2021 Intended Use Plan 
Drinking Water State Revolving Fund 
Prepared by the Georgia Environmental Finance Authority 
June 16, 2021 
 
 2021 Intended Use Plan Georgia Environmental Finance Authority 
Drinking Water State Revolving Fund 
 
Table of Contents 
 
Contents 
 
Page 
 
Part I - Section 1452 Requirements 
 
Introduction.................................................................................................................................................... 3 DWSRF Project Solicitation Process ............................................................................................................. 3 DWSRF Comprehensive List ......................................................................................................................... 4 DWSRF Fundable List and Estimated Disbursement Schedule .................................................................... 4 Terms and Conditions of Financing ............................................................................................................... 5 Four Percent Administration .......................................................................................................................... 8 Criteria and Method for Distribution of Funds ................................................................................................ 8 DWSRF Goals and Objectives ...................................................................................................................... 9 20 Percent State Match Requirement............................................................................................................ 9 Assurances and Specific Proposals............................................................................................................... 9 Public Participation ...................................................................................................................................... 10 
 
Part II - Attachments 
Attachment 1 - Comprehensive List (Drinking Water Projects) .................................................................... 11 Attachment 2 - Fundable List and Estimated Disbursement Schedule ...................................................... 15 Attachment 3 - ASAP DWSRF Payment Schedule.................................................................................... 16 Attachment 4 - Estimated Sources and Uses .............................................................................................. 17 Attachment 5 - DWSRF 2 Percent, 4 Percent, 10 Percent, and 15 Percent Set-Aside Work Plan .............. 18 Attachment 6 - DWSRF 10 Percent and 15 Percent Breakdown ............................................................... 20 Attachment 7 - DWSRF Affordability Criteria ............................................................................................. 36 Attachment 8 - Ranking Criteria for DWSRF Projects.................................................................................. 39 Attachment 9 - Public Meeting Summary IUP.............................................................................................. 41 Attachment 10 - Loan Program Policies ...................................................................................................... 42 
 
2 
 
 Drinking Water State Revolving Fund Intended Use Plan 2021 
Introduction 
Section 1452(b) of the Safe Drinking Water Act (SDWA) Amendments of 1996 requires each state to annually prepare an Intended Use Plan (IUP) identifying the use of funds from the Drinking Water State Revolving Fund (DWSRF) allotment to support the goal of protecting public health. This IUP outlines Georgia's proposed uses of the FY2021 DWSRF allotment of $25,924,000. 
The Georgia Environmental Finance Authority (GEFA) was created by the Georgia General Assembly in 1986 as the successor agency to the Georgia Development Authority, Environmental Facilities Program. GEFA assists local governments in financing the construction, extension, rehabilitation and replacement, and securitization of public works facilities. The GEFA board of directors consists of three ex-officio members and eight members appointed by the governor. Under an interagency agreement, the Georgia Environmental Protection Division (EPD) provides professional services to the DWSRF. The services include, but are not limited to: 
 Project reviews and approvals,  Planning and project development,  Information tracking,  Updating files,  Information gathering and development of the National Needs Survey,  Issuing and approving Notices of No Significant Impacts (NONSI) and Categorical Exclusions (CE),  Assistance with the National Information Management System (NIMS),  The Public Benefit Reporting (PBR) database, and  Administration of EPD's set-aside activities. 
DWSRF Project Solicitation Process 
Developing the DWSRF comprehensive list involves an online pre-application process where all communities requesting funding provide project-related information. 
 Project solicitation process began on September 1, 2021 and was open through February 26, 2021. 
 GEFA emailed the solicitation notice to its stakeholder list and coordinated with relevant trade and local government associations to further disseminate the project solicitation. 
 Solicitation for new projects was announced on the GEFA website.  GEFA made available project solicitation packets Containing information about financing terms, 
available funding, and the scoring system for project prioritization.  An online pre-application form was made available on the GEFA website.  GEFA used the pre-application information to score and rank all submitted projects.  Fifty-Nine drinking water projects were submitted with a total need of $214,970,856. The DWSRF 
comprehensive list includes all drinking water projects in descending order based upon project score. 
3 
 
 DWSRF Comprehensive List 
The DWSRF comprehensive list (Attachment 1) was created from the drinking water projects submitted during the pre-application solicitation period. The comprehensive list is comprised of 
 Community  Project score  Population  Total project cost  Principal forgiveness eligibility  Project description 
The list was generated by public water systems identifying a potential water project and submitting a preapplication. The GEFA board of directors reserves the right to fund lower priority projects over higher priority projects if, in the opinion of GEFA, a higher priority project has not taken the necessary steps to prepare for funding and initiation of construction (e.g., GEFA has not received a complete and approvable financial application, the project is not ready to proceed, or the community withdraws its project from consideration). Additionally, if a qualified project becomes viable within the funding year, Georgia may amend its comprehensive list. To accommodate those communities that decide to participate in the DWSRF after the capitalization grant has been awarded, GEFA will hold quarterly meetings to include any new projects on the comprehensive list. This same process of public review and comment will be followed for any substantive change in the priority of the DWSRF. 
DWSRF Fundable List and Estimated Disbursement Schedule 
The DWSRF fundable project list with an estimated disbursement schedule is in Attachment 2. The fundable list contains projects GEFA has identified as ready to move forward, which can be seen in the score column in Attachment 1. Projects qualify for the fundable list by meeting conditions such as: consent order issued by Georgia EPD, CE or NONSI issuance or approval, and/or requirement to bring the public water system into immediate compliance with the Safe Drinking Water Act. 
Projects on the fundable list are projected to draw down the 2021 grant funds. GEFA created this disbursement schedule based on the eight quarters identified in the 2021 DWSRF payment schedule located in Attachment 3, which indicates the timeframe for requesting the DWSRF capitalization grant allotment from the U.S. Environmental Protection Agency's (EPA) Automated Standard Application for Payments (ASAP) System. Some of the projects listed on the disbursement schedule are one phase of a larger project, and some of the projects may have a construction schedule longer than the eight quarters identified in the DWSRF payment schedule. 
The DWSRF assistance includes financing and any required principal forgiveness as outlined in the applicable appropriations language. Assistance will be provided to municipalities and water/sewer authorities created by the Georgia legislature for the construction, expansion, and improvements to publicly-owned drinking water facilities. All borrowers must designate a repayment source(s) for each loan agreement signed with GEFA. All construction projects will meet the requirements of the Federal Water Pollution Control Act with respect to Davis-Bacon requirements in section 513 and American Iron and Steel (AIS) requirements in section 608. 
4 
 
 Terms and Conditions of Financing 
Standard DWSRF Financing Terms GEFA's benchmark interest rate is the true interest cost (to the nearest hundredth of one percent) received by the state on its competitively-bid, general obligation bond issue. GEFA currently offers DWSRF loans to local governments and authorities at an interest rate of 50 basis points (0.50 percent) below the benchmark rate. 
DWSRF loans are available with terms as short as five years and not exceeding 40 years for communities designated by states as "disadvantaged" under state criteria or the useful life of the project. Interest rates are reduced from the 40-year DWSRF rate for shorter term loans. 
GEFA charges a one-time origination fee, calculated based on the total DWSRF financing provided for the project. The origination fee is charged on each commitment when the contract is executed and paid within the second month following contract execution. GEFA deposits origination fees into a separate non-project account. Program income generated from direct capitalization grant funds, and non-program income generated from repayment funds will be collected and accounted for separately. Program income and non-program income can be seen as a source and use of funds in the Estimated Sources and Uses of Funds in Attachment 4. 
DWSRF Conservation Financing Terms DWSRF-eligible conservation projects receive an interest rate reduction. 
The following types of water conservation projects are eligible: 
 Installing or retrofitting water-efficient devices, such as plumbing fixtures and appliances;  Implementing incentive programs to conserve water, such as rebates for water efficient 
fixtures;  Installing water meters in previously unmetered areas;  Replacing broken/malfunctioning water meters or upgrading existing water meters;  Water recycling and reuse projects that replace potable sources with non-potable sources; 
and  Replacing or rehabilitating distribution pipes to reduce water loss and to prevent water 
main breaks. 
The following types of energy production and energy conservation projects are eligible: 
 Projects that produce energy at a publicly-owned water treatment facility via wind, solar, or geothermal power projects; 
 Projects that involve capturing energy from pipe flow and providing power to the water facility; 
 Projects that replace pumps and motors to reduce power consumption;  Projects that eliminate pumps and pumping stations; and  Projects that install energy efficient treatment equipment or processes. 
5 
 
 Principal Forgiveness The terms and conditions of the grant award allow subsidy in the form of principal forgiveness (PF) to borrowers of the DWSRF loan program. Exactly 10 percent of the capitalization grant must be provided as additional subsidization and between 0 percent and 30 percent of the capitalization grant may be provided as additional subsidization. Therefore, principal forgiveness will be provided to eligible projects until it is exhausted and not to exceed 40 percent of the capitalization grant. Both the project score and the affordability score will be considered. 
GEFA uses a tool for evaluating and scoring communities to determine PF eligibility. For each criterion, a borrower will be categorized into one of four percentiles - 25 percent, 50 percent, 75 percent, or 100 percent. A score of one through four is given for each criterion, based on the percentile. A maximum of 40 points is possible. If a community has multiple projects on the DWSRF comprehensive list, only one project can receive PF. The affordability score for each applicant can be found in Attachment 1 and the ten criteria are listed below. 
 
1. Median Household Income (MHI) 
 
State Percentiles 25th Percentile 50th Percentile 75th Percentile 100th Percentile 
 
(4 points) 
 
(3 points) 
 
(2 points) 
 
(1 point) 
 
MHI 
 
$32,699 
 
$42,444 
 
$54,555 $54,556 and higher 
 
2. Unemployment Percent 
 
State Percentiles 25th Percentile 50th Percentile 75th Percentile 100th Percentile 
 
(1 point) 
 
(2 points) 
 
(3 points) 
 
(4 points) 
 
Unemployment Percent 
 
2.0% 
 
3.1% 
 
4.6% 4.7% and higher 
 
3. Percentage Not in Labor Force 
 
State Percentiles 
Percentage Not in Labor Force 
 
25th Percentile 50th Percentile 75th Percentile 100th Percentile 
 
(1 point) 
 
(2 points) 
 
(3 points) 
 
(4 points) 
 
36.9% 
 
43.5% 
 
50.3% 50.4% and higher 
 
4. Poverty Rate 
 
State Percentiles Poverty Rate 
 
25th Percentile 50th Percentile 75th Percentile 100th Percentile 
 
(1 point) 
 
(2 points) 
 
(3 points) 
 
(4 points) 
 
12.3% 
 
20.0% 
 
27.4% 27.5% and higher 
 
6 
 
 5. Percentage on Social Security 
 
State Percentiles 
Percentage on Social Security 
 
25th Percentile 50th Percentile 75th Percentile 100th Percentile 
 
(1 point) 
 
(2 points) 
 
(3 points) 
 
(4 points) 
 
29.2% 
 
36.1% 
 
43.3% 43.4% and higher 
 
6. Percentage on SSI 
 
State Percentiles Percentage on SSI 
 
25th Percentile 50th Percentile 75th Percentile 100th Percentile 
 
(1 point) 
 
(2 points) 
 
(3 points) 
 
(4 points) 
 
3.9% 
 
6.8% 
 
10.4% 10.5% and higher 
 
7. Percentage with Cash Public Assistance 
 
State Percentiles 
Percentage with Cash Public Assistance 
 
25th Percentile 50th Percentile 75th Percentile 100th Percentile 
 
(1 point) 
 
(2 points) 
 
(3 points) 
 
(4 points) 
 
0.2% 
 
1.3% 
 
2.3% 2.4% and higher 
 
8. Percentage with SNAP 
 
State Percentiles 25th Percentile 50th Percentile 75th Percentile 100th Percentile 
 
(1 point) 
 
(2 points) 
 
(3 points) 
 
(4 points) 
 
Percentage with SNAP 
 
10.8% 
 
18.8% 
 
25.2% 25.3% and higher 
 
9. Age Dependency Ratio 
 
State Percentiles 25th Percentile 50th Percentile 75th Percentile 100th Percentile 
 
(1 point) 
 
(2 points) 
 
(3 points) 
 
(4 points) 
 
Age Dependency Ratio 
 
58.6 
 
67.4 
 
77.3 77.4 and higher 
 
10. Population Trend The following will be the categories used for determining scoring for change in population from 2011 to 2019. 
 Positive growth or no growth (1 point)  Between -0.01 percent and -1 percent (2 points)  Between -1.01 percent and -2 percent (3 points) 
7 
 
  Greater than -2 percent (4 points) 
The following list shows the affordability score and potential PF percentage for the FY2021 grant year: 
 Score of 37 will receive 55 percent, not to exceed $1,300,000  Score of 32 - 36 will receive 50 percent, not to exceed $1,100,000  Score of 30 - 31 will receive 45 percent, not to exceed $900,000  Score of 27 - 29 will receive 40 percent, not to exceed $700,000  Score of 26 or less will not receive principal forgiveness 
GEFA will re-evaluate the PF allocation after the fourth board cycle following the 2021 capitalization grant award to identify communities who will not move forward with their project (upon written notification to GEFA). During this PF reallocation process, GEFA will move down the comprehensive list (based on the project score) using the PF methodology that is posted in the 2021 IUP. The following methodology will be used: 
 GEFA will go down the DWSRF 2021 comprehensive list and award PF to those with an affordability score of 27 or higher: and/or 
 GEFA will go down the CWSRF 2021 comprehensive list and award PF to those with an affordability score of 30 or higher. 
If there is PF remaining after GEFA has reached the bottom of the list, GEFA could amend the current language in the IUP and use a lower affordability score. 
Four Percent Administration 
Georgia intends to use four percent of the capitalization grant for administrative purposes. Based on the FY2021 allotment of $25,924,000, $1,036,960 is reserved for administrative support to manage and operate the DWSRF. A detailed account of the costs associated with the four percent account are found in Attachment 5. 
Criteria and Method for Distribution of Funds 
Attachment 8 explains Georgia's criteria and method used to score and distribute funds to DWSRF projects. Only those cities and counties that have been designated as a "Qualified Local Government" and are in compliance with O.C.G.A. Section 36-70-20 and appear on the comprehensive list may receive a DWSRF loan commitment. Communities within the Metropolitan North Georgia Water Planning District (MNGWPD) that are in compliance or making a good faith effort toward compliance with the MNGWPD plans are eligible for DWSRF funding. Lastly, only those communities that are in compliance with plumbing code standards as codified in O.C.G.A. Section 12-5-4 will be eligible for financing through GEFA. Eligible project costs include planning, design, engineering, and construction. Ineligible costs include maintenance and operation expenditures, projects needed primarily for fire protection, or projects to facilitate future growth. No loan will be executed until environmental approval has been issued and financial requirements have been met. 
8 
 
