1.0 1.1 1.2 1.3

INTRODUCTION .............................................................................................................2 Study Purpose .............................................................................................................2 Study Area Description ................................................................................................3 Study Process .............................................................................................................5

2.0 DEMOGRAPHIC INFORMATION....................................................................................6 2.1 Future Population ........................................................................................................6 2.2 Employment Data ........................................................................................................7

3.0 ASSESSMENT OF TRANSPORTATION FACILITIES.....................................................8

4.0 IMPROVEMENT DEVELOPMENT PROCESS..............................................................12

5.0 IMPROVEMENT RECOMMENDATIONS ......................................................................13

6.0 6.1 6.2 6.3 6.4

PRIORITIZATION..........................................................................................................24 Greene County Priorities ...........................................................................................24 Jasper County Priorities.............................................................................................25 Morgan County Priorities ...........................................................................................26 Putnam County Priorities ...........................................................................................27

7.0 CONCLUSIONS ............................................................................................................29

LIST OF FIGURES

Figure 1.2 Figure 1.3 Figure 5.1 Figure 5.2

Study Area ..........................................................................................................4 Study Process.....................................................................................................5 Recommended Improvements - Roadway ........................................................22 Recommended Improvements Bicycle & Pedestrian......................................23

Table 2.1 Table 2.2 Table 5.1 Table 5.2 Table 5.3 Table 5.4

LIST OF TABLES
Projected Population...........................................................................................7 Existing Work Commute Patterns .......................................................................7 Recommended Improvements Greene County ..............................................14 Recommended Improvements Jasper County ...............................................16 Recommended Improvements Morgan County ..............................................18 Recommended Improvements Putnam County..............................................20

East Georgia Multi-County Transportation Study

i

Executive Summary

Technical Memorandum August 2007

1.0 Introduction

Growth in Greene, Jasper, Morgan, and Putnam Counties has resulted in increased travel demand through the 4-County Region. The Georgia Department of Transportation (GDOT) Office of Planning, in conjunction with these four Counties, initiated the East Georgia MultiCounty Transportation Study to develop a Long Range Transportation Plan (LRTP) to serve the 4-County Region through the planning horizon, 2030. Currently, the transportation planning function for the Counties is provided by GDOT through coordination with each County. The Multi-County Transportation Study is built upon existing work efforts to date, and provides a mechanism for guiding transportation decision-making as development pressures increase through the 4-County Region.

HNTB coordinated with GDOT, Greene, Jasper, Morgan, and Putnam Counties, local cities, and other partners in the planning, development, review, and approval of potential improvements. Additionally, a comprehensive and interactive public involvement program was conducted. This ensured that alternative transportation improvements were not only coordinated with various governments, but afforded individual citizens and interested groups the opportunity to provide their input in developing and evaluating potential improvements to each County's transportation network.

Study efforts produced a LRTP that provides for the efficient movement of people and goods within and through the study area through the study horizon year (2030). Interim analysis was conducted for the year 2015. As part of this effort, existing and future operating conditions were documented for the following modes: roadways, bicycle and pedestrian facilities, freight, transit, railways, and airports. Ultimately, individual LRTPs were prepared for each County.

1.1 Study Purpose

The purpose of the LRTP is to identify long-range transportation needs, determine resources to meet those needs, and outline a framework of projects that meet the transportation needs of a community to the extent allowed by existing and future resources. While the 4-County Region is not within a Metropolitan Planning Organization (MPO) service area, the transportation plan development process followed the guidelines established for MPO's. This more rigorous process established a strong framework for transportation planning and decision-making. The format of the LRTP, and the process by which it was developed, is prescribed by federal legislation known the Safe, Accountable, Flexible, Efficient, Transportation Equity Act A Legacy for Users (SAFETEA-LU).

LRTPs are required to have a planning horizon of 20 or more years. This time frame provides a basic structure and overall goal for meeting the long-term transportation needs for the community. Since many factors influencing the development of the LRTP, such as demographics, forecast revenue, and project costs, change over time, long range transportation plans should be updated at least every five years.

East Georgia Multi-County Transportation Study

2

Executive Summary

Technical Memorandum August 2007

1.2 Study Area Description

The study area is located along the I-20 corridor in northeast Georgia, east of Atlanta. In recent years, communities located in the I-20 corridor from South Carolina to Alabama have recognized the economic importance of the corridor in attracting manufacturing, distribution, logistics, and warehousing operations and the associated residential, commercial, and office development that supports these valuable businesses.

Greene, Jasper, Morgan and Putnam Counties cover a land area of just over 1,453 square miles. According to the University of Georgia, the area features many appealing points of interest and is significant to the State's natural and built environments as well as its cultural and historic assets, creating unique impacts on its transportation system.

The southern boundary of Jasper and Putnam Counties are in the Oconee National Forest and much of this area is woodlands. Rock Eagle and Rock Hawk are quartz boulder mounds created by early Indians located in Putnam County.

Putnam County claims the title of "Dairy Capitol of Georgia". The unique transportation needs of this market sector were considered when assessing the transportation system.

The study area borders three large lakes Lake Jackson, Lake Oconee and Lake Sinclair. Each County has a portion of at least one of these lakes. These lakes have contributed to the recent population and employment growth in the area and represent a large "second home" population for Metro Atlanta residents.

The 4-County Region is part of two Regional Development Centers (RDC's). Greene, Jasper and Morgan County are part of the Northeast Georgia RDC (NEGRDC) and Putnam County is part of the Middle Georgia RDC (MGRDC). The study area is displayed in Figure 1.2.

East Georgia Multi-County Transportation Study

3

Executive Summary
Study Area
East Georgia Multi-County Transportation Study

Technical Memorandum
F August 2007
Figure No: 1.2 4

Executive Summary

Technical Memorandum August 2007

1.3 Study Process

The following activities generally represent the transportation plan development process: data collection and development of analysis tools and methodologies; analysis of existing and future conditions; development of improvement strategies; and, ultimately, project cost development and prioritization.

Figure 1.3 displays a flow chart depicting the study process.

Figure 1.3 Study Process

East Georgia Multi-County Transportation Study

5

Executive Summary

Technical Memorandum August 2007

2.0 Demographic Information

A review of US Census data shows that the 4-County Region has experienced population growth at a modest level during the past 20 years. Table 2.0 presents select demographic data to illustrate the characteristics of the population living in each of the four Counties, their households, and other socio-economic factors.

Table 2.0 Year 2000 General Demographic Characteristics

Demographic
Total Population
Median Age
Households
Average Household Size
Total Housing Units
Occupied Housing Units
Owner-Occupied Housing Units
Renter-Occupied Housing Units
School Enrollment (Age 3+) Percent High School Graduate or Higher Total Disabled Population (Age 5+) Percent of Population in Same House in 1995
Source: 2000 US Census

Greene
14,406

Jasper
11,426

Morgan
15,457

Putnam
18,812

39.1

36.3

36.8

39.6

5,477

4,175

5,558

7,402

2.59

2.72

2.75

2.50

6,653
5,477 (82.3% of total)
4,182 (62.9% of total)
1,295 (19.5% of total)
3,385 (23.5% of total)
70.1%

4,806
4,175 (86.9% of total)
3,300 (68.7% of total)
875 (18.2% of total)
2,876 (25.2% of total)
69.7%

6,128
5,558 (90.7% of total)
4,310 (70.3% of total)
1,248 (20.4% of total)
3,886 (25.1% of total)
74.0%

10,319
7,402 (71.7% of total)
5,870 (56.9% of total)
1,532 (14.8% of total)
4,207 (22.4% of total)
75.5%

3,299

2,355

2,963

4,108

56.4%

56.4%

59.3%

58.2%

2.1 Future Population
The 4-County Region has received a moderate amount of growth over the past 20 years (47%). This growth trend is expected to continue or accelerate as the area continues to attract people and business owners who enjoy a rural lifestyle while having good access to nearby amenities in the Atlanta, Macon, and Athens urban areas. Recently, several developments of regional impact (DRI) studies have been completed throughout the 4County Region. A majority of these DRIs are located in Greene and Morgan County. Table 2.1 displays the projected growth for each of the four Counties through the horizon year of 2030.

East Georgia Multi-County Transportation Study

6

Executive Summary

Table 2.1 Projected Population

Technical Memorandum August 2007

Greene

2000 14,406

2005 15,740

Jasper

11,426 13,060

Morgan

15,457 17,630

Putnam

18,812 19,900

Total

60,101 66,330

Source: NEGRDC and MGRDC Comprehensive Plans

2010 17,750 15,500 20,890 21,126 75,266

2015 19,260 17,340 23,550 22,327 82,477

2020 21,520 20,100 27,530 23,553 92,703

2025 25,830 24,920 34,680 24,841 110,271

2030 26,230 25,810 35,750 27,144 114,934

2.2 Employment Data
In the 4-County Region, manufacturing is the largest employment sector providing about one-fourth of the total jobs. Other important sectors are education and health services, and retail trade. Thirty-one companies in the 4-County Region employ 100 or more employees. The number, type, and location of jobs in these Counties have direct implications to the types of transportation facilities needed by business operators and employees in the area.
Table 2.2 illustrates the breakdowns in commuting modes for each of the Counties.
Table 2.2 Existing Work Commute Patterns

Work Commute Total Workers (Age 16+) Drove Alone Carpooled Transit/Taxi Biked or Walked Motorcycle or Other Means Worked at Home Mean Travel Time to Work (min.)
Source: 2000 US Census

Greene 5,609 4,035 1,039 34 142 112 247 26.0

Jasper 5,123 3,816 941 8 99 122 137 34.2

Morgan 7,278 5,638 1,162 3 134 61 280 25.0

Putnam 8,055 5,924 1,676 41 151 115 148 26.5

Total 100% 74.5% 18.5% 0.3% 2.0% 1.6% 3.1%

East Georgia Multi-County Transportation Study

7

Executive Summary

Technical Memorandum August 2007

3.0 Assessment of Transportation Facilities

Extensive data was collected for the transportation facilities within the 4-County Region. Based on the existing conditions inventory and assessment, an analysis of operating conditions was conducted for the following elements:

Public Transportation; Freight Transport; Airport Facilities; Bicycle and Pedestrian Facilities; Bridges; Safety; Roadway Characteristics; Roadway Operating Conditions; and, Citizen and Stakeholder Input.

