 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Warren
Project: 0007363 Type Work: Signals
Descp:SR 10 @ SR 47; SR 10BU @2 LOC; SR 12 @ SR 80 & SR 17 @ SR 44 Length: 2.00

Phase PE
ROW CST

Fund STP STP STP

Year 2006 2012 After 2015

Federal $187,877 $273,000 $225,232

State $46,969
$0 $0

Other $0 $0 $0

Total $234,847 $273,000 $225,232

Total Project Cost:

$ 733,079

Total Project Authorizations: $ 234,847

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2012 - FY 2015

Also in Wilkes County

Project: M004312 Type Work: Resurface & Maintenance
Descp:SR 12 FROM TALIAFERRO COUNTY LINE TO CS 639/MEADOW ROAD Length: 12.71

Phase CST

Fund STP

Year 2012

Federal $1,845,274

State $461,319

Other $0

Total $2,306,593

Total Project Cost:

$ 2,306,593

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Project: M004315 Type Work: Resurface & Maintenance Descp:SR 17 CONN FROM SR 80 TO SR 17
Length: 7.32

Phase CST

Fund STP

Year 2012

Federal $1,279,208

State $319,802

Other $0

Total $1,599,010

Total Project Cost:

$ 1,599,010

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Page 254 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Washington
Project: 0007415 Type Work: Intersection Improvement
Descp:SR 242 @ CR 210/WACO MILL RD & @ CS 659/SOUTH HOSPITAL RD
Lanes: Exist. 2 Prop. 3 Length: 0.34

Phase PE
ROW CST

Fund STP STP STP

Year 2007 2011 2013

Federal $151,200 $568,000
$2,058,890

State $37,800 $142,000 $514,722

Total Project Cost: Total Project Authorizations:

$ 3,472,612 $ 899,000

Other $0 $0 $0

Total $189,000 $710,000 $2,573,612

Project: 0009141 Type Work: TE-Bike/Ped Facility Descp:SANDERSVILLE STREETSCAPE IMPROVEMENTS

Phase CST

Length: 0.00

Fund STP

Year 2014

Total Project Cost:

$ 375,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: M004313 Type Work: Resurface & Maintenance Descp:SR 68 FROM SR 15 TO SR 24
Length: 4.85

Phase CST

Fund STP

Year 2012

Total Project Cost:

$ 1,053,807

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Federal $300,000

State $0

Federal $843,046

State $210,761

Other $75,000
Other $0

Total $375,000
Total $1,053,807

Washington Totals Summary
County Summary excludes lump sum projects.

Project PI# 0007415

Year 2013

Phase CST

Fund STP

Federal $2,058,890

State $514,722

Other $0

Total $2,573,612

$2,058,890

$514,722

$0

$2,573,612

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 255 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Wayne
Project: 0005572 Type Work: Replace Bridge
Descp:SR 203 @ DRY CREEK 5.7 MILES NW OF SCREVEN Length: 0.38

Phase PE
ROW CST

Fund Bridge Bridge Bridge

Year 2004 2011 2012

Federal $327,913 $96,000
$1,748,982

State $81,978 $24,000 $437,246

Total Project Cost: Total Project Authorizations:

$ 2,716,120 $ 529,892

Other $0 $0 $0

Total $409,892 $120,000 $2,186,228

Project: 0007567 Type Work: Miscellaneous Improvements Descp:TRANSPORTATION IMPROVEMENTS IN JESUP
Length: 0.00

Phase PE CST

Total Project Cost: Total Project Authorizations:

$ 2,831,684 $ 1,108,525

Fund HPP HPP

Year 2009 2013

Federal $886,820
$1,378,527

State $0 $0

Other $221,705 $344,632

Total $1,108,525 $1,723,159

Project: 0009142 Type Work: TE-Bike/Ped Facility Descp:JESUP STREETSCAPE - PHASE II

Phase CST

Fund STP

Year 2012

Length: 0.00

Total Project Cost:

$ 312,500

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Federal $250,000

State $0

Other $62,500

Total $312,500

Wayne Totals Summary
County Summary excludes lump sum projects.

Project PI#
0005572 0007567

Year
2012 2013

Phase
CST CST

Fund
Bridge HPP

Federal
$1,748,982 $1,378,527

State
$437,246 $0

Other
$0 $344,632

Total
$2,186,228 $1,723,159

$3,127,510

$437,246

$344,632

$3,909,387

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 256 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Wheeler
Project: 0001220 Type Work: Replace Bridge
Descp:SR 31/US 319/US 441 @ HGR #635193G NE OF MCRAE Length: 0.68

Total Project Cost: Total Project Authorizations:

$ 7,663,761 $ 2,222,000

Phase PE
ROW CST UTL

Fund Bridge Bridge Bridge Local

Year 2002 2010 2012 2012

Federal $481,600
$1,296,000 $4,157,814
$0

State $120,400 $324,000 $1,039,453
$0

Other $0 $0 $0
$244,494

Total $602,000 $1,620,000 $5,197,267 $244,494

Project: 0001366 Type Work: Replace Bridge Descp:SR 30/US 280 @ OCONEE RIVER & OVERFLOWS

Length: 1.30

Total Project Cost: Total Project Authorizations:

$ 20,884,197 $ 780,915

Phase PE
ROW CST UTL

Fund Bridge Bridge Bridge Local

Year 2002 2011 2012 2012

Federal $464,732 $160,000
$15,926,417 $0

State $116,183
$40,000 $3,981,604
$0

Other $0 $0 $0
$195,260

Total $580,915 $200,000 $19,908,022 $195,260

Also in Montgomery County

Project: 0007409 Type Work: Signals
Descp:SR 27 WEST @ 2 LOCS; SR 30 @ 2 LOCS & SR 31 @ 1 LOC Length: 1.40

Phase PE
ROW CST

Fund STP STP STP

Year 2006 2011 2013

Federal $112,923 $250,000 $987,988

State $28,231
$0 $0

Other $0 $0 $0

Total $141,154 $250,000 $987,988

Total Project Cost:

$ 1,379,142

Total Project Authorizations: $ 391,154

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2012 - FY 2015

Project: 0007572 Type Work: Sidewalks
Descp:SR 30 & CR 40 SIDEWALKS & SPEED MONITORING SYSTEM IN ALAMO Length: 0.67

Phase CST

Fund HPP

Year 2013

Federal $224,975

State

Also in Montgomery, Telfair County

Other

Total

$0

$65,025

$290,000

Total Project Cost: Total Project Authorizations:

$ 290,000 $0

Project: 0008417 Type Work: Replace Bridge Descp:CR 178/SNOWHILL ROAD @ OCHWALKEE CREEK
Length: 0.40

Total Project Cost: Total Project Authorizations:

$ 1,847,466 $0

Phase PE
ROW CST UTL

Fund Bridge Local Bridge Local

Year 2015 After 2015 After 2015 After 2015

Federal $176,653 $0 $956,074 $0

State $44,163
$0 $239,019
$0

Other $0
$34,116 $0
$397,441

Total $220,816
$34,116 $1,195,093
$397,441

Page 257 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/4/2011
Wheeler Totals Summary
County Summary excludes lump sum projects.

Project PI#

Year

Phase

Fund

Federal

State

Other

Total

0001220 0001220 0001366 0001366 0007572 0008417

2012

CST

2012

UTL

2012

CST

2012

UTL

2013

CST

2015

PE

Bridge Local Bridge Local HPP Bridge

$4,157,814 $0
$7,963,209 $0
$224,975 $176,653

$1,039,453 $0
$1,990,802 $0 $0
$44,163

$0 $244,494
$0 $97,630 $65,025
$0

$5,197,267 $244,494
$9,954,011 $97,630
$290,000 $220,816

$12,522,650

$3,074,419

$407,149

$16,004,218

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 258 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

White
Project: 0001935 Type Work: TE-Scenic Hwy/Welcome Ctr
Descp:HARDMAN FARM VISITOR CENTER - PARKING LOTS&PEDESTRIAN TRAIL Length: 0.00

Phase CST

Fund STP

Year 2013

Federal $576,800

State $0

Other $144,200

Total $721,000

Total Project Cost:

$ 721,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 0007495 Type Work: Pedestrian Crossings
Descp:PEDESTRIAN UPGRADES @ 20 SR LOCATIONS IN DISTRICT 1 Length: 0.00

Phase PE PE
ROW

Fund STP Safety Safety

Total Project Cost:

$ 4,064,053

CST Safety

Total Project Authorizations: $ 669,490

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Project: 0009143 Type Work: TE-Bike/Ped Facility
Descp:SR 17/MAIN ST FROM CS 605/DYE ST TO CS 604/SPRING ST Length: 0.07

Phase CST

Fund STP

Year 2007 2007 2012 2012
Year 2013

Federal $99,000
$503,541 $747,900 $2,307,207
Federal $100,000

State $11,000 $55,949 $83,100 $256,356

Other $0 $0 $0 $0

Total $110,000 $559,490 $831,000 $2,563,563

State

Also in Lumpkin, Towns, Union

County

Other

Total

$0

$25,000

$125,000

Total Project Cost:

$ 125,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 162390- Type Work: New Construction
Descp:W CLEVELAND BYP FM S OF HOPE DR TO N OF SR 115 - PH I
Lanes: Exist. 0 Prop. 4 Length: 1.76

Total Project Cost: Total Project Authorizations:

$ 48,675,538 $ 29,205,113

Phase PE
ROW ROW ROW ROW ROW ROW ROW ROW CST CST UTL

Fund NHS NHS HPP NHS HPP NHS STP HPP HPP HPP NHS NHS

Year 1998 2004 2007 2007 2007 2008 2010 2011 2011 2011 2011 2012

Federal $2,680,401
$270,200 $1,690,829 $9,720,797
$396,939 $4,146,035 $3,018,890 $1,097,811
$342,189 $359,800 $14,215,675 $1,000,865

State $670,100
$67,550 $422,707 $2,430,199
$99,235 $1,036,509
$754,722 $274,453
$85,547 $89,950 $3,553,919 $250,216

Other $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

Total $3,350,501
$337,750 $2,113,536 $12,150,996
$496,174 $5,182,544 $3,773,612 $1,372,264
$427,736 $449,750 $17,769,594 $1,251,081

Project: M004296 Type Work: Resurface & Maintenance

Phase

CST

Descp:SR 348 FROM SR 75 ALT TO UNION COUNTY LINE

Fund STP

Year 2013

Length: 7.03

Total Project Cost:

$ 703,970

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Federal $563,176

State $140,794

Other $0

Total $703,970

Page 259 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: M004303 Type Work: Resurface & Maintenance
Descp:SR 255 FROM SR 115/WHITE TO SR 17/HABERSHAM Length: 5.90

Phase CST

Fund STP

Year 2012

Federal $434,211

State $108,553

Other $0

Total $542,764

Total Project Cost:

$ 542,764

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Also in Habersham County

White Totals Summary
County Summary excludes lump sum projects.

Project PI# 162390-

Year 2012

Phase UTL

Fund NHS

Federal $1,000,865

State $250,216

Other $0

Total $1,251,081

$1,000,865

$250,216

$0

$1,251,081

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 260 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Wilcox
Project: M004258 Type Work: Resurface & Maintenance
Descp:SR 11 FROM BEN HILL COUNTY LINE TO PULASKI COUNTY LINE Length: 23.40

Phase CST

Fund STP

Year 2012

Federal $2,831,542

State $707,885

Total Project Cost:

$ 3,539,427

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE FOR ANY AREA FOR FY 2012 - FY 2015

Other $0

Total $3,539,427

Page 261 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Wilkes
Project: 0007363 Type Work: Signals
Descp:SR 10 @ SR 47; SR 10BU @2 LOC; SR 12 @ SR 80 & SR 17 @ SR 44 Length: 2.00

Phase PE
ROW CST

Fund STP STP STP

Year 2006 2012 After 2015

Federal $187,877 $273,000 $225,232

State $46,969
$0 $0

Other $0 $0 $0

Total $234,847 $273,000 $225,232

Total Project Cost:

$ 733,079

Total Project Authorizations: $ 234,847

Uses Lump Sum Bank: TRAF CONTROL DEVICES; UPGRADES & MAINT ANY AREA FOR FY 2012 - FY 2015

Also in Warren County

Project: 0009145 Type Work: TE-Bike/Ped Facility Descp:TIGNALL STREETSCAPE
Length: 0.00

Phase CST

Fund STP

Year 2012

Federal $80,000

State $0

Other $20,000

Total $100,000

Total Project Cost:

$ 100,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Project: 222255- Type Work: Widening
Descp:SR 10/SR 17 FM CR 6/SMITH MILL RD TO WASHINGTON BYP/WILKES
Lanes: Exist. 2 Prop. 4 Length: 12.00

Total Project Cost: Total Project Authorizations:

$ 50,626,810 $ 2,244,589

Phase PE PE
ROW CST UTL

Fund NHS State NHS NHS NHS

Year

Federal

2002

$301,722

2002

$0

2013

$3,504,067

After 2015 $35,154,843

After 2015

$46,866

State $75,431 $1,867,437 $876,017 $8,788,711 $11,717

Other $0 $0 $0 $0 $0

Total $377,152 $1,867,437 $4,380,084 $43,943,554
$58,583

Also in McDuffie County

Project: 222460- Type Work: Passing Lanes
Descp:SR 10: OGLETHORPE MP13.7-15;15.3-16.2& WILKES: 0-1.5;5.5-7.0
Lanes: Exist. 2 Prop. 3 Length: 5.32

Phase PE
ROW CST

Fund STP STP STP

Year 1998 2012 After 2015

Federal $478,320
$1,126,080 $5,507,518

State $119,580 $281,520 $1,376,880

Other $0 $0 $0

Total $597,900 $1,407,600 $6,884,398

Total Project Cost: Total Project Authorizations:

$ 8,889,898 $ 597,900

Also in Oglethorpe County

Project: M004331 Type Work: Resurface & Maintenance
Descp:SR 17 FROM CR 242/COUNTY FARM ROAD TO ELBERT COUNTY LINE Length: 15.27

Phase CST

Fund NHS

Year 2013

Federal $2,438,895

State $609,724

Other $0

Total $3,048,619

Total Project Cost:

$ 3,048,619

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2012 - FY 2015

Project: M004335 Type Work: Resurface & Maintenance
Descp:SR 10/US 78 FM CR 223/UPTON MILL RD TO MCDUFFIE COUNTY LINE Length: 6.48

Phase CST

Fund NHS

Year 2013

Federal $1,420,610

State $355,153

Other $0

Total $1,775,763

Total Project Cost:

$ 1,775,763

Total Project Authorizations: $ 0

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2012 - FY 2015

Page 262 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/4/2011
Wilkes Totals Summary
County Summary excludes lump sum projects.

Project PI#

Year

Phase

Fund

Federal

State

Other

Total

222255222460-

2013 2012

ROW ROW

NHS STP

$2,593,010 $653,126

$648,252 $163,282

$0

$3,241,262

$0

$816,408

$3,246,136

$811,534

$0

$4,057,670

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 263 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Wilkinson
Project: 0007583 Type Work: Sidewalks
Descp:TRAILS & AMENITIES IN BALLS FERRY PARK IN WILKINSON CO Length: 0.00

Phase PE CST

Fund HPP HPP

Year 2008 2012

Federal $150,000 $749,899

State $0 $0

Total Project Cost: Total Project Authorizations:

$ 1,124,874 $ 187,500

Other $37,500 $187,475

Total $187,500 $937,374

Project: 221875- Type Work: Roundabout Descp:SR 57 @ SR 18
Length: 0.15

Phase PE
ROW CST

Fund STP Safety Safety

Total Project Cost:

$ 1,278,923

Total Project Authorizations: $ 500,000

Uses Lump Sum Bank: ROADWAY SAFETY FUNDS FOR FY 2012 - FY 2015

Year 2000 2012 2012

Federal $400,000 $140,000 $638,923

State $100,000
$0 $0

Other $0 $0 $0

Total $500,000 $140,000 $638,923

Wilkinson Totals Summary
County Summary excludes lump sum projects.