 DWSRF Goals and Objectives Long-term Goals 
1. Maintain program pace using the national average for a pace target for this fiscal year. 2. Explore the viability of regionalization and/or consolidation of systems to take advantage of 
economies of scale and to address the technical, managerial, and financial capacity issues experienced by disadvantaged communities. 3. Consolidate multiple database management systems that will integrate Drinking Water project data with program management data. 
Short-term Goals 1. Increase the scope of onsite technical assistance provided to small water systems to include the 
management of assets, and the identification and remediation of failing system components. 2. Expand the outreach activities to ensure that systems are aware of and understand DWSRF 
assistance options and the application process by presenting at statewide workshops and conferences to publicize the DWSRF program. 3. GEFA seeks to draw down and close the 2018 DWSRF grant by June 30, 2021. This will ensure that GEFA is working to support the EPA's goal of minimizing unliquidated obligations. 
20 Percent State Match Requirement 
Under the provisions of the SDWA of 1996, Section 1452, the state is required to deposit an amount equal to at least 20 percent of the total amount of the capitalization grant into the DWSRF. Based on the FY2021 allotment of $25,924,000, the state match required equals $5,184,800. The Georgia Legislature has been requested to provide sufficient general obligation bonds to cover this requirement. GEFA will disburse these state bond funds along with federal direct capitalization grant funds in a proportionate manner to ensure the proper match on each loan disbursement. Each project that receives direct federal funds will receive a portion of the disbursement in federal grant funds (77.53 percent) and a portion of the disbursement in state match funds (22.47 percent). These state funds will be held outside the DWSRF until the disbursement is made. Once these state dollars are disbursed to a project, those funds and the interest paid on those funds will be returned to the program. Only project-related disbursements will be funded in this manner. None of the set-asides or administrative disbursements will be funded with state match funds. 
Assurances and Specific Proposals 
In addition to the assurances that accompany the capitalization grant application (Standard Form 424) for the 2021 funds, GEFA further agrees to adhere to all the certifications covered within the Operating Agreement with EPA Region 4. The specific certifications are: 
1. Capitalization grant agreement 2. Payment schedule 3. State matching funds 4. Commitment of 120 percent in one year 5. All funds - timely expenditures 6. Enforceable requirements of the Safe Drinking Water Act 7. Cross cutting issues 8. State law and procedures 9. State accounting and auditing procedures 
9 
 
 10. Recipient accounting and auditing procedures 11. Annual report 12. Limitations on eligibility 13. Environmental review process 14. Maintain the fund 15. Perpetuity 16. Types of assistance 17. Priority list 18. Limitations of double benefits 19. Consistency with planning requirements 20. Annual audit 21. Intended use plan 22. Annual federal oversight review and technical assistance 23. Dispute resolution 24. Reserve the right to transfer up to 33 percent of grant amount between programs 25. NIMS 26. PBR 
The Georgia SDWA of 1977, as amended, and the Rules for Safe Drinking Water, as amended, require that before constructing a public water system EPD must approve of: 
1. The source of water supply and, 2. The means and methods of treating, purifying, storing, and distributing water to the public. 
Furthermore, before placing the public water system in operation, the owner must obtain a permit to operate from EPD. Through the construction approval procedures and the issuance of operating permits, EPD ensures that public water systems are built and operated with adequate technical capacity to comply with existing and future state and federal drinking water regulations and standards. EPD also requires that public water systems have a certified operator. EPD supports several operator training and technical assistance programs to ensure that water systems and their operators maintain an adequate level of technical capacity. 
As in previous years, DWSRF program managers will continue to coordinate with the EPA Region 4 office on items such as quarterly and annual reports, annual reviews, National Need Surveys, collection of NIMS data, training opportunities, attendance at regional and national conferences, workshops, and various administrative program efforts. 
Public Participation 
This IUP is subject to review and comment by the public prior to incorporation into the 2021 capitalization grant application. A public notice was placed in the Fulton Daily Report on Tuesday, June 1, 2021, announcing a public meeting on the DWSRF IUP on Tuesday, June,15 2021, at 10:00 a.m. via conference call. A summary for the public meeting can be found within Attachment 9. 
10 
 
 Community 
City of Lavonia Talbot County Board of Commissioners 
City of Midway City of Bowman 
City of Dawson City of Ochlocknee City of Summerville City of Adel Bartow County City of Blackshear 
City of Eastman City of Fargo 
 
Project Score 
 
2019 Pop. Total Project Cost 
 
74 
 
2,445 
 
$2,500,000 
 
74 
 
6,321 
 
$1,000,000 
 
72 
 
1,763 
 
$1,217,000 
 
69 
 
866 
 
$1,000,000 
 
69 
 
4,225 
 
$2,261,500 
 
69 
 
672 
 
$821,700 
 
65 
 
4,320 
 
$2,900,000 
 
63 
 
5,289 
 
$300,000 
 
47 
 
104,919 
 
$5,000,000 
 
45 
 
3,489 
 
$1,263,417 
 
45 
 
5,135 
 
$1,285,000 
 
45 
 
256 
 
$642,300 
 
Affordability Score 
 
ATTACHMENT 1 Drinking Water State Revolving Fund 
2021 Comprehensive List 
 
Potential Principal Forgiveness 
 
Est. Notice to Proceed Date 
 
Est. Construction 
Start Date 
 
Est. Project Completion Date 
 
Est. Interest Rate 
 
Est. Terms 
 
Project Description 
 
Upgrade outdated and undersized components and to keep the system in good working 
 
order. The overall scope includes improvements associated with water supply and 
 
withdrawal; water treatment; and water storage and distribution to be implemented in 
 
phases. Phase I includes SCADA, WTP Renovations, elevated storage tank renovations, 
 
30 
 
$900,000 
 
8/2/2021 
 
8/2/2021 12/30/2022 
 
0.13% 
 
20 water main replacement and extensions. 
 
Improve the water system to increase supply and keep facilities in good working order. The 
 
goals are to increase revenue and decrease expenses while optimizing operations and 
 
improving reliability. The overall scope includes well development for emergency use, adding 
 
water mains extensions, hydrant/valve maintenance, meter replacement and other minor 
 
28 
 
$400,000 
 
8/2/2021 
 
8/2/2021 
 
8/1/2022 
 
1.13% 
 
20 improvements. 
 
Construct a 1,000 GPM Upper Floridan Well to alleviate low pressure and chlorine residual 
 
problems and provide reliability and redundancy. The city needs a second water supply for 
 
public health and safety reasons. The one and only well is over 40 plus years old and 
 
produces approximately 300 GPM. A back up well is needed. The new well will have speed 
 
controlled, back up emergency power generator, and a updated SCADA system for the 
 
20 
 
5/1/2021 
 
6/1/2021 
 
1/7/2022 
 
1.13% 
 
20 control of the existing well and elevated tank. 
 
Improve the water system. Upgrades include renovating the well, replacing aging 
 
infrastructure, adding water loops, rehabilitating water sources, preparing mapping, and other 
 
37 
 
$550,000 
 
8/2/2021 
 
8/2/2021 
 
8/1/2022 
 
1.13% 
 
20 minor improvements. 
 
Replace existing meters with new meters capable of automated reading, installation of back- 
 
flow preventers on services, replacement of leaking fire hydrants and water main, installation 
 
of new valves to allow for areas of isolation when repairs or connections are needed, and 
 
replacement of pressure reducing valve to provide reliable serve at appropriate pressures. 
 
Improvements will reduce leaks, reduce unaccounted for water use, and provide a more 
 
34 
 
$1,100,000 
 
12/15/2021 
 
1/3/2022 11/30/2022 
 
0.13% 
 
20 reliable water system. 
 
29 
 
$328,680 
 
10/8/2021 
 
11/1/2021 4/28/2022 
 
0.13% 
 
20 Replace water main and water meters. 
 
Construct two 8-inch test wells, two new +/-700 gallon per minute (gpm) or larger deep wells, 
 
two vertical turbine pumps and motors, electrical equipment, SCADA, and other necessary 
 
appurtenances. Also included is 1,000 LF of raw water lines to connect the wells to previously 
 
37 
 
$1,300,000 
 
3/1/2022 
 
5/1/2022 12/1/2022 
 
1.13% 
 
20 installed raw water lines nearby. 
 
Install approximately 3,100 LF of 12-inch PVC water main in conjunction with a road re- 
 
alignment to replace an existing water line located west of Interstate 75 in Adel, GA. The 
 
existing line is a 10-inch ductile iron pipe that is over forty years old. The new water line will 
 
improve water supply and pressure, as well as provide better fire protection, for existing 
 
29 
 
$120,000 
 
2/14/2022 
 
3/1/2022 12/15/2022 
 
0.13% 
 
20 residential and commercial customers in this area. 
 
21 
 
3/22/2021 
 
4/1/2021 10/1/2021 
 
0.13% 
 
20 Replace approximately 6,000 LF of 6-inch water main with 12-inch DIP water main. 
 
34 
 
$631,708 
 
4/1/2021 
 
7/6/2021 12/1/2021 
 
0.13% 
 
20 Replace water meters and meter reading equipment. 
 
Upgrade 2,500 existing manually read water meters to a fixed base advanced metering 
 
infrastructure system. The city plans to replace all existing meters and registers with new 
 
meters with AMI capable registers. These new meters will improve water conservation with 
 
improved leak detection capabilities, real time consumption information, and reduce labor 
 
costs and fuel consumption required to read meters. In addition to the AMI meters, this 
 
project will include the purchase and installation of meter reading infrastructure necessary to 
 
31 
 
$578,250 
 
2/16/2022 
 
3/14/2022 
 
9/1/2022 
 
0.13% 
 
20 integrate the reading system with the city's billing system. 
 
Drill a second well to provide water supply redundancy. Construction will address well 
 
deficiencies identified by previous EPD inspections. Installation of new meter registers to 
 
convert the system to automatic meter reading which will allow for tracking of water use, leak 
 
30 
 
$289,035 
 
1/10/2022 
 
2/1/2022 12/30/2022 
 
1.13% 
 
20 identification, and reduction of unaccounted for water. 
 
11 
 
 Community 
City of Sardis 
City of Sasser 
City of Sumner City of Sylvania City of Twin City City of Greenville City of McCaysville Haralson County Water Authority City of Monroe 
City of Gainesville 
City of Social Circle City of Hoschton City of Vidalia Town of Braselton 
 
Project Score 
 
2019 Pop. Total Project Cost 
 
45 
 
774 
 
$325,000 
 
45 
 
305 
 
$162,500 
 
45 
 
420 
 
$145,500 
 
45 
 
2,949 
 
$976,106 
 
45 
 
1,814 
 
$341,000 
 
42 
 
855 
 
$315,000 
 
42 
 
1,388 
 
$1,129,000 
 
42 
 
4,600 
 
$1,664,750 
 
40 
 
13,418 
 
$2,934,798 
 
34 
 
39,991 $10,000,000 
 
34 
 
4,447 
 
$1,400,000 
 
32 
 
1,637 
 
$2,500,000 
 
32 
 
10,409 
 
$2,500,000 
 
32 
 
11,452 
 
$1,210,000 
 
Affordability Score 
 
ATTACHMENT 1 Drinking Water State Revolving Fund 
2021 Comprehensive List 
 
Potential Principal Forgiveness 
 
Est. Notice to Proceed Date 
 
Est. Construction 
Start Date 
 
Est. Project Completion Date 
 
Est. Interest Rate 
 
Est. Terms 
 
Project Description 
 
Replace existing residential and commercial water meters with Automatic Meter Reading 
 
(AMR) meters. The AMR meters will provide an accurate recorded consumption which will 
 
assist the city in identifying leaks, aid in long term planning, and devise effective water 
 
34 
 
$162,500 
 
6/1/2021 
 
9/15/2021 
 
4/1/2022 
 
0.13% 
 
20 conservation strategies. 
 
Replace all existing meters with an automatic meter reading system. These new meters will 
 
have increased accuracy to record all usage, encourage water conservation, minimize 
 
unaccounted for water, maximize water revenues, reduce clerical errors in reading and billing 
 
processes, and reduce the time and cost of labor necessary to read water meters on a 
 
30 
 
$73,125 
 
7/1/2021 
 
8/1/2021 
 
5/1/2022 
 
0.13% 
 
20 monthly basis. 
 
Replace all existing meters and registers with new Automated Meter Reading meters and 
 
new AMR capable registers. These new meters and registers will have increased accuracy to 
 
record all usage, encourage water conservation, minimize unaccounted for water, maximize 
 
water revenues, reduce clerical errors in reading and billing processes, and reduce the time 
 
25 
 
7/1/2021 
 
8/1/2021 
 
5/1/2022 
 
0.13% 
 
20 and cost of labor necessary to read water meters on a monthly basis. 
 
Replace existing residential and commercial water meters with Automatic Meter Reading 
 
(AMR) meters. The AMR meters will provide an accurate recorded consumption which will 
 
assist the city in identifying leaks, aid in long term planning, and devise effective water 
 
33 
 
$488,053 
 
6/1/2021 
 
9/15/2021 
 
4/1/2022 
 
0.13% 
 
20 conservation strategies. 
 
27 
 
$136,400 
 
6/21/2021 
 
6/21/2021 9/24/2021 
 
0.13% 
 
20 Replace approximately 715 residential meters, and replace or adjust meter boxes. 
 
Improve the water system. Improvements include water meter replacement, software and 
 
32 
 
$157,500 
 
9/30/2021 11/15/2021 3/31/2022 
 
0.13% 
 
20 hardware upgrades, and installation of backflow preventers. 
 
Replace approximately 3,100 5/8-inch water meters, and 24 1-inch to 4-inch water meters. 
 
Provide and install approximately 1,600 backflow preventers. Purchase new hardware and 
 
software for billing system. Provide miscellaneous hardware, lids, and appurtenances 
 
31 
 
$508,050 
 
6/15/2021 
 
7/15/2021 5/31/2022 
 
0.13% 
 
20 required for a complete installation. 
 
Replace 4,600 residential/commercial water meters, install 500 backflow preventers and 
 
23 
 
9/30/2021 10/15/2021 6/15/2022 
 
0.13% 
 
20 provide new hardware and software for billing. 
 
Install approximately 5,500 LF of 16-inch PVC water main and a 500,000 gallon elevated 
 
32 
 
$1,100,000 
 
4/1/2021 
 
9/1/2021 
 
9/1/2022 
 
1.13% 
 
20 water storage tank on the northeast side of Monroe. 
 
Improve the water distribution system. The project will include water line rehabilitation and 
 
replacement, water meter testing program and water meter replacement, rehabilitation and 
 
replacement of booster pumps stations, upgrades to the water system's elevated storage 
 
22 
 
12/31/2021 
 
2/1/2022 12/31/2023 
 
1.13% 
 
20 tanks and other projects to improve reliability, redundancy and resilience. 
 