This analysis documented the baseline operating conditions for each element of the transportation system in an Existing and Future Conditions Report and forms the foundation for development of improvement recommendations. Some of the key findings of the Existing and Future Conditions Report include:

Greene County
Previous and On-Going Studies o 19 projects in the Statewide Transportation Improvement Program and Construction Work Program
Roadway System Characteristics o 98.70 miles of State and US Roads o 417.27 miles of County Roads o 59.11 miles of Collectors and Local Streets
Public Transportation o 2,113 one-way trips per month with Greene Transit
Freight Transport o 5 designated truck routes I-20, US 278, SR 15, SR 44, SR 77 o 20 miles of rail line operated by CSX
Airports o Greene County Regional Airport o Level II airport o 1 runway - 5,000' x 75'
Bicycle and Pedestrian Facilities o 1 pedestrian fatality from 2003 to 2005 o Additional infill and sidewalks recommended within a 1-mile buffer of schools, libraries, parks and community centers
Bridges o 63 bridges

East Georgia Multi-County Transportation Study

8

Executive Summary

Technical Memorandum August 2007

o 10 bridges with a sufficiency rating less than 50 meaning they are potentially in need of rehabilitation or repair.
o 5 additional bridges have a sufficiency rating less than 75 and may need rehabilitation or replacement through the studies horizon year, 2030.
Safety o 1,359 crashes o 358 injuries o 10 fatalities o 3 intersections with 10 or more crashes over the 3-year analysis period
Deficient Segments o 4 Existing deficient segments o 5 deficient segments in 2015 o 18 deficient segments in 2030

Jasper County
Previous and On-Going Studies o 9 projects in the Statewide Transportation Improvement Program and Construction Work Program
Roadway System Characteristics o 110.51 miles of State and US Roads o 458.51 miles of County Roads o 67.23 miles of Collectors and Local Streets
Public Transportation o No public transportation
Freight Transport o 2 designated truck routes SR 11, SR 83 o 20 miles of rail line operated by Norfolk Southern o 10 miles of rail line operated by Great Walton Railroad
Airports o No airports
Bicycle and Pedestrian Facilities o 0 pedestrian fatalities from 2003 to 2005 o Additional infill and sidewalks recommended within a 1-mile buffer of schools, libraries, parks and community centers
Bridges o 64 bridges o 17 bridges with a sufficiency rating less than 50 meaning they are potentially in need of rehabilitation or repair. o 9 additional bridges have a sufficiency rating less than 75 and may need rehabilitation or replacement through the studies horizon year, 2030.
Safety o 358 crashes o 151 injuries o 6 fatalities o 3 intersections with 10 or more crashes over the 3-year analysis period
Deficient Segments

East Georgia Multi-County Transportation Study

9

Executive Summary

Technical Memorandum August 2007

o 3 Existing deficient segments o 4 deficient segments in 2015 o 9 deficient segments in 2030

Morgan County
Previous and On-Going Studies o 18 projects in the Statewide Transportation Improvement Program and Construction Work Program
Roadway System Characteristics o 93.82 miles of State and US Roads o 438.17 miles of County Roads o 42.55 miles of Collectors and Local Streets
Public Transportation o 1,726 one-way trips per month with Morgan Transit
Freight Transport o 4 designated truck routes I-20, US 278, US 441, and SR 83 o 12 miles of rail line operated by CSX o 12 miles of rail line operated by Norfolk Southern
Airports o Madison Municipal Airport o Level I airport o 1 runway - 3,806' x 75'
Bicycle and Pedestrian Facilities o 0 pedestrian fatalities from 2003 to 2005 o Additional infill and sidewalks recommended within a 1-mile buffer of schools, libraries, parks and community centers
Bridges o 97 bridges o 18 bridges with a sufficiency rating less than 50 meaning they are potentially in need of rehabilitation or repair. o 19 additional bridges have a sufficiency rating less than 75 and may need rehabilitation or replacement through the studies horizon year, 2030.
Safety o 927 crashes o 338 injuries o 12 fatalities o 7 intersections with 10 or more crashes over the 3-year analysis period
Deficient Segments o 8 Existing deficient segments o 8 deficient segments in 2015 o 21 deficient segments in 2030

Putnam County
Previous and On-Going Studies o 13 projects in the Statewide Transportation Improvement Program and Construction Work Program

East Georgia Multi-County Transportation Study

10

Executive Summary

Technical Memorandum August 2007

Roadway System Characteristics o 84.95 miles of State and US Roads o 433.10 miles of County Roads o 61.95 miles of Collectors and Local Streets
Public Transportation o 2,132 one-way trips with Putnam Transit
Freight Transport o 3 designated truck routes US 129, US 441, SR 44 o 20 miles of rail line operated by Norfolk Southern
Airports o No airports
Bicycle and Pedestrian Facilities o 1 pedestrian fatality from 2003 to 2005 o Additional infill and sidewalks recommended within a 1-mile buffer of schools, libraries, parks and community centers
Bridges o 48 bridges o 11 bridges with a sufficiency rating less than 50 meaning they are potentially in need of rehabilitation or repair. o 5 additional bridges have a sufficiency rating less than 75 and may need rehabilitation or replacement through the studies horizon year, 2030.
Safety o 1,698 crashes o 413 injuries o 12 fatalities o 11 intersections with 10 or more crashes over the 3-year analysis period
Deficient Segments o 8 Existing deficient segments o 12 deficient segments in 2015 o 14 deficient segments in 2030

The next step in the long range transportation planning process is to address these deficiencies with improvements. A screening process will identify and evaluate the improvements, resulting in a prioritized list and cost estimates will be developed for these potential improvements.

East Georgia Multi-County Transportation Study

11

Executive Summary

Technical Memorandum August 2007

4.0 Improvement Development Process

After the existing and future conditions were evaluated, strategies were developed to address identified deficiencies. Improvements were developed for each element of the transportation system:

Deficient Roadways; Bicycle and Pedestrian; Public Transportation; Freight; Aviation; and, Citizen and Stakeholder Input.

The figure below illustrates the improvement development process.

East Georgia Multi-County Transportation Study

12

Executive Summary

Technical Memorandum August 2007

5.0 Improvement Recommendations

Based on the analysis completed as part of this study, a listing of recommended projects was created for each of the Counties in the study area. This listing includes:

Capacity Improvements and New Roadways; Minor Roadway Widening (increasing travel lane widths and/or shoulders); Intersection and Geometric Improvements; Bridge Improvements; Bicycle and Pedestrian Improvements; Airport Improvements; Rail Improvements; and, Transit Improvements.

For each recommendation several informational elements were produced including: facility; limits; existing and improved configuration; comments; source; improvement type; need; anticipated benefit; phasing; cost and potential funding sources. For successful implementation of these projects it is recommended that additional detailed engineering studies be conducted to determine the most appropriate design, cost and phasing of the particular project. Additionally, successful project implementation will require identified funding mechanisms, political support, and public recognition of the project need and benefit.

This information is presented in Tables 5.1 5.4 and Figure 5.1 - 5.2.

East Georgia Multi-County Transportation Study

13

Project Ref. No.

Facility

Capacity Improvements/New Roadways

G1 SR 44 G2 SR 44 G3 Greensboro Bypass G4 East Greensboro Bypass G5 SR 15 G6 SR 15 G7 SR 15 G9 East Siloam Bypass G10 SR 15 G11 West White Plains Bypass G12 SR 77 G13 SR 77 G14 US 278 G15 Wrightsville Church Rd Extension (E) G16 Wrightsville Church Rd Extension (W)

Segment Limits

From

To

Putnam County Linger Longer Rd Lick Skillet Rd SR 44 (S) Antioch Church Rd (Oconee County) Greensboro Bypass Pear Orchard Rd SR 77 English School Rd Edwards Rd (Hancock County) Peachtree Ave US 278 SR 15 Walker Church Rd SR 44

Linger Longer Rd East Greensboro Bypass Beaver Dam Creek US 278/SR 44 (NE) Greensboro Bypass Pear Orchard Rd SR 77 I-20 White Plains Bypass Eley Rd US 278 SR 15 SR 77 Leslie Mill Rd Carey Station Rd

Existing Configuration
2-Lanes 2-Lanes
N/A N/A 2-Lanes 2-Lanes N/A N/A 2-Lanes N/A 2-Lanes 2-Lanes 2-Lanes N/A N/A

Minor Widenings
G17 Wrightsville Church Rd G18 Liberty Church Rd G19 Leslie Mill Rd G20 White Plains Veazey Rd G21 Carey Station Rd G22 Veazey Rd G23 Penfield Greensboro Hwy G24 Church St G25 Leach Rd

SR 44 Veazey Rd Walker Church Rd Veazey Rd US 278 Walkers Church Rd Planning Mill Rd SR 77 Liberty Church Rd

Walkers Church Rd Hancock County Veazey Rd SR 15 SR 44 Hancock County Peachtree Rd White Plains Veazey Rd Walker Church Rd

< ideal typical section < ideal typical section < ideal typical section < ideal typical section < ideal typical section < ideal typical section < ideal typical section < ideal typical section < ideal typical section

Intersection/Geometric Improvements
G26 Carey Station Rd Interchange G27 US 278 G28 US 278 (Broad St) G29 US 278 (E Broad St) G30 US 278 (W Broad St) G31 Carey Station Rd G32 Carey Station Rd G33 Leslie Mill Rd G34 SR 77 G35 Veazey Rd G36 Penfield Greensboro Hwy G37 SR 15 G38 Wesley Chapel Rd

I-20 Cunningham Rd SR 44 (Main St) Walnut St SR 15 (Laurel St) US 278 SR 44 Walker Church Rd SR 15 Leslie Mill Rd/White Plains - Veazey Rd Shiloh Church Rd/Hensley Rd Lick Skillet Rd SR 15

no interchange
angled intersection
offset intersections offset intersections offset intersections

Bridge Improvements
G39 Rail Fence Rd G40 Centennial Church Rd G41 Old Eatonton Rd G42 Copeland Rd G43 Bethesda Church Rd G44 Randolph Church Rd G45 Geer Rd G46 Woodville Rd G47 Johnny Carson Rd G48 Little Creek Church Rd G49 Cold Springs Rd G50 SR 44 G51 Veazey Rd G52 Stage Coach Rd G53 Carey Station Rd G54 Conger Rd

Griffin Creek Little Shoulderbone Creek CSX Railroad (279584U) Greenbrier Creek South Fork Little River North Fork Little River McWhorter Creek North Fork Little River Greenbrier Creek Little Greenbrier Creek Town Creek South Fork Little River Beaverdam Creek I-20 I-20 Fishing Creek

365 sq ft 576 sq ft 1,731 sq ft 2,016 sq ft 672 sq ft 340 sq ft 360 sq ft 6,102 sq ft 366 sq ft 426 sq ft 891 sq ft 3,816 sq ft 3,636 sq ft 10,039 sq ft 8,666 sq ft bridge has been removed

Bicycle & Pedestrian Improvements
G55 Walker Church Rd Bike Lanes G56 MLK Jr Dr Sidewalks G57 MLK Jr Dr Sidewalks G58 SR 44 Sidewalks G59 SR 44 Sidewalks G60 US 278 Sidewalks G61 US 278 Sidewalks G62 SR 77 (N) Sidewalks G63 SR 44 Sidewalks G64 SR 15 Bike Lanes & Sidewalks G65 SR 15 Bike Lanes & Sidewalks G66 SR 44 Bike Lanes & Sidewalks G67 MLK Jr Dr Bike Lanes & Sidewalks G68 Penfield Rd Bike Lanes & Sidewalks G69 US 278 Bike Lanes & Sidewalks G70 SR 15 Bike Lanes G71 SR 15 Bike Lanes G72 US 278 Bike Lanes G73 US 278 Bike Lanes G74 SR 44 Multi-Use Path G75 SR 77 Multi-Use Path G76 Oconee River Multi-Use Path