Project PI# 0007583

Year 2012

Phase CST

Fund HPP

Federal $749,899

State $0

Other $187,475

Total $937,374

$749,899

$0

$187,475

$937,374

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 264 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Worth
Project: 0000475 Type Work: Widening
Descp:SR 133 FM N OF SR 112 TO N OF CR 459/COUNTY LINE ROAD
Lanes: Exist. 2 Prop. 4 Length: 3.73

Total Project Cost: Total Project Authorizations:

$ 22,386,859 $ 2,109,603

Phase PE
ROW CST UTL

Fund STP NHS NHS NHS

Year

Federal

2003

$1,687,682

2013

$1,767,259

After 2015 $14,039,931

After 2015 $414,614

State $421,921 $441,815 $3,509,983 $103,654

Other $0 $0 $0 $0

Total $2,109,603 $2,209,074 $17,549,914
$518,268

Also in Dougherty County

Project: 0000519 Type Work: Widening
Descp:SR 133 FM N OF COLQUITT COUNTY LINE TO N OF SR 112
Lanes: Exist. 2 Prop. 4 Length: 6.49

Total Project Cost: Total Project Authorizations:

$ 33,486,877 $ 3,556,179

Phase PE
ROW CST UTL

Fund STP STP STP STP

Year

Federal

2003

$2,844,943

2014

$3,024,757

After 2015 $20,431,431

After 2015 $488,370

State $711,236 $756,189 $5,107,858 $122,092

Other $0 $0 $0 $0

Total $3,556,179 $3,780,947 $25,539,289
$610,462

Project: 0000520 Type Work: Widening
Descp:SR 133 FM S OF SR 35/US 319 TO N OF COLQUITT COUNTY LINE
Lanes: Exist. 2 Prop. 4 Length: 13.87

Total Project Cost: Total Project Authorizations:

$ 76,092,905 $ 4,874,616

Project: 0007622 Type Work: Bicycle/Ped. Facility Descp:BIKE/PED IN SYLVESTER

Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 449,950 $ 60,000

Phase PE PE
ROW CST UTL
Phase PE CST

Fund STP HPP STP STP STP

Year 2003 2003 2014 After 2015 After 2015

Federal $2,899,693 $1,250,000 $10,704,593 $45,364,472
$905,566

State $724,923
$0 $2,676,148 $11,341,118
$226,392

Other $0 $0 $0 $0 $0

Total $3,624,616 $1,250,000 $13,380,742 $56,705,590 $1,131,958

Also in Colquitt County

Fund HPP HPP

Year 2009 2015

Federal $48,000
$311,960

State $0 $0

Other $12,000 $77,990

Total $60,000
$389,950

Project: 0007914 Type Work: Streetscapes Descp:CITY OF SYLVESTER STREETSCAPE
Length: 0.00

Total Project Cost: Total Project Authorizations:

$ 495,000 $ 60,000

Phase PE CST

Fund HPP HPP

Year 2009 2015

Federal $60,000
$435,000

State $0 $0

Other $0 $0

Total $60,000
$435,000

Project: 0009146 Type Work: TE-Bike/Ped Facility Descp:ISABELLA STREET PEDESTRIAN FACILITIES

Phase CST

Fund STP

Year 2012

Length: 0.00

Total Project Cost:

$ 500,000

Total Project Authorizations: $ 0

Uses Lump Sum Bank: TRANSPORTATION ENHANCEMENT (TE) FOR FY 2012 - FY 2015

Federal $400,000

State $0

Other $100,000

Total $500,000

Page 265 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM

10/4/2011

Project: 432092- Type Work: Replace Bridge
Descp:SR 32 @ FLINT RIVER & OVERFLOW @ LEE/WORTH COUNTY LINE Length: 1.17

Phase PE
ROW CST

Fund Bridge Bridge Bridge

Year 2001 2012 2013

Federal $368,000 $303,960
$8,849,312

State $92,000 $75,990 $2,212,328

Other $0 $0 $0

Total $460,000 $379,950 $11,061,640

Total Project Cost: Total Project Authorizations:

$ 11,901,590 $ 460,000

Also in Lee County

Project: M004381 Type Work: Resurface & Maintenance
Descp:SR 520 FROM DOUGHERTY COUNTY LINE TO CR 318/OLD SR 50 Length: 6.21

Phase CST

Fund NHS

Year 2012

Federal $2,288,156

State $572,039

Other $0

Total $2,860,195

Total Project Cost:

$ 2,860,195

Total Project Authorizations: $ 2,860,195

Uses Lump Sum Bank: MAINTENANCE ON NATIONAL HIGHWAY FOR FY 2012 - FY 2015

Worth Totals Summary
County Summary excludes lump sum projects.

Project PI#
0000475 0000519 0000520 0007622 0007914 432092432092-

Year
2013 2014 2014 2015 2015 2012 2013

Phase
ROW ROW ROW CST CST ROW CST

Fund
NHS STP STP HPP HPP Bridge Bridge

Federal
$1,749,587 $3,024,757
$321,138 $311,960 $435,000
$79,030 $2,300,821

State
$437,397 $756,189
$80,284 $0 $0
$19,757 $575,205

Other
$0 $0 $0 $77,990 $0 $0 $0

Total
$2,186,983 $3,780,947
$401,422 $389,950 $435,000
$98,787 $2,876,026

$8,222,293

$1,868,833

$77,990

$10,169,116

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 266 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/4/2011

FY 2012 Total: FY 2013 Total: FY 2014 Total: FY 2015 Total: All STIP Totals:
FY 2012 Total: FY 2014 Total: FY 2015 Total: Appling STIP Totals:
FY 2012 Total: FY 2013 Total: FY 2014 Total: FY 2015 Total: Baker STIP Totals:
FY 2012 Total: FY 2013 Total: Baldwin STIP Totals:
FY 2012 Total: FY 2014 Total: Banks STIP Totals:

STIP Counties Summary

Federal $

State $

All

$472,818,907

$97,909,784

$472,506,435

$97,485,598

$478,832,374

$93,297,874

$490,701,214

$93,169,491

$1,914,858,931

$381,862,747

Appling

$0

$0

$634,675

$158,669

$2,669,799

$667,450

$3,304,474

$826,118

Baker

$309,653

$77,413

$58,679

$14,670

$26,233

$6,558

$3,675,117

$918,779

$4,069,681

$1,017,420

Baldwin

$279,960

$0

$2,963,059

$740,765

$3,243,019

$740,765

Banks

$1,066,229

$266,557

$131,689

$32,922

$1,197,917

$299,479

Other $
$19,882,646 $36,770,675 $20,812,214 $24,546,023 $102,011,558
$20,930 $64,747 $42,900 $128,577
$0 $0 $0 $0 $0
$135,353 $0
$135,353
$0 $0 $0

Total $
$590,611,336 $606,762,708 $592,942,463 $608,416,729 $2,398,733,235
$20,930 $858,090 $3,380,149 $4,259,170
$387,066 $73,348 $32,791
$4,593,896 $5,087,101
$415,313 $3,703,824 $4,119,137
$1,332,786 $164,611
$1,497,397

Page 267 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/4/2011

FY 2012 Total: FY 2013 Total: FY 2014 Total: FY 2015 Total: Barrow STIP Totals:
FY 2012 Total: FY 2013 Total: FY 2014 Total: FY 2015 Total: Bartow STIP Totals:
FY 2014 Total: Ben Hill STIP Totals:
FY 2012 Total: FY 2013 Total: FY 2014 Total: FY 2015 Total: Berrien STIP Totals:
FY 2013 Total: Bleckley STIP Totals:
FY 2014 Total: Brantley STIP Totals:
FY 2012 Total: FY 2014 Total: Brooks STIP Totals:

Federal $

State $

Barrow

$36,323

$0

$37,050

$0

$37,050

$0

$37,050

$4,631

$147,472

$4,631

Bartow

$19,776,478

$4,217,521

$25,651,626

$6,404,744

$32,648

$0

$6,830,422

$1,703,524

$52,291,174

$12,325,789

Ben Hill

$449,951

$0

$449,951

$0

Berrien

$60,133

$0

$95,813

$4,460

$95,813

$4,460

$95,813

$4,460

$347,571

$13,380

Bleckley

$1,706,256

$426,564

$1,706,256

$426,564

Brantley

$58,018

$14,505

$58,018

$14,505

Brooks

$4,104,181

$778,545

$18,844,668

$4,711,167

$22,948,849

$5,489,712

Other $
$9,081 $9,262 $9,262 $4,631 $32,236
$1,924,621 $8,162 $8,162
$1,004,081 $2,945,026
$112,488 $112,488
$60,133 $64,593 $64,593 $64,593 $253,911
$0 $0
$0 $0
$0 $0 $0

Total $
$45,404 $46,312 $46,312 $46,312 $184,340
$25,918,620 $32,064,532
$40,810 $9,538,027 $67,561,989
$562,439 $562,439
$120,265 $164,865 $164,866 $164,866 $614,862
$2,132,820 $2,132,820
$72,523 $72,523
$4,882,727 $23,555,835 $28,438,561
Page 268 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/4/2011

FY 2012 Total: FY 2013 Total: FY 2015 Total: Bryan STIP Totals:
FY 2012 Total: FY 2013 Total: Bulloch STIP Totals:
FY 2012 Total: FY 2013 Total: FY 2014 Total: FY 2015 Total: Butts STIP Totals:
FY 2014 Total: FY 2015 Total: Calhoun STIP Totals:
FY 2012 Total: FY 2013 Total: FY 2014 Total: Camden STIP Totals:
FY 2012 Total: Candler STIP Totals:

Federal $

State $

Bryan

$3,264,000

$816,000

$4,984,712

$1,246,178

$2,022,574

$456,143

$10,271,286

$2,518,322

Bulloch

$146,490

$3,065

$9,066,416

$2,266,604

$9,212,906

$2,269,669

Butts

$2,610,544

$652,636

$0

$0

$7,344,086

$1,836,021

$22,271,518

$5,567,879

$32,226,147

$8,056,537

Calhoun

$64,946

$16,236

$44,163

$11,041

$109,109

$27,277

Camden

$0

$110,346

$1,873,669

$468,417

$32,082,869

$7,995,717

$33,956,538

$8,574,481

Candler

$689,220

$172,305

$689,220

$172,305

Other $
$0 $0 $0 $0
$4,645 $0
$4,645
$0 $62,000 $50,000 $112,616 $224,616
$0 $0 $0
$5,472,504 $0 $0
$5,472,504
$0 $0

Total $
$4,080,000 $6,230,891 $2,478,717 $12,789,608
$154,200 $11,333,019 $11,487,219
$3,263,179 $62,000
$9,230,107 $27,952,014 $40,507,300
$81,182 $55,204 $136,386
$5,582,850 $2,342,086 $40,078,586 $48,003,523
$861,525 $861,525

Page 269 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/4/2011

FY 2012 Total: FY 2013 Total: FY 2014 Total: FY 2015 Total: Carroll STIP Totals:
FY 2012 Total: FY 2014 Total: FY 2015 Total: Charlton STIP Totals:
FY 2012 Total: FY 2013 Total: FY 2015 Total: Chattooga STIP Totals:
FY 2012 Total: FY 2015 Total: Clinch STIP Totals:
FY 2012 Total: FY 2013 Total: FY 2014 Total: FY 2015 Total: Coffee STIP Totals:
FY 2012 Total: FY 2013 Total: FY 2014 Total: Colquitt STIP Totals:

Federal $

State $

Carroll

$1,215,666

$128,436

$2,907,301

$726,825

$4,840,637

$1,210,159

$539,547

$134,887

$9,503,150

$2,200,307

Charlton

$170,139

$33,785

$768,257

$192,064

$2,407,765

$601,941

$3,346,162

$827,790

Chattooga

$180,336

$45,084

$2,538,024

$634,506

$11,526,007

$2,881,502

$14,244,368

$3,561,092

Clinch

$3,669,042

$917,261

$32,471,586

$8,117,896

$36,140,628

$9,035,157

Coffee

$3,248,893

$812,223

$3,819,050

$954,763

$6,104,186

$1,526,046

$48,431

$12,108

$13,220,561

$3,305,140

Colquitt

$6,873,326

$1,718,331

$1,134,989

$0

$30,367,770

$7,591,942

$38,376,085

$9,310,274

Other $
$175,480 $0 $0 $0
$175,480
$0 $0 $0 $0
$224,726 $0 $0
$224,726
$0 $0 $0
$0 $0 $0 $0 $0
$11,461 $240,752
$0 $252,213

Total $
$1,519,582 $3,634,126 $6,050,796
$674,434 $11,878,938
$203,924 $960,322 $3,009,706 $4,173,952
$450,146 $3,172,530 $14,407,509 $18,030,186
$4,586,303 $40,589,482 $45,175,785
$4,061,116 $4,773,813 $7,630,232
$60,539 $16,525,701
$8,603,119 $1,375,741 $37,959,712 $47,938,572
Page 270 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/4/2011

FY 2012 Total: FY 2013 Total: FY 2014 Total: FY 2015 Total: Columbia STIP Totals:
FY 2012 Total: Cook STIP Totals:
FY 2012 Total: Crawford STIP Totals:
FY 2015 Total: Crisp STIP Totals:
FY 2013 Total: FY 2014 Total: FY 2015 Total: Dawson STIP Totals:
FY 2013 Total: FY 2015 Total: Decatur STIP Totals:
FY 2012 Total: Dodge STIP Totals:

Federal $

State $

Columbia

$427,992

$106,998

$188,810

$47,203

$13,901,724

$3,475,431

$1,573,443

$393,361

$16,091,970

$4,022,992

Cook

$218,739

$0

$218,739

$0

Crawford

$1,984,784

$496,196

$1,984,784

$496,196

Crisp

$401,362

$100,341

$401,362

$100,341

Dawson

$4,264,631

$1,066,158

$272,481

$68,120

$9,678,730

$2,419,682

$14,215,842

$3,553,961

Decatur

$39,607

$9,902

$3,642,810

$865,708

$3,682,417

$875,609

Dodge

$463,944

$0

$463,944

$0

Other $
$0 $0 $0 $0 $0
$54,685 $54,685
$0 $0
$0 $0
$193,118 $0
$481,000 $674,118
$0 $44,995 $44,995
$251,110 $251,110

Total $
$534,990 $236,013 $17,377,155 $1,966,804 $20,114,962
$273,424 $273,424
$2,480,980 $2,480,980
$501,703 $501,703
$5,523,907 $340,601
$12,579,412 $18,443,921
$49,508 $4,553,513 $4,603,021
$715,054 $715,054

Page 271 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/4/2011

FY 2012 Total: FY 2013 Total: FY 2014 Total: FY 2015 Total: Dooly STIP Totals:
FY 2012 Total: FY 2013 Total: FY 2015 Total: Effingham STIP Totals:
FY 2012 Total: FY 2013 Total: FY 2015 Total: Elbert STIP Totals:
FY 2012 Total: Emanuel STIP Totals:
FY 2012 Total: Evans STIP Totals:
FY 2014 Total: Fannin STIP Totals:
FY 2013 Total: Franklin STIP Totals:

Federal $

State $

Dooly

$18,844,678

$4,711,169

$10,857,350

$2,601,937

$90,994

$22,748

$18,784,970

$4,696,243

$48,577,992

$12,032,098

Effingham

$75,000

$0

$164,643

$41,161

$6,067,721

$1,368,430

$6,307,364

$1,409,591

Elbert

$1,187,721

$296,930

$42,448

$10,612

$438,612

$109,653

$1,668,781

$417,195

Emanuel

$20,847,924

$5,211,981

$20,847,924

$5,211,981

Evans

$359,960

$0

$359,960

$0

Fannin

$11,058,400

$2,764,600

$11,058,400

$2,764,600

Franklin

$6,376,879

$1,594,220

$6,376,879

$1,594,220

Other $
$0 $112,400
$0 $0 $112,400
$0 $0 $0 $0
$750,000 $0 $0
$750,000
$47,338 $47,338
$89,990 $89,990
$0 $0
$84,492 $84,492