Replace water main to eliminate older cast iron piping subject to breaks. The project will 
 
provide increased distribution system capacity, enhanced water quality through looping of the 
 
water system, improved system efficiency through the installation of AMR meters, and 
 
18 
 
6/1/2021 
 
6/1/2021 3/31/2022 
 
0.13% 
 
20 improved interconnection with the Walton County Water Department. 
 
Construct an elevated water tank in order to increase water storage and increase water 
 
pressure. The city also proposes to improve its water system by replacing water mains and 
 
20 
 
6/1/2021 
 
8/1/2021 
 
4/1/2023 
 
1.13% 
 
20 providing loops in the system to improve reliability and redundancy. 
 
Replace aged galvanized, transite, and cast iron water main. Valves and hydrants would also 
 
be replaced and GIS mapping would be included to properly locate new main and 
 
appurtenance locations. Additionally, the city plans to rehabilitate Well #1 and #2 with this 
 
31 
 
$900,000 
 
10/4/2021 
 
10/4/2021 10/3/2022 
 
1.13% 
 
20 funding. 
 
15 
 
8/1/2022 
 
9/1/2022 
 
5/1/2023 
 
1.13% 
 
20 Replace aging water line to reduce leaks. 
 
12 
 
 Community 
City of Winder City of Hogansville Rabun County WSA 
City of Dillard 
City of Hinesville City of Hoschton City of Thomson Town of Braselton Town of Braselton Town of Braselton City of Baldwin City of Blairsville Rabun County WSA 
City of Union Point 
Towns County Water and Sewerage Authority City of Blairsville City of Cumming City of Cumming 
 
Project Score 
 
2019 Pop. Total Project Cost 
 
30 
 
16,413 $25,000,000 
 
29 
 
3,125 
 
$5,424,700 
 
29 
 
16,645 
 
$5,880,000 
 
28 
 
319 
 
$1,750,000 
 
28 
 
32,996 
 
$3,044,585 
 
28 
 
1,637 
 
$1,000,000 
 
28 
 
6,593 
 
$3,969,000 
 
28 
 
11,452 
 
$950,000 
 
28 
 
11,452 
 
$2,500,000 
 
28 
 
11,452 
 
$8,500,000 
 
27 
 
3,517 
 
$1,200,000 
 
27 
 
724 
 
$2,500,000 
 
25 
 
16,645 
 
$1,200,000 
 
24 
 
1,841 
 
$1,000,000 
 
24 
 
4,210 
 
$2,500,000 
 
23 
 
724 
 
$1,611,000 
 
23 
 
6,309 $32,000,000 
 
23 
 
6,309 $12,400,000 
 
Affordability Score 
 
ATTACHMENT 1 Drinking Water State Revolving Fund 
2021 Comprehensive List 
 
Potential Principal Forgiveness 
 
Est. Notice to Proceed Date 
 
Est. Construction 
Start Date 
 
Est. Project Completion Date 
 
Est. Interest Rate 
 
Est. Terms 
 
Project Description 
 
Install a new pretreatment unit, water storage tank, chemical feed system, and transfer 
 
pump station at an existing raw water storage quarry site. The project will also include the 
 
addition of an energy recovery system. This project includes the scope of work for Phase 2 of 
 
20 
 
12/27/2021 
 
1/3/2022 12/29/2023 
 
1.13% 
 
20 the Raw Water Project. 
 
Rehabilitate the existing distribution system, construct a 500,000 gallon elevated storage 
 
28 
 
$700,000 
 
9/1/2021 
 
10/1/2021 10/1/2022 
 
1.13% 
 
20 tank, booster pump station and ground storage tank, and install new water meters. 
 
Construct redundancy transmission mains along the US 441 corridor from south of Clayton to 
 
26 
 
12/1/2022 
 
1/1/2023 10/1/2023 
 
1.13% 
 
20 north of Mountain City. 
 
Extend the water system to residents in an area of the city that currently lacks a public water 
 
system, and construct a 200,000 gallon water tank. Currently, the city does not have any 
 
19 
 
12/1/2022 
 
1/1/2023 
 
1/1/2024 
 
1.13% 
 
20 water storage and relies on other water suppliers to supply flow, pressure, and storage. 
 
Construct an Upper Floridan Drinking Water Well in Long County to supply water. The city is 
 
in the EPD designated Yellow Zone which does not allow installation of new wells due to salt 
 
water intrusion in the Floridan Aquifer. Long County is in the designated Green Zone which 
 
does allow new water wells. The project will permit and install a well in the Green Zone and 
 
19 
 
3/15/2022 
 
4/4/2022 12/16/2022 
 
1.13% 
 
20 pump water to Hinesville in the Yellow Zone. 
 
Improve the water system by drilling groundwater drinking wells to improve reliability and 
 
20 
 
6/1/2022 
 
7/1/2022 
 
4/1/2023 
 
1.13% 
 
20 reduce operating costs. 
 
Improve the Big Creek WTP by replacing existing, failing pretreatment infrastructure. The 
 
scope of work includes removal of existing pretreatment units and replacement with new 
 
32 
 
$1,100,000 
 
9/30/2021 10/15/2021 7/31/2022 
 
1.13% 
 
20 pretreatment infrastructure for flocculation and sedimentation. 
 
Improve the water system by drilling groundwater drinking wells to improve reliability and 
 
15 
 
6/1/2022 
 
7/1/2022 
 
4/1/2023 
 
1.13% 
 
20 reduce operating costs. 
 
15 
 
6/1/2022 
 
7/1/2022 
 
4/1/2023 
 
1.13% 
 
20 Construct an elevated water tank to increase water storage for the system. 
 
15 
 
6/1/2022 
 
7/1/2022 
 
4/1/2023 
 
0.13% 
 
20 Construct an indirect potable reuse water treatment facility . 
 
Improve the water system by replacing water main and providing loops in the system to 
 
21 
 
12/1/2022 
 
1/1/2023 
 
1/1/2024 
 
1.13% 
 
20 improve reliability and redundancy. 
 
29 
 
$700,000 
 
12/1/2022 
 
1/1/2023 
 
6/1/2023 
 
1.13% 
 
20 Replace aging and/or undersized water lines in areas with low pressure. 
 
Extend the water system along Wolfolk to residents in an area of Rabun County that 
 
currently lack a public water system. These residents are affected by dry or contaminated 
 
26 
 
12/1/2022 
 
1/1/2023 10/1/2023 
 
1.13% 
 
20 wells. The project will also provide a system loop that will improve flow and system reliability. 
 
Replace dilapidated and undersized existing water lines and provide a loop in the distribution 
 
system to alleviate water quality issues and low water pressure problems and improve 
 
31 
 
$450,000 
 
8/1/2022 
 
9/1/2022 10/1/2023 
 
1.13% 
 
20 reliability and redundancy. 
 
Construct a new storage tank, booster pump stations, and new water lines. Additionally, this 
 
project will replace leaking and under-sized lines, and other distribution system improvements 
 
to improve storage capacity, flows and pressures in the water system, reliability, redundancy, 
 
24 
 
3/1/2022 
 
3/1/2022 
 
3/1/2025 
 
1.13% 
 
20 and water efficiency. 
 
Rehabilitate the existing water treatment facility, including replacement of aging components, 
 
29 
 
12/1/2022 
 
1/1/2023 
 
6/1/2023 
 
1.13% 
 
20 replacement of filter media, and installing grit removal and mechanical screen. 
 
Construct approximately 62,000 LF of 16-inch water main, approximately 14,400 LF of 36- 
 
20 
 
1/5/2022 
 
1/12/2022 1/12/2023 
 
1.13% 
 
20 inch water transmission main, and a 1 million gallon ground storage tank. 
 
Construct a 6.0 MG clearwell, new high service pump station, and transfer piping. 
 
20 
 
7/21/2021 
 
7/28/2021 11/30/2022 
 
1.13% 
 
20 Additionally, this project will rehabilitate the office and improve sludge handling. 
 
13 
 
 Community 
City of Gainesville Barrow County Barrow County City of Maysville City of Plains Hancock County Hancock County Rabun County WSA Rabun County WSA City of Baldwin 
 
Project Score 
 
2019 Pop. Total Project Cost 
 
23 
 
39,991 $15,000,000 
 
20 
 
78,991 
 
$6,000,000 
 
20 
 
78,991 
 
$1,800,000 
 
20 
 
1,941 
 
$1,000,000 
 
20 
 
640 
 
$2,500,000 
 
20 
 
8,515 
 
$2,000,000 
 
20 
 
8,515 
 
$1,000,000 
 
20 
 
16,645 
 
$2,880,000 
 
20 
 
16,645 
 
$2,080,000 
 
7 
 
3,517 
 
$3,300,000 
 
Brunswick-Glynn County Joint Water & Sewer Commission City of Gordon Hart County WSA Lincoln County 
Rabun County WSA 
 
5 
 
60,552 
 
$7,500,000 
 
4 
 
1,990 
 
$2,000,000 
 
3 
 
2,310 
 
$2,500,000 
 
0 
 
7,856 
 
$4,067,000 
 
0 
 
16,645 
 
$3,120,000 
 
$214,970,856 
 
Affordability Score 
 
ATTACHMENT 1 Drinking Water State Revolving Fund 
2021 Comprehensive List 
 
22 19 19 21 37 29 29 26 26 21 
22 32 25 26 
26 Total: 
 
Potential Principal Forgiveness 
 
Est. Notice to Proceed Date 
 
Est. Construction 
Start Date 
 
Est. Project Completion Date 
 
5/31/2022 
 
6/15/2022 12/31/2023 
 
Est. Interest Rate 1.13% 
 
Est. Terms 
 
Project Description 
 
Upgrade the Lakeside and Riverside water treatment plants. Projects include upgrades to meet the lead and copper rules, filter backwash improvements, equipment upgrades, and 20 chlorine residual upgrades to meet NPDES permit. 
 
12/1/2022 
 
1/1/2023 
 
1/1/2024 
 
1.13% 
 
Construct a redundancy transmission main in the northern part of the county's water service 20 delivery area. 
 
12/1/2022 
 
1/1/2023 
 
1/1/2024 
 
1.13% 
 
Construct an elevated water tank to increase water storage in the eastern portion of the 20 water service delivery area. 
 
6/1/2022 
 
7/1/2022 
 
6/1/2023 
 
11/1/2021 
 
12/1/2021 12/1/2022 
 
6/1/2022 
 
7/1/2022 
 
4/1/2023 
 
1.13% 1.13% 1.13% 
 
Improve the water system by drilling groundwater drinking wells to improve reliability and 20 reduce operating costs. 
Extend water lines for interconnecting to surrounding municipalities, develop an additional 20 well, and install filters at existing well #7. 
Extend the water system to residents that currently lack a public water system. These 20 residents are affected by dry or contaminated wells. 
 
6/1/2022 
 
7/1/2022 
 
4/1/2023 
 
1.13% 
 
Improve the water system by drilling groundwater drinking wells in order to improve reliability 20 and reduce operating costs. 
 
12/1/2022 12/1/2022 
 
1/1/2023 10/1/2023 1/1/2023 10/1/2023 
 
1.13% 1.13% 
 
20 Construct watermain from Lake Rabun WTP south along Old 441 to New US 441 
Construct an elevated water storage tank and necessary water main in the north service area 20 to provide improved storage, system reliability, and improved operations 
 
10/1/2022 
 
11/1/2022 
 
6/1/2023 
 
6/1/2022 10/1/2021 
 
6/6/2022 12/31/2023 11/1/2021 12/30/2022 
 
6/1/2022 
 
7/1/2022 
 
4/1/2023 
 
1.13% 
0.13% 0.13% 1.13% 
 
20 Upgrade undersized water lines in the southeast section of the water service delivery area. 
Install and synchronize 30,986 water meters along with associated field and endpoint equipment. BGJWSC's strategic technology goals include integrating an Advanced Metering Infrastructure ("AMI") and Meter Data Management System ("MDMS") solution into its enterprise(s) which will support data collection and billing from AMI meters and enable the 20 many other benefits available from AMI and MDMS. 
20 Replace numerous water main throughout town that are constantly leaking. 
Extend the water system to residents that currently lack a public water system. These 20 residents are affected by dry or contaminated wells. 
 
10/1/2022 
 
11/1/2022 
 
6/1/2023 
 
$12,673,301 
 
12/1/2022 
 
1/1/2023 10/1/2023 
 
1.13% 1.13% 
 
20 Extend the water system to residents in an area that currently lacks a public water system. 
Extend the water system along East Wolf Creek to residents in an area of Rabun County that currently lack a public water system. These residents are affected by dry or 20 contaminated wells. 
 
14 
 
 Attachment 2 Drinking Water State Revolving Fund 
Estimated Disbursement Schedule 
 
NOTICE TO CONSTR. TARGET 
 
1st 
 
2nd 
 
3rd 
 
4th 
 
1st 
 
2nd 
 
3rd 
 
4th 
 
LOAN 
 
PROCEED START COMPL. 
 