Veazey Rd E Brighton St Adriane Dr Anita White Carson Middle School Sixth St SR 77 (N) Universal Dr US 278 SR 77 (N) US 278 US 278 US 278 US 278 US 278 Vandiver Rd Lick Skillet Rd Bowden Pond Rd Morgan County Brick House Rd I-20 US 278 US 278

end Adriane Dr Armour Cir Sixth St Fourth St Hillard St SR 77 (N) Elementary School Crawfordville Rd/Orear Rd Bowden Pond Rd Lick Skillet Rd I-20 Veazey Rd Richland Creek Bridge Brick House Rd Oconee County Hancock County Vandiver Rd Taliaferro County Putnam County Oglethorpe County Oconee County

no bike lanes/narrow shoulder no sidewalk on east no sidewalks no sidewalk on east no sidewalks deficient sidewalks no sidewalks no sidewalks no sidewalks no bike lanes/narrow shoulder no bike lanes/narrow shoulder no bike lanes/narrow shoulder no bike lanes/narrow shoulder no bike lanes/narrow shoulder no bike lanes/narrow shoulder no bike lanes/narrow shoulder no bike lanes/narrow shoulder no bike lanes/narrow shoulder no bike lanes/narrow shoulder

Table 5.1 Recommended Improvements

Improved Configuration

Notes/Comments

Source

Improvement Type

Need

Anticipated Benefit

Implementation Near Mid Long

Estimated Cost

Potential Funding Source Federal State County Local

4-Lanes, Divided 4-Lanes, Divided 4-Lanes, Divided 4-Lanes, Divided 4-Lanes, Divided 4-Lanes, Divided 4-Lanes, Divided 4-Lanes, Divided 4-Lanes, Divided 4-Lanes, Divided
4-Lanes 4-Lanes 4-Lanes 2-Lanes 2-Lanes

1.60 miles 7.94 miles 4.38 miles 3.61 miles 13.93 miles 2.75 miles 2.00 miles 0.75 miles 3.15 miles 5.00 miles 4.45 miles 5.75 miles 5.74 miles 1.56 miles 1.47 miles

CWP CWP CWP CWP CWP CWP CWP CWP CWP CWP Analysis Analysis Analysis Public Public

Arterial Widening Arterial Widening New Roadway New Roadway Arterial Widening Arterial Widening New Roadway New Roadway Arterial Widening New Roadway Arterial Widening Arterial Widening Arterial Widening New Roadway New Roadway

Capacity Deficiency Capacity Deficiency Connectivity Connectivity Capacity Deficiency Capacity Deficiency Connectivity Connectivity Capacity Deficiency Connectivity Capacity Deficiency Capacity Deficiency Capacity Deficiency Connectivity Connectivity

Increase Capacity & Improved Safety Increase Capacity & Improved Safety Improved Connectivity Improved Connectivity Increase Capacity & Improved Safety Increase Capacity & Improved Safety Improved Connectivity Improved Connectivity Increase Capacity & Improved Safety Improved Connectivity Increase Capacity & Improved Safety Increase Capacity & Improved Safety Increase Capacity & Improved Safety Improved Connectivity Improved Connectivity

$5,551,000 $28,807,000 $14,438,000
$8,766,000 $47,388,000
$9,075,000 $6,600,000 $2,475,000 $10,725,000 $16,500,000 $15,486,000 $20,010,000 $19,975,200 $7,644,000 $7,203,000 $220,643,200

12' lanes and 2' paved shoulders 12' lanes and 2' paved shoulders 12' lanes and 2' paved shoulders 12' lanes and 2' paved shoulders 12' lanes and 2' paved shoulders 12' lanes and 2' paved shoulders 12' lanes and 2' paved shoulders 12' lanes and 2' paved shoulders 12' lanes and 2' paved shoulders

2.22 miles 1.00 miles 2.22 miles 7.07 miles 7.90 miles 11.25 miles 6.80 miles 3.41 miles 2.73 miles

Public Public Public Public Public Analysis Analysis Analysis Analysis

Minor Widening Minor Widening Minor Widening Minor Widening Minor Widening Minor Widening Minor Widening Minor Widening Minor Widening

Sub-Standard Typical Section Sub-Standard Typical Section Sub-Standard Typical Section Sub-Standard Typical Section Sub-Standard Typical Section Sub-Standard Typical Section Sub-Standard Typical Section Sub-Standard Typical Section Sub-Standard Typical Section

Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity

$1,509,600 $680,000
$1,509,600 $4,807,600 $5,372,000 $7,650,000 $4,624,000 $2,318,800 $1,856,400 $30,328,000

interchange
align intersections align intersections align intersections

feasibility study
24 crashes 12 crashes 10 crashes

CWP CWP Analysis Analysis Analysis Public Public Public Public Public Public Public Public

Intersection Improvement Intersection Improvement Intersection Improvement Intersection Improvement Intersection Improvement Intersection Improvement Intersection Improvement Intersection Improvement Intersection Improvement Intersection Improvement Intersection Improvement Intersection Improvement Intersection Improvement

Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues

Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity

$1,629,000 $250,000 $250,000 $250,000 $250,000 $250,000 $250,000 $250,000 $250,000 $250,000 $250,000 $250,000
$4,379,000

Reopen bridge
Expand bridge from 1-lane to 2-lane replace bridge

14.00 sufficiency rating 15.13 sufficiency rating 18.39 sufficiency rating 31.68 sufficiency rating 36.09 sufficiency rating 37.86 sufficiency rating 38.19 sufficiency rating 40.67 sufficiency rating 45.14 sufficiency rating 45.95 sufficiency rating 52.68 sufficiency rating 58.53 sufficiency rating 62.41 sufficiency rating 66.07 sufficiency rating 69.46 sufficiency rating

Analysis Analysis Analysis
CWP Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis

Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge

Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance

Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations

$56,210 $88,704 $266,574 $299,000 $103,488 $52,360 $55,440 $939,708 $56,364 $65,604 $137,214 $587,664 $559,944 $1,546,006 $1,334,564 $400,000 $6,548,844

bike lanes on both sides

7.77 miles

sidewalk on east side

0.31 miles

sidewalks on both sides

0.30 miles

sidewalk on east side

0.22 miles

sidewalks on both sides

0.18 miles

replace sidewalks

0.48 miles

sidewalks on both sides

0.23 miles

sidewalks on both sides

0.76 miles

sidewalks on both sides

0.54 miles

bike lanes and sidewalks on both sides 2.56 miles

bike lanes and sidewalks on both sides 2.11 miles

bike lanes and sidewalks on both sides 2.69 miles

bike lanes and sidewalks on both sides 1.13 miles

bike lanes and sidewalks on both sides 2.87 miles

bike lanes and sidewalks on both sides 6.92 miles

bike lanes on both sides

11.40 miles

bike lanes on both sides

11.45 miles

bike lanes on both sides

8.67 miles

bike lanes on both sides

7.45 miles

multi-use path

8.70 miles

multi-use path

6.94 miles

multi-use path

14.42 miles

Public Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
RDC RDC RDC RDC RDC RDC RDC RDC RDC RDC RDC RDC RDC

Bike Lane Sidewalk Sidewalk Sidewalk Sidewalk Sidewalk Sidewalk Sidewalk Sidewalk Bike Lane & Sidewalk Bike Lane & Sidewalk Bike Lane & Sidewalk Bike Lane & Sidewalk Bike Lane & Sidewalk Bike Lane & Sidewalk Bike Lane Bike Lane Bike Lane Bike Lane Multi-Use Path Multi-Use Path Multi-Use Path

Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities

Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System

$1,165,500 $31,000 $60,000 $22,000 $36,000 $96,000 $23,000
$152,000 $108,000 $896,000 $738,500 $941,500 $395,500 $1,004,500 $2,422,000 $1,710,000 $1,717,500 $1,300,500 $1,117,500 $3,045,000 $2,429,000 $5,047,000

East Georgia Multi-County Transportation Study

14

Table 5.1 Recommended Improvements

Project Ref. No.

Facility

Segment Limits

From

To

Existing Configuration

Improved Configuration

Notes/Comments

Source

Improvement Type

Need

Anticipated Benefit

Airport Improvements
G77 Expand Aircraft Parking Apron G78 Extend Runway G79 Parallel Taxiway G80 Security fencing G81 Precision Approach G82 Expand Automotive Parking
Hangar Relocation Crack Seal Apron/Taxiway EA and Land Acquisiton North Terminal

500' x 800' 5,000' x 75 partial 90% complete

2x current size 5,500' x 100' full 100% complete

Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis

Apron Upgrade Runway Extension Taxiway Extension Fencing Equipment Upgrade Parking

Airport Upgrade Level III Facility Airport Upgrade Airport Upgrade Airport Upgrade Airport Upgrade Airport Upgrade Airport Upgrade Airport Upgrade

accommodate more aircraft accommodate larger aircraft

Rail Improvements
G83 Cunningham Rd Crossing G84 Chapel St Crossing G85 Planning Mill Rd Crossing G86 McKinley St Crossing

CSX #279573G CSX #279578R CSX #279575V CSX #279568K

passive traffic control Gates & Warning Devices

Upgrade crossing close crossing Additional Signage Upgrade Signage

Review for proper upgrades

Public Analysis Analysis Analysis

Upgrade Crossing Close Crossing Upgrade Crossing Upgrade Crossing

Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues

Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations

Transit Improvements
G87 Regional Transit System G88 Fixed Route Service G89 Park & Ride Lot

I-20 & SR 44

50 parking spaces

Analysis Analysis Analysis

Transit Transit Transit

Notes: 1. Intersection Improvements listed include all intersections developed through the public involvement process. Many of these locations may not warrant improvements, however additional study is required to make this determination.
2. Intersection costs assumed a unit cost of $250,000 3. Bridge replacement costs are based off of $140 per square foot 4. Estimated costs DO NOT include Right of Way

Commute Options Commute Options Commute Options

Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System

Implementation Near Mid Long

Estimated Cost

Potential Funding Source Federal State County Local

$24,458,000

$200,000

$600,000 $800,000
$120,000 $15,000
$325,000 $2,060,000

$5,000 $300 $150
$5,450

$50,000 $50,000 $288,472,494

East Georgia Multi-County Transportation Study

15

Project Ref. No.