Total $
$23,555,847 $13,571,687
$113,742 $23,481,213 $60,722,490
$75,000 $205,804 $7,436,151 $7,716,955
$2,234,651 $53,060
$548,264 $2,835,976
$26,107,244 $26,107,244
$449,950 $449,950
$13,823,000 $13,823,000
$8,055,590 $8,055,590

Page 272 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/4/2011

FY 2013 Total: FY 2014 Total: Gilmer STIP Totals:
FY 2012 Total: FY 2013 Total: FY 2014 Total: FY 2015 Total: Gordon STIP Totals:
FY 2012 Total: FY 2013 Total: FY 2014 Total: Grady STIP Totals:
FY 2012 Total: FY 2014 Total: FY 2015 Total: Greene STIP Totals:
FY 2012 Total: FY 2014 Total: Hancock STIP Totals:
FY 2012 Total: FY 2013 Total: FY 2014 Total: FY 2015 Total: Haralson STIP Totals:

Federal $

State $

Gilmer

$3,037,968

$759,492

$4,132,318

$1,033,080

$7,170,286

$1,792,572

Gordon

$13,883,769

$3,470,942

$6,955,443

$1,738,861

$780,000

$195,000

$15,923,918

$3,083,682

$37,543,130

$8,488,485

Grady

$2,542,949

$635,737

$808,199

$202,050

$480,866

$120,217

$3,832,014

$958,003

Greene

$3,856,752

$914,688

$22,384,035

$5,596,009

$0

$0

$26,240,786

$6,510,697

Hancock

$200,000

$50,000

$2,610,763

$652,691

$2,810,763

$702,691

Haralson

$0

$0

$392,000

$98,000

$29,256

$7,314

$44,163

$11,041

$465,419

$116,355

Other $
$0 $0 $0
$0 $0 $0 $0 $0
$125,785 $0 $0
$125,785
$0 $0 $6,820,000 $6,820,000
$0 $0 $0
$42,000 $0 $0 $0
$42,000

Total $
$3,797,460 $5,165,398 $8,962,858
$17,354,711 $8,694,303 $975,000
$19,007,600 $46,031,614
$3,304,471 $1,010,248
$601,083 $4,915,802
$4,771,440 $27,980,043
$6,820,000 $39,571,483
$250,000 $3,263,454 $3,513,454
$42,000 $490,000
$36,570 $55,204 $623,774

Page 273 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/4/2011

FY 2012 Total: FY 2013 Total: FY 2014 Total: FY 2015 Total: Harris STIP Totals:
FY 2012 Total: FY 2013 Total: Hart STIP Totals:
FY 2012 Total:

Federal $

State $

Harris

$98,328

$24,582

$1,881,088

$470,272

$45,947

$11,487

$0

$0

$2,025,363

$506,341

Hart

$0

$0

$493,485

$0

$493,485

$0

Heard

$3,949,265

$987,316

Other $
$0 $0 $0 $50,000 $50,000
$54,335 $274,326 $328,661
$0

Heard STIP Totals:
FY 2013 Total: FY 2014 Total: Irwin STIP Totals:
FY 2012 Total: FY 2013 Total: FY 2014 Total: FY 2015 Total: Jackson STIP Totals:
FY 2012 Total: FY 2013 Total: Jasper STIP Totals:
FY 2012 Total: FY 2014 Total: Jeff Davis STIP Totals:

$3,949,265

$987,316

Irwin

$0

$0

$384,246

$0

$384,246

$0

Jackson

$2,571,200

$0

$2,674,605

$428,940

$6,179,925

$1,544,981

$12,298,033

$3,074,508

$23,723,763

$5,048,430

Jasper

$824,950

$0

$1,572,492

$393,123

$2,397,442

$393,123

Jeff Davis

$0

$0

$478,790

$119,697

$478,790

$119,697

$0
$254,898 $96,062
$350,960
$1,927,076 $525,587 $0 $0
$2,452,662
$299,214 $0
$299,214
$15,790 $37,076 $52,866

Total $
$122,910 $2,351,360
$57,434 $50,000 $2,581,704
$54,335 $767,811 $822,146
$4,936,581 $4,936,581
$254,898 $480,308 $735,206
$4,498,276 $3,629,132 $7,724,906 $15,372,541 $31,224,855
$1,124,164 $1,965,615 $3,089,779
$15,790 $635,563 $651,353
Page 274 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/4/2011

FY 2013 Total: FY 2014 Total: FY 2015 Total: Jefferson STIP Totals:
FY 2012 Total: FY 2014 Total: Jenkins STIP Totals:
FY 2012 Total: FY 2014 Total:

Federal $

State $

Jefferson

$4,753,139

$1,188,285

$613,800

$153,450

$888,460

$222,115

$6,255,399

$1,563,850

Jenkins

$0

$0

$4,522,923

$1,130,731

$4,522,923

$1,130,731

Johnson

$620,069

$155,017

$64,795

$16,199

Other $
$0 $0 $0 $0
$430,902 $0
$430,902
$0 $0

Johnson STIP Totals:
FY 2013 Total: FY 2014 Total: Jones STIP Totals:
FY 2012 Total: FY 2014 Total: Lanier STIP Totals:
FY 2012 Total: FY 2014 Total: Laurens STIP Totals:
FY 2012 Total: FY 2013 Total: FY 2014 Total: FY 2015 Total: Lee STIP Totals:

$684,864

$171,216

Jones

$50,000

$0

$44,310,037

$11,077,509

$44,360,037

$11,077,509

Lanier

$701,984

$175,496

$82,865

$20,716

$784,849

$196,212

Laurens

$0

$0

$1,697,933

$424,483

$1,697,933

$424,483

Lee

$224,930

$56,233

$6,548,491

$1,637,123

$233,116

$0

$44,163

$11,041

$7,050,700

$1,704,396

$0
$0 $0 $0
$0 $0 $0
$271,320 $0
$271,320
$0 $0 $58,279 $0 $58,279

Total $
$5,941,423 $767,249
$1,110,575 $7,819,248
$430,902 $5,653,654 $6,084,556
$775,086 $80,994
$856,080
$50,000 $55,387,546 $55,437,546
$877,480 $103,582 $981,062
$271,320 $2,122,416 $2,393,736
$281,163 $8,185,614
$291,395 $55,204
$8,813,375
Page 275 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/4/2011

FY 2012 Total: FY 2013 Total: FY 2014 Total: FY 2015 Total: Lincoln STIP Totals:
FY 2012 Total: Lumpkin STIP Totals:
FY 2012 Total: FY 2013 Total:

Federal $

State $

Lincoln

$223,664

$55,916

$867,663

$216,916

$11,736,143

$2,934,036

$3,615,467

$903,867

$16,442,937

$4,110,734

Lumpkin

$726,847

$0

$726,847

$0

Macon

$160,000

$0

$4,129,266

$987,817

Other $
$0 $0 $0 $0 $0
$171,574 $171,574
$40,000 $44,500

Macon STIP Totals:
FY 2012 Total: FY 2015 Total: Madison STIP Totals:
FY 2012 Total: FY 2013 Total: FY 2014 Total: McDuffie STIP Totals:
FY 2012 Total: FY 2014 Total: McIntosh STIP Totals:
FY 2012 Total: FY 2014 Total: FY 2015 Total: Meriwether STIP Totals:

$4,289,266

$987,817

Madison

$558,927

$139,732

$10,313,846

$2,578,461

$10,872,773

$2,718,193

McDuffie

$3,443,520

$860,880

$947,350

$236,837

$613,800

$153,450

$5,004,670

$1,251,167

McIntosh

$143,984

$0

$3,256,635

$814,159

$3,400,619

$814,159

Meriwether

$890,124

$222,531

$80,000

$20,000

$2,711,382

$677,846

$3,681,506

$920,376

$84,500
$0 $0 $0
$0 $0 $0 $0
$240,786 $0
$240,786
$0 $0 $0 $0

Total $
$279,580 $1,084,579 $14,670,179 $4,519,334 $20,553,672
$898,421 $898,421
$200,000 $5,161,583 $5,361,583
$698,659 $12,892,307 $13,590,967
$4,304,400 $1,184,187
$767,249 $6,255,837
$384,770 $4,070,794 $4,455,564
$1,112,655 $100,000
$3,389,228 $4,601,882
Page 276 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/4/2011

FY 2012 Total: FY 2014 Total: FY 2015 Total: Miller STIP Totals:
FY 2014 Total: Mitchell STIP Totals:
FY 2012 Total: FY 2015 Total: Montgomery STIP Totals:
FY 2012 Total: FY 2014 Total: Morgan STIP Totals:
FY 2014 Total: FY 2015 Total: Murray STIP Totals:
FY 2012 Total: FY 2013 Total: FY 2014 Total: FY 2015 Total: Newton STIP Totals:
FY 2012 Total: Oglethorpe STIP Totals:

Federal $

State $

Miller

$43,297

$10,824

$18,019

$4,505

$367,579

$91,895

$428,895

$107,224

Mitchell

$2,733,895

$683,474

$2,733,895

$683,474

Montgomery

$7,963,209

$1,990,802

$2,335,491

$583,873

$10,298,700

$2,574,675

Morgan

$5,110,587

$1,277,647

$9,797,884

$2,449,471

$14,908,471

$3,727,118

Murray

$10,187,597

$2,546,899

$16,656

$4,164

$10,204,253

$2,551,063

Newton

$1,377,679

$174,019

$284,431

$31,155

$986,744

$206,733

$183,713

$25,952

$2,832,566

$437,859

Oglethorpe

$472,954

$118,238

$472,954

$118,238

Other $
$0 $0 $0 $0
$0 $0
$97,630 $20,991 $118,621
$255,000 $0
$255,000
$0 $0 $0
$423,244 $39,953 $39,953 $19,976
$523,127
$0 $0

Total $
$54,122 $22,523 $459,474 $536,119
$3,417,368 $3,417,368
$10,051,641 $2,940,355
$12,991,996
$6,643,233 $12,247,356 $18,890,589
$12,734,496 $20,820
$12,755,316
$1,974,942 $355,538
$1,233,430 $229,641
$3,793,551
$591,192 $591,192

Page 277 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/4/2011

FY 2012 Total: FY 2013 Total: FY 2014 Total: Peach STIP Totals:
FY 2012 Total: FY 2013 Total: FY 2014 Total: FY 2015 Total: Pickens STIP Totals:
FY 2013 Total: FY 2014 Total: FY 2015 Total: Pierce STIP Totals:
FY 2012 Total: Polk STIP Totals:
FY 2012 Total: FY 2013 Total: FY 2014 Total: Pulaski STIP Totals:
FY 2015 Total: Putnam STIP Totals:
FY 2013 Total: Quitman STIP Totals:

Federal $

State $

Peach

$5,277,292

$1,319,323

$0

$0

$364,956

$91,239

$5,642,248

$1,410,562

Pickens

$276,585

$69,146

$832,320

$208,080

$17,828,294

$4,457,074

$202,688

$50,672

$19,139,888

$4,784,972

Pierce

$0

$0

$0

$0

$2,826,447

$706,612

$2,826,447

$706,612

Polk

$0

$48,332

$0

$48,332

Pulaski

$200,000

$50,000

$1,048,139

$128,593

$80,000

$20,000

$1,328,139

$198,593

Putnam

$10,800,402

$2,700,101

$10,800,402

$2,700,101

Quitman

$0

$0

$0

$0

Other $
$0 $96,000
$0 $96,000
$0 $0 $0 $0 $0
$31,344 $75,505 $237,254 $344,103
$0 $0
$0 $139,831
$0 $139,831
$0 $0
$126,929 $126,929

Total $
$6,596,615 $96,000
$456,195 $7,148,810
$345,732 $1,040,400 $22,285,368
$253,360 $23,924,859
$31,344 $75,505 $3,770,313 $3,877,162
$48,332 $48,332
$250,000 $1,316,563
$100,000 $1,666,563
$13,500,503 $13,500,503
$126,929 $126,929

Page 278 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/4/2011

FY 2013 Total: Rabun STIP Totals:
FY 2013 Total: Schley STIP Totals:
FY 2013 Total: Screven STIP Totals:
FY 2012 Total: FY 2013 Total: Seminole STIP Totals:
FY 2012 Total: FY 2013 Total: FY 2014 Total: FY 2015 Total: Spalding STIP Totals:
FY 2012 Total: FY 2013 Total: FY 2014 Total: Stephens STIP Totals:
FY 2012 Total: Stewart STIP Totals:
FY 2013 Total: FY 2015 Total: Sumter STIP Totals:

Federal $

State $

Rabun

$17,278,663

$4,319,666

$17,278,663

$4,319,666

Schley

$224,975

$0

$224,975

$0

Screven

$4,676,107

$1,169,027

$4,676,107

$1,169,027

Seminole

$1,676,177

$419,044

$731,812

$182,953

$2,407,989

$601,997

Spalding

$178,498

$22,312

$182,068

$0

$182,068

$0

$182,068

$22,759

$724,702

$45,071

Stephens

$200,000

$50,000

$42,676,034

$10,669,009

$80,000

$20,000

$42,956,034

$10,739,009

Stewart

$143,984

$0

$143,984

$0

Sumter

$114,028

$28,507

$970,542

$242,636

$1,084,570

$271,143

Other $
$0 $0
$56,244 $56,244
$0 $0
$0 $0 $0
$22,312 $45,517 $45,517 $22,759 $136,105
$0 $565,446
$0 $565,446
$35,996 $35,996
$0 $0 $0

Total $
$21,598,329 $21,598,329
$281,219 $281,219
$5,845,134 $5,845,134
$2,095,221 $914,766
$3,009,986
$223,122 $227,585 $227,585 $227,585 $905,877
$250,000 $53,910,489
$100,000 $54,260,489
$179,980 $179,980
$142,535 $1,213,178 $1,355,713
Page 279 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/4/2011

FY 2012 Total: FY 2013 Total: FY 2015 Total: Talbot STIP Totals:
FY 2012 Total: Tattnall STIP Totals:
FY 2012 Total: Taylor STIP Totals:
FY 2012 Total: FY 2014 Total: Telfair STIP Totals:
FY 2015 Total: Thomas STIP Totals:
FY 2012 Total: FY 2013 Total: FY 2014 Total: FY 2015 Total: Tift STIP Totals:
FY 2012 Total: FY 2015 Total: Toombs STIP Totals:

Federal $

State $

Talbot

$1,453,057

$363,264

$602,783

$150,696

$271,104

$67,776

$2,326,944

$581,736

Tattnall

$1,343,928

$532,153

$1,343,928

$532,153

Taylor

$2,257,584

$496,196

$2,257,584

$496,196

Telfair

$441,560

$20,400

$80,000

$20,000

$521,560

$40,400

Thomas

$215,977

$0

$215,977

$0

Tift

$67,973

$16,993

$7,334,258

$1,833,565

$554,925

$0

$25,398,902

$6,349,725

$33,356,058

$8,200,283

Toombs

$359,960

$0

$20,111,020

$5,027,755

$20,470,980

$5,027,755

Other $
$0 $0 $0 $0
$0 $0
$68,200 $68,200
$89,990 $0
$89,990
$84,023 $84,023
$40,000 $0
$138,731 $0
$178,731
$889,040 $307,268 $1,196,308

Total $
$1,816,321 $753,478 $338,880
$2,908,680
$1,876,081 $1,876,081
$2,821,980 $2,821,980
$551,950 $100,000 $651,950
$300,000 $300,000
$124,966 $9,167,823
$693,656 $31,748,627 $41,735,073
$1,249,000 $25,446,043 $26,695,043