Qtr 
 
Qtr 
 
Qtr 
 
Qtr 
 
Qtr 
 
Qtr 
 
Qtr 
 
Qtr 
 
PROJECT 
 
AMOUNT 
 
DATE 
 
DATE 
 
DATE 
 
7/21-9/21 10/21-12/22 1/22-3/22 
 
4/22-6/22 
 
7/22-9/22 10/22-12/22 1/23-3/23 
 
4/23-6/23 
 
City of Lavonia 
 
$2,500,000 8/2/2021 8/2/2021 12/30/2022 
 
50,000 
 
100,000 1,110,000 
 
100,000 
 
500,000 
 
640,000 
 
- 
 
- $ 
 
Talbot County Board of Commissioners 
 
$1,000,000 8/2/2021 8/2/2021 8/1/2022 
 
50,000 
 
50,000 
 
250,000 
 
150,000 
 
500,000 
 
- 
 
- 
 
- $ 
 
City of Bowman 
 
$1,000,000 8/2/2021 8/2/2021 8/1/2022 
 
10,000 
 
500,000 
 
70,000 
 
170,000 
 
250,000 
 
- 
 
- 
 
- $ 
 
City of Dawson 
 
$2,261,500 12/15/2021 1/3/2022 11/30/2022 
 
80,000 
 
50,000 1,000,000 1,000,000 
 
500,000 61,500.00 
 
- 
 
- $ 
 
City of Ochlocknee 
 
$821,700 10/8/2021 11/1/2021 4/28/2022 
 
10,000 
 
700,000 
 
11,700 
 
100,000 
 
- 
 
- 
 
- $ 
 
City of Summerville 
 
$2,900,000 3/1/2022 5/1/2022 12/1/2022 
 
900 1,000,000 
 
500,000 
 
250,000 
 
500,000 
 
649,100 
 
- 
 
- $ 
 
City of Adel 
 
$300,000 2/14/2022 3/1/2022 12/15/2022 
 
40,000 
 
70,000 
 
80,000 
 
25,000 
 
15,000 
 
70,000 
 
- 
 
- $ 
 
City of Blackshear 
 
$1,263,417 4/1/2021 7/6/2021 12/1/2021 631,709 
 
631,708 
 
- 
 
- 
 
- 
 
- 
 
- 
 
- $ 
 
City of Eastman 
 
$1,285,000 2/16/2022 3/14/2022 9/1/2022 
 
85,000 
 
500,000 
 
250,000 
 
250,000 
 
200,000 
 
- 
 
- 
 
- $ 
 
City of Fargo 
 
$642,300 1/10/2022 2/1/2022 12/30/2022 
 
4,000 
 
300,000 
 
250,000 
 
50,000 
 
15,300 
 
23,000 
 
- 
 
- $ 
 
City of Sardis 
 
$325,000 6/1/2021 9/15/2021 4/1/2022 151,000 
 
154,000 
 
15,000 
 
5,000 
 
- 
 
- 
 
- 
 
- $ 
 
City of Sasser 
 
$162,500 7/1/2021 8/1/2021 5/1/2022 5,000.00 
 
80,000 
 
25,500 
 
52,000 
 
- 
 
- 
 
- 
 
- $ 
 
City of Sylvania 
 
$976,106 6/1/2021 9/15/2021 4/1/2022 80,000.00 
 
400,000 
 
296,106 
 
200,000 
 
- 
 
- 
 
- 
 
- $ 
 
City of Twin City 
 
$341,000 6/21/2021 6/21/2021 9/24/2021 341,000.00 
 
- 
 
- 
 
- 
 
- 
 
- 
 
- 
 
- $ 
 
City of Greenville 
 
$315,000 9/30/2021 11/15/2021 3/31/2022 15,000.00 
 
150,000 
 
150,000 
 
- 
 
- 
 
- 
 
- 
 
- $ 
 
City of McCaysville 
 
$1,129,000 6/15/2021 7/15/2021 5/31/2022 129,000.00 
 
250,000 
 
150,000 
 
600,000 
 
- 
 
- 
 
- 
 
- $ 
 
City of Monroe 
 
$2,934,798 4/1/2021 9/1/2021 9/1/2022 500,000.00 1,000,000 
 
200,000 
 
700,000 
 
34,798 
 
- 
 
- 
 
- $ 
 
City of Vidalia 
 
$2,500,000 10/4/2021 10/4/2021 10/3/2022 10,000.00 1,000,000 
 
250,000 
 
400,000 
 
200,000 
 
640,000 
 
- 
 
- $ 
 
City of Hogansville 
 
$5,424,700 9/1/2021 10/1/2021 10/1/2022 65,000.00 2,000,000 
 
500,000 2,000,000 
 
809,700 
 
50,000 
 
- 
 
- $ 
 
TOTAL $ 28,082,021 
 
$ 2,257,609 $ 8,935,708 $ 3,858,306 $ 2,352,000 $ 3,524,798 $ 2,133,600 $ 
 
-$ 
 
-$ 
 
TOTAL DISBURS. 
2,500,000 1,000,000 1,000,000 2,691,500 
821,700 2,900,000 
300,000 1,263,417 1,285,000 
642,300 325,000 162,500 976,106 341,000 315,000 1,129,000 2,434,798 2,500,000 5,424,700 28,012,021 
 
15 
 
 Attachment 3 - ASAP DWSRF Payment Schedule Drinking Water State Revolving Fund 
 
Payment No. 1 2 3 4 5 6 7 8 
TOTAL 
 
Attachment 3 ASAP Payment Schedule Drinking Water State Revolving Fund 
 
Federal Fiscal Year 
 
Quarter 
 
Date 
 
3rd 
 
7/2021 - 9/2021 
 
4th 
 
10/2021 - 12/2021 
 
1st 
 
1/2022 - 3/2022 
 
2nd 
 
4/2022 - 6/2022 
 
3rd 
 
7/2022 - 9/2022 
 
4th 
 
10/2022 - 12/2022 
 
1st 
 
1/2022 - 3/2022 
 
2nd 
 
4/2023  6/2023 
 
Amount ($) $25,924,000 
$0 $0 $0 $0 $0 $0 $0 $25,924,000 
 
16 
 
 Attachment 4 - Estimated Sources and Uses DWSRF Sources and Uses Table 
 
Attachment 4 Drinking Water State Revolving Fund (DWSRF) Sources and Uses 
Administered By Georgia Environmental Finance Authority State Fiscal Year July 1, 2021 - June 30, 2022 
 
Sources & Uses 
Funding Sources Loan Repayments (P&I) 
 
Federal Contribution 
 
State Contribution 
 
DWSRF Fund 
31,777,640 
 
Investment Income 
 
150,000 
 
Banked Setasides* 
 
5,000,000 
 
FFY 2021 Capitalization Grant 
 
18,924,520 
 
5,184,800 
 
Total Funding Sources 
 
$ 23,924,520 
 
$ 5,184,800 
 
$ 31,927,640 
 
Funding Uses 
 
Project Disbursements Setasides Spending 
 
17,887,560 5,000,000 
 
5,184,800 
 
31,927,640 
 
FFY 2021 Administration 
 
1,036,960 
 
Total Funding Uses 
 
$ 23,924,520 $ 5,184,800 
 
$ 31,927,640 
 
Total 
31,777,640 150,000 
5,000,000 24,109,320 $ 61,036,960 
55,000,000 5,000,000 1,036,960 $ 61,036,960 
 
* Banked setasides represent amounts from the prior years' grants that will be available for spending on a first-in, first-out approach. This amount also correlates to our estimated annual spend. 
 
17 
 
 Attachment 5 - DWSRF 2 Percent, 4 Percent, 10 Percent, and 15 Percent Set-Aside Work Plan 
The Safe Drinking Water Act (SDWA) Amendments of 1996 include a section authorizing states to provide funding for certain non-project activities called set-asides. States are required to describe, in their Intended Use Plans (IUP) the amount of funds that they will use for these activities. If a state does not expend all its set-asides, the state may transfer the monies to the DWSRF project account. 
 
4 Percent Administration (2021 - $1,036,960) 
 
Set-Aside Activity DWSRF Administration 
 
Activity 
Activities include project reviews and approvals; planning; project development; information tracking; information gathering and development of the National Needs Survey; project ranking; issuing Notices of No Significant Impact (NONSI) and Categorical Exclusions (CE); construction management; MBE/WBE requirements; project inspections; assistance with the National Information Management System (NIMS); and administration of EPD's set-aside activities all programmatic, financial, and legal aspects of making loans with DWSRF funds. 
Total 
 
Cost EPD Contract: $352,911 GEFA administration: $684,049 
$1,036,960 
 
Comments 
Unused funds may accrue and be used to administer the DWSRF program in future years. 
 
2 Percent Small System Technical Assistance (2021 - $518,480) 
 
Set-Aside Activity Small System Technical Assistance 
 
Activity 
Georgia Rural Water Association (GRWA): technical assistance field visits to governmentally owned and non-governmentally owned public water systems, perform visits during the contract period to provide Synthetic Organic Compound sampling assistance. 
 
Cost GRWA Contract: $295,350 
 
Assistance to provide statewide technical support $223,130 
 
to small systems. 
 
Total 
 
$518,480 
 
Comments A contract will be signed for FY2021. 
 
18 
 
 10 Assistance to State Programs (2021 - $2,592,400) 
 
Set-Aside Activity Assistance to State Programs 
 
Activity See Attachment 6 
 
Cost EPD Contract: $2,592,400 
 
Comments 
Unused funds may accrue and be used to administer the DWSRF program in future years. 
 
Total 
 
$2,592,400 
 
15 Percent Small System Technical Assistance (2021 - $3,888,600) 
 
Set-Aside Activity Technical Assistance and Financial Assistance 
 
Activity See Attachment 6 
 
Cost EPD Contract: $3,888,600 
 
Comments 
Unused funds may accrue and be used to administer the DWSRF program in future years. 
 
Total 
 
$3,888,600 
 
19 
 
 Attachment 6 - DWSRF 10 Percent Set-Asides 
GEORGIA ENVIRONMENTAL FINANCE AUTHORITY DRINKING WATER STATE REVOLVING FUND Assistance to State Programs (10%) 
Intended Use Plan (IUP) and Workplan for FY2021 Cap Grant Updated May 2021 
The Safe Drinking Water Act (SDWA) Amendments of 1996 authorize states to provide funding for certain non-project activities, called Set-Asides, provided that the amount of that funding does not exceed certain ceilings. States are required to describe in their Intended Use Plans (IUP) the amount of funds that they will use for these activities. A separate account must be set up to accept these funds. 
States are allowed to use up to 10% of its capitalization grant to provide funding for certain activities that provide "Assistance to State Programs." These activities include: administration of the Public Water System Supervision Program (PWSS); administration and provision of technical assistance through source water assessment programs; implementation of capacity development strategy; cross-connection control device tester certification program and water conservation and efficiency and continued state wide water planning; and implementation of the Environmental Protection Division's (EPD) Crypto Strategy. States are not required to use the entire 10% for these activities in any one year and are allowed to bank the excess balance and use it for the same activities in later years. 
Table 1 provides a summary of the activities to be funded under the FFY 2021 10% set-aside category. The State primacy agency, the Georgia Department of Natural Resources Environmental Protection Division (EPD), is the agency responsible for the development and implementation of these set-aside activities as specified in the existing "Interagency Agreement for Establishment of Drinking Water State Revolving Fund Agreement for Provision of Operating Funds, Financial Services and Project Management Services" between the Georgia Environmental Finance Authority (GEFA) and EPD. 
As allowed under Section 1452(g)(2) of the SDWA, Georgia will set-aside $2,592,400 (10.0%) of the capitalization grant in order to accomplish the activities outlined in the work plan (Table 1). 
 
10% 2021 DWSRF Set-aside State Match Determination 10% Set-aside for 2021 50% of 10% 2021 Set-aside 
1993 PWSS Grant 1993 Actual State Match PWSS (perpetual amount) 
Credit match for the 10% Set-aside from the 1993 State PWSS Cash match for the 10% Set-aside from the Drinking Water Contract Fee System Total Available Matching Funds 
 
$2,592,400 $1,296,550 
$1,199,900 $1,065,946 
$1,065,946 $1,526,454 
$2,592.400 
 
20 
 
 Object Class Categories: Capacity Development 10% (DWSRF 2021) EPD Organizational Number: EPD Project Number: GEFA Account Form Date or Revision Date: 
 
Personnel Services: 
Environmental Engineer 3 Environmental Specialist Env. Spec. Part-Time Env Engineer 1 Mgr1, Env Protection 
 
Work Plan Program/Unit Number in Average Work Years Total Cost 
 
Designator 
 
Position Annual 
 
Class Position 
 
Cost 
 
Goal 1,2,3,4,5 WPB DW 
 
2 
 
101,800 
 
1.00 
 
203,600 
 
Goal 1,2,3,4,5 WPB DW 
 
5 
 
73,643 
 
1.00 
 
368,215 
 
Goal 1,2,3,4,5 WPB DW 
 
1 
 
44,263 
 
1.00 
 
44,263 
 
Goal 1,2,3,4,6 WPB DW 
 
3 
 
78,864 
 
1.00 
 
236,591 
 
Goal 1,2,3,4,6 WPB DW 
 
1 
 
111,652 
 
1.00 
 
111,652 
 
Personnel Services Category Totals: 964,321 
 
Equipment: Office 
 
Description Miscellaneous Office 
 
Work Plan Program & Unit Total Cost 
 
Designator 
 
Goal 1,2,3,4,5 
 
WPB DW 
 
1,500 
 
Equipment Totals: 
 
1,500 
 
Supplies: List by groups, as appropriate: Laboratory to maintain primacy 
 
Description 
Equipment/Rents/Utilities to maintain DW primacy portion of lab due to increased base cost for the new facility 
 
Work Plan Program & Unit Total Cost 
 
Designator 
 
Goal 1,6,8 WPB DW, PCB 
 
79,412 
 
Contractual: GAWP 
 
Description 
CCR Training, TA and other Communications (1 year) 
 
Percent Total of Set-aside 4.32% 
 
Supplies Total: 79,412 
 
Work Plan Program & Unit Total Cost 
 
Designator 
 
Goal 1,2,7 WPB DW 
 
75,000 
 
Contractual Total: 75,000 Total Cost 1,120,233 
 
21 
 
 TABLE 1 
 
10 Percent Set-Aside - Assistance to State 
 
Programs (FFY2021-$2,592,400) 
 
Set-Aside Activity 
Capacity Development 
 
Funding ($, %) 
 
Goals and Objectives 
 
Outputs/Deliverables 
 
Evaluating Success 
 
Agency Responsibilities 
 
Schedule 
 
$1,120,233 
4.32% of 
FFY21 CAP Grant 
 
In order to continue the ability of Public Water Systems (PWS) to meet the requirements of the Federal Safe Drinking Water Act, and to avoid the withholding of a percentage of Georgia's DWSRF allotments, EPD will: 1. Continue to implement strategies and/or enhance existing strategies to ensure that all PWS's, especially all community 
 
1. Annually submit a written report to EPA that documents Georgia's implementation of national primary drinking water regulations. 2. Annually submit a written report to EPA that documents Georgia is 
 
1. Meet all deadlines and milestones in EPD's Watershed All activities are 
 
accordance with EPA implementation Protection Branch ongoing and will 
 
and compliance schedules based on (WPB) is the lead 
 
continue through the 
 
federal regulations, including 
 
branch for ensuring the life of the grant. Work 
 
LT2ESWTR, Stage 2 DBPR, GWR and development and 
 
covered by this funding 
 
RTCR.. 
 
implementation of 
 
has and will 
 
water systems (CWS) and non-transient non-community water implementing a strategy that 
 
2. Receive EPA approval of Georgia's adequate capacity continue to increase 
 
systems (NTNCWS), reliably provide safe drinking water in identifies PWS's most in need of capacity development reports without development strategies. due to the new drinking 
 
accordance with all current and future applicable State and improved capacity, and assists withholding any DWSRF funds. 
 
Stakeholder/public input water regulations 
 
Federal Safe Drinking Water Regulations. (Increased 
 
these PWS's in obtaining and 
 
3. Improved level of compliance with is solicited during the LT2ESWTR, Stage 2 
 
compliance determinations and technical assistance will be maintaining technical, managerial the State and Federal Safe Drinking development of these DBPR, GWR and the 
 
required due to new EPA regulations: LT2ESWTR, Stage 2 and financial capacity. 
 
Water Act Rules and Regulations 
 
strategies and is a key RTCR. 
 
DBPR, GWR and RTCR.); 
 
3. Implement and update Georgia's through the implementation of 
 
responsibility of the 
 
2. Solicit and consider public comment in the development of capacity development strategy. Georgia's capacity development 
 
WPB. WPB is 
 
any new capacity development strategies; 
 
4. Tri-annually submit a report to the strategies. 
 
responsible for the 
 
3. Implement new and enhance the implementation of existing Governor on the Efficacy of 
 
4. Increased level of CCR compliance, development and 
 
capacity development activities; 
 
Georgia's Capacity Development especially initial compliance levels. administration of the 
 
4. Continue to assess flow conditions, additional or alternate Strategy addressing the technical, 5. Increased compliance rate in the contract with GAWP. 
 
metrics, and/or impacts of flow alteration at selected locations financial and managerial capacity of submittal of CCR's. 
 