Facility

Capacity Improvements/New Roadways

J1 SR 83 NW Bypass J2 SR 83 SW Bypass J3 SR 83 Passing Lanes J4 SR 11 Passing Lanes J5 SR 212

From
SR 83/380 NW SR 11 Ocmulgee River S of Shepard Rd SR 16

Segment Limits To
SR 11 SR 16 Shady Dale Newton County Newton County

Existing Configuration
N/A N/A
2-Lanes

Minor Widenings
J6 Jackson Lake Rd J7 Calvin Rd / Aldridge Rd J8 Post Rd J9 Rock Eagle Rd J10 Liberty Church Rd J11 Bethel Church Rd J12 Clay Rd J13 Fullerton Phillips Rd J14 Aikenton Rd J15 Bullard Rd J16 Smithboro Rd

SR 11 Post Rd SR 11 SR 83 SR 11 SR 16 SR 16 SR 11 SR 83 Rock Eagle Rd SR 212

SR 16 Newton County SR 142 Putnam County Post Rd SR 11 SR 83 SR 212 Rock Eagle Rd SR 16 SR 16

< ideal typical section < ideal typical section < ideal typical section < ideal typical section < ideal typical section < ideal typical section < ideal typical section < ideal typical section < ideal typical section < ideal typical section < ideal typical section

Intersection/Geometric Improvements
J17 SR 11 J18 SR 212 J19 SR 11 J20 SR 212 J21 SR 11 (Green St) J22 SR 11 (Green St) J23 SR 16 (Washington St)

new School Church St Post Rd SR 380 SR 16 (E Green St) SR 11-SO (Forsyth St) SR 212 W

Bridge Improvements
J24 Pitts Chapel Rd J25 Old Agateville Rd J26 Lane Rd J27 Kinnard Creek Rd J28 Cook Rd J29 Guy Jones Rd J30 Wicker Rd J31 Ellis Rd J32 Whitten Rd J33 Ozborne Rd J34 River Rd J35 Benton Rd J36 Post Rd J37 Goolsby Rd J38 Post Rd J39 Lake Jackson Rd J40 Post Rd J41 Fullerton-Phillip J42 Smithboro Rd J43 Post Rd J44 King Plow Rd J45 Rock Eagle Rd J46 SR 16 J47 SR 83 J48 SR 11

Pittman Branch Cedar Creek Kinnard Creek Kinnard Creek Tributary Herds Creek Pittman Branch Whiteoak Creek Robinson Creek Hanna Branch Herds Creek Tributary Jack Creek Herds Creek Pittman Creek Cedar Creek Murder Creek Herds Creek Pearson Creek Cedar Creek North Fork Wolf Creek Lowry Branch Murder Creek Murder Creek Murder Creek Murder Creek Norfolk Southern Railroad (733263N)

324 sq ft 432 sq ft 391 sq ft 392 sq ft 540 sq ft 360 sq ft 479 sq ft 624 sq ft 372 sq ft 445 sq ft 564 sq ft 408 sq ft 6,051 sq ft 4,709 sq ft 3,792 sq ft 3,082 sq ft 3,082 sq ft 4,270 sq ft 3,363 sq ft 2,889 sq ft 5,648 sq ft 8,988 sq ft 10,618 sq ft 11,731 sq ft 4,664 sq ft

Bicycle & Pedestrian Improvements

J49 Funderburg St Sidewalks

Webb St

J50 Funderburg St Sidewalks

Wilson St

J51 Railroad Crossing

Funderburg St

J52 SR 83 Sidewalks

Highland Ave

J53 N Warren Sidewalks

SR 83 (S)

J54 SR 142 Sidewalks

Cemetery Rd

J55 SR 142 Sidewalks

Tucker St

J56 SR 83 Sidewalks

Park

J57 South Railroad St Sidewalks

SR 142

J58 Providence St Sidewalks

SR 142

J59 SR 11 Bike Lanes

SR 16

J60 SR 212 Multi-Use Trail

SR 16

J61 Rock Eagle Rd Multi-Use Trail

SR 83

J62 SR 11 Bike Lanes & Sidewalks

SR 16

J63 SR 16 Bike Lanes & Sidewalks

SR 212

J64 SR 16/SR 212 Bike Lanes & Sidewalks SR 16/SR 212

J65 SR 212 Bike Lanes & Sidewalks

SR 11

J66 SR 83 Bike Lanes & Sidewalks

SR 16

J67 SR 83 Bike Lanes & Sidewalks

SR 16

J68 SR 11 Bike Lanes

SR 380

J69 SR 16 Bike Lanes

Fellowiship Rd

J70 SR 212 Bike Lanes

Malone Dr

J71 SR 212 Bike Lanes

SR 380

J72 SR 83 Bike Lanes

CR 73

J73 Ocmulgee Trail

Jones County Line

Fred Smith St Fred Smith St

no sidewalk on west no sidewalk on east

mile marker 13 SR 83 (N) SR 83 Davidson Rd Calvery United Methodist Church Aikenton Rd Railroad Newton County Line Bethel Church Rd Putnam County SR 380 Fellowship Rd SR 11 SR 380 Edwards Rd CR 73 Jones County Line Butts County Line Newton County Line Putnam County Line Morgan County Line Jackson Lake Rd

no sidewalk on west no sidewalks no sidewalks no sidewalks limited sidewalks no sidewalk on east no sidewalk on west no bike lanes/narrow shoulder 2 schools and a rec center
no bike lanes/narrow shoulder no bike lanes/narrow shoulder no bike lanes/narrow shoulder no bike lanes/narrow shoulder no bike lanes/narrow shoulder no bike lanes/narrow shoulder no bike lanes/narrow shoulder no bike lanes/narrow shoulder no bike lanes/narrow shoulder no bike lanes/narrow shoulder no bike lanes/narrow shoulder

Rail Improvements
J74 E Washington St Crossing J75 Funderburg Dr/South St Crossing J76 Green St Crossing

Norfolk Southern #733250M Norfolk Southern #733251U Norfolk Southern #733249T

Table 5.2 Recommended Improvements

Improved Configuration
2-Lanes 2-Lanes Passing Lanes Passing Lanes 4-Lanes, Divided

Notes/Comments
2.94 miles 1.80 miles 2.73 miles 2.30 miles 12.20 miles

12' lanes and 2' paved shoulders 12' lanes and 2' paved shoulders 12' lanes and 2' paved shoulders 12' lanes and 2' paved shoulders 12' lanes and 2' paved shoulders 12' lanes and 2' paved shoulders 12' lanes and 2' paved shoulders 12' lanes and 2' paved shoulders 12' lanes and 2' paved shoulders 12' lanes and 2' paved shoulders 12' lanes and 2' paved shoulders

10.55 miles 11.15 miles 12.30 miles 9.15 miles 4.95 miles 3.87 miles 8.25 miles 7.31 miles 2.92 miles 3.78 miles 3.25 miles

Turn Lanes

19 crashes 10 crashes 10 crashes

15.57 sufficiency rating 17.09 sufficiency rating 17.33 sufficiency rating 18.04 sufficiency rating 20.04 sufficiency rating 20.52 sufficiency rating 26.10 sufficiency rating 26.71 sufficiency rating 26.79 sufficiency rating 28.06 sufficiency rating 28.77 sufficiency rating 39.19 sufficiency rating 41.66 sufficiency rating 45.45 sufficiency rating 46.23 sufficiency rating 47.78 sufficiency rating 52.78 sufficiency rating 59.73 sufficiency rating 62.11 sufficiency rating 65.88 sufficiency rating 67.41 sufficiency rating 68.69 sufficiency rating 72.83 sufficiency rating 72.97 sufficiency rating 74.78 sufficiency rating

sidewalk on west sidewalk on east pedestrian crossing sidewalk on west sidewalk on one side sidewalks on both sides sidewalk on south side sidewalks on both sides sidewalk on east sidewalk on west bike lanes on both sides multi-use path multi-use path bike lanes and sidewalks on both sides bike lanes and sidewalks on both sides bike lanes and sidewalks on both sides bike lanes and sidewalks on both sides bike lanes and sidewalks on both sides bike lanes and sidewalks on both sides bike lanes on both sides bike lanes on both sides bike lanes on both sides bike lanes on both sides bike lanes on both sides multi-use path

0.15 miles 0.15 miles
0.23 miles 0.54 miles 0.17 miles 0.19 miles 0.34 miles 0.57 miles 0.23 miles 14.04 miles 4.45 miles 9.17 miles 2.42 miles 1.91 miles 0.62 miles 2.54 miles 2.12 miles 3.18 miles 9.50 miles 7.07 miles 8.66 miles 8.12 miles 9.82 miles 17.45 miles

Upgrade crossing - add gates Upgrade crossing - add gates Upgrade crossing - add gates

limited sight distance, no gates limited sight distance, no gates limited sight distance, no gates

East Georgia Multi-County Transportation Study

16

Source
CWP Public CWP Public Analysis
Public Public Public Public Analysis Analysis Analysis Analysis Analysis Analysis Analysis
Public Public Public Public Analysis Analysis Analysis
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Public
RDC RDC RDC RDC RDC RDC RDC RDC RDC RDC RDC RDC
Analysis Analysis Analysis

Improvement Type

Need

Anticipated Benefit

Implementation Near Mid Long

Estimated Cost

Potential Funding Source Federal State County Local

New Roadway New Roadway Passing Lanes Passing Lanes Arterial Widening

Connectivity Connectivity
Capacity Deficiency

Improved Connectivity Improved Connectivity Increase Capacity & Improved Safety Increase Capacity & Improved Safety Increase Capacity & Improved Safety

$4,573,000 $8,820,000 $4,746,000
$47,824,000 $65,963,000

Minor Widening Minor Widening Minor Widening Minor Widening Minor Widening Minor Widening Minor Widening Minor Widening Minor Widening Minor Widening Minor Widening

Sub-Standard Typical Section Sub-Standard Typical Section Sub-Standard Typical Section Sub-Standard Typical Section Sub-Standard Typical Section Sub-Standard Typical Section Sub-Standard Typical Section Sub-Standard Typical Section Sub-Standard Typical Section Sub-Standard Typical Section Sub-Standard Typical Section

Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity

$7,174,000 $7,582,000 $8,364,000 $6,222,000 $3,366,000 $2,631,600 $5,610,000 $4,970,800 $1,985,600 $2,570,400 $2,210,000 $52,686,400

Intersection Improvement Intersection Improvement Intersection Improvement Intersection Improvement Intersection Improvement Intersection Improvement Intersection Improvement

Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues

Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity

$250,000 $250,000 $250,000 $250,000 $250,000 $250,000 $250,000 $1,750,000

Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge

Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance

Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations

$49,896 $66,528 $60,214 $60,368 $83,160 $55,440 $73,828 $96,096 $57,288 $68,530 $86,856 $62,832 $931,854 $725,155 $583,968 $474,628 $474,628 $657,580 $517,902 $444,906 $869,792 $1,384,152 $1,635,172 $1,806,574 $718,256 $12,045,603

Sidewalk Sidewalk Pedestrian Crossing Sidewalk Sidewalk Sidewalk Sidewalk Sidewalk Sidewalk Sidewalk Bike Lane Multi-Use Path Multi-Use Path Bike Lane & Sidewalk Bike Lane & Sidewalk Bike Lane & Sidewalk Bike Lane & Sidewalk Bike Lane & Sidewalk Bike Lane & Sidewalk Bike Lane Bike Lane Bike Lane Bike Lane Bike Lane Multi-Use Path

Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities

Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System

$15,000 $15,000
$500 $23,000 $54,000 $34,000 $19,000 $68,000 $57,000 $23,000 $2,106,000 $1,557,500 $3,209,500 $847,000 $668,500 $217,000 $889,000 $742,000 $1,113,000 $1,425,000 $1,060,500 $1,299,000 $1,218,000 $1,473,000 $6,107,500 $24,241,000

Upgrade Crossing Upgrade Crossing Upgrade Crossing

Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues

Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations

$125,000 $125,000 $125,000

Table 5.2 Recommended Improvements

Project Ref. No.