Page 280 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/4/2011

FY 2012 Total: FY 2013 Total: FY 2014 Total: FY 2015 Total: Towns STIP Totals:
FY 2013 Total: Treutlen STIP Totals:
FY 2014 Total: Troup STIP Totals:
FY 2014 Total: FY 2015 Total: Turner STIP Totals:
FY 2012 Total: FY 2013 Total: FY 2015 Total: Twiggs STIP Totals:
FY 2012 Total: FY 2013 Total: FY 2014 Total: Union STIP Totals:
FY 2012 Total: FY 2013 Total: FY 2014 Total: Upson STIP Totals:

Federal $

State $

Towns

$1,292,161

$173,040

$265,502

$66,375

$1,357,540

$339,385

$1,872,002

$468,001

$4,787,205

$1,046,801

Treutlen

$40,000

$0

$40,000

$0

Troup

$19,666,307

$4,916,577

$19,666,307

$4,916,577

Turner

$1,423,876

$216,486

$4,434,872

$1,108,718

$5,858,748

$1,325,204

Twiggs

$810,000

$0

$185,173

$46,293

$19,384,972

$4,846,243

$20,380,145

$4,892,536

Union

$652,800

$163,200

$4,196,662

$1,049,166

$25,820,000

$6,455,000

$30,669,462

$7,667,366

Upson

$1,453,057

$363,264

$177,933

$44,483

$11,993,337

$2,998,334

$13,624,327

$3,406,082

Other $
$0 $0 $0 $0 $0
$10,000 $10,000
$0 $0
$139,483 $0
$139,483
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0

Total $
$1,465,202 $331,877
$1,696,925 $2,340,003 $5,834,007
$50,000 $50,000
$24,582,883 $24,582,883
$1,779,845 $5,543,590 $7,323,434
$810,000 $231,466 $24,231,215 $25,272,682
$816,000 $5,245,828 $32,275,000 $38,336,828
$1,816,321 $222,417
$14,991,671 $17,030,409
Page 281 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/4/2011

FY 2012 Total: FY 2013 Total: Walker STIP Totals:
FY 2012 Total: FY 2013 Total: FY 2014 Total: FY 2015 Total: Walton STIP Totals:
FY 2012 Total: FY 2014 Total: FY 2015 Total: Ware STIP Totals:
FY 2013 Total: Washington STIP Totals:
FY 2012 Total: FY 2013 Total: Wayne STIP Totals:
FY 2012 Total: FY 2013 Total: FY 2015 Total: Wheeler STIP Totals:
FY 2012 Total: White STIP Totals:

Federal $

State $

Walker

$1,872,500

$464,125

$1,055,347

$0

$2,927,847

$464,125

Walton

$86,221

$13,056

$13,267,565

$3,308,222

$9,273,172

$2,309,624

$34,677

$4,335

$22,661,635

$5,635,236

Ware

$8,933,257

$1,313,215

$1,849,218

$462,304

$50,315,180

$12,578,795

$61,097,655

$14,354,315

Washington

$2,058,890

$514,722

$2,058,890

$514,722

Wayne

$1,748,982

$437,246

$1,378,527

$0

$3,127,510

$437,246

Wheeler

$12,121,022

$3,030,256

$224,975

$0

$176,653

$44,163

$12,522,650

$3,074,419

White

$1,000,865

$250,216

$1,000,865

$250,216

Other $
$0 $263,837 $263,837
$118,499 $8,669 $8,669 $4,335
$140,172
$1,650,119 $0 $0
$1,650,119
$0 $0
$0 $344,632 $344,632
$342,124 $65,025 $0
$407,149
$0 $0

Total $
$2,336,625 $1,319,184 $3,655,809
$217,776 $16,584,456 $11,591,465
$43,346 $28,437,043
$11,896,591 $2,311,522
$62,893,975 $77,102,089
$2,573,612 $2,573,612
$2,186,228 $1,723,159 $3,909,387
$15,493,402 $290,000 $220,816
$16,004,218
$1,251,081 $1,251,081

Page 282 of 283

STATE TRANSPORTATION IMPROVEMENT PROGRAM 10/4/2011

FY 2012 Total: FY 2013 Total: Wilkes STIP Totals:
FY 2012 Total: Wilkinson STIP Totals:
FY 2012 Total: FY 2013 Total: FY 2014 Total: FY 2015 Total: Worth STIP Totals:

Federal $

State $

Wilkes

$653,126

$163,282

$2,593,010

$648,252

$3,246,136

$811,534

Wilkinson

$749,899

$0

$749,899

$0

Worth

$79,030

$19,757

$4,050,408

$1,012,602

$3,345,895

$836,474

$746,960

$0

$8,222,293

$1,868,833

Other $
$0 $0 $0
$187,475 $187,475
$0 $0 $0 $77,990 $77,990

Total $
$816,408 $3,241,262 $4,057,670
$937,374 $937,374
$98,787 $5,063,010 $4,182,369
$824,950 $10,169,116

STIP Grand Totals:

$2,983,714,392

$640,791,266

$133,097,480

$3,757,603,138

NOTE: Cost estimates in this section show only the County's portion of the project; If the totals are different from the list above it is an indication that the project is in multiple counties.

Page 283 of 283

Appendix A Glossary

GLOSSARY OF TERMS
ATMS Advanced Transportation Management System; a computerized system that integrates video, voice, and data management functions to collect information about the transportation infrastructure and performance analysis as well as support traffic management decisions based on real-time information.
CMAQ Congestion Mitigation and Air Quality Improvement Program; directs funds primarily to areas that have failed to reach certain air quality standards. Projects allowed under this program include mass transit improvements and high-occupancy vehicle facilities.
CST Construction; phase of a project that includes the actual construction of the project.
DONOR STATE BONUS Donor states are states that contribute more to the Highway Trust Fund than they receive back in federalaid highway programs. These states receive a predetermined amount based on a comparison of a projection of all payments into the Highway Trust Fund and the amount received in federal-aid apportionments. Starting with the state with the lowest return, states are brought up to the level of return for states with the next higher level of return until available funds are depleted.
FED Share Federal Share; portion of funding to be paid for with federal money.
GARVEE Grant Anticipation Revenue Vehicle; bonds against anticipated federal funds for the purpose of accelerating the construction of the "Governor's Road Improvement Program".
GA Share Georgia Share; portion of funding to be paid for with state money.
GRVA GARVEE Advance; advance funding to pay for "Governor's Road Improvement Program" projects with GARVEE bond before converting to regular federal aid funding.
GRVC GARVEE Converted; funding to pay back the GARVEE bond.
HPP High Priority Project; list of 1,850 high priority projects specified by Congress in TEA-21. Funding for these projects totals $9.4 billion over the six years of TEA-21. Georgia will receive $283.87 million for 40 projects.
HIGHWAY TRUST FUND Federal account established by law to hold receipts collected by the government, earmarked for highway programs and a portion of the mass transit program; supported by the federal gasoline tax and other user taxes.

INTERMODAL SURFACE TRANSPORTATION EFFICIENCY ACT of 1991 (ISTEA) Transportation bill approved by Congress in 1991.
METROPOLITAN PLANNING ORGANIZATION (MPO) Required by federal regulations in urbanized areas to develop transportation plans and programs; responsible for developing the Transportation Improvement Program (TIP).
NEPA National Environmental Policy Act of 1969; requires federal government to use all practical means and measures to protect environmental values; makes environmental protection a part of the mandate of every federal agency and department.
NHS National Highway System; consists primarily of the Interstates and other major routes. Includes a large percentage of urban and rural principal arterials.
NON-ATTAINMENT The 20 county area around Atlanta that fails to meet federal air-quality standards. Projects in the nonattainment area are not allowed to proceed if they have a negative impact on air quality for the region.
OBLIGATION CEILING The maximum amount that a state is expected to receive from the Highway Trust Fund .
OTH Share Other Share; portion of funding to be paid for with money other than federal or state funds; generally provided by local governments.
PE Preliminary Engineering; phase of a project that includes the development of the concept, survey, environmental documentation and design plans.
ROW Right of Way; phase of a project that includes the acquisition of any necessary property for the construction of the project.
SAFETEA-LU Safe, Accountable, Flexible, Efficient Transportation Equity Act- A Legacy for Users. Most recent transportation bill, approved by Congress in 2005.
STATE AID LET Projects that are funded with state money.
STATE HIGHWAY SYSTEM Network of roads maintained by the state including road and bridge construction, maintenance, rehabilitation and restoration. There are approximately 17, 947 miles of state highways in Georgia which make up 16% of the total public road system in the state.

STP Surface Transportation Program; federal funding category that provides funding for projects on any federal-aid highway, including the NHS, bridge projects on any public road, transit capital projects, and public bus terminals and facilities.
TRANSPORTATION EQUITY ACT FOR THE 21ST CENTURY (TEA-21) Six year transportation bill approved by Congress in 1998.
TRANSPORTATION IMPROVEMENT PROGRAM (TIP) In metropolitan areas over 50,000 in population, a program of federally funded transportation projects proposed to be carried out in the first three years of adoption by the MPO. There are 15 urbanized areas in Georgia Chattanooga, Dalton, Rome, Athens, Gainesville, Augusta, Savannah, Hinesville, Brunswick, Macon, Columbus, Albany, Valdosta, Atlanta, and Warner Robins. The TIPs are incorporated into the STIP as adopted by the respective governments and approved by the Governor, with no changes.
TYPE WORK category of project and source of funding ATM/ITS - Advanced Transportation Management/Intelligent Transportation System; work relating to computerized transportation system that supports traffic management decisions; commonly known as the NAVIGATOR System. Bicycle/Ped. Facility - generally bike/pedestrian path/lane funded through a Transportation Enhancement Activity (TEA) project. Bridges - lump sum funding identified for bridge maintenance or bridge painting. Bridge Painting - lump sum for bridge painting. Bridge Rehab - bridge rehabilitation work that will improve and/or widen an existing bridge. Capital - funding identified for the purchase of transit related items. Historic Preservation - restoration or rehabilitation of historic structures that have a direct linkage to the transportation system; funded as part of a Transportation Enhancement Activities (TEA) project. Interchange - work at an interchange. Intersection Improvement - work that will improve an existing intersection. Landscaping - purchase/installation of shrubbery, plants, trees, etc. Lighting - lump sum funding for purchase/installation of lighting along a National Highway System road. Miscellaneous Improvements - identified for various projects that are not necessarily covered by a standard category. New Construction - new roadway construction on new location. Operating: funding identified for the operation of transit systems. Passing Lanes -- passing lanes added along an existing roadway. Preliminary Engineering - the design phase of a project. Ramp - construction work on a ramp at an interchange. Realignment - improvements to the geometry of a roadway. Replace Bridge - construction of a new bridge to replace an existing bridge. Rest Area - construction of rest areas along state routes (Interstates). Resurface and Maintenance - re-paving of a roadway and minor improvements. RR Xing - improvements to a road/rail crossing, such as the installation of gates, bells, lights, or improvements to the crossing itself. Safety - work that is designed to reduce accidents. Shoulder Work - improving and/or widening shoulders on a roadway.

Sidewalks - installation of sidewalk. Signals - installation and/or improvement of signals. Signing - fabrication/installation of roadway signs. Special Studies - lump sum funding for planning and management studies. Turn Lanes - addition of turn lanes at intersections. Water Pollution Mitig. - lump sum funding for wetland mitigation site that were taken by roadway construction. Weigh Station - construction and/or rehabilitation of truck weigh stations. Widening - adding additional travel lanes to a roadway.

Appendix B Financial Information
Regular AC Projects to be Converted GARVEE Bond AC Projects to be Converted

Regular AC Projects to be Converted This is a list of project that have been Advanced Constructed with State funds previously by
the Department and are subject to be converted to Federal Funds in the current STIP years.
GARVEE Bond Projects to be Converted This is a list of project that have been Advanced Constructed with GARVEE Bond Funds
previously by the Department and are subject to be converted to Federal Funds in the current STIP years.

8/13/2011 Project Id
0000292 0000302 0000346 0000408 0000409 0000423 0000425 0000523 0000535 0000543 0000555 0000759 0000765 0000766 0000805 0000883 0001037 0001097 0001298 0001560 0001565 0001570 0001571 0001579 0001585 0001791 0001817 0001913 0001933 0002229 0002392 0002409 0002486 0002626 0002637 0002754 0002906

Primary County
FORSYTH TOWNS BALDWIN SPALDING SPALDING JASPER HALL BUTTS GRADY BROOKS COBB LINCOLN TIFT COLUMBIA CRISP HENRY FORSYTH HALL FULTON CRISP LAMAR THOMAS BROOKS HABERSHAM GLYNN DEKALB CLAYTON BERRIEN JACKSON CRISP FORSYTH DOUGHERTY ALL BARTOW CHEROKEE CLAYTON DEKALB

Regular AC Projects to be Converted

Work Type
Passing Lanes Bridges Roadway Project Intersection Improvement Turn Lanes Widening Interchange Interchange Intersection Improvement Widening Turn Lanes Realignment Interchange Interchange Interchange Intersection Improvement Widening Roadway Project Realignment Turn Lanes Turn Lanes Turn Lanes Turn Lanes Turn Lanes Interchange Roadway Project Railroad Crossing Intersection Improvement Intersection Improvement Bridges Widening Widening Preliminary Engineering Interchange Widening ATMS/ITS Sidewalks

Description
SR 369 FM CHEROKEE CL TO CR 267/HIGHTOWER CIR - TRUCK LANES SR 17- SR 75 @ HIAWASSEE RIVER 3.6 MI S OF HIAWASSEE SR 540/FALL LINE FWY ON NEW LOC FM US 441/WILKINSON TO SR 24 SR 16 @ CR 35/VAUGHN RD & CR 507/ROVER RD - TURN LANES SR 16 @ CR 496/688/OLD 85 CONNECTOR/HOLLONVILLE RD SR 16 WIDENING @ WEST CITY LIMITS OF MONTICELLO I-985 NEW INTERCHANGE NO. OF SR 13 CROSSOVER NEAR MARTIN RD I-75 @ SR 16/ARTHUR BOLTON PKWY SR 38/US 84 @ SR 112 AND 17TH AVE SR 133 FM CR 276/TROUPEVILLE RD TO CR 10/PAULINE CHURCH RD CR 2846/CHASTAIN RD @ CR 2845/BELLS FERRY RD SR 79 RELOCATION USING CR 278 FM SR 43 TO SR 79 I-75 @ CR 418/OMEGA-ELDORADO ROAD - PHASE II I-20 UPGRADES @ SR 388 I-75 FM SR 159 NEAR ASHBURN TO SR 300/CRISP COUNTY - PH II SR 138 @ CR 100/FLAT ROCK ROAD SR 369 FM SR 9 TO SR 306 INCL NEW INTERCHANGE @ SR 400 THURMOND TANNER PWY FM PLAINVIEW RD TO SR 53 - PHASE III I-75/85 ATLANTIC STATION:14TH ST BR; RAMP; WILLIAMS ST RELOC SR 300/US 19 MEDIAN TURN LANES FM CR 29 TO I-75 SR 3/SR 7/US 41 FM S OF BARNESVILLE/LAMAR TO CR 42/SPALDING SR 3/US 19 FROM CR 219/SUNSET DRIVE TO CR 159/BIG CREEK ROAD SR 38/US 84 MEDIAN TURN LANES FROM THOMASVILLE TO QUITMAN SR 365/US 23 MED TN LNS FM SR 384 TO SR 184/STEPHENS I-95 @ SR 99 - INTERCHANGE RECONSTRUCTION LITHONIA IND BLVD EXT FM ROGERS LAKE TO SR124/ROCK CHPL-GRTA CR 1516 GRADE SEP @ NS RR; INC CONLEY RD & SR 3 RELOC - GRTA SR 11/US 129 @ CR 37/HAZEL AVE SR 98 @ CR 286/B WILSON & CR 536/KING ROAD CR 71/AMBOY ROAD @ LIME CREEK 2 MI E OF ARABI SR 20 FM CR 80/SAMPLES RD TO CR 450/JAMES BURGESS RD SR 520/CLARKE AVE FM CS 1060/TURNER FIELD RD TO CORDELE RD CONSULTANT PE TO DESIGN 26 MEDIAN TURN LANE PROJECTS SR 3/US 41 AND SR 61/US 411 INTERCHANGE RECONSTRUCTION CR 779/SIXES ROAD FROM I-575 TO CR 1061/OLD SR 5 I-285 FM I-75/CLAYTON NE THRU FULTN TO I-20/DEK-ATMS SURVEIL ROCKBRIDGE FROM STN. MTN./LITHONIA RD TO MEMORIAL DR