EPD District Offices 
 
to support accurate surface water availability; 
 
Georgia's PWS. 
 
6. Increased knowledge and improved and the EPD Laboratory 
 
5. Refine resource models and monitoring to estimate the 
 
5. Continuously populate and 
 
preparation in Public water system will provide input in the 
 
capacities of Georgia's surface and groundwater for water 
 
enhance the comprehensive data owners and operators in complying with development and 
 
supply; 
 
and information management 
 
and implementing federal and state implementation of these 
 
6. Assist systems to improve technical, managerial and 
 
system, including instream flow and requirements. 
 
strategies. 
 
financial capacity as part of EPD's approved capacity 
 
source water quality data for 
 
7. Documented implementation of best 
 
development strategy, plan review, and adherence to the 
 
protecting public water supply 
 
management practices to protect water 
 
"Minimum Standards for Public Water Systems" 
 
sources in Georgia. 
 
supply sources in Georgia. 
 
documentation. PWS will be required to make physical facility 6. Continuously collect flow and 8. Utilize recommendations in water 
 
and treatment process improvements to comply with existing data from surface waters for 
 
supply plans to provide a sustainable, 
 
and new regulations (LT2ESWTR, Stage 2 DBPR, GWR and evaluating impact to and protecting reliable and safe supply of water for all 
 
RTCR); 
 
public water supplies. 
 
users in Georgia. 
 
7. Improve capacity development implementation by providing 7. Maintain operations of the PWSS 9. Maintained operations of the PWSS 
 
CCR assistance, communication and technical assistance as portion of the EPD laboratory. 
 
portion of the EPD laboratory. 
 
well as training; and 8. Continue to operate the primacy PWSS 
 
portion of the EPD laboratory. (Increased cost is distributed 
 
between all users of the laboratory throughout the Division.) 
 
22 
 
 Object Class Categories: EPD Organizational Number: EPD Project Number: GEFA Account Form Date or Revision Date: 
 
EPD Crypto and PFAS Strategy 10% (DWSRF 2021) 
 
Personnel Services: 
Environmental Engineer Environmental Specialist Laboratory Scientist 
 
Work Plan Designator 
Goal 1,3,5 Goal 1,3,5 Goal 1,2,3,4,6,7 
 
Program/Unit 
WPB DW WPB DW PCB Lab 
 
Number in Position Class 
1 
1 
1 
 
Average 
 
Work Years 
 
Annual 
 
Position Cost 
 
97,177 1.00 
 
68,107 1.00 
 
65,697 1.00 
 
Total Cost 
97,177 68,107 65,697 
 
Equipment: Equipment: 
 
Personnel Services Category Totals: 
 
230,981 
 
Description 
Equipment for PFAS and Cryptosporidium i 
 
Work Plan Designator Goal 1,3,5 
 
Program & Unit EPD Lab 
 
Total Cost 189,796 
 
Supplies: List by groups, as appropriate: 
Laboratory 
 
Description 
Supplies for PFAS and Cryptosporidium testing 
 
Equipment Totals: 
 
189,796 
 
Work Plan Designator Goal 1,2,3,4,6,7 
 
Program & Unit EPD 
Laboratory 
 
Total Cost 63,032 
 
Laboratory to Maintain Primacy 
Contractual: 
 
Supplies/Rent/Utilities to maintain Drinking Water Primacy 
 
300,408 363,440 
 
Description 
 
Work Plan Program & Total Cost Designator Unit 
 
Percent Total of Set-aside 3.03% 
 
Contractual Total: Total Cost 
 
784,217 
 
23 
 
 TABLE 1 10 Percent Set-Aside - Assistance to State Programs (FFY2021-$2,592,400) 
 
Set-Aside Activity 
 
Funding ($, %) Goals and Objectives 
 
Outputs/Deliverables 
 
Evaluating Success 
 
Agency Responsibilities 
 
Schedule 
 
Crypto AND PFAS Strategy 
 
Continue to implement EPD's Crypto Strategy for 
 
1. Monitor selected PWS's for 
 
$784,917 sources in Bin 2 and assess PFAS in drinking water Cryptosporidium under SWAP, 
 
1. Through quarterly monitoring EPD's Watershed Protection All activities are 
 
of THMs and HAAs, many 
 
Branch, Drinking Water Program ongoing and will 
 
Implementation and update of 
 
3.03% 
 
is the lead entity coordinating the continue through the implementation of the Crypto and life of the grant. 
 
EPD's strategic plan for addressing the threat of a waterborne disease outbreak, including cryptosporidiosis, in Georgia's Public Water Systems (PWS) and assess PFAS Concentation in drinking water sources across Georgia 
 
of FFY21 CAP 
Grant 
 
1. Analyzing samples for Cryptosporidium in 
 
provide technical assistance to PWS. to develop a disinfection profile 1. Strategy, implementing and 
 
conjunction with EPD's SWAP (Source Water 
 
2. Provide technical assistance to 
 
and benchmark. 
 
enforcing the IESWTR and Stage 
 
Assessment Plan) implementation plan to determine surface water systems serving more 2. Large surface water system 1 &2 DBPR. It is also the lead on 
 
Cryptosporidium concentration in the source water for than 10,000 populations concerning compliance rates with the 
 
developing draft implementation 
 
sources that were identified as Bin 2 or higher during Stage 1, DBPR and IESWTR. 
 
requirements of the IESWTR and strategies for other microbial and 
 
the third round of Crypto sampling. 
 
3.Monitor and provide technical 
 
Stage 2 DBPR are high. 
 
disinfection by-products rules. 
 
2. Assisting affected public water systems with 
 
assistance to small surface water 
 
3. The public's awareness about EPD's environmental laboratory 
 
compliance with the Stage 1, DBPR and the IESWTR; systems quarterly for THMs and HAAs what PWSs are doing to address provides services for the 
 
LT2ESWTR and Stage 2 DBPR for surface water (trihalomethanes and haloacetic acids) DBPs and microbial pathogens IESWTR, LT1ESWTR, 
 
systems. 
 
and monthly for TOC (total organic 
 
is increased. 
 
LT2ESWTR and Stage 1&2 
 
3. EPD Protozoan Laboratory continues proficiency carbon) in accordance with the Stage 1, 4. EPD Laboratory proficiency DBPR, including the operation of 
 
and EPA approval for analysis of Cryptosporidium and DBPR. 
 
with methods 1622 and 1623 EPD's Protozoan Laboratory. 
 
Giardia by methods 1622 and 1623. 
 
4. Monitor and provide technical 
 
and maintained EPA approval. EPD District offices assist in 
 
4. Performing Microscopic Particulate Analysis (MPA) assistance to PWS with LT2ESWTR 5. Maintained operation of 
 
implementation of microbial and 
 
for groundwater sources suspected to be under the and Stage 2 DBPR. 
 
PWSS primacy portion of EPD disinfection by-products rules. 2. 
 
direct influence of surface water. 
 
5. 5. Maintain operation of the PWSS 
 
laboratory. 
 
EPD Lab will acquire needed 
 
Sample and Analyze for PFAS for drinking water 
 
primacy portion of the EPD laboratory. 6. All groundwater sources 
 
equipment and train personnal 
 
sources both surface water and ground wateracross 6.Results of PFOA sampling will be determined to be under the direct for analyzing PFAS. 
 
Georgia. 
 
plotted and available for public review influence of surface water installs 
 
treatment required under the 
 
surface water treatment 
 
regulations. 
 
7. 
 
Dissemenation of the PFAS 
 
sampling result and inform public 
 
of PFAS, sources of PFAS and 
 
the results of sampling in 
 
Georgia. 
 
24 
 
 Object Class Categories: 
 
Information Management 10% (DWSRF 2021) 
 
EPD Organizational Number: 
 
EPD Project Number: 
 
GEFA Account 
 
Form Date or Revision Date: 
 
Personnel Services: 
Env Specialist 4 MG1: Env Health/Protection PS: Business Analyst PS:Systems Admin 
 
Work Plan Designator Program/Unit Number in Average Work 
 
Total Cost 
 
Position Annual Years 
 
Class 
 
Position 
 
Cost 
 
Goal 1,2,3,45,6 
 
WPB DW 
 
1 
 
86,138 1.00 
 
86,138 
 
Goal 1,2,3,45,6 
 
WPB-DW 
 
1 
 
124,472 1.00 
 
124,472 
 
Goal 1,2,3,45,6 
 
WPB DW 
 
1 
 
96,305 1.00 
 
96,305 
 
Goal 1,2,3,45,6 
 
WPB DW 
 
1 
 
126,162 1.00 
 
126,162 
 
Personnel Services Category Totals: 433,077 
 
Equipment: 
Licenses Equipment 
 
Description Annual GIS software licenses Repair/maintenance 
 
Work Plan Program/ Total Cost Designator Unit 
 
Goal (all) WPB DW 25,000 
 
Goal (all) WPB DW 
 
1,000 
 
Equipment Totals: 26,000 
 
Supplies: List by groups, as appropriate: 
Software, plotter supplies 
 
Description 
 
Work Plan Program/ Total Cost Designator Unit 
 
Software upgrades, paper, ink, print heads, etc. Goal (all) WPB DW 
 
1,000 
 
Contractual: SDWIS/State 
 
Supplies Total: 1,000 
 
Description 
 
Work Plan Program/ Total Cost 
 
Designator Unit 
 
Continue to upgrade to modules attached to 
 
SDWIS/State that are impacted by the upgrade to Goal (all) WPB DW 50,000 
 
web release of SDWIS/State 
 
Percent Total of Set-aside 1.97% 
25 
 
Contractual Total: 50,000 Total Cost 510,077 
 
 Set-Aside Activity 
Information Management 
 
TABLE 1 10 Percent Set-Aside - Assistance to Programs (FFY2021-$2,592,400) 
 
Funding ($, %) Goals and Objectives 
 
Outputs/Deliverables 
 
Evaluating Success 
 
Agency Responsibilities 
 
Schedule 
 
$510,077 
1.97% of 
FFY21 CAP Grant 
 
1. Improve tracking and reporting of PWS data associated with the current and new regulations 
 
1. Improve tracking and reporting of 1. Improved data accuracy PWS data, especially laboratory data, through data verification and 
 
EPD's Watershed Protection All activities are Branch will be responsible for ongoing and will 
 
(LT1ESWTR, Stage 1 DBPR, LT2ESWTR, Stage 2 field visits data and monthly operating EPA data audits. 
 
the development and 
 
continue through the 
 
DBPR, Radionuclides and GWR), especially 
 
reports data based on EPA Data Audits 2. Improved compliance by administration of this activity with life of the grant. Work 
 
laboratory data through improvements to existing data and new tracking and reporting 
 
PWSs through more timely 
 
entry activities including electronic reporting from requirements for documenting field visit actions by EPD to ensure 
 
laboratories and PWS monthly operating reports. significant deficiencies. 
 
compliance. 
 
2. Track Consumer Confidence Reports (CCR) as 2. Automate compliance determinations 3. Improved field visit data by 
 
assistance from the DNR Program Support Division. 
 
covered by this funding has expanded to accommodate new tracking and reporting 
 
required by Federal Regulations. 
 
as modules are activated in 
 
having all the field inspectors 
 
requirements based 
 
3. Maintain an automated sample schedule for PWS's SDWIS/State and modules completed enter the data directly into 
 
Safe Drinking Water Act monitoring requirements as that are developed under the 
 
SDWIS/State after implementing 
 
recommended by EPA Region 4. 
 
programming contracts. 
 
the web based SDWIS/State 
 
4. Upgrade to the web-based version of SDWIS/State 3. Tracking of PWS compliance with the software. Associates in the 
 
on new federal and state drinking water regulations. EPD to upgrade to 3.1. 
 
for use by the District offices and develop and train CCR. 
 
District/Regional offices trained 
 
District associates in the use of the drinking water information management system, including Lab-toState reporting. 
 
4. Improve field visit data in 
 
in the use of SDWIS/State and 
 
SDWIS/State as the information 
 
are entering data. 
 
management system is made available 4. Improved compliance 
 
5. Issue contracts as needed for improving the 
 
in the District offices. 
 
determinations based on new 
 
drinking water information management system, 
 
5. At the completion of each program MOR reporting compliance 
 
linking other Division information systems to new web- module developed under programming module. 
 
based SDWIS/State and continue improving the 
 
contracts, implement the module. 
 
5. Improved data quality based 
 
Drinking Water Programs data flow and data quality. 6. The modules will include MOR data on electronic reporting of outside 
 
6. Work to implement 100% implementation of 
 
extraction, MOR compliance 
 
laboratory data. 
 
SDWIS/State 3.1, including monitoring schedules and determinations, laboratory certification 6. Improved field visit data 
 
compliance determinations. 
 
database, radionuclide database link to reporting based on SDWIS/State 
 
SDWIS/State, sanitary survey 
 
and the electronic sanitary 
 
automation using PDA's, electronic survey project module. 
 
reporting by outside laboratories and 7. New version of SDWIS/State 
 
data exchange system, linking to EPD data system, etc. 7. With assistance from an EPA contractor, continue the upgrade and 
 
operational and accessible by the EPD District offices. 
 
migration of data into the SDWIS/State 
 
web release 3.1, implement the data system and Drinking Water Watch and Lab-to-state reporting modules. 
 
26 
 
 Object Class Categories: EPD Organizational Number: EPD Project Number: GEFA Account Form Date or Revision Date: 
 
Source Water Assessment 10% (DWSRF 2021) 
 
Personnel Services: Geologist 3 
 
Work Plan Designator 
Goals 1,2,5-9 
 
Program/Unit W PB-DW 
 
Number in Position Class 
1 
 
Average 
 
W ork 
 
Annual 
 
Years 
 
Position Cost 
 
97,758 1.00 
 
Total Cost 97,758 
 
Equipment: Misc. Equipment 
 
Personnel Services Category Totals: 
 
97,758 
 
Description Misc. Lab and Field Equipment 
 
Work Plan Designator Goal 1,3,5 
 
Program/ Total Cost 
 
Unit 
 
WPB DW 
 
5,000 
 
Supplies: List by groups, as appropriate: 
Misc. Office and Field 
 
Description Office and Field Supplies 
 
Equipment Totals: 
 
5,000 
 
Work Plan Designator 
Goals 1-9 
 
Program/ Total Cost Unit 
2,500 
 
Contractual: 
 
Description 
 
Supplies Total: 
 
2,500 
 
Work Plan Program/ Total Cost Designator Unit 
 
Percent Total of Set-aside 0.41% 
 
Contractual Total: Total Cost 
 
105,258 
 
27 
 
 Set-Aside Activity 
Source Water Assessment 
 
TABLE 1 10 Percent Set-Aside - Assistance to Programs (FFY2021-$2,592,400) 
 
Funding($, %) Goals and Objectives 
 
Outputs/Deliverables 
 
Evaluating Success 
 
Agency Responsibilities 
 
Schedule 
 
1. Oversee the implementation of Georgia's EPA- 1. Continue implementation of EPA- 1. Continued implementation of EPD, Watershed Protection All activities are 
 
$105,258 approved Source Water Assessment Program/Plan approved SWAP. 
 