Facility

Segment Limits

From

To

J77 CR 127/ Georgia Pacific Spur Crossing Norfolk Southern #733261A

J78 Short St Crossing
J79 Rock Eagle Rd Crossing J80 Railroad St Crossing J81 South Railroad St Crossing J82 North Railroad St Crossing

Norfolk Southern #733253H
Norfolk Southern #733243C Norfolk Southern #733160N Norfolk Southern #733161V Norfolk Southern #733163J

Existing Configuration

Improved Configuration
Upgrade crossing
Upgrade crossing
Upgrade crossing Upgrade signage Upgrade signage Upgrade signage

Notes/Comments
old signage, limited warning limited warning, 3 sets of tracks limited warning limited warning

Transit Improvements
J83 Rural Transit Service J84 Park & Ride Lot

SR 212, SR 11 or SR 83

50 parking spaces

Notes: 1. Intersection Improvements listed include all intersections developed through the public involvement process. Many of these locations may not warrant improvements, however additional study is required to make this determination.
2. Intersection costs assumed a unit cost of $250,000 3. Bridge replacement costs are based off of $140 per square foot 4. Estimated costs DO NOT include Right of Way

Source Analysis
Analysis Analysis Analysis Analysis Analysis
Public Analysis

Improvement Type

Need

Upgrade Crossing upgrade stop signs

Operational & Safety Issues

Upgrade Crossing - install signage

Operational & Safety Issues

Upgrade Crossing

Operational & Safety Issues

Upgrade Crossing

Operational & Safety Issues

Upgrade Crossing

Operational & Safety Issues

Upgrade Crossing

Operational & Safety Issues

Anticipated Benefit
Improved Safety & Operations
Improved Safety & Operations
Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations

Transit Transit

Commute Options Commute Options

Enhanced Multi-Modal System Enhanced Multi-Modal System

Implementation Near Mid Long

Estimated Cost

Potential Funding Source Federal State County Local

$300

$450
$600 $350 $150 $350 $377,200

$50,000 $50,000 $157,113,203

East Georgia Multi-County Transportation Study

17

Project Ref. No.

Facility

Capacity Improvements/New Roadways

M1 SR 83 W Bypass M2 US 441 M3 SR 83/US 441 Bypass M4 SR 83 M5 SR 83

From
SR 83 (N) US 441 Bypass US 441 (N) US 278 I-20

Segment Limits To
SR 83 (S) N of Apalachee River (Oconee) SR 83 (N) I-20 Jasper County

Existing Configuration
N/A 2-Lanes
N/A 2-Lanes 2-Lanes

Operational Improvements
M6 US 278 M7 Dixie Hwy

US 441 Walton County

US 441 Bypass Pennington Rd

2-Lanes 2-Lanes

Minor Widenings
M8 Lower Apalachee Rd M9 Seven Island Rd M10 Sandy Creek Rd M11 Davis Academy Rd M12 Price Mill Rd M13 Fairplay Rd M14 Newborn Rd M15 Parks Mill Rd M16 Apalachee Rd M17 Buckhead Rd/Seven Island Rd M18 Bethany Rd M19 Bethany Church Rd M20 Pierce Dairy Rd M21 Godfrey Rd M22 Spears Rd M23 Brownwood Rd M24 Reese Rd/Knight Rd M25 Briar Creek Rd M26 Old Mill Rd M27 Cochran Rd M28 Double Bridges Rd

US 441 Glades Rd Fairplay Rd Walton County SR 83 Dixie Hwy Dixie Hwy US 278 Price Mill Rd Greensboro Rd Bramblewood Dr Bethany Rd US 441 SR 83 Brownwood Rd Spears Rd Brownwood Rd Lower Apalachee Rd Fairplay Rd US 441 (Putnam) Prospect Rd

US 278 US 278 US 441 US 278 Oconee County SR 83 Newton County end US 441 I-20 Seven Island Rd Seven Island Rd Seven Island Rd Seven Island Rd SR 83 Old Dixie Hwy Jasper County US 278 Newborn Rd Kingston Rd Dixie Hwy

< ideal typical section < ideal typical section < ideal typical section < ideal typical section < ideal typical section < ideal typical section < ideal typical section < ideal typical section < ideal typical section < ideal typical section < ideal typical section < ideal typical section < ideal typical section < ideal typical section < ideal typical section < ideal typical section < ideal typical section < ideal typical section < ideal typical section < ideal typical section < ideal typical section

Intersection/Geometric Improvements
M29 Fairplay Rd M30 Price Mill Rd M31 US 441 M32 US 278 M33 US 441 M34 US 441 Bypass M35 US 441 Bypass M36 Little's Rd M37 Lions Club Rd M38 Indian Creek Rd M39 US 278 (Atlanta Hwy) M40 US 278/US 441 (S Main St) M41 US 441 M42 US 441

SR 83 SR 83 US 278 SR 24 Spur SR 24 Spur Bethany Rd Old Buckhead Rd Harmony Rd (Putnam) US 441 vicinity of I-20 SR 83 (Pennington Rd) SR 83 (E Washington St) Pierce Dairy Rd Walker Cir

Bridge Improvements

M43 M44 M45 M46 M47 M48 M49 M50 M51 M52 M53 M54 M55 M56 M57 M58 M59 M60 M61 M62 M63 M64 M65 M66 M67 M68 M69 M70 M71 M72

Oil Mill Rd Newborn Rd Kingston Rd Lower Apalachee Rd US 441 Brownwood Rd Enterprise Rd US 441 Walton Mill Rd US 441 Davis Academy Rd Keencheefoonee Rd Buckhead Rd High Shoals Rd Parks Mill Rd I-20 (EB Lane) Old Mill Rd Bethany Rd Clack Rd Clack Rd Monticello Hwy Fairplay Rd Fairplay Rd Double Bridge Rd I-20 (WB Lane) I-20 (EB Lane) I-20 (WB Lane) Monticello Hwy Sewell Church Rd US 278

Norfolk Southern Railroad (733141J) Little River Little Sugar Creek Norfolk Southern Railroad (733130W) Hard Labor Creek Big Indian Creek Little Sugar Creek Apalachee River Little River Tributary Big Sandy Creek Big Indian Creek Hunnicut Creek North Sugar Creek Jacks Creek I-20 CR 214 - North Sugar Creek I-20 I-20 Little River Big Indian Creek Big Indian Creek Hard Labor Creek Still Branch Hard Labor Creek CR 214 - North Sugar Creek Big Indian Creek Big Indian Creek Little River I-20 CSX Railroad (279602P)

1,081 sq ft 2,056 sq ft 2,410 sq ft 2,131 sq ft 10,410 sq ft 2,070 sq ft 431 sq ft 12,874 sq ft 606 sq ft 10,896 sq ft 2,500 sq ft 983 sq ft 1,113 sq ft 2,016 sq ft 12,295 sq ft 7,778 sq ft 8,596 sq ft 11,578 sq ft 4,816 sq ft 4,515 sq ft 5,100 sq ft 1,343 sq ft 901 sq ft 3,078 sq ft 7,778 sq ft 4,956 sq ft 4,956 sq ft 6,392 sq ft 8,074 sq ft 8,747 sq ft

Bicycle & Pedestrian Improvements

M73 M74 M75 M76 M77 M78 M79 M80

High Shoals Rd Bike Lanes Buckhead Rd Bike Lanes Parks Mill Rd Bike Lanes Fairplay Rd Bike Lanes Buckhead Rd/Chivers Ave Sidewalks East Main St Sidewalks West Main St Sidewalks Fairplay Rd Sidewalks

SR 83 US 441 Bypass Buckhead Rd Rutledge Parks Mill Rd Hawkins St Fairplay St Main St

Walton County Parks Mill Rd Harmony Rd (Putnam) Bostwick Park Fairplay St New subdivision Williams St

no bike lanes/narrow shoulder no bike lanes/narrow shoulder no bike lanes/narrow shoulder no bike lanes/narrow shoulder deficient sidewalk on north deficient sidewalk on north deficient sidewalk on north no sidewalks

Table 5.3 Recommended Improvements

Improved Configuration
4-Lanes, Divided 4-Lanes, Divided 4-Lanes, Divided 4-Lanes, Divided 4-Lanes, Divided

Notes/Comments
2.00 miles 7.92 miles 2.00 miles 1.50 miles 9.75 miles

2-Lanes 2-Lanes

2.26 miles 10.65 miles

12' lanes and 2' paved shoulders 12' lanes and 2' paved shoulders 12' lanes and 2' paved shoulders 12' lanes and 2' paved shoulders 12' lanes and 2' paved shoulders 12' lanes and 2' paved shoulders 12' lanes and 2' paved shoulders 12' lanes and 2' paved shoulders 12' lanes and 2' paved shoulders 12' lanes and 2' paved shoulders 12' lanes and 2' paved shoulders 12' lanes and 2' paved shoulders 12' lanes and 2' paved shoulders 12' lanes and 2' paved shoulders 12' lanes and 2' paved shoulders 12' lanes and 2' paved shoulders 12' lanes and 2' paved shoulders 12' lanes and 2' paved shoulders 12' lanes and 2' paved shoulders 12' lanes and 2' paved shoulders 12' lanes and 2' paved shoulders

9.00 miles 14.90 miles 10.65 miles 9.20 miles 5.55 miles 10.45 miles 8.35 miles 8.20 miles 4.20 miles 4.80 miles 7.16 miles 2.57 miles 5.92 miles 4.62 miles 4.17 miles 4.90 miles 6.62 miles 2.85 miles 6.45 miles 3.76 miles 2.00 miles

sight distance sight distance 25 crashes safety issues safety issues 10 crashes, delay school traffic safety issues 26 crashes In I-20's ROW 31 crashes 16 crashes 13 crashes 11 crashes

15.76 sufficiency rating 18.07 sufficiency rating 26.98 sufficiency rating 31.79 sufficiency rating 35.53 sufficiency rating 36.54 sufficiency rating 37.19 sufficiency rating 38.86 sufficiency rating 38.91 sufficiency rating 41.45 sufficiency rating 41.50 sufficiency rating 45.38 sufficiency rating 49.16 sufficiency rating 52.22 sufficiency rating 56.07 sufficiency rating 57.36 sufficiency rating 61.15 sufficiency rating 63.57 sufficiency rating 65.38 sufficiency rating 67.54 sufficiency rating 68.01 sufficiency rating 68.28 sufficiency rating 69.27 sufficiency rating 69.70 sufficiency rating 70.06 sufficiency rating 72.49 sufficiency rating 72.49 sufficiency rating 72.89 sufficiency rating 73.52 sufficiency rating 73.55 sufficiency rating

bike lanes on both sides bike lanes on both sides bike lanes on both sides bike lanes on both sides new sidewalk on south, replace sidewalk on north replace sidewalk on south side new sidewalk on south, replace sidewalk on north sidewalks on both sides

5.03 miles 6.20 miles 11.22 miles 10.52 miles 0.33 miles 0.38 miles 0.31 miles 0.20 miles

East Georgia Multi-County Transportation Study

18

Source
CWP CWP Public Analysis Analysis
Analysis Public
Public Public Public Public Public Public Public Public Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Public Public Public Public
Public Public Public Public Public Public Public Public Public Public Analysis Analysis Analysis Analysis
Analysis Analysis
CWP Analysis
CWP CWP Analysis Analysis Analysis CWP CWP Analysis CWP Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
Public Public Public Public Analysis Analysis Analysis Analysis

Improvement Type

Need

Anticipated Benefit

Implementation Near Mid Long

Estimated Cost

Potential Funding Source Federal State County Local

New Roadway Arterial Widening New Roadway Arterial Widening Arterial Widening

Connectivity Capacity Deficiency Connectivity Capacity Deficiency Capacity Deficiency

Improved Connectivity Increase Capacity & Improved Safety Improved Connectivity Increase Capacity & Improved Safety Increase Capacity & Improved Safety

$2,800,000 $41,389,911 $21,760,000
$8,160,000 $53,040,000 $127,149,911

Operational Improvements Capacity Deficiency

Increase Capacity & Improved Safety

-

Operational Improvements Capacity Deficiency

Increase Capacity & Improved Safety

-

$0

Minor Widening Minor Widening Minor Widening Minor Widening Minor Widening Minor Widening Minor Widening Minor Widening Minor Widening Minor Widening Minor Widening Minor Widening Minor Widening Minor Widening Minor Widening Minor Widening Minor Widening Minor Widening Minor Widening Minor Widening Minor Widening