0002911 0002921 0003083 0003094 0003161 0003167 0003406 0003452 0003534 0003770 0003842 0003926 0004047 0004048 0004086 0004206 0004290 0004402 0004403 0004406 0004427 0004428 0004430 0004446 0004493 0004644 0004648 0004649 0004650 0004688 0004730 0004915 0005088 0005316 0005320 0005571 0005832 0005834 0005887 0005945 0006256 0006283 0006332

ALL CHATHAM CARROLL TIFT COWETA CLAYTON GWINNETT WALKER COBB BARTOW GRADY SPALDING CARROLL GORDON GWINNETT PEACH SEMINOLE CLAYTON COBB COWETA DOUGLAS DOUGLAS GWINNETT COBB FULTON GWINNETT ROCKDALE ROCKDALE ROCKDALE PAULDING CARROLL BARTOW GLYNN GORDON DOOLY WALKER THOMAS WASHINGTON TURNER FULTON CHATHAM BIBB FULTON

ATMS/ITS Roadway Project Bridges Bridges Widening HOV Lanes Median Work Bridges Transit Projects Widening Bridges Intersection Improvement Intersection Improvement Intersection Improvement Interchange Intersection Improvement Intersection Improvement ATMS/ITS Interchange Intersection Improvement Widening Widening Widening Realignment Streetscapes Widening Intersection Improvement Intersection Improvement Intersection Improvement Roadway Project Intersection Improvement Widening Bridges Intersection Improvement Interchange Bridges Intersection Improvement Intersection Improvement Signals Realignment Interchange Rumble Strips ATMS/ITS

ATMS: ITS OPERATIONS AND SUPPORT STATEWIDE - 2012 HARRY S.TRUMAN PKY FM ABERCORN ST TO WHITFIELD AVE - PHASE V CR 837/SANDY FLAT RD@ BIG INDIAN CRK & OVERFLOW SW OF BOWDON CR 411/SCOOTERVILLE ROAD @ TY TY CREEK 6.5 MI NW OF OMEGA I-85 FROM N OF CR 417/FOREST ROAD TO N OF SR 34 I-75 FM SR 54/CLAYTON TO EAGLES LANDING PKY/HENRY - HOV LNS SR 10/US 78 FM EAST PARK PLACE TO SR 124 -REMOVE REVERSE LNS CR 835/HAPPY VALLEY RD @ CHATTANOOGA & OVERFLOW I-285 FROM CUMBERLAND TO PERIMETER CENTER TRANSIT - GRTA CR 633/GLADE ROAD FM CR 605/HOMESTEAD DR TO CR 810/RYAN ROAD CR 85/JOYNER RD @ LITTLE TIRED CREEK APP 0.4 MI SE OF CAIRO SR 362 @ CR 231/SOUTH PINE HILL ROAD SR 166 @ CR 98/NORTH JONESVILLE RD&CR 124/WEST JONESVILLE RD SR 53 @ CR 5/MCDANIEL STATION ROAD 0.5 MI WEST OF CALHOUN SR 316 FM W OF CR 104/COLLINS HILL RD TO CR 177/HI-HOPE RD SR 49 @ CR 145/CHAPMAN; OLD MACON; INDUSTRIAL & WOODLAND SR 38/US 84 @ SR 39/SR 91 & @ SR 91 ALT-DRAINAGE IMPROVEMENT ATMS: CLAYTON COUNTY ATMS ENHANCEMENT IMPLEMENTATION- GRTA SR 3 CONN @ SR 120 ALT - GRTA SR 154 @ CR 469/HAMMOCK ROAD - GRTA CR 817/LEE ROAD/SOUTH SWEETWATER RD PHASE I - GRTA CR 817/LEE RD FM I-20 TO SR 92/FAIRBURN RD - PHASE II - GRTA SR 20 FM E OF BURNETTE TRAIL TO PEACHTREE IND BLVD-GRTA LEWIS RD FM SR 6/CH JAMES PKWY TO SR 6BU/NEW S SQ [PE-LCI] MARIETTA ST FM CS 101/HUFF RD TO CS 253/MOORES MILL RD EXT SR 20/LOGANVILLE HIGHWAY FM OZORA ROAD TO BRAND ROAD - GRTA CR 104/LENORA CHURCH ROAD @ PLEASANT HILL ROAD - GRTA CR 167/OLD SALEM ROAD @ CR 124/MCCALLA ROAD - GRTA CR 666/SIGMAN ROAD @ CR 157/GEES MILL ROAD - GRTA EAST HIRAM PKWY FROM SR 92 TO SR 6/US 278 - GRTA SR 8/US 78 @ CR 644/ROCKY BRANCH RD AND CS 80411/VILLA TRACE SR 140 FM SR 53/FLOYD TO 0.3 MI W OF OOTHKALOOGA CRK/BARTOW I-95 @ TURTLE RIVER & GIBSON CREEK SR 53 @ CASH ROAD/FOLSOM ROAD I-75 @ SR 215 SR 136 @ WEST CHICKAMAUGA CREEK 5.7 M NW OF LAFAYETTE SR 188 @ CR 124/ROCKY FORD ROAD 2 MI SW OF COOLIDGE SR 15 @ CR 347/MATTHEWS ROAD IN TENNILLE SR 7 & SR 112 @ VAR LOCS IN ASHBURN-UPGRADE TRAFFIC SIGNALS SR 9/14TH ST FM SPRING ST TO WEST PEACHTREE ST I-16/I-516 INTERCHANGE I-16 IN BIBB|TWIGGS&ALONG SR 54 IN TROUP - RUMBLE STRIPS I-85 FM CAMP CREEK PKWY TO SR 74 - ATMS COMMUNIC/SURVEILANCE

0006337 0006395 0006396 0006397 0006399 0006401 0006416 0006431 0006454 0006633 0006684 0006889 0006924 0006981 0006994 0007061 0007072 0007075 0007081 0007119 0007125 0007140 0007221 0007248 0007259 0007339 0007347 0007350 0007360 0007361 0007362 0007363 0007399 0007405 0007421 0007457 0007466 0007482 0007487 0007488 0007515 0007613 0007672

ALL DEKALB COBB DEKALB FULTON CLAYTON GORDON RICHMOND PEACH BURKE FULTON DEKALB GWINNETT COBB CHEROKEE FULTON FULTON THOMAS WALKER FULTON HOUSTON MONROE CANDLER SEMINOLE CHATHAM NEWTON BUTTS JACKSON COLUMBIA BURKE BALDWIN WARREN FLOYD BACON MCINTOSH ALL CHATHAM CHATHAM ALL ALL EFFINGHAM DEKALB DEKALB

ATMS/ITS ATMS/ITS ATMS/ITS ATMS/ITS ATMS/ITS ATMS/ITS Realignment Widening Signals TE-Bike/Ped Facility Median Work Roadway Project Roadway Project Streetscapes Streetscapes Intersection Improvement Utility Relocation Intersection Improvement Intersection Improvement Signals Intersection Improvement Roundabout Drainage Improvements Bridges Interchange Intersection Improvement Signals Signals Signals Signals Signals Signals TE-Bike/Ped Facility Signals Interchange Pedestrian Crossings Barriers Operational Improvement Miscellaneous Improvements Miscellaneous Improvements Intersection Improvement Streetscapes Signals

ATMS: HERO OPERATIONS AND SUPPORT STATEWIDE - 2009 I-285 NE ATMS RAMP METERS FM I-85 TO I-20 I-75 N ATMS RAMP METERS FROM I-85 TO CR 4395/CHASTAIN ROAD I-85 N ATMS RAMP METERS FM BUFORD HWY TO PLEASANT HILL I-75/I-85 ATMS RAMP METERS FM UNIVERSITY AVE TO 10TH ST I-75 FM SR 138 TO CS 3096/CLEVELAND AVE - ATMS RAMP METERS SR 53 FM E OF CR 269/RYO MOUNTAIN RD TO W OF CR 178/DAVIS RD SR 56 FM CR 17/BENNOCK MILL RD TO CR 1516/OLD WAYNESBORO RD UPGRADE TRAFFIC SIGNALS @ VARIOUS LOC IN PEACH COUNTY WAYNESBORO GREENWAY TRAIL SR 141/PTREE RD CORR IMP FM SHADOWLWN AVE TO MAPLE DR - GRTA LITHONIA INDUSTRIAL BLVD FM I-20 TO EVANS MILL RD- PHASE III SUGARLOAF PARKWAY EXTENSION FROM SR 20 TO SR 316 - PHASE II AUSTELL DOWNTOWN STREETSCAPE PHASE II - LCI WOODSTOCK PEDESTRIAN IMPROVEMENTS - LCI PROJECT SR 141/MEDLOCK BRIDGE ROAD @ SR 120/ABBOTTS BRIDGE ROAD SR 3; SR 9; & SR 139 IN FULTON COUNTY - UTILITY RELOCATION SR 3/US 19 @ SR 202/CR 247/COUNTY LINE ROAD SR 1/US 27 @ CR 587/BICENTENNIAL TRAIL FULL UPGRADE & REPAIR OF TRAFFIC SIGNALS @ 3 LOCS IN FULTON SR 11/US 41 FM S OF SR 49 TO N OF CR 535/HOUSTON LAKE RD SR 74 @ SR 42 - 1 MILE S OF RUSSELLVILLE CS 559/VERTIA FM CS 577/KENNEDY ST TO CS 558/S TRAPNELL ST CR 226/BURKE ROAD @ FISH POND DRAIN 11.5 MI S OF IRON CITY CR 984/JIMMY DELOACH PARKWAY @ SR 17/US 80 - INTERCHANGE SR 162/SALEM ROAD @ CR 20/SMITH STORE ROAD SR 16/US 23 @ 1 LOC; SR 42 @ 2 LOCS & SR 155 @ 1 LOC SR 15 @ 3 LOCS & SR 11BU @ 1 LOC SR 121@ 4 LOCS; SR 233@1 LOC; SR 388@1 LOC & CR 1503@1 LOC SR 4; SR 23; SR 24; SR 56; SR 121 - TRAFFIC SIGNAL UPGRADES SR 22;SR 29;SR 49;SR 243;CS 546&CS 578 @16 LOC IN BALDWIN CO SR 10 @ SR 47; SR 10BU @2 LOC; SR 12 @ SR 80 & SR 17 @ SR 44 OOSTANAULA RVR @ THIRD AVE IN ROME-DOWNTOWN URBAN WATERFRONT SR 4; SR 4 ALT; SR 15; SR 23; SR 32 &SR 38 - SIGNAL UPGRADES I-95 @ SR 251/BRIARDAM ROAD I-85; SR 8; SR 17 & SR 72 IN FRANKLIN; HART & MADISON CO I-16 & I-516 CABLE BARRIER INSTALLATION IN CHATHAM COUNTY SR 25/US 17 @ SR 307/BOURNE AVE DOT PERSONNEL TRAINING FY 2010 - PE ONLY DOT PERSONNEL TRAINING - FY 2011 - PE ONLY SR 21 @ CR 143/MCCALL ROAD CITY CENTER IN CLARKSTON STREETSCAPE - PHASE I SR 10/MEMORIAL DR@ 24 LOC & 4 CR LOC-UPGRADE TRAFFIC SIGNALS

0007693 0007843 0007951 0008055 0008056 0008057 0008275 0008288 0008344 0008357 0008382 0008396 0008409 0008424 0008534 0008627 0008767 0008852 0008855 0008893 0008904 0008947 0008965 0008974 0009285 0009298 0009308 0009309 0009310 0009326 0009394 0009404 0009411 0009417 0009438 0009439 0009440 0009441 0009442 0009443 0009444 0009445 0009446

SCREVEN FORSYTH DOUGLAS ALL ALL ALL CHATHAM DEKALB CLAYTON FORSYTH BARTOW JACKSON BRYAN BULLOCH PEACH HALL TIFT ALL BRANTLEY GRADY GWINNETT CHEROKEE BARTOW PIERCE LEE PAULDING ALL ALL ALL ALL FULTON FULTON FULTON ALL ATKINSON CHATTAHOOCHEE FAYETTE DEKALB FULTON FULTON GWINNETT BIBB HALL

Operational Improvement Widening Intersection Improvement Coordinator Coordinator Coordinator Intersection Improvement Turn Lanes Rail Projects Widening Widening Bridges Intersection Improvement Signals Intersection Improvement Realignment Operational Improvement Miscellaneous Improvements Intersection Improvement Intersection Improvement Bicycle/Ped. Facility Guardrail Passing Lanes Pavement Markings Pavement Markings Pavement Markings RRX Warning Device RRX Signing & Marking RRX Signing & Marking Special Studies Bicycle/Ped. Facility Transit Facilities Operational Improvement Preliminary Engineering Sidewalks Sidewalks Multi-use Trail Sidewalks Sidewalks Sidewalks Sidewalks Sidewalks Sidewalks

SR 21BU @ SR 73/US 301/WEST OGEECHEE ROAD IN SYLVANIA SR 9/ATLANTA HWY FM FULTON CO LINE TO CR 458/MCFARLAND RD CR 812/CHAPEL HILL RD@CR 174/DORSETT SHOALS RD/ANNEEWAKEE RD SAFE ROUTE TO SCHOOL COORDINATOR - 2008 SAFE ROUTE TO SCHOOL COORDINATOR - 2009 SAFE ROUTE TO SCHOOL COORDINATOR - 2010 SR 21 @ CR 9/CROSSGATE ROAD/GULFSTREAM ROAD SR 12/US 278 FM DEKALB MEDICAL PKWY TO CR 6313/CRAGSTONE CT CENTRAL GEORGIA RAILROAD FM BATTLE CREEK RD TO MT ZION RD SR 9 FROM SR 371 TO SR 141 SR 113 FM OLD ALA RD RELOC TO SR 61 @ NEW ALIGNMENT - PH I CR 146/GALILEE CHURCH ROAD @ MIDDLE OCONEE RIVER SR 26/US 80 @ SR 30/US 280 SR 73/US 301 @ SR 46 SR 247 CONN @ CR 189/JOHN E SULLIVAN ROAD/WALKER ROAD CR 1300/UNION CHURCH ROAD @ MULBERRY CREEK - HRRR SR 7 @ CR 413/20TH STREET SAFE ROUTES TO SCHOOL (SRTS) PROJECT MANAGEMENT - PE ONLY SR 520/US 82 @ SR 110/CR 223 SR 35/US 319 @ SR 93/JACKIE ROBINSON CS 910/MAIN ST & CS 738/FIRST ST - PEDESTRIAN IMPROVEMENTS SR 20 FM BARTOW TO FORSYTH & SR 140 FM BARTOW TO FULTON SR 20 WB FM MP 20.24 TO MP 21.86 OFF-SYSTEM SAFETY IMPROVEMENTS @ 6 CR LOCS IN PIERCE COUNTY OFF-SYSTEM SAFETY IMPROVEMENTS @ 7 CR LOCS IN LEE COUNTY OFF-SYSTEM SAFETY IMPROVEMENTS @ 33 CR LOCS IN PAULDING SIGNING & MARKING @ VAR RRX GRADE CROSSING LOCS IN DIST 4 SIGNING & MARKING @ VAR RRX LOCS IN DIST 6 SIGNING & MARKING @ VAR RRX LOCS IN DIST 3 & 7 RDC CONTRACT FOR PLANNING /ENVIRONMENT/LOC SERVICES- FY 2012 BELT LINE CORRIDOR MULTI-USE TRAIL & STREETSCAPES - PE ONLY MARTA BROOKHAVEN STATION PARKING DECK - PHASE I SR 74 FROM CR 3740/OAKLEY INDUSTRIAL BLVD TO I-85 SAFETY PROJECT IDENTIFICATION & EVALUATION WILLACOOCHEE ELEMENTARY SCHOOL SIDEWALK EXT - SRTS CHATTAHOOCHEE COUNTY ELEMENTARY SCHOOL - SRTS PEEPLES ELEMENTARY SCHOOL &RISING STARR MIDDLE SCHOOL - SRTS LIVSEY ELEMENTARY SCHOOL - SRTS MORNINGSIDE ELEMENTARY SCHOOL - SRTS CRABAPPLE CROSSING; SUMMIT HILL &NORTHWESTERN SCHOOLS - SRTS LAWRENCEVILLE & MARGARET WINN HOLT ELEMENTARY SCHOOLS - SRTS CITY OF MACON ELEMENTARY SCHOOLS & APPLING MIDDLE - SRTS CITY OF GAINESVILLE SAFE PASSAGE @ 5 SCHOOLS - SRTS