GA's EPA approved SWAP Branch (WPB) is the lead EPD ongoing and will 
 
0.41% 
of FFY 21 CAP 
Grant 
 
(SWAP). 
 
2. Delineate the surface water intake implementation plan. 
 
Branch in the development and continue through the 
 
2. Increase public water system and local government drainage areas of new sources of water 2. Continuation of chemical implementation of Georgia's lioff the grant. 
 
awareness of the need for the protection of drinking supply when they are approved and monitoring reform based on SWAP. Coordinate source water 
 
water sources. Local government is vital to the 
 
placed in operation. 
 
SWAP using the waiver 
 
activities with other branches of 
 
implementation of any source water protection plan. 3. Use results of SWAP in addition to program. 
 
EPD as well as other 
 
3. Develop/update GIS coverages required by 
 
the waiver program to support chemical 3.Developing and implementing stakeholders. Implement waiver 
 
Georgia's SWAP. 
 
monitoring reform but not fund routine source water protection creates program and ground water under 
 
4. Provide GIS support to other important activities of monitoring covered under EPA's 
 
an increase in PWS and local the direct influence of surface 
 
the Public Water System Supervision Program 
 
standard monitoring framework. 
 
government awareness of 
 
water determinations. 
 
(PWSS). 
 
4. As needed, provide technical 
 
source water protection issues Implement WHP Program, GIS 
 
5. Implement the new SWAP requirement under the assistance to public water systems and need for protecting sources coverages, coordinate on all 
 
new surface water treatment regulations. 
 
operators and local government officials of water supply. 
 
ground water / source water 
 
6. Perform SWAPs on new sources of water supply about the importance of implementing 4. Public water systems, 
 
activities, and identify sources of 
 
and update as needed when permits to operate a protection of source water. 
 
especially large surface water ground water contamination 
 
public water system come up for renewal. 
 
5. Update GIS maps of drinking water systems initiate and/or enhance impacting PWSs. Use the HUC 
 
7. Implement and meet the USEPA performance intake locations for use in notifying watershed (i.e. source water) 12 units to delineate the 
 
measures and goals in SWAP. 
 
downstream water systems of major protection. 
 
watershed above each surface 
 
8. Involve other EPD branches in implementing 
 
wastewater spills. 
 
5. Regular use of GIS coverages water intake. 
 
wellhead protection and SWAP. 
 
6. Report SWAP performance 
 
by EPD as part of source water 
 
9. Collaborate with other EPD branches to take 
 
measures to EPA. 
 
assessment and protection 
 
positive steps to manage potential sources of 
 
7. Make sure other EPD programs and activities. 
 
contaminants and prevent pollutants from reaching branches consider wellhead protection 6. Implement a mapping tool to 
 
sources of drinking water supply. 
 
plans and SWAPs when issuing 
 
efficiently notify downstream 
 
environmental permits. 
 
drinking water intakes of 
 
8. Help insure that fewer sources of wastewater spills. 
 
drinking water become contaminated as 7. Complete SWAP delineations 
 
a result of land use activities. 
 
for all proposed sources for 
 
CWS and NTNCWS and as 
 
permits to operate a public water 
 
system come up for renewal. 
 
8. Meet EPA performance 
 
measures in SWAP 
 
28 
 
 Object Class Categories: EPD Organizational Number: EPD Project Number: GEFA Account Form Date or Revision Date: 
 
Capacity Development 10% Water Conservation (DWSRF 2021) 
 
Personnel Services: Environmental Specialist 
 
Work Plan Designator 
Goals 1-5 
 
Program/Unit WPB DW 
 
Number in Position Class 
1 
 
Average 
 
W ork 
 
Annual 
 
Years 
 
Position Cost 
 
68,616 1.00 
 
Total Cost 68,616 
 
Equipment: Office Equipment/Repair 
 
Personnel Services Category Totals: 
 
68,616 
 
Description Misc. Office Equipment/Repair 
 
Work Plan Designator Goals 1-5 
 
Program/ Total Cost 
 
Unit 
 
WPB-DW 
 
2,000 
 
Supplies: List by groups, as appropriate: Office Supplies 
 
Description Misc. Office Supplies 
 
Contractual: 
 
Description 
 
Equipment Totals: 
 
2,000 
 
Work Plan Designator Goal 1-5 
 
Program/ Total Cost 
 
Unit 
 
WPB-DW 
 
2000 
 
Supplies Total: 
 
2,000 
 
Work Plan Program/ Total Cost Designator Unit 
 
Percent Total of Set-aside 0.28% 
 
Contractual Total: Total Cost 
 
0 72,616 
 
29 
 
 Set-Aside Activity 
Water Conservation andd WWatter 
Efficiency to Maintain Capacity 
 
TABLE 1 10 Percent Set-Aside - Assistance to Programs (FFY2021-$2,592,400) 
 
Funding($, %) Goals and Objectives 
 
Outputs/Deliverables 
 
Evaluating Success 
 
Agency Responsibilities 
 
Schedule 
 
$72,616 
0.28% of 
FFY21 CAP Grant 
 
In order to improve the ability of PWS's to meet the Through the effort of water conservation The ultimate measure of the 
 
requirements of the Federal Safe Drinking Water Act, and efficiency: 
 
success of this effort is the 
 
The Georgia Environmental Protection Division is the 
 
and to avoid water supply capacity problems, EPD 1. PWS's become more aware of the extent to which Georgia 
 
agency responsible for the work 
 
will: 
 
benefits of water conservation and implements water conservation to be completed. 
 
1. Implement new strategies and/or enhance existing efficiency in the long-term management and efficiency in helping to 
 
strategies to assist all PWS's, especially all 
 
of their water supply, infrastructure and extend the sustainability and 
 
community water systems (CWS) and non-transient financial capacity; 
 
reliability of Georgia's public 
 
non-community water systems (NTNCWS), in 
 
2. PWS's implement water conservation water systems. In concert with 
 
implementing water conservation and efficiency 
 
and efficiency programs; 
 
the implementation of the 
 
measures to help them reliably provide safe drinking 3. Water conservation and efficiency Statewide Water Plan, water 
 
water and prolong the capacity of their sources of are linked with the implementation of conservation and efficiency 
 
water supply; 
 
the Statewide Water Plan resulting in a become part of the daily 
 
2. Implement new and enhance the implementation of sustainable, reliable, and safe supply of operation and maintenance of 
 
existing capacity development activities; 
 
water for all users of public water 
 
public water systems in Georgia 
 
3. Assist PWSs in the Development of water 
 
systems in Georgia; 
 
enhancing technical, managerial 
 
efficiency plans; 
 
4. Georgia develops and/or updates and financial capacity. 
 
4. Provide technical assistance (e.g., water audits, water conservation and efficiency 
 
leak detection, and rate structure systems to 
 
implementation plan(s), guidance 
 
conserve water and other training and outreach 
 
documents, and technical assistance 
 
programs, Implementation of drought monitoring, training programs; and 
 
development and implementation of incentive 
 
5. Public water systems attend training 
 
programs or public education programs, development and/or receive technical assistance in 
 
and implementation of ordinances or regulations to implementing water conservation and 
 
conserve water); and 5. Develop and distribute efficiency. 
 
information guides and materials. 
 
All activities are ongoing and will continue through the life of the grant. 
 
30 
 
 GEORGIA ENVIRONMENTAL FINANCE AUTHORITY DRINKING WATER STATE REVOLVING FUND 
Local Assistance and Other State Programs (15%) Intended Use Plan (IUP) and Workplan for FY 2021 CAP Grant 
Updated May 2021 The Safe Drinking Water Act (SDWA) Amendments of 1996 authorize states to provide funding for certain non-project activities, called Set-Asides, provided that the amount of that funding does not exceed certain ceilings. States are required to describe in their Intended Use Plans the amount of funds that they will use for these activities. A separate account must be set up to accept these funds. 
States may provide assistance, including technical and financial assistance, to public water systems as part of a capacity development strategy under Section 1420 (c) of the Act. States may also use the 15% setaside to support the establishment and implementation of wellhead protection programs. States may use up to 15% of the capitalization grant amount for these activities, provided not more than 10% of the capitalization grant amount is used for any one activity. EPA allows states the flexibility to describe in their set-aside workplans how the 1452(k) funds will be obligated and spent. 
Table 2 provides a summary of the activities to be funded under the FFY 2021 15% set-aside category. The State primacy agency, the Georgia Department of Natural Resources, Environmental Protection Division (EPD), is the agency responsible for the development and implementation of these set-aside activities as specified in the existing "Interagency Agreement for Establishment of Drinking Water State Revolving Fund Agreement for Provision of Operating Funds, Financial Services and Project Management Services" between the Georgia Environmental Finance Authority (GEFA) and EPD. 
EPD continues to work on implementing the approved Regional Water Plans. We propose to fund portions of this work under two activities under this set-aside in the areas of local assistance to small public water systems. The Capacity Development and Wellhead Protection activity goals and objectives are written similar to ensure that the overall plan has continuity, is cohesive and implementable. The Capacity Development portion of the set-aside will cover work related to small public water system technical capacity, including source water and infrastructure adequacy, and to assure the availability of high quality and reliable drinking water to the citizens of Georgia (water source and water capacity). The Wellhead Protection activity will address work involving groundwater supply assessments, yield, safety and other issues that impact wellhead protection plans for existing and potential sources of supply As allowed under Section 1452(k) of the SDWA, Georgia will set-aside $3,888,600 (15.0%) of the capitalization grant in order to accomplish the following activities in the work plan (Table 2). 
31 
 
 Object Class Categories: EPD Organizational Number: EPD Project Number: GEFA Account Form Date or Revision Date: 
 
Capacity Development 15% (DWSRF 2021) 
 
Personnel Services: 
Env Engineer Env Comp Specialist MG1: Env Health/Prot Comp & Lisc Tech Modeler Geologist Environmental Eng Modeler 
 
Work Plan Designator 
 
Program/Unit 
 
Goal 1,2,3,4,6,7 Dist. Office 
 
Goal 1,2,3,4 Goal 1,2,3,4 Goal 1,2,3,4 Goal 2,6,7 Goal 1,2,3,4 Goal 1,2,3,4,6 Goal 2,6,7 
 
Dist. Office WPB Dist. Office WPB Dist. Office WPB DW WPB 
 
Number in Position Average 
 
Work 
 
Class 
 
Annual 
 
Years 
 
Position Cost 
 
Total Cost 
 
5 
 
91,724 
 
1.00 
 
9 
 
66,120 
 
1.00 
 
1 
 
93,514 
 
1.00 
 
2 
 
66,347 
 
1.00 
 
2 
 
115,290 
 
1.00 
 
1 
 
93,087 
 
1.00 
 
2 
 
100,534 
 
1.00 
 
1 
 
111,920 
 
1.00 
 
Personnel Services Category Totals: 
 
458,622 595,082 
93,514 132,694 230,581 
93,087 201,069 111,920 1,916,569 
 
Equipment: 
 
Description 
 
Work Plan Program/ Total Cost 
 
Supplies: List by groups, as Description Laboratory to Maintain Primacy Supplies/Equipment/Rents/Utilities to 
maintain DW primacy portion of laboratory 
 
Equipment Totals: 
 
Work Plan Program/ Total Cost 
 
Goal 2,3,5 WPB 
 
325,807 
 
Contractual: GAWP - GWWI Contracts 
 
Description Operator Training One or more contracts for hydrologic studies 
and/or water resource assessment modeling 
 
Supplies Total: 
 
325,807 
 
Work Plan Goal 1,2,4 Goal 6,7 
 
Program/ Total Cost 
 
WPB 
 
270,000 
 
WPB 
 
50,000 
 
Percent Total of Set-aside 
 
9.88% 
 
Contractual Total: Total Cost 
 
320,000 2,562,376 
 
32 
 
 Set-Aside Activity 
Capacity Development Strategy Implementation 
 
Table 2 15 Percent Set-Aside - Local Assistance and Other State Programs (FFY21-$3,888,600) 
 
Funding($, %) Goals and Objectives 
 
Outputs/Deliverables 
 
Evaluating Success 
 
Agency Responsibilities Schedule 
 
1. Continue to improve the operation of public 1. Contract with the Georgia Water And Wastewater 1. Number of students attending EPD's Watershed Protection All activities are 
 
$2,562,376 water systems by enhancing the opportunities for Institute (GWWI) to provide an ongoing technical 
 
training courses. 
 
Branch (WPB) is responsible ongoing and will 
 
9.88% 
of FFY21 Cap 
Grant 
 
the training of water operators and water 
 
training program for water system operators and 2. Review the results of student for the development and continue through the 
 
laboratory analysts in Georgia and help operators laboratory analysts using an EPD approved 
 
and third party course 
 
administration of contracts. lliiffe of the grant. 
 
to acquire and maintain technical, managerial and curriculum. 
 
evaluations. 
 
WPB and EPD District offices Existing GWWI 
 
financial capacity. 
 
2. Annually provide operator and laboratory analyst's 3. Improved operator skills and are responsible for evaluating contract to be 
 
2. Through Goal 1, improve the technical, 
 
technical training to approximately 1,500 students abilities identified through data the success of the 
 
renewed for 12-month 
 
managerial and financial capacity of the public and/or 100 courses. 
 
collected through the operator contracts.EPD District offices period.Existing GRWA 
 
water system the operator works for and those 3. Complete sanitary surveys on schedule and 
 
training program and sanitary will perform sanitary surveys, contract will be 
 
they may provide assistance to. 
 
perform other field visits as necessary and notify surveys. 
 
field visits and provide 
 
renewed for a 12 
 
3. As part of the EPD's approved capacity 
 
systems of deficiencies. 
 
4. Number of public water 
 
technical assistance and month period. 
 
development plan, use sanitary surveys, 
 
4. Complete plan reviews with timely responses. systems attending workshops. plans and specifications 
 
inspections and other field visits to identify 
 
5. As needed, assist surface water systems in 
 
5. Review the results of 
 
reviews for groundwater 
 
improvements that need to be made technical, conducting CPE's (Comprehensive Performance workshop attendee evaluations. systems WPB will perform 
 
managerial and financial capacity of the water Evaluations). 
 