Sub-Standard Typical Section Sub-Standard Typical Section Sub-Standard Typical Section Sub-Standard Typical Section Sub-Standard Typical Section Sub-Standard Typical Section Sub-Standard Typical Section Sub-Standard Typical Section Sub-Standard Typical Section Sub-Standard Typical Section Sub-Standard Typical Section Sub-Standard Typical Section Sub-Standard Typical Section Sub-Standard Typical Section Sub-Standard Typical Section Sub-Standard Typical Section Sub-Standard Typical Section Sub-Standard Typical Section Sub-Standard Typical Section Sub-Standard Typical Section Sub-Standard Typical Section

Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity

$6,120,000 $10,132,000
$7,242,000 $6,256,000 $3,774,000 $7,106,000 $5,678,000 $5,576,000 $2,856,000 $3,264,000 $4,868,800 $1,747,600 $4,025,600 $3,141,600 $2,835,600 $3,332,000 $4,501,600 $1,938,000 $4,386,000 $2,556,800 $1,360,000 $92,697,600

Intersection Improvement Intersection Improvement Intersection Improvement Intersection Improvement Intersection Improvement Intersection Improvement Intersection Improvement Intersection Improvement Intersection Improvement Intersection Improvement Intersection Improvement Intersection Improvement Intersection Improvement Intersection Improvement

Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues

Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity

$250,000 $250,000 $250,000 $250,000 $250,000 $250,000 $250,000 $250,000 $250,000 $250,000 $250,000 $250,000 $250,000 $250,000 $3,500,000

Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge

Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance

Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations

$166,505 $316,609 $1,011,000 $328,174 $1,944,992 $1,034,000
$66,359 $1,982,550
$93,324 $1,944,992 $1,019,000
$151,351 $900,000 $310,464 $1,893,461 $1,197,797 $1,323,784 $1,783,074 $741,664 $695,310 $785,400 $206,760 $138,754 $474,012 $1,197,797 $763,224 $763,224 $984,368 $1,243,411 $1,346,961 $26,808,319

Bike Lane Bike Lane Bike Lane Bike Lane Sidewalk Sidewalk Sidewalk Sidewalk

Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities

Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System

$754,500 $930,000 $1,683,000 $1,578,000
$66,000 $38,000 $62,000 $40,000

Table 5.3 Recommended Improvements

Project Ref. No.
M81 M82 M83 M84 M85 M86 M87 M88 M89 M90 M91 M92 M93 M94 M95 M96 M97 M98 M99 M100 M101

Facility

From

Newborn Rd Sidewalks

Dixie Hwy

SR 83 Sidewalks

2nd St

Wellington Rd Sidewalks

Ruark Ln

Wheat Rd Sidewalks

Whitehall St

Garnett St Sidewalks

SR 83

SR 83 Sidewalks

Garnett St

East Ave Sidewalks

Harris St

Moreland Ave Sidewalks

East Ave

Harris St

College Dr

Harris St

East Ave

Madison by the Creek Subdivision

School

Brownwood Rd Bike Lanes & Sidewalks US 278

Clack Rd Bike Lanes & Sidewalks

Brownwood Rd

SR 24 Spur Bike Lanes & Sidewalks US 278

SR 83 Bike Lanes & Sidewalks

US 278

US 441 Bike Lanes & Sidewalks

US 278

US 278 Bike Lanes & Sidewalks

Brownwood Rd

US 441 Bike Lanes

I-20

US 278 Bike Lanes

Brownwood Rd

US 278 Bike Lanes

Lambert Rd

Railroad Trail

US 278

Segment Limits To
US 278 Callaway St SR 83 Garnett St Wheat Rd Pearl St Morgan County Library College Dr
Clack Rd I-20 US 441 Doster Rd I-20 Lambert Rd Putnam County Line Walton County Line Greene County Line Oconee County Line

Existing Configuration deficient sidewalk on west no sidewalks no sidewalks no sidewalks no sidewalks no sidewalks no sidewalk on north no sidewalks no crosswalk no crosswalk no crosswalk no bike lanes/narrow shoulder no bike lanes/narrow shoulder no bike lanes/narrow shoulder no bike lanes/narrow shoulder no bike lanes/narrow shoulder no bike lanes/narrow shoulder no bike lanes/narrow shoulder no bike lanes/narrow shoulder no bike lanes/narrow shoulder

Improved Configuration replace sidewalk on west sidewalks on both sides sidewalks on both sides sidewalks on both sides sidewalks on both sides sidewalks on both sides sidewalk on north side sidewalks on both sides crosswalk - signage and pavement marking crosswalk - signage and pavement marking crosswalk - signage and pavement marking bike lanes and sidewalks on both sides bike lanes and sidewalks on both sides bike lanes and sidewalks on both sides bike lanes and sidewalks on both sides bike lanes and sidewalks on both sides bike lanes and sidewalks on both sides bike lanes on both sides bike lanes on both sides bike lanes on both sides multi-use path

Notes/Comments 0.22 miles 0.50 miles 0.20 miles 0.29 miles 0.44 miles 0.20 miles 0.53 miles 0.16 miles
0.91 miles 0.52 miles 0.41 miles 2.14 miles 1.69 miles 5.74 miles 8.26 miles 9.65 miles 4.52 miles 10.34 miles

Airport Improvements

M102 M103 M104 M105 M106 M107

Extend Runway Runway Rehabilitation Install PAPIs on Runway 32 Construct Access Road, Apron, TieDown Area Construct Traminal Building Relocate Fuel Farm

3,806' x 75'

4,500' x 75'

Rail Improvements

M108 M109 M110 M111 M112 M113 M114 M115

Hawkins Ave Crossing Lions Club Rd Crossing Fairplay St Crossing Jefferson St Crossing McHenry Rd Crossing Crossing Oconee Rd (E) Crossing Oconee Rd (W) Crossing Buckhead Rd Crossing

M116 Old Buckhead Rd Crossing

CSX #279621U CSX #733144E CSX #279622B CSX #279605K CSX #279611N, 279612V CSX #279591E CSX #279592L CSX #279593T
CSX #279597V

Warning Device

upgrade signage short term

Upgrade crossing - add warning lights and gates sight problems, inefficient stop

Upgrade crossing

review for safety of trucks crossing

Upgrade crossing - add warning lights and gates

Upgrade crossing - add warning lights and gates

Close Crossing

close and use crossing to the west

Upgrade crossing - add warning lights and gates

Upgrade crossing - new warning lights and add gatesold warning devices

Upgrade crossing - review further for improvement alternatives

inadequate clearance, 9.5'

Transit Improvements
M117 Park and Ride Lot M118 Multi-Modal Train Station

I-20 and SR 83 or US 441

50 parking spaces

Notes: 1. Intersection Improvements listed include all intersections developed through the public involvement process. Many of these locations may not warrant improvements, however additional study is required to make this determination.
2. Intersection costs assumed a unit cost of $250,000 3. Bridge replacement costs are based off of $140 per square foot 4. Projects M6 and M7 are proposed to have non-widening improvements, therefore costs were not provided 5. Estimated costs DO NOT include Right of Way

Source Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Public
RDC RDC RDC RDC RDC RDC RDC RDC RDC RDC

Improvement Type Sidewalk Sidewalk Sidewalk Sidewalk Sidewalk Sidewalk Sidewalk Sidewalk Crosswalk Crosswalk Crosswalk Bike Lane & Sidewalk Bike Lane & Sidewalk Bike Lane & Sidewalk Bike Lane & Sidewalk Bike Lane & Sidewalk Bike Lane & Sidewalk Bike Lane Bike Lane Bike Lane Multi-Use Path

Need Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities

Anticipated Benefit Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System

Analysis Analysis Analysis Analysis Analysis Analysis

Runway Extension Runway Improvement Equipment Upgrade

Airport Upgrade Airport Upgrade Airport Upgrade Airport Upgrade Airport Upgrade Airport Upgrade

meet GDOT Level I standards Improved Safety & Operations
Improved Safety & Operations

CWP Public Public Analysis Analysis Analysis Analysis Analysis
Analysis

Upgrade crossing Upgrade crossing Upgrade crossing Upgrade crossing Upgrade crossing Close Crossing Upgrade crossing Upgrade crossing
Upgrade crossing

Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues
Operational & Safety Issues

Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations
Improved Safety & Operations

Public Analysis

Transit Transit

Commute Options Commute Options

Enhanced Multi-Modal System Enhanced Multi-Modal System

Implementation Near Mid Long

Estimated Cost

Potential Funding Source Federal State County Local

$22,000

$100,000

$40,000

$58,000

$88,000

$40,000

$53,000

$32,000

$1,000

$1,000

$1,000

$318,500

$182,000

$143,500

$749,000

$591,500

$2,009,000

$1,239,000

$1,447,500

$678,000

$3,619,000

$16,564,500

$350,000 $350,000
$25,000 $825,000 $250,000 $250,000 $2,050,000

$150,000 $150,000
$150,000 $150,000
$5,000 $150,000 $150,000
-
$905,000

$50,000 -
$50,000 $269,725,330

East Georgia Multi-County Transportation Study

19

Project Ref. No.

Facility

Capacity Improvements/New Roadways

P1 Eatonton SE Bypass P2 SR 44 P3 Eatonton NE Bypass P4 US 129 P5 SR 16 Passing Lanes P6 SR 16/SR 44

From
SR 44 SR 16 SR 16 Mathis Rd (Jones)6 Texas Chapel Rd US 441 Business

Segment Limits To
SR 16 Greene County US 441 US 441 Oconee Springs Rd SR 16

Operational Improvements
P7 US 441 P8 US 441 Business P9 SR 16

US 441 Bypass US 441 Bypass (N) US 441 Business

Baldwin County US 441 Bypass (S) US 441 Bypass

Minor Widenings
P10 Old Phoenix Rd P11 Harmony Rd P12 Martin Luther King Jr Dr P13 Glades Rd P14 Union Chapel Rd P15 Glenwood Springs Rd P16 Twin Bridges Rd P17 Dennis Station Rd P18 Oconee Springs Rd P19 Crooked Creek Rd P20 Pinkerton Rd P21 Parks Mill Rd

SR 16 US 441 Oconee St Jasper County Reids Rd SR 212 SR 212 US 441 Martin Luther King Jr Dr Scuffleboro Rd Crooked Creek Rd Harmony Rd

SR 44 SR 44 Pea Ridge Rd Reids Rd US 441 US 441 Bypass US 441 Twin Bridges Rd Pea Ridge Rd Pinkerton Rd Oconee Springs Rd Morgan County

Intersection/Geometric Improvements
P22 Parks Rd P23 Godfrey Hwy P24 SR 16 P25 US 441 Bypass (N) P26 SR 16 P27 US 441 P28 SR 16 P29 US 441 P30 SR 16 (Sparta Rd) P31 SR 16 (Marion St) P32 US 441 Bypass (N) P33 US 441 P34 US 129 P35 US 441 P36 SR 44 P37 SR 16 P38 SR 44 P39 W Marion P40 US 441