0009447 0009448 0009449 0009551 0009597 0009600 0009619 0009626 0009688 0009710 0009721 0009725 0009818 0009819 0009820 0009821 0009822 0009830 0009957 0009982 0009983 0009984 0009985 0010123 0010147 0010227 0010363 110400110600121780121980122080122100122260122510122870132630132950132995133001141880142230162390-

CLARKE HARALSON JEFFERSON ALL ALL MILLER MERIWETHER CRISP MITCHELL ALL COWETA DEKALB DOUGLAS CLAYTON PEACH TWIGGS DAWSON ALL FULTON ALL ALL ALL WAYNE FULTON ALL FULTON COBB HALL GWINNETT HALL FORSYTH FRANKLIN MADISON STEPHENS JACKSON BARROW FORSYTH GWINNETT HALL FRANKLIN FORSYTH CLARKE WHITE

Sidewalks Sidewalks Sidewalks Preliminary Engineering Preliminary Engineering Pavement Markings Barriers Pavement Markings Pavement Markings Signals Operational Improvement Interchange Barriers Barriers Barriers Barriers Barriers Preliminary Engineering Operational Improvement Guardrail Guardrail Guardrail Pavement Markings Operational Improvement Preliminary Engineering Signals Operational Improvement Interchange Widening Widening Widening Widening Widening Widening Bridges Interchange Interchange Widening Bridges Bridges Widening Widening Roadway Project

BARROW ELEMENTARY SCHOOL - SRTS H A JONES ELEMENTARY SCHOOL - SRTS LOUISVILLE ACADEMY - SRTS QUALITY ASSURANCE REVIEW ON EROSION PLANS - FY 2011 HAZARD INDEX STUDIES - FY 2010 OFF-SYSTEM SAFETY IMPROVEMENTS @ 8 CR LOCS IN MILLER COUNTY I-85 FROM CR 417/MERIWETHER TO 1.25 MI N OF CR 201/COWETA OFF-SYSTEM SAFETY IMPROVEMENTS @ 5 CR LOCS IN CRISP CO OFF-SYSTEM SAFETY IMPROVEMENTS @ 8 CR LOC IN MITCHELL COUNTY ATLANTA REGIONAL TRAFFIC OPERATIONS PROGRAM - FY 2010 SR 34 @ SR 154 I-285 @ CR 1764/ASHFORD DUNWOODY ROAD I-20 FROM ALABAMA STATE LINE TO W OF SR 5 - CABLE BARRIERS I-675 FROM HENRY CO LINE TO DEKALB CO LINE - CABLE BARRIERS I-75 FM HOUSTON CO LINE TO CRAWFORD CO LINE - CABLE BARRIERS I-16 FROM SR 87/BIBB TO CR 96/LAURENS - CABLE BARRIERS SR 400 FM FORSYTH CO LINE TO S OF CR 145 - CABLE BARRIER STATEWIDE TDM/COMMUTE OPTIONS - ATTAINMENT AREA FY 2011-2013 I-285 @ SR 8 & @ SR 10; SR 13 @ SR 247 & @ CS 519 DISTRICT 1 & 2 @ SEV LOCS - GUARDRAIL ANCHOR REPLACEMENT DISTRICT 3; 6 & 7 @ SEV LOCS - GUARDRAIL ANCHOR REPLACEMENT DISTRICT 4 & 5 @ SEV LOCS - GUARDRAIL ANCHOR REPLACEMENT OFF-SYSTEM SAFETY IMPROVEMENTS @ 13 LOCS IN WAYNE COUNTY SR 237 FROM HABERSHAM ROAD TO 0.10 MI S OF HABERSHAM DRIVE STATEWIDE SURPLUS PROPERTY MONITORING & DISPOSAL - FY 2011 ATC MINOR INTERSECTION UPGRADES @ 75 LOCS IN ATLANTA SR 280 @ I-285 I-985 SPLIT DIAMOND INTERCHANGE @ SR 13 & SR 53 & CD SYSTEM I-85 FM I-985 TO N OF CR 134/HAMILTON MILL RD SR 53 FM DUCKETT MILL RD TO LAKE RANCH CT & OLD SARDIS RD SR 141 FM 0.6 MI NORTH OF FULTON COUNTY LINE TO SR 9 - GRTA SR 17 FM SE CR 67/ROSS PL N LAVONIA TO SE STEPHENS CL&BR SR 72 FM EAST OF SR 172 TO THE WEST CITY LIMITS OF COMER SR 17/SR 17 ALT FM CR 24/SCOTT ROAD TO CR 190/MEMORIAL DRIVE SR 15 ALT FM STOREY ST TO SR 82; INCL NEW BRIDGES@ CURRY CRK SR 316/US 29 @ SR 211 SR 400 AT SR 20 INTERCHANGE RECONSTRUCTION SR 13 FROM CS 1120/SAWNEE AVE/GWINNETT TO SR 347/HALL SR 52 @ CANDLER CREEK 5.4 MI SOUTH OF LULA SR 145 @ NORTH FORK BROAD RVR & SR 51 @MIDDLE FORK BROAD RVR CR 455/BETHELVIEW ROAD FROM SR 9 TO CR 8/CASTLEBERRY ROAD CR 127/OLD HULL RD FM CR 600/NORTH AVE TO CR 1149/4TH ST W CLEVELAND BYP FM S OF HOPE DR TO N OF SR 115 - PH I

162430210450210700220680221900221910221975222280222285222410222500222510222545232295245190245320245325245345245400250470250510250610250615262470262750311445311630312090312160322355322460322920331860331865331970332890332975333085333152333170333177333205342080-

HALL RICHMOND RICHMOND RICHMOND EMANUEL EMANUEL DODGE BALDWIN WASHINGTON BLECKLEY EMANUEL EMANUEL JENKINS PUTNAM NEWTON RICHMOND RICHMOND GLASCOCK MORGAN COLUMBIA RICHMOND RICHMOND RICHMOND WILKINSON RICHMOND MUSCOGEE MUSCOGEE BIBB HENRY FAYETTE HOUSTON UPSON HOUSTON HOUSTON SPALDING SPALDING HENRY SUMTER BIBB BUTTS COWETA TAYLOR BIBB

Widening Interchange Widening Widening Widening Widening Roadway Project Widening Widening Widening Widening Widening Bridges Bridges Intersection Improvement Widening Bridges Bridges Bridges Widening Widening Widening Bridges Roadway Project Roadway Project Widening Interchange Widening Interchange Widening Widening Median Work Widening Bridges Turn Lanes Interchange Intersection Improvement Bridges Bridges Bridges Bridges Bridges Widening

SR 347/FRIENDSHIP & THOMPSON MILL RD FM I-985 TO SR 211 I-20 @ I-520 INTERCHANGE RECONSTRUCTION I-520 FROM SR 4/US 1 TO SR 10/GORDON HIGHWAY SR 4/15TH ST/AUGUSTA FM MILLEDGEVILLE RD TO GOVERNMENT ST SR 4/US 1 FM SOUTH TO NORTH CTY LMTS IN OAK PARK/NEW LOC SR 4/US 1 FROM NORTH CITY LIMITS OAK PARK TO I-16 SR 841/NW EASTMAN BYP FM SR 27/US 341 NE TO SR 87/US 23 SR 24/SR 540 FM SOUTH OF CR 186 TO CR 10 IN WASHINGTON CO SR 24/SR 540 FM W OF CR 10/CR 342 TO W OF SR 68 SR 87/US 23 FM CR 8/LOG CABIN/DODGE TO S OF SR 257/BLECKLEY SR 4/US 1 FM CR 104 TO SR 4/US 1BU NEAR WADLEY & JEFFERSON SR 4/US 1 FM N SWAINSBORO BP TO CR 104| RELOC @ DELW'D SR 121/US 25 WIDEN LITTLE BUCKHEAD CREEK BRIDGE SR 16 @ ROOTY CREEK IN EAST EATONTON SR 212 FM S OF CR 8 TO N OF OAK HILL ELEMENTARY & @ CR 19 CR 65/WINDSOR SPRINGS RD FM SR 88 TO CR 1515/WILLIS FOREMAN CR 65/WINDSOR SPRINGS ROAD @ NS #734145P IN HEPHZIBAH SR 102 @ JOES CREEK 2.2 MI SE OF MITCHELL SR 83/BOSTWICK HWY @ LITTLE SANDY CRK 4.6 MI S OF BOSTWICK OLD PETERSBURG RD/OLD EVANS FM BASTON RD TO WASHINGTON RD CR 1501/WRIGHTSBORO RD FM JIMMIE DYESS PKWY TO I-520 RAMPS CR 65/WINDSOR SPRINGS RD FM WILLIS FORMAN RD TO TOBACCO RD CR 65/WINDSOR SPRINGS RD @ SPIRIT CREEK 2.7 MI N/HEPHZIBAH FALL LINE FWY ON NEW LOC FM SR 243 @ MORNINGSIDE TO US 441 ST. SEBASTIAN/GREENE ST EXT NEAR CSX RR & 15TH ST I-185/COLUMBUS FM SR 520 TO ST MARYS ROAD I-185 INTERCHANGE @ SR 1/SR 520 I-75 FM SR 247/US 41/PIERCE AVE TO ARKWRIGHT ROAD I-75 @ CR 824/JODECO ROAD - INTERCHANGE IMPROVEMENT SR 74 FROM SR 85 TO CS 597/COOPER CIRCLE SR 96 FROM E OF CR 540/OLD HAWKINSVILLE ROAD TO W OF SR 87 SR 3/US 19 FM N OF POTATO CRK TO CR 73/EAST & WEST COUNTY RD SR 127 FM NORTH PERRY PARKWAY TO BEAR BRANCH ROAD SR 127 @ MOSSY CREEK SR 155 @ CR 514/TEAMON ROAD SR 3/US 19 @ SR 16 IN GRIFFIN SR 81 @ CR 376/RACETRACK RD SR 49 @ SWEETWATER CRK & VINEY CRK 1 MI S OF ANDERSONVILLE SR 87/US 23 @ BEAVERDAM CREEK JUST NORTH OF I-75 SR 36 @ TOWALIGA RIVER 7.5 MI SW OF JACKSON SR 74 @ LINE CREEK COWETA-FAYETTE COUNTY LINE SR 128 @ FLINT RIVER 8 MI N OF REYNOLDS JEFFERSON'LE FM WALNUT CK-RECREATION & MILLER'LD TO BRISTOL

342621343110343370343420343460351000362910362930370813371280410245410530422400422560431170442965450510511090511092511112511140522130522300522590522790533150550550550593570760571455610890610930620940621255621340621410621415621500621595621600621660621700621710-

SPALDING TALBOT HARRIS HEARD SPALDING MUSCOGEE TROUP HEARD MONROE TALBOT TURNER COOK CLINCH DOUGHERTY BROOKS BROOKS LOWNDES GLYNN GLYNN MCINTOSH LIBERTY EMANUEL APPLING APPLING CHATHAM WHEELER CHATHAM CHATHAM MONTGOMERY MONTGOMERY WHITFIELD GORDON CHEROKEE BARTOW FANNIN BARTOW BARTOW BARTOW PICKENS FLOYD FLOYD BARTOW BARTOW

Widening Bridges Bridges Bridges Bridges Intersection Improvement Roadway Project Widening Bridges Bridges Widening Widening Widening Ramp Bridges Bridges Widening Widening Bridges Bridges Widening Widening Widening Widening Roadway Project Bridges Widening Roadway Project Bridges Bridges Interchange Interchange Widening Widening Widening Widening Widening Widening Passing Lanes Roadway Project Roadway Project Preliminary Engineering Passing Lanes

SR 3/US 19/H.TALMADGE HWY FM N OF CS 804 NORTH TO N OF CR 18 CR 172/POBIDDY ROAD@ FLINT RIVER N OF JCT SR 22/UPSON/TALBOT SR 116 @ LITTLE PALMETTO CREEK HAMILTON - NE SECTION SR 100 @ NEW RIVER & @ CLEAR CREEK W OF CORINTH CS 797/SIXTH STREET @ SR 155-CS 792-NOR-SOU RR IN GRIFFIN SR 22 SPUR @ CS 2107/BROWN AVE & CS 1056/PEACOCK AVE I-185 CONN FM I-185 @ I-85 TO SR 1/US 27 S OF BEECH CREEK SR 1/US 27 FM SR 54/TROUP TO SR 34 IN HEARD COUNTY CR 158/ROCKY CREEK ROAD @ LITTLE TOWALIGA RIVER W OF I-75 CR 17/GORMAN ROAD @ CSX RAILROAD IN TALBOTTON I-75 FM TIFT COUNTY LINE TO SR 32 - PHASE I I-75 FM CR 246/KINARD BRIDGE RD TO TIFT COUNTY LINE-PHASE I SR 89/US 441 FM N OF WILLIAMSBURG RD TO CR 40/204 SR 3/LIBERTY EXWY @ CLARK AVE - RAMPS & TURN LANES/ALBANY CR 305/DIXIE RD @CSX RAILROAD APPROX 7 MILES W OF QUITMAN GA SR 33 @ REEDY CREEK APP 0.8 MI SOUTH OF PAVO CR 188/NORTH OAK ST EXT FM SR 7BU TO CS 1093/BRECKENRIDGE DR I-95 FM US 17/SR 520 SOUTH OF BRUNSWICK TO NORTH OF SR 303 I-95 @ SOUTH BRUNSWICK RIVER AND HILLERY SLOUGH I-95 @ CHAMPNEYS RIVER - BUTLER RIVER- DARIEN CK- CATHEAD CK I-95 FM S OF SOUTH NEWPORT RIVER TO N OF NORTH NEWPORT RVR SR 4/US 1 FM LYONS CL TO SOUTH CL/OAK PARK IN EMANUEL CO SR 4/US 1 FM BACON CL TO N OF SR 15/BAXLEY INCL 3-BRIDGES SR 27/US 341 FM 4-LN IN BAXLEY TO W CL OF SURRENCY JIMMY DELOACH PARKWAY EXTENSION FM I-16 TO SR 26/US 80 SR 30/US 280 @ OCHWALKEE CREEK 1 MI E OF GLENWOOD SR 204 SPUR/DIAMOND CSWY FM FERGUSON AVE TO MCWHORTER DR POOLER PARKWAY EXTENSION FM PINE BARREN RD TO SOUTH OF US 80 CR 12 @ TIGER CREEK 3 MI SE OF TARRYTOWN CR 1 @ TIGER CREEK 1 MI E OF TARRYTOWN I-75 INTERCHANGE @ CR 665/CARBONDALE ROAD I-75 INTERCHANGE @ SR 136 & SR 136 FM CAMP CRK TO SR 3/US 41 SR 92 FM I-75 TO WADE GREEN ROAD SR 61/SR 113 FM CR 533 NO TO PLYMOUTH DR/CARTERSVILLE|EXC BR SR 5 FM SR 2/BLUE RIDGE N TO PROP MCCAYSVILLE BYP NR CR 138 SR 113/OLD ALA RD RELOC FM SR 113--PUMPKINVINE CK-TO CR 699 SR 113/OLD ALA RD RELOC FM CR 699 TO EAST OF SR 293 @ CSX RR SR 140 FM 0.3 MI W OF OOTHKALOOGA CRK TO SR 3/US 41 SR 53 FM E OF CR 36/OLD MILL WHITE RD TO E OF STEVE TATE RD S ROME BYP/US 27 FM SR 1 ALONG BOOZE MTN RD TO SR 101 @CR 96 WEST ROME BYPASS FM 0.34 MI S OF COOSA RIVER TO SR 20 SR 20/NEW ROUTE/ATLANTA TO MEMPHIS HIGHWAY-PE ONLY & BARTOW SR 20 EB FM MP 17.64 TO MP 20.24