6. Number of public water 
 
sanitary surveys, field visits; 
 
system based on IESWTR, LT1ESWTR, Stage 1 6. Conduct approximately 550 sanitary surveys 
 
systems showing improved CPE's and provide technical 
 
DBPR, LT2ESWTR, Stage 2 DBPR, radiological, annually and increase the frequency of the 
 
compliance with IESWTR, assistance for surface water 
 
new lead & copper rule and Groundwater Rule. inspections based on new EPA regulations. 
 
LT1ESWTR, Stage 1 DBPR, systems. 
 
4. As part of the approved capacity development 7. Extend contract with the Georgia Rural Water LT2ESWTR, Stage 2 DBPR, 
 
plan, plan review and EPD's "Minimum Standards Association to continue the groundwater PWS training radionuclides and other existing 
 
for Public Water Systems" help systems improve and technical assistance. 
 
regulations. 
 
their technical, managerial and financial capacity 8. Continue to update the surface water system MOR 
 
Stage 1 DBPR, Stage 2 DBPR, Radiological and project to link with the SDWIS/State data system for 
 
GWR. 
 
compliance and train the operators in the use of the 
 
5 Continued operation of the primacy Pubic Water modified system. 
 
System Supervision grant portion of the EPD 9. PWSS portion of EPD laboratory placed in full 
 
laboratory. This cost is distributed between all operation and available to assist in small public water 
 
users of the laboratory throughout EPD. 
 
system evaluation and technical assistance. 
 
6. Continue to improve water use data and 
 
10. Continue comprehensive data and information 
 
incorporate the data in revised models to support management systems including instream flow and 
 
safe and reliable drinking water supplies. 
 
source water quality data for protecting public water 
 
7. Continue to refine water quantity models and supply sources in Georgia. 
 
conduct hydrologic studies to estimate the 
 
11. Continue to operate, maintain, and collect flow 
 
capacities of Georgia's surface and groundwater and quality data from surface waters for evaluating 
 
for water supply. 
 
impact to and protecting public water supply sources 
 
in Georgia. 
 
33 
 
 Object Class Categories: EPD Organizational Number: EPD Project Number: GEFA Account Form Date or Revision Date: 
 
Wellhead Protection Implementation (DWSRF 2021) 
 
Personnel Services: 
Geologist 3 Env Engineer Comp & Lisc Tech MG2:Env Health/Prot MG1:Env Health/Prot MG1:Env Health/Prot 
 
Work Plan Designator 
Goal 1,2,3,5 Goal 1,2,4,5 Goal 3,4,5,6 Goal 2,5,8,10 Goal 2,5,8,10 Goal 2,5,8,10 
 
Program/Unit 
WPB Dist. Office Dist. Office WPB WPB WPB 
 
Number in Average 
 
Work 
 
Total Cost 
 
Position 
 
Annual 
 
Years 
 
Class 
 
Position Cost 
 
4 
 
97,087 
 
1.00 
 
388,347 
 
1 
 
104,808 
 
1.00 
 
104,808 
 
1 
 
64,894 
 
1.00 
 
64,894 
 
1 
 
180,549 
 
1.00 
 
180,549 
 
1 
 
124,137 
 
1.00 
 
124,137 
 
1 
 
107,265 
 
1.00 
 
107,265 
 
Personnel Services Category Totals: 
 
970,000 
 
Equipment: 
Primacy Laboratory to maintain primacy 
Miscellaneous Equipment 
 
Description 
Equipment/Rents/Utilities to maintain DW primacy portion of lab due to increased base cost for the new facility Field Equipment 
 
Work Plan Designator 
Goal 3,7,8,9 Goal 3,7,8,9 
 
Program/ Total Cost Unit 
226,928 
 
WPB WPB 
 
4,296 
 
Supplies: List by groups, as appropriate: 
Supplies 
 
Equipment Totals: 
 
231,224 
 
Description 
Filters, Supplies for Testing GW under direct influence of SW 
 
Work Plan Designator 
Goal 3,7,8,9 
 
Program/ Total Cost Unit 
 
WPB 
 
5,000 
 
Contractual: GRWA 
 
Description PWS Technical Assistance 
 
Supplies Total: 
 
5,000 
 
Work Plan Designator Goals 1-9 
 
Program/ Total Cost 
 
Unit 
 
WPB 
 
120,000 
 
Percent Total of Set-aside 5.12% 
 
Contractual Total: Total Cost 
 
120,000 1,326,224 
 
34 
 
 Set-Aside Activity 
Wellhead Protection Implementation 
 
Table 2 
Funding ($, %) 
$1,327,274 
5.12% of 
FFY21 CAP Grant 
 
15 Percent Set-Aside - Local Assistance and Other State Programs (FFY21-$3,888,600) 
 
Goals and Objectives 
 
Outputs/Deliverables 
 
Evaluating Success 
 
Agency Responsibilities Schedule 
 
1. As part of SWAP, continue the development of 1. Complete WHPPs for new municipal PWSs and wellhead protection plans (WHPPs) for all GA update existing WHPPs when permits are up for 
 
1. PWS sources are better protected EPD's Watershed Protection All Activities are 
 
through wellhead protection activities, Branch (WPB) is the lead 
 
ongoing and will 
 
municipal public water systems (PWSs). 
 
renewal. 
 
including site remediation and/or 
 
Branch in the development continue through the 
 
2. Continue the implementation of a program to 2. Validate submitted GPS data during construction replacement of contaminated wells. and implementation of GA's life of the grant. 
 
delineate the source water assessment areas and inspections and other field visits. 
 
2. Public drinking water aquifers are SWAP. Coordinate source 
 
make the susceptibility determinations for privately 3.Development of wellhead protection plans 
 
better protected through the 
 
water activities with other 
 
owned public water systems. Approximately 300 (susceptibility determinations) including GIS coverages investigation of existing or potential Branches of EPD and other 
 
per year. 
 
for privately-owned public water system sources, 
 
ground water contamination. 
 
stakeholders. Implement waiver 
 
3. Assist PWSs by identifying and investigating including source locations and locations of potential 3. Continuation of EPA-approved program and ground water 
 
areas of ground water contamination affecting or sources of contamination. 
 
chemical monitoring reform through under the direct influence of 
 
potentially affecting PWSs. 
 
4. Geologic and hydro-geologic investigations of areas of the waiver program for ground water surface water 
 
4. As part of construction inspections for new 
 
existing or potential ground water contamination. 
 
systems. 
 
determinations.Implement 
 
sources and facilities, conduct field visits, verify 5. Update wellhead protection plans when PWS's permit 4. No new GW source of water supply WHP Program, update GIS 
 
submitted GPS data, wellhead integrity and 
 
to operate a public water system comes due for renewal. will be constructed within a 
 
coverages, coordinate on all 
 
potential pollution sources within the inner 
 
6. All new municipal GW sources require approval of an contaminated area. 
 
ground water source water 
 
management zone of wellhead protection areas. initial wellhead protection evaluation prior to starting 5. Accurate well location data for activities, and identify sources 
 
5. Assist PWS in new survey and/or assessment construction. 
 
SDWIS inventory required by EPA. of ground water contamination 
 
requirements that may be related to new 
 
7. Other EPD programs and branches consider wellhead 6. PWSS portion of EPD laboratory impacting PWSs. 
 
regulations. 
 
protection plans and SWAPs when issuing 
 
placed in full operation and available EPD District offices will take 
 
6. Validate water facility location data. 
 
environmental permits. 
 
to assist in small public water system more responsibility in validating 
 
7. Involve other EPD branches in implementing 8. Fewer sources of drinking water become 
 
evaluation and technical assistance. GPS facilities location during 
 
wellhead protection and SWAPs. 
 
contaminated as a result of land use activities. 
 
7. Any groundwater source of water construction inspections and 
 
8. Work with other EPD branches to take positive 9. PWSS portion of EPD laboratory placed in full 
 
supply found under the direct influence other field visits and evaluate 
 
steps to manage potential sources of contaminants operation and available to assist in small public water of surface water corrects the problem well head integrity and potential 
 
and prevent pollutants from reaching sources of system source water evaluations and groundwater 
 
or installs treatment. 
 
pollution sources within the 
 
drinking water supply. 
 
contamination investigations impacting small public 
 
inner management zone. 
 
9. Continued operation of the primacy PWSS 
 
water systems. 
 
portion of the EPD laboratory. This increased cost 10. Groundwater sources that are suspected of being 
 
is distributed between all users of the laboratory under the direct influence of surface water are evaluated 
 
throughout the Division. 
 
as needed. 
 
10. Continue to refine water quantity models and 
 
conduct hydrologic studies to estimate the 
 
capacities of Georgia's groundwater for water 
 
supply. 
 
35 
 
 Attachment 7 - 2021 DWSRF Affordability Criteria 
 
Drinking Water State Revolving Fund Affordability Criteria 
 
GEFA's affordability criteria uses data on median household income, unemployment rate, and population trends from the U.S. Census Bureau's American Community Survey. The borrower's data is categorized in percentiles. GEFA will award principal forgiveness to Georgia's most disadvantaged communities. 
1. Median Household Income (MHI) 
 
State Percentiles MHI 
 
25th Percentile (4 points) 
 
50th Percentile (3 points) 
 
75th Percentile 100th Percentile 
 
(2 points) 
 
(1 point) 
 
$32,699 
 
$42,444 
 
$54,555 $54,556 and higher 
 
2. Unemployment Percent 
 
State Percentiles 
Unemployment Percent 
 
25th Percentile (1 point) 
 
50th Percentile 75th Percentile 100th Percentile 
 
(2 points) 
 
(3 points) 
 
(4 points) 
 
2.0% 
 
3.1% 
 
4.6% 4.7% and higher 
 
3. Percentage Not in Labor Force 
 
State Percentiles 
Percentage Not in Labor Force 
 
25th Percentile (1 point) 
 
50th Percentile (2 points) 
 
75th Percentile 100th Percentile 
 
(3 points) 
 
(4 points) 
 
36.9% 
 
43.5% 
 
50.3% 50.4% and higher 
 
4. Poverty Rate 
 
State Percentiles Poverty Rate 
 
25th Percentile (1 point) 
 
50th Percentile (2 points) 
 
75th Percentile 100th Percentile 
 
(3 points) 
 
(4 points) 
 
12.3% 
 
20.0% 
 
27.4% 27.5% and higher 
 
36 
 
 5. Percentage on Social Security 
 
State Percentiles 
Percentage on Social Security 6. Percentage on SSI 
 
25th Percentile (1 point) 
29.2% 
 
50th Percentile (2 points) 
 
75th Percentile 100th Percentile 
 
(3 points) 
 
(4 points) 
 
36.1% 
 
43.3% 43.4% and higher 
 
State Percentiles Percentage on SSI 
 
25th Percentile (1 point) 
3.9% 
 
50th Percentile (2 points) 
6.8% 
 
75th Percentile 100th Percentile 
 
(3 points) 
 
(4 points) 
 
10.4% 10.5% and higher 
 
7. Percentage with Cash Public Assistance 
 
State Percentiles 
Percentage with Cash Public Assistance 
 
25th Percentile (1 point) 
 
50th Percentile 75th Percentile 100th Percentile 
 
(2 points) 
 
(3 points) 
 
(4 points) 
 
0.2% 
 
1.3% 
 
2.3% 2.4% and higher 
 
8. Percentage with SNAP 
 
State Percentiles 25th Percentile (1 point) 
 
Percentage with SNAP 
 
10.8% 
 
50th Percentile (2 points) 
18.8% 
 
75th Percentile 100th Percentile 
 
(3 points) 
 
(4 points) 
 
25.2% 25.3% and higher 
 
9. Age Dependency Ratio 
 
State Percentiles 
Age Dependency Ratio 
 
25th Percentile 50th Percentile 
 
(1 point) 
 
(2 points) 
 
75th Percentile 100th Percentile 
 
(3 points) 
 
(4 points) 
 
58.6 
 
67.4 
 
77.3 77.4 and higher 
 
10. Population Trend The following will be the categories used for determining scoring for change in population from 2011 to 2019. 
 Positive growth or no growth (1 point)  Between -0.01% to -1% (2 points)  Between -1.01% and -2% (3 points)  Greater than -2% (4 points) 
37 
 
 The following list shows the affordability score and potential principal forgiveness percentage for the FY2021 grant year: 
 Score of 37 will receive 55 percent, not to exceed $1,300,000  Score of 32 - 36 will receive 50 percent, not to exceed $1,100,000  Score of 30 - 31 will receive 45 percent, not to exceed $900,000  Score of 27 - 29 will receive 40 percent, not to exceed $700,000  Score of 26 or less will not receive principal forgiveness GEFA will re-evaluate the principal forgiveness allocation after the fourth board cycle following the 2021 capitalization grant award to identify communities who will not move forward with their project (upon written notification to GEFA). During this PF reallocation process, GEFA will move down the comprehensive list (based on the project score) using the PF methodology that is posted in the 2021 IUP. The following methodology will be used:  GEFA will go down the DWSRF 2021 comprehensive list and award PF to those with an 
affordability score of 27 or higher: and/or  GEFA will go down the CWSRF 2021 comprehensive list and award PF to those with an 
affordability score of 30 or higher. If there is PF remaining after GEFA has reached the bottom of the list, GEFA could amend the current language in the IUP and use a lower affordability score. 
38 
 
 Attachment 8 - Ranking Criteria for DWSRF Projects Georgia Environmental Finance Authority 2021 DWSRF Call for Projects Project Ranking Criteria 
 
Projects will be rated in three categories to determine eligibility and selection for funding through the Drinking Water State Revolving Fund (DWSRF) Program. 
Drinking Water SRF 
 
Drinking Water State Revolving Fund Scoring System (maximum 100 points) 1. Readiness to proceed 2. Public health compliance benefit 3. Project benefits a. Energy conservation/production and efficiency benefit b. Water efficiency benefit 4. Other applicant or project attributes 
DWSRF Scoring System  Detailed Breakdown 
1. Readiness To Proceed 
a. State Environmental Review Process (SERP) complete (if selected you must attach the NONSI or CE) 
 
40 pts 
 
2. Public Health Compliance Benefits Check All That Apply a. Project is needed to fully address deficiencies documented in an enforcement action (e.g. Notice of Violation, Consent Order, Administrative Order, etc.) (Order # ________) b. Project will bring public water system into immediate compliance with Safe Drinking Water Act c. Project involves system and/or facility upgrades to create redundancy and enhance system reliability 
 
40 pts 
20 pts 20 pts 
 
3. Project Benefits Check All That Apply Within Each Category 
 
Energy Conservation/Production and Efficiency Benefit 
 
Check All Below That Apply 
 
a. Project designed to reduce energy consumption by the utility via the 
 
2 pts 
 
replacement of pumps and/or motors, blowers, SCADA equipment, 
 
lighting upgrades or other energy savings products or processes. 
 
b. Energy management planning projects, including energy 
 
2 pts 
 
assessments, energy audits, optimization studies and other projects 
 
designed to determine high use energy areas. 
 