Bridge Imperial Mill Rd SR 44 US 441 (N) US 441 Bypass Twin Bridges Rd US 441 BU SR 44 Putnam Ave Madison Ave Sherwood Ave US 129 SR 212 Pine Knoll Ln Old Phoenix Rd/Harmony Rd Pea Ridge Rd & Old Phoenix Rd Tanyard Rd & New Phoenix Rd Maple St Union Chapel

Bridge Improvements
P41 Griffith Rd P42 Glenwood Springs Rd P43 SR 16 P44 Martins Mill Rd P45 Old Macon Rd P46 Crooked Creek Rd P47 Oconee Springs Rd P48 Godfrey Rd P49 Godfrey Rd P50 Rock Eagle Rd P51 US 129 P52 Indian Creek Rd P53 US 129 P54 SR 44

Sugar Creek Tributary Little River Crooked Creek Little River Little River Crooked Creek Crooked Creek Big Indian Creek Glady Creek Little Glady Creek Murder Creek Big Indian Creek Little River Crooked Creek

Bicycle & Pedestrian Improvements
P55 Phillips Rd Sidewalks P56 Martin Luther King Jr Dr Sidewalks P57 Martin Luther King Jr Dr Sidewalks P58 SR 16 Sidewalks P59 SR 16 Sidewalks P60 Oak St Sidewalks P61 Old Glenwood Springs Rd Sidewalks P62 New Glenwood Springs Rd Sidewalks P63 Oak Way Sidewalks P64 SR 16 Bike Lanes P65 New St Sidewalks P66 Hogan St Sidewalks P67 Hogan St Sidewalks P68 Oconee Springs Rd Sidewalks P69 Rock Lane Sidewalks P70 Rock Lane Sidewalks P71 Maple Ave Sidewalks P72 Old Phoenix Rd Sidewalks P73 SR 44 Sidewalks P74 Harmony Rd Sidewalks P75 Glades/Union Chapel Trail P76 Courthouse Sq Sidewalks

Maple Dr Hogan St Rooty Creek US 441 Bypass US 441 Bypass New Glenwood Springs Rd Oak St Oak St Church St Eatonton Martin Luther King Jr Dr Jefferson Ave Rock Lane New Rd US 129 Railroad SR 16 Cuscowilla Rd Old Phoenix Rd Gosse Landing Jasper County Jefferson St

Gatewood School Rooty Creek Gholston Rd existing Ingles Old Glenwood Springs Rd New Glenwood Springs Rd Old Glenwood Springs Rd Hudson Rd Rock Hawk Oconee Springs Rd Martin Luther King Jr Dr Jefferson Ave SR 16 Railroad Hogan Rd Phillips Dr SR 44 Greene County SR 44 Rock Eagle SR 16/SR 44

East Georgia Multi-County Transportation Study

Existing Configuration
N/A 2-Lanes
N/A 2-Lanes
2-Lanes
4-Lanes 2-Lanes 2-Lanes
< ideal typical section < ideal typical section < ideal typical section < ideal typical section < ideal typical section < ideal typical section < ideal typical section < ideal typical section < ideal typical section < ideal typical section < ideal typical section < ideal typical section

Table 5.4 Recommended Improvements

Improved Configuration
4-Lanes, Divided 4-Lanes, Divided 4-Lanes, Divided 4-Lanes, Divided Passing Lanes
4-Lanes

Notes/Comments
6.25 miles 13.40 miles 1.60 miles 10.73 miles 1.87 miles 1.11 miles

4-Lanes 2-Lanes 2-Lanes

9.82 miles 3.71 miles 1.25 miles

12' lanes and 2' paved shoulders 12' lanes and 2' paved shoulders 12' lanes and 2' paved shoulders 12' lanes and 2' paved shoulders 12' lanes and 2' paved shoulders 12' lanes and 2' paved shoulders 12' lanes and 2' paved shoulders 12' lanes and 2' paved shoulders 12' lanes and 2' paved shoulders 12' lanes and 2' paved shoulders 12' lanes and 2' paved shoulders 12' lanes and 2' paved shoulders

5.57 miles 8.17 miles 6.14 miles 8.27 miles 3.03 miles 9.76 miles 7.30 miles 4.60 miles 5.31 miles 4.68 miles 2.95 miles 2.93 miles

Signal

curves
32 crashes 25 crashes 25 crashes 20 crashes 20 crashes 17 crashes 16 crashes 14 crashes 14 crashes 13 crashes 11 crashes Align Intersections Align Intersections

522 sq ft 9,632 sq ft 3,040 sq ft 2,088 sq ft 9,114 sq ft 508 sq ft 4,515 sq ft 5,870 sq ft 3,161 sq ft 932 sq ft 9,169 sq ft 567 sq ft 9,833 sq ft 1,050 sq ft

no sidewalks no sidewalks no sidewalks on west no sidewalks no sidewalks on north no sidewalks no sidewalks no sidewalks no sidewalks no bike lanes/narrow shoulders limited sidewalks no sidewalk on north no sidewalk on south no sidewalks no sidewalk on west no sidewalk on east no sidewalk on east no sidewalks no sidewalks no sidewalks
no sidewalks

sidewalks on both sides sidewalks on both sides sidewalks on west sidewalks on both sides sidewalk on north sidewalks on both sides sidewalks on both sides sidewalks on both sides sidewalks on both sides bike lanes on both sides sidewalks on both sides sidewalk on north sidewalk on south sidewalks on both sides sidewalks on west sidewalk on east sidewalk on east sidewalks on both sides sidewalks on both sides sidewalks on both sides multi-use path sidewalks on both sides

21.73 sufficiency rating 22.23 sufficiency rating 34.72 sufficiency rating 41.00 sufficiency rating 42.82 sufficiency rating 42.87 sufficiency rating 48.92 sufficiency rating 52.92 sufficiency rating 60.70 sufficiency rating 62.10 sufficiency rating 64.17 sufficiency rating 64.65 sufficiency rating 67.27 sufficiency rating 73.50 sufficiency rating
0.51 miles 0.70 miles 0.80 miles 0.93 miles 0.13 miles 0.38 miles 0.70 miles 0.42 miles 0.32 miles 11.57 miles 0.60 miles 0.38 miles 0.25 miles 0.80 miles 0.08 miles 0.42 miles 0.65 miles 0.41 miles 2.54 miles 0.94 miles 10.00 miles 0.35 miles
20

Source
CWP CWP CWP CWP Public Analysis
Analysis Analysis Analysis
Public Public Public Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
Public Public Public Public Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Public Public Public Public
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
Public Analysis Analysis Public Analysis Public Public Public Public Public Analysis Analysis Analysis Analysis Analysis Analysis Analysis Public Public Public Analysis
RDC

Improvement Type

Need

New Roadway Arterial Widening New Roadway Arterial Widening Passing Lanes Arterial Widening

Connectivity Capacity Deficiency Connectivity Capacity Deficiency
Capacity Deficiency

Anticipated Benefit

Implementation Near Mid Long

Estimated Cost

Potential Funding Source Federal State County Local

Improved Connectivity Increase Capacity & Improved Safety Improved Connectivity Increase Capacity & Improved Safety Increase Capacity & Improved Safety Increase Capacity & Improved Safety

$8,600,000 $46,495,000
$5,280,000 $48,647,753
$6,038,400 $115,061,153

Minor Widening Minor Widening Minor Widening Minor Widening Minor Widening Minor Widening Minor Widening Minor Widening Minor Widening Minor Widening Minor Widening Minor Widening

Sub-Standard Typical Section Sub-Standard Typical Section Sub-Standard Typical Section Sub-Standard Typical Section Sub-Standard Typical Section Sub-Standard Typical Section Sub-Standard Typical Section Sub-Standard Typical Section Sub-Standard Typical Section Sub-Standard Typical Section Sub-Standard Typical Section Sub-Standard Typical Section

Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity

Intersection Improvement Intersection Improvement Intersection Improvement Intersection Improvement Intersection Improvement Intersection Improvement Intersection Improvement Intersection Improvement Intersection Improvement Intersection Improvement Intersection Improvement Intersection Improvement Intersection Improvement Intersection Improvement Intersection Improvement Intersection Improvement Intersection Improvement Intersection Improvement Intersection Improvement

Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues Operational & Safety Issues

Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity Improved Safety & Capacity

Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge Upgrade Bridge

Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance Rehabilitation or Maintenance

Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations Improved Safety & Operations

Sidewalk Sidewalk Sidewalk Sidewalk Sidewalk Sidewalk Sidewalk Sidewalk Sidewalk Bike Lane Sidewalk Sidewalk Sidewalk Sidewalk Sidewalk Sidewalk Sidewalk Sidewalk Sidewalk Sidewalk Multi-Use Path Sidewalk

Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities

Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System

$0
$3,787,600 $5,555,600 $4,175,200 $5,623,600 $2,060,400 $6,636,800 $4,964,000 $3,128,000 $3,610,800 $3,182,400 $2,006,000 $1,992,400 $46,722,800
$250,000 $250,000 $250,000 $250,000 $250,000 $250,000 $250,000 $250,000 $250,000 $250,000 $250,000 $250,000 $250,000 $250,000 $250,000 $250,000 $250,000 $250,000 $250,000 $4,750,000
$80,342 $1,483,328
$468,098 $321,552 $1,403,556
$78,294 $695,310 $903,903 $486,717 $143,528 $1,412,026
$87,318 $1,514,205
$161,638 $9,239,815
$102,000 $140,000
$80,000 $186,000
$13,000 $76,000 $140,000 $84,000 $64,000 $1,735,500 $120,000 $38,000 $25,000 $160,000
$8,000 $42,000 $65,000 $82,000 $508,000 $188,000 $3,500,000 $70,000

Table 5.4 Recommended Improvements

Project Ref. No.
P77 P78 P79 P80 P81 P82 P83 P84 P85

Facility
SR 44 Multi-Use Path SR 16 Bike Lanes SR 16 Bike Lanes SR 16 Bike Lanes US 441 Bike Lanes Pea Ridge Rd Bike Lanes Old Phoenix Rd Bike Lanes SR 212 Bike Lanes Downtown City of Eatonton

From
US 441 (Jefferson St) SR 142 US 441 Bypass SR 16/SR 44 US 441/US 129 US 441 SR 16 US 129 Bicycle Racks

Segment Limits To
Greene County Line US 441 Bypass Madison Ave Hancock County Line Lake Sinclair SR 16 SR 44 Jasper County Line

Existing Configuration
no bike lanes/narrow shoulder no bike lanes/narrow shoulder no bike lanes/narrow shoulder no bike lanes/narrow shoulder no bike lanes/narrow shoulder no bike lanes/narrow shoulder no bike lanes/narrow shoulder no bicycle racks

Improved Configuration
multi-use path bike lanes on both sides bike lanes on both sides bike lanes on both sides bike lanes on both sides bike lanes on both sides bike lanes on both sides bike lanes on both sides bicycle racks -$100-$300 each - install 4

Notes/Comments
10.79 miles 4.25 miles 1.16 miles 13.42 miles 9.77 miles 8.34 miles 5.55 miles 6.93 miles

Notes: 1. Intersection Improvements listed include all intersections developed through the public involvement process. Many of these locations may not warrant improvements, however additional study is required to make this determination.
2. Intersection costs assumed a unit cost of $250,000 3. Bridge replacement costs are based off of $140 per square foot 4. Projects P7, P8 and P9 are proposed to have non-widening improvements, therefore costs were not provided 5. Estimated costs DO NOT include Right of Way 6. Logical termini for P4 should be extended to Gray Bypass in Jones County

Source
RDC RDC RDC RDC RDC RDC RDC RDC RDC

Improvement Type
Multi-Use Path Bike Lane Bike Lane Bike Lane Bike Lane Bike Lane Bike Lane Bike Lane Bicycle Racks

Need
Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities Bike/Ped Facilities

Anticipated Benefit
Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System Enhanced Multi-Modal System

Implementation Near Mid Long

Estimated Cost

Potential Funding Source Federal State County Local

$3,776,500

$637,500

$174,000 $2,013,000

$1,465,500

$1,251,000

$832,500

$1,039,500

$1,000

$18,617,000

$194,390,768

East Georgia Multi-County Transportation Study

21

Executive Summary

Technical Memorandum
F August 2007

Recommended Improvements - Roadway
East Georgia Multi-County Transportation Study

Figure No: 5.1 22

Executive Summary

Technical Memorandum
F August 2007

Recommended Improvements Bicycle & Pedestrian
East Georgia Multi-County Transportation Study

Figure No: 5.2 23

Executive Summary

Technical Memorandum August 2007

6.0 Prioritization

In order to aid GDOT and County staff, potential improvements were ranked by mode based on several evaluation factors. This section highlights some of the top priorities for each County.