621760621860621990642140642220642405662510671225712602712630713370720570720815721152721440721582722010722020731047731080742870751300751310751810752270752560752630752960752970753010753230762590770900870336M002558 M003158 M003242 M003309 M003320 M003340 M003374 M003715 M003798

BARTOW POLK CARROLL PICKENS CATOOSA FLOYD GORDON BARTOW CLAYTON CLAYTON COBB FULTON CLAYTON COBB CLAYTON ROCKDALE FORSYTH FORSYTH ROCKDALE ROCKDALE CLAYTON COBB FULTON CLAYTON ROCKDALE FULTON COBB FULTON FULTON CLAYTON DEKALB FULTON FULTON ALL ALL COBB HOUSTON DEKALB ALL DOOLY ALL DEKALB ELBERT

Bridges Widening Interchange Bridges Widening Bridges Roadway Project Bridges Bridges Interchange ATMS/ITS Median Work Widening Widening Widening Roadway Project Widening Widening Widening Widening Widening Widening Widening Widening Widening Bridges Bridges Bridges Bridges Bridges Roadway Project Intersection Improvement Bridges Preliminary Engineering Bridges Concrete Rehab Resurface & Maintenance Interchange Pipe Concrete Rehab Miscellaneous Improvements Resurface & Maintenance Resurface & Maintenance

SR 113 @ RICHLAND CREEK CEDARTOWN BYPASS/US 27 FM SR 100 N TO JUST S. OF CR 334 SR 1/US 27 @ SR 166 IN CARROLLTON SR 136 BRIDGE REPLACEMENT OVER TALKING ROCK CREEK N OF SR 53 SR 146/CLOUD SPR RD FM SR 1/US 27 EAST TO CR 553/LAKEVIEW RD SR 100 @ COOSA RIVER 0.3 MI SOUTH OF JCT WITH SR 20 SOUTH CALHOUN BYPASS FM SR 53 @ CR 13 EAST TO SR 53 @ CR 64 CR 851/HARDIN BRIDGE ROAD @ ETOWAH RIVER NORTH OF EUHARLEE LEE STREET IN MORROW OVER I-75 I-75 FM MEADOW BROOK DR TO MORROW CITY LIMITS &SR 54 INTERCH I-285 ATMS/SURVEIL FM I-20 W IN FULTN N TO I-75 IN COBB SR 8/US 78 FROM PROCTOR CREEK TO E OF CSX RR SR 42 FM CR 1348/LAKE HARBIN TO S OF CR 1350/ANVIL BLOCK RD SR 3/US 41/COBB PKWY FM PACES MILL RD TO AKERS MILL ROAD SR 54 FM MCDONOUGH RD/FAYETTE NE TO SR 3/US 19/US 41/CLAYTON SR 20/138 - RELOCATION OF OLD SALEM ROAD AWAY FROM I-20 SR 400 FROM SR 140/HOLCOMB BRIDGE RD TO MCFARLAND RD GRTA SR 400 FM HAYNES BRIDGE RD/FULTON TO SR 20/FORSYTH - GRTA SR 138/SR 20 FROM NORTH OF I-20 TO SIGMAN ROAD SR 138 FM DENNARD RD TO MILLER BOTTOM RD SR 920 FROM SR 54/FAYETTE TO SR 3/US 19/CLAYTON JOHNSON FERRY RD FM COLUMNS DR TO ABERNATHY & BRIDGE ABERNATHY RD FM JOHNSON FERRY RD TO ROSWELL RD - GRTA CR 1337/FLINT RIVER RD FM GLENWOOD DR TO KENDRICK RD - GRTA CR 164/OLD COVINGTON HWY FM GREEN STREET TO SR 20/138 - GRTA SR 999/CS 3586/SPRING STREET @ SOU RR- CSX RR REPLACEMENT CR 4455/CANTON ROAD & RR BR OVER SR 3/US 41 N OF MARIETTA CR 186/HEMBREE ROAD @ FOE KILLER CREEK 2 MI SW OF ALPHARETTA CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517 CR 1351/REX ROAD @ BIG COTTON INDIAN CREEK IN REX - GRTA LITHONIA IND FM STN MTN-LITHONIA TO ROGERS LAKE&RR SEP-GRTA SR 54/UNIVERSITY AVE/MCDONOUGH @ CAPITOL/RIDGE/GAMMON AVE CS 3101/GRIMES BRIDGE ROAD @ BIG CREEK IN SOUTH ROSWELL ASSISTANCE FOR PRIORITY FEDERAL ENVIRONMENTAL PROJECT REVIEW PROPOSED BRIDGE REHABILITATION @ 19 LOCATIONS IN DISTRICT 6 SR 6 FROM SR 5/US 78/DOUGLAS TO SR 176/COBB I-75 FM SR 26/HOUSTON TO SR 96/PEACH I-20 @ CR 5150/PANOLA ROAD - INTERCHANGE IMPROVEMENT RELINE DRAINAGE PIPES @ SEV SR LOCS IN DISTRICT 6 I-75 FROM CR 323/PINEHURST-HAWKINSVILLE ROAD TO SR 230 FORCE ACCOUNT MAINTENANCE ACTIVITIES FOR FY 2012 SR 12/US 278 FROM SR 10 TO SR 124 SR 17 FROM CR 355/LENA DRIVE TO SR 172

M003813 M003888 M003997 M004081 M004090 M004124 M004180 M004186 M004187 M004188 M004189 M004190 M004191 M004195 M004196 M004201 M004202 M004203 M004204 M004211 M004214 M004220 M004221 M004224 M004225 M004226 M004227 M004228 M004232 M004235 M004242 M004243 M004244 M004245 M004248 M004251 M004266 M004269 M004274 M004281 M004298 M004301 M004307

GWINNETT ALL MORGAN WHEELER CLARKE DEKALB OCONEE ALL HALL TWIGGS TREUTLEN ALL ALL HABERSHAM SEMINOLE DEKALB FULTON FULTON FULTON COWETA MILLER COBB COBB TATTNALL BACON TOOMBS CANDLER PIERCE TERRELL NEWTON BULLOCH BACON LIBERTY WARE DEKALB COBB FULTON FULTON HENRY RICHMOND GWINNETT BARROW RICHMOND

Resurface & Maintenance Bridges Resurface & Maintenance Resurface & Maintenance Resurface & Maintenance Bridges Pavement Markings Signing Signing Signing Signing Signing Signing Signing Resurface & Maintenance Signing Signing Signing Signing Resurface & Maintenance Resurface & Maintenance Resurface & Maintenance Resurface & Maintenance Resurface & Maintenance Resurface & Maintenance Resurface & Maintenance Resurface & Maintenance Resurface & Maintenance Resurface & Maintenance Resurface & Maintenance Resurface & Maintenance Resurface & Maintenance Resurface & Maintenance Resurface & Maintenance Resurface & Maintenance Resurface & Maintenance Resurface & Maintenance Resurface & Maintenance Resurface & Maintenance Resurface & Maintenance Resurface & Maintenance Resurface & Maintenance Resurface & Maintenance

SR 141 CONN FROM SR 141 TO SR 140 PROPOSED STEEL BEAM REPAIR @ 14 LOCS - STATEWIDE I-20 FROM SR 142/NEWTON TO SR 83/MORGAN SR 31/US 319 FROM N OF SR 30 TO DODGE COUNTY LINE SR 15 FM SR 10 LOOP TO 0.2 MI S OF CR 478/NEWTON BRIDGE ROAD I-85 @ 1 LOC & I-285 @ 5 LOCS - BRIDGE UPLIFT RETROFITS SR 316 FROM E OF SR 120 TO E OF CR 261/OCONEE CONNECTOR I-85 @ 13 LOCS BETWEEN BARROW COUNTY & HART COUNTY I-985 @ 7 LOCS IN GWINNETT & HALL COUNTY I-16 @ 5 LOCS & I-75 @ 4 LOCS I-16 @ 12 LOCS BETWEEN BLECKLEY COUNTY & EMANUEL COUNTY I-16 @ 17 LOCS BETWEEN CANDLER COUNTY & CHATHAM COUNTY I-20 @ 22 LOCS BETWEEN NEWTON COUNTY & RICHMOND COUNTY SR 365 @ SR 15/US 123 & @ SR 105/US 441BU SR 91 FROM SR 39/SEMINOLE TO SR 1/US 27/MILLER I-285 @ 16 LOCS IN DEKALB COUNTY I-285 @ 13 LOCS IN COBB & FULTON COUNTY I-285 @ 8 LOCS IN FULTON COUNTY I-285 @ 9 LOCS IN CLAYTON; DEKALB & FULTON COUNTY SR 34 FROM SR 14 TO 0.21 MI E OF SR 154 SR 91 FROM CS 539/PINE STREET TO BAKER COUNTY LINE SR 120 FROM SR 3 TO SR 3 CONN/SR 120 ALT SR 3 FROM SR 5 CONN TO BARTOW COUNTY LINE SR 57 FROM EMANUEL COUNTY LINE TO 0.06 MI N OF SR 23/SR 121 SR 19 FROM SR 4/US 1 TO APPLING COUNTY LINE SR 4 FM CR 1/NAILS FERRY RD/APPLING TO ALTAMAHA RIVER/TOOMBS SR 46 FROM EMANUEL COUNTY LINE TO SR 121 SR 32 FM 0.17 MI E OF BACON CO LINE TO BRANTLEY CO LINE SR 49 FM N OF CR 78/JERRY DUNN RD TO S OF KINCHAFOONEE CREEK SR 81 FROM SR 12 TO WALTON COUNTY LINE SR 73 FROM SR 26/US 80 TO SCREVEN COUNTY LINE SR 4 FM S OF CS 547/WILLIAMS ST TO N OF HURRICANE CRK OVRFLW SR 38/US 84 FROM SR 119 TO E OF CS 926/RYON AVE SR 122 FROM CLINCH COUNTY LINE TO SR 520/US 82 SR 10 FROM WOODCROFT DRIVE TO GOLDSMITH ROAD/MEMORIAL DRIVE SR 8 FROM CR 2407/JAMES ROAD TO E OF CHATTAHOOCHEE RIVER SR 14 FROM S OF CS 2005/GRIFFITH DRIVE TO SR 74 SR 9 FROM SR 120 TO CS 9049/CHURCH STREET SR 42 FROM SR 138 TO CLAYTON COUNTY LINE SR 88 FROM 0.02 MI W OF CS 712/JONES STREET TO SR 121/US 25 SR 124 FROM DEKALB COUNTY LINE TO CR 1948/ANNISTOWN ROAD SR 82 FROM SR 11 TO CR 324/PLEASANT HILL CHURCH ROAD SR 223 FROM SR 388/COLUMBIA TO SR 10/RICHMOND

M004308 M004309 M004311 M004312 M004340 M004342 M004343 M004349 M004365 M004368 M004369 M004370 M004371 M004373 M004378 M004379 M004380 M004381 M004412 M004414 M004416 M004418 M004428 M004431

MORGAN MORGAN JEFFERSON WARREN COWETA SUMTER UPSON TWIGGS SEMINOLE LANIER LANIER LANIER ECHOLS QUITMAN LOWNDES DECATUR COFFEE WORTH FULTON CLAYTON CLAYTON FULTON FULTON FULTON

Resurface & Maintenance Resurface & Maintenance Resurface & Maintenance Resurface & Maintenance Resurface & Maintenance Resurface & Maintenance Resurface & Maintenance Resurface & Maintenance Resurface & Maintenance Resurface & Maintenance Resurface & Maintenance Resurface & Maintenance Resurface & Maintenance Resurface & Maintenance Resurface & Maintenance Resurface & Maintenance Resurface & Maintenance Resurface & Maintenance Resurface & Maintenance Resurface & Maintenance Resurface & Maintenance Bridges Bridges Bridges

SR 24/US 129 FROM I-20 TO SR 24 BYPASS SR 24 BYP FROM SR 24 TO SR 12 SR 4 FROM CR 183/WYNDER SMITH ROAD TO SR 4BU SR 12 FROM TALIAFERRO COUNTY LINE TO CS 639/MEADOW ROAD SR 41 FROM MERIWETHER COUNTY LINE TO SR 14 SR 30 FROM SR 3/US 19/SUMTER TO SR 41/MARION SR 36 FROM SR 41/TALBOT TO POTATO CREEK/UPSON SR 19 FROM SR 18 TO WILKINSON COUNTY LINE SR 38 FROM SR 370/EARLY TO E OF CS 574/7TH STREET/SEMINOLE SR 135 BYPASS FROM SR 135 TO SR 135 SR 11 CONN FROM SR 122 TO SR 11 IN LAKELAND SR 11 BYPASS FROM SR 11 TO SR 135 BYPASS IN LAKELAND SR 94 FROM SR 11/ECHOLS TO SR 89/CLINCH SR 50 FROM SR 27 TO CR 84/UNION CHURCH ROAD SR 94 FROM SR 7 TO ECHOLS COUNTY LINE SR 253 FROM SEMINOLE COUNTY LINE TO SR 1BU SR 158 FROM IRWIN COUNTY LINE TO SR 206 SR 520 FROM DOUGHERTY COUNTY LINE TO CR 318/OLD SR 50 SR 372 FROM CR 1324/MAYFIELD ROAD TO CHEROKEE COUNTY LINE SR 3 FROM CR 332/HOLIDAY BLVD TO I-285 SR 314 FROM SR 279/CLAYTON TO SR 139/FAYETTE I-85 @ I-285 - BOX GIRDER REHAB SR 13 @ SR 9 - BOX GIRDER REHAB AMTRACK STATION @ NORFOLK SOUTHERN RAILROAD

8/13/2011 Project Id
0000523 0000805 0001298 0002754 0003161 0005071 0005088 0006073 0006335 0006395 0006396 0006397 0006398 0006399 0006400 0006401 0006402 0007119 0008219 0008256 0008344 110400210450210530210570210810311445311465311630311790410245410260410520410530511090511092-

Primary County
BUTTS CRISP FULTON CLAYTON COWETA GLYNN GLYNN TIFT FORSYTH DEKALB COBB DEKALB FULTON FULTON COBB CLAYTON COBB FULTON COLUMBIA CHEROKEE CLAYTON HALL RICHMOND NEWTON RICHMOND NEWTON MUSCOGEE BIBB MUSCOGEE COWETA TURNER CRISP COOK COOK GLYNN GLYNN

GARVEE Bond AC Projects to be Converted under PI # 0006372, 0006373, 0006366, 0006367

Work Type
Interchange Interchange Realignment ATMS/ITS Widening Widening Bridges Widening ATMS/ITS ATMS/ITS ATMS/ITS ATMS/ITS ATMS/ITS ATMS/ITS ATMS/ITS ATMS/ITS ATMS/ITS Signals Widening Managed Lanes Rail Projects Interchange Interchange Interchange Widening Widening Widening Interchange Interchange Ramp Widening Widening Widening Widening Widening Bridges