39 
 
 Water Efficiency Benefit 
 
Check All Below That Apply 
 
a. Project to replace leaking water lines in an attempt to identify and 
 
4 pts 
 
reduce system-wide real water loss. Project may include the 
 
purchase of leak detection equipment. 
 
b. Project to replace old water meters and install a more efficient 
 
2 pts 
 
method [such as an automatic meter reading (AMR) system or an 
 
advanced metering infrastructure (AMI) system] to read, record and 
 
track water usage and reduce system-wide apparent water losses. 
 
c. Project to create a water fixture or irrigation system retrofit or rebate 
 
2 pts 
 
program. 
 
4. Other Applicant or Project Attributes 
 
Check Any Below That Apply 
 
a. Project benefits more than one system or community, e.g., 
 
5 pts 
 
interconnection of two or more public water systems. 
 
b. Applicant maintains a central asset inventory (with descriptive 
 
3 pts 
 
information about assets such as age, size, construction materials, 
 
location, installation date, condition, and remaining useful life) and a 
 
complete water system map. 
 
* GEFA reserves the right to verify any information submitted within the pre-application. 
 
40 
 
 Attachment 9 - Public Meeting Summary IUP 
Georgia Environmental Finance Authority IUP Meeting Minutes Atlanta, Georgia 30303 
Tuesday, June 15, 2021 10:00 a.m. 
Call to Order The meeting will be held on Tuesday, June 15, 2021, at 10:00 a.m. via conference call. In accordance with safety precautions regarding COVID-19 virus and in keeping with the Governor's Declaration of a Public Health State of Emergency, members of the pubic who want to participate in the public meeting must do so via conference call. 
GEFA staff present at the meeting were: Tracy Williams 
Public participants present at the meeting were: None 
Tracy Williams welcomed everyone and introduced the staff in attendance. After discussing the purpose for the public meeting was to present and receive comments on the drafted 2021 Drinking Water and Drinking Water State Revolving Funds IUP, she opened the floor for comments. 
Comments from Speakers No other comments were made. The meeting was adjourned at 11:00 a.m. 
41 
 
 Attachment 10 - Loan Program Policies January 2021 
 
GEORGIA ENVIRONMENTAL FINANCE AUTHORITY 
 
1. 
 
PURPOSE 
 
The Georgia Environmental Finance Authority (GEFA) provides affordable financing to local governments throughout Georgia to develop environmental infrastructure that protects public health, preserves natural resources, and promotes economic development. GEFA sustains this mission through effective, efficient, and prudent management of these public resources. 
 
2. 
 
APPLICABILITY 
 
Loan program policies govern the use of funds managed within the: 
 
 Georgia Fund,  Georgia Reservoir Fund,  Clean Water State Revolving Fund (CWSRF), and  Drinking Water State Revolving Fund (DWSRF). 
 
3. 
 
SUB-PROGRAMS 
 
Georgia Fund 
 
 Emergency Loan Program  The GEFA executive director has the authority to approve emergency loans to assist communities with financing improvements that are necessary to eliminate actual or potential public health hazards. Emergency loans are ratified at the next scheduled board meeting. The applicant must determine and document the emergency nature of the project and apply O.C.G.A. Section 36-91-22(e), which outlines the local government actions needed to classify a project as an emergency. Relevant terms are addressed in these policies. 
 
4. 
 
ELIGIBLE RECIPIENTS 
 
Type of Entity 
 
 GEFA can provide financing to the following entities: 
o Local governments and instrumentalities of the state; o Municipal corporations; o County or local water, sewer, or sanitary districts; 
 
42 
 
 o State or local authorities, boards, or political subdivisions created by the General Assembly or pursuant to the Constitution and laws of the state; and 
o Nongovernmental entities with an approved land conservation project. 
 
Minimum Recipient Qualifications 
 
 Qualified Local Government  Municipalities and counties must be certified as Qualified Local Governments by the Georgia Department of Community Affairs (DCA). 
 Service Delivery Strategy  Municipalities, counties, and authorities must be included in a DCA-verified Service Delivery Strategy. The project for which an applicant seeks financing must be consistent with the verified strategy. 
 State Audit Requirements  Municipalities, counties, authorities, and nongovernmental entities must be in compliance with state audit requirements. 
 Metro Plan Compliance  Municipalities, counties, and authorities located within the Metropolitan North Georgia Water Planning District (MNGWPD) can receive GEFA financing if the director of the Georgia Environmental Protection Division (EPD) has certified that the applicant/recipient is in compliance or is making a good faith effort to comply with all MNGWPD plans and/or enforcement measures. 
 Updated Building Codes  Municipalities and counties must adopt and enforce O.C.G.A. Section 8-2-3 relating to the installation of high-efficiency plumbing fixtures. 
 Current Loan Agreements  A current GEFA borrower can receive additional GEFA financing only if the borrower is in compliance with the existing credit documents, e.g., loan agreement and promissory note. 
 Nongovernmental Entities  Nongovernmental entities must be a nonprofit organization with a primary purpose of permanently protecting or conserving land and natural resources, as evidenced by their organizational documents. 
 
5. 
 
ELIGIBLE PROJECTS 
 
GEFA's loan programs provide financing for a broad range of water, wastewater, sewer, stormwater, nonpoint source pollution prevention, land conservation, and solid waste projects. Specific project eligibility varies by program. The types of projects eligible for financing in each program and the minimum project requirements are listed below. 
 
 Georgia Fund  May finance projects consistent with O.C.G.A. Section 50-23-4 to: 
o Supply, distribute, and treat water o Collect, treat, or dispose of sewage or solid waste 
 
 Georgia Reservoir Fund  May finance projects consistent with O.C.G.A. Section 50-23-28 to: 
o Expand the capacity of existing reservoirs or other sources for water supply o Establish new reservoirs or other sources for water supply 
 
 CWSRF  May finance projects consistent with the federal Clean Water Act to: 
o Construct municipal wastewater facilities o Control nonpoint source pollution, including projects that permanently protect conservation land 
 
43 
 
  DWSRF  May finance projects consistent with the federal Safe Drinking Water Act to: 
o Install or upgrade facilities to improve drinking water quality or pressure, protect water sources, and provide storage create or consolidate water systems 
 
Minimum Project Eligibility Requirements Under the Federal State Revolving Fund Programs 
 
In addition to meeting the other applicable eligibility requirements outlined in these policies, projects receiving funding through the CWSRF or DWSRF must comply with applicable federal statutes, rules, and regulations. These requirements include, but are not limited to: 
 
 Each project must be included in an Intended Use Plan submitted by GEFA to the U.S. Environmental Protection Agency (EPA). 
 Each project must successfully complete the State Environmental Review Process, which is administered by EPD, and receive a Notice of No Significant Impact or Categorical Exclusion. 
 Each recipient must certify compliance with Title VI of the Civil Rights Act by completing EPA Form 4700-4.  Each DWSRF project and CWSRF treatment works project must comply with applicable federal procurement and 
labor rules, including Disadvantaged Business Enterprise utilization, Equal Employment Opportunity, the Davis Bacon Act, and requirements that may arise in future federal law or future federal assistance agreements.  Each DWSRF project and CWSRF treatment works project must incorporate iron and steel products produced in the U.S. ("American Iron and Steel Requirement").  Each CWSRF treatment works project must certify that a Fiscal Sustainability Plan has been developed and is being implemented for the project or certify that a Fiscal Sustainability Plan will be developed and implemented for the project. 
 
6. 
 
ELIGIBLE ACTIVITIES 
 
Recipients of GEFA financing may use GEFA funds for the following activities related to an eligible project: 
 
 Feasibility analysis  Project design  Construction, grading, site preparation, dredging, etc.  Land and easement acquisition needed for project implementation  Stream or wetland mitigation  Administrative and/or legal services  System purchase 
 
Engineering, Legal, and Administrative Costs  GEFA funds may be utilized for engineering, design, administrative costs, facilities planning, and land acquisition provided that these costs are necessary for the completion of the project defined by the scope of work and identified in the budget of the approved loan agreement. Such eligible costs incurred prior to the execution of a loan agreement are eligible for reimbursement with a GEFA loan. GEFA also offers engineering-only loans for these preliminary soft costs needed to facilitate the construction of an eligible project. GEFA will review and apply a standard to all project budgets. 
 
Purchase of Existing Systems  An application that proposes to purchase an existing water and/or wastewater system must be accompanied by a certification of the value of the system by a registered professional engineer. GEFA will require other information as needed to document the content and costs of the purchase. 
44 
 
 GEFA's loan agreement provides additional information about activities for which a borrower may or may not use GEFA funds. 
 
7. 
 
PROGRAM MAXIMUMS 
 
Loans available from GEFA are subject to the following maximums. 
 
Georgia Fund 
 
 The maximum loan amount is $3,000,000 per borrower per year.  The maximum loan amount for emergency loans is $500,000 per project.  The standard amortization period is 20 years or the useful life of the project. 
 
Georgia Reservoir Fund 
 
 The maximum loan amount will be determined based on availability of funds.  The length of the amortization period shall be determined on a case-by-case basis consistent with O.C.G.A. 
Section 50-23-28.  The maximum amortization period is 40 years. 
 
CWSRF 
 
 The maximum loan amount is $25,000,000 per borrower per year.  The maximum loan amount for engineering loans is $2,000,000 per project.  The maximum amortization period is 30 years not to exceed the useful life of the project. 
 
DWSRF 
 
 The maximum loan amount is $25,000,000 per borrower per year.  The maximum loan amount for engineering loans is $2,000,000 per project.  The maximum amortization period is 40 years for communities designated as "disadvantaged" based on GEFA's 
affordability criteria not to exceed the useful life of the project. 
 
8. 
 
INTEREST RATES 
 
GEFA indexes its interest rates to the true interest cost (to the nearest hundredth of one percent) received by the state on its 20-year, competitively-bid, general obligation bond issue. This is GEFA's benchmark rate; however, the interest rate adjustments described below may apply. 
 
Federal Loans  For CWSRF and DWSRF loans, GEFA will charge an interest rate that is 50 basis points (0.50 percent) below GEFA's benchmark rate. 
 
45 
 
 Interest Rate Concessions  GEFA provides the following interest rate concessions for eligible borrowers or eligible projects under the specified funding programs. Interest rate concessions shall not be used in combination. 
 
 WaterFirst  Communities that receive the WaterFirst designation may receive an interest rate 100 basis points (1 percent) below the prevailing interest rate for the program through which it is to be funded. 
 PlanFirst  Communities designated as a PlanFirst Community may receive an interest rate 50 basis points (0.50 percent) below the prevailing interest rate for the program through which it is to be funded. 
 Conservation  Communities seeking financing for eligible energy, land, or water conservation projects may receive an interest rate 100 basis points (1 percent) below the prevailing interest rate for the program through which it is to be funded as outlined in GEFA's Water Conservation Financing guidance. 
 Special Loan Terms  The GEFA board may approve loans with different interest rates or specialized terms, e.g., principal forgiveness, consistent with specific program objectives and/or relevant federal requirements. 
 
9. 
 
FEES 
 
GEFA may assess certain fees to loan recipients. 
 
Origination Fee  GEFA will charge an origination fee of 1 percent pursuant to the loan agreement. 
 
Loan Servicing Fees  Under specific circumstances, GEFA may charge the following loan servicing fees: 
 
 GEFA may assess a non-sufficient funds fee (NSF) if the borrower fails to have sufficient funds in its designated bank account at the time the payment is drafted. The payment due may be for any type of payment due under the credit documents including origination fees, construction interest, monthly principal and interest payments, or any other fee. GEFA will charge the NSF fee to the borrower for each loan for which payment is due and not available. 
 GEFA may assess a late fee for any payment not received by the 15th of the month in which the payment is due. This will be in addition to any NSF fees assessed in the same month. 
 GEFA may assess a monthly Loan Continuation Fee in the event the borrower fails to draw funds within six months (180 days) of loan agreement execution. 
 
For details about the fees, refer to the Loan Servicing Fee Schedule available at gefa.georgia.gov/loan-documents. 
 
10. LOAN SECURITY 
 
GEFA requires a revenue and full-faith-and-credit pledge of each borrower and any other special loan condition GEFA may deem necessary, e.g., debt service reserve, etc. 
 
For borrowers, such as authorities, that lack taxation powers or lack adequate taxation capacity to provide a full-faith-andcredit pledge equal to the value of the loan, the following requirements will need to be fulfilled prior to execution of loan: 
 
 A debt service coverage ratio of 1.25x or greater  A debt service coverage ratio of less than 1.25x, but equal to or greater than 1.05x  a reserve in the amount of 
one year's debt service on the proposed debt must be deposited into a separate bank account that names GEFA as the beneficiary, prohibits the borrower from withdrawing funds without GEFA's written consent, and requires the bank to submit quarterly statements of activity and account balance information directly to GEFA.  A debt service coverage ratio of less than 1.05x  Additional security through an agreement with the authority's local government that is willing and able to provide a full-faith-and-credit pledge to back the loan. 
 
46 
 
  For nongovernmental entity borrowers, a deed to secure debt will be required. 
11. RELEASE OF GEFA FUNDS DURING CONSTRUCTION 
GEFA monitors construction and endorses GEFA payments in accordance with the loan agreement. To allow monitoring, the loan or grant recipient must notify GEFA prior to commencing construction. 
12. LOAN EXECUTION DEADLINE 
If the loan agreement is not fully executed within six months (180 days) from the date of board approval, GEFA reserves the right to terminate its commitment. 
13. LOAN RESTRUCTURING 
Loan restructuring is the changing of terms and/or conditions of an existing loan. The range of restructuring options may include adjusting the interest rate of a loan, changing the amortization period of a loan, or changing the repayment schedule to adjust allocation between interest and principal. GEFA will consider a borrower's request to restructure its existing GEFA loan(s) on a case-by-case basis if the borrower is experiencing financial hardship. In evaluating a restructuring request, GEFA will consider at a minimum the following indicators of financial hardship: 
 The borrower's debt service coverage ratio history.  The type and extent of efforts undertaken by the borrower to improve its financial condition, including enhancing 
revenues from rate increases or raising of ad valorem taxes and/or reducing costs.  Emergency or exigent circumstances beyond the control of the borrower that impose a long-term and severe 
financial hardship. 
Under no circumstances will loan principal be forgiven. 
14. LOAN REFINANCING 
Loan refinancing uses loan funds to pay off an existing debt obligation, thereby satisfying the terms of the existing debt agreement and cancelling the existing obligation. GEFA will consider requests to refinance existing GEFA debt on a caseby-case basis if one of the following conditions is met: 
 The community is requesting a loan from GEFA to finance an eligible, time-sensitive, and critical project, but needs to consolidate existing GEFA debt into the new loan to afford the new project. 
 The community has an engineering loan it would like to refinance with the proceeds of a construction loan from GEFA, thereby combining the engineering loan and the construction loan into one loan. 
15. CREDIT ANALYSIS 
GEFA requires a minimum debt service coverage of 1.05 times in the first year of repayment and each subsequent year of the outstanding GEFA debt. 
47