6.1 Greene County Priorities

Corridors East Greensboro Bypass from SR 44 (S) to SR 44 (NE); SR 44 from Linger Longer Road to East Greensboro Bypass; SR 44 from Putnam County to Linger Longer Road; US 278 from SR 15 to SR 77; Greensboro Bypass from Lick Skillet Road to Beaver Dam Creek; Carey Station Road from US 278 to SR 44; SR 77 from US 278 to SR 15; Wrightsville Church Road from SR 44 to Walkers Church Road; Leslie Mill Road from Walker Church Road to Veazey Road; and, White Plains Veazey Road from Veazey Road to SR 15.

Bicycle and Pedestrian US 278 bike lanes & sidewalks from Vandiver Road to Brick House Road; SR 77 (N) sidewalks from US 278 to Elementary School; SR 44 sidewalks from SR 77 (N) to Crawfordville Road/Orear Road; SR 44 sidewalks from Anita Carson Middle School to Sixth Street; and, SR 44 sidewalks from Sixth Street to Fourth Street.

Intersections US 278 (Broad Street) and SR 44 (Main Street); US 278 (E Broad Street) and Walnut Street; Carey Station Road and SR 44; Interchange at Carey Station Road and I-20; US 278 and Cunningham Road; US 278 (W Broad Street) and SR 15 (Laurel Street); SR 77 and SR 15; Veazey Road and Leslie Mill Road/White Plains - Veazey Road; Wesley Chapel Road and SR 15; and, Carey Station Road and US 278.

Bridges Rail Fence Road at Griffin Creek; Centennial Church Road at Little Shoulderbone Creek; Old Eatonton Road at CSX Railroad; Copeland Road at Greenbrier Creek; Bethesda Church Road at South Fork Little River;

East Georgia Multi-County Transportation Study

24

Executive Summary
Randolph Church Road at North Fork Little River; Geer Road at McWhorter Creek; Woodville Road at North Fork Little River; Johnny Carson Road at Greenbrier Creek; and, Little Creek Ch Road at Little Greenbrier Creek.

Technical Memorandum August 2007

6.2 Jasper County Priorities
Corridors Liberty Church Road from SR 11 to Post Road; SR 83 NW Bypass from SR 83/380 NW to SR 11; SR 83 SW Bypass from SR 11 to SR 16; SR 212 from SR 16 to Newton County; Post Road from SR 11 to SR 142; Bethel Church Road from SR 16 to SR 11; Clay Road from SR 16 to SR 83; Fullerton Phillips Road from SR 11 to SR 212; Aikenton Road from SR 83 to Rock Eagle Road; and, Bullard Road from Rock Eagle Road to SR 16.
Bicycle and Pedestrian Bike lanes and sidewalks along SR 16/SR 212 from SR 16/SR 212 to SR 11; Bike lanes and sidewalks along SR 83 from SR 16 to Edwards Road; Bike lanes and sidewalks along SR 212 from SR 11 to SR 380; Bike lanes and sidewalks along SR 11 from SR 16 to SR 380; Bike lanes and sidewalks along SR 16 from SR 212 to Fellowship Road; Bike lanes and sidewalks along SR 83 from SR 16 to CR 73; Bike lanes along SR 11 from SR 16 to Newton County Line; Sidewalks along Funderburg Street from Webb Street to Fred Smith Street; Sidewalks along Funderburg Street from Wilson Street to Fred Smith Street; and, Funderburg Street Pedestrian crossing at railroad.
Intersections SR 212 and Church Street; SR 11 and Post Road; SR 11 (Green Street) and SR 16 (E Green Street); SR 11 (Green Street) and SR 11-SO (Forsyth Street); and, SR 16 (Washington Street) and SR 212 W.
Bridges Pitts Chapel Road at Pittman Branch; Old Agateville Road at Cedar Creek; Lane Road at Kinnard Creek;

East Georgia Multi-County Transportation Study

25

Executive Summary
Kinnard Creek Road at Kinnard Creek Tributary; Cook Road at Herds Creek; Guy Jones Road at Pittman Branch; Wicker Road at Whiteoak Creek; Ellis Road at Robinson Creek; Whitten Road at Hanna Branch; and, Ozborne Road at Herds Creek Tributary.

Technical Memorandum August 2007

6.3 Morgan County Priorities
Corridors US 441 from Madison Bypass to north of Apalachee River (Oconee); SR 83 W Bypass from SR 83 (N) to SR 83 (S); SR 83 from US 278 to I-20; SR 83/US 441 Bypass from US 441 (N) to SR 83 (N); Buckhead Road/Seven Island Road from Greensboro Road to I-20; Seven Island Road from Glades Road to US 278; Fairplay Road from Dixie Highway to SR 83; Apalachee Road from Price Mill Road to US 441; Parks Mill Road from Seven Island Road to Putnam County; and, Dixie Highway from Walton County to Pennington Road.
Bicycle and Pedestrian SR 83 bike lanes and sidewalks from US 278 to Doster Road; East Avenue sidewalks from Harris Street to Morgan County Library; Buckhead Road/Chivers Avenue sidewalks from Parks Mill Road to Park; Moreland Avenue sidewalks from East Avenue to College Drive; SR 24 Spur bike lanes & sidewalks from US 278 to US 441; US 441 bike lanes and sidewalks from US 278 to I-20; and, US 278 bike lanes and sidewalks from Brownwood Road to Lambert Road.
Intersections Lions Club Road at US 441; US 441 at US 278; US 278 (Atlanta Highway) at SR 83 (Pennington Road); US 441 Bypass at Bethany Road; US 441 at SR 24 Spur; US 278 at SR 24 Spur; US 278/US 441 (S Main Street) at SR 83 (E Washington Street); US 441 at Pierce Dairy Road; Indian Creek Road in the vicinity of I-20; and, Little's Road at Harmony Road (Putnam County).

East Georgia Multi-County Transportation Study

26

Executive Summary
Bridges Oil Mill Road at Norfolk Southern Railroad; Newborn Road at Little River; Kingston Road at Little Sugar Creek; Lower Apalachee Road at Norfolk Southern Railroad; US 441 at Hard Labor Creek; Brownwood Road at Big Indian Creek; Enterprise Road at Little Sugar Creek; US 441 at Apalachee River; Walton Mill Road at Little River Tributary; and, US 441 at Big Sandy Creek.

Technical Memorandum August 2007

6.4 Putnam County Priorities
Corridors SR 16/SR 44 from US 441 Business to SR 16; SR 44 from SR 16 to Greene County; Eatonton SE Bypass from SR 44 to SR 16; Eatonton NE Bypass from SR 16 to US 441; US 129 from Mathis Road (Jones County) to US 441; SR 16 from US 441 Business to US 441 Bypass; US 441 Business from US 441 Bypass (N) to US 441 Bypass (S); US 441 from US 441 Bypass to Baldwin County; Old Phoenix Road from SR 16 to SR 44; and, Oconee Springs Road from Martin Luther King Jr Drive to Pea Ridge Road.
Bicycle and Pedestrian Sidewalks along Rock Lane from US 129 to Railroad; Sidewalks along Phillips Road from Maple Drive to Gatewood School; Sidewalks along Old Glenwood Springs Road from Oak Street to New Glenwood Springs Road; Sidewalks along Courthouse Square from Jefferson Street to SR 16/SR 44; Sidewalks along SR 16 from US 441 Bypass to existing; Sidewalks along SR 16 from US 441 Bypass to Ingles Shopping Center; Sidewalks along Oak Street from New Glenwood Springs Road to Old Glenwood Springs Road; Sidewalks along New Glenwood Springs Road from Oak Street to Old Glenwood Springs Road; Sidewalks along Oak Way from Church Street to Hudson Road; and, Sidewalks along Old Phoenix Road from Cuscowilla Road to SR 44.
Intersections SR 16 at SR 44; US 441 at Union Chapel;

East Georgia Multi-County Transportation Study

27

Executive Summary
US 441 at SR 44; SR 16 at US 441 Bypass; US 441 at Twin Bridges Road; SR 16 at US 441 Business; SR 16 (Sparta Road) at Putnam Avenue; SR 16 at Pea Ridge Road and Old Phoenix Road; SR 44 at Tanyard Road and New Phoenix Road; and, US 441 at US 129.
Bridges Griffith Road at Sugar Creek Tributary; Glenwood Springs Road at Little River; SR 16 at Crooked Creek; Martins Mill Road at Little River; Old Macon Road at Little River; Crooked Creek Road at Crooked Creek; and, Oconee Springs Road at Crooked Creek.

Technical Memorandum August 2007

East Georgia Multi-County Transportation Study

28

Executive Summary

Technical Memorandum August 2007

7.0 Conclusions

Growth in Greene, Jasper, Morgan, and Putnam Counties has resulted in increased travel demand through the 4-County Region. GDOT Office of Planning, in conjunction with these four Counties, initiated the East Georgia Multi-County Transportation Study to develop a LRTP to serve the 4-County Region through the planning horizon, 2030. Recommended projects were identified and selected according to all applicable rules and regulations with the intent of enhancing the quality of life for County residents and visitors. Efforts were taken to ensure that proposed projects impacted the community as little as possible while providing maximum benefits. Analysis was conducted to ensure that the projects benefited and did not disproportionately impact low-income and minority communities. Ultimately, the study identified multi-modal improvements and prioritized project implementation in the form of a Long Range Transportation Plan.

HNTB coordinated with GDOT, Greene, Jasper, Morgan, and Putnam Counties, local cities, citizens, and other partners in the planning, development, review, and approval of potential improvements. Additionally, a comprehensive and interactive public involvement program was conducted. This ensured that alternative transportation improvements were not only coordinated with various governments, but afforded individual citizens and interested groups the opportunity to provide their input in developing and evaluating potential improvements to each County's transportation network.

The end product for this study was a LRTP that provided for the efficient movement of people and goods within and through the 4-County Region through the horizon year of this study, 2030. Interim year analysis was conducted for the year 2015. As part of this effort existing and future operating conditions were documented for the following modes: highways and bridges, bicycle and pedestrian improvements, freight, transit, railways and airports.

East Georgia Multi-County Transportation Study