Description
I-75 @ SR 16/ARTHUR BOLTON PKWY I-75 FM SR 159 NEAR ASHBURN TO SR 300/CRISP COUNTY - PH II I-75/85 ATLANTIC STATION:14TH ST BR; RAMP; WILLIAMS ST RELOC I-285 FM I-75/CLAYTON NE THRU FULTN TO I-20/DEK-ATMS SURVEIL I-85 FROM N OF CR 417/FOREST ROAD TO N OF SR 34 I-95 FM NORTH OF SR 303 TO CR 586 I-95 @ TURTLE RIVER & GIBSON CREEK I-75 FM COOK COUNTY LINE TO CR 204/SOUTHWELL BLVD - PHASE I SR 400 FM S OF SR 120 TO N OF CR 458 - ATMS COMM/SURVEILANCE I-285 NE ATMS RAMP METERS FM I-85 TO I-20 I-75 N ATMS RAMP METERS FROM I-85 TO CR 4395/CHASTAIN ROAD I-85 N ATMS RAMP METERS FM BUFORD HWY TO PLEASANT HILL SR 400 ATMS RAMP METERS FM I-285 TO SR 120/OLD MILTON PKWY I-75/I-85 ATMS RAMP METERS FM UNIVERSITY AVE TO 10TH ST I-285 FM I-20/FULTON TO US 41/COBB PKWY - ATMS RAMP METERS I-75 FM SR 138 TO CS 3096/CLEVELAND AVE - ATMS RAMP METERS I-20 FM I-285/FULTON TO I-285/DEKALB - ATMS RAMP METERS FULL UPGRADE & REPAIR OF TRAFFIC SIGNALS @ 3 LOCS IN FULTON I-20 FROM SR 383/BELAIR ROAD TO E OF CR 601/WHEELER ROAD I-75/I-575 HOV MANAGE LANE IN COBB & CHEROKEE CENTRAL GEORGIA RAILROAD FM BATTLE CREEK RD TO MT ZION RD I-985 SPLIT DIAMOND INTERCHANGE @ SR 13 & SR 53 & CD SYSTEM I-20 @ I-520 INTERCHANGE RECONSTRUCTION I-20 @ SR 142/COVINGTON (INCL RELOC OF CR 72/FRONTAGE RD) I-20 FM E OF CR 842/WARREN RD TO W OF AUGUSTA CANAL I-20 FM ALCOVY ROAD INCL INTERCHANGE TO SR 142 IN COVINGTON I-185/COLUMBUS FM SR 520 TO ST MARYS ROAD I-75/I-475 INTERCHANGE @ CR 740/HARTLEY BRIDGE ROAD I-185 INTERCHANGE @ SR 1/SR 520 I-85 @ SR 34 RAMP RECONSTRUCTION SOUTHEAST QUADRANT I-75 FM TIFT COUNTY LINE TO SR 32 - PHASE I I-75 FM SR 300 TO DOOLY COUNTY LINE I-75 FM SR 37 TO CR 246/KINARD BRIDGE RD - PHASE I I-75 FM CR 246/KINARD BRIDGE RD TO TIFT COUNTY LINE-PHASE I I-95 FM US 17/SR 520 SOUTH OF BRUNSWICK TO NORTH OF SR 303 I-95 @ SOUTH BRUNSWICK RIVER AND HILLERY SLOUGH

511100511110511112511120611210712930713280713320713370721940722010-

GLYNN MCINTOSH MCINTOSH MCINTOSH CATOOSA DOUGLAS DEKALB DEKALB COBB DEKALB FORSYTH

Widening Widening Bridges Widening Interchange Interchange Interchange Interchange ATMS/ITS ATMS/ITS Widening

I-95 FM N OF CSX RR TO N OF S ALTAMAHA RIVER;EXC SR 99 INT I-95 FM JUST N OF ALTAMAHA RIVER BRIDGE TO SR 251 I-95 @ CHAMPNEYS RIVER - BUTLER RIVER- DARIEN CK- CATHEAD CK I-95 FM 1 MILE NORTH OF SR 251 TO NORTH OF SR 57 - PHASE I I-75 @ SR 146/CLOUD SPRINGS ROAD I-20 @ SR 92/FAIRBURN ROAD & APPROACHES IN DOUGLASVILLE I-285 @ SR 10/MEMORIAL DR & RELOCATE GEORGE LUTHER DR I-285 @ SR 8/US 29/LAWRENCEVILLE HIGHWAY I-285 ATMS/SURVEIL FM I-20 W IN FULTN N TO I-75 IN COBB SR 410 ATMS/COMM/SURVEIL FM LAWRENCEVILLE HWY TO E PARK PL SR 400 FROM SR 140/HOLCOMB BRIDGE RD TO MCFARLAND RD GRTA

Appendix C MPO Financial Information

2012-2015 STIP Totals by MPO Area

Albany Athens Atlanta TMA Augusta TMA Brunswick Chattanooga TMA Columbus TMA Dalton Gainesville Hinesville Macon Rome Savannah TMA Valdosta Warner Robins MPO Total Rural Area State Total

2012 $19,535,862 $16,006,029 $819,899,726 $21,291,921
$1,200,485 $18,494,167
$6,751,763 $4,530,695 $73,942,651 $12,270,600 $27,145,314 $28,833,279 $145,084,011 $29,828,793
$0 $1,224,815,296
$825,048,647 $2,049,863,943

2013 $17,738,440
$8,010,418 $520,884,760
$28,108,238 $11,549,461
$3,660,118 $33,040,442 $30,794,675 $54,022,765 $23,651,728 $11,311,218 $14,595,643 $54,816,139 $20,293,396 $19,278,609 $851,756,050 $826,873,538 $1,678,629,588

2014 $19,672,852 $12,995,859 $1,293,437,575 $32,656,614
$4,820,529 $28,113,284 $22,656,743
$2,069,606 $795,906
$11,620,721 $100,000 $0
$13,478,931 $0
$35,679,181 $1,478,097,801
$974,463,690 $2,452,561,491

2015 $53,651,305
$1,451,451 $484,092,674
$29,521,687 $0
$7,503,258 $13,341,040
$0 $63,506,739
$404,706 $10,183,493
$0 $22,198,146 $37,753,296
$0 $723,607,795 $957,786,153 $1,681,393,948

Total $110,598,459
$38,463,757 $3,118,314,735
$111,578,460 $17,570,475 $57,770,827 $75,789,988 $37,394,976
$192,268,061 $47,947,755 $48,740,025 $43,428,922
$235,577,227 $87,875,485 $54,957,790
$4,278,276,942 $3,584,172,028 $7,862,448,970

excludes Transit projects

Appendix D Maps
Georgia Rail System Existing Urban and Rural Transit Systems
Statewide Bike Route Network Governor's Road Improvement Program (GRIP)

Urban and Rural Transit Map

! ! ! ! Regional Urban Transit System (May

!!

!

!!

!

Dade Catoosa

Fannin

WhitfieldMurray

Towns Union

Rabun

Walker

Gilmer

WhiteHabersham

Chattooga Floyd

Lumpkin Gordon PickensDawson
Hall Bartow CherokeeForsyth

Stephens BanksFranklin Hart

not include entire county) Rural County Transit
Urban Transit System Rural City Transit System

Jackson Madison Elbert

Polk City of Cedartown Paulding Cobb

GwinnettBarrow Clarke Oglethorpe

Haralson

DeKalb Walton Oconee

Wilkes Lincoln

Carroll

Douglas Fulton

City of Social Circle

Rockdale

Greene

Clayton Newton Morgan

Taliaferro

Columbia

McDuffie

Fayette Henry

Warren

Coweta Heard

Spalding Butts Jasper Putnam Hancock Glascock

Richmond

TroupMeriwetherPike Lamar Monroe

Jones Baldwin

Jefferson Washington

Burke

Upson

Harris Talbot

Bibb

Wilkinson

Crawford

Twiggs

Johnson

Jenkins Screven

Muscogee

Taylor Peach

Emanuel

ChattahoocheeMarion

HoustonBleckley Laurens Treutlen Macon

Candler Bulloch Effingham

Schley City of Unidilla Pulaski

Dooly StewartWebsteCriStyuomf AtmeerricuCsity of Vienna

Quitman

Crisp Wilcox

Montgomery Dodge Wheeler Toombs

Evans

Telfair

Tattnall

Bryan Liberty

Randolph Terrell Lee

Turner

Jeff Davis

Ben Hill

Appling

Long

Chatham

Clay Calhoun Dougherty Worth

Irwin

Tift

Coffee Bacon

Wayne

McIntosh

Early Baker

Miller

Mitchell

Colquitt

Berrien Atkinson
Cook Lanier

Pierce

Ware

Brantley

Glynn

Seminole Decatur Grady Thomas Brooks Lowndes

Clinch

Charlton

Camden

Echols

*Map does not include transit services provided by all Regional Comissions on behalf of the county.

09/2011

Georgia Department of Transportation
Fact Sheet
The Governor's Road Improvement Program (GRIP)

Definition

The Governor's Road Improvement Program, commonly referred to as GRIP, is a system of proposed economic developmental highways in Georgia. GRIP was originally adopted in 1989 by the Georgia General Assembly. Georgia law defines the following corridors as the GRIP:

Appalachian Developmental Highway South Georgia Parkway/US 82 US 319 Golden Isles Parkway Fall Line Freeway SR 72 Savannah River Parkway US 19 US 1/SR 17 US 27

US 441 US 84 Sunbelt Parkway/SR 133 Power Alley/US 280 East-West Highway SR 40 SR 32 SR 125 SR 15

GRIP was initiated in 1989 and originally consisted of 12 corridors with 2,845 miles of roadway, including 113 miles of truck access routes. During the 2001 and 2005 Legislative sessions, the General Assembly added new routes, including three truck access routes. The current length of the GRIP system has grown to 3,273 miles. The total length will continue to vary as alignments, including bypasses and shifts, are determined through the engineering process.

Purpose
Economic development highways traditionally receive strong support in Georgia. The purpose of the GRIP system explains why :
Connectivity in Rural Georgia: GRIP will connect 95% of Georgia cities with a population of 2,500 or more to the Interstate System and ensure that 98% of all areas in the state will be within 20 miles of a four-lane road.
Provide opportunities for growth: Several studies have provided evidence that GRIP fosters economic development.
Provide effective and efficient transportation for the growing statewide population
Safer travel in rural areas: Accidents occur three times more often on 2-lane highways than on multi-lane divided highways especially on corridors with the higher travel volumes.

Visit www.dot.ga.gov for updates to this fact sheet.

GDOT GRIP System Fact Sheet, updated April 2011, Page 1

Current GRIP Corridor Statistics

GRIP CORRIDOR Appalachian Developmental
Highw ay South Georgia Parkw ay/US 82
US 319
Golden Isles Parkw ay
Fall Line Freew ay
SR 72
Savannah River Parkw ay
US 19
US 1/SR 17
US 27
US 441
US 84 Sunbelt Parkw ay/SR 133
Pow er Alley/US 280 SR 32 SR 40
East-West Highw ay SR 15 SR 125

COMPLETE OR

TOTAL

UNDER

LENGTH CONSTRUCTION

(m iles)

(m iles)

60

58

262

262

72

72

168

168

215

183

45

20

156

156

194

194

331

157

352

312

371

196

259

235

66

0

204

177

149

13

29

13

169

0

149

0

22

4

COMPLETE OR UNDER
CONSTRUCTION (pe r ce ntage ) 97%
100% 100%
100%
85%
44%
100%
100%
47%
89%
53%
91% 0% 0% 0% 45% 0% 0% 18%

CORRIDOR STATUS No Activity on Final
2 Miles
Complete
Complete Engineering Active Construction Complete Engineering Active Construction Active Engineering and
Construction Active Engineering and
Construction Active Engineering and
Construction Active Engineering and
Construction Active Engineering and
Construction Active Engineering and
Construction Active Engineering and
Construction Active Engineering and
Construction
Active Engineering
Active Engineering on 27 miles only
Active Engineering on 44 miles only
Active Engineering No Activity No Activity No Activity

REM AINING COST TO
COM PLETE (m illions)
$16.2
$0.0 $0.0
$0.0
$124.2
$148.7
$0.0
$0.0
$1,145.5
$471.0
$1,036.1
$140.6 $348.5 $1,842.1 $1,518.1
$58.5 $676.7 $1,120.6 $207.4

Subtotals for Original 1989 GRIP Cor r idor s :
Subtotals for Active & Com plete GRIP Corridors: Grand Totals for all GRIP
Cor r idor s :

2485 2933 3273

2013 2203 2220

81% 75% 68%

$3,082.3 $6,452.0 $8,854.2

Meeting the Challenge
GDOT is striving to complete the construction of the GRIP System. A strategy is in place that recognizes the complexity of each of the three phases of project development:
Engineering (including environmental studies) Right of way acquisition Construction These phases are not generally scheduled for completion in the same year, and in most cases a phase takes several years to complete. Another consideration in scheduling each phase is the availability of funds. A multiple-year funding program to accomplish the planning, design, right of way and construction of the GRIP System is based on these considerations and the past funding history for GRIP projects.
Contact:
Genetha Rice-Singleton, Program Control Administrator 404-631-1522

Visit www.dot.ga.gov for updates to this fact sheet.

GDOT GRIP System Fact Sheet, updated April 2011, Page 2

Governor's Road

Improvement Program

DADE
59

CATOOSA

East West WALKER Highway 27

WHITFIELD MURRAY

GILMERFAANpNpINalachiLaUnMHPUiDKgNIeINhOvwNealoypWTmHOITWeEnNStaHl ABERRASBHU4ANM41

CHATTOOGA

75 GORDON

PICKENS 575

DAWSON
400

STEPHENS

HALL

BANKS

HART

FLOYD

FRANKLIN

BARTOW

CHEROKEE

FORSYTH

(GRIP) CURRENT STATUS
APRIL 2011

POLK HARALSON

COBB PAULDING
2D0OUGLAS

FULTON

GWINNETT DEKALB
ROCKDALE

85 JACKSON

MADISON

72

BARROW

CLARKE

WALTON

OCONEE
441

OGLETHORPE

MORGAN

GREENE

ELBERT
17
WILKES

LINCOLN

CARROLL

27
HEARD

COWETA
85

CLAYTON FAYETTE

NEWTON HENRY

SPALDING

BUTTS

JASPER

PUTNAM

TROUP

MERIWETHER

PIKE

LAMAR

MONROE

BALDWIN
JONES Line

TALIAFERRO 20 WARREN

COLUMBIA

MCDUFFIE

RICHMOND

HANCOCK

y GLASCOCK FreewaJEFFERSON

15

1

WASHINGTON

BURKE

UPSON

Savannah River Parkway

HARRIS

TALBOT

BIBB
Fall CRAWFORD

WILKINSON TWIGGS

JOHNSON

JENKINS EMANUEL

SCREVEN

MUSCOGEE

TAYLOR

CHATTAHOOCHEE

MARION

19

SCHLEY

PEACH MACON

HOUSTON

BLECKLEY
Golden

LAURENS

16 TREUTLEN

CANDLER

BULLOCH

EFFINGHAM

STEWART

WEBSTER

SUMTER

QUITMAN
82 RANDOLPH

TERRELL

LEE

CLAY

CALHOUN

DOUGHERTY

DOOLY
280 CRISP 32

PULASKI

WILCOX

TURNER

BEN HILL IRWIN

DODGE

MONTGOMERY

WHEELER

TOOMBS

280 EVANS

TATTNALL

BRYAN

TELFAIR
441

Isles
JEFF DAVIS

APPLING

LIBERTY
P34a1rkway LONG 84

CHATHAM CHATHAM

South

125

WORTH

COFFEE

32

TIFT

Georgia

BACON

WAYNE

MCINTO9SH5

MCINTOSH

27 EARLY
MILLER

BAKER

MITCHELL

COLQUITT

75 COOK

BERRIEN

Parkway
ATKINSON

PIERCE BRANTLEY

GLYNN

GLYNN

SEMINOLE

DECATUR

84

GRADY

133
319

THOMAS

BROOKS

LANIER

WARE

LOWNDES

CLINCH

441

1
CHARLTON

CAMDEN
40

ECHOLS

Open Under Construction
Right of Way Preliminary Engineering No Activities